mba weekly bulletin vol.57 issue#45

36
WEEKLY BULLETIN www.marinba.org [email protected] November 26 , 2013 Vol. 57, Issue #45

Upload: marin-builders-association

Post on 31-Mar-2016

233 views

Category:

Documents


10 download

DESCRIPTION

Marin Builders Association Weekly Bulletin vol.57 issue#45

TRANSCRIPT

Page 1: MBA Weekly Bulletin vol.57 issue#45

WEEKLY BULLETIN

www.marinba.org ◆ [email protected] November 26 , 2013 Vol. 57, Issue #45

Page 2: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 2

www.marinba.org ◆ [email protected]

Marin Builders AssociationBoard of Directorsinvites you to our

HOLIDAY OPEN HOUSE

Thursday, December 12th4p.m. to 7p.m. at

Marin Builders Association660 Las Gallinas Avenue, San Rafael

Join us for a tasting of hors d’oeuvres and holiday cheer!

Marin Builders AssociationBoard of Directorsinvites you to our

Marin Builders AssociationMarin Builders AssociationMarin Builders Association

Page 3: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 3

01.21.14CPR/FIRST AID CLASS@ Marin Builders Association8:30 AM - 12:00 PM

www.marinba.org ◆ [email protected]

12.12.13

01.31.14

05.02.14

09.22.14

SAVE THE DATES2013-2014 events

HOLIDAY OPEN HOUSE@ Marin Builders Association4:00 PM - 7:00 PM

ANNUAL CRAB FEED@ Margaret Todd CenterTime TBA

BOCCE BALL TOURNAMENTDetails TBA

ANNUAL GOLF TOURNAMENT@ Marin Country ClubTime TBA

Page 4: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 4

www.marinba.org ◆ [email protected]

north bayh a p t e rC

North Bay NARI

Holiday CelebrationConnect with Friends and Associates

Enjoy Great Food, Drink, and a Fun-Filled Auction

G

E

I

A

M The North Bay chapter of NARI (the National Association of the Remodeling Industry) and Golden State Lumber are co-hosting this cheery holiday mixer. Proceeds from the auction go to fund the Construction Technology program, based at Redwood High School for the past 18 years.

This accredited course teaches students real-world construction skills, and the positive effects of this exceptional program can be seen in the students’ growing confidence and sense of pride as they complete their finished projects. North Bay NARI’s annual auction is this program’s main source of funding.

• A Full Celebration Menu with Fresh, Local Food

• Beer, Wine, & Non-Alcoholic Beverages

Come enjoy the fun, celebrate the end of 2013, and make a difference for our teens!

H

When

Tuesday, December 3, 2013

5:30-8:30 pm

Location Golden State Lumber

1100 Anderson Dr. San Rafael, CA 94901

Cost $50 at the door $40 advance

Online registration: www.northbaynari.org

(Deadline 11/28)

North Bay NARI PO Box 1313

Novato, CA 94948

Email membership@

northbaynari.org

Website www.northbaynari.org

A great big Thank You to our host and sponsor, Golden State Lumber and our meeting sponsor,

High Tech Screens and ShadesG

H

I

I

Page 5: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 5

PROJECT OF THE WEEKNotice inviting bids for

West Avenue, Sheppard,

Roseland Elementary/

Middle School Safe Routes

to School Projectin the city of Santa Rosa, Sonoma County

Wednesday, December 4th, 2013 @ 2:00 PM

SCOPE: The project consists of construction curb ramps, bulb outs. Lighted pedestrian signs, installation of new sidewalk, curb and gutter, and pavement markings and striping.

For more information contact the County of Sonoma at (707) 585-2231.

Plans and specifications may be viewed at the MBA and online by subscribers to the MBA Online Plan Service.

IN THIS ISSUE

________________________

Happy Thanksgiving! .........................1

MBA Holiday Party 2013 ...............2

Save The Date: MBA 2013/14 Events ...3

Project of the Week ........................5

Local Notices & Member News ............6

5 Things You Should Know .............11

Phil Vermeulen ...........................12

Guest Editorial: Mark J. Rice ...............13

Safety : CELL PHONES & DRIVING ....15

Permits ..............................................19

Tax Liens & Completions ...................22 Project Bid Schedule ........................25

Classifieds ..........................................34__________________________

CONTACT MBA660 Las Gallinas Avenue

San Rafael, CA 94903 ◆

Office: 415-462-1220Fax: 415-462-1225

[email protected]

www.marinba.org ◆ [email protected]

Page 6: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 6

LOCAL NOTICES & MEMBER ANNOUNCEMENTS

www.marinba.org ◆ [email protected]

MEMBERS IN THE NEWSMarin IJ’s Movers & Shakers (11.22.13) – Whistlestop welcomes Marin Builders Association member Etta Allen owner of Allen Heating & Sheet Metal Inc. to its Board of Directors!

“Allen was the first woman president of the Marin Builders Exchange, the first woman contractor on the executive committee of the California Association of Builders Exchanges and served nine years as director of the Marin Builders Exchange.”

Congratulations, Etta!- your MBA Team

NOTICE INVITING QUALIFIED CONTRACTORS

The City of Burlingame, California is subject to the Uniform Public Construction Cost Accounting Act. Per Section 22034, the City of Burlingame is updating its list of qualified contractors and is invit-ing all licensed, interested contractors to submit the name of their firm for inclusion on the City’s list of qualified bidders. Most projects are under $75,000 and are for the departments of Facilities, Streets, Sewers, and Water.

Interested contractors should provide the following information:

• The name and address to which a “Notice to Contractors” or a “Proposal” should be mailed.• A phone number and email address where the contractor can be reached.

• The type of work in which the contractor is interested and currently licensed to do (e.g., earthwork, pipelines, electrical, painting, general building, etc.).

• The class of contractor’s license(s) held and contractor license number(s).

Please provide the above required information to the City of Burlingame; Public Works Corporation Yard; 1361 N. Carolan Avenue; Burlingame, CA 94010;

Attn: Kevin Dawdy or via email to [email protected].

Page 7: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 7

www.marinba.org ◆ [email protected]

2013-2014 MBA DIRECTORS & OFFICERS

Presidentjim Schalich - Schalich Bros.

Construction

Vice PresidentTyler Doherty - Cal-West Rentals, Inc.

Chief Financial Officer Tom Barr - Ghilotti Bros., Inc.

SECRETARYJohn Busick - Bob Kunst Painting

Past PresidentJeff Mertel - Mertel Carpets

Executive DirectorKLIF KNOLES

Aimi Dutra - The Dutra GroupOliver Dibble - Dibble & Company

Keith Dotto - Dotto Glass, Inc.Clayton Fraser - West Bay Builders

Dave Garbarino - Marin Sanitary Service, IncJeff Grady - California Mortgage Advisors

Diane Henderson - DMH Land Use PlanningDan McLennon - McLennon Law Corporation

Herb Moran - Insurance ConsultantRob Scerri - Golden State LumberDave Trahan - Patriot Mechanical

Michelle Whiteside - Whiteside Construction

STAFFPaula Krause - Office Manager

Barbara Jones - Membership ManagerKellie Buono - Administrative Assistant/Reception

CONSULTANTSCasey Mazzoni - Legislative Analyst

Terrence Knoles - Publications

The weekly bulletin is owned by MBA. Archive available at www.marinba.org

660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Klif Knoles

MBA MEMBER

FROM OUR MEMBERSHIP MANAGERDear Members,

We value each of our MBA members and thank you for your continued support. Together we are part of the greater picture that brings individual businesses together to “provide the foundation for a well-built community”.

Each member is unique and brings their own expertise and experiences to the table. In the coming year we will be developing additional programs to enrich your membership and deliver more value to your business. You can look forward to increased networking opportunities, greater access to jobs, and new referrals. OUR WINTER PROGRAM FEATURES A HOLIDAY OPEN HOUSE ON DECEMBER 12TH and we look forward to having you join us.

Stay tuned!

Regards,Barbara

Page 8: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 8

www.marinba.org ◆ [email protected][email protected]

O

ne n

ight

a w

eek

for

18 w

eeks

----

---

Wed

nesd

ay, 5

p.m

. – 9

p.m

. Fu

ll C

redi

t --

--- 5

uni

ts

FR

EE

TO

MA

RIN

CO

UN

TY

HIG

H S

CH

OO

L ST

UD

EN

TS

$

65.0

0 m

ater

ial f

ee fo

r al

l non

-hig

h sc

hool

par

tici

pant

s

See

You

r Sc

hool

To

Car

eer

Cen

ter

or C

onta

ct t

he R

OP

off

ice

at 4

99-5

860

VIS

IT O

UR

WEB

SITE

: cla

ssro

om.y

hwdi

y.co

m O

pen

the

RO

P ta

b

Intr

oduc

tion

to

GR

EEN

Bui

ldin

g

Sp

onso

red

by

Mar

in C

ount

y R

egio

nal

Occ

upat

iona

l Pro

gram

M

arin

Cou

nty

Off

ice

of E

duc

atio

n M

arin

Bui

lder

s A

ssoc

iati

on

Nat

iona

l Ass

ocia

tion

of R

emod

elin

g In

dus

try

Page 9: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 9

www.marinba.org ◆ [email protected][email protected]

R

OP

CO

NST

RU

CT

ION

TE

CH

NO

LOG

Y

Red

woo

d H

igh

Scho

ol

Bu

ild a

Com

mun

ity

Pro

ject

from

the

Gro

und

Up

STU

DE

NT

S W

ILL

LEA

RN

:

G

RE

EN

BU

ILD

ING

PR

AC

TIC

ES

JOB

SIT

E &

TO

OL

SAFE

TY

FR

AM

ING

E

LEC

TR

ICA

L

PL

UM

BIN

G

WIN

DO

WS

& D

OO

RS

RO

OFI

NG

BL

UE

PR

INT

RE

AD

ING

BU

ILD

ING

FR

OM

LO

CA

L PR

OFE

SSIO

NA

LS

HA

ND

S-O

N T

RA

ININ

G

Hig

h Sc

hool

Stu

dent

s ca

n ea

rn c

redi

ts-u

p to

5 u

nits

Qua

lify

for

Sum

mer

Inte

rnsh

ip E

mpl

oym

ent w

ith

a C

onst

ruct

ion

Prof

essi

onal

Ear

n th

e M

arin

Cou

nty

RO

P W

ork

Rea

dine

ss C

erti

ficat

e

The

Mar

in C

ount

y O

ffice

of E

duca

tion

Regi

onal

Occ

upat

iona

l Pro

gram

doe

s not

dis

crim

inat

e on

the

basi

s of r

ace,

col

or, n

atio

nal o

rigi

n, se

x, d

isab

ility

, or a

ge in

an

y of

its p

olic

ies,

proc

edur

es, o

r pra

ctic

es in

com

plia

nce

with

Titl

e VI

of t

he C

ivil

Righ

ts A

ct, T

itle

IX o

f the

Edu

catio

n Am

endm

ents

of 1

972,

Sec

tion

504

of th

e Re

habi

litat

ion

Act o

f 197

3, a

nd th

e Ag

e D

iscr

imin

atio

n Ac

t of 1

975.

“Con

stru

ctio

n is

ver

y in

tere

stin

g. It

is fu

n to

bui

ld

and

lear

n to

man

age

thin

gs.”

