May 4,2010
Mr. William BurrusPresidentAmerican Postal Workers
Union (APWU), AFL-CIO1300 L Street, NWWashington, DC 20005-4128
Dear Bill:
Certified Mail Tracking Number:70993400000905162520
This is to inform you of the Postal Service's decision to consolidate all originating mail processingoperations at the following Southeast Area location:
• Panama City, Florida Processing and Distribution Facility (P&DF) into Pensacola, FloridaProcessing and Distribution Center (P&DC)
After review, it was decided that this consolidation is in the best interest of the Postal Service.Implementation of this AMP is expected to be completed by October. Enclosed, per your requestis a copy of the completed study.
The Postal Service must continually look to improve productivity and increase efficiency whilemaintaining excellent service. The decline in mail volume and revenues due to the economicdownturn has only heightened the need for such improvements This consolidation will allow us toaccomplish this goal by making better use of excess space, staffing, and equipment, and toprocess mail more efficiently.
It is projected that this consolidation will result in significant savings for the Postal Service. Someaffected career employees may be reassigned to the gaining facility or to other vacant positions.Reassignments will be made in accordance with the collective bargaining agreement
If you have questions, or need additional information, please contact Ron Scott at (202) 268-7512.
Sincerely,
John W. DockManagerContract Administration
Enclosure
(CA2010-315)
STEvEN J. FORTESENIOO VIOC. PRFSlflfNT
OP"~
~ UNITEDSTJjTESI!!'1iiM POSTJjL SERVICE
April 28, 2010
LINDA J. WELCH
SUBJECT: Panama City, Florida Originating - Area Mail Processing Proposal
A functional review of the Panama City, FL Area Mail Processing (AMP) proposal has beencompleted. The proposal recommends transferring all originating operations from the PanamaCity, FL Processing and Distribution Facility for ZIP Code 324 to the Pensacola, Fl Processingand Distribution Center. The proposal, which has a projected annual savings of $574,695, hasbeen approved.
The AMP must be implemented as approved. Ifchanges to the approved AMP are deemednecessary, please provide revised worksheets along with supporting justification and conc:urrencefrom the other managers approving the original proposal. All changes are to be reviewed andapproved prior to proceeding.
Please provide a timeline for the implementation of the consolidation of operations as outlined inHandbook P0-408, Area Mail Processing (AMP) Guidelines, within two weeks of this letter.
,If you have any questions orconeems, pleCise Rootaet Frank Ned, Manager, Processing Operations,at (2 268-5556.
. Forte
475 L'ENFANf PtNA SoN
WASHlNGra.I, cx.:; 20200-2700
202c268-5100
FAX.: 202-268-7509
WIWI.I.Jf:PS.COM
00: Mr. DonahoeMe VeglianteMs. DominguezMr. SmallMs. BetmanMs. KilletteMs. WeaverMr. NeriMs. MaloneMr. DookinsMs. HagamanMs. Moore
- 2 -
-".- ~ ~ ~""~
_ ~ _-: -:- -: -: -:: !1~! Data ~ Entry Page - - - - -
Type of Distribution to Consolidate:j OriginatingFacility Name & Type:' Panama City P&DF
Street Address:! 1336 Sherman AveCity:! Panama City
State: I FL,5D Facility ZIP Code:1 32401
District: i North FloridaArea:i Southeast
Finance Number: i 117260Current 3D ZIP Code(s):, 324
Miles to Gaining Facility:! 106EXFC office:! Yes
Plant Manager: I Eugene GreenSenior Plant Manager: i Arthur A. Rosenberg
District Manager: i James A. NemecFacility Type after AMP:; P&DC/F
MODS/BPI Office
Oct-01-2008 : Sep-30-2009
Date & Time this workbook was last saved:
Facility Name & Type:! Pensacola P&DCStreet Address:! 1400 W Jordan St
City:1 Pensacola,State: I FL
5D Facility ZIP Code:! 32501District:; North Florida
Area:; SoutheastFinance Number:, 117410
Current 3D ZIP Code(s):! 325EXFC office:! Yes
Plant Manager: I Ethel M. KingSenior Plant Manager: i Arthur A. Rosenberg
District Manager: i James A. Nemec
Start of Study:: 10/02/09Date Range of Data:
Processing Days per Year: 310Bargaining Unit Hours per Year: 1,750
EAS Hours per Year: 1,825Date of HQ memo, DAR Factors/Cost ofBorrowing/ New
Facility Start-up Costs Update 1- M_a_Y_2_7_,_2_00_9 -1
4/19/2010 11 :03
Area Vice President:! Linda WelchSenior Vice President, Operations:1 Steven J. Forte,
Area AMP Coordinator:1 Andrew BenefieldHQ AMP Coordinator: i Barbara Brewington
Package Page 1 AMP Data Entry Page
AppC~()"ClI SignaturesLast 'Saved: Oecetl'\ber 1,2.009
Losing Facility Name and Type:e...,P~a;,;,nl>;,.:.m;;a:..C;:.;i"'ty.;:,P..:&;.;:O..:..F_· _Street Address.:. 133€lSherman Ave
City: Panama CityState: FL
Facility ZIP Code: ""'3':;;2~40::':1""---Finance Numoor: 117260
Current 3D ZlP COO&(s):.;:3::;24..:- _
Type of Distribution to ConsoHdat&: _O,-f'I",'g....in..;.<'l,-ling...,....... _
Gaining Facility Name and Type: pen~$;.;:a:;.,co:.;,Ja::..Pl.,&;;;:D:.;C;,.,----------------------_Street Address: 1400 W Jordan St
City: PeitSacolaState: FL
Facility ZlP Cpde: ""'3,:;;2::::50::':1:----
Finance Number: 117410Current 3D ZIP Code(s):.::3::;.2~5 _
J .... " .. ' .. _ _ ._. __ ~ _ '.tt __ .--._-.l1r _. -$~ __ __ __ _ __~;t:
ACKNOWLEDGEMENT OF ACCOUNTABILITY· I acknowledge that I am accountable for respecting andsupporttng the Integrity of all official postalreporting systems, including flnandal reports and those relating to compliance with. coottacting; complement. or similar efiJ:>rts involVing the investment andexpenditure 01 funds. as well as all systems to service to our customers,
Printed Name
b.9SING FACILITY~
Postmaster or Plant Manager:
Eugene Green
Date
Date
I{
\
Printed Name
Linda J. WelchPrlnledName
Senior Plant Manager:Arthur A. Rosenberg
Prlt1l!ldName
District Manager:James A Nemec
Printed Name
Prtnle<1.Name
District Manager:James A Nemec
Senior Plant Manager:Arthur A. Rosenberg
Printed Name
!3AlNfNG fACILITY~
Plant Manager:Ethel M. King
AREA ICe"Arp:;l Vice President:
Implementation Date:
HEADQUARTERS:
Senior Vice President Operations:
Steven J. Forte
PackaQe Page 2 AMP Approval Signatures
Executive SummaryLast Saved: Apnl15,2010
Losing Facility Name and Type: Panama City P&DF
Street Address: 1336 Sherman Ave
City, State: Panama City, FL
Current 3D ZIP Code(s): 324
Type of Distribution to Consolidate: Originating Miles to Gaining Facility: 106
Gaining Facility Name and Type: Pensacola P&DC
Current 3D ZIP Code(s): 325
Summary of AMP Worksheets
$574,695
Savings/CostsMail Processing Craft Workhour Savings = $224,434 from WorkhourCosts • Proposed
Non-MP CraftlEAS + Shared LDCs Workhour Savings (less MaintITrans) = $665 from Other Curr vs Prop------PCES/EAS Supervisory Workhour SaVings = $63,262 from Other Curr vs Prop
Transportation Savings = $149,455 from Transportation (HCR and PVSj
Maintenance Savings = $136,880 from Maintenance
Space Savings = $0 from Space Evaluation and Other Costs
Total Annual SaVings =
Total One-Time Costs = $0 from Space Evaluation and Other Costs---..;,;,.$574,695Total First Year Savings =-""""""........====
Staffing Positions
from Staffing - Craft8Craft Position Loss =--...;;;..---PCES/EAS Position Loss =__~__ from Staffing - PCESIEAS
Volume
Total FHP to be Transferred (Average Daily Volume) = 103,611 from Workhour Costs - Current
Current FHP at Gaining Facility (Average Daily Volume) = 1,210,468 from Workhour Costs - Current
Losing Facility Cancellation Volume (Average Daily Volume) = 85,937 (= Total TPH I Operating Days)---..:;...;..:..;...;...-
Service
Service Standard ImpactsbyADV
First-Class Mail®Priority Mail®
Package Services
Periodicals
Standard MailCode to destination 3-digit ZIP Code volume is not
available
ADV
N/A*
N/A*
oo8
ADV ADV %4,963 397,938 98.8%
97 6,903 98.6%
168 1,710 91.1%
N/A* N/A' N/A'
N/A' N/A' N/A*
Package Page 3 AMP Executive Summary
Summ.ary NarrativeLast Saved: April 15, 2010
Losing Facility Name and Type: Panama City P&DFCurrent 3D ZIP Code(s): 324
Type of Distribution to Consolidate: Originating
Gaining Facility Name and Type: Pensacola P&DCCurrent 3D ZIP Code s : 325
BACKGROUNDThis isa suin.n.1ary ofthefeasibility study for the consolidation of originating mailfrom the Panama City P&DF (ZIP 324) to the Pensacola P&DC (ZIP 325). Thisstudy was conducted to detennine the feasibility of relocating the originatingprocessing operations every day Monday through Saturday. Pensacola currentlyprocesses the Panama City originating mail on Saturdays only. For this study, thedestinating mail for Panama City will continue to be processed in Panama City. The24 - hour clock target of 80% cancellations by 2000 will be adversely affected by theAMP, as the last collections will not depart Panama City until 1930, arriving atPensacola 2205 or later.
