Asphalt Shingle Recycling: Big Tons, Big PartnershipsCalifornia Resource Recovery Association 2014 Conference
In February of 2013, the Marin Builders Association in partnership with Marin Sanitary Service and ZeroWasteMarin.org launched the Roofs to Roads pilot program. The project gave local roofers the opportunity to recycle composition shingles at Marin Sanitary Service. The discarded roofing shingles are turned into a renewable asphalt base or hot mix additive for paving.
On August 6th the Marin Builders Association and the Roof to Roads partners were asked to present at the 2014 California Resource Recovery Association’s annual conference and trade show.
The speakers included:• Steve Devine, County of Marin• Casey Mazzoni, Marin Builders Association• Kimberly Scheibly, Marin Sanitary Service• Joshua Fookes, Asphalt Shingle Recyclers. • Delyn Kies, Kies Strategies, Moderator
The “Roofs-to- Roads” presentation described the perspectives and objectives of all partners – the generating roofers, the receiving facility, the recycling processor, and the end user.
The successes discussed included contractor incentives, contractor compliance and the successful public/private partnership. Another success discussed was the diversion rate, which will help in the county’s goal of zero waste by 2025.
The presentation also educated the audience about AB 2355 (Levine), which states:
“By January 1, 2017, a local government that has jurisdiction over a street or highway to either adopt the standards developed by the Department of Transportation for recycled paving materials and for recycled base, subbase, and pervious backfill materials, or discuss why it is not adopting those standards at a public hearing.”
The challenges discussed included the lack of Caltrans specifications allowing for the use of recycled asphalt shingles in road base which affects any public works project in the state.
WEEKLY BULLETIN
www.marinba.org ◆ [email protected] August 12, 2014 Vol. 58, Issue #32
5 Things you need to know
BY CASEY MAZZONIMARIN BUILDERS ASSOCIATION
LEGISLATIVE [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 2
09.22.1437TH ANNUAL GOLF TOURNAMENT@ Marin Country ClubCheck-In 11 AM
09.12.14NEW WAGE & HOUR WORKSHOP WITH MBA MEMBER LARRY LEVY@ MBA Offices8:00 AM to 12:00 PM
www.marinba.org ◆ [email protected] ◆ [email protected]
09.06 – 09.07.14
MARIN Ideal Fall HOME SHOW@ Marin Fairgrounds & Exhibit Hall*MBA members receive a 10% discount on booth cost
For calendar changes and updates visit the MBA website at www.marinba.org
SAVE THE DATES
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 3
PROJECT OFTHE WEEK
Notice inviting bids for
OAK AVENUE TANKDue Tuesday, August 12th, 2014 @ 10:00 AM
Sealed bids shall be delivered to Office of the Manager of Engineering, Marin Municipal Water District, 220
Nellen Avenue, Corte Madera, CA 94925.
Project Description:This project consists of furnishing labor and equipment for the installation of 100,000 gallon bolted steel tank. The work to be done is located in hte Town of San Anselmo within the County of Marin , California.
Plans and specifications for this project and more may be viewed online by subscribers to the MBA Online Plan Service.
IN THIS ISSUE________________________
VOL.58 ISSUE#32
Casey Mazzoni - Things You Need to Know .....................1
Save The Dates ...............................2
Project of the Week ........................3
Register & Sponsor! Annual MBA Golf Tournament ..................6
New Wage & Hour Workshop Registration Form ...........................10
Capitol Connection .........................14
Phil Vermeulen -Legislative Update .....16
SAFETY: Hand Truck Safety ........20
Permits ..............................................25
Tax Liens & Completions ..................28
Project Bid Schedule .......................31
Classifieds ..........................................44
_______________________
CONTACT MBA660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 4
www.marinba.org ◆ [email protected]
DO YOU HAVE COMPANY ITEMS YOU WOULD LIKE TO INCLUDE IN THE PLAYERS’ GIFT BAGS
AT OUR 37TH ANNUAL GOLF TOURNAMENT?
Monday, September 22nd Marin Golf and Country Club
Novato
Bags with special gift items are given to each golfer So . . . if your company has anything you would like to add to the mix
Please let us know!
Remember – It’s for the Kids!
If you have anything you can offer please contact Paula at [email protected] or 415-462-1220
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 5
www.marinba.org ◆ [email protected]
2013-2014 MBA DIRECTORS & OFFICERS
Presidentjim Schalich - Schalich Bros.
Construction
Vice PresidentTyler Doherty - Cal-West Rentals, Inc.
Chief Financial Officer Tom Barr - Ghilotti Bros., Inc.
SECRETARYJohn Busick - Bob Kunst Painting
Past PresidentJeff Mertel - Mertel Carpets
Chief Executive OfficerRick Wells
Oliver Dibble - Dibble & CompanyKeith Dotto - Dotto Glass, Inc.Aimi Dutra - The Dutra Group
Clayton Fraser - West Bay BuildersDave Garbarino - Marin Sanitary Service, Inc
Jeff Grady - California Mortgage AdvisorsDiane Henderson - DMH Land Use Planning
Dan McLennon - McLennon Law CorporationRob Scerri - Golden State LumberDave Trahan - Patriot Mechanical
Michelle Whiteside - Whiteside Construction
STAFFPaula Krause - Office Manager
Barbara Jones - Membership ManagerKellie Buono - Administrative Assistant/Reception
CONSULTANTSCasey Mazzoni - Legislative Analyst
Terrence Knoles - Publications
The weekly bulletin is owned by MBA. Archive available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Marin Builders Association
MBA MEMBER
415.472.3434
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 6
2014
A Benefit Event for the Marin Builders Association Scholarship Fund
MONDAY, SEPTEMBER 22, 2014at Marin Country Club, Novato
Check in at 11:00 AM
Shotgun Start at 1:00 PM
Dinner & Awards at 6:00 PM
Registration
☐ Check if individual player $215 player
Name:
Company:
E-mail:
Address:
Phone:
Team Name:
Amount Enclosed:
Player #1:Company:Phone:Email:
Player #2:Company:Phone:Email:
Player #3:Company:Phone:Email:
Player #4:Company:Phone:Email:
Billing Information (Please check one) VISA__ MasterCard__
Name as it appears on card:
Card# ______________________________________________ Security#_______________ Expiration Date _____/_____/_____/
$860 per team (4 players) or $215 per individual. Player entry fee includes green fees, lunch, golf cart,
refreshments, and dinner.
(Register online at marinba.org)
Please send your check and registration form to:Marin Builders Association
660 Las Gallinas Ave.San Rafael, CA 94903
Attn: Paula Krause
Additional dinner guests welcome at $40 per person. Registrations are due by September 15th
SAVE!Early Bird SpecialRegister on or before
August 1, 2014 and save $20 per player
HELP SUPPORT
MARIN KIDS!
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 7
2014
A Benefit Event for the Marin Builders Association Scholarship Fund
MONDAY, SEPTEMBER 22, 2014at Marin Country Club, Novato
Check in at 11:00 AM
Shotgun Start at 1:00 PM
Dinner & Awards at 6:00 PM
SponsorshipLevels
Presenting Sponsor $5,000 (1 available) Name/logo listed as Presenting Sponsor on tournament signage, printed ads, website, facebook, event program and thank you ad | Two complimentary foursomes with VIP treatment and up to eight catered dinner tickets Tee Sign | Reserved table | Full page ad in MBA weekly bulletin | Four complimentary tickets to participate
in Putting Contest
Dinner Sponsor $2,500 (1 available)Name/logo listed as Dinner Sponsor on tournament signage, printed ads, website, facebook, event program and thank you ad | One complimentary foursome with VIP treatment and four catered dinner tickets | Tee Sign
Reserved table | Half page ad in MBA weekly bulletin | Two complimentary tickets to participate in Putting Contest
Luncheon Sponsor $1,500 (1 available)Name/logo listed as Luncheon Sponsor on tournament signage, printed ads, website, facebook, event program
and thank you ad | One complimentary foursome with VIP treatment and four catered luncheon tickets Tee Sign | Quarter page ad in MBA weekly bulletin | Two complimentary tickets to participate in Putting Contest
Gold Sponsor $1,250 (ONLY 4 LEFT) Name/logo listed as Gold Sponsor on tournament signage, printed ads, website, facebook, event program and thank you ad | One complimentary foursome with VIP treatment | Two extra catered dinner tickets | Tee Sign
Quarter page ad in MBA weekly bulletin | Two complimentary tickets to participate in Putting Contest
Golf Cart Sponsor $1,000 (1 available)Name/logo listed as Golf Cart Sponsor on golf carts, tournament signage, printed ads, website, facebook,
event program and thank you ad | One complimentary twosome | Tee Sign | Two complimentary tickets to participate in Putting Contest
SOLD OUT
Thanks Ghilotti Construction!
SOLD OUT
SOLD OUT
SOLD OUT
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 8
2014
A Benefit Event for the Marin Builders Association Scholarship Fund
MONDAY, SEPTEMBER 22, 2014at Marin Country Club, Novato
Check in at 11:00 AM
Shotgun Start at 1:00 PM
Dinner & Awards at 6:00 PM
Silver Sponsor $750 (ONLY 3 LEFT) Name/logo listed as Silver Sponsor on tournament signage, printed ads, website, facebook, event program and thank you ad | One complimentary twosome | Tee Sign | One complimentary ticket to participate in Putting
Contest
Wine Sponsor $750 (1 available)Name/logo listed as Wine Sponsor on tournament signage, printed ads, website, facebook, event program
and thank you ad | Two complimentary catered luncheon tickets | Tee Sign | One complimentary ticket to participate in Putting Contest
Happy Hour Sponsor $750 (1 available) Name/logo listed as Happy Hour Sponsor on tournament signage, printed ads, website, facebook, event
program and thank you ad | Two complimentary catered luncheon tickets | Tee Sign | One complimentary ticket to participate in Putting Contest
Putting Contest Sponsor $500 (1 available) Name/logo listed as Putting Contest Sponsor on tournament signage, printed ads, website, facebook, event
program and thank you ad | Tee Sign | One complimentary ticket to participate in Putting Contest
Tee Sign Sponsor $150 (22 available) Name/logo associated with Tee Sign sponsor signage, placed EITHER at tee or green | Name/logo listed as Tee
Sign Sponsor on tournament signage, printed ads, website, facebook, event program and thank you ad
SponsorshipLevels
SOLD OUT
SOLD OUT
SOLD OUT
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 9
2014
A Benefit Event for the Marin Builders Association Scholarship Fund
MONDAY, SEPTEMBER 22, 2014at Marin Country Club, Novato
Check in at 11:00 AM
Shotgun Start at 1:00 PM
Dinner & Awards at 6:00 PM
Team Name:Golfer 1:Golfer 2:
Golfer 3:Golfer 4:
Section 2: Payment Details☐ CREDIT CARD
Card Holders Name:
Credit Card Type: ☐ Visa ☐ Master Card
Card Number: ☐☐☐☐-☐☐☐☐-☐☐☐☐-☐☐☐☐Expiration Date: ☐☐-☐☐ V-Code (3 to 4 digits on the back of the card): ☐☐☐☐Authorized Signature: Date:
☐ Check Enclosed for amount:
Please send completed form to:Marin Builders Association - 660 Las Gallinas Ave., San Rafael, CA 94903 - Fax: 415.462.1225 Email: [email protected]
Sponsorship
Section 1: Registration / Sponsor Contact Information
Company:
Contact Person:
Address:
City: State: Postal Code:
Phone: Email:
Section 2: Sponsorship Opportunities☐ Presenting Sponsor (1) $5,000☐ Dinner Sponsor (1) $2,500☐ Luncheon Sponsor (1) $1,500☐ Gold Sponsor (4) $1,250
☐ Golf Cart Sponsor (1) $1,000☐ Silver Sponsor (3) $750☐ Wine Sponsor (1) $750
☐ Happy Hour Sponsor (1) $750☐ Putting Contest Sponsor (1) $500☐ Tee Sign Sponsor (22) $150
Section 3: Golf RegistrationPlease e-mail logo to [email protected] with sponsor logo in subject line.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 10
www.marinba.org ◆ [email protected]
A Special Seminar
FRIDAY, SEPTEMBER 12TH
8:30 A.M. to 12:30 P.M. COST (due in advance): $150.00 per person
LOCATION: Marin Builders Association 660 Las Gallinas Avenue, San Rafael, CA 94903 (415) 462-1220
MAKE YOUR RESERVATIONS NOW……...DEADLINE IS SEPTEMBER 8TH
Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-892-6596. Make check payable to Larry Levy. Mail to 458 San Marin Drive, Novato, CA 94945
Thank you, Larry. We are planning to come. Enclosed is my check. Names of participants: ___________________________________________________________________________ ___________________________________________________________________________ From (Co. or Org.) ___________________________________________________________________________
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 11
OUTLINE
Overtime Requirements as of January 2014 Overtime Exemptions Make-up Time is Available Alternative Workweeks — New Law Itemization of Wage Statements When does the Work Week begin? Timekeeping Minimum Wage Violations — New Law
Wage Theft — New Law Misclassification of Independent Contractors vs. Employees — New Law Commission Agreements — New Law Meal and Rest Periods — New Laws San Francisco Ordinances— New Laws Compensable (“Comp.”) Time On-Call Time Waiting Time The Company’s vs. the Employees’ Tools Paid Vacation Paid Sick Leave — New Law Paid Holidays Deductions from Paychecks Final Paychecks Frequency of Paying Employees Travel Time — New Law; Heads Up, Contractors! Determining the Difference between Exempt vs. Non-exempt Employees
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 12
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 13
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 14
The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.
LLC’s, SSN’s and INS, oh my! We put a ‘finger’ on some issues with Nevada licensing to get us started on our contractor Q&A. Another contractor needs to avoid digging himself into a hole he can’t get out of, while we have a ‘yes’ and a ‘no’ for two others…
Q: You helped our company with a CA license and now we need your assistance with obtaining a Contractor’s License in Nevada. The entity is a General Partnership with one Partner being a corporation and the other is a LLC, or Limited Liability Company. I understand that we will need to have an Officer/Member/Manager sign on behalf of each entity. The issue we had in California is that all individuals listed on the license application were required to have a US Social Security number (SSN). The personnel that make up each of these entities are not US citizens and they don’t have SSN’s. Is this going to be an issue in Nevada? And does Nevada require that the individuals come to Nevada to get fingerprinted?