Form

er S

tude

nt R

OP

“I le

arne

d w

hat a

n em

ploy

er

look

s fo

r in

hir

ing

an

empl

oyee

.” Fo

rmer

Stu

dent

RO

P

Page 10: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 10

www.marinba.org ◆ [email protected][email protected]

Much of the buzz surrounding Health Care Reform concerns the employer mandate, which only applies to companies with 50 or more employees. However, there are components of both the Federal and State reform legislation that affect small businesses as well – and you need to know!

* As an employer, what is required of me?

* Can I get a tax credit – can my employees?

* What exactly IS the Exchange and will it be a good option for my organization?

* Should I send my employees to the State Exchange / Covered California?

* Will my current plan look/act different?

When: Thursday, December 5th, 2013 - Continental breakfast provided & Attendance is free.

8:00 A.M. Registration - 8:30 A.M. Program begins

Where: Marin Builders Association - 660 Las Gallinas Ave, San Rafael

-- Featured Presenters: Mike Carlson, Stephen Craford and Cody Hampton - Builders Association Health Plan Division, Craford Benefit Consultants

Obamacare is Here – Are You Ready?

What Small Business Owners Need to Know

Page 11: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 11

5 things you need to know

BY CASEY MAZZONIMARIN BUILDERS ASSOCIATION

LEGISLATIVE [email protected]

1 . THE MARIN BUILDERS ASSOCIATION TRACKED THE ADOPTION of the Novato housing element. The housing element amends the

Novato’s general plan to include sites for affordable housing in five places.www.cityofnovato.org

2 . THE MARIN BUILDERS ASSOCIATION CONTINUES TO our “Roof to Road’s” project. The Marin Builders Association in partnership

with Marin Sanitary Service, Redwood Landfil l, Ghilotti Bros. and the County of Marin is in the process of identifying a “Roofs to Roads” pilot project.

3 . NOVATO CITY OFFICES HAVE MOVED! THE NEW DOWNTOWN office is open for business. http://www.marinij.com/novato/

ci_24518254/novatos-new-administrative-offices-open-business

5 . SMART APPROVES ITS FINAL CONSTRUCTION CONTRACT. The work will begin in Marin to begin in spring. http://www.marinij.com/

novato/ci_24566466/smart-approves-final-construction-contract-work-marin-begin

“I do not agree

with what you have to say,

but I’ll defend

to the death your right to say it.”

– Voltaire

4 . SUSAN ADAMS ANNOUNCED FRIDAY SHE PLANS TO RUN FOR re-election, setting the stage for a contentious race. Three candidates are currently

eyeing the 1st District seat. The Marin Builders Association will be monitoring and endorsing in this race. http://www.marinij.com/marinijelectioncoverage

www.marinba.org ◆ [email protected]

Page 12: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 12

Also In This Update• Virtual tour of the Smithsonian Museum

2014 Employment PosterAs you may recall from my annual year-end legislative report, AB 10 raises California’s current minimum wage of $8 per hour by two, one-dollar increments — the first in July 2014, and the second in January 2016. The new law marks the first increase to the minimum wage since January 1, 2008.

California employers are required to post the California minimum wage notice (Labor Code sections 1182.13, 1183). With these changes forthcoming, I want to urge you to stay “ahead of the curve ball” by ordering the Cal Chamber’s annual posters now before the New Year rush hits. The chamber’s 2014 California and Federal Employment Notices Poster and 2014 Required Notices Kit (with all-in-one poster) contain the new official California Minimum Wage notice prepared by the California Labor Commissioner.• The new official notice displays:• The current minimum wage of $8.00 per

hour;• The new first increase in the minimum wage

to $9.00 per hour effective July 1, 2014; and,• The second increase in the minimum wage to

$10.00 per hour effective January 1, 2016.The California Labor Commissioner included the current minimum wage rate and the two upcoming increases on the new official notice.

The decision to include all three rates benefits employers. It gives your business a legally compliant minimum wage notice you can use on January 1, 2014, and covers you when the July 2014 increase occurs.Employers should further note there is a mandatory change to the California Department of Fair Employment and Housing notice “California Law Prohibits Workplace Discrimination and

Harassment” that requires a new employment notices posting on January 1, 2014. This posting is also included in the Cal Chamber’s 2014 California and Federal Employment Notices Poster.Even if you only employ one person in California, you must post and hand out required state and federal employment notices in each company location. Take one check off your compliance list by preordering your required poster online, or by calling (800) 331-8877, Monday through Friday, 8 a.m. to 5 p.m. PT.

Virtual tour of the Smithsonian Museum-incredible

Here is something special, a virtual tour of the Smithsonian Museum room by room. It’s really something with a 360 degree viewing by using your cursor. You could easily spend days/weeks looking at everything. It is something that both kids and adults will enjoy; AND, you don’t have to fly to Washington D.C.! Follow the blue

arrows on the floor to move into new rooms.

This site shows both inside and outside of the museum and there are little cameras here and there which show detailed information on certain things. If you click on the floors (upper right corner) you get a floor plan of that floor and you can click on a blue circle and go directly to that room.

This is a truly incredible website; hence, the reason that I’m sending it to you! Watch it in fullscreen when you open this up. Use the roller on your mouse to move in and out. Look for the “arrows” on the floor and click on them. They take you to otherplaces.

Point your mouse on the address below and press control on your keyboard at the same time. Enjoy!

http://www.mnh.si.edu/vtp/1-desktop/

www.marinba.org ◆ [email protected][email protected]

Cal Chamber’s Employment Notices Poster for 2014 Features California’s New Official Minimum Wage Notice by Phil Vermeulen, Legislative Advocate

Page 13: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 13

www.marinba.org ◆ [email protected]

Each time I help a client draft a contract compliant with the Home Improvement Statute, I cringe and wonder – is this any way to make a new customer comfortable with the already scary process of hiring a contractor, building a home or remodel? I do not think so. But, the Legislature does, and we are stuck with it. A complicated statute, Business &

Professions Code Section 7159 – read it and weep, and figure out how to insert all its “10 and 12 point Bold font” requirements onto any form less than the size of the New York phone book. Then decide if it will scare away any potential client, who cannot figure out why you have some a complicated form, with scary “WARNINGS” about YOU. It could make one going into an easy line of work, like tornado chaser.

The “Cher” Factor. Before getting into the guts of “how to survive Section 7159 without losing my mind”, let’s start with the comic story of Cher’s remodel, and her attorney’s failed attempt to void the contract for the Malibu project from hell, for failure to comply with Section 7159 – the Home Improvement Statute. Yes, Cher, as in, Sonny and Cher, and “I Got You Babe” and “Half Breed.” Great singer – but, not so easy it seemed as an owner in a big remodel according to the published decision by the California Court of Appeal, Ayra Group, Inc. v. Cher (2000) 77 Cal.App.4th 610 where the Court said that she might win, or not, in her defense to the oral contract that it did not comply with Section 7159 and companion Section 7164 of the B&P Code:“It appears from the operative pleading that Cher is a highly sophisticated homeowner with previous involvement in residential construction projects, that her legal representatives assisted her in negotiating the Malibu construction project agreement with Arya, that Arya had already

completed a substantial amount of the work it contracted to perform when Cher terminated the parties’ agreement, and that Cher would be unjustly enriched if she were not required to compensate Arya for the reasonable value of its work. Under these circumstances, we decline to hold that Arya’s noncompliance with section 7164 absolutely forecloses it from seeking to enforce the oral agreement it purportedly made with Cher, which was allegedly memorialized in an unsigned written contract. On the other hand, should it become apparent in the course of a motion for summary judgment or trial that “the facts are otherwise than as alleged and are such as to place the case outside the exceptions to the general rules regarding enforceability of illegal contracts,” our holding here would not preclude Cher from reasserting her position about the illegality and unenforceability of any agreement between her and Arya in the absence of a signed written contract.”

What does this mean for the Contractor? Maybe this:• If you contract with Cher, and Cher has a lawyer help draft the

contract that no one signs and which does not contain the terms required by B&P Section 7159, maybe you get to a hall pass and get to collect anyway, since Cher is not an unsophisticated consumer – the class of folks the Legislature intended to protect by 7159.

• For other situations, you may be in trouble. “I Got You Babe” might just mean, “I Got You.” The statute does say equitable rights survive to avoid unjust enrichment to the owner who has the benefit of your work. Ok, that’s nice. But why risk it, when you do not have to? Be safe, not a Cher Bear.

What to do?For starters, get a form that satisfies the terms of 7159 and avoid these arguments. Your client may seem like Cher, but maybe the Court will think you - a licensed Contractor - should know better.

What are those terms? How do I get them into my contract without scaring

Cher & The Home Improvement Contract Statute–Building your form contract before you get Burned by Mark J. Rice, MBA member and Construction Attorney

Page 14: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 14

www.marinba.org ◆ [email protected][email protected]

off the customer, or creating a confusing mess?

It’s not easy. But here are some suggestions:1. Get a good form. Whether you use a California contract form service,

or your construction attorney, update your contract form every December. The Legislature tends to change things effective January 1 – beware.

2. Take time to blend your key proposal terms and exclusions with the requirements of 7159- price, progress payment schedule, estimated start and completion dates, change order clause and warnings – must be in writing, Notice to Owner about mechanics’ liens, and Notice of Three-Day Right to Cancel.

3. Contractors State License Board requires you list your license number, and identify whether you have workers’ compensation insurance and general liability insurance. If you have employees, you must have worker’s comp. If not, your license is deemed automatically suspended even without CSLB action.

4. Consider a form that calls out to the customer which terms are phrased per the CSLB requirements of 7159, and provide in the form www.cslb.ca.gov. That tells your customer why these bizarre

terms and warnings are there, and tells them you comply with the law. Make it your marketing to say that you want the customer to know their rights and the CSLB guidelines and regulations. That will put the customer at ease, even if the form language is not very user friendly.

5. Go onto Google, and type in “Business & Professions Code Section 7159, and look at the requirements – including verbatim language, required 10 point and 12 point type face, required notices and the like.

6. Sit down with the prospective customer and walk through the form and terms, and explain Section 7159. Print it out and give it to your client. Make that your practice. Tell the client – CSLB requires these terms, and so they are in my contract form with you.

When trying to give “cut and paste” options to the reader from Section 7159, this article got very “User Unfriendly.” Went on for 11 pages. 11 pages. So, that you will need to do on your own. Unless you are just working for Cher, its worth doing.

Bruce Okrepkie707.360.4117

[email protected]

Daniel Walters707.525.4168

[email protected]

Sean Parsons707.525.2715

[email protected]

George Petersen Insurance Agency

NEW MBA Workers’ Compensation & Commercial Insurance Program

We are excited to announce that George Petersen Insurance Agency has developed a new workers’ compensation & commmercial insurance program for the Marin Builders Association. With a 76-year history of insuring local contractors, George Petersen Insurance Agency has the experience and expertise to protect your business.

By partnering with George Petersen Insurance Agency, you’ll receive preferred pricing on your workers’ compensation rates. In addition, you can benefit from working closely with one of George Petersen’s construction-industry professionals. With over 50 years of combined experience, George Petersen’s specialized construction agents have a deep understanding of the industry, allowing them to assess the unique characteristics of your business, its exposures and its evolving needs.

Support the MBA and protect your business by contacting one of our construction specialists today:

License #0603247

Page 15: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 15

Driver Safety - Cell Phones Not a safe practice!