CUSTOMER & SERVICE IMPACTSPensacola currently has an overnight EXFC score of97.36 and Panama City has97.97%. These excellent service scores will be adversely affected by the AMP. ThePanama City P&DF is approximately 106 miles from the Pensacola P&DC with atravel time of2 hours and 35 minutes. Service is adversely affected by the AMP asTallahassee (ZIP 323) and Dothan (ZIP 363) are overnight from Panama City andtwo-day from Pensacola. The distance between the Pensacola and Tallahassee plantsis approximately 120 miles and there is a change from Central to Eastern Timezones.
Panama City's originating volume (excluding manual letters) will achieve processingfinalization no later than 2330 and be available for dispatch at 2345. With thisdeparture time, the overnight Panama City volumes for Tallahassee will arrive at theTallahassee P&DF at 0435 due to the distance and time zone change. The currentovernight DOV from Pensacola to Panama City departs at 0001, with an arrival timein Panama City of 0235. It is noted that the AMP will result in an increase in theamount of mail arriving on this trip that is committed to overnight delivery. Theproposed departure time to Dothan is 0030, with an arrival time of 0340. These latearriving volumes will be received as 3-digit for Dothan and Panama City requiring indepth sortation and processing. At this time, the letter mail will not be processed inDPS and will only be processed on carrier route which will adversely affect DPSpercentages in Panama City (324), Tallahassee (323) and Dothan (363). The flatvolume after SCF processing will be dispatched to the delivery units as working mailrequiring additional Function 4 work hours which will adversely affect the new 24hour clock target of 100% flats cleared by 05 :00 and will result to delivery unitsreceiving flats on their last transportation.
RETAILAND BUSINESS MAIL ENTRY UNIT CBMEU) IMPACTSThere will be no change to the retail or BMEU operations connected with this AMPstudy. There will be no changes to local mail collection box pick-up times andmailers will still be able to deposit their mail through the Panama City BMEU aspresently done. A local Panama City postmark will be available at the retail unit anda wall drop box at the Panama City P&DF.
Package Page 4 AMP Summary Narrative
Summary Narrative (continued)
Summary Narrative Page 2
EMPLOYEE Th1PACTSIf this AMP is approved there is an estimated net reduction of 8 craft positions and 1management position. Currently Panama City is authorized for 9 managementpositions and 8 of these are filled. While the number on-rolls and proposed numberof management persons are the same, 1 of the 9 positions will be reduced. The PostalService ensures that its standard practices comply with the Worker Adjustment andRetraining Notification (WARN) Act. .
, Craft =FTR+PTR+PTF+Casuals
SDOs to Craft 1
(1 :25 target)
1: 17
1 : 26
MDOs+SDOs to Craft 1
(1 :22 target)
1 : 171: 23
SDOs to Craft 1
(1 :25 target)
f: 22
1 : 27
MDOs+SDOs to Craft 1
(1 :22 target)
1: 22
1 : 23
, Craft =FTR+PTR+PTF+Casuals
2 Craft = F1 + F4 at Losing; F1 only at Gaining
TRANSPORTATIONTransportation supporting both the Panama City P&DF and the Pensacola P&DC isexclusively HCR facility with no PVS service. In the study itwas determined thatthere would be a transportation savings of $149,455. The savings result byelimination of trips 1 and 2 on HCR 32433 and the current service to Panama City onHCR 323HE, HCR 328SE, HCR 32511 and restructuring ofHCR 32512. In ordertransport the 324 (panama City, FI) volumes to 323 (Tallahassee, FL) and 363(Dothan, AL), new service from 325 will be added The new service required isdesigned as shown on the transportation schedules to serve a dual purpose - transportthe overnight volume from 325 to 323 and 363, as well as to transport collection mailfrom four of the 324 associate offices along the line of travel (Chipley 32428,Bonifay 32425, Marianna 32446, and Defuniak Springs 32433) directly to thePensacola P&DC in order to improve the arrival profile of the 324 collectionvolumes. It should be noted that the arrival time of the 324 volume at 323 isadversely affected by the change from Central Time to Eastern Time that occurs.With the service constraints associated to the AMP study, these transportationchanges will not guarantee the current service performance from Panama City toTallahassee and Panama City to Dothan.
Package Page 5 AMP Summary Narrative
Summary Narrative (continued)Summary Narrative Page 3
DARJEXPANSION OR RENOVATIONThere are no expansion or renovation projects or expenses associated with this AMPstudy. The Panama City facility and the land that it occupies are currently owned bythe USPS. This facility does not have any leases associated with it.
EQUIPMENT RELOCATION and MAINTENANCE IMPACTSThere will be no equipment move in Panama City associated with this AMP study.
FINANCIAL JUSTIFICATIONAnnual baseline data came from October 2008- September 2009. Financial savingsproposed for the consolidation of originating operations into these facilities are:
Total First Year SavingsTotal Annual Savings
$574,695$574,695
SUMMARYThe consolidation of originating mail from the Panama City P&DF to the PensacolaP&DC (AMP) will save the United States Postal Service approximately $498,898per year if approved. With the approved AMP, the 24-hour clock goal of 80%cancellation by 2000 in Pensacola, DPS percentages, DPS cleared by 0600 and flatscleared by 0500 in 324,323 and 363 will be adversely affected causing degradationin service to the customers. Moving the mail from Panama City (324) to Pensacola(325) will require the service standards from Panama City (324) to Tallahassee (323)and Panama City (324) to Dothan (363) to be downgraded from an overnight servicecommitment to a two-day service commitment.