A: First of all, thank you for contacting us again. Nevada does not require that all personnel have US Social Security numbers. The Qualifying Individual on the other hand will need to have a SSN or INS card for proof that he/she can work in Nevada. To answer your second question, they don’t need to travel to Nevada to get fingerprinted. They can do the fingerprinting on the fingerprint cards provided
by the fingerprinting agency, or they can request the forms from the NV Board.
Q: I am a “C-27” Landscaping contractor and I have a customer who wants me to re-design and landscape the entire background; including new grass, rock gardens, sprinkler and drip system, a waterfall, etc. As part of the project my customer wants me to construct an in-ground spa next to their existing pool. Am I allowed to do that since it’s part of the overall landscape project?
A: No, you cannot self perform the spa construction. A landscaping contractor may enter in to a contract for the construction of a spa if it’s part of a landscaping project, however you are required to subcontract that portion out to a properly licensed “C-53” Swimming Pool contractor.
Q: I am a “C-36” Plumbing contractor and I have several work trucks that my employees use that have our business name and license number on the side. One of my employees recently said that on a job site he was told by another plumbing contractor that, “we are required to have our address on our trucks” as well. Is that accurate?
A: 7029.5 of the CA Contractors License Law states that every Plumbing contractor (C36), Sign contractor (C45), and Well-drilling (C57)
contractor is required to “have displayed on each side of each motor vehicle used in his or her business…his or her name, permanent business address, and contractor’s license number”, so yes, what your employee was told is in fact accurate.
Q: We have pending litigation against a contractor who we are fairly certain “fibbed” on his work experience in order to obtain his license. We would like to get a copy of his Certification of Work Experience that he originally submitted. Is that something that you can help with?
A: No, while we can assist with obtaining copies of a Contractor’s entire file, the Certification of Work Experience form is considered personal and confidential so the only way to get a copy of that is to Subpoena it. Even then, certain entries would be redacted from the form such as the third person information.
While knowledge is power, knowing where to go for the answers
is half the battle. Get expert assistance immediately when you call
866-443-0657, email [email protected], or write us at Capitol
Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814.
Research past columns at www.cutredtape.com.
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 15
New MBA Workers’ Comp Program Reduces Rates by 15-25%!
George Petersen Insurance Agency
George Petersen Insurance Agency175 W. College AvenueSanta Rosa, CA 95401
1.800.236.9046 | 707.525.4150Fax 1.888.579.2843 | 707.525.4175
License #0603247www.gpins.com
Brought to you by:
Endorsed Broker of the
Reasons to join the MBA Insurance Program
1.
2.
3.
4.
5.
For more information, please contact:
Bruce Okrepkie: 707.360.4117 or [email protected] Walters: 707.525.4168 or [email protected] Parsons: 707.525.2715 or [email protected]
MBA members receive preferred pricing through exclusive carrier
Access to exclusive online Human Resources and Safety & Loss Control portal
Work with one of three highly knowledgeable agents who specialize in construction.
Outstanding customer service
Continued access to MBA’s safety programs
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 16
Also In This Update• Bills Signed by the Governor• Update on Remaining BIG Issues• Drones Could Help Check If Buildings
and Bridges Are Safe• Hearing On Proposed Heat Illness
Prevention Standards Set
They’re Baaack!The Legislature returned this week ‘bright eyed and bushy tailed’ after a month-long recess. Jumping out of the starting blocks first thing Monday morning was a hearing in the Senate Appropriations Committee. Most of the remaining ‘bad’ bills were set to be heard in this committee and, thankfully, most were held under suspense in committee due to their costs to the state. Although the committee will decide on Thursday, August 14th which bills will survive and which will remain held on suspense, chances are good that most, if not all, will be dead for the year (but I will have to remain vigilant the remainder of the month to ensure they don’t ‘pop up’ as a ‘gut and amend).’ Following are the ones of largest interest to us and their outcome.
AB 52 (Gatto) – Held on Suspense - Would allow Indian Tribes to challenge virtually any proposed construction project contending that it is a sacred site or other designation, even if it is not within their current tribal boundaries. This measure, if it were to pass, could make the current CEQA process seem like a ‘walk in the park!’
AB 1522 (Gonzalez) - Held on Suspense - Would enact the Healthy Workplaces, Healthy Families Act of 2014 to provide that an employee who on or after July 1, 2015, works in California for 7 or more days in a calendar year is entitled to paid sick days, to be accrued at a rate of no less than one hour for every 30 hours worked. An employee would be entitled to use accrued sick days beginning on the 90th calendar day of employment.
AB 1634 (Skinner) - Held on Suspense - Would prohibit the Division of Occupational Safety and Health a stay of an abatement period during the pendency of an appeal of a citation for a violation that is classified as a serious violation, repeat serious violation, or willful serious violation. The bill would, however, authorize the Division of Occupational Safety and Health to stay these abatement periods, upon request, if the division determines that a stay will not adversely affect the health and safety of employees.
AB 1650 (Jones-Sawyer) - Held on Suspense - This bill would require any person submitting a bid to the state on a contract involving onsite construction-related services to certify that the person does not ask an applicant for onsite construction-related employment to disclose orally or in writing information concerning the conviction history of the applicant on or at the time of an initial employment application. This bill would not apply to a position for which the person or the state is otherwise required by state or federal law to conduct a conviction
history background check or to any contract position with a criminal justice agency.
AB 1705 (Williams) – 5% Retentions – Passed out of committee - Defines ‘substantially complex’ to ensure that, in particular, school districts don’t classify every project as substantially complex which under current law allows them to require the full 10% retention instead of 5%.
AB 1723 Nazarian D - Employees: wages. – Passed out of committee - Current law authorizes the Labor Commissioner to recover liquidated damages for an employee who brings a complaint alleging payment of less than the minimum wage fixed by an order of the commission or by statute. This bill would expand that penalty, restitution, and liquidated damages provision for a citation to also subject the employer to payment of any applicable penalties for the willful failure to timely pay wages of a resigned or discharged employee.
AB 1897 Hernández, Roger D- Labor contracting: client liability – Held on Suspense -Recently amended to not affect business entities with a workforce of less than 25 workers including those hired through a temp agency unless they are supplying more than 5 workers at one time, it would require a employer to share with a temp agency all civil legal responsibility and civil liability for the payment of wages, the obligation to provide a safe working environment and workers
THEY’RE BAAACK!by Phil Vermeulen, MBA Legislative Advocate
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 17
www.marinba.org ◆ [email protected] ◆ [email protected]
compensation coverage.
AB 2188 (Muratsuchi) – Solar Permit Streamlining - Passed out of committee - Requires cities and counties to adopt an ordinance streamlining the permit process for small rooftop solar energy systems. Unfortunately, the streamlining would be at the expense of virtually every other type of construction permit which could result in lengthy delays for other types of permits and approvals. This measure was recently amended removing the mandatory 5 day turnaround; however, even with this amendment, the League of California Cities and most construction groups still oppose this measure.
AB 2271 Calderon, Ian D - Employment: discrimination: status as unemployed - Held on Suspense -Would make it unlawful, unless based on a bona fide occupational qualification or any other provision of law, for an employer, an employment agency, or a person who operates an Internet Web site for posting jobs in this state to publish an advertisement or announcement for any job that includes provisions pertaining to an individual’s current employment or employment status.MBA’s Bill AB 2355 (Levine) - Held on Suspense -MBA’s bill that would require local governments to either adopt the January 1, 2017 Cal Trans recycling mandate for roadways or discuss in a public hearing why it has not, was sent to Suspense back in late June. While debatable, the committee consultants believe that a local government could bill the state for the costs to adopt the Cal Trans mandate and that the potential cost to the state could far exceed the $50,000 threshold. The consultants have informed our author, Assemblyman Marc Levine that they believe the bill will ultimately be approved. This is important since the Department of Finance has also previously raised this concern about costs the state which
could be a reason for the governor to ultimately veto the bill. As with the remainder of the bills on suspense, we will know the outcome next Thursday, August 14th
AB 2416 Stone D - Liens: laborers and employees - Held on Suspense -This bill would allow an employee to record and enforce a wage lien against all of his employer’s real property for failure to pay any wages and other compensation, penalties, and interest owed to the employee. Amendments were recently taken that state if a court or the Labor Commissioner sends to the employer an order stating that the employee does not have a reasonable likelihood of success on their claim, then the lien must be extinguished within 30 days or receive attorney’s fees and a fine of up to $1,000.
On Wednesday of this week, the Assembly Appropriations met. Following is the outcome of bills that were set:
SB 315 Lieu D - Contractors’ License Board Enforcement Capabilities – Passed out of committee - Would allow the CSLB’s enforcement staff when participating in a joint strike operation against the underground economy to enter any place of business that has labor present.
SB 785 (Wolk) – Design Build - Passed out of committee - This bill repeals existing law authorizing state and local agencies to use the design/build procurement process, and enacts uniform provisions authorizing this process for specified public works projects costing more than $1 million. This bill does not include projects on the state highway system or school construction projects.
SB 1077 DeSaulnier - Vehicles: mileage-based fee pilot program – Held on Suspense -
Would establish a Mileage-Based Fee (MBF) Task Force within the California Transportation Commission. The bill would require the task force to study MBF alternatives to the gas tax and to make recommendations to the Department of Transportation and the commission on the design of a pilot program.
SB 1159 (Lara) – Use of Individual Taxpayer ID in Lieu of SSN # - Held on Suspense - This bill would allow applicants or licensees to provide an individual’s taxpayer identification number (ITIN) in lieu of a SSN to a licensing board. This bill resolves inconsistencies throughout the code and provides additional identification options to applicants and licensees, thereby increasing access to California professional licenses to immigrants according to the author.
Signed Into Law By The Governor
AB 1939 (Daly) - Public works: prevailing wages: contractor’s costs. Chapter 161 of 2014 Statutes – Will authorize a contractor to bring an action in a court of competent jurisdiction to recover from the public agency they are performing the work for any increased costs, including labor costs, penalties, and legal fees incurred as a result of any decision by the Department of Industrial Relations, the Labor and Workforce Development Agency, or a court that classifies, after the time at which the public agency accepts the contractor’s bid, awards the contractor a contract when no bid is solicited, or otherwise allows construction to proceed, the work covered by the project, or any portion thereof, as a public work. The bill takes effect January 1, 2015.
AB 2376 (Weber) - State construction projects: insurance. Chapter 115 of 2014 StatutesCurrent law generally prohibits property belonging to the state from being insured
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 18
www.marinba.org ◆ [email protected] ◆ [email protected]
against risk of damage or destruction by fire, with specified exceptions. Existing law, notwithstanding this general prohibition, authorizes the Director of General Services to establish a master builders’ risk insurance program for all state construction projects during construction. This bill will require the contractor’s deductible under a master policy to be outlined in the request for bids or proposals.
Update On Big Issues
Besides the aforementioned, there are several BIG issues that the Legislature is dealing with.
Water BondI have previously reported that the long-delayed water bond approved by the Legislature years ago is now on the November ballot. It is proposing a roughly $11.1 billion water bond that includes some storage and lots of ‘pork.’ Polling shows it will be rejected so the governor has announced he is developing his own replacement bond that would be valued at around $6 billion.
My ‘inside sources’ told me yesterday they are urging the governor to drop his replacement water bond efforts. Polling shows that even a $6 billion bond would likely fail. So, it means that the $11.1 billion bond loaded with pork will remain on the ballot as is and will be rejected by the voters. It will likely be 2016 before another bond comes before the voters; however, with reports in today’s paper that the El Nino effect in the Pacific Ocean disappearing, chances of a fourth-year drought this winter have greatly increased, meaning that a costly emergency bond measure and/or other governmental actions in 2015 could appear. Stay tuned.
School Bond – Set to be heard in Senate Appropriations Committee next week, this bill would place
on the November ballot the “Kindergarten-University Public Education Facilities Bond Act of 2014” for an undecided (at this time) amount of billions of dollars. Following is a recent article that discusses the need for this bond measure.
California Needs a Statewide School BondBy Joe DixonChair of the Coalition for Adequate School Housing
The Coalition for Adequate School Housing (C.A.S.H.) announced leading a radio and television issue advocacy effort in support of Assembly Bill 2235, a measure that would allow voters to decide this November on urgently needed funding for school facilities throughout the state.
California schools are aging, desperately in need of billions of dollars in repairs, upgrades and technology to prepare students for today’s workforce. This backlog grows by the day and our schools need new funding.
It has been nearly a decade since California provided state voters with the opportunity to vote on a statewide school bond.
There are no more construction dollars. Local districts are doing their part to partner with the state, it’s time for the state to meet their end of the bargain.
Since its inception, the state facilities funding program has overseen the construction of safe and secure classrooms for over 1.3 million of California’s children and modernized facilities for over 3.4 million more. State funds are disbursed when they can be matched with local district funds, providing for a strong state and local partnership.
With the State of California’s Department of Finance projecting that 343,000 new students will be entering the public school system within the next decade, it is critical that schools be able to meet the facilities needs of the incoming children and the existing 6.2 million students currently enrolled in California’s K-12 public school system.
Also supporting this critical issue advocacy effort is the California Building Industry Association.“Providing our children with safe and modern schools has always been a top priority of new homebuyers and our industry,” said Dave Cogdill, CEO of the California Building Industry Association. “Preservation of California’s successful school facilities program is essential for our long-time educational allies and the overall health of our fragile state economy,” added Cogdill.A study by the Center for Strategic Economic Research found that the existing $3 billion pipeline of new school construction and modernization work could result annually in more than 15,000 new jobs, $990 million of employee compensation (salaries/wages and benefits), $99.8 million in state and local tax revenue and more than $2.5 billion in additional economic benefits for California’s economy.
Both the radio and television issue advocacy ads stress the importance of allowing voters the opportunity to approve new funding for school facilities and calling on state policy makers to approve AB 2235.
It’s critical that we put our Children first and that voters be given the chance to decide on whether or not to maintain a school funding program essential to students and their success. We strongly believe that if given that opportunity voters will ultimately make the right decision, but first we need California’s
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 19
www.marinba.org ◆ [email protected] ◆ [email protected]
policy makers to give them that opportunity by passing and signing into law AB 2235.
To view or listen to the ads please click on each respective link, TV Spot - https://vimeo.com/101972091 and Radio Spot -https://vimeo.com/101973835
Cap and Trade Tax On FuelsDid you know that starting on January 1, 2015 transportation fuels (gasoline and diesel) will start being taxed under the AB 32 program known as the ‘cap and trade program.’ Assemblyman Henry Perea has amended his AB 69 to roll back this new tax for several years while a more definitive study is performed to determine the true impact it would have on the economy, were this tax to take effect next January it would add the following costs to gasoline. Assemblyman Perea also asked the Legislative Analyst’s office (LAO) to do a study that would estimate the true effects were this tax to take effect next year. I have attached the entire letter from the LAO, but highlights state:
“Your staff asked us about some of the effects of including transportation fuels in California’s cap-and-trade program. In particular, they asked us to summarize and comment on estimates of the effects of that action on the retail price of gasoline. As we discuss in this letter, the studies we reviewed suggest that, by 2020, the resulting price increase likely will be about 13 cents to 20 cents per gallon, but the price increase could exceed 50 cents per gallon. The actual price increase will depend on a wide variety of economic, technological, and regulatory factors that are difficult to predict. We note that if transportation fuels were not part of the cap-and-trade program, alternative policies to meet the AB 32 emissions targets might be adopted that also have the effect of increasing gasoline prices.” Again, I am attaching the full letter so you can read it in detail if you like. I should add, politically,
this measure has little chance of making it out this year, meaning that the tax will go into effect on January 1st. I should add, disturbing to many is the power the California Air Resources Board has on the state that far exceeds the power of the Legislature! It truly is a ‘Frankenstein Monster!’
Drones Could Help Check If Buildings and Bridges Are SafeBy Kevin Ebi.After a disaster, inspectors may have to put their lives at risk to get a close look at damage to buildings and critical infrastructure to keep the public safe. But thanks to German researchers who have developed an inspection drone, soon they may not have to.
The technology may also help engineers better assess structures even before disaster strikes by allowing them to cover more ground in more detail in less time.
Providing a rich detailThe drone is an octocopter, a remote-controlled helicopter that has eight rotors. Special sensors help it detect and adjust for wind and keep it safely away from the structure it’s inspecting.
But the real power is in its on-board imaging systems. A high-resolution digital camera can capture exquisitely detailed images. Images can even be combined to give building engineers a three-dimensional view.
That’s a huge boost for inspectors who have largely been limited to what they can see with their own eyes. In many cases, performing detailed inspections has been hugely laborious and required extensive set-up.
A thermal imaging camera could also be added to measure the effectiveness of the building’s insulation.
More information in less timeBecause of the ease at which the drone can reach tough spots, it can complete a detailed survey of an area in two or three hours that would take a human two or three days to personally inspect.
The developers are also working on the ability for the drone to fly completely on autopilot. The next phase of the project is to allow the drone to fly on pre-programmed tracks.
One final note, in today’s Capitol Alert was notice of a hearing today about drones: “But when the skies fill with hovering eyes, what becomes of personal privacy? A joint hearing of three Assembly committees will take a look today. Witnesses at the “Drones in our Future: Opportunity and Privacy Considerations” meeting will include representatives from the Aerospace States Association, the California Broadcasters Association, the American Civil Liberties Union, UCLA Law School and the sheriff’s departments of Ventura and Los Angeles County, respectively.”
Hearing to Decide if Heat Illness Prevention Standards SetThis just in, the Occupational Standards Board just announced that a hearing has been scheduled for Thursday, September 25th in San Diego. To access the information, go to: http://www.dir.ca.gov/oshsb/documents/noticeSep2014.pdf
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 20
Material Handling - Hand Truck Safety
Hand trucks are effective for reducing strain while moving heavy materials. However, injury can still occur. Use the following tips to prevent strains, trips and falls when using a hand truck. Lifting practices:
• Load and unload the hand truck carefully, following proper lifting technique. − Always keep your back straight while lifting.
• Get help if the load is too bulky for proper lifting techniques to work or if the load cannot be handled safely for any reason.
Before moving a load:
• Prepare the path. − Inspect and clear your path for ease of movement. − Use ramps if the path has stairs or curbs. − Measure openings to be sure that there is enough space. − Clear the set point.
• Ensure that you have a good view of your path. The load should not be so tall that it obscures your vision.
• Put the heaviest part of the load on the bottom of the hand truck. • Secure the load as needed, and ensure that the straps are tight. • Inspect equipment before use. • Check the tire pressure. Balloon-type tires are more
prone to losing pressure, adding strain on the person pushing the hand truck.
Using the hand truck:
• Grip the hand truck firmly. Push with a straight back, leaning into your walk.
• Walk forwards, unless you are trapped in a tight space. • Push or pull loads with both hands. • Tilting the truck back enables you to push the load uphill
more easily, but be aware that this action increases the overall weight that you are carrying.
General safety:
• Ensure that you are trained and authorized for work.
• Wear supportive, closed toe, and non-slip shoes.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 21
Material Handling - Hand Truck Safety
This form documents that the training specified above was presented to the listed participants. By signing below, each participant acknowledges receiving this training. Organization: Trainer: Trainer’s Signature: _____ Class Participants: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Remember to load your completed trainings into the Risk Management Center.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 22
Manejo de materiales - Seguridad de carretillas de mano
Las carretillas de mano son afectivas para reducir la presión al mover materiales pesados. Sin embargo, todavía las lesiones pueden ocurrir. Utilice los consejos siguientes para prevenir presión, tropiezos y caídas al usar una caretilla de mano. Pautas de levantamiento: • Cargue y descargue la carretilla de mano con cuidado, siguiendo la técnica correcta de
levantamiento. − Mantenga la espalda recta mientras levanta.
• Consigue ayuda si la carga es demasiado inmensa para levantarla con técnica correcta o si la carga no puede ser manejado con seguridad por cualquier razón.
Antes de mover la carga: • Prepare el camino.
− Inspeccione y vacíe su camino para facilidad de movimiento. − Utilice rampas si el camino contiene escaleras o bordillos. − Mida las brechas para asegurarse que hay espacio suficiente. − Vacíe el punto de descarga.
• Asegúrese que tenga una vista suficiente de su camino. La carga no debe ser demasiada alta que oculte la visión.
• Coloque la parte más pesada de la carga en la parte de abajo de la carretilla de mano.
• Amarre la carga como necesario y asegúrese que las correas estén apretadas.
• Inspeccione el equipo antes de utilizar. • Compruebe la presión del neumático. Los neumáticos de
globo son más propensos a perder presión, lo cual agrega presión a la persona que empuja la carretilla de mano.
El uso de la carretilla de mano: • Agarre la carretilla de mano firmemente. Empuje con la
espalda recta, echándose hacia adelante, en la dirección de su camino.
• Camine adelante, a menos que esté atrapado en un espacio reducido.
• Empuje o tire las cargas con ambos manos. • Reclinar la carretilla le permite empujar la carga en subida
con más facilidad, pero tenga en cuenta que esta acción aumenta el peso total que lleva.
Seguridad general:
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 23
Manejo de materiales - Seguridad de carretillas de mano
• Asegúrese que está capacitado y autorizado a trabajar.
• Use zapatos soportantes, cerrados y antideslizantes.
Este formulario documenta que los participantes mencionados recibieron la capacitación que se detalla más arriba. Al firmar a continuación, cada participante reconoce haber recibido dicha capacitación. Organización: _____ Instructor: Firma del instructor: _____ Participantes de la clase: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: ______ Fecha: Nombre: _____ Firma: Fecha:
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 24
www.marinba.org ◆ [email protected] ◆ [email protected]
RETURNING BY POPULAR DEMAND . . . . . . . . . .
ENJOY A CLEAN CAR!!
and
SUPPORT OUR SCHOLARSHIP PROGRAM!
Marin Builders Association in partnership with
Matt & Jeff’s Car Wash is providing an opportunity to get a top quality car wash
and support the MBA Scholarship Fund Matt & Jeff’s will donate 50% of car wash price to the Scholarship Fund
Price:
$24.95 for a full service car wash
How: MBA Office, 660 Las Gallinas Avenue. San Rafael
Reserve tickets by calling Barbara at 462-‐1220 or send an email to [email protected]. We can bill your membership account!
You get: Full service car wash – takes approximately 15 minutes
Car wash tickets never expire! Offer is available 7 days a week
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 25
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Owner Contractor Address Parcel # Construction ValueRosenbaum Stacey & Evan OWNER/BUILDER 2058 Huckleberry Rd San Rafael 164-013-03 (23) Kitchen Remo $15,000 Li Chih ATTICO ENTERPRISE INC 57 Milland Dr Mill Valley 043-361-10 (56) Siding Over $30,000 Griffin Nicholas D & More LINSCOTT ENG. CONTR 522 The Alameda San Anselmo 177-133-07 (55) Foundation & $15,000 Camilleri Gioacchino T Tr THE HOME DOCTORS INC 406 Tennessee Glen Way Mill Va 052-560-04 (53) Tear-Off & R $45,000 Knoles Terrence & Emily OWNER/BUILDER 429 Calle De La Mesa Novato 160-182-07 (23, 24) Convert $75,000 Cooke Alison M & SALGO CONSTRUCTIONS 285 Morning Sun Ave Mill Valle 051-272-27 (22,13,57) Struct $50,000 Scott James R & BUILDING LAB 112 Bretano Way Greenbrae 070-201-06 (13,23) Rmdl 2 Ba $150,000 Marshall Casey CHARLES WINDOW AND DOOR 11870 State Route 1 Point Reye 119-183-07 (56) Siding $22,000 Schmitt Cathleen /Tr/ CHARLES WINDOW AND DOOR 32 Silver Hills Rd Point Reyes 166-150-24 (58) Repl 5 Wndws $18,000 Monahan Thomas /Tr/ & E AGAPE ALL AMERICAN ROOFIN 61 Bridgegate Dr San Rafael 164-570-12 (53) Reroof $39,140 Reinsdorf Laurie N MIGUEL VELASQUEZ 316 Via Recodo Mill Valley 200-302-17 (23,13) Rmdl Kit, $100,000 Rivett-Carnac Christopher KORHUMMEL, PAUL FREDERICK 152 Perth Way Inverness 112-201-12 (12) Det. Garage $50,000 Development Solutions Pc BEACH STREET BUILDERS 225 Trinidad Dr (Lot #9) Tibur 038-460-09 (20--1/5, 12) New $400,000 Development Solutions Pc BEACH STREET BUILDERS 225 Trinidad Dr (Lot #9) Tibur 038-460-09 (11) Retaining Wa $10,000 Development Solutions Pc BEACH STREET BUILDERS 229 Trinidad Dr (Lot #10) Tibu 038-460-10 (20--1/5, 12, 13) $425,000 Development Solutions Pc BEACH STREET BUILDERS 229 Trinidad Dr (Lot #10) Tibu 038-460-10 (11) Retaining Wa $10,000 Development Solutions Pc BEACH STREET BUILDERS 233 Trinidad Dr Tiburon 038-460-11 (20--1/6, 12, 13) $450,000 Development Solutions Pc BEACH STREET BUILDERS 237 Trinidad Dr (Lot #12) Tibu 038-460-12 (20--1/6, 12, 13) $480,000 Development Solutions Pc BEACH STREET BUILDERS 241 Trinidad Dr (Lot #13) Tibu 038-460-13 (20--1/5, 12, 13) $400,000 Zahn Lynda J Revoc Trust DESIGN / BUILD ALLIANCE I 6910 Sir Francis Drake Blvd Fo 168-141-06 (54, 56) Replace $12,000 Perrin Daniel & Neuman SKYLINE ROOFING 305 Dolan Ave Mill Valley 050-231-10 (53) Tear-Off, Re $14,691 Cunningham Keith& Mezo OWNER/BUILDER 33 Pikes Peak Dr San Rafael 164-411-06 (23) Master Bath $12,000 Segars David Q & REC SOLAR INC 316 Goodhill Rd Kentfield 074-171-10 (60) Rf Mtd P V S $56,000 Leveroni David H Iv /Tr/ HENRIS ROOFING INC 3100 Novato Blvd Novato 125-100-12 (53) Reroof $13,500 Grothe Howard SOLARCRAFT SERVICES 90 Old Ranch Rd Novato 146-310-14 (60,61) Rf Mtd P $40,825 Skinner Dana CALIFORNIA CONSTRUCTION 658 Edgewood Ave Mill Valley 046-320-09 (93) Cosmetic Fou $20,000 Skinner Dana CALIFORNIA CONSTRUCTION 658 Edgewood Ave Mill Valley 046-320-09 (62,11) Demo Gara $15,000 Wilka William & Theresa OWNER 108 Woodland Rd Kentfield 074-261-11 (23) Rmdl Ma Ba - $27,000 Farrell Thomas E & PENNY, DAVID CONST. SVCS 435 Oceana Dr Dillon Beach 100-342-05 (56) Siding On 2 $20,000 Skywalker Properties Ltd WRIGHT CONTRACTING INC 3838 Lucas Valley Rd Nicasio 164-310-02 (92) Install Catw $35,000 Hale Matthew C /Tr/ & HENDRICKSON POOLS, INC. 19 Manor Rd Greenbrae 071-201-22 (10,12,13) New Po $180,000 Ewry Scott /Tr/ & SUPERIOR ROOFING 1 Villa Ct Kentfield 071-161-12 (53) Reroof $14,800 Dominique Torkel J OWNER/BUILDER 828 Marin Dr Mill Valley 049-223-15 (22) Rmdl Ba; New $10,000 Wagner Richard & Carole MCGOVERN SKYLIGHT SPECIAL 5 Mather Rd San Anselmo 176-132-01 (57) Add Skylight $19,000 Chow Stanley & Gabrielle ARMUSEWICZ, RICH 315 Vista Grande Greenbrae 070-041-17 (23,50) Rmdl Kit; $36,000 Elliott Daniel C Tr & CASCADE ROOFING CO 170 Maestro Rd Novato 146-321-45 (53) Reroof $24,000 Folsom Revoc Liv Trust CHARLES WINDOW AND DOOR 119 Buena Vista Ave Stinson Be 195-191-06 (56) Repl Siding $17,000 Lowe Matthew R & SOLARCITY CORPORATION 210 Goodhill Rd Kentfield 074-172-02 (60) 8.67 Kw Roof $18,000 Sierra Asset Servicing Ll OWNER/BUILDER 373 School Rd Novato 143-411-12 (53) Tear Off & R $12,950 Blake Desmond & Joanne AMERICAN HOME RENEWAL 472 Miller Creek Rd San Rafael 164-123-24 (58) Replace 16 W $24,000 Tomita Kenji Tr & ABRIL ROOFING CO 12 Mt Tioga Ct San Rafael 164-391-10 (53) Reroof $15,650 Longstreth Trust Etal OWNER/BUILDER 10 Balmoral Way Inverness 112-143-11 (58) Replace Wind $10,000 San Francisco Zen Cntr PRUNUSKE CHATHAM INC 1601 Shoreline Hwy Mill Valley 200-020-21 (12) Repl Steel P $255,909
COUNTY OF MARIN PERMITS ISSUED
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 26
COUNTY OF MARIN PERMITS RECEIVEDAddress Owner Work Value75 Westwood Dr Kentfield Carbone Alison E /Tr/ (21,22) Add Master Suit And Re $75,000454 Wellesley Ave Mill Valley Sapp B Daniel /Tr/ & Etal (13) Add Sliding Door, Upper D $15,00082 Vista Del Sol Mill Valley Nishiguchi Nathan & Etal (11) Ret Wsll $40,00082 Vista Del Sol Mill Valley Nishiguchi Nathan & Etal (20--1/3,12,13 ) New Sfd W/Att $1,000,000125 Stuyvesant Dr San Anselmo Corr-Merrill Trust Etal (55) Voluntary Underpinning Fo $60,0001601 Shoreline Hwy Mill Valley San Francisco Zen Cntr (12) Construct New Laundry Roo $17,00010 Sacramento Patio Stinson Beach Brown Edward /Tr/ & (21--1/2, 12,13) Add 2 Bdrms; $220,000307 Reed Blvd Mill Valley Beuhler Frank B Tr & Helen M Tr (13) Replace 2 Upper And 2 Low $35,00075 Poplar Dr Kentfield Miller Carl A /Tr/ Etal (21, 22, 24) Add 3rd Fl, Remod $200,0002 Fawn Ct San Anselmo Gustafson Jeffrey 2002 Revoc Inter- (10) New Pool & Spa $75,00020 Manzanita Ave Novato Tang Hui Y S (11,93) Ret Wall, Repl Stair $10,00020 Manzanita Ave Novato Tang Hui Y S (23,50,58) Rmdl Kit & 2 Bas; R $32,000235 Laverne Ave Mill Valley Ogloza Darius & Lora M (60) Roof Mounted Photovoltaic $25,00014 Fay Dr Kentfield Meckler, Adelson (22,50,57) Structural Roof Rep $75,00033 Pikes Peak Dr San Rafael Cunningham Keith J & Mezo Nicole P (23) Master Bath Remodel - Exp $12,000316 Goodhill Rd Kentfield Segars David Q & (60) Rf Mtd P V Sys 7.6 K W - $56,00090 Old Ranch Rd Novato Grothe Howard (60,61) Rf Mtd P V Sys 6.95 K $40,825108 Woodland Rd Kentfield Wilka William & Theresa Fam Trust 200 (23) Rmdl Ma Ba - Express $27,000828 Marin Dr Mill Valley Dominique Torkel J (22) Rmdl Ba; New Beam & Joist $10,0005 Mather Rd San Anselmo Wagner Richard H & Carole R (57) Add Skylights - Express $19,000210 Goodhill Rd Kentfield Lowe Matthew R & (60) 8.67 Kw Roof Mount Photov $18,000
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
CITY & TOWN PERMITS ISSUEDCity/Town Issue
DateOwner Contractor Site Address Type Valuation
Tiburon 7/14 David & Deborah Walton Owner Builder 3 Juno Road Remodel $50,000 Tiburon 7/15 Lori Buckley Christensen
Construction8 Upper Cecilia Way
Remodel $90,000
Tiburon 7/15 Ryan & Angela McInerney
Dromhus Inc 60 Mount Tiburon Road
Remodel $42,000
Tiburon 7/16 Lisa McCubbin Michael Stone 1912 Mar West Street
Remodel $41,549
Tiburon 7/16 Mary Bender Lema Construction 5 Felipa Court Replace wood deck $20,000 Tiburon 7/17 Kristen Armstrong Altura Construction Inc 3 Janet Way #26 Kitchen and Bath
Remodel $28,000
Tiburon 7/17 John Wang Kenwood Fence Company, Inc.
98 Sugar Loaf Drive
Fence $14,780
Tiburon 7/21 Adam & Tamazin Heher Mason Austin 75 Pamela Court Remodel $10,000 Tiburon 7/22 Belvedere Land Co Marvel Construction 1550 Tiburon Blvd Resurfacing $160,000 Tiburon 7/28 Emese Toth & Ted
SchroederM2 Landscape & Construction
270 Karen Way Addition $130,000
Tiburon 7/28 Michael Turan Merritt- Nelson Custom Builders
672 Hawthorne Drive
Repair $36,000
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 27
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Tiburon 7/28 Todd Werby & Nonie Green
Dan Gillies Construction Services, Inc.
200 Diviso Street Addition $100,000
Tiburon 7/28 Tiburon Peninsula Club Terra Nova Industries 1600 Mar West Street
Remodel $300,000
Tiburon 7/29 Michael Etemad The Solar Company Inc 15 Venado Drive Solar $25,000 Tiburon 7/30 Brenda Foster A1 Solar Power Inc 396 Greenwood
Beach RoadSolar $22,500
Tiburon 7/30 Paul & Ellen Stein DRL Builders 4 Cibrian Drive Kitchen Remodel $45,000 Tiburon 7/31 Jeff and Lori Runnfeldt Floyd Construction 193 Gilmartin
DriveKitchen Remodel $70,000
Tiburon 8/4 Toremi 1994 Rev Trust Apartment Services Company
4 Davis Drive #A Leak Repair $11,000
Tiburon 8/4 St Hilary School Handy Construction Team Inc
765 Hilary Drive Interior Remodel $13,000
Tiburon 8/5 Kenneth Kahn Solarcity Corporation 75 Spring Lane Solar $25,000 Tiburon 8/5 Robert Tomasello Bill Sweeney
Construction22 Lagoon Vista Remodel $15,000
CITY & TOWN PERMITS ISSUED (continued)
YOUR AD HERE!
For current rates and information contact Paula at
415.462.1220 or [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 28
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
COMPLETIONSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/5 CARBERRY CONSTRUCTION (I) (none) COMPLETION 2014-00323508/5 FOLEY-ELLIOTT FAMILY LIVING TRUST (I) (none) COMPLETION 2014-00323508/5 JCCC CALIFORNIA PROPERTIES LLC (I) (none) COMPLETION 2014-00322018/5 MOUTAFIAN RUTHIE PETTY (I) (none) COMPLETION 2014-00323408/5 MOUTAFIAN TODD (I) (none) COMPLETION 2014-00323408/5 REEVE-KNIGHT CONSTRUCTION INC (I) (none) COMPLETION 2014-00322018/5 SCHALICH BROTHERS (I) (none) COMPLETION 2014-00323408/6 CITY OF MILL VALLEY (I) (none) COMPLETION 2014-00323848/6 D & D PIPELINES INC (I) (none) COMPLETION 2014-00325578/6 MARIN MUNICIPAL WATER DISTRICT (I) (none) COMPLETION 2014-00325578/6 TEAM GHILOTTI INC (I) (none) COMPLETION 2014-00323848/8 CAMINO RAMON ASSOCIATES LLC (I) (none) COMPLETION 2014-00328988/9 DRESBACH JAMES A /TR/ (I) (none) COMPLETION 2014-00329618/9 DRESBACH PAMELA /TR/ (I) (none) COMPLETION 2014-00329618/9 MICHAEL C CUNNINGHAM LIVING TRUST
(I)(none) COMPLETION 2014-0032961
HOMESTEADSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/9 DEAN D LEHR 2009 TRUST (I) (none) HOMESTEAD 2014-00329388/9 LEHR DEAN D (I) (none) HOMESTEAD 2014-00329388/9 LEHR DEAN D /TR/ (I) (none) HOMESTEAD 2014-0032938
LIENSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/5 GOLDEN STATE LUMBER INC (E) JARVIE DANIELLE A (O) LIEN 2014-00322118/5 GOLDEN STATE LUMBER INC (E) JARVIE DAVID A (O) LIEN 2014-00322118/9 MARINER TOWNHOUSE OWNERS ASSO-
CIATION (E)ABELLA FRANCIS (O) LIEN 2014-0033116
8/9 MARINER TOWNHOUSE OWNERS ASSO-CIATION (E)
ABELLA KIMULI (O) LIEN 2014-0033116
8/9 TURNER & TAYLOR METAL WORKS INC (E)
SHAY JAMES (O) LIEN 2014-0032932
8/9 TURNER & TAYLOR METAL WORKS INC (E)
SHAY JAMES L (O) LIEN 2014-0032932
8/9 TURNER & TAYLOR METAL WORKS INC (E)
SHAY KAREN (O) LIEN 2014-0032932
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 29
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
RELEASE OF LIENSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/5 PIERCECO PROPERTIES (E) AMERICAN TECHNOLO-GIES INC (O)
RELEASE OF LIEN 2014-0032162
8/6 RICE YISRAEL /TR/ (E) LUCAS VALLEY HOME OWNERS ASSOCIATION INC (O)
RELEASE OF LIEN 2014-0032502
8/6 ROSS PRISCILLA /TR/ (E) LUCAS VALLEY HOME OWNERS ASSOCIATION INC (O)
RELEASE OF LIEN 2014-0032501
8/6 ROSS RICHARD /TR/ (E) LUCAS VALLEY HOME OWNERS ASSOCIATION INC (O)
RELEASE OF LIEN 2014-0032501
8/7 O HANLON CHRISTINE M (E) CORTE MESA HOMEOWN-ERS ASSOCIATION (O)
RELEASE OF LIEN 2014-0032651
8/8 AIMCO MADERA VISTA LLC (E) BRAND ENERGY SER-VICES OF CALIFORNIA INC (O)
RELEASE OF LIEN 2014-0032815
8/8 AIMCO MADERA VISTA LLC (E) BRAND ENERGY SER-VICES OF CALIFORNIA INC (O)
RELEASE OF LIEN 2014-0032816
8/9 DUARTEAU KAREN (E) BOWERS PLUMBING SER-VICE (O)
RELEASE OF LIEN 2014-0032928
8/9 MUGHANNAM OMAR (E) WESTERN OAKS VILLAGE ASSOCIATION (O)
RELEASE OF LIEN 2014-0032995
8/9 MUGHANNAM SUMAYA (E) WESTERN OAKS VILLAGE ASSOCIATION (O)
RELEASE OF LIEN 2014-0032995
TAX LIENSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/5 FRANCHISE TAX BOARD (E) LANGDON GROUP LLC (O) TAX LIEN 2014-00322608/5 FRANCHISE TAX BOARD (E) LATINO SERVICIOS NO-
VATO LLC (O)TAX LIEN 2014-0032261
8/5 FRANCHISE TAX BOARD (E) MECCP - 22 LLC (O) TAX LIEN 2014-00322628/5 FRANCHISE TAX BOARD (E) CAMERA THOMAS F (O) TAX LIEN 2014-00323178/5 FRANCHISE TAX BOARD (E) GREENLEY TERRY W (O) TAX LIEN 2014-00323188/5 FRANCHISE TAX BOARD (E) WEILAND ROBERT G (O) TAX LIEN 2014-00323198/5 FRANCHISE TAX BOARD (E) HINE JOSEPH A (O) TAX LIEN 2014-00323208/5 FRANCHISE TAX BOARD (E) HAYNES JEFFREY (O) TAX LIEN 2014-00323218/5 FRANCHISE TAX BOARD (E) PEPPERS GARY A (O) TAX LIEN 2014-00323228/5 FRANCHISE TAX BOARD (E) CLAYTON MARGARET F
(O)TAX LIEN 2014-0032323
8/5 FRANCHISE TAX BOARD (E) RODRIGUEZ JOHNNA S (O)
TAX LIEN 2014-0032324
8/5 FRANCHISE TAX BOARD (E) DIXON MARC G (O) TAX LIEN 2014-0032325
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 30
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
TAX LIENS (continued)Recording Date
Grantors/Grantees Grantees/Grantors Title Document Number
8/5 FRANCHISE TAX BOARD (E) ERDOGAN AHMET (O) TAX LIEN 2014-00323268/5 FRANCHISE TAX BOARD (E) MARSHALL PATRICK (O) TAX LIEN 2014-00323278/5 FRANCHISE TAX BOARD (E) BROVELLI MICHAEL (O) TAX LIEN 2014-00323288/5 FRANCHISE TAX BOARD (E) BROVELLI VALOREE C (O) TAX LIEN 2014-00323288/5 FRANCHISE TAX BOARD (E) CHAMBERLIN SCOTT (O) TAX LIEN 2014-00323298/5 FRANCHISE TAX BOARD (E) FLYNN JAMES (O) TAX LIEN 2014-00323308/5 FRANCHISE TAX BOARD (E) CROWDER CLIFTON E (O) TAX LIEN 2014-00323318/5 FRANCHISE TAX BOARD (E) DEMARIA GLORIA T (O) TAX LIEN 2014-00323328/5 FRANCHISE TAX BOARD (E) PARKS WALTER (O) TAX LIEN 2014-00323338/5 FRANCHISE TAX BOARD (E) FODOR NICOLAS (O) TAX LIEN 2014-00323348/5 FRANCHISE TAX BOARD (E) MACCORMICK DONALD
A (O)TAX LIEN 2014-0032335
8/5 INTERNAL REVENUE SERVICE (E) CAKIR ISMAIL (O) TAX LIEN 2014-00322948/5 INTERNAL REVENUE SERVICE (E) KIMMEL CARIE L (O) TAX LIEN 2014-00322948/5 INTERNAL REVENUE SERVICE (E) KIMMEL CARIE L (O) TAX LIEN 2014-00322958/5 INTERNAL REVENUE SERVICE (E) VALENTINE JEFFREY A
(O)TAX LIEN 2014-0032296
8/5 STATE BOARD OF EQUALIZATION (E) J M ASSOCIATES (O) TAX LIEN 2014-00322638/5 STATE BOARD OF EQUALIZATION (E) MICHAELS ADRIANA C (O) TAX LIEN 2014-00322638/5 STATE BOARD OF EQUALIZATION (E) MICHAELS JEROME EL-
DON (O)TAX LIEN 2014-0032263
8/5 STATE BOARD OF EQUALIZATION (E) OZDEMIR CEMALTTIN (O) TAX LIEN 2014-00322648/5 STATE BOARD OF EQUALIZATION (E) OZKAN SEZER F (O) TAX LIEN 2014-00322648/5 STATE BOARD OF EQUALIZATION (E) SAN RAFAEL NISSAN (O) TAX LIEN 2014-00322658/5 STATE BOARD OF EQUALIZATION (E) WIFIC INC (O) TAX LIEN 2014-00322658/8 FRANCHISE TAX BOARD (E) FLOATICAL LLC (O) TAX LIEN 2014-00328928/8 FRANCHISE TAX BOARD (E) GREAT WAVE LLC (O) TAX LIEN 2014-00328938/8 FRANCHISE TAX BOARD (E) SHER COMPANY INSUR-
ANCE SERVICES (O)TAX LIEN 2014-0032894
8/8 FRANCHISE TAX BOARD (E) GREEN PLANET SOLAR (O)
TAX LIEN 2014-0032895
8/8 FRANCHISE TAX BOARD (E) PERSEVERUS LLC (O) TAX LIEN 2014-00328968/8 FRANCHISE TAX BOARD (E) FAIRFAX HEALTH CLUB
(O)TAX LIEN 2014-0032897
8/8 FRANCHISE TAX BOARD (E) MARCKWORDT CLARK (O) TAX LIEN 2014-0032897
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 31
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.Marin Bulletin
Plans on File as of 08/11/2014 through 12/31/2014
Total number of projects = 347
Bid Date Bid Time Project Name City BIN # Plan Issuer
11/13/2014 2:00 PM TG08.3-Skylights San Francisco ONLINE
10/08/2014 4:00 PM
RFQ-Testing, Inspection & Analysis Report for Historic Main Street Bridge Half Moon Bay ONLINE Half Moon Bay
10/02/2014 2:00 PM
8-Inch Ductile Iron Pipe Main Installation on Cement Street From Arguello Blvd to 14th Ave San Francisco ONLINE San Francisco, City &
County of
09/30/2014 12:00 PM TG08.2R-Exterior Awning San Francisco ONLINE Webcor/Obayashi Joint
Venture
09/30/2014 11:00 AM
Downstream Water System Improvements Tier 2 Pressure Regulating Valves Modesto ONLINE Modesto, City of
09/30/2014 2:00 PM Fairfield/Vacaville Train Station Project Fairield/Vacaville ONLINE Fairfield, City Of
09/23/2014 4:00 PM Candlestick Park Stadium Demolition & Abatement San Francisco ONLINE Lennar Urban
09/23/2014 2:00 PM Richmond Intermodal Improvement Project Richmond ONLINE Bay Area Rapid Transit
District
09/19/2014 11:00 AM
Supply & Installation of Various Generators (Natural Gas & Diesel) Visalia ONLINE Visalia, City Of
09/18/2014 2:00 PM
TG10.4 Electrical, Communications, Security & Integrated Networks San Francisco ONLINE
09/17/2014 3:00 PM District Office Building Roofing Replacement Los Altos ONLINE
Foothill-De Anza Community College District
09/16/2014 3:00 PM Signage Phase II - Foothill College Los Altos ONLINE
Foothill-De Anza Community College District
09/16/2014 3:00 PM
Republican Alley 16-Inch Water Main Rehabilitation Project Roseville ONLINE Roseville, City of
09/16/2014 2:00 PM TG16.8 Fireproofing San Francisco ONLINE
09/15/2014 3:00 PM
RFP-Design, Construction, Operation, Mainetnance of a Compost Family for Yard Trimmings & Residential Food Scraps
Palo Alto ONLINE Palo Alto, City of
09/15/2014 10:00 AM Camp Berryessa Improvement Project Napa ONLINE
Napa County Regional Park & Open Space District
09/12/2014 2:00 PM
RFQ-Consulting Services for WETA Vallejo Ferry Terminal 2015 Dredging Project Vallejo ONLINE
San Francisco Bay Area Water Emergency Transportation Authority
09/11/2014 3:00 PM
7121-Police Administration Building Security Card Access System-Rebid San Jose ONLINE San Jose, City Of
09/11/2014 4:00 PM
RFP-Concord Citywide Bicycle & Pedestrian Safe Routes to Transit Project Concord ONLINE Concord, City of
09/11/2014 2:00 PM Elevator Modernization at Five Sites San Francisco ONLINE San Francisco Housing
Authority
09/10/2014 2:00 PM
Construct New Main Kitchen @ Napa State Hospital Napa ONLINE California Department of
General Services
09/10/2014 2:30 PM
Pavement Renovation & Sewer Replacement-Various Locations No. 18 San Francisco ONLINE San Francisco, City &
County of
09/09/2014 2:00 PM RFP-Systemwide Parking Lot Sweeping Services Various Cities ONLINE Bay Area Rapid Transit
District
09/09/2014 Larkspur Online Larkspur, city of
Page 1 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 32
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
11:00 AM
RFQ-Consultant Services for the City of Larkspur's Schematic Design of the Community Facility Parcel
09/09/2014 2:00 PM Annual Street Striping Los Altos ONLINE Los Altos, City of
09/09/2014 2:00 PM
Operations & Maintenance Facility Improvement Project Vallejo ONLINE Solano County Transit
09/09/2014 2:00 PM
North Bay Regional Water Treatment Plant Sludge Lagoon No. 1 Decant Stucture Improvements Project
Fairfield ONLINE Fairfield, City Of
09/09/2014 3:00 PM 2300 Delaware Elevators 72 & 73 Modernization Santa Cruz N/A Santa Cruz, UC
09/08/2014 5:00 PM
Planning Consulting Services for the Albany Neck & Bulb Transition Improvement Plan Albany ONLINE Albany, City of
09/05/2014 4:00 PM
RFQ-San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian & Maintenance Path Project
San Franbcisco/Oakland ONLINE Bay Area Toll Authority
09/05/2014 2:00 PM
Salt Point State Park-Salt Point Trail Pavement Rehabilitation Jenner ONLINE State of California
09/04/2014 2:00 PM East Market Street Improvements Phase III Salinas Salinas, City of
09/04/2014 5:00 PM
RFP-Construction Management Services for the 11th Street-East Tracy Overhead Bridge Replacement Project
Tracy ONLINE Tracy, City of
09/04/2014 2:30 PM Main Jail Polished Concrete Flooring Project Santa Cruz ONLINE Santa Cruz, County of
09/04/2014 2:00 PM Fire Damage Repair for John Steinbeck Library Salinas ONLINE Salinas, City of
09/04/2014 3:00 PM RFP-Underground Facility Locating Service Santa Clara ONLINE Santa Clara, City of
09/04/2014 2:00 PM
Rinconada Water Treatment Plant Reliability Improvement Project Los Gatos ONLINE Santa Clara Valley Water
District
09/04/2014 3:00 PM
Old Main Hospital Seismic Safety Project, Ancillary Building:Change Order 4 (MEP). Change Order 5 (Link & Stairwell, & Tenant Improvements (Basement & 2nd Floor)
San Jose ONLINE Santa Clara Valley Health and Hospital System
09/03/2014 2:00 PM
Bay Friendly Landscape Maintenance Services for Scattered Residential Sites Alameda ONLINE Alameda, City of
09/03/2014 2:00 PM
Pier 70-Bldg 113/114 Only-Safety, Security & Restoration (No GC Openings) San Francisco ONLINE
09/03/2014 2:30 PM 126 Front Street Bathroom Remodel Project Santa Cruz ONLINE Santa Cruz, County of
09/03/2014 1:30 PM
Richmond Advanced Recycled Expansion (RARE) Chloramination System Richmond ONLINE East Bay Municipal Utility
District
09/03/2014 1:30 PM Camanche South Shore to North Shore Pipeline Amador County/Calaveras
County ONLINE East Bay Municipal Utility District
09/03/2014 5:00 PM Rear Range Light ALTON Relocation/Replacement Stockton ONLINE D-Square Construction
09/03/2014 2:00 PM Valley View River Access Trail Oakdale Online Oakdale, City of
09/03/2014 2:00 PM
Janitorial Services for Human Service's Agency & Rail Road Square Building Stockton ONLINE San Joaquin, County of
09/03/2014 2:00 PM Oakland Coliseum Janitorial Services Oakland ONLINE Department of Motor
Vehicles
09/02/2014 11:00 AM
Public Safety Building HVAC Equipment Replacement San Leandro ONLINE San Leandro, city of
09/02/2014 2:00 PM
General Offices Fire Sprinkler Compliance Project 2011 Oakland ONLINE AC Transit District
09/02/2014 2:00 PM
RFP-111 Jackson Street Information Technology Upgrade Oakland ONLINE Alameda, County of
Page 2 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 33
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
09/02/2014 5:00 PM
Mission Bay SOMA Hotel, Block One, San Francisco
San Francisco ONLINE San Francisco, City & County of
09/02/2014 3:00 PM
San Leandro Ball Park Locker/Restroom Refurbishment San Leandro ONLINE San Leandro, city of
09/02/2014 2:00 PM Civic Center Bicycle Facility San Francisco ONLINE Bay Area Rapid Transit
District
09/01/2014 12:00 PM Tree Trimming Martinez ONLINE Contra Costa, County of
09/01/2014 5:00 PM
RFP-Design & Build Solar Photovoltaic (PV) Systems at Various Schools Tulare ONLINE TerraVerde Renewable
Partners
08/29/2014 12:00 PM
On-Call Architectural, Engineering & Other Professional Services South San Francisco ONLINE South San Francisco,
City of
08/29/2014 2:00 PM Transbay Block 7 San Francisco ONLINE
08/29/2014 5:00 PM
RFQ-San Joaquin County Fair Commercial Development Project Stockton ONLINE San Joaquin, County of
08/29/2014 2:30 PM
Carpet Projects for Ceres Library & Community Services Agency A-2 & B-2 Ceres/Modesto ONLINE Stanislaus, County of
08/29/2014 5:00 PM RFP - California Technology Agency - Gold Camp Rancho Cordova ONLINE Department of General
Services
08/29/2014 5:00 PM Florin Creek Vegetation & Tree Removal Sacramento ONLINE USACE Sacramento
District
08/29/2014 5:00 PM RFP - Franchise Tax Board - Butterfield Complex Sacramento ONLINE Department of General
Services
08/29/2014 3:00 PM
Construction Sequencing & Scheduling for the Van Ness Corridor Transit Improvement Project San Francisco ONLINE San Francisco, City &
County of
08/29/2014 5:00 PM
RFP - California Energy Commission - Headquarters Sacramento ONLINE Department of General
Services
08/29/2014 10:00 AM
RFP-Pre Finished Cabinetry at Various Scattered Sites Oakland ONLINE Oakland Housing
Authority
08/28/2014 2:00 PM
2014 UL, LL & Main Comprehensive Replacement Project Vallejo ONLINE Vallejo Sanitation and
Flood Control District
08/28/2014 3:00 PM
RFQ-Blakeley Reservoir Outlet Conduit Remediation Project Placerville ONLINE El Dorado Irrigation
District
08/28/2014 2:00 PM RFQ-Engine & Generator Maintenance & Repair Martinez ONLINE Central Contra Costa
Sanitary District
08/28/2014 3:00 PM Flume 42/43 Replacement Pollock Pines ONLINE El Dorado Irrigation
District
08/28/2014 2:00 PM Safe Routes to School (SR2S), Cycle 10 Oakland ONLINE Oakland, City of
08/28/2014 4:00 PM
RFP-Meadowview Road/24th Street Streetscape Imrovements Sacramento ONLINE Sacramento, city of
08/28/2014 2:00 PM Storm Drain Cleaning Maintenance Project Belvedere Tiburon ONLINE Tiburon, town of
08/28/2014 2:00 PM Chestnut Street Emergency Slip-Out Repair Santa Cruz ONLINE Santa Cruz, City of
08/28/2014 2:00 PM Mission Bay North N4P3 (No GC Openings) San Francisco ONLINE Suffolk Construction
Company
08/28/2014 3:00 PM 7329-Chris Hotts Park Improvements Project San Jose ONLINE San Jose, City Of
08/28/2014 2:00 PM Install Aggregate Base Napa County ONLINE California Department of
Fish & Wildlife
08/28/2014 4:00 PM Eucalyptus Tree Removal at Hellyer County Park San Jose ONLINE Santa Clara, County of
08/28/2014 2:00 PM
De Anza High School Component # 7:Building 10 Linked Learning El Sobrante ONLINE West Contra Costa
Unified School District
08/28/2014 2:00 PM
Main Street Median Improvement Project Oakley ONLINE Oakley, City of
Page 3 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 34
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
08/28/2014 3:30 PM
Napa County Hall of Justice Generator Fuel Line Project Napa ONLINE Napa, County of
08/28/2014 4:00 PM RFQ-Affordable Housing Development East Palo Alto ONLINE East Palo Alto, City Of
08/28/2014 2:00 PM
Novato Housing Maintenance & Repair Electrical System Novato ONLINE J.I. Garcia Construction,
Inc.