Operating a motor vehicle safely requires concentration, focus and awareness of constantly changing surroundings. Talking on a cell phone can take your focus away from the road and increase the risk of accidents. On average, a person is four times more likely to be in an accident when talking on a cell phone. State laws regarding driving with cell phones: More and more states have passed laws that prohibit hand-held cell phone usage while driving. Check with your local jurisdictions to determine if any cell phone restriction laws are present. Important guidelines: Regardless of your state, a comprehensive cell phone policy should be included in your organization’s fleet safety program. At a minimum, the following guidelines can be included into your organization’s fleet safety program:

• Get your phone set-up to be legal and safe: Every cell phone manufacturer creates different devices to use in a hands-free manner. It is important to know how to program your speed dial, operate the speakerphone, voice activation, redial features and other safety functions.

• Have someone else make the calls: If passengers are present, allow them to answer and dial calls for you.

• Use a hands-free device with your cell phone: Hands-free cell phone accessories are readily available. Whether you choose an installed mounted device for your cell phone or a speaker phone accessory, take advantage of these devices. Assure it is safe and legal!

• Do not multi-task with your phone when driving: Never text message or take down notes when the vehicle is in motion. These types of activities are serious distractions and increase your risk of an accident.

• Use your voice mail: Allow phone calls to go to voice mail, and return calls when you reach your destination.

• Pull the vehicle over: If you must make or receive a call, pull your vehicle over to a safe and legal location before making or answering a phone call.

• Do not use your phone in poor conditions: Poor driving conditions or low light situations can severely affect your reaction and response time. Using a cell phone when driving at night or in rainy situations is not recommended.

SAFETY Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

Page 16: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 16

Driver Safety - Cell Phones This form documents that the training specified above was presented to the listed participants. By signing below, each participant acknowledges receiving this training. Organization: Trainer: Trainer’s Signature: Class Participants: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date:

Remember to load your completed trainings into the Training Track application of the Risk Management Center.

SAFETY Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

Page 17: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 17

Seguridad al conducir – Teléfonos celulares ¡Una costumbre nada segura!

Operar un vehículo de motor de forma segura requiere de concentración, atención, y estar alerta de los cambios constantes en el entorno. El uso de teléfonos celulares puede distraer tu atención del camino e incrementar el riesgo de que suceda un accidente. En promedio, es cuatro veces más posible que una persona sufra un accidente cuando está usando el teléfono celular. Las leyes estatales en cuanto a conducir con teléfonos celulares: Más y más estados han aprobado leyes que prohíben el uso de celulares de mano al conducir. Acude a tu jurisdicción local para determinar si existen leyes que restrinjan el uso de teléfonos celulares. Normas importantes: En cualquiera que sea tu estado, el programa de seguridad de tu flotilla debe incluir una política exhaustiva sobre teléfonos celulares. Como mínimo, las siguientes normas deben ser parte del programa de seguridad de tu flotilla:

• Programa tu teléfono para que sea seguro y legal: Todos los fabricantes de celulares fabrican dispositivos para usar el modo "manos libres". Es importante saber cómo programar las funciones de marcado rápido, altavoz, activación por voz, y remarcado automático, así como otras funciones de seguridad.

• Que alguien más haga las llamadas: Si llevas pasajeros, permite que sean ellos quienes reciban y marquen tus llamadas.

• Usa un dispositivo manos-libres con tu teléfono celular: Los accesorios manos-libres para celulares se pueden conseguir fácilmente. Ya sea que elijas un dispositivo que se monte a tu celular, o un accesorio para altavoz, aprovecha estos dispositivos. ¡Asegúrate de que sea seguro, y legal!

• No hagas otras cosas con tu celular mientras conduces: Nunca uses mensajes escritos o tomes notas mientras el vehículo está en movimiento. Este tipo de actividades significan una seria distracción y aumentan el riesgo de sufrir un accidente.

• Usa el correo de voz: Permite que las llamadas entrantes se vayan correo de voz, y devuelve la llamada cuando hayas alcanzado tu destino.

• Detén el vehículo a un lado: Si tienes que hacer o recibir una llamada, detén el vehículo en un lugar seguro y legal antes de hacer o recibir una llamada.

• No utilices el teléfono en condiciones adversas: La poca luz o malas condiciones para conducir pueden afectar de forma severa tu velocidad de reacción y respuesta. No es recomendable usar un teléfono celular cuando se conduce de noche o con lluvia.

SAFETY Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

Page 18: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 18

Seguridad al conducir – Teléfonos celulares El presente formulario certifica que el entrenamiento especificado anteriormente fue presentado a los participantes registrados. Al firmar, cada participante reconoce haber recibido dicho entrenamiento. Organización: Instructor: Firma del Instructor: Participantes del curso: Nombre: Firma: Fecha: Nombre: Firma: Fecha:

Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha:

Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha:

Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha: Nombre: Firma: Fecha:

Recuerda cargar los entrenamientos completados a la aplicación de Seguimiento de Entrenamientos del Centro de Manejo de Riesgos.

SAFETY Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

Page 19: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 19

PERMITS Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

Owner Contractor Address Parcel # Construction ValueMartin Jeffrey C & Haag J SANDRA BIRD CUSTOM KITCHE 16 Locust Ave Kentfield 074-011-53 (22) Remodel Kitc $15,000 Robertson A James Ii & ALTERNATIVE ROOFING SOLUT 146 Almonte Blvd Mill Valley 051-095-03 (53) Reroof $14,130 Osterloh Katherine G D Et CAPSTONE ROOFING 12916 Sir Francis Drake Blvd I 112-101-07 (53) Reroof $20,000 Leader Dennis J /Tr/ & MULVEY,THOMAS & ASSOC. 10 Corte Dorado Greenbrae 070-041-42 (13) Replace Deck $12,000 Aronovsky Fam Trust 20 ELLIOTT BUILD 375 Johnstone Dr San Rafael 164-152-04 (21,23,50,58) Enc $50,000 Diamond Jenny /Tr/ Etal NORTHWEST EXTERIORS INC 2 Topside Way Mill Valley 043-102-09 (58) Replace 11 W $11,780 Williams Stephen JANNEY, STEVE ROOFING 9 Calle Del Pradero Stinson Be 195-163-02 (53) Reroof $14,000 Baumsteiger Richard O /Tr JANNEY, STEVE ROOFING 219 Kent Ave Kentfield 074-072-07 (53) Reroof $10,613 Development Solutions BEACH STREET BUILDERS 249 Trinidad Dr (Lot 15) Tibur 038-460-15 (20--1/3) New S F $400,000 Development Solutions BEACH STREET BUILDERS 249 Trinidad Dr Tiburon 038-460-15 (11) Ret WallT.D $30,000 Development Solutions BEACH STREET BUILDERS 221 Trinidad Dr (Lot 8) Tiburo 038-460-08 (20--1/4) New S F $500,000 Development Solutions BEACH STREET BUILDERS 221 Trinidad Dr Tiburon 038-460-08 (11) Ret WallTo $30,000 Pesce Michael J /Tr/ & SOS ELECTRIC 269 Emerystone Ter San Rafael 164-231-03 (60) Rf Mtd P V S $11,000 Development Solutions BEACH STREET BUILDERS 245 Trinidad Dr (Lot 14) Tibur 038-460-14 (20--1/4) New S F $450,000 Development Solutions BEACH STREET BUILDERS 245 Trinidad Dr Tiburon 038-460-14 (11) Ret WallTo $30,000 Mc Intosh Kerry L Revoc AMERICAN SOLAR 222 Cobblestone Dr San Rafael 164-222-21 (60) Roof-Top Pho $11,500 Kamesar Jack D & Dahlia SUN FIRST CONST 7 Crescent Ct Woodacre 172-231-26 (60) Rooftop Phot $29,900 Jones Natalie M FLINT CONSTRUCTION 170 Almonte Blvd Mill Valley 051-096-04 (23) Rmdl Laund/S $20,000 Nemetz Kathleen SOLARCITY CORP 610 Rosal Wy Mill Valley 180-055-01 (60) Rf Mtd P V S $12,000 Le Vieux James T & NORTHERN PACIFIC ROOFING 509 The Alameda San Anselmo 177-111-40 (53) Tear Off & R $15,661 Olson Lisa Tr WORMOOD INC. 48 Marina Court Dr San Rafael 016-064-38 (23) 2 Bathroom R $19,600 Sierra Asset Servicing Ll AIC CONSTRUCTION 744 Estancia Way San Rafael 180-142-21 (23) Interior Rem $36,000 Skywalker Properties Ltd PLATH & COMPANY INC. 5858 Lucas Valley Rd Nicasio 121-130-22 (54)(50)(58)(92) $50,000 Henson Family Trust SEASIDE CONSTRUCTION DBA 130 Altena St San Rafael 018-111-07 (23) Kitchen Remo $20,000 Mauceli Robert & Sandra R W COLFER GENERAL CONTRA 118 Oak Shade Ln Novato 143-540-01 (23) Kitchen Remo $33,713 Andrew Benjamin M BOESEL DESIGN & CONSTR 121 Reed St Mill Valley 048-061-56 (56) (58) (92) Re $22,000 Blake Susan Tr COLONIA ELECTRIC INC 603 Goodhill Rd Kentfield 074-191-01 (50) Generator10 $20,000

COUNTY OF MARIN PERMITS ISSUED

COUNTY OF MARIN PERMITS RECEIVEDAddress Owner Work Value30 Westwood Dr Kentfield Vuille Ann (60) Rooftop Photovoltaic - So $26,00021 Turnagain Rd Kentfield Stanek Roman & Romana (13) Add New Deck & Stairs $25,00021 Turnagain Rd Kentfield Stanek Roman & Romana (12, 22) Substantial Interior $917,00065 Third St Point Reyes Station Point Reyes Livery Stable (50) 2 E V Charging Stations $25,300190 Seadrift Rd Stinson Beach Orrick William H Iii Etal (13) Repl Deck W/ Smaller $13,000200 Ricardo Rd Mill Valley Eschliman Dwight D /Tr/ & (23) Rmdl 2 Upstairs Bathrooms $70,0007 Patricia Ln Mill Valley Smith Jed A & Caitlin W Trust Etal (22,12,13,56) Strct Rmdl, Pool $40,00022 Makin Grade Kentfield Sanchez Mark S & (21)(12)(92) Closet Addn, Porc $14,00032 Heron Dr Mill Valley Stoller David & (23) Rmdl Kit, Bas, Media Rm, $157,000454 Blackstone Dr San Rafael Dickinson George L /Tr/ (60) Rf Mtd P V Sys 3.78 K W - $16,065182 Corte Anita Greenbrae Elder Robert J /Tr/ & Etal (22) Kitchen Remodel - Express $65,000222 Cobblestone Dr San Rafael Mc Intosh Kerry L Revoc Trust (60) Roof-Top Photovoltaic 3.8 $11,500170 Almonte Blvd Mill Valley Jones Natalie M (23) Rmdl Laund/Stor Into Bedr $20,000

Page 20: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 20

PERMITS Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

CITY & TOWN PERMITS ISSUEDCity/Town Issue Date Owner Contractor Site Address Type Valuation Corte Madera 11/12 195-205 Tamal Vista Blvd.

