MUNICIPAL CORPORATION OFGREATER MUMBAI
BRIDGE DEPARTMENT
VOLUME-I
UNIFIED SCHEDULE OF RATES FOR
BRIDGE WORKS
2013
-
8/13/2019 MCGM USOR Bridge 2013
2/81
FOREWORD
Ever since it's establishment in 1888 by the erstwhile British rulers in India, in the last
125 years of the history of its existence Mumbai Municipal Corporation has catered
to every aspect of the citizen of Mumbai that can be conceived of. Think of Engineer
Victor Tulloch, who through his unparalleled immense efforts conceived the water
supply scheme fetching running over from distance of more than 100 km by
constructing a dam across river Tansa, to feed the population of Mumbai, then only a
few thousands in number. The items have changed with technological advancement
and the works like Roller Compacted Concrete Dam at Middle Vaitarna or numerous
underground tunnels for water supply and sewerage disposal, for example, have
become hallmark of MCGM's dedication to the citizen of Mumbai. The challenges
have always been daunting, nevertheless, always met with.
Every civilization be it 5000 years old Harrappan civilization on the bank of
Sindhu River, or Mumbai on the west coast of the Indian Ocean, require
infrastructure like water supply and sewerage system, storm water drainage system,
road, bridges, etc. and hospitals, markets, recreation centers etc. The exponentially
growing population of Mumbai and the technological explosion in the field of
engineering has made every aspect of contracting of works highly challenging.
M.C.G.M. is one of the largest local self government in the Asian Continent.
In observance of historic traditions of strong civic activism, with the change in time
and living conditions to match with the urbanization, M.C.G.M. has mainly focused in
providing variety of engineering services viz, storm water drain, sewerage, water
supply projects, roads, bridges, solid waste management, environmental services.
Beside this, the Corporation is also providing dedicated services in the Health sector
by establishing numbers of Major and Peripheral hospitals.
To update and modernize the mechanism being used for working on projects
from the stage of conceptualization upto execution, the need was realized to revise
prevailing Schedule of Rates along with specifications which were in operations
with various departments and being prepared individually as per their need and
used to revised at different span of time, resulting into various anomalies. Therefore,
to overcome all these, it was essential to revise the schedule of rates, not only with
simple mechanized revision, major changes to keep up with the pace of urbanization,
civilization, construction techniques / mechanization and voluminous developments
by restructuring items in the schedule as per requirements. This exercise would
-
8/13/2019 MCGM USOR Bridge 2013
3/81
provide comfort with field requirements and designs and will assist in effective
checks on creation of extra items during execution.
A conscious decision has been taken to keep pace with the changing time
and preparation of Unified Schedule of Rates is the first step forward in this direction.
Since long time, there have been demands made by the stake holders like Municipal
Engineers and Contractors about non-uniformity, anomalies and discrepancies in
various schedules of rates for work contracts of various departments of MCGM.
Every department had its own expertise and way of functioning which got reflected in
its independent schedule of rates, which, however, had no linkage with the fair
market schedules of other departments and resulting into extra items and fair rates.
In place of earlier 9 Schedule of Rates, the Unified Schedule of Rates is an effort &
seeks to rectify the defects, discrepancies and non uniformities which will provide,
not to mention about the ease and accuracy of estimation to the Engineers.
In view of the enormous and voluminous nature of work, keeping time
frame in perspective and above all, to ensure professionalism, the work of
preparation of Unified Schedule of Rates was awarded to the eminent consultants
M/s.Tata Consulting Engineers Ltd. M/s.Tata Consulting Engineers Ltd were directed
to conduct a thorough factual market research for major materials from
stockists/manufacturers/dealers and to study schedules of rates of Govt bodies like
C.P.W.D. and P.W.D. The new Rate Analysis are based on Factual Market research
done by M/s.Tata Consulting Engineers Ltd.
The anomalies in rate are minimized after extensive market research and
collection of quotations from reputed large scaled stockists/dealers, and also after
comparison with rates of CPWD, PWD etc.
The SOR is linked with its comprehensive specifications of basic important
activities so as to have clarity in execution. These specifications follow a chronology
of general scope of the item, material required, processing of material, construction
operation, finishing and mode of measurement.
All the rates are now linked to their detailed specifications and wherever
required, with drawings. Though there are about 12500 items, every item is now
given a Unique Code No. which will eliminate the repetition.
It has been our endeavour to include all the necessary modern materials and
technologies in SOR, for example, the concept of green building, which will go a long
-
8/13/2019 MCGM USOR Bridge 2013
4/81
way to have control on creation of extra items and fair rates. A salient feature of this
USR is 'Starring of items' specified, categorically which can be used only at certain
works or locations.
Another salient features is 'Dynamic Rate System' which will be based on
study of data base of quantities and bidding prices of awarded contracts on the basis
of which necessary corrections can be applied to the Unified Schedule of Rates at
specified intervals. The MCGM will be now in position to revise the Unified Schedule
of Rates every year after incumbency period of M/s.Tata Consulting Engineers Ltd of
one year, to work with and correct the system as and when necessary.
I hope this 'Unified Schedule of Rates' will be a milestone in civic governance
by MCGM. This self-contained publication shall be of great help and guidance to theofficers engaged in the project work of MCGM.
A.M.C. (Project) Municipal Commissioner
-
8/13/2019 MCGM USOR Bridge 2013
5/81
A. GENERAL NOTES
1. The schedule of rates will be operative from 16-09-2013
2. The unified schedule of rates includes following department:
i. Buildings
ii. Water Supply Projects
iii. Hydraulic Engineering
iv. Sewerage Projects
v. Storm Water Drainage
vi. Roads
vii. Bridges
viii. Traffic and Signals
ix. Mechanical and Electrical
x. Garden Works
3. Volume-I contains USR, basic rate list and approved makes and Volume-II
contains specification along with drawings wherever necessary and mandatory
tests.
4. The specification of the items shall be as per latest Indian Standard Codes
unless otherwise specified.
