Alviso Pond A9, A10 and A11 Levee Repair and A9 Water Control Structure Replacement
WHAT:
WHY:
WHEN:
Daily closures of maintenance access road for levee fill and aggregate hauling and construction activities along Pond A12 to Ponds A11, A10 and A9 between 7 a.m to 5 p.m. weekdays. Truck traffic will enter the stockpile area through the Alviso Marina Park entrance. Trucks will also be traveling along Pond A12 levee to transport the materials to the repair locations.
September 2019 – December 2019
To help maintain the protection of wildlife habitat, these sections of the levee system requires rehabilitation to restore the structural integrity of the pond system and the existing A9 water control structure requires complete replacement.
DAILY CLOSURES
Pond A12
Pond A11
Pond A14
Pond A10
Pond A9
Pond A15
Pond A13BEGIN REPAIRS
ENVIRONMENTAL EDUCATION CENTER
END OF REPAIRS
ALVISO MARINACOUNTY PARK ENTRANCE
RESTRICTED ROUTE
FOR YOUR SAFETY, PLEASE FOLLOW ALL TRAIL CLOSURE SIGNS AND FENCES.CAUTION:
PROJECT CONTACT:PROJECT OWNER:CONTRACTORS: