Maude Street Bus Interchange Bus SheltersD e s i g n r e p o r t
D e c e m b e r 2 0 1 3
Liesl Malan Landscape Architects
PO Box 78 Harcourt Victoria 3453
p 03 5442 2253 m 0427 132 601
e [email protected] w www.lmalan.com.au
Table of Contents Page
Introduction........................................................................ 3
Report purpose
Project background
Why is a new bus shelter proposed?
Why is the bus shelter being updated
Influence from the Vaughan Street Redevelopment ............... 4
Process............................................................................... 5
The Bus Shelter Working Group
Traffi c and bus shelter environment
Draft drawings and images ...................................................................... 6
The Final Bus Shelter Design................................................ 7
Key design outcomes
Final Draft Sketch Design Drawings...................................... 8
Final Bus Shelter Design Concept Plans................................ 9
Further work required ....................................................... 10
Appendices..........................................................................11
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
IntroductionReport PurposeThis document has been prepared to provide a record of how the bus shelter design has been developedwith theBus Shelter Working Group. Their input guided the direction of the bus shelter design and was a collaborative process.
Project backgroundLMLA has been working on the concept to redevelop Maude Street since 2010. The project’s key outcomes include linking the new Vaughan Street redevelopment (now known as Vaughan Central) with the Maude Street Mall. This aims to create a walk-able inner CBD connecting the major commercial areas with a new bus interchange and the existing railway station.
Why is a new bus interchange proposed?The design of the new bus interchange is central to the success of the overall Maude Street redevelopment. The existing bus stop area in Maude Street provides for 5 buses at one time. Shepparton Transit (the major public bus provider in Shepparton and surrounds) has advised that this is becoming inadequate for the needs of the Greater Shepparton community. The need for buses to be able to wait in this area is causing congestion and time tabling restrictions. Greater Shepparton City Council (GSCC) has identifi ed the block between Vaughan Street and Ashenden Street as a suitable location for a bus interchange.
Why is the bus shelter being updated? Shepparton has a standard CBD bus shelter which has serviced the centre of Shepparton for some time. The need for a new design for Shepparton’s Maude Street Bus Shelters is an outcome of the following issues:• The Vaughan Street Redevelopment brief called for a new palette of materials and structure of the new streetscape to infl uence future works in Shepparton’s CBD. The Vaughan Central project has been constructed and completed in November 2013. The design needs to respond and fi t in with the new style developed in Vaughan Central.
•Public transport will play a large role in Shepparton’s future transport and traffi c requirements. The bus stop and shelters need to refl ect this reality creating an environment that supports increasing public transport usage. The new design response needs to include the modern systems found in capital cities such as audible / digital timetables which are linked to bus GPS systems to provide up to the minute information to transport users.
Maude Street Bus Shelter design report
3
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
Infl uence from the Vaughan Street RedevelopmentIn early 2010 LMLA began work on the Vaughan Street Redevelopment (now known as Vaughan Central). LMLA were the key designers on many aspects of the streetscape including the idea of restructuring the streetscape to provide a more welcoming pedestrian experience, the level crossings to address access issues and the detailed design features such as the custom seating and pyc sculptures.
The new design in Vaughan Street was to promote Shepparton as a city in a regional area. The cultural defi nition that ‘in the country people want to stop and talk in the street’ became the key driver behind the streetscape structure and the need to address walk-ability of Shepparton’s CBD. This new direction for Shepparton’s CBD aims to infl uence Shepparton’s dependance on cars.
Pattern and detail were developed as a way to celebrate Shepparton culture and also provided an alternative to urban minimalism which was generating negative feedback from the public.
Within the bus shelters and the bus interchange, these principles of inclusion, walk-ability, detail and pattern are continued.
Maude Street Bus Shelter design report
4
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
ProcessThe Bus Shelter Working GroupFrom the outset, the design of the bus shelters was to address issues of access and inclusion, including those faced by people with a disability and older people, as well as the general community’s needs. For this reason a Bus Shelter Working Group was established with representatives from GSCC including Carl Byrne (Development Offi cer - Projects Department at GSCC), Darren Buchanan (Team Leader Design Services at GSCC), Louise Dwyer (Access and Inclusion Offi cer at GSCC) and representatives from the Disability Advisory Committee (DAC) and Positive Ageing Advisory Committee (PAAC). The Working Group met for a series of workshops to develop the bus stops. Their input guided the direction of the bus shelter design and was a collaborative process.
The four workshops with the Bus Shelter Working Group addressed the following:
• The existing Shepparton CBD Standard Bus Shelters were reviewed and discussed.
• A precedent study of bus stops and public transport facilities was collated and discussed with the Working Group.
• A survey regarding bus stop user needs and thoughts on the current bus shelters was developed and distributed through the Working Group. Feedback was received and incorporated into the design.
• Crime Prevention Through Environmental Design (CPTED) principles were applied to each design and formed a major consideration in each revision.
• Louise Dwyer has been involved in providing comprehensive comments on both the streetscape and the bus shelter design at all stages. Her comments on both the shelters’ form and the streetscape environment have been valuable in addressing access and inclusion issues on multiple levels.
• The design form of the bus shelters was considered in the streetscape to ensure the shelter responded to site-based issues including response to the Shepparton climate.At each stage, the bus shelter form was refi ned and developed to meet the needs of the users.
Traffic and the bus shelter environmentAdditional expertise from within Council was drawn on to help address the bus shelters in the streetscape. Brendan Walsh (Senior Design and Traffi c Engineer at GSCC) has reviewed the turning circles and bus movement systems as well as providing information on Vic Road Bus Stop Standards.
• As part of Brendan Walsh’s review, the streetscape has undergone several realignment studies utilising turning circles. Each time the streetscape has been refi ned to meet the traffi c needs of different stakeholders including the CFA, traders and buses. The needs of vehicles have been balanced with the need to promote an excellent pedestrian experience. The bus shelters’ design have responded to the changing streetscape to meet standards.
• Public Transport Victoria’s website refers to Vic Roads to set the standard for bus shelters and stops. The Vic Roads standard for bus stops and shelters was reviewed and incorporated into the design.
Maude Street Bus Shelter design report
5
Current Shepparton CBD Standard Bus Shelter
LMLA draft sketch design LMLA draft sketch design amended to respond to
survey feedback
LMLA draft sketch design amended to respond to workshop feedback
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
Draft drawings and images
Maude Street Bus Shelter design report
6
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
The Final Bus Shelter DesignAs a result of the workshops and discussions with the Bus Shelter Working Group, the follow key design principles were developed:
Legible - easy to read cues, the information provided is clear and linked to the new GSCC wayfi nding strategy
Robust - withstand daily wear and tear, as well as destructive behaviour and not provide a target for vandalism.
Welcoming & comfortable - Pattern and texture, provide a welcoming space which imbues the user with a sense that they can be trusted with a beautiful facility, create a comfortable space which encourages people to use the service.
Ergonomic design principles - the materials and form should respond directly to the human forms of a diverse user group.
Modern and state of the art - utilise modern technology to improve the transport users’ experience.
Designed for Shepparton - respond to environmental conditions to ensure good shelter is provided, use Vaughan Central styling, design for local skills and materials.
These key principles are discussed in detail on the Maude Street Bus Shelter Conceptual Plans included in this report.
Key design outcomesKey features of the design are discussed in detail on the plans included in this report such as:
• Use of colour, super graphics and other cues to distinguish the bus shelters apart.• A guide for providing timetable and route information as well as regulatory and location signage has been outlined.• A robust materials palette of concrete, toughened glass and steel, balanced with timber slats on the seat, a plywood ceiling and feature detailing to ensure the space is welcoming and comfortable.• Sight lines to provide good visual surveillance.• The form of the bus shelter has been designed around the human form whether in a wheelchair or free standing. Space for luggage and additional items such as prams has been considered.• An audible timetable has been designed into the structure. Additional digital timetables have been suggested.• The roof form to responds to the environmental conditions and provides excellent shelter.
Maude Street Bus Shelter design report
7
LMLA fi nal draft sketch design amended to respond to workshop feedback
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
Final Draft Sketch Design Drawings
Maude Street Bus Shelter design report
8
4m w
ide
1.9m
2.
1m
1m
1.5m
1.1m
C
Project numberSheet No.
Liesl Malan Landscape Architects ABN 39 133 179 212
DesignedDrawn
THIS DOCUMENT IS COPYRIGHT AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED USE PROHIBITED. ALL DIMENSIONS AND LEVELS TO BE CHECKED ON THE PROJECT BEFORE COMMENCING ANY WORKS OR SHOP DRAWINGS. DRAWINGS NOT TO BE SCALED.
Revision
N
Rev -
P O B o x 7 8 H a r c o u r t V i c t o r i a 3 4 5 3t : 0 3 5 4 4 2 2 2 5 3 m : 0 4 2 7 1 3 2 6 0 1 e : l m @ l m a l a n . c o m . a uw : w w w . l m a l a n . c o m . a u A B N : 3 9 1 3 3 1 7 9 2 1 2
Scale
Maude Street Bus Interchange
Greater Shepparton City Council
Draft Bus Shelter Design Development
1050
DD Bus Shelter 01
-
1: 20 @ A1
CR LM November 2013CR 19.12.2013-
L i e s l M a l a n L a n d s c a p e A r c h i t e c t s
Double length bus shelter in plan1:20 at A1
Double length bus shelter in section - road side view1:20 at A1
Dashed line indicates extent of roof line above
Dashed line indicates minimum distance between shelter and kerb
Orange dashed line indicates pedestrian movement on footpath
Refer to Maude Street Streetscape Concept Plan
Feature bench modified from Vaughan Central.Refer to details on other page.
Open space within the shelter to provide for those using a mobility aid. It is likely it will also provide space for prams, shopping and other luggage items. This area should be coupled with regulatory signage to ensure it is made available when required.In a double shelter this space is large enough for 2 wheelchairs and is provided in the middle of the shelter to provide the maximum weather protection available. In a single shelter there is enough space for 1 wheelchair. Weather protection is provided by the side wall and roof.
Mixed clear and coloured glass windows to provide clear sight lines into and out of the bus stop.
Off white concrete wall to base of shelter. This is intended to provide a thermal barrier without drafts. The robust nature of concrete provides longevity to the structure with limited maintenance issues.
Colour in the Bus SheltersThe use of colour is an important element to ensure the bus shelters can be identified as different. It will however require review to ensure there is enough colour variation to meet the needs of visually impaired people. The colour palette shown here is intended as a guide to start this process.
It is intended that relationship between the colour of the shelter and the bus route be created. Bus route maps and other branding of the routes could be updated to match in with the colour of the shelters. Some shelters may service more than one bus route, multiple colours could be considered here.
Elements to assist in identifying your bus stopDuring the working group meetings it was identified that significant change to bus stop locations and the increased number of stops may lead to confusion in some bus users. To help combat this issue each of the eight bus stops is to be distinguished by colour and by a super graphic able to be read at some distance. While colour can not be relied on alone to differentiate the stops, it is one of the layers of information provided to make the bus stops look different. Within the shelter itself the route(s) and timetables will be clearly displayed providing additional cues to bus users.
End wall. Refer to section for more details
Shade protection over the Maude Street footpath provides added amenity to the passing pedestrian as well as improving shade protection inside the bus shelter.
8m
2.525m 2.65m
Area at eye height and at a level that following text with a finger is possible. This space should be used for detailed information such as timetables. The height, method of display and font size should ensure the information can be read from the lower vantage point of a wheelchair. Audible timetables should be provided for the visually impaired and those with lower literacy levels.
Area above direct eye height to be used for large diagrammatic maps which are easy to read from a few steps away for most literacy levels.
Space for route names and PTV logo and other branding requirements.
LegibilityIt is essential that the bus stops and shelters provide easy to read cues that they are bus stops, the route serviced and that the information provided is clear. Refer to colour and super graphics notes for more information.
Information such as maps, route diagrams and timetables needs to conform to modern legibility expectations. In this concept , where possible, the information has been provided in multiple formats eg Bus system map (spatial reading) and a route diagram with all stops shown (diagrammatic reading), timetable with arrival times at each stop (list reading) and an audible timetable (listening). Multiple formats cater for a variety of needs and provide a rich information base to empower transport users.
This area may at times be obscured behind a person in a wheelchair and is therefore not a preferred space for detailed information. It is a good location for regulatory symbols (such as no smoking or drinking) and a sign noting that this space shall be vacated for someone using a mobility device.
RobustBus shelters by their nature will need to withstand daily wear and tear, as well as destructive behaviour and not providing a target for vandalism.It is the design intent to use robust materials such as steel, shatter proof glass and concrete to limit ongoing maintenance requirements. These materials are treated sensitively with detail to provide a sense of pride in the Shepparton Public Transport system. The details have been designed to fit in with existing maintenance programs. By providing care and detail CPTED issues are addressed by ensuring the space feels welcoming and comfortable.
Ergonomic design principles con’tThe spaces have been designed around human bodies whether in a wheel chair or free standing. Space for baggage has been thought through and included at the base of the seats and available within a large area within the shelter.
Designed for SheppartonThe design intends to respond to the Shepparton environment by providing sun, rain and wind protection from north and south. The design has been developed for Shepparton’s CBD. Vaughan Central styling has been worked with to ensure the new works fit with the recent style direction.When developing this conceptual design local skills and materials have been considered.
Ergonomic design principlesBus shelters can be designed simply to respond to traffic standards. However these spaces become an uncomfortable space spent waiting impatiently for a bus - the user just wants to leave as soon as possible. By considering the needs of human bodies, the design intends to respond to this issue. The space provided is to be comfortable, with multiple waiting spaces. The seating provided is of a generous length with back rest, arm rest and capacity for an easy transition from wheelchair. Materials have ben chosen not just for their robust nature, but also their thermal properties in the Shepparton environment eg, timber slats on the seats provide a warm / cool seat, the low concrete wall blocks drafts and heat. The roof shape responds to rain and direct sun exposure.