5. The rates of the items in this schedule of rates are worked out assuming average
lead for Greater Mumbai area for all sorts of materials.
6. The rates are inclusive of transportation, duties, taxes and charges of all
Government, Municipal or any other statutory body, applicable from time to time
but exclusive of Works Contract Tax and Labour Cess levied by Government of
Maharashtra.
7. The rates also includes Overheads @ 5% and Contractors Profit @10% which is
inclusive of labour supervision charges, tools and plants.
8. Rates of common material and labour is attached in the Annexure-A in Volume-I.
9. The building Schedule of Rates 2013 includes the existing items of FMA, FMB
2009, SIC and Fair items, with deletion of obsolete items, merger of similar items
-
8/13/2019 MCGM USOR Bridge 2013
6/81
and value addition of new items in line with modern technology and trends in
accordance with latest rules, regulation, byelaws etc.
10. As per the Government policy the use fly ash is done for framing the items of
work in accordance with the latest provisions of IS Codes. Also green building
items have been introduced in new schedule to minimize the consumption of
energy during construction and occupancy of building and also maintaining
ecological balance.
11. From safety, health and environment point of view two legged steel tubular
scaffolding shall be used, without making any holes in the outer face of the
building or any structure. And no extra payment shall be made for works like
scaffolding, centering for any height unless otherwise specified.
12. All materials shall be as per approved list of MCGM or equivalent material having
quality standards as per relevant IS codes and shall be of first quality unless
otherwise specified.
13. Following basic rates are considered in the USR:
i. Cement : Rs. 6,000/ MT
ii. Mild Steel : Rs. 47,400/ MT
iii. HYSD Steel (Fe415) : Rs. 48,400/ MT
iv. T.M.T. (Fe500) : Rs. 49,400/ MT
v. Structural Steel : Rs. 53,400/ MT
14. Rates given in SOR are for estimation purpose.
15. Rates of items and specification for excavation, concrete, plaster and brickwork
shall be referred from common schedule unless and otherwise not mentioned in
concerned departments schedule.
16. Coding of items:
The Coding procedure for Basic master material is as follows:
Code will start with the common prefix of MA which stands for materials
Followed by Abbreviation code for each schedule of rate for eg H.E. for
Building works, SP for Sewerage, WSP for water supply and so on and so
forth.
The first item category in the list will be numbered as 1
The last part of the code will be a number starting with a to indicate the item
number in the master list.
The alpha numerics will be separated by (dash).
-
8/13/2019 MCGM USOR Bridge 2013
7/81
The code will look like: MA-GN-01
The Coding procedure for SOR is as follows:
Code will start from abbreviation for Department name HE or WSP or SP
The USR will be subdivided into chapters according to the item classification;
these chapters will be numbered as 1, 2, 3 ..
The items under the chapter will be numbered from 1
The sub items will be numbered as a, b, c .
The code will look like CS-CW-1-a-1
Abbreviations to be used for Department
Sr. No. Department Abbreviation
1 Building works/Common
Schedule
CS
2 Roads RW
3 Traffic and Signalling RT
4 Bridges BW
5 Water Supply Projects WSP
6 Hydraulic Engg. HE
7 Sewerage Projects SP
8 Storm Water Drains SWD
9 Mechanical and electrical ME
10 Garden Works GW
-
8/13/2019 MCGM USOR Bridge 2013
8/81
B. SALIENT FEATURES OF SOR FOR BUILDING WORKS
1) All the rates are for all heights and levels unless noted otherwise.
2) Chloropyrifos EC 20 has been considered for anti termite treatment.
3) Artificial sand (crushed sand) has been considered for flooring bedding and for
concrete work.
4) All the items are excluding fixtures otherwise not specified in respective item. In such
case, items of Hardware section shall be used for fixtures.
5) For plastering and mortar work, river sand has been considered.
6) For plastering work all the rates are for all heights and levels and architectural
decorative surface.
7) All external plaster items are including waterproofing compound except plastering
item for structures like compound wall, masonary pedestals, pillars, etc.
8) Items for ashlar masonry, dewatering, self compacting concrete, vacuum dewatered
concrete flooring and TMT steel bars have been introduced.
9) Rates of all the items in roofing work are inclusive of staging or scaffolding for any
height.
10) Non-asbestos cement sheet provided in place of asbestos cement sheet roofing.
11) Concreting of pile shall be done with RMC only.
12) Rates of piling are inclusive of Chiseling of intermediate local boulders. No separate
payment shall be made for the same
13) While estimating the quantity for Grouting of bentonite slurry in bored precast piles
shall be measured as per bore dia and pile dia. Exact quantity can be measured
while execution and shall be paid accordingly
14) Rates considered in concrete items are including pumping of concrete upto placing
point.
15) New items like Self compacting concrete, vacuum dewatered concrete flooring and
TMT steel bars have been introduced.
16) The dismantling and demolishing chapter covers only removing old items and repair
work covers both removing old items and refixing the new.
17) For heritage works the rate includes the statutory charges for heritage committee
and conservation architect and no extra payment will be made.
18) APP (Atactic poly-propylene) modified polymeric membrane water proofing will be
used only for trial basis on approval of City Engineer and/or Chief Engineer (P&D).
19) In plumbing waterless urinals, fly ash bricks, fly ash concrete for green building
concept have been introduced.
-
8/13/2019 MCGM USOR Bridge 2013
9/81
Star Rating:
In view of ambiguity related to choice of quality or grade of materials and subsequent
items of works to be used at Ward level projects, Centralised projects or Special projects
of and for smooth functioning during planning stage of a project, the new concept of Star
Rating has been introduced for building works depending on the life expectancy of
building, degree of occupancy of building and comfort to the end user. The buildings or
structures rated are as follows:
i. Two Star **- Ward offices and Central dept. Offices, schools, Small
Hospitals, Primary Health Center, Fire Station, Crematorium, Slaughter
Houses, Markets, Swimming Pools, Zoos, Chowkies, Libraries, Staff
quarters and residential colonies, Public Toilets and Water tanks.
ii. Three Star ***- Superspeciality Hospitals , Drama Theatres, MCGM
Mayors and Officers bungalow, Heritage Structures, Head Office and
Engineers Hub.
