ENOTEK BULLETIN As a commitment and highly awareness on Covid-19 spread, Enotek Top Management committed to held in-house weekly RTK Covid-19 swab test to al staff and frontliner on every week during this Covid-19 Pandemic. This session been conducted by Medical Officer from Poliklinik Putra Care, Kajang. As of end of May 2021, Enotek management had conducted 7 session of RTK swab test. This weekly swab test session been conducted to ensure the health status of all staff are well known and if any positive cases present, immediate action will be taken effectively in order to eliminate Covid- 19 spread in organization. As cumulative result for May weekly basis swab test session, no positive cases for Enotek staff and frontliner. Health Safety Security Environmental & Quality Control May 2021 HOUSEKEEPING DOCUMENTATION POOR ISOLATION 6 4 3 5113 24 7 NMPI AUDIT HOURS YTD YTD YTD 43,615 51 245 HSSE – 3 PROJECT – 0 QAQC - 4 HSSE – 24 PROJECT – 6 QAQC - 21

Upload: others

Post on 20-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 2021 ENOTEK BULLETIN

ENOTEK BULLETIN

As a commitment and highly awareness onCovid-19 spread, Enotek Top Managementcommitted to held in-house weekly RTKCovid-19 swab test to al staff and frontlineron every week during this Covid-19Pandemic. This session been conducted byMedical Officer from Poliklinik Putra Care,Kajang. As of end of May 2021, Enotekmanagement had conducted 7 session ofRTK swab test.

This weekly swab test session beenconducted to ensure the health status of allstaff are well known and if any positivecases present, immediate action will betaken effectively in order to eliminate Covid-19 spread in organization. As cumulativeresult for May weekly basis swab testsession, no positive cases for Enotek staffand frontliner.

Health Safety Security Environmental & Quality Control

May 2021

HOUSEKEEPING

DOCUMENTATION

POOR ISOLATION

6

4

3

5113 247NMPIAUDITHOURS

YTD YTD YTD

43,615 51 245

HSSE – 3

PROJECT – 0

QAQC - 4

HSSE – 24

PROJECT – 6

QAQC - 21

Page 2: May 2021 ENOTEK BULLETIN

May 2021ENOTEK BULLETIN

RANDOM DRUG TEST – MAY 202112 LSR COMPLIANCES - ENOTEK

Lead Site Engineer, Abdul Karim and Shahrul Hirzuan were attended the AGTES training at NIOSH

Bangi

AUTHORISED GAS TESTER & ENTRY SUPERVISORCOMPETENCY TRAINING – NIOSH BANGI

Eagerness from Enotek

Management level to comply and ensure

work site execute in safe condition, 2 staff

which is Lead Site Engineer, Abdul Karim

and Shahrul Hirzuan been sent for

Authorised Gas Tester and Entry Supervisr

Competency Training at National Institute of

Safety and Health (NIOSH) on physical

training session which is on 3 & 4 May 2021.

The purpose of the training is to entitle a

person to be a competent person to conduct

gas testing prior AESP enter confine space

area according to Industrial Code of Practice

(ICOP2010).

Commitment to comply with Shell 12

Life Saving Rules, NGC Probina – Enotek

Contractor had conducted Random Drug-

Urine Test to their workers to ensure all their

worker are free from any drug consuming

post advice by Enotek management. This

test were been agreed by contractor to

conduct randomly to their worker for May

2021 in assurance with respective result.

Next, the result for the drug test for NGC

Probina – Enotek contractor are negative.

Tubiono - Negative

Jumari - Negative

Page 3: May 2021 ENOTEK BULLETIN

May 2021ENOTEK BULLETIN

SAFETY CORNER – MYSEJAHTERA DAILY UPDATE – COVID-19 STATUS

PH – Kamarul Alam conducted LFI sharing at worksite SH NTI SLE East during morning TBT.