Package Page 6 AMP Summary Narrative
24 Hour ClockLast Saved: April 15,2010
Losing Facility Name and Type: Panama City P&DFCurrent 3D ZIP Code(s): 324
Type of Distribution to Consolidate: Originating
Gaining Facility Name and Type: Pensacola P&DCCurrent 3D ZIPC()de(s): 325
24 Hour Indicator Re ort 80% 100% 100% 100% Millions 100% 100% 86.9%
~~ ~~ !I ~~ hi ~~ ~~,F
~ 1l~ E~ E~ dr~ ]~ ~~~ lj Ii" I" I"
i~j ~j ~j~J §I ~I! .- ~ J ! ~~ ~s~
Package Page 7 AMP 24 Hour Clock
Losing Facility Name and Type: Panama City P&DFCurrent 3D ZIP Code(s): 324
Miles to Gaining Facility: 106
Gaining Facility Name and Type: Pensacola P&DCCurrent3b ZIP Code(s): 325
MAPLast Saved: April 15. 2010
Package Page 8 AMP MAP
Service Standard ImpactsLast Saved: April 15, 2010
Losing Facility: Panama City P&DF
Losing Facility 3D ZIP Code(s): 324-::-:--=-----------------------------Gaining Facility 3D ZIP Code(s): 325-------------------------------4/13/2010Based on report prepared by Network Integration SU!"l!"l0rt n::lted'
_--.:.:...:....:..:..:::..;,.,.,;,..~-
(1) .ml''4l1SW3U'·p'·"m''Ft,[T'Ii .._FCM PRJ PER sm PSVC All CLASSES
Overnight % Change All Others % Change Total % Change All % Change All % Change All % Change All % Change All % Change
UPGRADE 0 0.0% 0 0.0% 0 0.0% 0 0.0% 87 4.7% 1 0.1% 1 0.1% 89 1.0%
DOWNGRADE 2 33.3% 0 0.0% 2 0.1% 2 0.1% 4 0.2% 2 0.1% 1 0.1% 11 0.1%
TOTAL 2 33.3% 0 0.0% 2 0.1% 2 0.1% 91 4.9% 3 0.2% 2 0.1% 100 1.1%
NET (2) -33.3% 0 0.0% (2) -0.1% (2) -0.10/. 83 4.5% (1 ) -0.1% 0 0.0% 78 0.8%
I Selected summary fields are transferr~}tg~theEx'ecutiVe Summary .i; . I
(2)
UPGRADE
DOWNGRADE
TOTAL
NET UP+NO CHNG
VOLUME TOTAL
FCM PRJ . PER" STD" PSVC ALL CLASSES
Overnight % Change All Others % Change Total % Change All %Chlj.mll:\ All % Change All %Chaflge All % Change All %Change
0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 8 0.4% 8 0.0%
4,963 2.8% 0 0.0% 4,963 1.2% 97 1.4% 0 0.0% 0 0.0% 168 8.9% 5,228 1.3%
4,963 2.8% 0 0.0% 4,963 1.2% 97 1.4% 0 0.0% 0 0.0% 176 9.4% 5,236 1.3%
173781 -2.8% 224158 0.0% 397938 -1.2% 6,903 -1.4% 0 0.0% 0 0.0% 1,710 -8.5% ~o6.5?1 -1.3%
178,744 224,158 402,901 7,000 1,878 411,779
(3) Notes:
.. - Periodical and Standard mail origin 3-digit ZIP Code to destination 3-digit ZIP Code volume is not available
Package Page 9 AMP Service Standard Impacts
stakeholders Notification(WorkBook Tab Notification - 1)Losing Facility: Panama City P&DF
Employees
Service Talk(Meltloo)
Newsbreak(Method)
Employee Organizations
Santo Ramono, Local PresidentiConl..'.lCt Person)
Pam Grigsby, President(Contact Person)
Tim Ford, VP NAPS(Contact Person)
Terry Fedea, President(Contact Person)
Joseph R. Gerace, President(Contact Person)
Government Officials
Last Saved: April15,2010
NPMHU(TrtlelUnion I
APWULocal1414(Title!lJQlon)
NAPS Southem Regional VP(Title/Union)
NAPUS(TltlelUnion)
National League of Postmasters(TrtlelUnion)
Stakeholder Notification Page 1
AMP Event: Start of Study
10108/2009Date
10108/2009Date
10108/2009Date
10108/2009Date
10108/2009Date
10108/2009Date
10108/2009Date
William T. Dozier, Commissioner District 3 CotintyCommissioner 10108/2009(Contact Person) (Title/Office) Date
Scott Clemons, Mayor City of Panama City 10108/2009(Contacl Person) (Tltle/Offlce) Date
Gayle Oberts, Mayor Panama City Beach 10/08/2009(COn1act Person) (Title/Office) Date
Honorable Jeff Miller Fort Walton Beach, FL 10/08/2009(Contact Person! (Title/Office) Date
Honorable Bill Nelson US Senate, Tallahassee FL 10/08/2009(Contact Person) (Title/Office) Date
Honorable George Lemieux US Senate, Pensacola, FL 10/08/2009(Contact Person) (Title/OffIce) Date
Media
Karen Hanes, VP/Publisher Panama City News Herald 10/08/2009IContElct Person} (Company Name) Date
Todd Berry, Director of Programming WFLFFox News Radio 10/08/2009{Contact Person) (Company Name) Date
Tom Lewis, News Director WJHGTV 10/08/2009(Contact Person) (CoI11pany Name) Date
Terry Cole, General Manager WMBBTV 10/08/2009(Contact Person) (Company Name) Date
Community Organizations/Groups
Carol Roberts, President CEO(Contact Person)
Package Page 10
BayCounty Chamber of Commerce(Organization Name)
10/08/2009Date
AMP Stakeholders Notification
Stakeholder Notification Page 2
AMP Event: Start of Study
Stakeholders Nfetiticatiol'1 (continued)(WorkBook Tab Notification - 1)
Losing Facility: Panama City P&DF
Local Mailers
288(NumMr Contacled)
Package Page 11
Notification List •• PanamaCity· ··1 00809(Ust Filename & Localion)
10/08/2009Date
AMP Stakeholders Notification
Stakel'lo:l·dersNotification(WorkBook Tab Notification - 2)Losing Facility: Panama CityP&DF
Meeting Legion H~II G91.1/'l.t¥Location: 2230 E 15' ,"'g,,:
Employees
Service Talk(Method)
Newsbreak(Method)
Last Saved: April 15, 2010 Stakeholder Notification Page 1
AMP Event: Public Meeting
Mee.tlnDate: .-,;1.;,;/1:..;41",,2;;,;O...;.1~O ---!Meeting Time: ~7.:;:O:.:O:..;P..;M~ ---J
12129/2010Date
12129/2010Dale
Employee Organizations ,
Santo Ramono, Local President NPMHU 12129/2010(Contact Person) (Tille/Union) Date
Pam Grigsby, President APWU Local 1414 12129/2010(Contact Per;Of'\) (TitlelUnion) Date
Tim Ford, VP NAPS NAPS Southern Regional VP 12129/2010(Contact Per;on) (TitleiUl1Ion) Dale
Terry Fedea, President NAPUS 12129/2010(Contact Person) (TltlelUnionj Date
Joseph R. Gerace, President National League of Postmasters 12129/2010(Contact Person) (TI~elUnion) Date
Government Officials
William T. Dozier, Commissioner District 3 County Commissioner 12129/2010(Contact Per;on) (Title/Office) Date
Scott Clemons, Mayor City of Panama City 12129/2010(Contact Person) (TltleiOffice) Date
Gayle Oberts, Mayor Panama City Beach 12129/2010(Conlact Person) (Tille/Office) Date
