masterlist nombor siri sistem pengurusan...
TRANSCRIPT
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE.SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .01. LV Internal Electrical Installation 1 LS. .(01). 2011 CKE.LS.01.1.(01).2011
CKE. .01. LV Internal Electrical Installation 1 LS. .(03). 2013 CKE.LS.01.1.(03).2013
CKE. .01. Power Factor Correction Equipment 2 LS. .(00). 1999 CKE.LS.01.2.(00).1999
CKE. .01. Underground Cable 3 LS. .(00). 1999 CKE.LS.01.3.(00).1999
CKE. .01. Overhead Line Distribution System 4 LS. .(00). 1990 CKE.LS.01.4.(00).1990
CKE. .01. Three Phase Generator Set 5 LS. .(00). 2005 CKE.LS.01.5.(00).2005
CKE. .01. Acoustic Treatment For Generator Room 6 LS. .(00). 2055 CKE.LS.01.6.(00).2055
CKE. .01. Single Phase Diesel Generator Set 7 LS. .(00). 1986 CKE.LS.01.7.(00).1986
CKE. .01. Lightning Protection System (Using Stranded GI Wires) 8 LS. .(00). 1977 CKE.LS.01.8.(00).1977
CKE..01. Specification For Lightning Protection System for Structures 9 LS. .(01). 2011 CKE.LS.01.9.(01).2011
CKE. .01. 11kV Distribution Transformers 10 LS. .(00). 1990 CKE.LS.01.10.(00).1990
CKE. .01. HV Oil Circuit Breaker 11 LS. .(00). 1983 CKE.LS.01.11.(00).1983
CKE. .01. Switchgear 12 LS. .(00). 1999 CKE.LS.01.12.(00).1999
CKE. .01. HV Underground Cable 13 LS. .(00). 1986 CKE.LS.01.13.(00).1986
CKE. .01. Specification for 11kV SF6 Ring Main Unit 14 LS. .(01). 2012 CKE.LS.01.14.(01).2012
CKE. .01. Specifircation for 11kV Metal-Enclosed Switchgear 15 LS. .(01). 2011 CKE.LS.01.15.(01).2011
CKE. .01. -- 16 -- -- -- CKE.--01.16----
CKE. .01. Specification for 11kV Dry-Type Distribution Transformers 17 LS. .(00). 2011 CKE.LS.01.17.(00).2011
CKE. .01. -- 18 -- -- -- CKE.--01.18----
CKE. .01. -- 19 -- -- -- CKE.--01.19----
CKE. .01. Road Lighting Installation 20 LS. .(02). 2013 CKE.LS.01.20.(02).2013
CKE. .01. ITP for 11kV Dry Type Transformer 21 ITP. .(00). 2011 CKE.ITP.01.21.(00).2011
CKE. .01. ITP for 11kV Switchgear 22 ITP. .(00). 2011 CKE.ITP.01.22.(00).2011
CKE. .01. ITP for Electrical Boards 23 ITP. .(00). 2011 CKE.ITP.01.23.(00).2011
CKE. .01. ITP for Wiring System & Underground Cable 24 ITP. .(00). 2011 CKE.ITP.01.24.(00).2011
CKE. .01. ITP for Standby Generator Set 25 ITP. .(00). 2011 CKE.ITP.01.25.(00).2011
CKE. .01. ITP for Lightning Protection System 26 ITP. .(00). 2011 CKE.ITP.01.26.(00).2011
CKE. .01. ITP for Street Lighting 27 ITP. .(00). 2011 CKE.ITP.01.27.(00).2011
KLASIFIKASI
BIDANG
Elec
tric
al P
ow
er E
ngi
nee
rin
g
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
CKE. .01. FORM FOR LINE CONTINUITY AND PHASE SEQUENCE TEST 28 ITP. .(00). 2012 CKE.ITP.01.28.(00).2012
CKE. .01. Record of Continuity and Insulation Resistance Test 29 ITP. .(00). 2012 CKE.ITP.01.29.(00).2012
CKE. .01. Record of Continuity and Insulation Resistance Test For Ring Final Circuit30 ITP. .(00). 2012 CKE.ITP.01.30.(00).2012
CKE. .01. Record of Earth Electrode Resistance Test 31 ITP. .(00). 2012 CKE.ITP.01.31.(00).2012
CKE. .01. Record of Insulation Resistance And Continuity Test 32 ITP. .(00). 2012 CKE.ITP.01.32.(00).2012
CKE. .01. Record of Polarity Test 33 ITP. .(00). 2012 CKE.ITP.01.33.(00).2012
CKE. .01. Record of RCCB Test 34 ITP. .(00). 2012 CKE.ITP.01.34.(00).2012
CKE..01.