The items or work not marked as two star or three star are assumed to be
applicable for all the star buildings or structures mentioned above.
-
8/13/2019 MCGM USOR Bridge 2013
10/81
C. SALIENT FEATURES OF SOR FOR ROAD AND BRIDGE WORKS
1. The rate analysis includes some provisions such as shuttering / centering on a
percentage basis. This has been brought on a rational basis using available data.
2. Since the entire area covered by Greater Mumbai falls within the coastal belt, the
minimum grade of structural concrete as recommended by IRC / MORTH for severe
exposure has been adopted.
Items referred from common schedule or other schedule:
ROAD
CS-EW-15 & 16: Excavation in foundation for road works
CS-CW-1-c: Cement Concrete - Nominal Mix of 1:3:6 -M10
CS-CW-1-a: P/L M-20 grade concrete for RCC work (using cement @ 330
kg/cum) - All work upto plinth level
CS-CW-7 & 19: Providing and laying in position machine batched and machine
mixed design mix M-40 grade
CS-CW-30-a: Formwork
CS-PL-52: Cement Mortar 1:2 (1 Cement: 2 Coarse/ Fine Sand)
CS-PL-56: Cement Mortar 1:6 (1 Cement: 6 Coarse/ Fine Snad)
CS-CW-35-a: Reinforcement for R.C.C. work all complete. -Upto plinth level
Mild steel bars.
CS-SS-01: Providing, detailing, fabricating and fixing at desired location
using hot rolled sections and MS Plates of grade Fe 250 as
per specifications and approved fabrication drawings
S-PN-4-c: Oil paint/ synthetic enamel paint in two coats with one coat ofprimer for Steelwork
BRIDGE:
CS-EW-1-10: Earthwork
CS-SS-01: Providing and Fabricating structural steel work in rolled
sections
CS-CW-1-b: PCC Grade M15 for Open Foundation by Mixer
CS-CW-1-a: PCC Grade M20 for Open Foundation by Mixer
-
8/13/2019 MCGM USOR Bridge 2013
11/81
CS-CW-2-a-1: RCC Grade M20 for Open Foundation by Batching Plant
(RMC)
CS-CW-16: Extra and over for providing richer RMC of M-25 grade cement
concrete instead of M20
CS-CW-17: Extra and over for providing richer RMC of M-30 grade cement
concrete instead of M20
CS-CW-18: Extra and over for providing richer RMC of M-35 grade cement
concrete instead of M20
CS-CW-19: Extra and over for providing richer RMC of M-40 grade cement
concrete instead of M20
CS-CW-20: Extra and over for providing richer RMC of M-45 grade cement
concrete instead of M20
CS-CW-21: Extra and over for providing richer RMC of M-50 grade cement
concrete instead of M20
CS-CW-35-b: Supplying, fitting and placing HYSD bar reinforcement
Items that are referred to other SORs
RW-2-01: Supplying blue trap stones of approved quality & providing the
same in rubble packing 25cm.
D. LIST OF UNITS USED
Sr.
No.
Units Abbreviation
Symbol
Remark
1 Length (Running Meter) Rmt
2 Weight (Metric Tonne) MT
3 Weight Kilogram Kg
4 Time Shift Shift Refers to a time duration of 8 Hrs
5 Time (Hour) Hr
6 Quantity (Numbers) Each/No.Each refers to a single quantity per
entity
7 Quantity (Lump sum) LS
8 Volume Cum
9 Area (Square Meter) Sqm
10 Litre Ltr
11 Cubic Centimeter Cucm
-
8/13/2019 MCGM USOR Bridge 2013
12/81
E. LIST OF ABBREVIATIONS
AASHTO American Association of State Highway and Transportation Officials
ASTM American Society for Testing and Materials
BS British Standard published by the British Standards Institution
BOQ Bill of Quantities forming part of the contract
CBR California Bearing Ratio
IRC Indian Road Congress
IS Indian Standard published by the Bureau of Indian Standards
WC Water Cement Ratio
CRRI Central Road Research Institute
UCS Unconfined Compressive Strength
WBM Water Bound Macadam
SAM Stress Absorbing Membrane
SAMI Stress Absorbing Membrane Interlayer
MoRTH Ministry of Road Transport and Highways
PCC Plain cement concrete
RCC Reinforced cement concrete
PSC Prestressed concrete
HYSD High Yield Strength Deformed Bars
EJ Expansion joints
FBEC Fusion Bonded Epoxy Coating
RE Reinforced Earth
ESU Elastomeric slab unit
-
8/13/2019 MCGM USOR Bridge 2013
13/81
Schedule for Bridge Works
2013
INDEX
Chapter.No.
ChapterCode
Contents Item RangePageNo.
1 BW-1 SUBSOIL INVESTIGATION BW-1-1 to BW-1-28 1-4
2 BW-2 FOUNDATION BW-2-1 to BW-2-115 4-24
3 BW-3 SUB-STRUCTURE BW-3-1 to BW-3-29 24-28
4 BW-4 SUPER-STRUCTURE BW-4-1 to BW-4-72 28-38
5 BW-5 MISCELLANEOUS ITEMS BW-5-1 to BW-5-7 38-45
6 BW-6RIVER TRAINING ANDPROTECTION WORKS
BW-6-1 to BW-6-11 45-47
7 BW-7REPAIR ANDREHABILITATION
BW-7-1 to BW-7-23 47-48
BASIC RATE LIST Appendix-A 49-57
LIST OF APPROVEDMAKE
Appendix-B
-
8/13/2019 MCGM USOR Bridge 2013
14/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
SUBSOIL INVESTIGATION
A) WORKS TO BE CARRIED OUT IN HAND
Note: Contractors will have to submit proof of sufficient technical
competence of agency undertaking items below. The contractors will
not be entitled to additional reimbursement for employing alternative
agency, if Engineer-in-charge so desires.