CUMULATIVE LFI SHARING WORKSITE LFI SHARING – ENOTEK

On end of May 2021, Enotek PH had

conducted LFI Sharing to all frontliner at work site

related to Driver Crashed into C-Store, Driver runs

overs Service Champion and Armed Robbery of

Security Office. Consequences and severity of an

incident been highlighted to all frontliner to ensure

no repeated incident been occur especially at

Enotek site as per LFI. The conclusion of the

sharing is any possible of unsafe act and unsafe

condition are probably lead to disaster or harm to

human and assets, without concrete control

measure towards any possible hazard may lead

to an incident. At end of the sharing, all frontliner

understand on the input of the sharing

SH NTI JALAN KAPAR. SH BATU BERENDAM SH CHAAH

COVID-19 MY SEJAHTERA APPS1. Always to update Daily health declaration

in Covid-19 status2. Ensure the date of declaration are updated

at Profile section.

-------------- SYAMIL ZAKWAN BIN AHMAD TAJUDDIN

Page 4: May 2021 ENOTEK BULLETIN

MAY 2021ENOTEK BULLETIN

Quality

QAQC REWARDS AND RECOGNITIONS

SHARING WITH SITE ENGINEER & FRONTLINER

In May 2021, ENOTEK QAQC Department running

an awareness and sharing program about QLASSIC to Site

Engineer. The Aims of this program is to increase the

knowledge about how to conduct inspection using the

correct tools which is construction full fill criteria and meet

the standard. Beside that ,QLASSIC is to measure and

evaluate the workmanship quality of a building construction

which is the information collected can be use for

improvement.

To motivated the Site Engineer & site front liner to construct

and deliver good quality of project construction, ENOTEK

Engineering Sdn. Bhd. will introduced the Rewards &

Recognition system which is QAQC department will conduct

Internal audit and evaluate the site performance . This

program planning to be start in June 2021.

The R&R (Rewards and Recognitions) will be carried out

together with cooperation ENOTEK Project and Safety

Department. QAQC R&R initiative is as appreciation to the

site front liner .

QLASSIC TOOLS

QLASSIC TOOLSSHARING QLASSIC WITH SITE ENGINEER FOR NTI KAPAR

SHARING QLASSICWITH SITE ENGINEER FOR NTI SLE EAST

Page 5: May 2021 ENOTEK BULLETIN

MAY 2021ENOTEK BULLETIN

STEEL FIBRE REINFORCEMENT CONCRETEINNOVATION FOR SHELL PROGRAM

WHAT IS STEEL FIBRE REINFORCEMENT

CONCRETE?Steel fiber is a metal reinforcement. Steel fiber for

reinforcing concrete is defined as short, discrete

lengths of steel fibers with an aspect ratio (ratio of

length to diameter) from about 20 to 100, with

different cross-sections, and that are sufficiently

small to be randomly dispersed in an unhardened

concrete mixture using the usual mixing

procedures.

FORECOURT SLAB

Steel Fibre Reinforcement concrete had applied at

ENOTEK site at NTI Shell Jln Kapar, Klang. The

element apply for using the SFRC is forecourt

element which mean replace conventional method

casting concrete from using BRC as reinforcement

to use Steel Fibre for reinforcement.Steel Fibre

Cross section for concrete SFRC method Quality control on Slump test Casting work with direct pour

SHARING BY

--- HANAFI ROSLAN & FIRDAUS RAMLAN

BENEFIT USING SFRC

Significant productivity improvements. Time Saving. (Save time on both

preparation & construction stages)

Cost saving together with reduced material volume (no BRC), more rapid

construction (direct discharge) and reduced labor costs (eliminate labor for

machine handling). Average cost saving:

Suspended slab (on pile) - 20%

Non-suspended slab (on ground) - 30%

For NTI application, the steel fiber dosage is ranging from 15-30kg/m³. Subject to

design loading determined by principal consultant.

No DESCRIPTION SFRC CONVENTIONAL

1 Reinforcement Strength

1100MPa (HVMIX® 80/60)

510 Mpa (BRC)

2 Placement Method Steel fiber mixed inconcrete truck (on-site)

BRC to receive concrete

3 Concrete Discharge Direct Pour,concrete pump & mobile crane

Concrete pump & mobile crane.