Welcoming and comfortableThe role of public transport in Shepparton is expected to increase. The bus shelter design needs to support this trend by providing a space that is comfortable and welcoming. It is intended that by including pattern and detail as well as design for the human body, people will feel supported in their choice to use public transport in Shepparton.
Modern and state of the artA new bus shelter design has the opportunity to utilise modern technology to improve the transport users’ experience. For this reason the concept includes digital and audible timetables. A direct link to bus GPS to give up to the minute information should be included. Timetable service apps are outside the scope of this project, however should be considered as part of a comprehensive response to the bus interchange.Provision of free limited Wifi would improve the users experience and provide a valuable service.
Window to provide light and sight lines in and out of the bus shelter. The window has been divided into smaller panes of glass to limit replacement costs and the vandalism appeal of a large sheet of glass.Mixed tints of the bus shelter colour palette provide interest and variation.
0.5m
Maude
Stre
etHigh
Stre
etCori
o Stre
etNixo
n Stre
etMau
de S
treet
Rea S
treet
Corio S
treet
Monas
h Stre
et
and
Graham
Stre
et
Numurk
ah S
treet
Grutzn
er Ave
nue
Camero
n Ave
nue
Fenn S
treet
Brauman
Stre
etPark
side D
rive
Tyqu
in Stre
etOlym
pic Ave
nue
SHEPPARTON
SHEPPARTON
Angled area of roof to provide a prominent display of individual bus route that arrives/ departs from this bus stop. Display to be lit
from behind to provide light at night to bus stop. Refer to example bus route diagram.
Example bus route diagram.
Bus stop side of roof structure.Metal sheeting to roof. Further resolution of structure, flashing and ridge capping required Ceiling to be clad in plywood to limit bird nesting and climbing opportunities. Colour to match timber on bench seats.
Footpath side of roof structure.Metal battens (colour to match shelter colour) to provide shade protection to pedestrians.
Audible bus route information button, to provide next bus arrival / departure information.
Precast concrete back to provide shelter from elements.
Feature bench with timber seat to include lighting, back and arm rest similar to the Vaughan Street Feature Benches.
C
Project numberSheet No.
Liesl Malan Landscape Architects ABN 39 133 179 212
DesignedDrawn
THIS DOCUMENT IS COPYRIGHT AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED USE PROHIBITED. ALL DIMENSIONS AND LEVELS TO BE CHECKED ON THE PROJECT BEFORE COMMENCING ANY WORKS OR SHOP DRAWINGS. DRAWINGS NOT TO BE SCALED.
Revision
N
Rev -
P O B o x 7 8 H a r c o u r t V i c t o r i a 3 4 5 3t : 0 3 5 4 4 2 2 2 5 3 m : 0 4 2 7 1 3 2 6 0 1 e : l m @ l m a l a n . c o m . a uw : w w w . l m a l a n . c o m . a u A B N : 3 9 1 3 3 1 7 9 2 1 2
Scale
Maude Street Bus Interchange
Greater Shepparton City Council
Draft Bus Shelter Design Development
1050
DD Bus Shelter 01
-
1: 20 @ A1
CR LM November 2013CR 19.12.2013-
L i e s l M a l a n L a n d s c a p e A r c h i t e c t s
Maude St Bus StopMaude St Bus Stop
orthorthN 2
Single length bus shelter in plan1:20 at A1
Dashed line indicates extent of roof line above
Dashed line indicates extent of roof line above
Single length bus shelter in section - road side view1:20 at A1
Vaughan Central - a design style directionThe Vaughan Street redevelopment was completed in November 2013. The materials, form and style are to create a style direction for the Maude Street works. It is intended that there will be precincts within the area of Vaughan and Maude Street.
The bus interchange will form one of these precincts. The paving and logic behind the streetscape should remain. However to ensure the needs of bus users are met and the area is distinctly a bus interchange there will need to be some key differences such as a more diverse colour palette, as well as, additional street furniture associated with the bus stop.
Public Transport Victoria (PTV) requirementsThe Vic Roads standards for bus shelter design are endorsed by PTV. These standards have been reviewed and incorporated into the design as an integral element of the form of the bus shelter. During the consultation process it was noted that PTV will require their logos to be clearly displayed on the shelters. Suggested locations have been designed into the signage areas and are intended to be able to be updated should logos or authorities change.
Feature benches - adapted to meet bus shelter needsThe feature benches (first installed and designed for Vaughan Central) have been modified to be an integral part of the bus shelters. It is intended that the concrete base of the seats and the low concrete wall are integrated as one, or appear to be one element. The back rest has been extended to service the entire length of the bench. The arm rest and concrete end of the bench have been located to make transferring from a wheelchair to the bench easier.
Detail of end of feature bench 1:10 at A1. The end of the bench is clear of obstructions to provide for wheelchair to bench transfer.
Detail of end of feature bench 1:10 at A1. Arm rest provided to assist people with mobility requirements
Detail of bench and wall 1:10 at A1.
Concrete elements to be integrated.
Areas provided for super graphic.It is intended that high contrast letters and the bus stop colour be provided on both end walls. The scale and contrast of this graphic should be able to be read at a distance to assist with way finding.
2N
Galvanised steel wall to frame glass and provide protection from the elements.
Window to provide light and sight lines in and out of the bus shelter. Laser cut text / graphic to be applied to window to provide additional way finding information.Mixed tints of the bus shelter colour palette provide interest and variation.
Open space within the shelter to provide for those using a mobility aid. It is likely it will also provide space for prams, shopping and other luggage items. This area should be coupled with regulatory signage to ensure it is made available when required.In a double shelter this space is large enough for 2 wheelchairs and is provided in the middle of the shelter to provide the maximum weather protection available. In a single shelter there is enough space for 1 wheelchair. Weather protection is provided by the side wall and roof.
End wall. Refer to section for more details
Shade protection over the Maude Street footpath provides added amenity to the passing pedestrian as well as improving shade protection inside the bus shelter. Refer to section for more information.
Mixed clear and coloured glass windows to provide clear sight lines into and out of the bus stop.
Off white concrete wall to base of shelter. This is intended to provide a thermal barrier without drafts. The robust nature of concrete provides longevity to the structure with limited maintenance issues.
Orange dashed line indicates pedestrian movement on footpath
refer to Maude Street Streetscape Concept Plan
Refer to double length shelter for display details.
Feature bench modified from Vaughan Central. Refer to details.
Laser cut steel panel powdercoated to match bus shelter colour(s). Pattern with transport theme to be developed.
Window to provide light and sight lines in and out of the bus shelter. The window has been divided into smaller panes of glass to limit replacement costs and the vandalism appeal of a large sheet of glass.Mixed tints of the bus shelter colour palette provide interest and variation.
Dashed line indicates minimum distance between shelter and kerb
4.1m
2.525m1.25m
0.5m
4m w
ide
2.6m
at l
owes
t poi
nt
2.5m
at l
owes
t poi
nt
2.7m
at l
ow p
oint
2.95
m a
t low
poi
nt
3.1m
to p
eak
of r
oof
1.9m
2.
1m
1m
1.5m
1.1m
0.
5m
esign Development Report - Liesl Malan Landscape ArchitectsMMaudede StrStreeteete BuBuB Is Intenterchrchangangee - BuBus Ss Shelhelterter DeD
Further work requiredThe bus shelter design has progressed to a fi nal concept. The project team has discussed that there are areas best resolved during detailed design and documentation. The following list outlines some items which will need to be resolved:
• Detailed drawings and specifi cations should be produced. It is intended that shop drawings will be produced by fabricators and approved prior to fabrication and installation of items.
• The conceptual design should be work shopped /reviewed with a Structural Engineer. The design should be revised as a result. Then the Structural Engineer should undertake computations of the documented design.
• The conceptual design should be work shopped /reviewed with fabricators to ensure the design is able to be fabricated effi cently, manufactured and maintained using local skills and easily sourced materials. The design should be revised as a result.
• The lighting design of the individual bus shelters and the streetscape will need to be co-ordinated / work shopped with a lighting expert / designer and lighting authorities.
• The detailed design and discussions with fabricators should be used to produce an Opinion of Probable Costs specifi c to the bus shelter.
• The audible/digital timetable system to be discussed and negotiated with PTV.
• PTV logos and signage to be co-ordinated with PTV to ensure requirements are met.
• Final review by PTV, DAC, PAAC and relevant Council team members to ensure that the design meets access requirements including fi ne details such as colour and contrast, display of information and spatial relationship requirements.
• Review with Council works team to ensure the maintenance requirements are within the team’s capacity, or acceptable capacity extension.
• It is strongly recommended that a physical model be made of the fi nal bus shelter design at an appropriate scale (eg 1:10). Much of the feedback on the bus shelter design discussed the need for multiple ways of communicating information to ensure it has been understood. Reading plans is not always a core skill for committee members, however their input is valuable and alternative methods of communication should be considered. A physical model would provide a tangible object to engage with.
Maude Street Bus Shelter design report
11
Maude Street Bus Interchange - Bus Shelter Design Development Report - Liesl Malan Landscape Architects
Maude Street Bus Shelter design report
12
Appendices
• LMLA draft sketch design (1)
• LMLA draft sketch design (2)
• Concept for Maude Street redevelopment - Streetscape plans
• Shepparton CBD standard Bus Stop
• Vic Roads standard
BU
S ST
OP
BU
S ST
OP
OR
TH
OR
TH
N2
CProj
ect n
umbe
rSh
eet N
o.
Lies
l Mal
an L
ands
cape
Arc
hite
cts
AB
N 3
9 13
3 17
9 21
2
Des
igne
dD
raw
n
TH
IS D
OC
UM
EN
T I
S C
OPY
RIG
HT
AN
D M
AY
ON
LY B
E U
SED
FO
R T
HE
PU
RPO
SE F
OR
WH
ICH
IT
WA
S C
OM
MIS
SIO
NE
D. U
NA
UT
HO
RIS
ED
USE
PR
OH
IBIT
ED
. ALL
DIM
EN
SIO
NS
AN
D L
EV
ELS
TO
B
E C
HE
CK
ED
ON
TH
E P
RO
JEC
T B
EFO
RE
CO
MM
EN
CIN
G A
NY
WO
RK
S O
R S
HO
P D
RA
WIN
GS.
D
RA
WIN
GS
NO
T TO
BE
SC
ALE
D.
Rev
isio
n
N
Rev
-
PO
B
ox
7
8
Ha
rc
ou
rt
V
ic
to
ri
a
34
53
t:0
3 5
44
2 2
25
3 m
: 0
4 2
7 1
3 2
6 0
1
e : l
m @
l m a
l a n
. c o
m . a
uw
: w
w w
. l m
a l
a n
. c o
m .
a u
AB
N:
39
13
3 1
79
21
2
Scal
e
Mau
de S
tree
t Bus
Int
erch
ane
Gre
ater
She
ppar
ton
Cit
y C
ounc
il
Dra
ft B
us S
helt
er D
esig
n D
evel
opm
ent
1050
DD
Bus
She
lter
01
-
1: 2
0 @
A1
CR
LM
Aug
ust 2
013
CR
28.0
8.20
13-
-
Lie
sl
Ma
lan
La
nd
sc
ap
e A
rc
hit
ec
ts
draf
t
SHEPPARTON
Maude
Stre
et High S
treet
Corio S
treet Nixo
n Stre
etMau
de S
treet Rea
Stre
etCori
o Stre
et Monas
h Stre
et
and Graham
Stre
et
Numurk
ah S
treet
Grutzn
er Ave
nue
Camero
n Ave
nue
Fenn S
treet
Brauman
Stre
et Parksid
e Driv
e Tyqu
in Stre
et Olympic
Avenu
e
Mau
de S
t Bus
Sto
p
N2
Mau
de S
t Bus
Sto
p
N2
BU
S ST
OP 2
BU
S ST
OP 22222222222222222
Bus
She
lter
Con
cept
- 12
.08.
2013
N.T
.S.
Feed
back
sum
mar
yPr
otec
tion
from
win
d is
ver
y im
port
ant a
nd n
eede
d to
be
impr
oved
Serv
ice
info
rmat
ion
to b
e pr
ovid
ed in
add
itio
nal f
orm
ats
such
as
brai
lle a
nd a
n au
dibl
e ti
met
able
Des
ign
to e
nsur
e th
at s
helt
er r
eads
as
an id
enti
fiabl
e bu
s sh
elte
r ut
ilisi
ng c
olou
r to
hel
p id
enti
fy in
divi
dual
sto
ps
Bus
she
lter
s to
be
smok
e fr
eeTi
met
able
and
bus
rou
te to
be
clea
rly
disp
laye
d in
side
the
shel
ter
Seat
ing
and
light
ing
com
pone
nts
to e
nsur
e sp
ace
is s
afe
and
wel
com
ing.
E
nsur
e C
CTV
and
vis
ibili
ty is
incl
uded
for
safe
ty
Bus
term
inus
to h
ave
supp
orti
ng fa
cilit
ies
near
by
incl
udin
g pu
blic
toile
ts, d
rink
foun
tain
, par
ents
faci
litie
s an
d br
east
feed
ing
room
.D
esig
n sh
ould
uti
lise
the
Vau
ghan
Str
eet d
esig
n fu
rthe
r
Bus
She
lter
Con
cept
- 28
.08.
2013
N.T
.S.
Feed
back
sum
mar
ySp
aces
for
whe
elch
airs
to b
e w
ider
and
not
ed a
s re
serv
edB
ench
nex
t to
whe
elch
air
area
to h
ave
no a
rm r
est t
o en
sure
the
whe
elch
air
user
can
mov
e ac
ross
to s
it o
n th
e be
nch
Con
cept
is p
rovi
ding
bet
ter
shel
ter
and
has
bett
er le
gibi
lity
and
way
find
ing
orie
ntat
ion
cues
Con
side
r a
shel
ter
mod
el th
at u
ses
the
angl
ed b
ench
mod
el fr
om V
augh
an S
tree
tSt
raig
hten
upr
ight
of f
ram
e on
bus
sid
e to
impr
ove
acce
ss &
min
imis
e po
ssib
ility
inju
ry b
y bu
mpi
ng in
to p
ost.