08/28/2014 2:00 PM CMAQ-Bike Rack Project Merced ONLINE Merced, City Of
08/28/2014 5:00 PM
RFP-Provide Professional Design Services for Hakone Gardens Master Plan Saratoga ONLINE Saratoga, City of
08/28/2014 2:00 PM 2014 Roadway Improvements Ross ONLINE Ross, Town of
08/28/2014 2:00 PM TG16.3-Terrazzo San Francisco ONLINE
08/28/2014 2:00 PM
Installation of Non-Contact Reversing System on Roll-Up Doors at Dept of Water Serevices Oroville ONLINE State of California
08/28/2014 2:00 PM 2014 Pavement Maintenance Project-Phase 3 Cupertino ONLINE Cupertino, city of
08/28/2014 2:00 PM Rube Boesch Center HVAC Improvements Turlock ONLINE Turlock, City of
08/27/2014 4:00 PM
RFQ-Window Installation Pilot Project-100 McAllister San Francisco ONLINE Hasting College of Law
08/27/2014 2:00 PM
HVAC Replacement & Air Balancing Project for Placerville DMV Field Office Placerville ONLINE Department of Motor
Vehicles
08/27/2014 2:00 PM
Water Treatment Plant Modifications Delta Operations and Maintenance Center Byron E805B/004C California Natural
Resources Agency
08/27/2014 3:30 PM Jardin De Ninos Park Renovation Redwood City ONLINE Redwood City, city of
08/27/2014 2:00 PM Water Street Bridge Debris Removal Project Santa Cruz ONLINE Santa Cruz, City of
08/27/2014 2:00 PM Measure U Irrigation Improvements-Package A Sacramento ONLINE Sacramento, City of
08/27/2014 2:30 PM 2014 Pavement Management Program Pittsburg R008/015C Pittsburg, city of
08/27/2014 10:00 AM 2014 Slurry Seal Project Ceres ONLINE Ceres, City Of
08/27/2014 11:00 AM Dewatering Polymer Lodi ONLINE Lodi, City of
08/27/2014 5:00 PM
As-Needed Graphic & Artistic Design & Interpretation Sonoma County ONLINE Sonoma, County of
08/27/2014 1:30 PM RFQ-Non-Leaded Brass Water Service Fittings Oakland ONLINE East Bay Municipal Utility
District
08/27/2014 2:00 PM
Construction of Runway Safety Area Improvements, North Field, Oakland International Airport
Oakland ONLINE Port Of Oakland
08/27/2014 2:00 PM
Mill Valley-Sausalito Multi-Use Pathway Roundabout at Bayfront Park Mill Valley Pending Marin, county of
08/27/2014 4:00 PM McAllister Street Streetscape Project San Francisco ONLINE Hasting College of Law
08/27/2014 2:30 PM
North Beach/Joe Dimmagio Playground Renovation San Francisco ONLINE San Francisco, City &
County of
08/27/2014 3:00 PM
Park Tennis & Basketball Court Resurfacing Project Sunnyvale ONLINE Sunnyvale, City of
08/27/2014 2:00 AM
Water Treatment Plant Capital Improvements Project, Phase 1A Pittsburg 014C/R007 Pittsburg, city of
08/27/2014 2:00 PM CCTV at Various Locations Phase 2 San Jose E809B/070C Santa Clara Valley
Transportation Authority
Page 4 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 35
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
08/26/2014 2:00 PM
Refurbish Train Operator Facilities at Hayward, Richmond and Concord Yards
Contra Costa County Online San Francisco Bay Area Rapid Transit District
08/26/2014 2:00 PM Napa River & Bay Trail-Segments 7 & 8 Napa ONLINE
Napa County Regional Park & Open Space District
08/26/2014 3:00 PM Dive Pool-Tower Removal Cupertino ONLINE
Foothill-De Anza Community College District
08/26/2014 2:00 PM Redwood Valley Lions Park Ball Field Repairs Redwood Valley ONLINE Mendocino, County of
08/26/2014 3:00 PM Sanitary Sewer Rehabilitation Project 24/25 Palo Alto ONLINE Palo Alto, City of
08/26/2014 2:00 PM
Refurbish Train Operator Facilities at Hayward, Richmond & Concord Hayward/Richmond/Concord ONLINE Bay Area Rapid Transit
District
08/26/2014 11:00 AM Strengthen & Replace La Loma Water Mains Modesto ONLINE Modesto, City of
08/26/2014 2:00 PM
Reroof Fruitvale Station Train Control Facilities & Bay Fair Station Entrance Canopy San Leandro/Oakland E808B/080C Bay Area Rapid Transit
District
08/26/2014 2:00 PM
SFO Architecture & Engineering Design Services for South Field Tenant Relocations San Francisco ONLINE San Francisco
International Airport
08/26/2014 3:00 PM
RFQ-Sand, Rock & Asphalt for Utilities Construction Palo Alto ONLINE Palo Alto, City of
08/26/2014 3:00 PM
CCure Maintenance & Monitoring - Bay Area Employment Development Department Northern California Offices
Northern California ONLINE CA Employment Development Department
08/26/2014 2:00 PM Galbreath Wildlands Preserve Water Well Rohnert Park ONLINE Sonoma State University
08/26/2014 2:00 PM
Dennis The Menace Walkway/Access Improvements Phase II and Skateboard Park Renovation and Expansion
Monterey ONLINE Monterey, City of
08/26/2014 2:00 PM Civic Center Water Tower Repainting Tracy Tracy, City of
08/25/2014 4:00 PM Swings Space Connections Package Phase 2 Fremont/Newark ONLINE Ohlone Community
College District
08/25/2014 2:00 PM Harbour View Apartments Richmond ONLINE
08/25/2014 2:00 PM Telecommunications System Repair Services Fremont ONLINE California Dept of
Education
08/25/2014 1:00 PM
BUILDING 361, COMMUNITY LIVING CENTER CLINIC, MENLO PARK DIVISION, VETERANS AFFAIRS PALO ALTO HEALTH CARE SYSTEM,
Palo Alto ONLINE US Army Engineering Dist-San Francisco
08/25/2014 1:00 PM
RFQ-Electrical Services for Various Equipment at CSJ ESD (Rebid) San Jose ONLINE San Jose, City of
08/22/2014 5:00 PM
RFQ-Pipe Canopy Contractors for 60-Inch Brick Interceptor Phase VI-A Project San Jose ONLINE San Jose, City Of
08/22/2014 2:00 PM
HVAC Repairs for Juvenile Detention Center & Honor Farm French Camp ONLINE San Joaquin, County of
08/22/2014 5:00 PM
Hazardous Material Investigation Survey Abatement Design Documentation & Observation/Monotoring
San Joaquin County ONLINE San Joaquin, County of
08/22/2014 10:00 AM Elementary Schools Window Coverings Phase 2 Palo Alto ONLINE Palo Alto Unified School
District
08/22/2014 2:00 PM Hunters View, Phase II, Blocks 7 & 11 San Francisco ONLINE
08/22/2014 12:00 PM Traffic Signs Contra Costa County ONLINE Contra Costa, County of
08/22/2014 2:00 PM Demolition of Residence at 2821 Rosedale Avenue Soquel ONLINE Soquel Creek Water
District
08/21/2014 San Leandro ONLINE San Leandro, city of
Page 5 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 36
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
3:00 PM
Marina Community Center (MCC) Storefront Window Replacement
08/21/2014 2:00 PM Storm Drain Improvements on Dianne Drive Turlock ONLINE Turlock, City of
08/21/2014 2:00 PM
RFP-Equipment Provider of Automated Parking Data Collection & Enforcement Berkeley ONLINE Berkeley, City of
08/21/2014 2:00 PM RFQ-Emergency Operation Center Alameda ONLINE Alameda, City of
08/21/2014 2:00 PM TG16.2-Tile/Flooring/Base San Francisco ONLINE
08/21/2014 5:00 PM RFQ-Delta Service Center Stockton Stockton ONLINE Department of General
Services
08/21/2014 2:00 PM Information Technology Center Richmond ONLINE West Contra Costa
Unified School District
08/21/2014 10:00 AM Street Resurfacing 2013-2014 San Rafael 075C/E811B San Rafael, city of
08/21/2014 2:00 PM
Sacramento International Airport Reconstruction Portions of Taxiway Delta 3 Sacramento ONLINE
Sacramento County Municipal Services Agency
08/21/2014 10:00 AM Lewis Hall Fire Alarm Upgrade Berkeley ONLINE Berkeley, UC
08/21/2014 2:00 PM
Sausalito City Hall Ceiling Tile Replacement Project Sausalito ONLINE Sausalito, City of
08/21/2014 2:00 PM FY 2015 Bicycle Rack Installation Berkeley ONLINE Berkeley, City of Public
Works
08/21/2014 5:00 PM
RFQ-Santa Rosa Rural Cemetery Pavement Rehabilitation Santa Rosa ONLINE Santa Rosa, City of
08/21/2014 4:00 PM
Detroit Avenue Bicycle and Pedestrian Improvements RFP Concord Pending Concord, City of
08/21/2014 2:00 PM Rubberized Chip Seal 2014 Solano County ONLINE Solano, County Of
08/21/2014 2:00 PM
Ambulatory Care Center (ACC) 5th Floor Heart & Vascular Consolidation (Prequalifed Bidders Only) San Francisco ONLINE San Francisco, UC
08/21/2014 2:00 PM
Sixth Street Improvements, LED Trail Lighting, LED Upgrades & Fiber Optic Repair Gilroy ONLINE Gilroy, city of
08/21/2014 2:00 PM
Water Quality Control Facility Improvements Project Patterson ONLINE Patterson, City of
08/21/2014 2:00 PM Lewis Hall Fire Sprinklers Upgrade Berkeley ONLINE Berkeley, UC
08/21/2014 3:00 PM
6597-San Carlos Street Multimodal Streetscape Improvement Project-Phase II San Jose ONLINE San Jose, City Of
08/21/2014 2:00 PM Tree Removal Services Project Stockton ONLINE Stockton, City of
08/21/2014 2:00 PM
Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project Elk Grove ONLINE Elk Grove, City of
08/21/2014 11:00 AM
City Hall ADA Improvements and Electric Vehicle Charging Station Install Project (WFM007/WFM006)
Elk Grove ONLINE Elk Grove, City of
08/21/2014 11:00 AM
RFP-Submersible Wastewater Pumps-Lift Station C Morgan Hill ONLINE Morgan Hill, City of
08/21/2014 2:00 PM WWTP Levee Removal & Irrigation Improvements Merced ONLINE Merced, City Of
08/20/2014 2:00 PM R Street Improvements 16th St to 18th St Sacramento ONLINE Sacramento, city of
08/20/2014 5:00 PM
Tracy Blvd. Advanced Traffic Signal System & Fiber Optics from City Hall to WWTP Tracy ONLINE Tracy, City of
08/20/2014 2:00 PM
Foothill Horizons New Classroom Building (Lease Leaseback Project) Sonora ONLINE
Page 6 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 37
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
08/20/2014 2:00 PM
Florin Creek R/W Fence Sacramento ONLINE Sacramento, City Of
08/20/2014 9:00 AM East Wing PO&M Roof Repairs Sacramento ONLINE Davis, UC Health System
08/20/2014 2:00 PM
RFQ/RFP-New Boarding Area B Reconstruction Project & Terminal 1 Center Renovation Project San Francisco ONLINE San Francisco
International Airport
08/20/2014 2:30 PM
San Francisco General Hospital Building 5 Accessibility Compliance Improvements San Francisco ONLINE San Francisco, City &
County of
08/20/2014 2:00 PM Energy Savings Upgrade at Various City Buildings South San Francisco ONLINE South San Francisco,
City of
08/20/2014 3:00 PM Well Abandonment Services Rio Vista ONLINE Department of
Conservation
08/20/2014 2:00 PM
Amphitheater Surface Replacement, Las Positas College Livermore R056/087C Chabot-LasPositas
Comm College Dist
08/20/2014 3:00 PM Carson Creek 1 Lift Station El Dorado Hills ONLINE El Dorado Irrigation
District
08/20/2014 11:00 AM
RFP-Consulting Services for Access Control, Alarm & Alarm Monitoring Oakland ONLINE Peralta Community
College District
08/20/2014 2:00 PM
Sacramento River Water Treatment Plant COAG Roof Replacement Sacramento ONLINE Sacramento, City of
08/20/2014 9:00 AM UT PO&M Roof Repairs Sacramento ONLINE Davis, UC Health System
08/20/2014 5:00 PM T-Mobile 2920-San Jose San Jose ONLINE
08/20/2014 2:00 PM
Multi-Trade Building Renovation Job Order Contract Davis ONLINE Davis, UC
08/20/2014 2:30 PM
Ruth Williams Memorial Theater Bayview Opera House San Francisco ONLINE San Francisco, City &
County of
08/20/2014 2:00 PM 855-856 West Grand Avenue (No GC Openings) Oakland ONLINE
08/20/2014 5:00 PM Asbestos Abatement, Seismic Reinforcement M&R Petaluma ONLINE
08/20/2014 3:00 PM Baylands Park Equipment Replacement Sunnyvale ONLINE Sunnyvale, City of
08/20/2014 2:00 PM Fencing & Bollards at 2561 Land Avenue Sacramento ONLINE Sacramento Regional
Transit District
08/20/2014 2:30 PM Randolph Streetscape Improvements San Francsico ONLINE San Francisco, City &
County of
08/20/2014 3:00 PM Cowell College-Fireside Lounge Renovation Santa Cruz ONLINE Santa Cruz, UC
08/20/2014 2:00 PM Outdoor Lighting Fixtures Oakland ONLINE Port Of Oakland
08/20/2014 2:00 PM Simmerhorn-Carillion Water Main Project Galt ONLINE Galt, city of
08/20/2014 2:00 PM
TG10.3 Heating, Ventilating & Air Conditioning Construction Services San Francisco ONLINE
08/20/2014 2:00 PM 2013-2014 Lakeville Rd Tree Pruning & Removal Sonoma* E802B/063C
08/20/2014 2:00 PM
Facilities Mechanical, Electrical & Plumbing (MEP) Job Order Contract Davis ONLINE Davis, UC
08/20/2014 3:00 PM Park Place Well Replacement Petaluma ONLINE Petaluma, City of
08/20/2014 12:00 PM Newbury Park Apartments San Jose ONLINE Core Builders
08/20/2014 11:00 AM Monte Vista Shopping Center S2 Shop Turlock ONLINE Huff Construction
Company, Inc.