LlcSafeco Sound & Security

195 Tamal Vista Blvd 4 Fire Alarm Installation

$15,000

Corte Madera 11/12 Bowers Doug And Sharon G Family, Inc. 6 Baja Ct New Deck $75,000 Corte Madera 11/12 Peterson David Trust Armstrong Installation

Svc400 Tamal Plz Reroof $129,000

Corte Madera 11/13 IJ Marketplace, Llc Bay Signs 69 Tamal Vista Blvd Installation Of Two Illuminated Signs

$10,600

Novato 11/4 Morbitzer Dirk Rec Solar Inc. 115 Portsmouth Dr Solar $21,000 Novato 11/4 Mc Donalds Corp C R C Roofing, Inc. 7340 Redwood Blvd Reroof $25,000 Novato 11/4 Josephine & Ashish

SharmaBertotti Landscaping 8 Nunes Dr Construction $50,000

Novato 11/5 Gretchen Simon Murphy Roofing Consulting

2 Norma Ct Reroof $10,000

Novato 11/5 Haig Marianne Mac’S Roofing Inc. 785 St Francis Ave Reroof $12,200 Novato 11/5 Petranto Nancy A /Tr/ A1 Solar Power Inc 117 Crystal Ct Solar $13,515 Novato 11/5 Smith Gregory & Vicki Wedge Roofing, Inc. 103 Cobblestone Ct Reroof $17,025 Novato 11/5 Posedel Frances D Murphy Roofing

Consulting1626 Ignacio Blvd 1624/1626

Reroof $17,500

Novato 11/5 Julie Cruel Cal Construction Expert Compan

662 Plum St Construction $22,515

Novato 11/6 Debbie Lennon Mcleran, Inc. 237 Grande Vista Reroof $10,500 Novato 11/6 Rudden Anna N Tr Etal Mcleran, Inc. 711 Diablo Ave Reroof $13,300 Novato 11/6 Ryder Novato Investors

LlcLic.Contract.Hired By Owner

840 Mcclay Rd Demolition $14,000

Novato 11/6 Margot Homburg Fireplace Safety Service

60 Carnoustie Hts Minor Mechanical $14,130

Novato 11/6 Harris Josh L Mcleran, Inc. 771 Rowland Blvd Reroof $18,700 Novato 11/6 Brian Conner Owner-Builder 11 Celeste Ct Construction $20,000 Novato 11/6 Zanides Mark N /Tr/ & Richard Guidry Const

Co799 Arlington Cir Minor

Construction $23,557

Novato 11/6 Greenhalgh Family Trust 2012 E

Hoffmann Construction

80 Leland Dr Construction $24,500

Novato 11/6 Biomarin Pharmaceutical Inc

Esd Construction-Energy System

46 Galli Dr Construction $2,938,522

Novato 11/7 Finn James R & Judith A A1 Solar Power Inc 18 Andreas Cir Solar $11,265 Novato 11/7 Puccinelli Richard E Tr & Solarcity 80 Santa Maria Dr Solar $15,000 Novato 11/7 Le Fevre Ronald E &

TouvanitaCastletown Construction Co Inc

22 Carnoustie Dr Minor Construction

$20,818

Novato 11/7 Combs Kenneth G /Tr/ & Solarcraft Services, Inc.

104 Garner Dr Solar $23,485

Novato 11/7 Simone Scheunert Lic.Contract.Hired By Owner

36 Lupine Cir Construction $30,000

Novato 11/7 Daniels John R Owner-Builder 271 Fairway Dr Construction $100,000 Novato 11/18 Mc Clanahan June B

2000 RevocSears Home Improvement

491 Quercus Ct Minor Construction

$16,048

Page 21: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 21

PERMITS Permit lists subject to change,please check with Association.

www.marinba.org ◆ [email protected]

City/Town Issue Date Owner Contractor Site Address Type Valuation Novato 11/18 Nativity Of Christ Greek

OrthoD E S Builders 1110 Highland Dr Electrical $18,000

Novato 11/18 Lomax John A Solarcity 15 Jackson Ct Solar $22,000 Novato 11/18 Wilson Keith M /Tr/ & Tomrose & Assoc 46 Plata Ct Minor

Construction $25,000

Novato 11/18 Scott & Susan Wilson Wedge Roofing, Inc. 5 Borges Ct Reroof $34,500 Novato 11/19 Aiello Antonio & Enza

Revoc TNorth Bay Area Corporation (Db

631 Fairhaven Way Minor Construction

$10,500

Novato 11/19 Janet & Bill Meyer Detail Construction 742 W Orange Ave Minor Construction

$20,000

Novato 11/19 Lenaerts Bart & Christina Jemico Llc Aka Renewal By Ande

19 Sinaloa Ct Windows 9 Or More Ol

$24,690

Novato 11/19 Novato Redwood Properties Inc

Mcdevitt Construction Partners

8171 Redwood Blvd Construction $25,000

Novato 11/19 Lisa Smith Robert A. Hart 14 Sandy Creek Way Construction $35,000 Novato 11/19 Rowe William A /Tr/ & V N G Construction

Inc241 Fairway Dr Construction $60,000

Novato 11/20 Doherty Robert M & Able Roofing Co 1510 Buchanan St Reroof $12,850 Novato 11/20 Carrasco George & Owner-Builder 210 Montura Way Construction $30,000 Novato 11/21 Reed Vincent D &

VanessaCastle Roofing 18 Los Cedros Dr Reroof $10,000

Novato 11/21 Novato Toyota Dks, Inc. 115 Vintage Way Plumbing $46,500 Novato 11/21 Novato Toyota Bosley Electric

Company115 Vintage Way Electrical $101,244

San Rafael 11/12 Ceccarelli Santino /Tr6 Sergio Lopez Roofing 23 Valencia Ave Alter-Apartments $11,300 San Rafael 11/12 Phillip Berardi Phillip Berardi 282 Riviera Dr Alter-Sfd $22,000 San Rafael 11/12 Bit Holdings Forty-Five Novo Construction 4000 Civic Center Dr 1St

FloorAlter-Commercial $39,877

San Rafael 11/12 Suberville Patrick & Ken Cooper Roofing 140 Deer Park Ave Alter-Sfd $40,000 San Rafael 11/12 Rosen Wendy B & Allen Enterprises 244 Waterside Cir Alter-Sfd $60,000 San Rafael 11/13 Mc Namara Daniel Abril Roofing 41 Bryn Mawr Dr Alter-Sfd $12,495 San Rafael 11/14 Wagoner Lorna K 3 Royal Ct Alter-Sfd $10,000 San Rafael 11/14 Afc Northgate Llc Just Construction

Management400 Las Gallinas Ave Alter-Commercial $20,000

San Rafael 11/14 Brooks Street Llc L.A. Reavis Construction Co

800 A St Alter-Commercial $40,000

San Rafael 11/15 Carroll Natasha P Living 204 Du Bois St Alter-Sfd $35,000 San Rafael 11/15 Greenstone Howard & Josh Powers

Construction364 Riviera Dr Alter-Sfd $148,500

San Rafael 11/18 Baird Cameron M & 38 E Crescent Dr Alter-Sfd $12,000 San Rafael 11/18 Hays West Coast Builders 120 Toyon Way Alter-Sfd $90,000 San Rafael 11/19 Venkataramani Sitar Charles Window &

Door227 Devon Dr Alter-Sfd $25,000

San Rafael 11/19 Montecito Mkt Place 351 3Rd St Alter-Commercial $30,000 Tiburon 11/18 Victor Barkhordarian Owner Builder 25 Venus Court New Addition And

Remodel $225,000

Page 22: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 22

TAX LIENS & COMPLETIONS

www.marinba.org ◆ [email protected]

COMPLETIONSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/19 IN-N-OUT BURGERS (I) (none) COMPLETION 2013-007077611/20 LAS GALLINAS VALLEY SANITARY

DISTRICT (I)(none) COMPLETION 2013-0071099

11/20 LAS GALLINAS VALLEY SANITARY DISTRICT (I)

(none) COMPLETION 2013-0071100

11/20 MONTEREY MECHANICAL CO (I) (none) COMPLETION 2013-007109911/20 MONTEREY MECHANICAL CO (I) (none) COMPLETION 2013-007110011/20 MURRAY BUILDING INC (I) (none) COMPLETION 2013-007090811/20 SAN RAFAEL CITY SCHOOL DIS-

TRICT (I)(none) COMPLETION 2013-0070908

11/20 SCHOOL DISTRICT SAN RAFAEL CITY (I)

(none) COMPLETION 2013-0070908

11/21 221 SOUTH LLC (I) (none) COMPLETION 2013-007119611/21 CHURTON RAYMOND (I) (none) COMPLETION 2013-007119611/21 CITY OF SAUSALITO (I) (none) COMPLETION 2013-007127711/21 MC DONALD BRIAN (I) (none) COMPLETION 2013-007119611/21 MC DONALD CONSTRUCTION (I) (none) COMPLETION 2013-007119611/21 NATURECAPES (I) (none) COMPLETION 2013-007127711/21 SAUSALITO CITY (I) (none) COMPLETION 2013-007127711/21 SYUFY JOSEPH (I) (none) COMPLETION 2013-007119611/22 MARIN MUNICIPAL WATER DIS-

TRICT (I)(none) COMPLETION 2013-0071451

11/22 PIAZZA CONSTRUCTION (I) (none) COMPLETION 2013-007145111/23 MAGGIORA & GHILOTTI (I) (none) COMPLETION 2013-007168011/23 MARIN COMMUNITY COLLEGE

DISTRICT (I)(none) COMPLETION 2013-0071694

11/23 MARIN MUNICIPAL WATER DIS-TRICT (I)

(none) COMPLETION 2013-0071678

11/23 MARIN MUNICIPAL WATER DIS-TRICT (I)

(none) COMPLETION 2013-0071679

11/23 MARIN MUNICIPAL WATER DIS-TRICT (I)

(none) COMPLETION 2013-0071680

11/23 PIAZZA CONSTRUCTION (I) (none) COMPLETION 2013-007167811/23 PIAZZA CONSTRUCTION (I) (none) COMPLETION 2013-007167911/23 SILVERADO CONTRACTORS INC

(I)(none) COMPLETION 2013-0071694

LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/19 SAN MARIN VALLEY HOMEOWN-

ERS ASSOCIATION (E)HOULIHAN JOY L (O) LIEN 2013-0070815

11/22 CASA MADERA ASSOCIATION INC (E)

THOMPSON BLANCA (O) LIEN 2013-0071427

11/22 CASA MADERA ASSOCIATION INC (E)

THOMPSON CHARLES G (O) LIEN 2013-0071427

11/23 GOAL CONSTRUCTION CO INC (E) 863 E FRANCISCO PROPER-TIES (O)

LIEN 2013-0071645

Page 23: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 23

TAX LIENS & COMPLETIONS

www.marinba.org ◆ [email protected]

LIENS CONTINUEDRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/23 GOAL CONSTRUCTION CO INC (E) FARB LAWRENCE (O) LIEN 2013-007164511/23 GOLD RIVER CONTRACTORS (E) 863 E FRANCISCO PROPER-

TIES (O)LIEN 2013-0071645

11/23 GOLD RIVER CONTRACTORS (E) FARB LAWRENCE (O) LIEN 2013-007164511/23 ZAPALSKI NATHAN C (E) GUIDE DOGS FOR THE BLIND

(O)LIEN 2013-0071589

11/23 ZAPCON (E) GUIDE DOGS FOR THE BLIND (O)

LIEN 2013-0071589

RELEASE OF LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/19 FREER GLORIA C (E) SEASCAPE VILLAGE HOME-

OWNERS ASSOCIATION (O)RELEASE OF LIEN 2013-0070727

11/19 RODAS DARVIN M (E) SEASCAPE VILLAGE HOME-OWNERS ASSOCIATION (O)

RELEASE OF LIEN 2013-0070727

11/19 WILLIAMS KARIE (E) CITIBANK (O) RELEASE OF LIEN 2013-007081211/20 BAUER JOSEPH L (E) MARIN COUNTY DEPARTMENT

OF CHILD SUPPORT SERVIC-ES (O)