Plan
- B
us S
helt
er T
ype
1 - s
ingl
e
Sect
ion
B
Exa
mpl
e B
us R
oute
Dia
gram
Exa
mpl
e B
us S
top
Feat
ure
Col
ours
- as
sist
in le
gibi
lity
of b
us s
tops
(s
ugge
sted
col
ours
onl
y - s
ubje
ct to
legi
bilit
y re
view
)
Sect
ion
A
Ker
b si
de
Col
oure
d gl
ass
and
galv
anis
ed
met
al s
cree
n to
pro
vide
pro
tect
ion
from
the
elem
ents
Not
eTh
e po
sts
on th
e ke
rb s
ide
may
be
able
to
be r
emov
ed fr
om th
e de
sign
sub
ject
to a
St
ruct
ural
Eng
inee
r’s
revi
ew
Gal
vani
sed
met
al s
cree
n to
pro
vide
pr
otec
tion
from
the
elem
ents
Col
oure
d gl
ass
win
dow
to p
rovi
de
prot
ecti
on fr
om th
e el
emen
ts
Bus
sto
p lo
cati
on a
nd n
ame
clea
rly
disp
laye
d
Col
oure
d gl
ass
win
dow
wit
h G
reat
er
Shep
part
on C
ity
Cou
ncil
logo
. C
lip s
tyle
fitt
ing
to p
rovi
de
vent
ilati
on to
she
lter
Gal
vani
sed
Stee
l upr
ight
Cei
ling
to b
e cl
ad in
ply
woo
d to
lim
it b
ird
nest
ing
and
clim
bing
op
port
unit
ies.
Col
our
to m
atch
ti
mbe
r on
ben
ch s
eats
.
Met
al s
heet
ing
to r
oof.
Furt
her
reso
luti
on o
f str
uctu
re, f
lash
ing
and
ridg
e ca
ppin
g re
quir
ed
Spac
e to
be
rese
rved
for
whe
elch
airs
Edg
e of
feat
ure
benc
h to
be
flush
to
prov
ide
for
ease
of t
rans
itio
n be
twee
n w
heel
chai
r an
d be
nch
Col
oure
d gl
ass
win
dow
to p
rovi
de
sigh
t lin
es in
to s
helt
er. S
ize
of
open
ings
to v
ary
in a
ccor
danc
e w
ith
loca
tion
. Ref
er to
det
ails
.
Prec
ast c
oncr
ete
back
to p
rovi
de
shel
ter
from
ele
men
ts.
Feat
ure
benc
h w
ith
tim
ber
seat
to
incl
ude
light
ing,
bac
k an
d ar
m r
est
sim
ilar
to th
e V
augh
an S
tree
t Fea
-tu
re B
ench
es.
1125
mm
TBC
1400 mm
Section A
Section B
Con
side
r an
aud
ible
bus
rou
te
info
rmat
ion
butt
on, t
o pr
ovid
e ne
xt
bus
arri
val /
dep
artu
re in
form
atio
n
Ang
led
area
of r
oof t
o pr
ovid
e a
prom
inen
t dis
play
of i
ndiv
idua
l bus
ro
ute
that
arr
ives
/ de
part
s fr
om th
is
bus
stop
. Dis
play
to b
e lit
from
be
hind
to p
rovi
de li
ght a
t nig
ht to
bu
s st
op.
Ref
er to
exa
mpl
e bu
s ro
ute
diag
ram
.
The
spac
e be
twee
n po
st a
nd b
us is
to
ens
ure
bus
does
n’t b
ump
into
sh
elte
r. I
f the
re is
eno
ugh
spac
e in
th
e st
reet
scap
e a
full
path
will
be
prov
ided
for.
Not
eW
hile
the
stre
etsc
ape
of M
aude
Str
eet i
s no
t nar
row
the
spac
e is
sti
ll lim
ited
. The
fin
al a
lignm
ent o
f the
roa
d ba
sed
on th
e E
xist
ing
Serv
ice
Rep
ort f
indi
ngs
may
in
fluen
ce d
ista
nce
betw
een
the
bus
shel
ter
and
the
bus.
CProj
ect n
umbe
rSh
eet N
o.
Lies
l Mal
an L
ands
cape
Arc
hite
cts
AB
N 3
9 13
3 17
9 21
2
Des
igne
dD
raw
n
TH
IS D
OC
UM
EN
T I
S C
OPY
RIG
HT
AN
D M
AY
ON
LY B
E U
SED
FO
R T
HE
PU
RPO
SE F
OR
WH
ICH
IT
WA
S C
OM
MIS
SIO
NE
D. U
NA
UT
HO
RIS
ED
USE
PR
OH
IBIT
ED
. ALL
DIM
EN
SIO
NS
AN
D L
EV
ELS
TO
B
E C
HE
CK
ED
ON
TH
E P
RO
JEC
T B
EFO
RE
CO
MM
EN
CIN
G A
NY
WO
RK
S O
R S
HO
P D
RA
WIN
GS.
D
RA
WIN
GS
NO
T TO
BE
SC
ALE
D.
Rev
isio
n
N
Rev
-
PO
Bo
x 7
8
Ha
rco
urt
V
icto
ria
34
53
t:
03
54
42
22
53
m :
0 4
2 7
1 3
2 6
0 1
e
: l m
@ l
m a
l a
n . c
o m
. a u
w:
w w
w .
l m a
l a
n . c
o m
. a u
A
BN
:3
9 1
33
17
9 2
12
Scal
e
Mau
de S
tree
t Bus
Int
erch
ange
Gre
ater
She
ppar
ton
Cit
y C
ounc
il
Dra
ft B
us S
helt
er D
esig
n D
evel
opm
ent
1050
DD
Bus
She
lter
01
-
1: 2
0 @
A1
CR
LM
Aug
ust 2
013
CR
04.0
9.20
13-
-
Lie
sl
Ma
lan
La
nd
sc
ap
e A
rc
hit
ec
ts
draf
t
Prec
eden
t im
ages
Con
cept
Dev
elop
men
t Pro
cess
and
Fee
dbac
k Su
mm
ary
Aftern
oon
sun
Mor
ning
sun
Dia
gram
of B
us S
helt
ers
in M
aude
St
Maude St North bound traffic
Maude St South bound traffic
Vie
w o
f int
erna
l bus
sto
p ba
ck w
all
- Wes
tern
sid
e
Vie
w o
f int
erna
l bus
sto
p ba
ck w
all
- Eas
tern
sid
e
Ker
b si
de
Ker
b si
de
Aft
erno
on s
un w
ill h
it th
e co
ncre
te
wal
l of b
us s
helt
ers
on th
e W
est s
ide
of M
aude
Str
eet.
To p
rovi
de s
helt
er
the
win
dow
s on
this
sid
e of
the
road
w
ill b
e sm
alle
r lim
itin
g su
n ac
cess
w
hile
sti
ll pr
ovid
ing
sigh
t lin
es in
to
the
shel
ter
Mor
ning
sun
will
hit
the
conc
rete
w
all o
f bus
she
lter
s on
the
Eas
t sid
e of
Mau
de S
tree
t. Th
e w
indo
ws
on
this
sid
e of
the
road
hav
e th
e op
port
unit
y to
be
larg
er.
Aft
erno
on
sun
is li
mit
ed in
side
this
bus
sto
p by
th
e ro
of li
ne.
Feat
ure
benc
h ba
sed
on th
e V
augh
an S
tree
t ben
ches
how
ever
it
utili
ses
two
sect
ions
of t
he s
hort
er
benc
h to
lim
it th
e fo
ot p
rint
re
quir
ed w
ithi
n th
e sh
elte
r
Not
eW
hile
the
stre
etsc
ape
of M
aude
Str
eet i
s no
t nar
row
the
spac
e is
sti
ll lim
ited
. The
fin
al a
lignm
ent o
f the
roa
d ba
sed
on th
e E
xist
ing
Serv
ice
Rep
ort f
indi
ngs
may
in
fluen
ce th
e ab
ility
to fi
t the
ang
led
bus
sh
elte
r in
.
Col
oure
d gl
ass
pane
l to
prov
ide
sigh
t lin
e in
to b
us s
top
Bus
rou
te a
nd ti
met
able
in
form
atio
n to
be
clea
rly
disp
laye
d .
Reg
ulat
ory
sign
age
incl
udin
g “t
his
spac
e is
res
erve
d fo
r w
heel
cha
irs”
“N
o Sm
okin
g” “
No
Alc
ohol
”etc
Gap
to e
nsur
e w
ater
doe
sn’t
pool
at
base
dur
ing
rain
eve
nt
Way
find
ing
Map
of S
hepp
arto
n C
BD
wit
h a
“You
are
Her
e” lo
cato
r
Ven
tila
tion
gap
Gla
ss w
indo
ws
to p
rovi
de s
ight
lin
es in
to th
e sh
elte
r. T
he s
ize
and
num
ber
to r
espo
nd to
mor
ning
and
af
tern
oon
sun
cond
itio
ns.
Col
oure
d gl
ass
and
galv
anis
ed
met
al s
cree
n to
pro
vide
pro
tect
ion
from
the
elem
ents
Col
oure
d gl
ass
and
galv
anis
ed
met
al s
cree
n to
pro
vide
pro
tect
ion
from
the
elem
ents
Spac
e to
be
rese
rved
for
whe
elch
airs
Edg
e of
feat
ure
benc
h to
be
flush
to
prov
ide
for
ease
of t
rans
itio
n be
twee
n w
heel
chai
r an
d be
nch
Col
oure
d gl
ass
win
dow
to p
rovi
de
sigh
t lin
es in
to s
helt
er. S
ize
to v
ary
to r
espo
nd to
the
loca
tion
ref
er to
de
tails
.
Prec
ast c
oncr
ete
back
to p
rovi
de
shel
ter
from
ele
men
ts.
Feat
ure
benc
h w
ith
tim
ber
seat
to
incl
ude
feat
ure
light
ing,
bac
k an
d ar
m r
est s
imila
r to
the
Vau
ghan
St
reet
feat
ure
benc
h.
Col
oure
d gl
ass
win
dow
to p
rovi
de
sigh
t lin
es in
to s
helt
er. S
ize
to v
ary
to r
espo
nd to
the
loca
tion
ref
er to
de
tails
.
Prec
ast c
oncr
ete
back
to p
rovi
de
shel
ter
from
ele
men
ts.
Spac
e to
be
rese
rved
for
whe
elch
airs
Spac
e to
be
rese
rved
for
whe
elch
airs
Plan
- B
us S
helt
er T
ype
2 - d
oubl
e in
str
aigh
t lin
e
Plan
- B
us S
helt
er T
ype
2 - d
oubl
e on
an
angl
e
Des
ign
Rat
iona
le
Whe
n de
velo
ping
the
bus
shel
ter
desi
gn w
e co
nsid
ered
mul
tipl
e an
d co
mpe
ting
con
cern
s w
hile
list
enin
g to
the
feed
back
of t
he p
roje
ct r
evie
w te
am. S
helt
ers
have
the
func
tion
al r
equi
rem
ent o
f pro
tect
ing
from
the
elem
ents
whi
lst s
till
feel
ing
safe
and
mai
ntai
ning
cle
ar s
ight
line
s. I
nfor
mat
ion
is to
be
clea
rly
disp
laye
d an
d av
aila
ble
in d
iffer
ent f
orm
ats
to m
eet a
wid
e ra
nge
of u
sers
req
uire
men
ts.
The
feed
back
on
exis
ting
She
ppar
ton
Bus
She
lter
s ac
know
ledg
ed c
once
rns
over
lo
ngev
ity
and
vand
alis
m b
ut e
xpre
ssed
a d
esir
e fo
r a
mor
e w
elco
min
g an
d co
mfo
rtab
le b
us s
top.
The
se r
equi
rem
ents
bec
ame
the
driv
ing
fact
ors
in s
elec
ting
m
ater
ials
and
in d
esig
ning
the
form
of t
he s
helt
ers.
Not
e it
is in
tend
ed th
at to
ilets
, and
oth
er p
ublic
faci
litie
s as
wel
l as
bike
hoo
ps, d
rink
ing
foun
tain
s an
d bi
ns w
ill b
e pr
ovid
ed a
t an
appr
opri
ate
dist
ance
wit
hin
the
stre
etsc
ape
or th
e pl
aza.
Furt
her
Wor
kFu
rthe
r w
ork
will
be
requ
ired
to fi
nalis
e th
e bu
s sh
elte
r de
sign
. An
exis
ting
ser
vice
s re
port
is c
urre
ntly
bei
ng p
rodu
ced.
The
find
ings
in th
is r
epor
t will
not
onl
y af
fect
the
stre
etsc
ape
and
bus
stop
layo
ut b
ut w
ill a
lso
influ
ence
the
final
des
ign
form
of t
he s
helt
er.
All
sign
age,
bus
info
rmat
ion
and
the
exac
t col
ours
of t
he b
us s
helt
ers
requ
ire
a re
view
to e
nsur
e th
e in
form
atio
n m
eets
bes
t pra
ctic
e fo
r in
form
atio
n di
spla
y an
d to
ens
ure
legi
bilit
y fo
r al
l.
Thes
e de
sign
s ar
e in
tend
ed a
s a
prel
imin
ary
conc
epts
onl
y an
d fu
rthe
r de
sign
dev
elop
men
t will
be
base
d on
feed
back
rec
eive
d an
d St
ruct
ural
Eng
inee
ring
re
quir
emen
ts. F
urth
er r
esol
utio
n of
the
roof
str
uctu
re in
clud
ing
flash
ing
and
ridg
e ca
ppin
g w
ill b
e re
quir
ed.
The
desi
gn fo
r th
e gl
ass
win
dow
fixi
ngs
will
re
quir
e de
sign
dev
elop
men
t wit
h a
Stru
ctur
al E
ngin
eer
and
fabr
icat
ors.