08/20/2014 2:00 PM
RFQ-Furnish & Install Pool Covers at the Centennial Recreation Center
Morgan Hill ONLINE Morgan Hill, City of
Page 7 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 38
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
08/20/2014 2:00 PM TG10.2 Plumbing Construction Services San Francisco ONLINE
08/19/2014 2:00 PM Slurry Seal of Local Streets & Airport Aprons Ukiah ONLINE Ukiah, City Of
08/19/2014 2:00 PM
General Municipal Building Improvements On-Call 2014 for Presidio Municipal Services Agency (PMSA) Projects
Monterey ONLINE Monterey, City of
08/19/2014 2:00 PM North Napa CIPP Lining Project Napa ONLINE Napa Sanitation District
08/19/2014 2:00 PM 2014 Slurry Seal Project Salinas ONLINE Salinas, City of
08/19/2014 2:00 PM
Median Landscape FY14 - Winton Ave (Southland Dr to Southland Pl) Hayward E810B/082C Hayward, city of
08/19/2014 1:30 PM Sewer Line & Storm Drain Cleaning San Quentin ONLINE
State of California Department of Corrections and Rehabilitation
08/19/2014 4:00 PM
RFP-City of West Sacramento Water Treatment Plant Gas to Liquid Chlorine System Conversion West Sacramento ONLINE West Sacramento, City of
08/19/2014 9:00 AM
DOM 4 Force Main Repair Project Mare Island Causeway Vallejo ONLINE Vallejo Sanitation and
Flood Control District
08/19/2014 2:00 PM Marsten Avenue Storm Drain Repair Project Belmont ONLINE Belmont, city of
08/19/2014 2:00 PM
Butte Regional Transit Operations Center (Prequalified Bidders) Chico ONLINE
08/19/2014 1:00 PM Garden Valley Forest Fire Station - Replace Facility Garden Valley ONLINE Department of Forestry
and Fire Protection
08/19/2014 2:00 PM Community & Senior Center Emergency Generator Woodland ONLINE Woodland, City of
08/19/2014 11:00 AM
RFP-Well Site Repairs, Maintenance, Rehabilitation & Pump Replacements Morgan Hill ONLINE Morgan Hill, City of
08/19/2014 2:00 PM New Walmart Supercenter # 3081-00 Sacramento ONLINE
08/19/2014 3:00 PM
RFP-Design of the Old Pumping Plant Rehabilitation Palo Alto ONLINE Palo Alto, City of
08/19/2014 5:00 PM Verizon Wireless Vacaville ONLINE
08/19/2014 3:00 PM Flooring Services for Central Services Department Roseville ONLINE Roseville, City of
08/19/2014 10:00 AM
FY14 Pleasant Hill Main Replacements & Other District Improvements
Pleasant Hill/Walnut Creek/Concord E803B/007C Contra Costa Water
District
08/19/2014 2:00 PM TG10.5 Fire Protection and Fire Suppression San Francisco ONLINE
08/19/2014 2:00 PM
The Improvements of Foothill Blvd from 150th Ave to the Vicinity of 164th/Miramar Ave Eden Township 001C Alameda, County of
08/19/2014 4:30 PM
RFQ-Architect-Engineer Professional Services for Los Medanos College Brentwood Center Brentwood ONLINE Contra Costa Community
College District
08/19/2014 2:00 PM
Building B-100 Tenant Improvements/Voluntary Seismic Retrofit at Chabot College Hayward T004/033C Chabot-LasPositas
Comm College Dist
08/19/2014 2:00 PM
Station Access, Parking, Path & Wayfinding Improvements, San Bruno San Bruno E795B/086C Bay Area Rapid Transit
District
08/19/2014 3:30 PM Saddleback Lift Station Improvements Auburn ONLINE Placer, County of
08/19/2014 2:00 PM Hotel at 1499 University Avenue Berkeley ONLINE
08/19/2014 2:00 PM
General Municipal Building Improvements On-Call 2014 for City Projects Monterey ONLINE Monterey, City of
08/19/2014 Cupertino ONLINE Cupertino, city of
Page 8 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 39
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
2:00 PM
Quinlan Community Center Fiber Installation Project
08/19/2014 3:00 PM
Technology Ctr/Student Ctr Interior Finish Upgrades San Jose ONLINE San Jose Evergreen
Community College Dist
08/19/2014 10:00 AM
Clayton Road & Schenone Court Left Turn Lane Civil Improvements Concord ONLINE Concord, City of
08/19/2014 11:00 AM Combination Air & Vacuum Relief Valves Modesto ONLINE Modesto, City of
08/19/2014 3:00 PM RFP-City Bridge Assessment Palo Alto ONLINE Palo Alto, City of
08/18/2014 3:00 PM Sylvia Besana Park Stairs Rehab Roseville ONLINE Roseville, City of
08/18/2014 4:00 PM Hunters Point Shipyard Block 48 Architecture RFP San Francisco ONLINE San Francisco, City &
County of
08/18/2014 2:00 PM
RFP-Cherryland Fire Station Hazardous Materials Abatement and Demolition Hayward ONLINE Alameda, County of
08/18/2014 2:00 PM
SFO- Project Management Support Services for South Field Abatement, Demolition & Hazmat Project
San Francisco ONLINE San Francisco International Airport
08/18/2014 2:00 PM
Cathodic Protection, Phase 1 Central Contra Costa Sanitary District Martinez Online Central Contra Costa
Sanitary District
08/18/2014 1:00 PM
RFQ-Maintenance, Repair & Installation of Audio & Video Equipment San Jose ONLINE San Jose, City of
08/18/2014 3:30 PM High Friction Surface Treatment Project Auburn ONLINE Placer, County of
08/18/2014 11:00 AM Signal Upgrades & Pedestrian Improvements Watsonville ONLINE Watsonville, city of
08/18/2014 1:00 PM
RFQ-Street Light Poles10B & Union Metal 13 Foot Ornamental One Piece Lighting San Jose ONLINE San Jose, City of
08/18/2014 2:00 PM
Noth Natomas Regional Park Phase 5-Farmer's Market Grading Sacramento ONLINE Sacramento, City of
08/18/2014 3:00 PM Sims Road Gate Modification Elk Grove ONLINE Sacramento Regional
County Sanitation Dist
08/15/2014 2:00 PM
Nancy & Stephen Grand Family House, Mission Bay Block 7E San Francisco ONLINE
08/15/2014 4:00 PM
Professional Services for Citrus Heights Urban Greening Strategy Citrus Heights ONLINE Citrus Heights, City of
08/15/2014 4:00 PM
RFP-Material Testing & Construction Inspection Consulting Services San Ramon ONLINE San Ramon, City of
08/15/2014 2:00 PM Thatcher Chemical, Phase 2 Sacramento ONLINE
08/15/2014 1:00 PM
RFQ-Bird Barrier/Netting Services at Norman Mineta San Jose International Airport San Jose ONLINE San Jose, City Of
08/15/2014 2:00 PM
East Campus Operations Center Landscaping Maintenance Sacramento ONLINE Sacramento Municipal
Utility District
08/15/2014 2:00 PM Fire Sprinkler System San Francisco ONLINE
08/15/2014 12:00 PM Century Theatres # 399 Remodel Mountain View ONLINE
08/15/2014 10:00 AM Dollar Tree (Retail Store) Folsom ONLINE Marco Contractors
08/15/2014 1:00 PM Cooley Landing Park Phase III Education Center Palo Alto ONLINE East Palo Alto, City Of
08/15/2014 4:00 PM RFQ-Geotechnical Consulting Services San Ramon ONLINE San Ramon, City of
08/15/2014 2:00 PM Culvert Repair & Bridge Spall Repair Project 2014 Solano County ONLINE Solano, County Of
08/15/2014 RFQ-Landscape Architect Services Roseville ONLINE Roseville, City of
Page 9 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 40
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
3:00 PM
08/15/2014 4:00 PM
RFP-Surveying & Miscellaneous Civil Engineering Consulting Services San Ramon ONLINE San Ramon, City of
08/15/2014 4:00 PM RFQ-Traffic Civil Engineering Consulting Services San Ramon ONLINE San Ramon, City of
08/15/2014 5:00 PM
RFQ-Master Agreement for Landscape Architectural Services San Jose ONLINE San Jose, City Of
08/14/2014 2:00 PM East Second Street Overlay Project - REBID Benicia ONLINE Benicia, City Of
08/14/2014 2:00 PM DeRicco Lobby Project Stockton ONLINE
San Joaquin Delta Community College District
08/14/2014 2:00 PM
Region Five (5) Landscape Manintenance District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 2:00 PM Commercial Pool Service at Multiple Pool Facilities Stockton ONLINE Stockton, City of
08/14/2014 2:00 PM Newark Greenhouse, Ohlone College Fremont Online Ohlone Community
College District
08/14/2014 2:30 PM VA Menlo Park Lawn Sprinkler Project Menlo Park ONLINE Department of Veterans
Affairs
08/14/2014 3:00 PM
7724-Norman Y. Mineta San Jose International Airport Mechanical Services Contract San Jose ONLINE San Jose, City Of
08/14/2014 2:00 PM
Plant Maintenance Projects, East Generator Replacement and SCADA Communications Network
Gilroy Online South County Regional Wastewater Authority
08/14/2014 2:00 PM
Mount Zion (MZ) "A" Building Freight Elevator No. 8 Upgrade-Rebid San Francisco ONLINE San Francisco, UC
08/14/2014 2:00 PM Tank No. 3 (Glenview) Replacement Project San Bruno* 032C San Bruno, City of
08/14/2014 3:00 PM 2013-2014 Slurry Seal Project Redwood City ONLINE Redwood City, city of
08/14/2014 2:00 PM Franklin Boulevard 39" Diameter Lining Project Sacramento ONLINE
Sacramento County Municipal Services Agency
08/14/2014 5:00 PM
RFP-Environmental Technical Studies for Three Safety Improvements Project Solano County ONLINE Solano, County Of
08/14/2014 10:00 AM
Traffic Signal & Street Light Services (FY 2014/15-FY 2019/20) Pacifica ONLINE Pacifica, city of
08/14/2014 2:00 PM
Region Seven (7) Landscape Manintenance District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 2:00 PM
Relocation of the Sheriff's Record Unit to 2530 Arnold Drive Martinez ONLINE Contra Costa, County of
08/14/2014 2:00 PM Air Cooled Chiller Replacement Music Building San Pablo ONLINE Contra Costa Community
College District
08/14/2014 2:00 PM Janitorial Services at the Seaside DMV Field Office Seaside ONLINE Department of Motor
Vehicles
08/14/2014 1:00 PM Play Area ADA Ramps Elk Grove ONLINE Cosumnes Community
Services Distrcit
08/14/2014 10:00 AM Finley Community Center Reroofing Santa Rosa ONLINE Santa Rosa, City of
08/14/2014 2:00 PM
Region Three (3) Landscape Maintenance District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 3:00 PM
Security Controls Upgrade-John Latorraca Correctional Facility Merced ONLINE Merced, County of
08/14/2014 2:00 PM 2015 Parks Pest Control Project Stockton ONLINE Stockton, City of
08/14/2014 Champs-Vintage Fair Modesto ONLINE
Page 10 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 41
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
2:00 PM
08/14/2014 2:00 PM
Region Eight (8) Landscape Manintenance District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 2:00 PM Region One (1) Landscape District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 3:00 PM
RFQ-On-Call Design, Engineering, Planning, Environmental, Construction Management & Other Airport Consulting Services
Palo Alto ONLINE Palo Alto, City of
08/14/2014 2:00 PM
Region Four (4) Landscape Maintenance District (LMD) Vallejo ONLINE Vallejo, City of
08/14/2014 2:00 PM
Mather Housing Treatment Plant Filter Rehabilitation Project Sacramento County 066C
Sacramento County Municipal Services Agency
08/14/2014 4:00 PM RFQ-Security Roof Fence-198 McAllister San Francisco ONLINE Hasting College of Law
08/14/2014 2:00 PM
Construction of the Terrace Boulevard Sewer Main Replacement Healdsburg Healdsburg, City Of
08/14/2014 5:00 PM
RFQ-As-Needed Lead-Based Paint & Asbestos Contractor Service San Francsico ONLINE San Francisco Housing
Authority
08/14/2014 10:00 AM Refinish Basketball Court Alameda ONLINE US Coast Guard
08/14/2014 2:00 PM
Concrete Rehabilitation of Sedimentation Tank No. 3 (At The Wastewater Treatment Facility) Santa Cruz ONLINE Santa Cruz, City of
08/13/2014 2:30 PM
Vicente Street & Ocean Avenue Pavement Renovation, Sewer Replacement & Water Main Installation
San Francisco ONLINE San Francisco, City & County of
08/13/2014 2:00 PM On-Call CCTV Inspection Sacramento ONLINE Sacramento, City Of
08/13/2014 2:00 PM
Portable Generator for Harbor Facilities - CANCELLED Oakland ONLINE Port Of Oakland
08/13/2014 12:00 PM Paving 2366 Stanwell Circle Concord ONLINE Contra Costa, County of
08/13/2014 12:00 PM SRJ Concrete Wall Repair Dublin ONLINE Alameda, County of
08/13/2014 3:00 PM RFP-City of Hayward Downtown Specific Plan Hayward ONLINE
Alameda County Transportation Commission
08/13/2014 2:30 PM
Landscaping & Tree Maintenance Various Locations Contract-1 San Francisco ONLINE San Francisco, City &
County of
08/13/2014 2:30 PM Freisman Park City Project 2007-2066 Livermore 013C/R005 Livermore, city of
08/13/2014 10:00 AM
Site UCDMC RAD Mobile PET CT Scanner Relocation Sacramento ONLINE Davis, UC Health System
08/13/2014 5:00 PM Popeyes Chicken Restaurant Lodi ONLINE RC Pacific Construction,
Inc
08/13/2014 3:00 PM Pavement Repair Digouts Sunnyvale ONLINE Sunnyvale, City of
08/13/2014 4:00 PM RFQ-Kilroy Mission Bay Block Office Building San Francisco ONLINE San Francisco, City &
County of
08/13/2014 3:00 PM 2014-2015 Sanitary Sewer Replacement Project Redwood City ONLINE Redwood City, city of
08/13/2014 3:00 PM Roof Removal and Replacement at City Hall Sebastopol 062C Sebastopol, City of
08/13/2014 2:00 PM
LAVTA Bus Stop Accessibility Improvements for City of Dublin & City of Pleasanton Livermore ONLINE Livermore Amador Valley
Transit Authority
08/13/2014 2:30 PM Crows Landing Air Facility Test Well Project Patterson ONLINE Stanislaus, County of
Page 11 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 42
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
08/13/2014 1:00 PM
HVAC Duct Cleaning at the DMV Merced Field Office (Rebid)
Merced ONLINE Department of Motor Vehicles
08/13/2014 1:30 PM Civic Center Handrail Accessibility Modifications San Rafael E806B/069C Marin, county of
08/13/2014 2:00 PM
CDBG Traffic Calming Measures for Intersections along Sheridan Street Vallejo ONLINE Vallejo, City of
08/13/2014 5:00 PM The Habit Burger-Antioch Antioch ONLINE
08/13/2014 2:00 PM Starbucks - New Site & Shell Construction Woodland ONLINE
08/13/2014 2:00 PM
Combined Landscape Maintenance Projects - Rebid San Jose E798B/090C Santa Clara Valley
Transportation Authority
08/13/2014 2:00 PM FJC 470 27th St Exterior Paint Oakland ONLINE Alameda, County of
08/12/2014 2:00 PM
ESC-Sacramento Kings Foundation Concrete, Foundation Reinforcing, Waterproofing & Under Mat Slab Plumbing
Sacramento ONLINE
08/12/2014 2:00 PM Brown Street Lift Station Vacaville ONLINE Vacaville, City Of
08/12/2014 3:00 PM
Hesperian/Springlake Railroad Crossing Improvements San Leandro ONLINE San Leandro, city of
08/12/2014 2:00 PM Beach/Pacific (Wharf) Intersection Roundabout Santa Cruz ONLINE Santa Cruz, City of
08/12/2014 2:00 PM Job Order Contract Phase 21 San Jose ONLINE San Jose State University
08/12/2014 2:00 PM 2198 Market Street San Francisco ONLINE
08/12/2014 2:00 PM
Station Access, Parking, Path & Wayfinding Improvements Dublin/Pleasanton Dublin/Pleasanton ONLINE Bay Area Rapid Transit
District
08/12/2014 2:00 PM
Pest Control Service Contract for City of Monterey, Presidio of Monterey, and Ord Military Community. Monterey ONLINE Monterey, City of
08/12/2014 3:00 PM Mount Umunhum Interim Tower Repairs Project Los Gatos ONLINE Midpeninsula Regional
Open Space District
08/12/2014 2:00 PM
Tracy Municipal Airport Reconstruction of Runway 12-30 and Taxiways B, D and E and The Runway/Taxiway Intersection Schedule A and Schedule B
Tracy ONLINE Tracy, City of
08/12/2014 3:00 PM
Third Street Light Rail Transit Project Mision Bay Loop Project San Francisco ONLINE San Francisco, City &
County of
08/12/2014 2:00 PM
RFP-A Local Community Solar Program for the City of Palo Alto Palo Alto ONLINE Palo Alto, City of
08/12/2014 5:00 PM Kapor Center for Social Impact Oakland ONLINE
08/12/2014 10:00 AM Oak Avenue Tank Replacement Project San Anselmo ONLINE Marin Municipal Water