BW-1-01
Providing and transporting necessary and adequate plant and
equipment to site with in a lead of 50 km for taking trial bores for subsoil
investigations including conducting an initial survey for establishing datum
RLS and locations at trial bores including installation of the drilling
equipment of the first bore location etc. complete as specified and
directed.
Each unit 25000.00
BW-1-02
Shifting and locating the drilling equipment from one location to
another within a lead of 500 m between successive locations including
surveying the spot for establishing bore hole location, fixing ground levels
with reference to datum RLs and observing groundwater level during
boring operation etc. complete as specified and directed.
Each
shift1000.00
Taking trial bores upto 150 mm dia. for subsoil investigation through
overburden and soil of all sorts including providing of temporary casing
and cleaning the bottom of holes before conducting field tests or collecting
samples at various depths etc. complete as specified and directed.
BW-1-03-a a) Depth upto 6.0m below ground surface Rmt 1000.00
BW-1-03-b b) Depth beyond 6.0 m upto 20.0 m below ground surface Rmt 1200.00Taking trial bores for subsoil investigation through rock using rotary
drilling equipment with NX size diamond core drilling bits to obtain
approximately 54 mm dia. rock cores including provision of wooden boxes
for storage of cores, indexing the core samples at site of work and
conveying the same to the head quarters of concerned office etc. complete
as specified and directed.
BW-1-04-a a) Depth upto 10.0 m below ground surface Rmt 950.00
BW-1-04-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 1000.00
BW-1-04-c c) Beyond 20 mtr. Rmt 1100.00
Taking trial bores for subsoil investigation through rock using rotary
drilling equipment with NX size diamond core drilling bits and double tubecore barrel to obtain approximately 54 mm dia. rock cores including
provision of wooden boxes for storage of cores, indexing the core samples
at site of work and conveying the same to the headquarters of concerned
office etc. complete as specified and directed.
BW-1-05-a a) Depth upto 10.0 m below ground surface Rmt 1600.00
BW-1-05-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 1900.00
BW-1-05-c c) Depth beyond 20mtr. Rmt 2000.00
BW-1-06
Conducting Standard penetration test as per specifications in soil at
various levels of bore holes and reporting the results in the approved
format etc. complete as specified and directed.
No. 200.00
Collecting disturbed samples of soil from bore holes as per specifications and delivering the same to the testing laboratory anywhere
in Greater Mumbai as directed etc. complete as specified and directed.
DESCRIPTION OF ITEMS __ BRIDGE
-
8/13/2019 MCGM USOR Bridge 2013
15/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-1-07-a a) In M.S. Black tube 50 mm dia 150 mm. long including the cost of tube No. 300.00
BW-1-07-b b) In polythene bags by driving 100 mm size tube. No. 150.00
BW-1-08
Collecting undisturbed samples of soil as per specifications at any
depth in M.S. black tube 100 mm dia. 450 mm long, sealed at both endswith paraffin wax and delivering the same to the testing laboratory
anywhere in Greater Mumbai etc. complete as specified and directed.
No. 450.00
B) WORKS TO BE CARRIED OUT IN WATER CREEK
Note: 1) The Contractors will have to submit proof of sufficient
technical competence of agency undertaking items below. The
Contractor will not be entitled to additional reimbursement for
employing agency, if Engineer-in-charge so desires.
2) The Contractor will have to make their own arrangements for
boats, barges, pontoons, floating platforms etc. for carrying out the
works covered under 1.009 to 1.016 below for which no extra,
payment what so ever will be made.
BW-1-09
Providing and transporting to site necessary and adequate plant and
equipment for taking trial bores for subsoil investigations including
conducting an initial survey for establishing datum RLS and locations of
trial bores including installation of the drilling equipment of the first bore
location etc. complete as specified and directed with reference to T.H.D.
Each
Unit45000.00
BW-1-10
Shifting and locating the drilling equipment from one location to
another within a lead of 500 m between successive locations including
surveying the spot for establishing bore hole location, fixing ground levels
with reference to datum RLS and observing ground water level during
boring operation etc. complete as specified and directed.
Each
Unit3500.00
Taking trial bores upto 150 mm dia. for subsoil investigation through
overburden and soil of all sorts including cleaning the bottom of holes
before taking field tests at various depths etc. complete as specified and
directed.
BW-1-11-a a) Depth upto 6.0 m below ground surface Rmt 1600.00
BW-1-11-b b) Depth beyond 6.0 m upto 20.0 m below ground surface Rmt 2100.00
Taking trial bores for subsoil investigation through rock using rotary
drilling equipment with NX size diamond core drilling bits to obtain
approximately 54 mm dia. rock cores including provision of wooden boxes
for storage of cores, indexing the core samples at site of work and
conveying the same to the head quarters of concerned office etc. -
complete as specified and directed.BW-1-12-a a) Depth upto to 10.0 m below ground surface. Rmt 2500.00
BW-1-12-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 2800.00
BW-1-12-c c) Depth beyond 20 m to 30 m Rmt 3000.00
Taking trial bores for sub soil investigation through rock using rotary
drilling equipment with NX size diamond core drillng bits and double tube
core barrel to obtain approximately 54 mm dia. rock cores including
provision of wooden boxes for storage of cores, indexing the core samples
at site of work and conveying the same to the headquarters of concerned
office etc. complete as specified and directed.
BW-1-13-a a) Depth upto 10.0 m below ground surface Rmt 1900.00
BW-1-13-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 2400.00
-
8/13/2019 MCGM USOR Bridge 2013
16/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-1-14
Conducting Standard penetration test as per Specifications in soil at
various levels of bore holes and reporting the results in the approved
format etc. complete as specified and directed.
No. 300.00
Collecting disturbed samples of soil from bore holes as per
specifications and delivering the same to the testing laboratory anywherein Greater Mumbai as directed etc. complete as specified and directed.