Factory Acceptance Test - Checklist for Visual Inspection of LV
Electrical Boards35 ITP. .(00). 2012 CKE.ITP.01.35.(00).2012
CKE..01.
Electrical System Design and Installation Guidelines for
Architects and Engineers36 GP. .(00). 2012 CKE.GP.01.36.(00).2012
CKE. .01. Borang Pengiraan bagi Kerja-Kerja Elektrik 37 BC. .(00). 2013 CKE.BC.01.37.(00).2013
CKE..01. Borang Ringkasan Mesyuarat Verifikasi Rekabentuk 38 BC. .(01). 2014 CKE.BC.01.38.(01).2014
CKE. .01. Senarai Semak Keperluan Dokumen Rekabentuk 39 BC. .(01). 2014 CKE.BC.01.39.(01).2014
CKE..01. Senarai Semak Rekabentuk (Checklist Design Review) 40 BC. .(01). 2014 CKE.BC.01.40.(01).2014
CKE..01. Borang Pengukuran Kualiti Rekabentuk Perunding Elektrik 41 BC. .(00). 2013 CKE.BC.01.41.(00).2013
CKE..01. Pemerhatian Peringkat Verifikasi Reka Bentuk "Lesson Learnt" 42 BC. .(01). 2014 CKE.BC.01.42.(01).2014
CKE. .01. Panduan Teknik Edisi 4 43 GP. .(00). 2011 CKE.GP.01.43.(00).2011
CKE..01.
Prosedur Operasi Standard (SOP) Bagi Penyerahan Projek
Untuk Penyeliaan Tapak Bina Daripada HODT Kepada WPPE44 GP. .(00). 2014 CKE.GP.01.44.(00).2014
CKE..01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Rekod Daftar Lukisan Pembinaan45 BC. .(00). 2014 CKE.BC.01.45.(00).2014
CKE.
.01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Kualiti Pemasangan Elektrik di
Tapak dan Prestasi Semasa Kontraktor
46 BC. .(00). 2014 CKE.BC.01.46.(00).2014
CKE.
.01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Pertambahan Kos disebabkan oleh
Ralat Rekabentuk
47 BC. .(00). 2014 CKE.BC.01.47.(00).2014
Elec
tric
al P
ow
er E
ngi
nee
rin
g
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
CKE.
.01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Kajian Kepuasan Pelanggan
Terhadap Rekabentuk Elektrik Yang disediakan HOPT
48 BC. .(00). 2014 CKE.BC.01.48.(00).2014
CKE.
.01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Pengumpulan Data Daftar Aset
Khusus Bangunan (Blok) -Borang(DA 6)
49 BC. .(00). 2014 CKE.BC.01.49.(00).2014
CKE.
.01.
Penyerahan Projek Untuk Penyeliaan kepada Wakil Pegawai
Penguasa Elektrik - Borang Pengumpulan Data Daftar Aset
Khusus - Bangunan (Binaan Luar) Borang(DA 9)
50 BC. .(00). 2014 CKE.BC.01.50.(00).2014
CKE..01.
Borang Ringkasan Kajian Semula / Verifikasi Senarai
Kuantiti (BQ)51 BC. .(00). 2014 CKE.BC.01.51.(00).2014
CKE. .01. CKE.01.
CKE. .01.
CKE. .01.
CKE. .01.
CKE. .01.
Elec
tric
al P
ow
er E
ngi
nee
rin
g
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE.SUB KLASIFIKASI
Running
NoKategori Pindaan Bulan Tahun No. Siri
CKE. .02. Prosedur Penerimaan Aset Elektrik 1 GP. .(00). 2009 CKE.GP.02.1.(00).2009
CKE. .02. Garis Panduan Kos Piawai bagi Kerja-kerja Penyelenggaraan Elektrik 2 GP. .(00). 2012 CKE.GP.02.2.(00).2012
CKE. .02.