Honorable Jeff Miller Fort Walton Beach, FL 12129/2010I Contact PersOf'\) !Title/Office) Date
Honorable Bill Nelson US Senate, Tallahassee FL 12129/2010{Contact Person) (Title/Office) Dale
Honorable George Lemieux US Senate, Pensacola, FL 12129/2010(Contact PersOf'\) (Title/Office) Date
Media
Karen Hanes, VPiPublisher Panama City News Herald 12129/2010(Contact PersOf'\) (Company Name) Date
Todd Berry, Director of Programming WFLF Fox News Radio 12129/2010(Ccntact Per;Of'\) (Company Name) Date
Tom Lewis, News Director WJHGlY 12129/2010(Contact Person} (Company Name) Date
Terry Cole, General Manager WMBBTV 12129/2010(Conlact PersOf'\) (Company Name) Date
Community Organizations/Groups
Carol Roberts, President CEOtCOf'\tacr Person)
Package Page 12
Bay County Chamber of Commerce(Organizahon Name)
12129/2010Date
AMP Stakeholders Notification
Stakeholder Notification Page 2
AMP Event: Public Meeting
Stakeholders Notification (continued)(WorkBook Tab Notification - 2)
Losing Facility: Panama City P&DF
Local Mailers
same stakeholders notified as start of study(Numoer Conlacled)
Package Page 13
(Usl Filename & Location)12/29/2010Date
AMP Stakeholders Notification
Workhour Costs - CurrentLast Saved: April 19.2010
Losing Facility: Panama City P&DF Gaining Facility: Pensacola P&DC
Gaining Current Workhour Rate by LOC
uxFunction 1
U>CFunction 4
11 $44.31 41 $0.00
12 $45.11 42 $0.00
13 $41.49 43 $38.37
14 $40.47 44 $36.01
15 $36.90 4S $49.28
16 $0.00 45 $0.00
11 $38.25 41 $0.00
15 $40.25 45 $33.84
10/01/08 «=lIJ:: :.._» 09/30/09
Losing Current Workhour Rate by LOe
Function 1 Function 4c U>C
1 $36.52 41 $0.00
2 $44.20 42 $0.00
3 $45.56 43 $0.00
4 $39.62 44 $34.43
5 $0.00 45 $36.63
5 $0.00 46 $0.00
1 $37.31 41 $0.00
5 $39.30 45 $32.80
Date Range of Data·
U>C
(1) (2) (3) (4) (5) (6) (7) (8) (9) (lor-- --
(11) (12) (13)-"'" (14)Current
% Moved to Cu.....nt Current Current Current Current Current Current Current Current Current CurrentOperation Annual FHP Annual TPH or Annual Productivity Annual Operation % Moved to
AnnualFHP Annual TPH or Annual Productlvlty AnnualNumbera Gaining
Volume NATPH Volume Workhours (TPH or NATPHI Workhour Costs Numbers LosingVolume NATPH Volume Wor1choura (TPH or NATPHI W<>rkhour Coata
002 100.0% $16,353 ¢ 002 $26,361010 100.0% $58,404 ¢ 010 $51.22.4:011 100.0% $522 ¢ ~012 100.0% $0 ¢ 010du015 100.0% $43,514 015
---_ ...~~-- ---- -I'----$103,00:2.¢
020 100.0% $298 ¢ 020 $1,285021 100.0% $0 ¢ 021 i. $0022 100.0% $0 ¢ 022 $0030 100.0% $87,386 ¢ 030 $456 56:2040 100.0% $650 ¢ 040 $16,803050 100.0% $1,220 ¢ 321 $5,56e060 100.0% $91 ¢ 060 $102.005066 100.0% $0 ¢ 066 $21,7$3067 100.0% $0 ¢ 067 $0070 100.0% $28 ¢ O6Odup120 100.0% $877 ¢ 138 $546967124 70.0% $649 ¢
~ $0134 100.0% $0 ¢ I 138du!138 100.0% $0 ¢ 138dul208 100.0% $0 ¢ 208 $48,080209 100.0% $0 ¢ 209 $0261 100.0% $4 ¢ 261 $0271 100.0% $123,456 ¢ 271 $220,730281 100.0% $2,761 ¢ 281 $177,320321 100.0% $92,971 ¢ 138dup441 100.0% $112,648 ¢ 461 $16,079442 100.0% $4,075 ¢ 462 $8,012585 50.0% $174,330 ¢ 585 $83,418811 100.0% $12,884 ¢ I 461duF812 100.0% $0 ¢ 462du831 100.0% $3,097 ¢ 261dup871 100.0% $635 ¢ 891 1 1 1 1 1 -r $4,069881 100.0% $394 ¢~891 100.0% $650 ¢ I 891du892 100.0% $0 ¢ 892
Package Page 9 AMP Worl<hour Costs - Current
Package Page 10 AMP Workhour Costs - Current
(1) (2) (3) (4) (5) (6) (7)Current
% Moved to Current Current Current Current CurrentOperatlon Annual FHP Annual TPH or Annual Productlvlty AnnualNumbers
GainingVolume NATPH Volume Workhours ITPH or NATPHI Workhour Costs
...
Package Page 11 AMP Workhour Costs - Current
(1) (2) (3) (4) (5) (6) (7)Current
% Moved toCurrent Current Current Current Current
OperationGaining
Annual FHP Annual TPH or Annual ProductIVIty AnnualNumbers Volume NATPH Volume Workhours (TPH or NATPH) Workhour Costs
Package Page 12
(8) (9) (10) (11) (12) (13) (14)Current
% Moved toCurrent Current Current Current Current
OperationLosing
Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours ITPH orNATPH) Workhour Costs
AMP Workhour Costs - Current
(1) (2) (3) (4) (5) (5) (7)Current
% Moved 10 Current Current Current Current CurrentOperation
Gaining Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Wor!<hours (TPH or NATPH) Workhour Costs
Package Page 13
(8) (9) (10) (11) (12) (13) (14)Current
% Moved 10Current Current Current Current Current
OperationLosing Annual FHP Annual TPH or Annual Productivity Annual
Numbers Volume NATPH Volume Workhours (TPH or NATPH) Workhour Costs
AMP Workhour Costs - Current
(1)Current
OperationNumbers
(2)
% Moved toGaining
(3)Current
Annual FHPVolume
(4)Current
Annual TPH orNATPH Volume
(6)CurrentAnnual
Worl<hours
(6)Current
Productivity(TPH or NATPH)
(7)CurrentAnnual
Workhour Costs
(8)Current
OperationNumbers
(9)
% Moved toLosing
(10)Current
AnnualFHPVolume
(11)Current
Annual TPH orNATPH Volume
(12)CurrentAnnual
Worl<hours
(13)Current
ProductivityI (TPH or NATPH)
(14)CurrentAnnual
Workhour Costs
I
3,196 $737,913No Calc
Totals $3,212,061
$3,949,974
78,347,436 138,473,616 $1,889,889o 0 $0
T tal 1~i~41j~§ j~~;41~c§1§$jll!~~ll!!l~o s 234,667,170 600,325,777 $5,723,522
62,230,495 149,312,841 $4,853,432375245101 888,112,234 $12.466.844
198,523,089
149,312,8411,352,646,509
1,004,810,579
Combined Current Workhour Annual Workhour Costs : $16,416,818(This number is carried forward to the bottom of AMP Worksheet Workhoui Costs-Proposed)
Total FHP to be Transferred (Average Dally Volume) : 103,611(This number Is carried forward to AMP Worksheet Executive Summa!}')
Current FHP at Gaining Facility (Average Dally Volume) : 1,210,468(This number Is carried forward to AMP Worksheet Executive Summa!}')
Package Page 14 AMP Workhour Costs· Current
Losing Facility: Panama City P&DF
Workhour Costs - ProposedLast Saved: April 19,2010