BW-1-15-a a) In M.S. Black tube 50 mm dia 150 mm. long including the cost of tube No. 300.00
BW-1-15-b b) In polythene bags by driving 100 mm size tube. No. 150.00
BW-1-16
Collecting undisturbed samples of soil as per specifications at any
depth in M.S. black tube 100 mm dia. 450 mm long, sealed at both ends
with paraffin wax and delivering the same to the testing laboratory
anywhere in Greater Mumbai etc. complete as specified and directed.
No. 450.00
BW-1-17
Collecting soil samples and sub-soil water samples in glass or plastic
bottles I jars from trial bore holes and getting the same chemicallyanalyzed in an approved laboratory for determination of sulphate and
chloride contents and pH value etc. complete as specified and directed.
No. 100.00
BW-1-18
Carrying out Plate Load Test complete with necessary and adequate
Kentledge loads, equipments and instruments etc. as per specifications for
determination of bearing capacity of soil etc. complete as specified and
directed and submitting reports in duplicate.
No. 75000.00
(C) SUB-SURFACE EXPLORATIONS
BW-1-19
Preparing and submitting reports and drawings in triplicate for location
depth and details of underground pipe lines, cables and services as
existing according to standard technique as specified upto whatever depth
of excavation and including all equipment, material, and labour of technical
expertise as directed excluding excavation.
EachTrench
15000.00
Taking trial pit in soil of all sorts excluding rock including shoring and
strutting as required, collecting disturbed & undisturbed samples at 1 m
intervals and trial depth, collecting water samples & transporting all soil &
water sample to lab., visual inspection for description of strata / recording
water table encountered, dewatering manually and refilling at end etc.
complete as specified and directed.
BW-1-20-a a) Upto 2 mt. depth Cum 2000.00
BW-1-20-b b) 2 m to 4 m depth Cum 3000.00
BW-1-20-c c) 4 m to 6 m depth Cum 5000.00
(D) LABORATORY TESTING
Carrying out testsas per specifications for determination of:
BW-1-21-a i) Natural moisture Content (NMC) of soil by Oven Drying method No. 150.00
ii)Atterberg limits
BW-1-21-b a) Liquid limit No. 150.00
BW-1-21-c b) Plastic limit No. 150.00
BW-1-21-d c) Shrinkage limit No. 150.00
iii) Grain size analysis including grain size distribution curves in
accordance with IS 2720 (part 4)
BW-1-21-e a) Sieve Analysis No. 200.00
BW-1-21-f b)Hydrometer Analysis No. 300.00
BW-1-21-g iv) In-situ density of soil samples No. 150.00
BW 1 21 h ) S ifi it N 150 00
-
8/13/2019 MCGM USOR Bridge 2013
17/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-1-21-ivi) Unconfined compressive strength of rock samples, including
determination of percentage of water absorption and density.No. 500.00
BW-1-22
Carrying out Vane Shear Test at various levels of bore holes as per
specifications laid down in IS:4434 and reporting results thereof as per
prescribed proforma etc. complete as specified and directed. (Including
mobilization of necessary and adequate equpment)
No. 12000.00
BW-1-23Providing and transporting to site necessary and adequate plant and
equipment for performing DPTetc. complete as specified and directed.
Each
Unit7000.00
BW-1-24Shifting and locating plant and equipment from one location to another
location for performing DPTetc. complete as specified and directed.
Each
Shift1000.00
Performing Dynamic cone penetration test in accordance with IS 4968
and reporting the results in the approved format etc. complete as specified
and directed.
BW-1-25-aa) Conducting probing test by using lighter probing rod and light weight
hammer (18 kg)No. 3000.00
BW-1-25-b b) Conducting probing test using a-drill and SPT hammer (65 kg) No. 3000.00
BW-1-26
Conducting Direct Shear Test in accordance with IS:2720 (part 13) and
reporting results thereof as per prescribed proforma etc complete as
specified and directed.
No. 500.00
BW-1-27
Conducting Consolidation test on undisturbed soil sample or soil sample
compacted to specified density in accordance with IS 2720 ( part-15
),reporting results including unit weights, specific gravity, e-log p curve,
virgin curve, PO, eo, Cc, Cv and mv for all pressure increments etc.
complete as specified and directed.
No. 900.00
BW-1-28
Conducting Unconfined compression test on undisturebed soil samples
or soil samples compacted to specified density in accordance with IS :
2720 (part 10) and reporting results thereof as per prescribed Proforma
etc. complete as specified and directed.
No. 350.00
FOUNDATION
A) EXCAVATION
BW-2-1Excavation for foundation in any type of Marshy or creek land upto a
depth of 3.0 m by Manual meansCum 427.00
BW-2-1-a Cost for dewatering , where required for Item No. BW -2-1 Cum 96.60
BW-2-1-b Cost for Shoring & strutting , where required for Item No. BW -2-1 Cum 48.30
It is assumed that Marshy Soil will be available upto 3 m depth only. For
deeper excavation below 3 m depth, refer Common Schedule Earth WorkChapter
BW-2-2Excavation for foundation in any type of Marshy or creek land upto a
depth of 3.0 m by Mechanical MeansCum 177.00
BW-2-2-a Cost for dewatering , where required for Item No. BW -2.1.2 Cum 30.78
BW-2-2-b Cost for Shoring & strutting , where required for Item No. BW -2.1.2 Cum 15.39
It is assumed that Marshy Soil will be available upto 3 m depth only. For
deeper excavation below 3 m depth, refer Common Schedule Earth Work
Chapter
BW-2-3 Back Filling in Marshy Foundation Pits Cum 256.00
-
8/13/2019 MCGM USOR Bridge 2013
18/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-4
Excavation for foundation in earth, soil of all sorts excluding rock by
any method as required and / or directed including shoring and strutting as
necessary, removing down vegetation, bailing out water manually,
removing the excavated materials upto a safe distance as directed
including all l ifts and leads, preparing the bed for foundation, backfil ling
with approved materials, ramming, watering and disposing off the surplus
excavated material and cleaning the site etc. complete as specified and
directed (0 to 2m.)