CKE. .02.
CKE. .02.
CKE. .02.Pen
yen
ggar
aan
dan
Fasi
liti A
set
KLASIFIKASI BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE.SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .03. ITP for External Installation for ICT & Telephone 1 ITP. .(00). 2011 CKE.ITP.03.1.(00).2011
CKE. .03. ITP for Internal Installation for ICT: Passive Equipement 2 ITP. .(00). 2011 CKE.ITP.03.2.(00).2011
CKE. .03. ITP for Internal Installation for ICT: Active Equipment 3 ITP. .(00). 2011 CKE.ITP.03.3.(00).2011
CKE. .03. ITP for Internal Installation for Telephone 4 ITP. .(00). 2011 CKE.ITP.03.4.(00).2011
CKE. .03. Senarai Semak Pemeriksaan Pemasangan Manhole & Pit 5 ITP. .(00). 2012 CKE.ITP.03.5.(00).2012
CKE. .03.Senarai Semak Pemeriksaan Pemasangan uPVC Pipe & G.I
Pipe6 ITP. .(00). 2012 CKE.ITP.03.6.(00).2012
CKE. .03.Senarai Semak Pengujian & Pentauliahan Clearence of G.I
Pipe & uPVC Pipe7 ITP. .(00). 2012 CKE.ITP.03.7.(00).2012
CKE. .03.Senarai Semak Pemeriksaan Pemasangan Interbuilding
Cabling - Fiber & Jelly Filled8 ITP. .(00). 2012 CKE.ITP.03.8.(00).2012
CKE. .03.Senarai Semak Pengujian & Pentauliahan Interbuilding
Fibre Optic cable9 ITP. .(00). 2012 CKE.ITP.03.9.(00).2012
CKE. .03.Senarai Semak Pengujian & Pentauliahan Interbuilding
Jelly Filled cable10 ITP. .(00). 2012 CKE.ITP.03.10.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Access Switch11 ITP. .(00). 2012 CKE.ITP.03.11.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Distribution Switch12 ITP. .(00). 2012 CKE.ITP.03.12.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Core Switch13 ITP. .(00). 2012 CKE.ITP.03.13.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Wireless Access Point14 ITP. .(00). 2012 CKE.ITP.03.14.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Wireless Controller15 ITP. .(00). 2012 CKE.ITP.03.15.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Un-Interruptible Power Supply, UPS16 ITP. .(00). 2012 CKE.ITP.03.16.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Server17 ITP. .(00). 2012 CKE.ITP.03.17.(00).2012
CKE. .03.Senarai Semak Pemeriksaan, Pengujian & Pentauliahan
Firewall18 ITP. .(00). 2012 CKE.ITP.03.18.(00).2012
CKE. .03. General Practices For ICT System Installation 19 LS. .(00). 2013 CKE.LS.03.19.(00).2013
KLASIFIKASI BIDANGIn
form
atio
n &
Co
mm
un
icat
ion
Tec
hn
olo
gy
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
.03.
CKE. .03.