Gaining Facility: Pensacola P&DC
$0
$0
$0
$5,568
$0
$17,466
$0
$0
$0
$4,859
. $466
$0
$0
$0$0
$0
$1,591
$48,080
$0
$43,145
$172,687
$0$0
$12,172
$0
$21,753
$106,769
$180,675$320,985
$578,@S
$102,126
$545,~47
$147,613
$111,635
(12)Proposed
AnnualWorkhour Costs
(10)ProposedAnnual
Workhours
(9)Proposed
Annual TPH orNATPH Volume
(8)Proposed
AnnualFHPVolume
015020
002010
021
010du010du
(7)ProposedOperationNumbers
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0
$195
$87,165
(6)Proposed
AnnualWorkhour Costs
(4)Proposed
AnnualWorkhours
(3)Proposed
Annual TPH orNATPH Volume
(2)Proposed
Annual FHPVolume
134
120
138
871
124
881
261
831
208
271281
209
321
442441
812
5115811
891
070
022
060050
067066
011
015020021
030040
012
002010
(1)ProposedOperationNumbers
Package Page 15 AMP Workhour Costs - Proposed
Package Page 16 AMP Workhour Costs - Proposed
(1) (2) (3) (4) (5) (6)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours ITPH or NATPHI Workhour Costs
Package Page 17 AMP Workhour Cos(s - Proposed
(1) (2) (3) (4) (5) (6)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours (TPH orNATPH\ Workhour Costs
Package Page 18
(7) (8) (9) (10) (11) (12)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours ITPH or NATPHI Workhour Costs
AMP Workhour Costs - Proposed
(1) (2) (3) (4) (5) (6)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours : (TPH or NATPHI Workhour CoSIs
Package Page 19
(7) (8) (9) (10) (11) (12)Proposed Proposed Proposed Proposed Proposed ProposedOperation AnnualFHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours /TPH or NATPH) Workhour Cosls
AMP Workhour Costs - Proposed
(1)ProposedOperationNumbers
(2)Proposed
Annual FHPVolume
(3)Proposed
Annual TPH orNATPH Volume
(4)Proposed
AnnualWorkhours
(5)Proposed
ProductivityI (TPH or NATPHl
(6)Proposed
AnnualWorkhour Costs
(7)ProposedOperationNumbers
(8)Proposed
Annual FHPVolume
(9)Proposed
Annual TPH orNATPH Volume
(10)ProposedAnnual
Workhours
(11)Proposed
ProductivityI(TPH or NATPH)
(12)Proposed
AnnualWorkhour Costs
01 111.0141 2.2231 501 $87,36001
131,825,355
131.825.355
Package Page 20
110,466,8401 198,412,0751 58,6Gal 3,3821 $2,422,633o 0 $0
110466840· 1ll8;4U;075 $2,4~~633;
234,667,170 600,325,777 $5,723,52262,230,4951 149,312,8411 115,3381 1,2!l51 $4,6ll2,734
407.364.5051 948.050.6931 309.6171 3.0621 $12,8jMaa
AMP Workhour Costs - Proposed
(1) (2) (3) (4) (5) (6)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours lTPH or NATPHI Workhour Costs
(7) (8) (9) (10) (11) (12)Proposed Proposed Proposed Proposed Proposed ProposedOperation Annual FHP Annual TPH or Annual Productivity AnnualNumbers Volume NATPH Volume Workhours ITPH or NATPHI Workhour Costs
I ~:~ I I I I I i:~:~~~095 ! ! ! ! ! $887096 I I I I I $1,952097 I I I ! I $29,198
Totals 2.331.866 2.331.866 113 20.636 $4.127 Totals o o 3423 No Calc $151,890
Combined Current Annual Workhour Cost: $16,416,818(ThIs number brought forward from IM,,1<hour Costs - CUJTent)
Proposed Annual Workhour Cost: $16,192,384(Tolal of Columns 6 and 12 on this page)
Minimum Function 1 Workhour Savings: ($198,385)(This number represents proposed worl<hour savings with no productivity improvement!
apptied to operations at the gaining taciUty)
Function 1 Workhour savings: $224,434(This number equals the difference In the current and proposed worl<hour cost!
above and is carried forward to the Executive Summary)
Package Page 21
$2,509,993
$0
AMP Workhour Costs - Proposed
I Other Workhour Move Analysis ILast Saved: April 19. 2010
losing Facility: Panama City P&DF
Package Page 22
Gaining Facility: Pensacola P&DC Date Range of Data: 10101108 to ..:09=130=109:=.... _
AMP Other Curr vs Prop
I 111
11 11111' III I I " I' , "" II I I I 1'1 I I "1' '1 1 I III I I I 'II I II IIII
1 1 1 1 11 1 1 1 ~ 11 11 1 1 1 11 11
11 1 I 1 1 1 IJ J J ~---r-J I
II II III1J J 11 I11111 111111 11 1 11II I II I "l' I I '1 ' I I ,
l -L 1I I I '"'' " '" 'J I I I 1 I
1
1111f I i I I I I 1r-
1 I J j! I 1I 1
I,I ~
I II
1 1
I 11J.
1 JillII
11 I 1 1 11~~111 ~l~ ~l 1I
.J..1.L!
1 ~ .L.L.L ~.L ~~~ ~ .L~
-$1022099Ops-Redudng 19936
TotalsOps-Increaslng 0 $0
Ops-Staylng 45434 $1847473AlOpe:ratlons 65370 $2869572
_.ops-ReduciOO- . 0 $0
TotalsOps-lnatla.1ng 34009 $1619000
Ops-Staylng 76861 $3034630AI OJ>enIllons 111629 $4654590
Dos-Red 16341 $840331Ons-Inc 0 $0
Oos-Sla 45434 $1847473AllOns 63775 $2767604
_._-I--- .- ------Oos-Red 0 $0
Oos-Inc 34969 $1619000Oos-Sla 76861 $3034630
AlIOos 111629 $4654590
Package Page 24
1---+--·· I I
AMP Other Curr V$ Prop
I
I
I1
I
I I
I,
I
•
I,
I i I,
i I
I ttttI i
i
i Ii
I, Iill
IIIII
Ii j
I I '
0-ea.~l:::Jo~£oa.~
, .Ops-Redudng 7715 $341956
TotalsOps·lnaeaslng 0 $0
Ops-Slaylng 9841 $487041AI OpereUons 17555 $828998
Ops..-Reduclng 0 $0
TotalsOps-Increaslng 1666 $80 019Ops-staytng 29959 $1530145
Al Openltlons 31625 $1610184
Cps-Red()p$-tnc
Cos-SlavAJ10ps
6,267o
9,84116,128
$276.694$0
$487.041$7ElS.7se
nos-Red 0 $0Co..lnc 1666 $80 019
Cos·Sts 29959 $1530 145AQOns 31625 $1610184
Current WOrKhours for LDCsCommon to & Shared between Supv & Craft
Ops-Rodudng I 166 I $4,837
T Ops-ln"",••1ng $0otals Ops-Staying 38 837
AI Operations $43,674
Ops-Redudng I 0 I $0
I Ops-lncreaslng I 6991 $23 047 1Totals Ops-Staylng 3,085 $116:672AI OpenltlonS I 3,784 I $139,719
..RedOPS-lnc
!-Sts'
139o
1.0071.147
$4.063$0
$38.837$42.900
$0$2315e116672
$139.828
Opo617, ~9, 7.. (31)\ I $n,533!Cpo 765, 766 (3<) $0
Sublet (or
Tf.,.wSTab
1,778
$0$0
77.533Sub&etfOfTr_ns-PVS
TabCpo a17, 679, 7.. (31)1 0 I $0I
Cpo 765, 766 (3<) 0 $0
1.776
Cpo617.679.7.. (31)! I $n,533!Opo 7a.. 766 (3<) $0
Cpo617.~9.7"(31)1 0 I ~ICpo 765. 766 (3<) 0 $0
Package Page 26 AMP Other Curr vs Prop
$0
$0$0
$0
$0$0
..$0
$lM,907
$501.739..$72.865
$1.810,16431.625Total.