The
audi
ble
tim
etab
le w
ill r
equi
re d
evel
opm
ent t
o en
sure
it m
eets
the
need
s of
bot
h tr
ansp
ort u
sers
and
pro
vide
rs.
A c
ompr
ehen
sive
ligh
ting
des
ign
will
nee
d to
be
unde
rtak
en fo
r al
l ele
men
ts o
f the
bus
she
lter
and
in th
e co
ntex
t of t
he s
tree
tsca
pe.
CProj
ect n
umbe
rSh
eet N
o.
Lies
l Mal
an L
ands
cape
Arc
hite
cts
AB
N 3
9 13
3 17
9 21
2
Des
igne
dD
raw
n
TH
IS D
OC
UM
EN
T I
S C
OPY
RIG
HT
AN
D M
AY
ON
LY B
E U
SED
FO
R T
HE
PU
RPO
SE F
OR
WH
ICH
IT
WA
S C
OM
MIS
SIO
NE
D. U
NA
UT
HO
RIS
ED
USE
PR
OH
IBIT
ED
. ALL
DIM
EN
SIO
NS
AN
D L
EV
ELS
TO
B
E C
HE
CK
ED
ON
TH
E P
RO
JEC
T B
EFO
RE
CO
MM
EN
CIN
G A
NY
WO
RK
S O
R S
HO
P D
RA
WIN
GS.
D
RA
WIN
GS
NO
T TO
BE
SC
ALE
D.
Rev
isio
n
N
Rev
-
Scal
e
Mau
de S
tree
t Bus
Int
erch
ange
Gre
ater
She
ppar
ton
Cit
y C
ounc
il
Dra
ft B
us S
helt
er D
esig
n D
evel
opm
ent
1050
DD
Bus
She
lter
01
-
1: 2
0 @
A1
CR
LM
Aug
ust 2
013
CR
04.0
9.20
13-
-
draf
t
PO
Bo
x 7
8
Ha
rco
urt
V
icto
ria
34
53
t:
03
54
42
22
53
m :
0 4
2 7
1 3
2 6
0 1
e
: l m
@ l
m a
l a
n . c
o m
. a u
w:
w w
w .
l m a
l a
n . c
o m
. a u
A
BN
:3
9 1
33
17
9 2
12
Lie
sl
Ma
lan
La
nd
sc
ap
e A
rc
hit
ec
ts
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
eeeexxxeeexxxee
exxxxexx
eeeeeeexxex
exexex
R o w e S t r e e t
U n i o n L a n e
M a u d e S t r e e t M a l l
Ma
ud
e S
t re
et
exexxex
McDonalds
FormerLa Porchetta
Collins Book Sellers on Maude
GB Coffee
Public Realm 2
PR 1
PR 2
CFA
7.2m
x 2
.3m
(typ
.)
15m
in15
min
6.7m
x 2
.3m
(typ
.)
PR 3
PR 6
PR 7
PR 8
Public Realm 6
Central median planting
AA
BB
15m
in
15m
in
5.5
3 min
4.3
3 min
6
4.5
4.52.3 2.3
5
Baking Dough Bakery
JB Jewellers
Doyle’sElectrical
3
3.4
Proposed public realm area with custom seating, lighting, bins, understorey planting and additional tree planting.
Closed Circuit TV (CCTV)CCTV is to be provided throughout the streetscape and in the bus interchange. A comprehensive design by specialists will be required to ensure this is adequately provided for.
CFA and signalised intersectionsThe new intersection at Vaughan Street is to be able to be activated by the CFA to limit negative impact on response times. Consideration of similar facilities at the High Street intersection should be discussed with Vic Roads
New signalised intersections Vaughan Street GSCC intended that this intersection and the Maude Street precinct would be included in the Smart Roads program. However this option was not available at the time of conceptual design. Should it become available during documentation this process could be undertaken.
CFA traffic movementsThe CFA have been consulted with directly to ensure that their vehicles have been designed for in the streetscape. The road design has been created using a turning circle of a vehicle larger than the biggest in the current fleet to future proof the streetscape. The final road way width is a balance of pedestrian and vehicle requirements. It has been developed collaboratively with GSCC Engineers, Shepparton Transit and the CFA
Kerb radii5m radii have been used on the kerbs to provide for the street sweeper requirements. Note the central median does not require street sweeper access as it is the high point of the road.
Car parking restrictionsSome traders have expressed that 2hr carparks is too long for their business models. They have suggested 1hr car parks throughout the street. 15min carparks have been requested in front of several shops to suit the nature of their business.
Duration of constructionSome traders have raised concern about the impact of construction on their business. This issue should be considered during documentation and by GSCC to mitigate the impact where possible.
Public Facilities in the PlazaThe public facilities shown on this plan are a concept only and are subject to further investigation and design development. There is the potential to provide an integrated public facilities and toilet in this location. A Public Toilet Review (2013) has been produced by LMLA for the Greater Shepparton City Council. This report should be referred to for any design development. The report notes that public toilet facilities have been requested in this location. The report recommends that not only are 9 or more cubicles needed in this area, but additional facilities are also required, such as adult change facilities, a parents’ room, breast feeding room and child changing facilities. Please note - Bus service provider has requested bus staff toilets be included in the facilities. Facilities to consider provision of a mobility aid recharge point.
Proposed bus bay.
Entrance to Rowe Street carpark realigned to allow for minimal disturbance of High Street traffic. Refer to GSCC plans for details.
2 x 15 minute car spaces.
Proposed centre parallel parking with 400mm centre space.
Bus bay
Additional planted centre medians to provide extra shade, protection for parked cars and pedestrian refuge.
Proposed Rowe Street raised pedestrian crossing.
Proposed raised pedestrian crossing.
Upgrade and realignment ofexisting Maude Street pedestrian crossing to a raised crossing. Relocation to align to existing underground power easement and move pedestrians further away from CFA.
Proposed public realm area with custom seating, lighting, bins, understorey planting and additional tree planting.
Additional outdoor cafe space provided for GB customers.
Proposed centre parallel parking with 400mm centre space.
Raised pedestrian crossing
Proposed rain garden to collect storm water from road
Existing tree to be removed
Additional footpath space provided to reduce existing congestion.
2 x 15 minute car spaces either side of Doyle’s driveway.
Bus
bay
Central median area with raised profile kerb to protect understorey planting. Median shape has been designed to facilitate vehicular access to carparks. Proposed shape also maximises space for tree and understorey planting to assist in cooling the streetscape.
CFA crossover in plain concrete to CFA requirements.
Area for bike racks, relocated public phone and drinking fountain. Ensure fountain is able to be accessed by all abilities and a dog bowl for assistance animals is provided. Provision of facilities near the CFA should not encourage people to linger. Ensure no seating is provided to this side of the crossing.
Ensure corner of kerb at bus stop is able to be crossed by CFA vehicles without a lip.
Concrete island to limit vehicles overhanging in the CFA required space. Ensure kerb profile provides for CFA vehicles to mount this island.
Allowance in streetscape for additional cafe dining.
Planting buffer between seating and traffic.
Proposed tree
Proposed bench
Doyle’s driveway retained in existing location. Line marking to designate this as a driveway not a car park.
Proposed drop off bus bay to facilitate easy access to High Street and the Mall. 150mm high kerb in line with the bus doors is required to meet Vic Roads standards.
Proposed public realm area with seating, lighting, bins, understorey planting rain garden, pyc sculptures and additional tree planting.
Blank CFA wall. Potential to be used to commemorate the CFA service to Shepparton with art work or large historical photos.
Existing servicesA Services Investigation Report has been undertaken by CS and A. The service findings have been considered and adjustments made to the design to limit conflict with existing services. However, to ensure best outcomes, the exact location and depth of services should be surveyed and liaison with service authorities should be undertaken.
Future underground powerUnderground power requires a significant easement. Any future underground power should consider the locations’ impact on the street trees.Minor alterations to the alignment of the power will have a significant impact on the streetscape.
Design for all abilitiesThe design of individual feature elements and furniture is to ensure sufficient contrast with it’s environment to limit potential hazards for the visually impaired. Tactile Ground Surface Indicators (TGSIs) are to be provided in the streetscape at areas of potential pedestrian / vehicle hazards as well as intersections and crossings.Ensure space for mobility aids in public realm is provided for.
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
ex
exex
exxeexxexxeexxxe
eeeeexxeexx
eeeeexxexxxxxxxxeeexxexxeexexxexxxxxxeeexxxexxeeeexexxxxx
eeexxeex
eeexxeexx
exeeeeeexeeeeeeeeeeee
eeeexxxxxeeeexxxxxxxexxeexxxeeexxxeeeeexxeex
eeeeeeeexxxxxxxxxxxxexxxxeeeexexxexxxxxxxeexxxxxxxxxxee
Legend
Proposed pedestrian footpath
Proposed parking
Proposed public realm paving
Existing kerb
Proposed understorey planting
Proposed rain-garden
Proposed custom seating element
Proposed bench to GSCC standards
Existing trees to be removed
Proposed Street tree Geijera parvifolia Wilga
Proposed Street tree Zelkova serrata Zelkova
Proposed Plaza tree Eucalyptus pauciflora Little Snowman
Proposed shelter - refer to additional plans
ex
Pr o
po
s ed
Ma
ud
e S
t re
et
Bu
s I n
t er c
ha
ng
e
Ma
ud
e S
t re
et
V a u g h a n S t r e e t
A s h e n d e n S t r e e t
Future development to existing Coles site - refer to plans by others
Streetscape Design RationaleThe streetscape design provides a stronger pedestrian link between the Mall, Vaughan Street and the proposed bus interchange. At the same time this design provides a quality retail streetscape experience.New tree planting provides greater shade for pedestrians, and for parked cars, while also assisting in cooling the streetscape. “Public realm spaces” provide areas for resting / socialising without a commercial imperative. These public realm areas are to be welcoming spaces with understorey planting to contribute to the overall streetscape amenity. They have been strategically placed to provide resting areas with shade, seating, lighting and bins.
Note:Please refer to Bus shelter concept for details
Car parking
North(High Street to Vaughan Street)Existing parking 43 x Standard bays 2 x 15 minute bays 5 x Bus BaysProposed Parking 40 x Standard bays 4 x 15 minute bays 2 x Accessible bays 1 x Bus drop off bay 1 x Bus stop in High streetSouth(Vaughan Street to Ashenden Street)Existing parking 33 x Standard baysProposed Parking 8 x Bus Bays
Existingcarpark - subject to further design
Chemist
8m x
3.8
m (t
yp.)
Acc
essi
ble
Acc
essi
ble
PR 4
PR 5
Public Realm 6BB
CC
Bakery
3.5
4.5 2.3 2.32.3
6.5
4.5
4
2.5
3.65
1.453.2
3.2
4
3
an
ge
Proposed plaza design is conceptual only. This design has been shown for discussion purposes only. All elements are subject to change during consultation and design development.
This Concept Plan is based on a desktop study of existing services and infrastructure. Significant changes may occur to the Concept Plan during an impact assessment of existing services to this concept. It is intended that the design integrity and concept of the overall streetscape will be maintained after the existing services investigation.
C
Project numberSheet No.
Liesl Malan Landscape Architects ABN 39 133 179 212
DesignedDrawn
THIS DOCUMENT IS COPYRIGHT AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED USE PROHIBITED. ALL DIMENSIONS AND LEVELS TO BE CHECKED ON THE PROJECT BEFORE COMMENCING ANY WORKS OR SHOP DRAWINGS. DRAWINGS NOT TO BE SCALED.
Revision
N
Rev -
P O B o x 7 8 H a r c o u r t V i c t o r i a 3 4 5 3t : 0 3 5 4 4 2 2 2 5 3 m : 0 4 2 7 1 3 2 6 0 1 e : l m @ l m a l a n . c o m . a uw : w w w . l m a l a n . c o m . a u A B N : 3 9 1 3 3 1 7 9 2 1 2
Scale
Maude Street Streetscape Redevelopment
Greater Shepparton City Council
Streetscape Concept Plan
1050
1050_CPDD
C
1: 250 @ 594 x 1500mm
CR LM Nov 2013CR 16.12.2013- -
L i e s l M a l a n L a n d s c a p e A r c h i t e c t s
Raised pedestrian crossing
Proposed tree
Proposed rain garden to collect storm water from road
Proposed rain garden to collect storm water from road
Feature public realm pavement treatment
Existing tree to be removed
Proposed feature bench with lighting
Additional slip lane for vehicles turning into Vaughan Street
Existing roundabout to be replaced by a signalised intersection with dual lanes in all directions for through and turning traffic.
Vaughan Street Project.Refer to separate documentation package
Proposed carpark alignment by others. Refer to Vaughan Street Plans.
Proposed plaza, with sloped grassed areas for informal play inlaid with lighting.
Existing property boundary.
3 x Accessible parking bays
Existing pylon sign to be retained.
Potential play space to further design development.
Framed seating element, with lighting.
Tree planting to filter light, provide shade to informal seating and reduce plaza temperature.
Proposed bus shelters to each stop. Refer to details and bus shelter concept plans for more information
Ensure proposed street tree location does not obscure new signals at intersection
Central median with trees in tree cells and fence. Maintenance regime and the treatment of this median will require further liaison with Council works team. Note - ensure fence has no horizontal components
Low priority bus bay due to potential conflict with existing residence driveway
Proposed raised pedestrian crossing
Proposed public facilities. Concept only subject to further investigation and design development. Refer to notes.
Awning and building treatment to be considered. Refer to Architects plans
South Bus bay 2
South Bus bay 1
South Bus bay 4
South Bus bay 3
Nor
th B
us b
ay 2
Nor
th B
us b
ay 3
Nor
th B
us b
ay 4
Nor
th B
us b
ay 1
2 x Accessible parking bays provided with bollards between pedestrians and car parks. Ensure the distance between bollards provides room for a mobility aid on a ramp with carer assisting.
2m wide area adjacent to front door of bus to be clear of obstacles.