RELEASE OF LIEN 2013-0071118

11/22 HOLLAND LESLIE D (E) SAN MARIN VALLEY ASSOCIA-TION INC (O)

RELEASE OF LIEN 2013-0071426

11/23 COLBERG LAURA LEE (E) SCOTTSDALE LAKE CONDO-MINIUM OWNERS ASSOCIA-TION INC (O)

RELEASE OF LIEN 2013-0071604

11/23 SIAS SPENCER R /TR/ (E) MARIN LUMBER INC (O) RELEASE OF LIEN 2013-007160311/23 SIAS STACEY R /TR/ (E) MARIN LUMBER INC (O) RELEASE OF LIEN 2013-007160311/23 SPENCER R SIAS & STACEY R

SIAS REVOCABLE TRUST (E)MARIN LUMBER INC (O) RELEASE OF LIEN 2013-0071603

TAX LIENSRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/19 FRANCHISE TAX BOARD (E) HOT PACKET TESTING INC (O) TAX LIEN 2013-007073811/19 FRANCHISE TAX BOARD (E) HARNEY BROS CONSTRUC-

TION INC (O)TAX LIEN 2013-0070740

11/19 FRANCHISE TAX BOARD (E) A BETTER TRAFFIC SCHOOL CO INC (O)

TAX LIEN 2013-0070741

11/19 FRANCHISE TAX BOARD (E) A BETTER TRAFFIC SCHOOL COM (O)

TAX LIEN 2013-0070741

11/19 FRANCHISE TAX BOARD (E) MISSION LTS LLC (O) TAX LIEN 2013-007074211/19 FRANCHISE TAX BOARD (E) HASSAN LEE (O) TAX LIEN 2013-007077311/19 FRANCHISE TAX BOARD (E) WEERASINGHE CHARLES G

(O)TAX LIEN 2013-0070774

11/19 INTERNAL REVENUE SERVICE (E) DODGE CALEEN R (O) TAX LIEN 2013-007074511/19 INTERNAL REVENUE SERVICE (E) DODGE GUY D (O) TAX LIEN 2013-007074511/19 INTERNAL REVENUE SERVICE (E) FAVALORO AGGIE (O) TAX LIEN 2013-007074611/19 INTERNAL REVENUE SERVICE (E) MOYNIHAN MICHAEL (O) TAX LIEN 2013-007074611/19 INTERNAL REVENUE SERVICE (E) WILSON KAREN (O) TAX LIEN 2013-007074711/19 INTERNAL REVENUE SERVICE (E) RYAN DOUGLAS (O) TAX LIEN 2013-0070748

Page 24: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 24

TAX LIENS & COMPLETIONS

www.marinba.org ◆ [email protected]

TAX LIENS CONTINUEDRecording Date Grantors/Grantees Grantees/Grantors Title Document Number11/19 INTERNAL REVENUE SERVICE (E) LIGHTLE CARMEN M (O) TAX LIEN 2013-007074911/19 INTERNAL REVENUE SERVICE (E) LIGHTLE DOUGLAS D (O) TAX LIEN 2013-007074911/19 INTERNAL REVENUE SERVICE (E) WAISS SUSAN A (O) TAX LIEN 2013-007075011/19 INTERNAL REVENUE SERVICE (E) CANTON AMY G (O) TAX LIEN 2013-007075111/19 INTERNAL REVENUE SERVICE (E) KAVRELL HARMON D (O) TAX LIEN 2013-007075111/19 INTERNAL REVENUE SERVICE (E) WYLLIE ANDREA (O) TAX LIEN 2013-007075211/19 INTERNAL REVENUE SERVICE (E) WYLLIE DEREK G (O) TAX LIEN 2013-007075211/19 INTERNAL REVENUE SERVICE (E) SANCHEZ-HERNANDEZ ANTO-

NIO (O)TAX LIEN 2013-0070753

11/19 INTERNAL REVENUE SERVICE (E) JOHNSON LASER C (O) TAX LIEN 2013-007075411/19 INTERNAL REVENUE SERVICE (E) JOHNSON STEVEN C (O) TAX LIEN 2013-007075411/19 INTERNAL REVENUE SERVICE (E) JOHNSON STEVEN C (O) TAX LIEN 2013-007075511/20 EMPLOYMENT DEVELOPMENT

DEPARTMENT (E)RAINBOW FABRICS YARNS & TRIMS (O)

TAX LIEN 2013-0071095

11/20 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

TABER ROSE (O) TAX LIEN 2013-0071095

11/20 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

EYE CONNECTION INCORPO-RATED (O)

TAX LIEN 2013-0071096

11/20 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

SITE FOR SORE EYES (O) TAX LIEN 2013-0071096

11/20 INTERNAL REVENUE SERVICE (E) DENNIS REBECCA (O) TAX LIEN 2013-007102911/20 STATE BOARD OF EQUALIZATION

(E)KLOTZ & SYNDERMAN LLC (O) TAX LIEN 2013-0071097

11/20 STATE BOARD OF EQUALIZATION (E)

KLOTZ WATCHES & CLOCKS (O)

TAX LIEN 2013-0071097

11/20 STATE BOARD OF EQUALIZATION (E)

REVIVAL MERCANTILE INC (O) TAX LIEN 2013-0071098

11/21 FRANCHISE TAX BOARD (E) MORSE HARRISON R III (O) TAX LIEN 2013-007124511/21 FRANCHISE TAX BOARD (E) CSAKLOS WILLIAM R (O) TAX LIEN 2013-007124611/21 FRANCHISE TAX BOARD (E) THOMPSON DANIEL S (O) TAX LIEN 2013-007124711/21 FRANCHISE TAX BOARD (E) DEAN PATRICK H (O) TAX LIEN 2013-007124811/21 FRANCHISE TAX BOARD (E) VEST JAMES (O) TAX LIEN 2013-007124911/21 FRANCHISE TAX BOARD (E) MC GINLEY JOSEPH (O) TAX LIEN 2013-007125011/21 FRANCHISE TAX BOARD (E) DEAN NANCY L (O) TAX LIEN 2013-007125111/22 EMPLOYMENT DEVELOPMENT

DEPARTMENT (E)NORTHGATE CARE CENTER INC (O)

TAX LIEN 2013-0071402

11/22 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

JML ENGINEERING & CON-STRUCTION INC (O)

TAX LIEN 2013-0071403

11/22 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

CAILIN CONSTRUCTION INC (O)

TAX LIEN 2013-0071404

11/22 EMPLOYMENT DEVELOPMENT DEPARTMENT (E)

RCL 88 INVESTMENT INC (O) TAX LIEN 2013-0071405

11/22 FRANCHISE TAX BOARD (E) HUGH CAMPBELL P (O) TAX LIEN 2013-007139911/22 FRANCHISE TAX BOARD (E) HONTALAS AMI (O) TAX LIEN 2013-007140011/22 FRANCHISE TAX BOARD (E) SETTLEMENT FUND (O) TAX LIEN 2013-0071401

Page 25: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 25

Bid Date Bid Time Project Name City BIN # Plan Issuer11/22/2013 2:00 PM Santa Cruz ONLINE

Santa Cruz, County ofRFQ-Telephone System Replacement

11/22/2013 2:00 PM Visalia ONLINE

Visalia, City OfConstruction of Visalia Animal Control Facility

11/22/2013 4:30 PM Elk Grove ONLINE

Elk Grove, City ofControl Contractor Providing Oversight at the City's Special Waste Collection Center

11/22/2013 3:00 PM Stockton ONLINE

Stockton, City ofStormwater Water Monitoring

11/22/2013 5:00 PM Sunnyvale ONLINE

Homestead Park

11/22/2013 2:00 PM Porterville ONLINE

Pacific West Builders, Inc

The Village at Henderson

11/22/2013 3:00 PM San Jose ONLINE

Santa Clara Valley Health and Hospital System

RFQ - Santa Clara Valley Health & Hospital System Facilities Department Expansion Project

11/22/2013 2:00 PM Orangevale ONLINE

San Juan Unified School District

Louis Pasteur MS Student Toilet Room Upgrades

11/22/2013 12:00 PM San Francisco ONLINE

Whiting-TurnerKaiser Permanente Medical Office

11/22/2013 3:00 PM Nevada City ONLINE

Nevada, County OfRFQ-Project Plans, Specifications & Estimates for Brunswick Road/Loma Rica Dr Intersection Improvements

11/22/2013 3:00 PM San Francisco ONLINE

University of California, San Francisco

Health Science Instruction & Research (HSIR) Fire Smoke Damper Repair

11/22/2013 11:00 AM San Francisco ONLINE

San Francisco Unified School District

Nourse Auditorium Toilet Room Renovation

11/22/2013 3:00 PM Stockton ONLINE

Stockton, City ofStormwater Program Management

11/25/2013 2:00 PM Santa Ana ONLINE

S & H Concrete Construction

Savers

11/25/2013 2:00 PM Mill Valley ONLINE

Mill Valley, City ofSycamore Avenue Pedestrian Improvement

11/25/2013 2:00 PM East Palo Alto ONLINE

Menlo Park Fire Protection Dist

Menlo Park Fire Protection Dist (Menlo Park FPD) - Fire Station No. 2

11/25/2013 3:00 PM Alameda ONLINE

Alameda, City of RFP-Furnishing Labor, Materials & Equipment to Install Three 6" HDPE Conduits for the Alameda HDD Crossing Project

11/25/2013 2:00 PM San Francisco ONLINE

Cahill Contractors, Inc.Hunter's Point Shipyard Phase 1-Block 56-57

11/25/2013 4:30 PM Modesto ONLINE

Modesto, City of 1813 Aloha Way

11/25/2013 4:00 PM Oakland ONLINE

Bay Area Toll AuthorityRFQ-On-Call Construction Management & Design Services

11/26/2013 2:00 PM Various 022C Bay Area Rapid Trnsit District

Wayside Fence Refurbishment, R-Line

11/26/2013 2:00 PM San Mateo 023C/R023

San Mateo, City of25th Avenue Sanitary Sewer Relief Line Project

11/26/2013 2:30 PM Various E324B/065C

Kjeldsen, Sinnock & Neudeck, Inc.