7060
~1
88
50
80
4035
'30:20
$0
$0
$0
$0$0
$0$94.824
$765.738
$331.663
16.128
70
Total.as~1
60
40
80
50
35
$0
$()
$1.610,164
$10M07$0
$0
$0$0$0
$501.739$72:a6S
31.~25
Summary by SUb-Group
$0$0
$0
$0$0
$0$94.~24
$82~.998
$331.663
17.555Total.~~
~1
70
5040
30
50
80
35
20
ICurrent c Combined Special AdJuslmanls
Combined -Propo.ed + Spec1aI Adjuslmanls
-Combined- ChangeAnrwai VIJofkhow-a .t· Annual DoI~
'O!hor c,.,.. Cps (nolo 1) 15 187 $800,242T,.,.""",,_ ops (nol. 2) 1 778 $77 533
MaIn,......,. ops (nolo 3) 183 820 $8 918~SupoNlso", ops 49180 $2439182
Supv1Cr.rlJotntOps(not1i4) 1394 $46818TO\<lI 231131 $10146116
,,""...,-oooooo
Annuol DolIaA
$0$0$0$0$0$0
Annuli Workhours Annuli DoIars WoridlouJ Chanoe % Change OoIaraChange Percent Chang.e
15167 $666242 0 0.0% (SO 0,0%1776 $77 533 0 0.0% SO 0.0%
162025 $8~35195 1595 -1.0% ($81188 -1.2r,47753 $2315 !!OO 142 -2.9% $83 2~2 -2.6%
1371 $48153 23 "1.7% ($665 -1,4%228.091 $10,(>01,022 (3,045) -1.3% ($145.694) -1.4%
LOG
"eO.. ,
LOG
Total Ad'
Note:s:1) Ius Op$ goklg to 'Tran..-PYS· & 'Maintenance' Tabl
2) goin~ to T~n&-PVS t.b3) going to Malntonanc. t.b
.) I.... Cps golng to. 'Mal:nten~' Tabs
o $0 Tolal A" o $0
Package Page 27 AMP Other Curr vs Prop
Staffing • ManagementLast Saved: April 15, 2010
Losing Facility: Panama City P&DFData Extraction Date: 10/09/09 Finance Number: 117260
Management Positions(1 ) (2) (3) (4) (5) (6) (7)
Current Auth Current ProposedDifference
Position Title Level Proposed vs AMP ImpactsLine Staffing On-Rolls Staffing'
On~Rolis
1 MGR PROCESSING/DISTRIBUTION FCLTY EAS-22 1 1 1 0 0
2 MGR MAINTENANCE EAS~19 1 !J./ 1 1 0
3 SUPV DISTRIBUTION OPERATIONS EAS~17 3 3 2 -1 -1
4 SUPV MAINTENANCE OPERATIONS EAS-17 3 3 3 0 0
5 OPERATIONS SUPPORT SPECIALIST EAS;15 1 1 1 0 0
678910111213141516171819202122232425262728293031323334353637383940414243
Package Page 33 AMP Staffing - PCES/EAS
43444546474849505152535455565758596061626364656667686970717273747576777879
Totals 9 8 8 0 (1 )
(1)
oPosition Change: Proposed vs. On-RollsI__--1.....-_
Position Impacts Due to AMP:
3Retirement Eligibles:
Package Page 34 AMP Staffing - PCES/EAS
Gaining Facility: Pensacola P&DCData Extraction Date: 10/09/09 Finance Number: 117410
Management Positions(12) (13) (14) (15) (16) (17) (17)
Current Auth Current ProposedDifference
Position Title Level Proposed vs AMP ImpactsLine Staffing On-Rolls Staffing
On-Rolls
1 MGR PROCESSING/DISTRIBUTION EAS-24 1 1 1 0 0
2 MGR MAINTENANCE EAS-21 1 1 1 0 0
3 MGR DISTRIBUTION OPERATIONS EAS-20 1 1 1 0 0
4 OPERATIONS SUPPORT SPECIALIST EAS-18 1 1 1 0 0
5 OPERATIONS SUPPORT SPECIALIST EAS-17 3 3 3 0 0
6 SUPV DISTRIBUTION OPERATIONS EAS-17 7 1"i6'<·· 6 0 0
7 SUPV MAINTENANCE OPERATIONS EAS-17 4 4 4 0 0
8 NETWORKS SPECIALIST EAS-16 1 1 1 0 0
9 SECRETARY (FLD) EAS-12 1 1 1 0 0
10111213141516171819202122232425262728293031323334353637383940414243444546
Package Page 35 AMP Staffing - PCES/EAS
464748495051525354555657585960 "
61626364656667 "
68697071 '.
7273747576777879
Total 20 19 19 0 0
oPosition Change: Proposed YS. on-Rollsl__o~_...1..... _
Position Impacts Due to AMI-':
7Retirement Eligibles:
Total PCES/EAS Position Loss: 1 (This number carried forward to the Executive Summary)
Package Page 36 AMP Staffing - PCES/EAS
Staffing - CraftLast Saved: April 15. 2010
Losing Facility: Panama City P&DF Finance Number: 117260
Data Extraction Date: 10/09/09
(1) . (2) (3) (4) (5) (6)
Craft Positions Casuals Part Time Full Time Total TotalDifference
On-Rolls On-Rolls On-Rolls On-Rolls ProposedFunction 1 - Clerk 0 0 37 37 31 (6)Function 4 - Clerk 0 0 0
io)RiJOQ{IOh 1 - Mail Hand.ler 0 0 14 14 12 (2\FUnotloh 4 - Mail Handler 0 0 O.
Function 1 & 4 Sub-Total 0 0 51 51 43 (8)FLJnction 3A - Vehicle Service 0 0 0Function 38 - Maintenance 2 0 31 33 32 (1 )f;unotions 67-69 - Lmtd/RehablWC 0 1 1 1 0Other FUhctions O' 0 1 1 1 0
i,' mQtiJ 2 0 84 86 77 (9)
Retirement Eligibles: 18y\ x
Gaining Facility: Pensacola P&DC Finance Numb-er:- 117410.- _.".~
Data Extraction Date: 10/09/09
(7) (8) (9) (10) (11) (12)
Craft Positions Casuals Part Time Full Time Total TotalDifference
On-Rolls On-Rolls On-Rolls On-Rolls ProposedFunction 1 - Clerk 0 0 114 114 114 0Function 1 - Mail Handler 2 2 40 44 45 1
Function 1 Sub-Total 2 2 154 158 159 1Function 3A- Vehicle Service 0 0 0Function 38 - Maintenance 3 0 56 59 59 0Functions 67-69 - Lmtd/RehablWC 0 1 1 1 0Other Functions 0 0 2 2 2 0
Total 5 2 213 220 221 1
Retirement Eligibles: 62
Total Craft Position Loss: 8 (This number carried forward to the Executive Summary)
(13) Notes: Pensacola will gain 1 mail handler from Panama City due to the AMP.