“Bus stop post and flag” to PTV requirements
4m wide area adjacent to rear doors of bus to be clear of obstacles.
1.2m min continuous path to front of bus shelter.
Kerb required to be 150mm high for entire length of bus to provide for accessible ramp access.
Bus shelter. Refer to detailed concept plans.
Ensure structures are at least 0.5m back from the kerb to provide for swing of bus
intersections and crossings.Ensure space for mobility aids in public realm is provided for.
C
Project numberSheet No.
Liesl Malan Landscape Architects ABN 39 133 179 212
DesignedDrawn
THIS DOCUMENT IS COPYRIGHT AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED USE PROHIBITED. ALL DIMENSIONS AND LEVELS TO BE CHECKED ON THE PROJECT BEFORE COMMENCING ANY WORKS OR SHOP DRAWINGS. DRAWINGS NOT TO BE SCALED.
Revision
Rev -
P O B o x 7 8 H a r c o u r t V i c t o r i a 3 4 5 3t : 0 3 5 4 4 2 2 2 5 3 m : 0 4 2 7 1 3 2 6 0 1 e : l m @ l m a l a n . c o m . a uw : w w w . l m a l a n . c o m . a u A B N : 3 9 1 3 3 1 7 9 2 1 2
Maude Street Streetscape Redevelopment
Greater Shepparton City Council
Streetscape Concept Sections
1050
1050_CS
C
CR LM Nov 2013CR 19.12.2013- -
L i e s l M a l a n L a n d s c a p e A r c h i t e c t s
Adjoining business Foottpath Shaded public realm Public realm Coles buildingLevel pedestrian crossing Level pedestrian crossing Central median refuge
Section AARaised pedestrian crossing - Maude Street Rowe Street
Adjoining business Footpath Carpark Coles buildingPedestrian Shade tree and planting
Roadway Roadway Central median parking with raised planting and shade trees. Tree guards to protect trees. Section BB
Central median with raised planting
Adjoining carpark by others
Footpath Bus bay - Public realm behind
Bus bay PlazaPedestrian Bus stop with shelter
Roadway Roadway Central median planting with feature fence and trees
Section CCMaude Street Bus Interchange
Proposed plaza design is conceptual only. This design has been shown for discussion purposes only. All elements are subject to change during consultation and design development.
Streetscape Design RationaleThe streetscape design provides a stronger pedestrian link between the Mall, Vaughan Street and the proposed bus interchange. At the same time this design provides a quality retail streetscape experience.New tree planting provides greater shade for pedestrians, and for parked cars, while also assisting in cooling the streetscape. “Public realm spaces” provide areas for resting / socialising without a commercial imperative. These public realm areas are to be welcoming spaces with understorey planting to contribute to the overall streetscape amenity. They have been strategically placed to provide resting areas with shade, seating, lighting and bins.
Note:Please refer to Bus shelter concept for details
October 2007
Greater Shepparton City Council Urban Design ManualA Catalogue of approved furniture, soft and hard landscape details for use in the Shepparton C.B.D.
Bus & Taxi Shelters - CBD use
DESIGN PHILOSOPHYThe Bus and Taxi Shelter is designed specifically for the Shepparton City. It draws on the theme of metallic furniture with blue colour trim of the Greater Shepparton furniture range. The signage on the end elevation metallic fins uses the Greater Shep-parton logo and identifies the shelter as a taxi rank or bus shelter.
The shelter has a laminated glass surround that is housed in a metal-lic coloured frame, providing shelter whilst maintaining visibility of oncom-ing buses or taxis. A double shelter can provided for major Bus Stops.
This double Bus shelter has a blue seat matching the blue trim of the roof whilst the standard Single Shelter for Taxi's and Bus's has the standard Bright Silver Satin coloured seat. The shelter roof extends over the frame providing maximum shade from summer sun for pedestrians. A light weight aluminium frame is designed to be attached to the glass walls to provide bus information from both sides of the shelter.
446
2125mm
1785mm
445mm
4˚ angle to top of fin
100mm25mm50mm
322mm
1240mm
405mm
5843
Profile of Front Nose of fin to match front bull-nosed fascia.Front Elevation bull nosed fascia to be Powdercoated DULUX Blaze Blue Gloss 19941Zinc plated gutter system to be 100mm in length from rear of column. To be powdercoated Dulux Blaze Blue gloss 19941. Centre line of logo.
-74˚ angle to rear of fin.
25mm radius to all corners.
Side Fasci Fin to be laser cut with profile and City of Shepparton logo as shown. Logo to be 58mm from base of fin, 25mm from gutter system and 48mm from top of fin as shown. Fin to be attached to roof structure. Fin to be powdercoated DULUX Bright Silver Satin 51491. Graphic to be sign written as shown on following page. Seat to powdercoated DULUX Blaze Blue Gloss for Double Bus Shelters and DULUX Bright Silver Satin 5149 for Standard Bus and Tazi Shelters.
RHS Frame 2270 min. height. Fabrication as nominated by manufacturer. Frame to be powdercoated DULUX Bright Silver Satin 51491.
Sheet 1 of 2 F 810 Bus & Taxi Shelters - CBD
A Catalogue of approved furniture, soft and hard landscape details for use in the Shepparton C.B.D.Greater Shepparton City Council Urban Design Manual
October 2007 F 810 Bus & Taxi Shelters - CBD
SUPPLIERBus & Taxi ShelterPolite Enterprises Pty Ltd.ph. 03 9436 9922fax. 03 9436 9944Aluminium Frame for Bus Information20mm Snap & Grip Foolscap sizeClear anodised aluminium frame.See Urban Design Manual F 820.DESIGN CONTACTUrban Initiativesph. 03 9329 6844SHELTER FINISHESSide Fins8mm thick Laser Cut ends.Powdercoat DULUX Bright Silver Stain 51491.Graphic Sigh to be written using:Green Colour - DULUX Thai Teal 53 GG 50/360.Gloss to match powdercoat colours.Blue Colour - DULUX Blaze Blue Gloss 19941.Blue Text - DULUX Space Blue Gloss 19990.Front Bull Nosed Fascia & Rear GutterBlue Colour - DULUX Blaze Blue Gloss 19941.Bus Shelter FramePowdercoat DULUX Bright Silver Stain 51491.Seat for Double Bus ShelterBlue Colour - DULUX Blaze Blue Gloss 19941.Seat for Standard Bus & Taxi ShelterSilver Colour - DULUX Bright Silver Stain 51491.RECOMMENDED USEIn Shepparton City Centre.MAINTENANCECleaning and maintenance as required.DOCUMENTATIONCross reference with site layout drawings.RESPONSIBLE COUNCIL OFFICERManager - Engineering Projects ph. 03 5832 9700
Sheet 2 of 2
Text to be 200mm high Arial Font, aligned horizontally. Centre on centre line of f i n a n d 4 3 5 m m f r o m bot tom rear corner of fin. Text to be adhesive vinyl as recommended by manufacturer. Colour to match DULUX Space Blue Gloss 19990 powdercoat colour.
40mm wide band of adhesive vinyl as recommended by manufacturer. Colour to be DULUX Thai Teal Green 53GG 50/360 gloss to match powdercoat colour gloss.
Bands of Colour to be parallel to rear of fin beginning 75mm from end of fin.
165mm wide band of adhesive vinyl as recommended by manufacturer. Colour to be DULUX Blaze Blue Gloss 19941 powder coat.
435
43
58
405
1654075
Graphic to Shelter Fins Not to Scale
800
1330
23000min.
300
600
Bus
Bus
Doo
rway
500300 60
0
Bus and taxi Shelter to be aligned a minimum of 800mm from front of kerb to front of overhang on shelter roof. A minimum of 500mm from edge of tree pit, a minimum of back of wall of shelter to overhanging verandas. Allow a 2300mm minimum width of footpath between adjacent building and rear of shelter where possible. Make sure shelter is out of the alignment of adjacent doorways and entry to shops and buildings.
Typical Layout Plan Not to Scale
Provide Directional Tactile ground surface Indicators in Locations as shown. For paving types and detail refer to Urban Design Manual Notes H 040.Provide Hazard Tacti le ground surface Indicators in Locations as shown. For paving types and detail refer to Urban Design Manual Notes H 040.
Ensure 1330mm minimum clear distance to allow for wheelchair turning circles.
October 2007
Greater Shepparton City Council Urban Design ManualA Catalogue of approved furniture, soft and hard landscape details for use in the Shepparton C.B.D.
Typical Layout Plan
F 820 Bus Timetable Frame
Aluminium Frame for Bus Timetable
Sheet 1 of 2
20mm Foo l scap S i ze Clear Anodised Aluminium Snap & Grip Frame with Bus Timetable Information. Visible from both inside and outside of Bus Shelter. Frame to be mounted in the interior of Bus Shelter. Locate frame on the corner where the seat does not join the Shelter end. Neatly butt frame nest to corner column. Where two frames might be required one frame to be mounted on end elevation the other to the back wall of the Shelter as shown in the Timetable Frame Section/ Elevation Drawing Sheet 2 of 2 of this Urban Design Manual Notes. Base to be 1300mm from ground for easy reading. Frame supplied an mounted by Polite Enterprises ph. 9436 9922
DESIGN PHILOSOPHYThe 20mm snap and grip clear anodised aluminium frame used to house bus timetable information has been selected for its ability to be mounted on a glass wall so that bus timetable information can be seen from both the interior and exterior of the shelter. Its form is unobtrusive and its finish has been selected to compliment the bus shelter metallic finish.
The snap and grip unit provides a frame that is fixed in appearance but its sides and tops flip out allow-ing timetable information to be eas-ily placed by Shepparton Transit. When Council orders bus shelters two frames per shelter should also be ordered and installed when bus shelters are placed in Shepparton City Centre.
End Elevation Not to Scale
1300mm
Bus Shelter
A Catalogue of approved furniture, soft and hard landscape details for use in the Shepparton C.B.D.Greater Shepparton City Council Urban Design Manual
October 2007 F 820 Bus Timetable Frame
SUPPLIERPolite Enterprises Pty Ltd.ph. 03 9436 9922
DESIGN CONTACTPolite Enterprises Pty Ltd.ph. 03 9436 9922
MATERIALS & FINISHES20mm Snap & Grip Foolscap sizeClear anodised aluminium frame.Frame to be mounted to glass as shown in drawing by supplier.Clear acrylic sheet to be glare free.
RECOMMENDED USEIn Shepparton City Centre Bus Shelters.
MAINTENANCECleaning and maintenance as re-quired.
DOCUMENTATIONCross reference with site layout drawings.
RESPONSIBLE COUNCIL OFFICERManager - Engineering Projects ph. 03 5832 9700
Sheet 2 of 2
Bus Timetable Information and Frame Detail Not to Scale
20mm wide Clear Anodised Aluminium Snap and Grip Frame Supplied and instead by Polite Enterprises ph. 03 9436 9922. Whilst looking permanently fixed, frame sides and top can bend back to place timetable information. Timetable updates can easi ly be replaced.
Bus Timetable information to be firstly laminated with approximately 2mm overhang around edge of foolscap page.s
Timetable information to be placed on either side of central acrylic sheet so the same information can be viewed from outside the shelter as well as inside. Ensure acrylic sheet is glare free.
Double-sided Clear adhesive tape fixing frame to glass by Polite Enterprises ph. 03 9436 9922.
T i m e t a b l e Fr a m e S e c t i o n /Not to Scale
Bus Shelter Rear Corner Column.
Bus End Elevation Thickened Glass Wall.
20mm Aluminium Snap & Grip Frame Section with Bus Timetable information mounted to Bus Shelter End to but join Shelter Rear Column furthermost from seat. Frame base to be 1300mm from ground.
Seat
Second 20mm Aluminium Snap & Grip Frame mounted on back Wall of Shelter.
Intr
od
uct
ion
Bu
s st
op
s ar
e a
n i
mp
ort
ant
inte
rfac
e b
etw
een
bu
ses
and
pas
sen
gers
. T
hey p
rovi
de f
acil
itie
s fo
r w
aiti
ng
pas
sen
gers
an
d f
acil
itie
s fo
r th
e b
us.
Ap
pro
pri
ate
traf
fic
man
agem
en
t is
sues
also
need
to
be a
dd
ress
ed
to a
llo
w t
he b
us
to e
nte
r an
d l
eav
e t
he s
top
. T
his
app
roac
h m
ean
s th
at b
us
sto
ps
can
be d
ivid
ed
in
to
the t
wo
dis
tin
ct c
om
po
nen
ts o
f p
asse
ng
er
wai
tin
g
area
and
bu
s st
op
pin
g a
rea.
Th
e f
oll
ow
ing
gu
ideli
nes
pro
vid
e i
nfo
rmat
ion
on
th
e d
esi
gn
an
d i
nte
nd
ed
op
era
tio
n o
f b
oth
pas
sen
ger
wai
tin
g a
nd
bu
s st
op
pin
g
areas
fo
r ri
gid
bu
ses
up
to
14.5
metr
es
in l
en
gth
.
Gu
idan
ce o
n b
us
sto
ps
for
arti
cula
ted
bu
ses
is n
ot
cove
red
in
th
is d
ocu
men
t.
Pa
ssen
ger
wa
itin
g a
rea
Th
e p
asse
ng
er
wai
tin
g a
rea
at b
us
sto
ps
sho
uld
hav
e a
con
sist
en
t an
d p
red
icta
ble
lay
ou
t, t
akin
g i
nto
acc
ou
nt
wai
tin
g, b
oar
din
g a
nd
ali
gh
tin
g p
asse
ng
ers
, p
assi
ng
ped
est
rian
s, a
ccess
fo
r p
eo
ple
wit
h v
isio
n o
r p
hysi
cal
imp
airm
en
ts, an
d i
nte
ract
ion
wit
h t
he b
us
and
bu
s
dri
ver.
All
new
bu
s st
op
s m
ust
no
w c
om
ply
wit
h t
he
req
uir
em
en
ts o
f th
e D
isab
ilit
y D
iscr
imin
atio
n A
ct
(1992)
and
th
e D
isab
ilit
y S
tan
dar
ds
for
Acc
ess
ible
Pu
bli
c T
ran
spo
rt (
2002).