Refer
Common
Schedule
Earth WorkChapter
BW-2-5
Excavation for foundation in earth, soil of all sorts excluding rock by
any method as required and / or directed including shoring and strutting as
necessary, removing down vegetation, bailing out water manually,
removing the excavated materials upto a safe distance as directed
including all l ifts and leads, preparing the bed for foundation, backfil ling
with approved materials, ramming, watering and disposing off the surplus
excavated material and cleaning the site etc. complete as specified and
directed (above 2m upto 4m.)
Refer
Common
Schedule
Earth Work
Chapter
BW-2-6
Excavation for foundation in earth, soil of all sorts excluding rock by
any method as required and / or directed including shoring and strutting as
necessary, removing down vegetation, bailing out water manually,
removing the excavated materials upto a safe distance as directed
including all l ifts and leads, preparing the bed for foundation, backfil ling
with approved materials, ramming, watering and disposing off the surplus
excavated material and cleaning the site etc. complete as specified and
directed (above 4m upto 6m.)
Refer
Common
Schedule
Earth Work
Chapter
BW-2-7
E.O for Excavation for foundation in soft rock by any method as
required and / or directed including bailing out water manually, removing
the excavated materials upto a safe distance as directed including all lifts
and leads, preparing the bed for foundation, backfilling with approved
materials, watering and disposing off the surplus excavated materials andcleaning the site etc. completed as specified and directed (any depth).
Refer
Common
Schedule
Earth Work
Chapter
BW-2-8
E.O for Excavation for foundation in hard rock by blasting including
bailing out water manually, removing the excavated materials upto a safe
distance as directed, stacking the serviceable materials neatly and
disposing off the unserviceable materials as directed including all leads
and lifts, preparing the bed for foundation backfilling with approved
materials and disposing off the surplus excavated materials and cleaning
the site etc. complete as specified and directed (any depth).
Refer
Common
Schedule
Earth Work
Chapter
BW-2-9
Excavation for foundation in hard rock by chiseling / wedging / line
drilling without blasting including bailing out water manually, removingthe excavated materials upto a safe distance as directed, stacking the
serviceable materials neatly and disposing off the unserviceable materials
as directed including all leads and lifts, preparing the bed for foundation,
backfilling with approved materials and disposing off the surplus excavated
materials and cleaning the site etc. complete as specified and directed
(any depth).
Refer
Common
Schedule
Earth Work
Chapter
BW-2-10Filling Annular Space Around Footing in Rock (Lean cement concrete
1:3:6 nominal mix).Cum 4696.00
BW-2-11Sand Filling in Foundation Trenches as per Drawing & Technical
SpecificationCum 1766.00
-
8/13/2019 MCGM USOR Bridge 2013
19/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-12
Dewatering on Horse Power basis by using water pumps including
diversion of streams, providing earthen bunds, cofferdams etc. as may
necessary for foundation and other parts of structure including pumping
out water during and after excavation until work for foundation and sub-
structure above natural water is completed etc. completed as specified and
directed.
HP per
hr
Refer CS-
EW-10
MASONRY ITEMS
BW-2-13
Providing and laying Dry Rubble stone packing having thickness 230 mm
and above in foundation including hand packing in regular line and level,
filling interstices with small pieces of stone, thoroughly ramming and
consolidating including watering as necessary etc. complete as specified
and directed.
Cum 1219.00
BW-2-14
Providing Coursed rubble masonry 1st sort of trap stone in cement
mortar 1:5 in superstructure including scaffolding, racking outI striking out
joints, watering etc. complete as directed and specified.
Cum 3992.00
Providing random rubble stone masonry of trap stone in cement mortar 1:3
in foundation / sub structure as per drawing and specification striking jointsof non exposed faces and pointing the exposed faces with cement mortar
1:3 including scaffolding and watering including bailing out water manually
etc. complete.
BW-2-15-a Square Rubble Coursed rubble masonry( first sort ) Cum 4776.00
BW-2-15-b Random Rubble Masonry Cum 4611.00
(B) PLAIN AND R.C.C. FOR OPEN FOUNDATIONS
Notes: Applicable for all cement concrete items in the BRIDGE
Schedule.
1) All concrete shall be machine mixed and consolidated and I or
compacted by vibrators. The maximum siize of aggregate for plain
concrete works shall be limited to 40mm and that of reinforcedconcrete shall be limited to 25mm unless otherwise specified in
particular items or in drawings.
2) Whenever contractor uses fly ash as part of the cement quantity,
the following formula shall be applied for deduction in the rate of the
item.
Amount in Rupees per Cubic metre of Concrete to be deducted from the
rate of item in the schedule of Rates/Tender :
Notes for R.M.C.
1) Any lead for R.M.C more than 20 km. is on contractors account.
2) R.M.C is required to be unloaded within one hour from plant tosite, hence more than 20kms. Is not desirable.
3) If lead is more than 20kms. The contractor has to establish his own
batching plant near site.
4) All Batch mixed plant is assumed to be RMC plant
1.155[N x a/100] (A - B)
Where N = The Number of bags per Cum. of concrete considered in the
mix.
a = Percentage of fly ash used in the concrete mix by the Contractor.
A : Market Rate of cement per bag (50 Kg) in Rupees In Mumbai or
Schedule Rate of Cement whichever is higher
B : Market Rate of fly Ash per 50Kg. in Rupees in Mumbai.
The factor 1.155 accounts for over head charges and sundries considered
i th R t b t t f th it
-
8/13/2019 MCGM USOR Bridge 2013
20/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
N' for various grade of concrete considered in the schedule of Rate.
M-45 = 10.8 bags/Cum. M-25= 8.2 bags I Cum.
M-40 = 10.8 bags/Cum. M-20 =7.20 bags / Cum.