The mail handler will be assigned to OPN 010.;~~k1;tlQ,~l~9,§~~gi~iil
Package Page 37 AMP Staffing - Craft
MaintenanceLast Save<!: Apti115. 2010
Losing Facility: Panama City P&DF
Date Range of Data: Oct-01-2008: Sep-30-2009
Gaining Facility: Pensacola P&DC
Workhour Activity
(1 )
Current Cost
(2)Proposed
Cost
(3)
Difference Workhour Activity
(4)
Current Cost
(5)Proposed
Cost
(6)
Difference
Building Equipment $ 452,332 $ 452,332 $
Building Services $ 939,674 $ 939,674 $(Custodial Cleaning)
Maintenance $ 210,743 $ 210,743 $Operations Support
Maintenance $ 36,122 $ 36,122 $Training
LDC36
LDC37
LDC38
LDC39
LDC93
Mail Processing $Equipment
1,022,099 $ 940,331 $ (81,768)
o
o
o
o
LDC36
LDC37
LDC38
LDC39
LDC93
Mail Processing $ 2,020,370 $ 2,020,370 $Equipment
Building Equipment $ 1,020,689 $ 1,020,689 $
Building Services $ 838,424 $ 838,424 $(Custodial Cleaning)-
Maintenance $276,057 $ 276,057 $
Operations Support
Maintenance $100,453 $ 100,453 $
Training
o
o
o
o
o~ ~ ~ - - '1
Workhour Cost" __ _ _SUbto!~I,
$ 2,660,970 $ 2,579,202 $ {81,76B)
~ ~ -, F ~ -- ~ ~ ~ f
Workhour CostSubtotal
~ ,_ ~ ~ _ ~_"-~_ _~~",,,,,,,,,,","_1
$ 4,255,992 $ 4,255,992 $ o
Other Related Maintenance &Facility Costs
DifferenceOther Related Maintenance &
Facility Costs Difference
TotalMaintenance Parts, Supplies & $
Facility Utilities
Adjustments(from "Other CurT VS PlOP" falJj
371,093 $
$
315,981 $
o
(55,112) Total Maintenance Parts, Supplies & $Facility Utilities
Adjustments(from "Other Curt vs Prop" fl)bJ
831,658 $
$
831,658 $
o
o
Grand Total $3,032,063 $ 2,895,183 $ (136,880) Grand Total $ 5,087,650 $ 5,087,650 $ o
Annual Maintenance Savings: $136,880 (This number carried forward to the ExecuUve Summary)
(7) Notes: ~ _
Package Page 38 AMP Maintenance
Losing Facility: Panama City P&DFFinance Number: _1;..;1.;.;7:::-26;:.;0~:---_-:--__
Date Range of Data: 10101/08 - to - 09/30109
Transportation - PVSLast Saved: April 15, 2010
Gaining Facility: Pensacola P&DCFinance Number: 117410
(1 ) (2) (3)Current Proposed Difference
PVS Owned EquipmentSeven Ton Trucks 0 0Eleven Ton Trucks 0 0Single Axle Tractors 0 0
Tandem Axle Tr<:lctors 0 0
Spotte~ 0 0
PVSTranspor1ationTotal Number of Schedules 0
Tot<:ll Annual Mil~Clge 0
Total Mileage Costs $0
PVS LeasesTotal Vehicles Leased 0
Total Lease Costs $0
PVS Workhour CostsLOG 31 (617,679,764) $77,533 $77,533 $0
LOG 34 (765, 766) $0 ::.Adjustments~(from "Other Curr vs Prop" tab)
$77,533 $0Total Workhour Costs $77,533
(4) (5) (6)Current Proposed Difference
PVS Owned EQuiomentSeven Ton Trucks 0Eleven Ton Trucks 0Single Axle Tractors 0Tandem Axle Tractors 0Spotters 0
PVS TransoortationTotal Number of Schedules 0Total Annual Mileage 0
Total Mileage Costs $0
PVS LeasesTotal Vehicles Leased 0
Total Lease Costs $0
PVS Workhour CostsLOG 31 (617,679,764) $0 $0 $0LOG 34 (765,766)$0 ::.Adjustments~
(from "Other Curr vs Prop" tab)
Total Workhour Costs $0 $0 $0
PVS Transportation Savings (Losing Facility): I $0 I PVS Transportation Savings (Gaining Facility): I $0 ITotal PVS Transportation Savings: $0 «== (This number is summed with Total from 'Trans-HCR' and carried forward to the
Executive Summary as Transportation Savings)
(7)Notes: Neither facility has PVS service. Both are HCR serviced facilities.
Package Page 39 AMP Transportation - PVS
Losing Facility: Panama City P&DF
Transportation - HeRLast Saved: April 15, 2010
Gaining Facility: Pensacola P&DC
Type of Distribution to Consolidate: Originating_-:.._-------------Data Extraction Date: 10/12/09
CET for cancellations: 20:05 CET for OGP: 22:05
CT for Outbound Dock: 3:15
1 2 3 4 5 6 7Current Current Current Proposed Proposed Proposed
Route Annual Annual Cost per Annual' Annual Cost perNumbers Mileage Cost Mile Mileage Cost Mile
32433 137,692 $238,074 $1.73 95,428 $1}5,960 $1.84323HE 392,435 $573,545 $1.46 322,730 $486,951 $1.51
328SECA) 1,898,590 $2,613,671 $1.38 1,814,349 $2;515,097 $1.39
..
Package Page 40
8 9 10 11 12 13 14Current Current Current Proposed Proposed Proposed
Route Annual Annual Cost per Annual Annual Cost perNumbers Mileaae Cost Mile Mileaae Cost Mile
32512 214,304 $320,194 $1.49 190,644 $2$0,146 $1.52NEW323 $0.00 101,565 $$9,000 $0.94NEW363 $0.00 77,762 $85,000 $1.09
32511 238,286 $314,311 $1.32 191,796 $262,186 $1.37
AMP Transportation - HeR
1 2 3 4 5 6 7Current Current Current Proposed Proposed Proposed
Route Annual Annual Cost per Annual Annual Cost perNumbers Milea~e Cost Mile Milea~e Cost Mile
8
RouteNumbers
9CurrentAnnualMileaae
10CurrentAnnual
Cost
11CurrentCost per
Mile
12Proposed
AnnualMileaae
13ProposedAnnual
Cost
14ProposedCost per
Mile
Package Page 41 AMP Transportation - HeR
1 2 3 4 5 6 7Current Current Current Proposed Proposed Proposed
Route Annual Annual Cost per Annual Annual Cost perNumbers Mileage Cost Mile Mileage Cost Mile
8 9 10 11 12 13 14Current Current Current Proposed Proposed Proposed
Route Annual Annual Cost per Annual Annual Cost perNumbers Mileaae Cost Mile Mileaae Cost Mile
Current Movingother
Trips fromChanges Proposed Result
Gaining to Lose (-) (+/-) Losing
53,417 0 0 0 53,417
Current MovingOther
Trips fromChanges Proposed Result
Losing to Gain (-) (+/-) Gaining
31,423 0 0 0 31,423
~ p~~~~;~;~" Trip -"I
~~I~~a:~L1HCR Annual Savings (Losing Facility): $247,282 HCR Annual Savings (Gaining Facility): ($!)7,827)
Total HeR Transportation Savings: $149,455 «== (This number is summed with Total from 'Trans-PVS' and carried forwardto the Executive Summary as Transportation Savings)
Package Page 42 AMP Transportation - HeR
Distribution ChangesLast Saved: April 15, 2010
Losing Facility: Panama City P&DFType of Distribution to Consolidate:...:O""n;>;·g"'in.;;:a;.:;ti""ng"- _
(1)
Indicate each DMM labeling list affected by placingan ·x· to the left of the list.
If revisions to DMM L005 or DMM L201 are needed, indicateproposedDMM label chanlle below.
(2)IDMM Labeling List L005 - 3-Dlgit ZIP Code Prefix Groups· SCF Sortation
Important NoI!' Section 2 & 3 Ilustrete po..ible menges to DMM IBbeling lI.ts. Section 2rolet.. to oonaolldetion of DestinetionOp....tlollll. Section 3 pertslna to Origln.Ung Operatiollll. The Ares DlBtrlbution Networl< group wMI.ubmlt .pproprlate requests forDMM chang.. eft.. AMP approval.