CKE. .03.In
form
atio
n &
Co
mm
un
icat
ion
Tec
hn
olo
gy
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare
CKE.SUB KLASIFIKASI Running No Kategori Pindaan Tahun No. Siri
CKE. .04. Energy Efficiency Guidelines for CKE Design 1 GP. .(01). 2010 CKE.GP.04.1.(01).2010
CKE. .04.Manual Proses Pengujian dan Pentauliahan Pemasangan Sistem
Solar Photovoltaic (PV)2 MN. .(00). 2013 CKE.MN.04.2.(00).2013
CKE. .04.Senarai Semak Dokumen Pengujian dan Pentauliahan Pemasangan
Sistem Solar Photovoltaic (PV)3 BC. .(00). 2013 CKE.BC.04.3.(00).2013
CKE. .04. Borang Pemeriksaan Bateri (Gudang Simpanan) 4 BC. .(00). 2013 CKE.BC.04.4.(00).2013
CKE. .04. Pemeriksaan dan Analisa Awalan Sistem Solar Photovoltaic (PV) 5 BC. .(00). 2013 CKE.BC.04.5.(00).2013
CKE. .04. Pemeriksaan Spesifikasi Komponen (Solar PV Panel & Inverter) 6 BC. .(00). 2013 CKE.BC.04.6.(00).2013
CKE. .04. Pemeriksaan Spesifikasi Komponen (Janakuasa & Sistem Bateri) 7 BC. .(00). 2013 CKE.BC.04.7.(00).2013
CKE. .04. Pemeriksaan Pembinaan dan Pemasangan 8 BC. .(00). 2013 CKE.BC.04.8.(00).2013
CKE. .04. Pengujian No Load Sistem Bateri 9 BC. .(00). 2013 CKE.BC.04.9.(00).2013
CKE. .04. Pengujian Open Circuit Voltage Sistem Solar PV 10 BC. .(00). 2013 CKE.BC.04.10.(00).2013
CKE. .04. Pengujian Komponen Solar PV & Grid Inverter 11 BC. .(00). 2013 CKE.BC.04.11.(00).2013
CKE. .04. Pengujian Konfigurasi & Kefungsian AMF dan Janakuasa Diesel 12 BC. .(00). 2013 CKE.BC.04.12.(00).2013
CKE. .04.Pengujian Komponen Bateri dan Konfigurasi Sistem (Proses
Discharging Bateri Sehingga Genset Beroperasi)13 BC. .(00). 2013 CKE.BC.04.13.(00).2013
CKE. .04.Pengujian Komponen Bateri dan Konfigurasi Sistem (Genset
Beroperasi Sehingga Genset Dimatikan Secara Automatik)14 BC. .(00). 2013 CKE.BC.04.14.(00).2013
CKE. .04.
CKE. .04.
Ener
gy M
anag
emen
tKLASIFIKASI BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASIRunning
NoKategoriPindaan Bulan Tahun No. Siri
CKE. .05. Manual Inspektorat Elektrik 1 MN. .(02). 2006 CKE.MN.05.1.(02).2006
CKE. .05.Garis Panduan Pendaftaran & Pengendalian Pepasangan Elektrik
Merujuk Kepada Akta & Peraturan2 GP. .(00). 2014 CKE.GP.05.2.(00).2014
CKE. .05.
CKE. .05.
Elec
tric
al
Engi
nee
rin
g Sa
fety
KLASIFIKASI BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASIRunning
NoKategori Pindaan Bulan Tahun No. Siri
CKE. .06. ITP for Public Address System 1 ITP. .(00). 2011 CKE.ITP.06.1.(00).2011
CKE. .06.Borang Pemeriksaan Ujian Keterusan dan Rintangan Penebat bagi
Sistem Siaraya.2 ITP. .(00). 2012 CKE.ITP.06.2.(00).2012
CKE. .06.Borang Pemeriksaan Ujian Pemasangan Speaker bagi Sistem
Siaraya3 ITP. .(00). 2012 CKE.ITP.06.3.(00).2012
CKE. .06.Borang Pemeriksaan Ujian Fungsi Untuk Semua Peralatan bagi
Sistem Siaraya4 ITP. .(00). 2012 CKE.ITP.06.4.(00).2012
CKE. .06.Borang Pemeriksaan Ujian Sound Pressure Level dan Zoning Test
bagi Sistem Siaraya5 ITP. .(00). 2012 CKE.ITP.06.5.(00).2012
CKE. .06. Specification For Public Address (P.A) System 6 LS. .(00). 2013 CKE.LS.06.6.(00).2013
CKE. .06.Specification For Satellite Master Antenna Television (SMATV)
System7 LS. .(00). Jan 2015 CKE.LS.06.7.(00).2015
CKE. .06.
CKE. .06.
Aco
ust
ic &
Ext
ra L
ow
Vo
ltag
eKLASIFIKASI
BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE.SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .07. 1 0
CKE. .07. 2 0
CKE. .07. 3 0
Syst
em
Mo
nit
ori
n
g &
KLASIFIKASI
BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASIRunning
NoKategori Pindaan Bulan Tahun No. Siri
CKE. .08. Garis Panduan Bahan : Panduan Penggantungan Fluorescent
Luminiaires, Downlight dan Speakers1 GP. .(00). 2010 CKE.GP.08.1.(00).2010
CKE. .08. 02. Panduan Menyemak Moulded Case Circuit Breaker 2 GP. .(00). 2011 CKE.GP.08.2.(00).2011
CKE. .08.Garis Panduan Bahan: Panduan Menyemak Fluorescent Luminiare
jenis Downlight3 GP. .(01). 2013 CKE.GP.08.3.(01).2013
CKE. .08.