M-35 = 10.2 bags/Cum. M-15= 6.40 bags I Cum.
M-30 = 9.2 bags/Cum. M-10 =5.50 bags / Cum.
BW-2-16
Providing and laying in position M-10 plain cement concrete to fill up loose
pockets of foundations bed for making required levels, annular filling
aroundabutments, piers, columns for foundation.
4775.00
BW-2-17
Providing and placing in position controlled cement concrete ofM-15grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels including
leveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed.
Cum 5218.00
BW-2-18
Providing and placing in position controlled cement concrete ofM-20grade
for foundation work with minimum cement 400 kg./cum. and water cementratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels including
leveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed.
Cum 5609.00
Providing and placing in position controlled cement concrete ofM-20grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 for RCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels including
leveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed but
excluding reinforcement.
BW-2-19-a a) Using concrete mixer Cum 5646.00
BW-2-19-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6019.00
Providing and placing in position controlled cement concrete ofM-25grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels including
leveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed.
BW-2-20-a a) Using concrete mixer Cum 5991.00
BW-2-20-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6210.00
Providing and placing in position controlled cement concrete ofM-25grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 for RCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels including
leveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed but
excluding reinforcement.
BW-2-21-a a) Using concrete mixer Cum 6033.00
BW-2-21-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6210.00
Providing and placing in position controlled cement concrete ofM-30grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped
/ flat / strlp footings, pile caps tie beams to required lines / levels includingleveling, compacting by vibrators, curing including shuttering, centering as
necessary and required etc. complete as specified and as directed.
-
8/13/2019 MCGM USOR Bridge 2013
21/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-22-a a) Using concrete mixer Cum 6020.00
BW-2-22-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6541.00
Providing and placing in position controlled cement concrete ofM-30grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 forRCC raft foundation slab with V notchesSloped / flat / strlp footings, pile caps tie beams to required lines /
levels including leveling, compacting by vibrators, curing including
shuttering, centering as necessary and required etc. complete as specified
and as directed but excluding reinforcement.
BW-2-23-a a) Using concrete mixer Cum 6042.00
BW-2-23-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6606.00
Providing and placing in position controlled cement concrete ofM-35grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 forRCC raft foundation slab with V notches
Sloped / flat / strlp footings, pile caps tie beams to required lines /
levels including leveling, compacting by vibrators, curing includingshuttering, centering as necessary and required etc. complete as specified
and as directed but excluding reinforcement.
BW-2-24-a a) Using concrete mixer Cum 6122.00
BW-2-24-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6779.00
BW-2-25
Providing and placing in position controlled cement concrete ofM-40grade
for foundation work with minimum cement 400 kg./cum. and water cement
ratio not exceeding 0.4 forRCC raft foundation slab with V notches
Sloped / flat / strlp footings, pile caps tie beams to required lines /
levels including leveling, compacting by vibrators, curing including
shuttering, centering as necessary and required etc. complete as specified
and as directed but excluding reinforcement.
Cum 7017.00
(C) PILE FOUNDATIONS
Providing and installing in position controlled concrete of grade M-
30(Batching Plant,Transit Mixer and Concrete Pump ) with minimum
cement content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for
RCC work in cast-in-situ bored piles each of load capacity as per design
and of specified diameter using maximum 20 mm size of aggregate
including boring through aIl strata except rock, including placing of
concrete by tremie arrangement through mild steel casing to the required
depth through all strata except rock, compaction as necessary with drawl
of mild steel casing including chipping / dressing of piles to requiredlevels, cleaning the reinforcement etc. complete as specified and directed
(Excluding reinforcement).
BW-2-26-a 1) 400 mm dia Rmt 1272.00
BW-2-26-b 2) 450 mm dia Rmt 1610.00
BW-2-26-c 3) 500 mm dia Rmt 1987.00
BW-2-26-d 5) 600 mm dia Rmt 2862.00
BW-2-26-e 8) 750 mm dia Rmt 4490.00
BW-2-26-f 11) 1000 mm dia Rmt 7982.00
BW-2-26-g 13) 1200 mm dia Rmt 11494.00
-
8/13/2019 MCGM USOR Bridge 2013
22/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
Providing and installing in position controlled concrete of grade M-35
(Batching Plant, Transit Mixer and Concrete Pump ) with minimum
cement content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for
RCC work in cast-in-situ bored piles each of load capacity as per design
and of specified diameter using maximum 20 mm size of aggregate
including boring through aIl strata except rock, including placing of
concrete by tremie arrangement through mild steel casing to the required
depth through all strata except rock, compaction as necessary with drawl
of mild steel casing including chipping / dressing of piles to required
levels, cleaning the reinforcement, removal of excavated earth with all lifts
and lead upto 1000 m. etc. complete as specified and directed (Excluding
reinforcement).
BW-2-27-a 1) 400 mm dia Rmt 1245.00
BW-2-27-b 2) 450 mm dia Rmt 1575.00
BW-2-27-c 3) 500 mm dia Rmt 1945.00
BW-2-27-d 4) 550 mm dia Rmt 2353.00
BW-2-27-e 5) 600 mm dia Rmt 2801.00
BW-2-27-f 6) 650 mm dia Rmt 3287.00
BW-2-27-g 7) 700 mm dia Rmt 3812.00
BW-2-27-h 8) 750 mm dia Rmt 4376.00
BW-2-27-i 9) 800 mm dia Rmt 4979.00
BW-2-27-j 10) 900 mm dia Rmt 6302.00
BW-2-27-k 11) 1000 mm dia Rmt 7780.00
BW-2-27-l 12)1100mmdia Rmt 9414.00
BW-2-27-m 13) 1200 mm dia Rmt 11203.00
Extra over rates quoted in items BW-2-26 and BW-2-27 for chiseling
through soft / weathered rock / hard rock / large boulders / old foundations
/ masonry / concrete etc. using a chisel weighing not less than 750 kg.