District
08/12/2014 6:00 PM
New HVAC System for 15 Bed HIV/AIDS Residential Facility San Francisco ONLINE San Francisco, City &
County of
08/12/2014 12:00 PM Hyatt Place-Emeryville Emeryville ONLINE
08/12/2014 2:00 PM Marsh Creek Road Bridge (28C0143) Scour Repair Contra Costa County ONLINE Contra Costa, County of
08/12/2014 2:00 PM Byron Airport Pavement Enhancements Byron ONLINE Contra Costa, County of
08/12/2014 10:00 AM Bon Air Road Bridge Replacement Project Larkspur Online Larkspur, city of
08/12/2014 2:30 PM Brown Street Sewer Project Vacaville ONLINE Vacaville, City Of
08/12/2014 Oakland ONLINE
Page 12 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 43
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
11:00 AM
Laney College Building "A" Installation of a HVAC Split System
Peralta Community College District
08/12/2014 4:00 PM
May Valley Community Center Roofing Replacement Richmond ONLINE Richmond, City Of
08/12/2014 5:00 PM RFP-Power Purchase Agreement for Solar Power Brentwood ONLINE Brentwood, city of
08/12/2014 3:00 PM
Runway 13-31 Pavement Rehabilitation Hollister Municipal Airport Imrpovements Hollister ONLINE Hollister, City Of
08/12/2014 12:00 PM 2014 Overlay Project Brisbane ONLINE Brisbane, city of
08/12/2014 2:00 PM Virginia-McGee Totland Play Area Renovation Berkeley ONLINE Berkeley, City of
08/12/2014 2:30 PM 2014 Street Resurfacing Project Livermore E807B/002C Livermore, city of
08/12/2014 4:00 PM Muir Ridge, Tract 7418 Contra Costa County ONLINE Habitat for Humanity East
Bay/Silicon Valley
08/12/2014 2:00 PM
Angel Island State Park Project A:Sewer System repairs & Project B:Access Modifications Tiburon ONLINE Department of Parks &
Recreation
08/12/2014 2:00 PM
Penngrove Elementary School-YMVA Modular Building Penngrove ONLINE
08/12/2014 2:00 PM
West A Street Safety Improvements (West A Street at South Garden Avenue, Happyland Avenue, and Santa Clara Street-Hathaway Avenue)
Hayward E799B/091C Hayward, city of
08/12/2014 2:00 PM
Mission Bay Development Blocks 36-39 & X3, Block 25 Infrastructure Project San Francisco 071C
08/12/2014 2:00 PM LED Streetlight Luminaries Elk Grove ONLINE Elk Grove, City of
08/11/2014 3:00 PM
I-880/Broadway - Jackson Interchange Improvements Project: Professional Engineering Services for the Project Approval and Environmental Document (PA&ED) Phase (A14-0051)
Oakland ONLINE Alameda County Transportation Commission
08/11/2014 3:00 PM RFP-Technology Equipment and/or Services Richmond ONLINE West Contra Costa
Unified School District
08/11/2014 2:00 PM Sacramento Cosentino Center Roseville ONLINE
08/11/2014 12:00 PM
RFQ-Planning Project Management, CEQA & Sustainability Planning Services Davis ONLINE Davis, city of
08/11/2014 2:00 PM Magnolia Avenue Trunk Line Rehabilitation Project Larkspur ONLINE Ross Valley Sanitary
District
08/11/2014 2:00 PM Bed Bath & Beyond-Roseville Roseville ONLINE
08/11/2014 3:00 PM
Repurpose Boiler Plant, Phase II-Boiler Room Office Addition San Jose ONLINE San Jose Evergreen
Community College Dist
08/11/2014 5:00 PM Steam Cleaning & Power Washing Services Santa Rosa ONLINE Santa Rosa, City of
Page 13 of 13Project Information Report
8/11/2014http://db.onlineplanservice.com/projectentry/reports/project_info.aspx?projectid=null
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 44
www.marinba.org ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
SEEKING EXPERIENCED PROJECT MANAGER FOR
SAN RAFAEL BASED CONSTRUCTION CO.
Residential remodeling company seeks experienced project managers for full and/or time positions. Health care benefits
available after 60 days. Salary DOE.
QUALIFICATIONS INCLUDE:
Working knowledge of building tradesStrong organizational and managerial skillsCan read plans well and assemble materials lists2+ years in residential construction industryStrong organizational and interpersonal skillsWillingness & ability to interface with clients as well as staffStrong communication skills and clean/neat appearanceFamiliarity with Marin CountyClean driving recordFluent in both Spanish and English a plus
RESPONSIBILITIES INCLUDE (BUT NOT LIMITED TO):
Scheduling and timelinesJob costingAssemble & order materialsSchedule subcontractorsCoordination, communication, safety, planning, budgetingDocumentation & job logsInterfacing with clients/architects/engineers/etc.
Please forward resume and salary requirements to:[email protected]
SEEKING GENERAL ENGINEERING CONSTRUCTION FOREMAN FORMALONEY CONSTRUCTION, INC.
A successful candidate has the ability to work independently, manage/lead other crew members, and troubleshoot all aspects of the projects. The individual should be knowledgeable and proficient with all phases of general engineering construction and has an excellent attitude and work ethic. Compensation is
competitive and dependent on experience.
THE SITE SUPERINTENDENT/FOREMAN WILL:- Direct, supervise and teach other crew members- Perform any construction tasks needed to meet deadlines - Determine labor requirements and recruit talent to meet demands- Create supplies and materials lists and timelines- Review materials and subcontractors invoices against forecasts- Review job costs, budgets and weekly field time cards- Communicate with clients throughout the project to guarantee customer satisfactionRequirements:- Relevant industry experience.- Must utilize smart phone from the field for emailing and text messaging- Must be able to read and interpret plans- Knowledgeable in all trades- Excellent written and verbal communication skills, with an ability to speak professionally with clients, architects, subcontractors, etc.- Ability to identify and problem-solve various issues- Able to run projects with minimal supervision- Must have a truck in good working condition, insurance, valid driver’s license and own tools
What we offer:Competitive salary , 5 days / year PTO after 90 Days, Truck
Allowance, Gas Card
Equal Opportunity EmployerPlease submit cover letter and resume to
[email protected] and we will contact qualified candidates. Or fax to 415-493-6910 please includes salary requirements. Due to the high volume of
responses we will not be able to reply to all inquiries.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 45
SEEKING ESTIMATING ADMINISTRATOR
Dutra is currently looking for an Estimating Administrator. This position supports the Estimating Department. Successful applicant will be re-sponsible for distributing, organizing and maintaining bidding documents such as plans, specifications, addenda and quotes. Will also work to support the Chief Estimator and Proposal and Contracts Manager in preparing estimates, proposals, Statement of Qualifications and marketing materials. Additionally, will assist the Contract Administrator with bonds, contracts and tracking SBE participation.
ESSENTIAL DUTIES AND RESPONSIBILITIES:• Distribute, organize and maintain bidding documents including printing, copying, filing and tracking distribution.• Assist in the preparation of estimates, proposals, SOQs and marketing materials.• Assist in the preparation of contract documents, bond requests and Small Business Enterprise (SBE) requirements and goals.• Keep accurate records of SBE participation. Ensure company is compliant with SBE regulations.• Maintain detailed and organized files on future, current and past projects.• Prepare reports, maintain estimating schedule and track contract deadlines.• Identify and track bidding opportunities.
COMPETENCIES: Communication Proficiency: Demonstrates effective written and oral communication skills. Attention to Detail: Diligently attends to detail and pursues quality in accomplishing tasks. Checks work to ensure accuracy and completeness. Researching Information: Identifies, collects and organizes data for analysis and decision making. Knows where and how to access the right data for the assignment. Teamwork: Promotes cooperation and commitment within a team to achieve goals and deliverables.
QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The require-ments listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Education/Experience: Associate of Arts degree and at least three years of Administrative experience. Language Ability: ability to effectively communicate and respond to questions from manager, clients, customers and internal team. Reasoning Ability: ability to apply common sense understanding to carry out instructions furnished in written, oral, diagram, or schedule form. Computer Skills: to perform this job successfully, an individual should have knowledge of and experience with internet research, and advanced abilities in Microsoft Office software including Outlook, Word, Excel, and PowerPoint. Physical Presence: Regular and predictable physical presence in the corporate office is an essential qualification for this position due to the
importance of the team-related aspects of the essential duties, the aggres-sive timeframes under which the employee will operate, and the need for face-to-face interaction with employees in Estimating and Operations in order to properly perform job-related functions.
SUPERVISORY RESPONSIBILITIES: This position has no supervi-sory responsibilities.
WORK ENVIRONMENT: The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommoda-tions may be made to enable individuals with disabilities to perform the essential functions. Usual office work conditions. The noise level in the work environment is moderate. Minimum physical exertion.
PHYSICAL DEMANDS: The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the es-sential functions. The employee must occasionally lift and/or move up to 25 pounds. Specific vision abilities required by this job include close vision. While performing the duties of this job, the employee is regularly required to sit; use hands to finger, handle, or feel and talk or hear. The employee is occasionally required to stand and walk.
The above job description is not intended to be an all-inclusive list of duties and
standards of the position. Incumbents will follow any other instructions, and
perform any other related duties, as assigned by their supervisor.
www.marinba.org ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 46
www.marinba.org ◆ [email protected] ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
SEEKING ESTIMATOR IN COMMERCIAL ROOFING
Wedge Roofing, Inc. is currently looking for an Estimator in the Commercial Roofing Market for the San Francisco Bay Area. Experienced Estimator who is capable of performing hard bid and conceptual estimates in both private and public
work markets. They must be able to manage multiple estimates at one time along with some minor project management.
This person will need to have the ability to work with plans & drawings, clients, consultants, subcontractors and municipali-
ties. This position will be expected to work in both a team atmosphere and function autonomously at various times. Local
market estimating experience is also preferred. Commercial Estimator position works from Petaluma office facility.
Desired Skills & Experience
1. Familiarity with all major roofing systems.
2. Local Bay Area experience.
3. Strong client interaction skills.
4. Strong plan & bid take off skills.
FOR MORE INFORMATION CALL 707-763-5475
Company DescriptionSince 1976, San Francisco Bay Area’s most trusted roofing contractor, Wedge Roofing provides quality and dependable roofing solutions for residential, commercial, industrial and
public work clients throughout San Francisco, Marin County, Sonoma County, Napa County and the East Bay.
Lic # 416737 C-2, C39, C-43, & B General
SEEKING CONTRACT ADMINISTRATOR IN
ESTIMATING DEPARTMENT
Ghilotti Bros., Inc. is seeking a Contract Administrator in our Estimating Department. This position reports to the Vice
President of Estimating.
Some duties may include: processing/reviewing Owner and subcontractor contracts, insurance and bonding; maintaining
appropriate public agency business licenses; initiating and completing job folder; maintain jobs in progress log;
processing change orders; tracking owner and subcontractor final pay estimate timeline; coordinating final contract closeout documentation. Annual salary depends on experience. Become
part of our growing and successful team.
We are in search of someone who is very organized, proactive, works well under pressure & detail-oriented. This person must
also have strong computer skills, specifically in Microsoft applications. Preferred experience with contracts and/or in
construction field.
This position is exempt. We offer competitive pay along with an extensive benefits package. Salary is DOE.
If you’re interested in this position, please submit a cover letter
and resume to
and put “Contract Administrator” in the subject line.
If you would like more information about our company, please visit www.ghilottibros.com.
GBI is committed to being an equal opportunity employer.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 47
ReadyMarin.orgTraining and education to keep you and your family safe,
warm, and fed in the event of a disaster
In the event of an emergency, our first responders will be overwhelmed. It is critical for citizens to be prepared to take care of themselves, their neighbors, and their community for at least 3 days, and preferably 5-7.
ReadyMarin.org is Marin County’s website for information on emergency preparedness, whether you are just learning or an experienced emergency volunteer. Our mission is to provide guidance, training and resources to keep you and your family safe during an emergency, whether it requires you to evacuate or shelter in place. You will find information and links to resources, checklists, and training opportunities. Let’s get prepared.
Plan & Prepare
Learn what supplies you should store at home, work, and in your car to take care of yourself and your family for 5-7 days. Download our checklists and get started.
ReadyPets
Your pets depend on you to be prepared to help them in an emergency. Whether you are staying in your home or leaving, a little planning will go a long way.
ReadyKids
Tips for preparing you and your children in a disaster. Kits, games, contact information cards. We have the resources you need.
Get Ready Training
Get Ready is a county-sponsored 2-hour training, facilitated by our local Fire Departments and community volunteers, that will provide you with an overview of how to prepare your family and home.
Community Emergency Response Team (CERT)
For those of you who wish to step beyond preparing your home and reach out to help your community in an emergency, train to be a Community Emergency Response Team (CERT) member.
Resources
We have listed great resources and links to help you prepare to whatever level you wish.
This project is supported by US Department of Homeland Security (DHS) FY2011 Homeland Security Grant #97-067 awarded by the State of California Office of Homeland Security (Cal OES). The opinions, findings, and conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of DHS.
www.readymarin.org
www.marinba.org ◆ [email protected]