Th
e S
tan
dar
ds
ou
tlin
e
the r
eq
uir
em
en
ts i
n a
reas
su
ch a
s ac
cess
pat
hs,
man
oeu
vrin
g a
reas
, ra
mp
s, w
aiti
ng
are
as, su
rfac
es
and
tac
tile
gro
un
d s
urf
ace i
nd
icat
ors
(T
GS
Is).
Th
ese
bu
s st
op
gu
ideli
nes
use
‘acc
ess
ible
’ desi
gn
pri
nci
ple
s,
bu
t sh
ou
ld b
e r
ead
in
co
nju
nct
ion
wit
h t
he D
isab
ilit
y
Sta
nd
ard
s.
Bus
stop
pos
t an
d fla
gA
bu
s st
op
po
st a
nd
fla
g (
i.e. si
gn
) ar
e u
sed
to
iden
tify
th
e b
us
sto
p, an
d p
rovi
de a
“m
ark
er”
fo
r th
e
bu
s d
rive
r to
sto
p w
ith
th
e f
ron
t o
f th
e b
us
in l
ine
wit
h t
he p
ost
. T
his
prov
ides
a “
cont
rol p
oint
” fo
r th
e la
yout
of b
us s
top
faci
liti
es,
an
d a
llo
ws
a co
nsi
sten
t
and
pre
dic
tab
le e
nvir
onm
ent t
o be
cre
ated
. Thi
s is
pa
rtic
ular
ly im
port
ant t
o pa
ssen
gers
with
vis
ion
or
phys
ical
impa
irm
ents
.
Boar
ding
and
alig
htin
g cl
ear
area
sTo
pro
vide
uno
bstr
ucte
d ac
cess
to th
e fr
ont a
nd r
ear
door
s of
the
bus,
an
area
adj
acen
t to
the
door
s sh
ould
be
free
from
obs
tacl
es s
uch
as s
tree
t fur
nitu
re, t
rees
, an
d po
les.
Thi
s is
par
ticul
arly
impo
rtan
t for
whe
elch
air
acce
ss to
the
bus,
for
the
effic
ient
load
ing
and
unlo
adin
g of
pas
seng
ers,
and
to p
rovi
de a
con
sist
ent b
us s
top
layo
ut.
Figu
re 1
illu
stra
tes
the
min
imum
cle
ar a
reas
. The
se
dim
ensi
ons
are
base
d on
:
P
rovi
sio
n o
f m
ano
eu
vrin
g s
pac
e f
or
a w
heelc
hai
r
adja
cen
t to
th
e d
oo
rs, as
lo
w f
loo
r b
use
s m
ay
hav
e r
amp
s at
eit
her
the f
ron
t o
r re
ar d
oo
rs
A
wid
er
clear
are
a at
th
e r
ear
do
or
to p
rovi
de
imp
rove
d e
gre
ss w
ith
pas
sen
gers
bein
g a
ble
to
eas
ily e
xit
in
a n
um
ber
of
dir
ect
ion
s o
nce
off
th
e
bu
s, a
nd
T
he r
ear
do
or
loca
tio
n v
aryin
g w
ith
dif
fere
nt
len
gth
bu
ses.
Feb
rua
ry 2
006
Bu
s St
op
Gu
idelin
es
Bu
s st
op w
ith s
hel
ter
an
d b
us
serv
ice
info
rma
tion
tot
em
Bu
s St
op
Gu
idelin
es
2
Pa
ssen
ger
ha
rdst
an
d a
rea
A p
asse
ng
er
har
dst
and
are
a w
ith
a s
eal
ed
sm
oo
th
surf
ace p
rovi
des
a co
nn
ect
ion
betw
een
th
e b
us
do
ors
and
th
e n
ear
by f
oo
tpat
h, p
arti
cula
rly f
or
wh
eelc
hai
r
use
rs. It
als
o d
efi
nes
the w
aiti
ng
an
d c
ircu
lati
ng
sp
ace
aro
un
d t
he b
us
sto
p p
asse
ng
er
faci
liti
es.
Th
e e
xte
nt
of
the h
ard
stan
d a
rea
may
var
y d
ep
en
din
g u
po
n t
he
bu
s st
op
en
viro
nm
en
t. I
t sh
ou
ld c
on
sist
of
on
e o
f th
e
foll
ow
ing
:
T
he b
oar
din
g/
alig
hti
ng
cle
ar a
rea
adja
cen
t to
the d
oo
r w
ith
wh
eelc
hai
r ac
cess
(su
itab
le i
f al
l
bu
ses
usi
ng
th
e s
top
dep
loy r
amp
s fr
om
th
e
sam
e d
oo
r)
T
he b
oar
din
g/
alig
hti
ng
cle
ar a
reas
ad
jace
nt
to
bo
th d
oo
rs
T
he b
oar
din
g/
alig
hti
ng
cle
ar a
reas
plu
s th
e
spac
e b
etw
een
th
em
, o
r
T
he o
pti
on
s d
esc
rib
ed
ab
ove
, b
ut
wit
h a
con
nect
ion
to
th
e f
oo
tpat
h.
Ad
dit
ion
al h
ard
stan
d a
rea
may
be r
eq
uir
ed
on
th
e
oth
er
sid
e o
f th
e p
ost
if
tim
eta
ble
cas
es
face
th
e
op
po
site
dir
ect
ion
, an
d c
an’t
be s
pu
n a
rou
nd
.
Tact
ile g
roun
d su
rfac
e in
dica
tors
Tac
tile
gro
un
d s
urf
ace i
nd
icat
ors
(T
GS
Is)
assi
st
peo
ple
wit
h v
isio
n i
mp
airm
en
t to
acc
ess
th
e b
us
fro
m
the a
djo
inin
g f
oo
tpat
h. T
acti
le d
irect
ion
al i
nd
icat
ors
dir
ect
peo
ple
fro
m t
he f
oo
tpat
h t
o t
he k
erb
wh
ere
th
e
bu
s fr
on
t d
oo
r w
ill
be, an
d f
rom
th
e b
us
bac
k t
o t
he
foo
tpat
h. T
acti
le w
arn
ing
in
dic
ato
rs w
arn
peo
ple
of
the k
erb
an
d p
ote
nti
al h
azar
d b
eyo
nd
it.
Th
e l
ayo
ut
and
sp
eci
fica
tio
n o
f T
GS
Is s
ho
uld
gen
era
lly b
e i
n
acco
rdan
ce w
ith
th
e A
ust
rali
an S
tan
dar
d A
S1428
Desi
gn
fo
r A
ccess
an
d M
ob
ilit
y P
art
4, T
acti
le
Ind
icat
ors
.
Th
e T
GS
I la
yo
ut
sho
wn
in
fig
ure
1 p
rovi
des
go
od
gu
idan
ce f
or
peo
ple
wh
o a
re v
isio
n i
mp
aire
d b
y
dir
ect
ing
th
em
to
wh
ere
th
e f
ron
t d
oo
r o
f th
e b
us
wil
l b
e. It
als
o m
inim
ises
the i
mp
act
of
the t
iles
on
wh
eelc
hai
r u
sers
if
they a
re b
oar
din
g o
r al
igh
tin
g
fro
m t
he f
ron
t d
oo
r. T
his
is
ach
ieve
d b
y l
oca
tin
g
the d
irect
ion
al t
iles
cen
tral
to
th
e f
ron
t d
oo
rs s
o t
he
wh
eelc
hai
r ca
n s
trad
dle
th
em
. In
ad
dit
ion
to
th
is,
it s
ho
uld
be n
ote
d t
hat
mo
st o
f th
e t
acti
le w
arn
ing
ind
icat
ors
wil
l b
e c
ove
red
by t
he r
amp
wh
en
it
is
dep
loyed
fro
m t
he b
us.
Fig
ure
1:
Pre
ferr
ed B
us
Sto
p L
ayo
ut
- R
oadsi
de
Wid
th >
3.2
m (
wit
h 3
m l
ong
shel
ter)
or >
4.0
m (
wit
h l
arg
er s
hel
ter
as
show
n)
Min
imu
m b
oard
ing
an
d a
ligh
tin
g cl
ear
are
as
at
a l
ow-u
sage
sto
p
Wit
h m
ore
faci
liti
es,
this
sto
p s
till
pro
vides
requ
ired
cle
ar
are
as
Bu
s St
op
Gu
idelin
es
3
Bus
pass
enge
r sh
elte
rB
us
pas
sen
ger
shelt
ers
pro
vid
e a
n i
mp
ort
ant
servi
ce
to w
aiti
ng
pas
sen
gers
. T
he d
esi
gn
an
d l
ayo
ut
of
shelt
ers
sh
ou
ld m
eet
a n
um
ber
of
req
uir
em
en
ts
incl
ud
ing
:
P
rovi
din
g s
helt
er
fro
m t
he s
un
, w
ind
, an
d r
ain
A
llo
win
g p
asse
ng
ers
to
see t
he a
pp
roac
hin
g b
us
and
fo
r th
e b
us
dri
ver
to s
ee t
he p
asse
ng
ers
B
ein
g a
ccess
ible
wit
h t
he n
ece
ssar
y c
lear
ance
and
cir
cula
tio
n s
pac
es,
par
ticu
larl
y f
or
peo
ple
wit
h p
hysi
cal
or
visi
on
im
pai
rmen
ts, an
d
P
rovi
din
g a
saf
e s
helt
er
for
pas
sen
gers
wh
ile n
ot
po
sin
g u
nn
ece
ssar
y d
ang
ers
to
th
e o
ccu
pan
ts o
r
rid
ers
of
pas
sin
g v
eh
icle
s.
Bu
s sh
elt
ers
sh
ou
ld b
e p
osi
tio
ned
so
th
at s
igh
t
dis
tan
ce r
eq
uir
em
en
ts f
or
road
use
rs a
re n
ot
sig
nif
ican
tly i
mp
acte
d. W
here
th
ere
is
amp
le w
idth
,
bu
s sh
elt
ers
sh
ou
ld b
e l
oca
ted
ou
tsid
e t
he C
lear
Zo
ne
(as
defi
ned
in
Vic
Ro
ads
Ro
ad D
esi
gn
Gu
ideli
nes,
2002).
Ho
weve
r, i
n m
ost
cas
es
this
wil
l n
ot
be
po
ssib
le, so
sh
elt
ers
sh
ou
ld b
e m
ade o
f m
ateri
als
to
min
imis
e i
nju
ry t
o e
rran
t ro
ad u
sers
.
In a
co
nst
rain
ed
en
viro
nm
en
t th
e p
refe
rred
lo
cati
on
for
a b
us
pas
sen
ger
shelt
er
is a
s sh
ow
n i
n f
igu
re 1
. A
min
imu
m w
idth
1200 m
m i
s sh
ow
n o
n e
ach
sid
e o
f
the s
helt
er
to p
rovi
de a
co
nti
nu
ou
s ac
cess
ible
pat
h
of
trav
el.
If
the s
helt
er
has
an
ad
vert
isin
g p
anel
that
is 1
500 m
m w
ide, a
min
imu
m r
oad
sid
e w
idth
of
3.9
metr
es
wo
uld
be r
eq
uir
ed
. If
th
ere
were
800 m
m
en
d p
anels
, th
e m
inim
um
ro
adsi
de w
idth
wo
uld
be
red
uce
d t
o 3
.2 m
etr
es.
Wh
en
th
e r
oad
sid
e w
idth
is
less
th
an 3
.2 m
etr
es,
it
can
be d
iffi
cult
to
lo
cate
a b
us
pas
sen
ger
shelt
er
and
mai
nta
in t
he a
pp
rop
riat
e c
lear
ance
s.
Th
e m
inim
um
req
uir
em
en
ts t
o b
e m
ain
tain
ed
are
as
foll
ow
s:
A
co
nti
nu
ou
s ac
cess
ible
pat
h o
f tr
avel
of
1200
mm
is
to b
e m
ain
tain
ed
th
rou
gh
ou
t th
e b
us
sto
p
P
eo
ple
wai
tin
g (
seat
ed
or
stan
din
g)
occ
up
y a
n
800 m
m w
idth
, an
d i
f m
ore
th
an t
his
sp
ace i
s
occ
up
ied
(fo
r ex
amp
le b
y a
wh
eelc
hai
r u
ser)
then
th
is a
dd
itio
nal
sp
ace c
ou
ld b
e s
har
ed
wit
h
the c
on
tin
uo
us
acce
ssib
le p
ath
of
trav
el
T
he a
rea
to 5
00 m
m f
rom
th
e b
ack
of
the k
erb
is
to b
e f
ree o
f fi
xed
ob
stac
les
to a
llo
w f
or
ove
rhan
g
of
the b
us
and
its
mir
rors
on
en
try a
nd
ex
it, an
d
T
he b
oar
din
g a
nd
ali
gh
tin
g c
lear
are
as s
ho
wn
in
fig
ure
1 a
re t
o b
e f
ree f
rom
fix
ed
ob
stac
les.
Usi
ng
th
e a
bo
ve c
rite
ria,
th
e f
oll
ow
ing
fo
ur
op
tio
ns
hav
e b
een
id
en
tifi
ed
fo
r ro
adsi
des
nar
row
er
than
3.2
metr
es.
Eac
h o
pti
on
has
ad
van
tag
es
and
dis
adva
nta
ges
that
wil
l n
eed
to
be c
on
sid
ere
d p
rio
r
to d
ete
rmin
ing
th
e m
ost
ap
pro
pri
ate s
olu
tio
n f
or
a
par
ticu
lar
site
.
Shel
ter
Opt
ion
A i
s se
t b
ack
beh
ind
th
e f
oo
tpat
h a
s
sho
wn
in
fig
ure
2. T
his
usu
ally
req
uir
es
neg
oti
atio
ns
wit
h t
he a
djo
inin
g l
and
ow
ner.