Levee Maintenance Project Dryland Levee Pipe Improvements Various Locations Between Stations 878+09 & 972+11

11/26/2013 2:00 PM Clovis ONLINE

Clovis, City ofN. Temperance Avenue Widening - Enterprise Canal to Shepherd Avenue

11/26/2013 2:00 PM Ukiah ONLINE

Mendocino, County ofRFQ - Boonville DOT Yard Above Ground Fuel Vault

11/26/2013 2:00 PM Berkeley ONLINE

Berkeley, City of Sanitary Sewer Rehabilitation - Grizzly Peak Blvd, Forest Ln, Et Al

11/26/2013 3:00 PM Fresno ONLINE

Fresno, City ofProcurement Requirements Contract for Single Jet Water Meters

11/26/2013 2:00 PM Burney ONLINE

Dept of Parks & Recreation

McArthur-Burney Falls Memorial State Park

11/26/2013 2:00 PM Newark ONLINE

Newark, city of Jerry Raber Ash Street Park Turf Renovation

www.marinba.org ◆ [email protected]

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Page 26: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 26

Bid Date Bid Time Project Name City BIN # Plan Issuer11/26/2013 2:00 PM Fresno ONLINE

Fresno, City ofPlant 2 Demolition at Wastewater Division

11/26/2013 2:00 PM Sacramento ONLINE

California State University Sacramento

American River Courtyard Domestic Hot Water Controls Modifications

11/26/2013 2:00 PM Placer County ONLINE

Placer County Water Agency

French Meadows Penstock Acess Improvements

11/26/2013 3:00 PM Ripon ONLINE

Ripon Fire District Station No. 3 REBID

11/26/2013 3:30 PM Citrus Heights ONLINE

Citrus Heights, City ofProfessional Services for the Citrus Heights Green Parking Lot Demonstration Project

11/26/2013 2:00 PM Tracy ONLINE

Tracy, City ofSenior Center & Transit Station Misc Improvements

11/26/2013 2:00 PM Fresno ONLINE

Fresno, City ofFinish and Install Chemical Root Control Foaming Machine

11/26/2013 2:00 PM Berkeley ONLINE

Berkeley, City of Public Works

Willard Park Tennis Court

11/26/2013 2:00 PM Sacramento ONLINE

San Juan Unified School District

Laurel Ruff Learning Center Student Toilet Upgrades

11/26/2013 2:00 PM Dublin/San Leandro ONLINE

Alameda, County ofRFQ-ACSO Sandy Turner II Educational Center & BHCS Villa Short Stay Facility

11/26/2013 5:00 PM Stockton ONLINE

San Joaquin, County ofRFQ-Planning & Design Runway & Taxiways Lighting Systems

11/26/2013 5:00 PM Foster City ONLINE

Foster, City ofSidewalk Repair & Replacement

11/26/2013 2:00 PM San Francisco ONLINE

San Francisco International Airport

Runways 1-19s RSA Improvement

11/26/2013 5:00 PM Foster City ONLINE

Foster, City ofPavement Repair & Replacement

11/26/2013 3:00 PM San Jose ONLINE

San Jose Evergreen Community College Dist

EVC Soccer Filed Phase 1 Bleacher Project (Construction)

11/26/2013 3:00 PM Fresno ONLINE

Fresno, City ofSewer Rehabilitation in Kern Street and Fulton Alleys

11/26/2013 2:00 PM Various ONLINE

Sanitary District No 1 of Marin County

FY 2014 Gravity Sewer Rehabilitation Project - Group B

11/27/2013 12:00 PM Walnut Creek ONLINE

Janie & Jack - Walnut Creek Residence

11/27/2013 12:00 PM Lafayette ONLINE

Contra Costa, County of

Exterior Painting

11/27/2013 2:00 PM Solano County ONLINE

Solano, County OfMetal Beam Guardrail Project 2013 at Suisun Parkway, Dixon Avenue West, & Putah Creek Road

11/27/2013 3:30 PM San Jose ONLINE

San Jose State University

Wifi Campus Cabling Project

11/27/2013 10:00 AM San Carlos R026 San Carlos, City of1st Floor Remodel & Fire Srinkler Project

11/29/2013 12:00 PM Richmond ONLINE

Inclusion Letter for Licensed Contractors, West Contra Costa Unified School District

11/29/2013 5:00 PM Rancho Cordova ONLINE

Town & Country Contractors, Inc.

ARCO AM/PM Sunrise

12/2/2013 11:00 AM Visalia ONLINE

Visalia, City OfAnnual Contract for Backflow Maintenance

12/2/2013 2:00 PM Sacramento ONLINE

Sacramento, City ofRFQ - Various On-Call Contractor Services

12/2/2013 2:00 PM Vallejo ONLINE

Vallejo, City ofNotice to Interested Consultants Service

12/2/2013 2:00 PM Albany ONLINE

Construction of 2013 Sewer Improvements

12/2/2013 2:00 AM Concord ONLINE

Mt Diablo Unified School District

South West Parking Lot Overlay & Expansion Project at Clayton Valley Charter High School

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Page 27: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 27

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/2/2013 2:00 PM Various County ONLINE

California Department of Corrections & Rehabilitation

RFQ - Access Compliance Services for Proposed Infill Project - Level II Dorm Facilities

12/2/2013 2:00 PM San Francisco ONLINE

Nibbi Brothers General Contractors

1751 Carrol Avenue

12/2/2013 5:00 PM Richmond ONLINE

Richmond, City ofInclusion Letter for Licensed Contractors, City of Richmond

12/2/2013 10:00 AM Pittsburg ONLINE

MOT Building Erection & Site Work - REBID

12/3/2013 2:00 PM San Francisco E322B/066C

Bay Area Rapid Trnsit District

Controllers & Power Savers for O & K Escalators

12/3/2013 2:00 PM Berkeley E326B

Berkeley, City of FY 2014 Proactive Sidewalk Project

12/3/2013 2:00 PM San Francisco ONLINE

Dept of Parks & Recreation

Refuse-Candlestick Point State Recreation Area

12/3/2013 2:00 PM Berkeley ONLINE

Berkeley, City of RFQ - On-Call Civil Engeneering Services

12/3/2013 5:00 PM Turlock ONLINE

Turlock, City ofBicycle and Pedestrian Master Plans

12/3/2013 2:00 PM San Francisco ONLINE

Webcor/Obayashi Joint Venture

TG14.1 Elevator & Escalator Construction Services for Transit Center

12/3/2013 2:00 PM San Jose ONLINE

Ocala School Turf Renovation 2013

12/3/2013 12:00 PM Bolinas ONLINE

Bolinas Community Public Utilities District

Replacement of Wastewater Treatment Plant Control Panels & Related Electrical & Piping Upgrades Bolinas Community Public Utilities District

12/3/2013 2:00 PM Concord ONLINE

Mt Diablo Unified School District

PE Building Renovation at Mt. Diablo High School

12/3/2013 2:00 PM San Francisco ONLINE

Nibbi Brothers General Contractors

Franciscan Towers Demo & Abatement

12/3/2013 2:00 PM Tulelake ONLINE

Department of Motor Vehicles

Tulelake HVAC Replacement

12/3/2013 10:30 AM San Francisco ONLINE

Port Of San FranciscoFisherman's Wharf Triangle Lot & SWL 321 Pedestrian Circulation Improvement

12/3/2013 3:00 PM Crescent City ONLINE

State of California Department of Corrections and Rehabilitation

High Voltage Equipment Maintenance, Testing & Repair Services at the Pelican Bay State Prison

12/3/2013 2:00 PM Richmond ONLINE

Richmond, City ofUrban Runoff Treatment Retrofits Cutting Boulevard

12/3/2013 3:00 PM Nevada City ONLINE

Nevada, County OfLock Maintenance Services for Nevada County Correctional Facilities

12/3/2013 2:00 PM Mill Valley ONLINE

Mill Valley, City of2014 Street and Sewer

12/3/2013 2:00 PM Roseville ONLINE

IRWM Blue Oaks & Hayden Pkwy Well Pump Stations

12/3/2013 12:00 PM Los Angeles ONLINE

Tri-North BuildersBath & Body Works

12/3/2013 2:00 PM Foresthill ONLINE

Filter Rehabilitation Project

12/3/2013 10:00 AM Belmont ONLINE

Sequoia Union High School Dist

Carlmont High School Classroom Building-Rebid

12/3/2013 3:00 PM San Francisco ONLINE

Mission Bay Development Group, Inc

Mission Bay Park 6 Project

12/3/2013 3:00 PM Fresno ONLINE

Fresno, City ofFirst Avenue Wireless ITS Project

12/4/2013 2:00 PM Novato E320B/061C

Novato Sanitary DistrictPump Station Improvement Project - Unit 5

Page 28: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 28

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/4/2013 2:00 PM Santa Rosa* E323B/0

79CWest Avenue, Sheppard, Roseland Elementary/Middle School Safe Routes to School Project

12/4/2013 2:00 PM Los Altos Hills ONLINE

Neary Tank Utilization Project - Phase II

12/4/2013 2:00 PM San Francisco ONLINE

San Francisco, City & County of

Point Lobos Avenue and Washington Street Pavement Renovation, Sewer Replacement and Watermain Installation

12/4/2013 3:00 PM Sunnyvale ONLINE

Sunnyvale, City ofSanitary Sewer Lift Stations Rebuild

12/4/2013 3:00 PM Santa Clara ONLINE

Santa Clara, City ofRemoval of Barriers to the Phusically Challenged FY 2013-14

12/4/2013 3:00 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-Alice Griffith Housing Phases I, II & III

12/4/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

South of Market Alleyway Improvement Project Phase 2

12/4/2013 2:00 PM Fremont ONLINE

Fremont, City ofRoof Parapet & Eaves Repair at Fremont City Hall

12/4/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

Castro Streetscape Improvement Project

12/4/2013 3:00 PM Mountain View ONLINE

Mountain View, city ofInduction Lighting Replacements Phase 1

12/4/2013 5:00 PM San Jose ONLINE

San Jose, City OfRFQ - Fire Station No. 21

12/4/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

Jefferson Elementary School Safe Routes To School

12/4/2013 2:00 PM Various ONLINE

Central Contra Costa Sanitary District

Nondestructive Potholing of Underground Utilities

12/4/2013 10:00 AM West Sacramento ONLINE

West Sacramento, City of

Westmore Oaks Water Meter Project

12/4/2013 2:00 PM Oakdale ONLINE

Oakdale, City of 2013-2014 Water Meter Upgrade Project - Water Meters & Materials Installation - Phase II

12/4/2013 9:00 AM Rancho Cordova ONLINE

California Technology Agency

Building Engineering Services

12/4/2013 12:00 PM Sacramento ONLINE

Tri-North BuildersVictoria's Secret

12/4/2013 11:00 AM Lodi ONLINE

Lodi, City ofWestern & Southern Plumes Monitoring Wells Installation Project

12/4/2013 2:00 PM Corcoran ONLINE

California Department of Corrections & Rehabilitation

Enhanced Vapor Recovery - For Above Ground Fuel Storage Tank at California State Prison

12/4/2013 1:00 PM Gilroy ONLINE

PMSM ArchitectsGilroy High School Renovation Phase 2 B Relocatable Restroom & Site Upgrades

12/4/2013 2:00 PM Redding ONLINE

Redding, City OfRFQ - Inspect & Repair/Rebuild Two Turbine Pumps

12/5/2013 2:00 PM Morgan Hill E318B

Santa Clara, County OfPedestrian Improvement Project at San Martin Ave & Drainage Improvement Project at Spring Ave

12/5/2013 2:00 PM Vallejo ONLINE

Vallejo, City ofSereno Drive Concrete Rehabilitation Project - Measure B FY13/14

12/5/2013 2:00 PM Fremont ONLINE

Department of General Services

Re-Roof Building # 22 High School

12/5/2013 2:00 PM Galt ONLINE

Galt, city of2013 Well Rehabilitation Project

12/5/2013 2:00 PM Elk Grove ONLINE

PMO-CMID Building

12/5/2013 2:00 PM Stockton ONLINE

Stockton, City ofWater Well 25 & 26 Diesel Engine Conversion to Electric Motor

12/5/2013 3:00 PM Carmel ONLINE

Carmel Area Water District

Digester Heating Improvement Project

12/5/2013 9:30 AM Monterey ONLINE

Department of Parks & Recreation

Seismic Stabilization of California's First Theater

Page 29: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 29

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/5/2013 4:00 PM Merced ONLINE

University of California, Merced

Housing Maintenance Office Trailer

12/5/2013 2:00 PM Fairfield ONLINE

Fairfield, City OfCity Parks Lighting Project-Phase 2 (Meadow Glen & Vintage Valley Neighborhood Parks)

12/5/2013 2:00 PM Salinas ONLINE

Monterey, County ofNatividad Medical Center Bulding 400 Third Floor Tenant Improvements