Garis Panduan Bahan: Pemasangan Service Box dan Junction Box
bagi Underfloor, Raisedfloor dan Flushfloor System (Do's and
Don’t's)
4 GP. .(00). 2013 CKE.GP.08.4.(00).2013
CKE. .08.Garis Panduan Sijil Kalibrasi Peralatan Pengujian :- Panduan
Menyemak dan Menilai5 GP. .(00). 2013 CKE.GP.08.5.(00).2013
CKE. .08. Panduan Penggunaan Fluorescent Luminaires Jenis T5 6 GP. .(00). 2014 CKE.GP.08.6.(00).2014
CKE. .08.
CKE. .08.
Elec
tric
al M
ater
ial
KLASIFIKASI
BIDANG
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .09. Manual Sistem Pengurusan Dokumentasi CKE 1 MN. .(01). 2013 CKE.MN.09.1.(01).2013
CKE. .09. Pelan Strategik CKE 2 GP. .(00). 2010 CKE.GP.09.2.(00).2010
CKE. .09. 3
CKE. .09. 4
CKE. .09. 5
KLASIFIKASI
BIDANG
Gen
eral
Pu
blic
atio
n
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .10. Borang Tempahan Tiket Kapal Terbang 1 BC. .(00). 2011 CKE.BC.10.1.(00).2011
CKE. .10. Borang Permohonan No. Siri Dokumen CKE - Khusus 2 BC. .(00). 2011 CKE.BC.10.2.(00).2011
CKE. .10. Borang Permohonan No. Siri Dokumen CKE - Berkala 3 BC. .(00). 2011 CKE.BC.10.3.(00).2011
CKE. .10. Kertas Perakuan jawatankuasa Standard dan Spesifikasi 4 BC. .(00). 2011 CKE.BC.10.4.(00).2011
CKE. .10. Borang Soal Selidik Analisa Keperluan Latihan 5 BC. .(00). 2012 CKE.BC.10.5.(00).2012
CKE. .10. 6
CKE. .10. 7
KLASIFIKASI
BIDANGB
ora
ng
- B
ora
ng
BC
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASI Running No Kategori Pindaan Bulan Tahun No. Siri
CKE. .11. ITP for Medical Equipment System 1 ITP. .(00). 2011 CKE.ITP.11.1.(00).2011
CKE. .11. 2
CKE. .11. 3
CKE. .11. 4
CKE. .11. 5
KLASIFIKASI
BIDANG
Med
ical
Eq
uip
men
t
Syst
em
MASTERLIST NOMBOR SIRI SISTEM PENGURUSAN DOKUMENTASI CKE (updated on 16/04/2015)
Compare CKE.
CKE. SUB KLASIFIKASIRunning
NoKategori Pindaan Bulan Tahun No. Siri
CKE. .12. Garis Panduan Pengurusan Nilai CKE 1 GP. .(00). 2013 CKE.GP.12.1.(00).2013
CKE. .12. Design and Build Needs Statement 2 GP. .(00). 2014 CKE.GP.12.2.(00).2014
CKE. .12.PMP Rekabentuk Elektrik - Projek PARLIMEN FASA 3 (Konvensional
Dalaman)3 GP. .(00). 2014 CKE.GP.12.3.(00).2014
CKE. .12.PMP Rekabentuk Elektrik - Projek MAHKAMAH KOTA KINABALU
(Konvensional Perunding)4 GP. .(00). 2014 CKE.GP.12.4.(00).2014
CKE. .12.PMP Rekabentuk Elektrik - Projek Hospital Pengajar UnisZa (Reka &
Bina) 5 GP. .(00). 2014 CKE.GP.12.5.(00).2014
CKE. .12.Work Breakdown Structure of Electrical Services (Construction
Stage)6 GP. .(00). 2014 CKE.GP.12.6.(00).2014
CKE. .12.
CKE. .12.
CKE. .12.
KLASIFIKASI
BIDANGP
roje
ct M
anag
emen
t