Ho
weve
r, t
his
op
tio
n
pro
vid
es
a so
luti
on
fo
r ro
adsi
de w
idth
s as
nar
row
as 2
.0 m
etr
es.
An
ad
vert
isin
g e
nd
pan
el
cou
ld b
e
pro
vid
ed
on
th
e s
helt
er.
Ad
eq
uat
e c
lear
ance
s an
d
sig
ht
lin
es
sho
uld
be p
rovi
ded
aro
un
d t
he s
helt
er
for
mai
nte
nan
ce, p
asse
ng
er
secu
rity
an
d v
isib
ilit
y
betw
een
wai
tin
g p
asse
ng
ers
an
d b
us
dri
vers
.
Sit
es
wit
h f
en
ces,
veg
eta
tio
n o
r o
ther
ob
stru
ctio
ns
adja
cen
t to
th
e p
rop
ose
d s
et
bac
k s
helt
er
may
no
t b
e
suit
able
fo
r S
helt
er
Op
tio
n A
.
STO
PP
ED
BU
S
AP
PR
OA
CH
ING
BU
S
DE
SIR
AB
LE S
IGH
T L
INE
S
FO
R B
US
DR
IVE
R
Fig
ure
2:
Bu
s P
ass
enge
r S
hel
ter
Loc
ati
on O
pti
on A
- R
oadsi
de
wid
th >
2.0
m
Bu
s St
op
Gu
idelin
es
4
Shel
ter
Opt
ion
B p
rovi
des
a b
us
pas
sen
ger
shelt
er
wit
ho
ut
seat
s o
r en
d p
anels
an
d i
s lo
cate
d a
gai
nst
the p
rop
ert
y l
ine a
s sh
ow
n i
n f
igu
re 3
. It
co
uld
be
fitt
ed
wit
h a
lean
ing
rest
to
pro
vid
e s
om
e s
up
po
rt f
or
wai
tin
g p
asse
ng
ers
, b
ut
wo
uld
need
to
be o
f m
inim
um
wid
th a
nd
hav
e t
apere
d e
nd
s to
min
imis
e i
ts i
mp
act
on
peo
ple
wit
h v
isio
n i
mp
airm
en
t.
Shel
ter
Opt
ions
C a
nd D
po
siti
on
a b
us
pas
sen
ger
shelt
er
wit
h i
ts b
ack
to
th
e k
erb
as
sho
wn
in
fig
ure
4.
Th
e p
rox
imit
y o
f th
e s
helt
er
to t
he k
erb
in
creas
es
the
risk
of
it b
ein
g h
it b
y a
n e
rran
t ve
hic
le. W
hil
st t
here
is
a lo
w i
nci
den
ce o
f th
is t
yp
e o
f cr
ash
, it
is
neve
rth
ele
ss
an i
ssu
e f
or
con
sid
era
tio
n. F
igu
re 4
is
con
sid
ere
d t
o
be a
pp
rop
riat
e o
nly
in
lo
w-s
peed
en
viro
nm
en
ts o
r
wh
ere
near
by p
ark
ing
cre
ates
a b
uff
er,
as
sho
wn
in
fig
ure
7.
Vis
ibil
ity b
etw
een
wai
tin
g p
asse
ng
ers
an
d d
rive
rs
can
be c
om
pro
mis
ed
wit
h s
helt
ers
fac
ing
aw
ay f
rom
the r
oad
. G
oo
d s
igh
t li
nes
sho
uld
be m
ain
tain
ed
wit
h t
hese
op
tio
ns,
wh
ich
may
be p
refe
rred
on
th
e
bas
is o
f p
rovi
din
g b
ett
er
weat
her
pro
tect
ion
in
so
me
circ
um
stan
ces.
Ad
vert
isin
g e
nd
pan
els
may
no
t b
e p
oss
ible
if
the
min
imu
m c
lear
ance
s an
d a
deq
uat
e s
igh
t li
nes
are t
o
be m
ain
tain
ed
.
Op
tio
n C
is
sho
wn
do
wn
stre
am o
f th
e b
us
sto
p p
ost
and
fla
g. T
his
lo
cati
on
may
im
pac
t o
n s
igh
t li
nes
for
veh
icle
s ex
itin
g n
ear
by d
rive
way
s. O
pti
on
D
is b
etw
een
th
e b
oar
din
g a
nd
ali
gh
tin
g c
lear
are
a.
Ho
weve
r w
ith
on
ly 3
000 m
m b
etw
een
th
e a
reas
, a
smal
ler
shelt
er
wo
uld
be r
eq
uir
ed
.
Tim
etab
le in
form
atio
nT
imeta
ble
in
form
atio
n s
ho
uld
be p
rovi
ded
on
th
e b
us
sto
p p
ole
. A
t h
igh
use
sto
ps,
it
is d
esi
rab
le t
o d
isp
lay
tim
eta
ble
in
form
atio
n m
ore
pro
min
en
tly,
su
ch a
s o
n
the b
us
pas
sen
ger
shelt
er.
Ho
weve
r it
sh
ou
ld b
e n
ote
d
that
th
e c
urr
en
t co
ntr
act
(Ju
ne 2
003)
betw
een
th
e b
us
op
era
tors
an
d t
he G
ove
rnm
en
t o
f V
icto
ria
req
uir
es
the o
pera
tor
to “
dis
pla
y a
cle
arly
leg
ible
tim
eta
ble
in
dis
pla
y c
ase f
or
at l
eas
t 30%
of
all
bu
s st
op
s”.
FRO
NT
DO
OR
BU
S S
TOP
PO
ST
AN
D F
LAG
SH
ELT
ER
OP
TIO
N C
S
HE
LTE
R O
PTI
ON
Dmin.
RE
AR
DO
OR
11.0
m -
14.5
m
3.0
m
2.5m
1.2 m 0.8 m 0.5m
2.0
m m
in
Fig
ure
3:
Bu
s P
ass
enge
r S
hel
ter
Loc
ati
on O
pti
on B
- R
oadsi
de
wid
th >
2.0
m
Fig
ure
4:
Bu
s P
ass
enge
r S
hel
ter
Loc
ati
on O
pti
ons
C a
nd D
- R
oadsi
de
wid
th >
2.5
m
Bu
s St
op
Gu
idelin
es
5
Oth
er s
tree
t fu
rnitu
reO
ther
stre
et
furn
itu
re s
uch
as
rub
bis
h b
ins,
seat
s in
lieu
of
bu
s p
asse
ng
er
shelt
ers
, re
al-t
ime i
nfo
rmat
ion
sig
ns,
an
d b
us
servi
ce i
nfo
rmat
ion
to
tem
s m
ay a
lso
be p
rovi
ded
. T
hese
sh
ou
ld b
e l
oca
ted
su
ch t
hat
th
e
bo
ard
ing
an
d a
lig
hti
ng
cle
ar a
reas
are
mai
nta
ined
,
and
th
e 1
200 m
m c
on
tin
uo
us
acce
ssib
le p
ath
of
trav
el
is p
rovi
ded
th
rou
gh
ou
t th
e b
us
sto
p a
rea.
All
str
eet
furn
itu
re s
ho
uld
be s
et
bac
k f
rom
th
e k
erb
by 5
00 m
m
to a
llo
w f
or
bu
s o
verh
ang
s.
Ligh
ting
Lig
hti
ng
at
bu
s st
op
s se
rve
s a
nu
mb
er
of
pu
rpo
ses.
It
pro
vid
es
illu
min
atio
n f
or
acce
ssin
g t
he s
top
, w
aiti
ng
,
bo
ard
ing
, an
d a
lig
hti
ng
. It
als
o p
rovi
des
an i
ncr
eas
ed
leve
l o
f p
erc
eiv
ed
saf
ety
an
d s
ecu
rity
. T
he m
inim
um
lig
hti
ng
sta
nd
ard
is
to m
eet
the r
eq
uir
em
en
ts o
f
the P
ub
lic
Lig
hti
ng
Co
de A
S/
NZ
S 1
158 - 1
997.
Lig
hti
ng
leve
ls a
bo
ve t
he C
od
e s
ho
uld
be c
on
sid
ere
d
at l
oca
tio
ns
wh
ere
th
ere
is
a h
igh
dem
and
fo
r th
e
servi
ce.
Bus
stop
ker
bing
Wh
ere
a k
erb
is
pro
vid
ed
at
a b
us
sto
p, it
sh
ou
ld b
e
150 m
m h
igh
bar
rier
kerb
as
per
Vic
Ro
ads
Sta
nd
ard
Desi
gn
Dra
win
g S
D 2
001. T
his
typ
e o
f k
erb
pro
vid
es
go
od
gu
idan
ce f
or
the b
us
dri
ver,
pro
vid
es
som
e
pro
tect
ion
to
th
e w
aiti
ng
bu
s p
asse
ng
ers
, an
d m
eets
the r
amp
heig
ht
req
uir
em
en
ts o
f th
e D
isab
ilit
y
Sta
nd
ard
s fo
r A
ccess
ible
Pu
bli
c T
ran
spo
rt (
2002).
If
kerb
is
no
t p
rovi
ded
, co
nsi
dera
tio
n m
ust
be g
iven
to
oth
erw
ise a
chie
vin
g t
he m
inim
um
req
uir
ed
gra
die
nt
for
ram
ps
dep
loyed
fro
m t
he b
us.
Bu
s st
op
pin
g a
rea
Def
inin
g a
bus
stop
ping
are
aA
bu
s st
op
is
desi
gn
ated
by a
bu
s st
op
fla
g o
r si
gn
.
Sto
pp
ing
at
or
near
a b
us
sto
p i
s d
efi
ned
in
th
e R
oad
Ru
les.
Ru
le 1
95 s
tate
s th
at “
A d
rive
r (e
xce
pt
the d
rive
r
of
a p
ub
lic
bu
s) m
ust
no
t st
op
at
a b
us
sto
p, o
r o
n t
he
road
, w
ith
in 2
0 m
etr
es
befo
re a
sig
n, an
d w
ith
in 1
0
metr
es
afte
r th
e s
ign
, u
nle
ss t
he d
rive
r st
op
s at
a p
lace
on
a l
en
gth
of
road
, o
r in
an
are
a, t
o w
hic
h a
par
kin
g
con
tro
l si
gn
ap
pli
es
and
th
e d
rive
r is
perm
itte
d t
o s
top
at t
hat
pla
ce u
nd
er
the R
oad
Ru
les”
.
If t
he b
us
sto
p a
rea
is o
ther
than
30 m
etr
es
in l
en
gth
,
or
add
itio
nal
par
kin
g c
on
tro
l is
need
ed
, p
ark
ing
con
tro
l si
gn
s an
d/
or
Bu
s Z
on
e s
ign
s as
sh
ow
n i
n
fig
ure
5 a
re r
eq
uir
ed
.
Pav
em
en
t m
ark
ing
s as
sh
ow
n i
n f
igu
re 5
, m
ay b
e
inst
alle
d t
o s
up
po
rt t
he B
us
Zo
ne s
ign
s. H
ow
eve
r,
the p
avem
en
t m
ark
ing
s d
o n
ot
hav
e r
eg
ula
tory
sig
nif
ican
ce.
Bu
s zo
ne s
ign
s an
d p
avem
en
t m
ark
ing
s m
ay a
lso
be
use
d:
at
bu
s st
op
s ab
utt
ing
par
kin
g a
reas
w
here
pro
ble
ms
ex
ist
wit
h i
lleg
al p
ark
ing
at
bu
s
sto
ps,
or
w
here
it
is d
esi
rab
le t
o i
mp
rove
th
e c
on
spic
uit
y
of
a b
us
sto
p f
or
inte
nd
ing
pas
sen
gers
, o
r fo
r
traf
fic
op
era
tio
nal
reas
on
s.
It i
s n
ot
app
rop
riat
e t
o u
se b
us
zon
e p
avem
en
t
mar
kin
gs
at i
nd
en
ted
bu
s b
ays.
Fig
ure
5:
Bu
s Z
one
Sig
n A
nd B
us
Zon
e P
ave
men
t M
ark
ings
Bu
s St
op
Gu
idelin
es
6
Bus
stop
bay
sB
us
sto
ps
may
be i
nd
en
ted
in
to t
he a
dja
cen
t ro
ad s
ide
area
so t
hat
th
e b
us
is o
ut
of
the t
raff
ic s
tream
wh
ile
it i
s se
ttin
g d
ow
n o
r ta
kin
g u
p p
asse
ng
ers
. F
igu
re 6
sho
ws
the l
ayo
ut
of
a ty
pic
al b
us
sto
p b
ay. R
oad
Ru
le
77 r
eq
uir
es
dri
vers
to
giv
e w
ay t
o b
use
s d
isp
layin
g
a “G
ive W
ay t
o B
use
s” s
ign
, h
ow
eve
r b
us
op
era
tors
ex
peri
en
ce d
iffi
cult
y e
xit
ing
fro
m b
us
bay
s d
ue t
o
oth
er
traf
fic
bein
g r
elu
ctan
t to
all
ow
th
e b
us
to r
e-
en
ter
the t
raff
ic s
tream
.