12/5/2013 2:00 PM San Francisco ONLINE

San Francisco, City & County of

18th/25th/35th/47th/ Avenues & Delancey/Felton/Fern/Hawes/Madrid/Steiner Streets Sewer Replacement

12/5/2013 1:45 PM Castro Valley & San Lorenzo

ONLINE

Hayward Area Recreation & Park District

Kitchen Renovations at Castro Valley Community Center & San Lorenzo Community Center

12/5/2013 1:30 PM Hayward ONLINE

Hayward Area Recreation & Park District

Kitchen and Pathway Renovation at Weekes Community Center

12/5/2013 2:00 PM Fairfield ONLINE

Fairfield, City OfNBR Polymer & Alum Piping Replacement Project North Bay regional Water Treatment Plant

12/5/2013 3:00 PM Santa Cruz ONLINE

Santa Cruz, UCMerrill College Renovation Phase 2 Plaza Building & Gatehouse

12/5/2013 3:00 PM Hughson ONLINE

Hughson, city ofWell 6 Improvement Project

12/6/2013 3:00 PM San Pablo ONLINE

Contra Costa Community College District

Special Inspection & Testing Services for C-617 New College Center Project

12/6/2013 3:00 PM Berkeley ONLINE

Lorentz Bruun Construction

UC Theatre

12/6/2013 3:00 PM Shingle Springs ONLINE

El Dorado, County ofCounty El Dorado Community Corrections Center Shingle Springs

12/6/2013 5:00 PM Oroville ONLINE

Oroville, City OfOroville Dam Boulevard Bicycle Lanes Project

12/6/2013 3:00 PM San Jose ONLINE

San Jose, City of RFQ-Acoustical Services for the SJC Noise Control Program Consultant Services

12/6/2013 2:00 PM Madera ONLINE

Madera, County OfMadera County Government Center Third Floor Tenant Improvement

12/6/2013 3:00 PM San Jose ONLINE

Santa Clara County Housing Authority

Exterior Painting, Trim Replacement, Recoating of Waterproof decks & Replace Exterior Lighting Fixtures for Pinmore Gardens

12/6/2013 12:00 PM Ukiah ONLINE

Ukiah, City OfOrchard Substation T-1 Bushing Replacement

12/6/2013 2:00 PM San Francisco ONLINE

San Francisco, City & Co of

Airfield Lighting at San Francisco Airport

12/6/2013 11:00 AM Visalia ONLINE

Visalia, City OfProfessional Design Services for the Greenway Trail along SCE Power Lines from Cameron Creek to St. John's River Trail

12/6/2013 11:00 AM Oakland ONLINE

Port Of OaklandBuilding Maintenance Services

12/6/2013 11:00 AM Various ONLINE

Peralta Community College District

District Wide Fire System Testing, Inspection, Repair & Maintenance

12/6/2013 2:00 PM Concord ONLINE

Central Contra Costa Transit Authority

Replacement of HVAC Units

12/9/2013 2:00 PM San Lorenzo ONLINE

Alameda, County ofSan Lorenzo Library Expansion

12/9/2013 5:00 PM Santa Rosa ONLINE

Victoria's Secret

12/9/2013 1:00 PM Rio Linda ONLINE

L Street Reservoir & Pump Station

12/9/2013 2:00 PM Sacramento ONLINE

Sacramento City Unified School District

Marquee Sign - Installation & Site Work

12/9/2013 2:00 PM Larkspur ONLINE

Larkspur Court Apartment

12/10/2013 2:00 PM Napa E321B

Napa Sanitation DistrictMST Recycled Water Pipeline Project

Page 30: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 30

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/10/2013 3:00 PM Turlock ONLINE

Turlock, City ofHVAC Unit Replacements and Roofing at TRWQCF

Oprerations Building

12/10/2013 2:00 PM Brentwood ONLINE

Contra Costa Community College District

L-10 Brentwood Center New Classroom/Laboratory Preparation Room

12/10/2013 3:00 PM Palo Alto ONLINE

Palo Alto, City ofPole Replacement Package

12/10/2013 2:00 PM Madera ONLINE

Madera, City of6th Street Bike Lanes - N Street to Lake Street, & Bike Route Signs at Various Location

12/10/2013 11:00 AM Modesto ONLINE

Modesto, City ofInterior Recoat Tank 3

12/10/2013 2:00 PM San Rafael ONLINE

Sierra ContractingHomegoods TI

12/10/2013 2:00 PM Davis ONLINE

Davis, UCVeterinary Medicine Student Services

12/10/2013 3:00 PM Fresno ONLINE

Fresno, City ofMcKinley Avenue Intelligent Transportation System Wireless from Highway 99 to Clovis Avenue

12/10/2013 3:00 PM Fresno ONLINE

Fresno, City ofBullard Avenue ITS Wireless, Marks Avenue to Willow Avenue

12/11/2013 1:30 PM Oakland B122 East Bay Municipal Utility District

Wet Weather Facilities Chemical Systems Improvements Phase 2

12/11/2013 2:00 PM Sacramento ONLINE

Sacramento, City OfP/Q Alley Sewer & Water Replacement, 16thto 17th Street

12/11/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

San Jose Avenue Stairs & Wal Repair

12/11/2013 2:00 PM Sacramento ONLINE

Sacramento, City ofDogwood Park Development

12/11/2013 4:00 PM Merced ONLINE

University of California, Merced

Solar Photovoltaic System(s) -UC Merced

12/11/2013 10:00 AM Concord ONLINE

Concord, City ofTemporary Service Agency for Parks & Landscape Maintenance Laborers

12/11/2013 2:00 PM Sacramento ONLINE

Sacramento, city ofCM - Service - Scaramento City College Ped/BikeProject

12/11/2013 4:00 PM Lancaster ONLINE

Sunseri ConstructionPremier Rehabilitation & Wellness Center

12/11/2013 3:00 PM San Leandro ONLINE

San Leandro, city ofMonarch Bay Drive Bridge Repair

12/11/2013 2:00 PM Santa Rosa ONLINE

Santa Rosa, City ofLeland Street, Stanford Street, and Fair Oaks Ave Water Replacement

12/11/2013 2:00 PM South San Francisco ONLINE

Midstate ConstructionBank of The West

12/11/2013 2:00 PM Pittsburg R025/015C

Pittsburg, city of Vidrio Tenant Improvements

12/12/2013 2:00 PM Modesto ONLINE

Stanislaus, County of RFQ - Stanislaus County Public Safety Center Expansion - Part 2

12/12/2013 5:00 PM Corona ONLINE

Kelley ConstructionTexas Roadhouse Restaurant

12/12/2013 2:00 PM Various Counties ONLINE

Department of General Services

Communication Towers & Vaults, Phase IV

12/12/2013 5:00 PM Mountain View ONLINE

L & D ConstructionFirst Community Housing Mountain View Studios

12/12/2013 2:00 PM Livermore ONLINE

Chabot-LasPositas Comm College Dist

Building 2000, Library Renovation Project, Las Positas College

12/12/2013 2:00 PM San Francisco* ONLINE

Southeast Water Pollution Control Plant Chemical System Relocation & Facility Upgrades - PROJECT WILL NOT BE SCANNED

12/12/2013 2:00 PM San Francisco ONLINE

San Francisco, City & County of

Alhambra/Bay/Beach Streets and Mallorca/Retiro/Toledo Way Sewer Replacement

12/12/2013 2:00 PM Modesto ONLINE

Stanislaus, County of RFQ - Stanislaus County Public Safety Center Expansion - Part1

Page 31: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 31

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/12/2013 2:00 PM Berkeley ONLINE

Berkeley, UCGiannini Hall IS&T Riser

12/12/2013 2:00 PM Union City ONLINE

Union City, city ofAlameda Creek Bridge at Decoto Road Seismic Retrofit Project

12/13/2013 2:30 PM San Francsico ONLINE

San Francisco, City & County of

RFQ-AS-Needed Waterproofing Consultation Services 2013

12/13/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Professional Rendering Services 2013

12/13/2013 2:00 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Elevator Design Services 2013

12/13/2013 3:00 PM San Jose ONLINE

San Jose, City ofTemporary Modular Living Facility

12/13/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Constructability Review Services 21013

12/13/2013 5:00 PM San Jose ONLINE

San Jose, City ofRFQ-Public/Private partnership High Density Urban Mixed Use Development Opportunity

12/13/2013 3:00 PM Visalia ONLINE

Visalia, City OfAnnual Contract for Landscape Maintenance

12/13/2013 4:00 PM Various ONLINE

San Joaquin, County ofDesign Engineering Services for Sexton Road Bridge (29C-319) Across South San Joaquin Irrigatin District Canal Replacement Project

12/13/2013 5:00 PM Stockton ONLINE

Stockton Walgreen

12/13/2013 2:00 PM San Jose ONLINE

Santa Clara Valley Transportation Authority

Rail Rehabilitation-Signal & Track Improvements Contract (Rebid)

12/13/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Lighting Design Services 2013

12/13/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Specifications Writing & Hardware Design Services 2013

12/13/2013 2:30 PM San Francisco ONLINE

San Francisco, City & County of

RFQ-As-Needed Cost Estimating Services 2013

12/16/2013 5:00 PM Hayward R024 Josephine Lum Lodge Renovation of Commercial Kitchen (General Contractors Only)

12/17/2013 2:00 PM Oakland E309B/080C

San Francisco Bay Area Rapid Transit District

Procurement of 75KVA, 34.5kV/208Y-120V Control Transformers

12/17/2013 2:00 PM Oakland E325B/014C

San Francisco Bay Area Rapid Transit District

19th Street Station Entrance Enclosure

12/17/2013 10:00 AM Vallejo ONLINE

Vallejo Sanitation and Flood Control District

Chemical System Rehabilitation Project

12/17/2013 11:00 AM Modesto ONLINE

Modesto, City of Closed Circuit TV Pipeline Inspection Services

12/17/2013 11:00 AM Modesto ONLINE

Modesto, City of On-Call Contractor Services for City of Modesto

12/17/2013 11:00 AM Modesto ONLINE

Modesto, City ofKiernan Avenue Water Main Replacement

12/17/2013 2:00 PM Alameda Co R007/063C

Alameda, County ofThe Repair & Rehabilitation of High Street Bridge & Park Street Bridge

12/18/2013 2:00 PM Sacramento ONLINE

Sacramento, city ofMae Fong Park Shade Structure

12/18/2013 2:00 PM Scramento ONLINE

Sacramento, city ofQuail Park Shade Canopy

12/18/2013 2:00 PM Milpitas ONLINE

Santa Clara Valley Water District

MIlpitas Pipeline Rehabilitation Project

12/18/2013 2:00 PM San Francisco ONLINE

San Francisco State University

Job Order Contracts

12/18/2013 2:00 PM Mountain View ONLINE

Mountain View, city ofTeen Center (CDBG) Rock Church Refurbishment & Modification

Page 32: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 32

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer12/18/2013 2:30 PM San Francsico ONLINE