DMM Lool ----DMM LOll
DMM Loo2 X DMM L201
DMMLoo3 ----DMM L601
DMM LOO4 ----DMML602
DMMLOO5 ----DMML603
DMMLOO6 ----DMML604
DMM Loo7 ----DMML605
DMM Looa DMM L606----DMM LOO9 DMML607----DMM L010 ----DMM L601
In 5
From:
Action Code' IColumn A· 3-Dig~ ZIP Code Prefix Group
To:
Action Code' IColumn A• 3-Dlon ZIP Code Prefix Group
"ACtion Cod..: A"add O-do!ete CF..chtI~ from CTachange to
Column B - Labef to
Column B- Label to
CF 1325
Column B - 3-Dkln ZIP Code D..Unotlona005,070-089, 100-119, 124-127, 140-212,214-268,270-284,287-342,344,346,347,349-352,354-418,420-427,430-509,20-528,530-532,534,535,537-539,541-545,549,600-620,2-631,633-641,644-658,680-662,664-668,700,701,703-708,
710·714,716-731,733-738,740,741,743-767, nO-789, 798, 799,880,885
070-089, 100-102, 104, 140-212,214-268,270-279,285,298-342,344,348, 347, 349-352, 354-418, 420-427, 430'509, 520·528:530-532,534,535,537-539,541-545,549,600-620,622-631,633-641,644-658,660-662,664-668,700,701,703-708,716,717,719-731,734-738,740,741,743-749
344,
716-
Column C- Lebel to
OMX PENSACOLA FL 325
(4) Drop Shipments for Destination Ent YDiscounts - FAST Appointment Summary Rep< rt
Month LoalngiGalnlng "A~~ Facility Nama Total N9'Show Lale ''''''al .0 - CIOMd un.cnaCode Schd Anoia Count % Count % Count % Count % Count
Sept '09 Losing FacilitV 324 Panama Citv 135 81 60.00% 18 13.33% 0 0.00% 54 40.00% 1
AUG '09 Losinll Facllitv 324 Panama Citv 129 96 74.42% 5 3.88% 0 0.00% 33 25.58% 0
Sepl '09 Gaining FacilitV 325 Pensacola 242 54 22.31% 36 14.88% 0 0.00% 184 76.03% 11
AUlI'09 Gaining FacilitV 325 Pensacola 236 46 19.49% 42 17.80% 0 0.00% 185 78.39% 6
(5)~
Package Page 43
~ . lev 511412009 " ," '
AMP Distribution Changes
MPE InventoryLast Saved: April 15. 2010
Gaining Facility: Pensacola P&DC
10/11/09
Losing Facility: Panama City P&DF
Data Extraction Date· ---_.:..::.:..:....:.:.;::..:::.-_---
(1) (2) (3)
EquipmentCurrent Proposed
DifferenceType
Number Number
AFCS 2 0 (2)
AFSM -ALL 0 0 0
APPS 0 0 0
ClOSS 0 0 0
CSBCS 0 0 0
DBCS 4 4 0
DBCS-OSS 0 0 0
DIOSS 1 1 0
FSS 0 0 0
SPBS 0 0 0UFSM 0 0 0
FC I MICRO MARK 0 0 0
ROBOT GANTRY 0 0 0
HSTSI HSUS 0 0 0
LCTSI LCUS 0 0 0
LIPS 0 0 0
MLOCR-ISS 0 0 0
MPBCS-OSS 0 0 0
TABBER 0 0 0
POWEREDINDUSTRIAL 0 0 0EQUIPMENT
(4) (5) (6) (7) (8)
EquipmentCurrent Proposed
DifferenceExcess Relocation
TypeNumber Number Equipment Costs
AFCS 3 3 0 (2)
AFSM 100 1 1 0 0
APPS 0 0 0 0
ClOSS 2 2 0 0
CSBCS 0 0 0 0
DBCS 7 7 0 0
DBCS-OSS 0 0 0 0
DIOSS 1 1 0 0
FSS 0 0 0 0
SPBS 1 1 0 0UFSM 0 0 0 0
FC I MICRO MARK 0 0 0 0
ROBOT GANTRY 0 0 0 0
HSTSI HSUS 0 0 0 0
LCTS I LCUS 1 1 0 0
LIPS 0 0 0 0
MLOCR-ISS 0 0 0 0
MPBCS-OSS 0 0 0 0
TABBER 0 0 0 0
POWEREpINDUSTRIAL 0 0 0 0EQUIPMENT
Mail Processing Equipment Relocation Costs from losing to Gaining Facility: $0 (This number is carried forward to Space Evaluation and
Other Costs)
(9) Notes: No equipment will be moved.
Package Page 44 AMP MPE Inventory
Customer Service Issueslast Saved: April 15. 2010
Losing Facility: Ranama City P&DF
5-Dlglt ZIP Code:-:3.::;240.=.:1 _Data Extraction Date:--:1.::0:.:/1.::6/:.;:O.::.9 _
1. Collection Points
N"mWp~.'"~~ 'pm I 32 I "I I I I I I I"":::~~=~:,:,. ~: ,E. 00.. o. 0 0: 0
2. How many collection boxes are designated for "local delivery"? [-- () J
3. How many "local delivery" boxes will be removed as a result of AMP? ,- - 0 I
4. Delivery Performance Report
QuarterlFY P$fC8flt
% Carriers relumlnQ before 5 p.m. 04 FY09 91.7%
03 FY 09 ~4.5%
02 FY09 95.7%
01 FY 09 94.6%
5. Retail Unit Inside Losing Facility (Window Service Times) 6. Business (Bulk) Mall Acceptance Hours
End
17:30
17:30
17:30
17:30
17:30
Start
11:00
11:00
11:00
11:00
11:00
CLOSED
Start EndMonday 11:00 17:30
Tuesdal 11:00 17:30
Wednesday 11:00 17:30
Thursda 11:00 17:30
Friday 11:00 17:30
saturday CLOSED
start End Start End
y 9:00 17:30 9:00 17:30
y 9:00,
17:30 9:00 17:30
y 9:00 17:30 9:00 17:30
v 9:00 17:30 9:00 17:30
v 9:00 17:30 9:00 17:30
v 9:00 12:30 9:00 12:30
Monda
Tuesda
Wednesda
Thursda
Frida
Saturda
7. Can customers obtain a local postmark in accordance with applicable policies in the Postal Operations Manual? YES
8. Notes: There will be no change to the retail or BMEU operations connected with this AMP study. A local Panama City postmark will be availableat the retail unit and a wall drop box at the Panama City P&DF.
Gaining Facility: Pensacola P&DC
9. What postmark will be printed on collection mall?
Line 1 Pensacola P&DC 325
Line 2 _
Package Page 45 AMP Customer Service Issues
Space Evaluation and Other Costs
Last Saved: April 15, 2010
Losing Facility: Panama City P&DF
1, Affected FacilityFacility Name Panama City P&DF
Street Address: 1336 Sherman AveCity, State ZIP: Panama City. FL 32412-9998
2. Lease Information. (If not leased skip to 3 below.)Enter annual lease cost $0
Enter lease expiration date--"n"'-a---------------Enter lease options/terms-.:.:n;;:.a _
3. Current Square FootageEnter the total interior square footage ofthe facili~-;1~1""73~9:.:::6..::s:;i9:..:.ft.::,. _
Enter gained square footage expected with the AMF~1.:::.5.:.;79::-s:::;9l:-' .:.:;fl.:..- _
4. Planned use for acquired space from approved,AM1If AMP is approved. the expected gain of 1.579s9. ft. will be utilized for MTE processin
5. Facility Costs
Enter any projected one-time facility costs,:...:..:±$~O-,. -,-__(This number 'Shown below under One-Time Costs section.
6. Savings Information
Space Savings ($):......::;$""'0 ---,-.--(This number carried forward to the Executive Summary)
7. Notes _
Employee Relocation Costs: ......:::$",-0 _
Mail Processing Equipment Relocation Costs: --::$~O _(from MPE Inventory)
Facility Costs: ~$::::O _(from above)
Total One-Time Costs: $0-::(Th~:':'ls:-nu~m~be-r:-ca~rrled=':'"forw...... ard to Executive Summary)
Losing Facility: Panama City P&DF Gaining Facility: .PensacolaP&DC
YTD Range of Report: 10/01/08 : 09/30/09
(1) (2) (3)
Current CostProduct Associated REC per 1,000
Imil9esLetters Glendale $28,86Flats Glendale $29.77
PARSCOA Glendale $163.28PARS Redirects Glendale $37.39
APPS N/A
Package Page 46
(4) (5) (6)
Current CostProduct Associated REC per 1,000
ImagesLetters Glendale $28.86Flats Glendale $29.77
PARS COA Glendale $163.28PARS Redirects Glendale $37.39
APPS NfA
t~~~.1i1:~~~~~~~1ij
AMP Space Evaluation and Other Costs