Vic
Ro
ads
has
ad
op
ted
a p
oli
cy t
o l
imit
th
e u
se o
f b
us
sto
p b
ays,
wh
ich
co
nsi
ders
th
e v
iew
s an
d e
xp
eri
en
ces
of
bu
s o
pera
tors
, an
d a
lso
op
era
tio
nal
ch
arac
teri
stic
s
of
a ro
ad. A
s a
resu
lt o
f th
e p
oli
cy, th
e f
oll
ow
ing
gu
ideli
nes
hav
e b
een
est
abli
shed
wh
en
co
nsi
deri
ng
bu
s st
op
bay
s:
B
us
bay
s sh
ou
ld n
ot
be c
on
stru
cted
in
60 k
m/
h
zon
es
un
less
th
ere
is
ph
ysi
call
y n
o w
ay a
no
ther
veh
icle
co
uld
ove
rtak
e t
he s
top
ped
bu
s, o
r
the s
top
is
very c
lose
to
th
e d
ep
artu
re s
ide o
f
a si
gn
alis
ed
in
ters
ect
ion
in
a w
ay t
hat
wo
uld
seve
rely
im
pac
t in
ters
ect
ion
op
era
tio
n
B
us
bay
s sh
ou
ld n
ot
be c
on
stru
cted
in
70 k
m/
h
zon
es
un
less
th
ere
is
on
ly o
ne l
ane i
n t
he b
us
dir
ect
ion
, o
r th
e s
top
is
clo
se t
o t
he d
ep
artu
re
sid
e o
f a
sig
nal
ised
in
ters
ect
ion
B
us
bay
s sh
ou
ld n
ot
be c
on
stru
cted
in
80 k
m/
h
zon
es
un
less
th
ere
are
on
ly o
ne o
r tw
o l
anes
in t
he b
us
dir
ect
ion
, o
r th
e s
top
is
clo
se t
o t
he
dep
artu
re s
ide o
f a
sig
nal
ised
in
ters
ect
ion
, an
d
B
us
bay
s m
ay b
e c
on
stru
cted
in
90 k
m/
h a
nd
100 k
m/
h z
on
es.
Co
nsi
dera
tio
n s
ho
uld
be g
iven
,
wh
ere
th
e b
us
bay
is
in a
sh
ou
lder,
to
pro
vid
ing
a
lon
ger
acce
lera
tio
n z
on
e t
o a
ssis
t re
-en
teri
ng
th
e
traf
fic
stre
am.
In p
lace
s w
here
th
e b
us
is s
top
pin
g i
n t
raff
ic,
con
sid
era
tio
n o
f m
ark
ing
s an
d s
ign
age t
o i
ncr
eas
e t
he
con
spic
uit
y o
f st
op
s is
req
uir
ed
(re
fer
to f
igu
re 5
).
Bu
s b
ays
may
, h
ow
eve
r, b
e c
on
stru
cted
wh
ere
th
e
sto
p:
Is
use
d a
s a
tim
ing
po
int,
wh
ere
bu
ses
may
need
to w
ait
for
seve
ral
min
ute
s if
ru
nn
ing
ear
ly
Is
use
d a
s a
bu
s d
rive
r ch
ang
e-o
ver
po
int,
req
uir
ing
th
e b
us
to s
top
fo
r lo
ng
er
peri
od
s, o
r
Is
a p
arti
cula
rly h
igh
lo
adin
g b
us
sto
p, w
here
th
e
tim
e t
aken
to
lo
ad p
asse
ng
ers
can
reg
ula
rly t
ake
min
ute
s.
In p
lace
s w
here
a b
us
bay
is
con
sid
ere
d a
s n
ece
ssar
y,
it i
s al
so i
mp
ort
ant
to o
bta
in w
ritt
en
ag
reem
en
t fr
om
the o
pera
tor
and
to
co
nsi
der
mean
s o
f as
sist
ing
th
e
bu
s ex
itin
g t
he b
ay t
hro
ug
h m
eas
ure
s su
ch a
s:
L
inem
ark
ing
, p
avem
en
t m
ark
ing
s o
r st
atic
road
sid
e s
ign
s to
ad
vise
mo
tori
sts
of
the b
us
bay
and
th
e n
eed
to
giv
e w
ay t
o e
xit
ing
bu
ses,
an
d
A
ssis
tin
g b
us
ex
it m
ano
eu
vre t
hro
ug
h t
he u
se
of
near
by s
ign
als
to c
reat
e a
gap
in
th
e t
raff
ic
stre
am.
Gu
idan
ce o
n s
peci
al c
ircu
mst
ance
s ca
n b
e p
rovi
ded
by V
icR
oad
s’ R
oad
Bas
ed
Pu
bli
c T
ran
spo
rt s
ect
ion
.
Bus
stop
s an
d ro
ad s
houl
ders
Wh
ere
bu
s st
op
s ar
e s
itu
ated
on
ro
ad s
ho
uld
ers
, th
e
wid
th o
f th
e s
ho
uld
er
and
th
e n
atu
re a
nd
co
nd
itio
n
of
the s
urf
ace s
ho
uld
be c
arefu
lly c
on
sid
ere
d, ta
kin
g
acco
un
t o
f ve
hic
le v
olu
mes
and
sig
ht
dis
tan
ce.
Sit
es
and
tre
atm
en
ts s
ho
uld
pro
vid
e s
afe a
nd
con
ven
ien
t co
nd
itio
ns
for:
p
asse
ng
er
acce
ss a
nd
wai
tin
g
b
use
s st
op
pin
g a
nd
re-e
nte
rin
g t
he t
raff
ic f
low
ve
hic
les
to p
ass
or
ove
rtak
e a
sto
pp
ed
bu
s.
The
use
of bu
s ba
ys i
s to
be
lim
ited
to
pa
rtic
ula
r
situ
ati
ons
No
bus
bay
is r
equ
ired
in
a 6
-la
ne
roa
d w
ith a
n
80
km
/h s
pee
d z
one
Bu
s St
op
Gu
idelin
es
7
Ker
bsid
e bu
s st
ops
It i
s n
ece
ssar
y t
o h
ave s
uff
icie
nt
clear
kerb
sid
e s
pac
e
to a
llo
w a
bu
s to
en
ter
the b
us
sto
p, st
raig
hte
n u
p, an
d
sto
p a
t th
e b
us
sto
p f
lag
wit
h i
ts f
ron
t an
d r
ear
do
ors
clo
se t
o t
he k
erb
. T
he b
us
mu
st t
hen
be a
ble
to
ex
it
the b
us
sto
p w
ith
ou
t en
cro
ach
ing
in
to t
he n
ex
t tr
affi
c
lan
e.
Co
mp
ute
r m
od
ell
ing
usi
ng
“A
uto
TU
RN
” an
d f
ield
test
s h
ave b
een
use
d t
o d
ete
rmin
e t
he m
inim
um
cle
ar
kerb
sid
e l
en
gth
need
ed
fo
r th
e r
ear
do
ors
of
the b
us
to b
e n
ot
mo
re t
han
300 m
m f
rom
th
e k
erb
. F
or
a
12.5
metr
e l
on
g b
us,
an
ap
pro
ach
len
gth
of
26 m
etr
es
and
an
ex
it l
en
gth
of
10 m
etr
es
are r
eq
uir
ed
. F
or
a
14.5
metr
e l
on
g b
us,
an
ap
pro
ach
len
gth
of
30 m
etr
es
and
an
ex
it l
en
gth
of
10 m
etr
es
are n
eed
ed
. T
hese
reco
mm
en
ded
min
imu
m d
imen
sio
ns
are i
llu
stra
ted
in
fig
ure
7.
Usi
ng o
ther
roa
d sp
ace
Pro
hib
itin
g 3
6 o
r 40 m
etr
es
of
kerb
sid
e p
ark
ing
may
be d
iffi
cult
at
som
e s
ites.
Lo
cati
ng
th
e b
us
sto
p s
o
that
th
e b
us
mak
es
use
of
oth
er
road
sp
ace o
n t
he
app
roac
h o
r ex
it t
o t
he s
top
can
red
uce
th
e a
mo
un
t
of
clear
kerb
sid
e s
pac
e r
eq
uir
ed
. F
or
ex
amp
le, fi
gu
re
8 s
ho
ws
a b
us
zon
e o
n t
he d
ow
nst
ream
sid
e o
f a
mid
blo
ck p
ed
est
rian
cro
ssin
g w
ith
th
e b
us
mak
ing
use
of
the s
pac
e f
rom
th
e p
ed
est
rian
sig
nal
s.
In s
om
e l
oca
tio
ns
wh
ere
par
kin
g i
s at
a p
rem
ium
, it
may
be a
ccep
tab
le t
o p
rovi
de a
kerb
ou
tsta
nd
an
d
hav
e t
he b
us
sto
p i
n t
he t
raff
ic s
tream
as
sho
wn
in
fig
ure
9. W
hil
st t
his
has
a m
om
en
tary i
mp
act
on
the g
en
era
l tr
affi
c fl
ow
, it
sig
nif
ican
tly r
ed
uce
s th
e
amo
un
t o
f p
ark
ing
th
at n
eed
s to
be r
em
ove
d a
nd
rem
ove
s th
e d
ela
ys
to t
he b
us
asso
ciat
ed
wit
h e
xit
ing
a co
nve
nti
on
al b
us
sto
p. C
arefu
l co
nsi
dera
tio
n t
o
bic
ycl
e m
ove
men
ts s
ho
uld
be m
ade, p
arti
cula
rly o
n
road
s w
ith
bic
ycl
e l
anes.
Fig
ure
6:
Typ
ica
l B
us
Ba
y L
ayo
ut
Fig
ure
7:
Ker
bsid
e S
top w
ith P
ark
ing
On
Appro
ach
an
d E
xit
Bu
s St
op
Gu
idelin
es
8w
ww
.vic
road
s.vi
c.g
ov.
auV
RP
IN 0
1326/
1
TR2005251
Furt
her
read
ing
AU
STR
OA
DS
(19
94
) G
uid
e t
o T
raff
ic E
ng
ineeri
ng
Par
t 11 –
Par
kin
g, S
ect
ion
7.2
.3 B
us
Sto
ps.
CO
MM
ON
WE
ALT
H O
F A
UST
RA
LIA
(2
00
2)
Dis
abil
ity S
tan
dar
ds
for
Acc
ess
ible
Pu
bli
c T
ran
spo
rt.
DE
PA
RTM
EN
T O
F IN
FRA
STR
UC
TUR
E (
20
05
) R
eq
uir
em
en
ts f
or
Bu
s S
top
Co
mp
lian
ce.
VIC
RO
AD
S (1
99
9)
Tra
ffic
En
gin
eeri
ng
Man
ual
Vo
lum
e 1
, S
ect
ion
9.3
.4 B
us
Zo
nes
and
Min
ibu
s
Zo
nes.
VIC
RO
AD
S (2
00
1)
Tra
ffic
En
gin
eeri
ng
Man
ual
Vo
lum
e 2
, S
ect
ion
18.5
.1 P
avem
en
t M
ark
ing
s at
On
-
Ro
ad B
us
Sto
ps.
VIC
RO
AD
S (2
00
2)
Ro
ad D
esi
gn
Gu
ideli
nes,
Sect
ion
3.9
Cle
ar Z
on
es.
PU
BLI
C L
IGH
TIN
G C
OD
E A
S/
NZ
S 1
158 - 1
997
Furt
her
info
rmat
ion
Fo
r fu
rth
er
info
rmat
ion
on
ro
ad b
ased
pu
bli
c
tran
spo
rt s
tan
dar
ds
and
gu
ideli
nes,
co
nta
ct:
Man
ager
Ro
ad B
ased
Pu
bli
c T
ran
spo
rt
Vic
Ro
ads
60 D
en
mar
k S
treet
KE
W V
IC 3
101
Tel:
(03)
9854 2
441
Fax
: (0
3)
9854 2
918
Em
ail:
rb
pt@
road
s.vi
c.g
ov.
au
Th
ese
gu
ideli
nes
are a
lso
ava
ilab
le o
n V
icR
oad
s
web
site
, w
ww
.vic
road
s.vi
c.g
ov.
au, u
nd
er
the
Pu
bli
c T
ran
spo
rt h
ead
ing
. F
utu
re u
pd
ates
wil
l
also
be p
lace
d o
n t
he w
eb
site
.
Fig
ure
8:
Ker
bsid
e S
top o
n D
epa
rtu
re S
ide
of P
edes
tria
n S
ign
als
Fig
ure
9:
Ker
bsid
e S
top w
ith K
erb
Ou
tsta
nd
C
Project numberSheet No.
Liesl Malan Landscape Architects ABN 39 133 179 212
DesignedDrawn
THIS DOCUMENT IS COPYRIGHT AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS COMMISSIONED. UNAUTHORISED USE PROHIBITED. ALL DIMENSIONS AND LEVELS TO BE CHECKED ON THE PROJECT BEFORE COMMENCING ANY WORKS OR SHOP DRAWINGS. DRAWINGS NOT TO BE SCALED.
Revision
Rev -
P O B o x 7 8 H a r c o u r t V i c t o r i a 3 4 5 3t : 0 3 5 4 4 2 2 2 5 3 m : 0 4 2 7 1 3 2 6 0 1 e : l m @ l m a l a n . c o m . a uw : w w w . l m a l a n . c o m . a u A B N : 3 9 1 3 3 1 7 9 2 1 2
Maude Street Streetscape Redevelopment
Greater Shepparton City Council
Streetscape Concept Sections
1050
1050_CS
C
CR LM Nov 2013CR 19.12.2013- -
L i e s l M a l a n L a n d s c a p e A r c h i t e c t s
Adjoining business Foottpath Shaded public realm Public realm Coles buildingLevel pedestrian crossing Level pedestrian crossing Central median refuge
Section AARaised pedestrian crossing - Maude Street Rowe Street
Adjoining business Footpath Carpark Coles buildingPedestrian Shade tree and planting
Roadway Roadway Central median parking with raised planting and shade trees. Tree guards to protect trees. Section BB
Central median with raised planting
Adjoining carpark by others
Footpath Bus bay - Public realm behind
Bus bay PlazaPedestrian Bus stop with shelter
Roadway Roadway Central median planting with feature fence and trees
Section CCMaude Street Bus Interchange
Proposed plaza design is conceptual only. This design has been shown for discussion purposes only. All elements are subject to change during consultation and design development.
Streetscape Design RationaleThe streetscape design provides a stronger pedestrian link between the Mall, Vaughan Street and the proposed bus interchange. At the same time this design provides a quality retail streetscape experience.New tree planting provides greater shade for pedestrians, and for parked cars, while also assisting in cooling the streetscape. “Public realm spaces” provide areas for resting / socialising without a commercial imperative. These public realm areas are to be welcoming spaces with understorey planting to contribute to the overall streetscape amenity. They have been strategically placed to provide resting areas with shade, seating, lighting and bins.