San Francisco, City & County of

Mcallister Street Pavement Renovation & Sewer Replacement

12/18/2013 4:30 PM Modesto ONLINE

Modesto, City of 933 Beryl Way

12/18/2013 4:30 PM Modesto ONLINE

Modesto, City of 200 Needles Court

12/19/2013 2:00 PM San Carlos ONLINE

San Mateo County Transit District

Furnish Elevator Maintenance Services

12/19/2013 2:00 PM Various ONLINE

California Department of Corrections & Rehabilitation

Electrified Fence Project Statewide Bird Netting Replacement, Phase 3

12/19/2013 2:00 PM San Francisco ONLINE

San Francisco International Airport

Boarding Area G A380 Improvements-Phase A

12/19/2013 2:00 PM Richard ONLINE

East Bay Regional Park District

Point Pinol Regional Shoreline Restroom, Parking, and Access Upgrades

12/19/2013 3:00 PM Fremont ONLINE

Ohlone Community College District

Building 22 Fire Alarm Upgrade

12/19/2013 2:00 PM Burlingame ONLINE

Burlingame, City ofBurlingame Public Library Lighting Control

12/19/2013 2:00 PM Sacramento ONLINE

Department of General Services

Spandrel Panel Replacement

12/19/2013 2:00 PM San Mateo* ONLINE

Peninsula Pipelines Seismic Upgrade - THIS PROJECT WILL NOT BE SCANNED

12/19/2013 2:00 PM Citrus Heights ONLINE

Sacramento, County of, Internal Services

Arcade Creek Park Preserve & Extension

12/20/2013 3:00 PM Oakhurst ONLINE

Madera, County OfOakhurst Mid-Town Connector

12/20/2013 2:00 PM Merced ONLINE

Merced Community College District

Merced College Wayfinding Project

12/26/2013 2:00 PM Alameda County ONLINE

Alameda, County ofRegional Renewable Energy Procurement

12/30/2013 5:00 PM Saratoga ONLINE

West Valley-Mission Community College

Inclusion Letter for Licensed Contractors, West Valley-Mission Community College District

12/30/2013 5:00 PM Newark ONLINE

Ohlone Community College District

Inclusion Letter for Licensed Contractors for Ohlone Community College District

12/30/2013 5:00 PM Cupertino ONLINE

Cupertino, city of Inclusion Letter for Licensed Contractors, City of Cupertino

12/31/2013 5:00 PM El Dorado ONLINE

El Dorado, County ofInclusion Letter for Licensed Contractors, City of El Dorado

12/31/2013 5:00 PM Napa ONLINE

Napa Sanitation DistrictInclusion Letter for Licensed Contractors, Napa Sanitation District

12/31/2013 4:00 PM San Jose ONLINE

San Jose, City OfInclusion Letter for Licensed Contractors, city of San Jose

12/31/2013 5:00 PM Rohnert Park ONLINE

Rohnert Park, city ofInclusion Letter for Licensed Contractors, city of Rohnert Park

12/31/2013 4:00 PM San Ramon ONLINE

San Ramon Valley Unified School District

Inclusion Letter for Licensed Contractors, San Ramon Valley Unified School District

12/31/2013 4:00 PM Orinda ONLINE

Orinda, City ofInclusion Letter for Licensed Contractors, city of Orinda

12/31/2013 5:00 PM San Luis Obispo ONLINE

San Luis Obispo, City of

Inclusion Letter for Licensed Contractors, City of San Luis Obispo

12/31/2013 5:00 PM Vacaville ONLINE

Solano County Water Agency

Inclusion Letter for Licensed Contractors for Solano County Water Agency

12/31/2013 12:00 PM Turlock ONLINE

Turlock, City ofInclusion Letter for Licensed Contractors, city of Turlock

12/31/2013 5:00 PM Davis ONLINE

Davis, city ofInclusion Letter for Licensed Contractors for the City of Davis

12/31/2013 5:00 PM Ukiah ONLINE

Ukiah, City OfInclusion Letter for Licensed Contractors, city of Ukiah

Page 33: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 33

PROJECT BID SCHEDULE

www.marinba.org ◆ [email protected]

Bid list subject to change prior to bid date,please check with Association.

Bid Date Bid Time Project Name City BIN # Plan Issuer1/6/2014 3:00 PM Martinez ONLINE

Contra Costa, County of

Design, Manufacture, & Install Interior & Exterior Signage for Contra Costa County

1/6/2014 2:00 PM South Lake Tahoe Online Onl

Lake Tahoe, City ofHarrison Avenue Streerscape Improvement Project

1/7/2014 2:00 PM San Francisco E317B/083C

Bay Area Rapid Trnsit District

Power Transformer Replacement & Installation for SBS & SPS Auxiliary Substations

1/7/2014 2:00 PM San Francisco ONLINE

San Francisco State University

Window Replacement and Exterior Repairs Thornton Hall - West Elevation

1/7/2014 3:00 PM Roseville ONLINE

Roseville, City of2013 Wastewater Manhole Lining Rehabilitation

1/8/2014 2:00 PM Davis ONLINE

Davis, UCInternational Complex Phase 1

1/14/2014 2:00 PM San Francisco ONLINE

TG07.2 Structural Concrete Superstructure Package Construction Services

1/15/2014 1:30 PM Oakland, Berekeley, San Pablo

020C East Bay Municipal Utility District

Fontaine Street, El Portal Drive, & Euclid Avenue Pipeline Improvements

1/15/2014 2:00 PM San Francisco ONLINE

TG08.1 Curtain Walls and Skylights

1/16/2014 2:00 PM San Francisco ONLINE

TG08.2 Exterior Awning System

1/17/2014 2:00 PM Richmond ONLINE

Richmond, City ofMarina Bay Park Restroom Facility

1/23/2014 1:00 PM Various ONLINE

California Department of Corrections & Rehabilitation

Generator Maintenance, Inspection and Repair Services

1/30/2014 2:00 PM Elk Grove ONLINE

Elk Grove, City ofGrant Line Road Widening Phase I Project

2/6/2014 2:00 PM San Francisco ONLINE

TG18.1 Bus Ramp Construction Services

Page 34: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 34

www.marinba.org ◆ [email protected]

CLASSIFIED ADSClassified ads are provided free to MBA members & staff.

Please advise if position is filled or commodity is [email protected]

SEEKING A MECHANIC / TECHNICIAN

Cal-West Rentals is in search of a technician to work within our service department at our yard in Petaluma. They will be responsible for repairing and maintaining all types of equipment including small engines, heavy construction equipment, and delivery trucks.

The work is mostly in the shop, but also includes field service calls and deliveries of equipment. It is a full-time position, M-F, with full benefits. This person will be reporting to our service manager. Must possess knowledge and experience in the mechanical and construction field.

Please apply to [email protected] or call 707.763.5665.

SEEKING ESTIMATOR FOR RESIDENTIAL CONSTRUCTION

Seeking Estimator/Project Manager for a Marin based Residential General Contractor.Requirements:• Minimum 10 years experience in Residential

Construction. Field experience desired.• Offering Benefits• Salary DOE

Please reply to the email below with your resume if you are interested.

Lee Bonilla - Fontana Construction Inc. 1945 E. Francisco Blvd. Suite N., San Rafael ,CA 94901

415-457-1290 P | 415-457-1294 F | [email protected]

SEEKING EXPERIENCED ACCOUNTINGPROFESSIONAL WITH EXTENSIVE OFFICE

MANAGEMENT SKILLS

Must be highly motivated and organized with strong human resource skills. The primary duties of the position include:

• Direct and manage all accounting functions • Produce all monthly and yearend financial reports • Responsible for all human resource functions • Responsible for all payroll related activities including state and fed-

eral tax filings and reporting • Assist with all insurance activities, including auto, liability, personal

property and workers compensation

Experience – minimum of five years experience in increasingly complex accounting positions with a similar level of managerial responsibility. Experience with computers and accounting software is required, con-

struction accounting and software experience a plus.

Qualified applicants may reply with a resume, cover letter and salary requirements to [email protected]

SEEKING ESTIMATOR FOR CONCRETE CONTRACTOR

Concrete company seeks an experienced Estimator for residential/commercial projects. Must have experience in estimating concrete to apply.

Be able to prepare complete estimates for assigned project by doing a thorough and complete takeoff of the scope and quantities of work.Review proposal specifications, drawings, attend pre-bid meetings, etc. to determine scope of work and required contents of estimate.Prepare subcontracts, materials list once job is awarded..Prepare, RFI’s, change orders and all other construction related documentation.Interface with owners, vendors, subcontractors and lower tier employees.

Must have clean DMV and pass drug test.

Qualified applicants may reply with a resume, cover letter and salary requirements to [email protected]

Page 35: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 35

www.marinba.org ◆ [email protected][email protected]

CLASSIFIED ADSClassified ads are provided free to MBA members & staff.

Please advise if position is filled or commodity is [email protected]

CLAD MARVIN WINDOWS FOR SALE $9,500

Marvin aluminum clad windows/doors, Evergreen exterior with primed pine interior. Includes all window hardware and screens. All sizes listed below are the rough opening sizes.

Windows have not been installed, packaging only opened to verify hardware and screens.

1. Ultimate Casement CN3648 37” x 47 5/8”2. Ultimate Casement CN3648 37” x 47 5/8”3. Ultimate Casement CN3648 37” x 47 5/8”4. Ultimate Casement CN3648 37” x 47 5/8”5. Ultimate Casement CN3648 37” x 47 5/8”6. Ulitmate Sliding French Door CN6668 78” x 82 1/2”7. Ultimate Single Light Outswing Door CN3680 44 7/16” x 96”8. Ultimate Casement CN2436 25” x 35 5/8”9. Ultimate Casement CN3660 37” x 59 5/8”10. Ultimate Picture Window 90 1/4” x 59 5/8”11. Ultimate Casement CN3660 37” x 59 5/8”12. Ultimate Bay Window, Casement/Fixed/Casement 93 3/4” x 66 1/2”

Please call Jon to come see the windows. 415-250-4267FLOYD CONSTRUCTION, INC., LICENSE #365653

714 C STREET #207, SAN RAFAEL, CA 94901(415) 485-0645 | FAX 485-9297

SEEKING ESTIMATOR/PROJECT MANAGER WHO WILL:

• Seek out projects to bid• Complete estimates and produces proposals• Create material list for the job and compares to bid• Review purchase orders from jobs and manages any

discrepancies• Participate in job scheduling • Review job site prior to start of job and throughout

project to completion for quality• Determine material and equipment schedule and assure

delivery to job• Visit job sites as needed throughout the project• Maintain contact and communication with client

representative on the job• Schedule subcontractors and follow up to assure work is

done as needed, on time, and to specifications• Assure job site inspections are occurring• Coordinate job payment schedule with Accounting

Dept.• Document job changes in writing with assistance from

Project Assistant

MINIMUM QUALIFICATIONS• 5 years experience in concrete construction estimating

and project management• 5 years construction field experience• College or other coursework in construction

management or estimating• Strong organizational, interpersonal skills• Proficient on MS Office • Clean DMV, drug free

Please forward resume and salary requirements to [email protected]

20 MAHOGANY DOORS 3”WIDE X 8”TALL FOR SALE

20 Mahogany doors 3”wide x 8”tall, in very good condition with all hardware included. Valued at $550. offered at $99. each.

Contact Carri at [email protected] if interested. I am happy to email a photo.

Page 36: MBA Weekly Bulletin vol.57 issue#45

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 36Marin Builders Association ◆ Weekly Bulletin ◆ Page 34

Publication rules for submission of articles to the MBA Weekly Bulletin

Members cornerLimited to 600 words and edited for length, grammar, spelling, clarity, style, libel and civility. We do not publish form

letters, petitions or consumer complaints. Please include writers name, address and phone number. All submissions become the property of Marin Builders Association and cannot be returned.

note: We would like a photo (jpeg) head shot and can offer ¼ page ad space to *fill out page for ½ the price.

*Ad space only available to fill out page if necessary.

www.marinba.org ◆ [email protected]

Page 34

Marin Builders Associationcirca 1962