BW-2-28-a 1) 400mmdia Rmt 786.00
BW-2-28-b 2) 450 mm dia Rmt 995.00
BW-2-28-c 3) 500 mm dia Rmt 1228.00
BW-2-28-d 4) 550 mm dia Rmt 1486.00
BW-2-28-e 5) 600 mm dia Rmt 1769.00
BW-2-28-f 6) 650 mm dia Rmt 2076.00
BW-2-28-g 7) 700 mm dia Rmt 2407.00
BW-2-28-h 8) 750 mm dia Rmt 2764.00
BW-2-28-i 9) 800 mm dia Rmt 3144.00
BW-2-28-j 10) 850 mm dia Rmt 3550.00
BW-2-28-k 11) 900 mm dia Rmt 3980.00
BW-2-28-l 12) 1000 mm dia Rmt 4913.00BW-2-28-m 13) 1100 mm dia Rmt 5945.00
BW-2-28-n 14) 1200 mm dia Rmt 7075.00
BW-2-3-4Empty boring through over burden including road crust upto the bottom of
pile cap for all diameters of piles.Rmt 1806.00
Chipping and dressing of the RCC piles to remove surplus concrete
above cut off level without damaging the projecting reinforcement including
clearing reinforcement and removing the dismantled materials etc.
complete as specified and directed.
BW-2-29-a 1) 400 mm dia Rmt 110.00
BW-2-29-b 2) 450 mm dia Rmt 140.00
BW-2-29-c 3) 500 mm dia Rmt 173.00
BW-2-29-d 4) 550 mm dia Rmt 209.00BW-2-29-e 5) 600 mm dia Rmt 248.00
BW 2 29 f 6) 650 mm dia Rmt 292 00
-
8/13/2019 MCGM USOR Bridge 2013
23/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-29-g 7) 700 mm dia Rmt 338.00
BW-2-29-h 8) 750 mm dia Rmt 388.00
BW-2-29-i 9) 800 mm dia Rmt 442.00
BW-2-29-j 10) 900 mm dia Rmt 499.00
BW-2-29-k11) 1000 mm dia Rmt 559.00
BW-2-29-l 12) 1100 mm dia Rmt 690.00
BW-2-29-m 13) 1200 mm dia Rmt 835.00
Providing and installing in position controlled concrete of grade M-35
(Batching Plant, Transit Mixer and Concrete Pump ) with minimum cement
content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for RCC work in
driven cast-in-situ vertical piles each of load capacity as per design and
of specified diameter using maximum 20 mm size of aggregate including
boring through aIl strata except rock, including placing of concrete by
tremie arrangement through mild steel casing to the required depth
through all strata except rock, compaction as necessary with drawl of mild
steel casing including chipping / dressing of piles to required levels,
cleaning the reinforcement etc. complete as specified and directed(Excluding reinforcement).
BW-2-30-a a) 750 mm dia Rmt 4174.00
BW-2-30-b b) 1000 mm dia Rmt 6865.00
BW-2-30-c c) 1200 mm dia Rmt 9989.00
BW-2-31
Providing and placing in position M-35 RCC precast piles of 500 mm dia
in preformed bores made with hydraulic rig drilling / boring through all type
of strata including hard rock using portland cement with minimum cement
content as 400 kg. Per cum. and water cement ratio not exceeding 0.40
each with a load capacity as per design, transporting the precast pile from
casting yard to site of work, hoisting and holding the pile truly vertical with
the help of crane of required capacity, placing the pile in position includinggrouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)
between the pile and the preformed bore including cutting off the surplus
length of pile and dressing neatly including providing M.S. black tube 30
mm dia through the centre of pile for grouting etc. complete including cost
of all boring work through all type of strata as specified and directed but
excluding the cost of reinforcement.
Rmt 2508.00
BW-2-32
Providing and placing in position M-35 RCC precast piles of 600 mm dia
in preformed bores made with hydraulic rig drilling / boring through all type
of strata including hard rock using portland cement with minimum cement
content as 400 kg. Per cum. and water cement ratio not exceeding 0.40
each with a load capacity as per design, transporting the precast pile fromcasting yard to site of work, hoisting and holding the pile truly vertical with
the help of crane of required capacity, placing the pile in position including
grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)
between the pile and the preformed bore including cutting off the surplus
length of pile and dressing neatly including providing M.S. black tube 30
mm dia through the centre of pile for grouting etc. complete including cost
of all boring work through all type of strata as specified and directed but
excluding the cost of reinforcement.
Rmt 2788.00
-
8/13/2019 MCGM USOR Bridge 2013
24/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-33
Providing and placing in position M-35 RCC precast piles of 450 mm dia
in preformed bores made with hydraulic rig drilling / boring through all type
of strata including hard rock using portland cement with minimum cement
content as 400 kg. Per cum. and water cement ratio not exceeding 0.40each with a load capacity as per design, transporting the precast pile from
casting yard to site of work, hoisting and holding the pile truly vertical with
the help of crane of required capacity, placing the pile in position including
grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)
between the pile and the preformed bore including cutting off the surplus
length of pile and dressing neatly including providing M.S. black tube 30
mm dia through the centre of pile for grouting etc. complete including cost
of all boring work through all type of strata as specified and directed but
excluding the cost of reinforcement.
Rmt 2255.00
BW-2-34
Providing and placing in position M-35 RCC precast piles of 750 mm diain preformed bores made with hydraulic rig drilling / boring through all type
of strata including hard rock using portland cement with minimum cement
content as 400 kg. Per cum. and water cement ratio not exceeding 0.40
each with a load capacity as per design, transporting the precast pile from
casting yard to site of work, hoisting and holding the pile truly vertical with
the help of crane of required capacity, placing the pile in position including
grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)
between the pile and the preformed bore including cutting off the surplus
length of pile and dressing neatly including providing M.S. black tube 30
mm dia through the centre of pile for grouting etc. complete including cost
of all boring work through all type of strata as specified and directed but
excluding the cost of reinforcement.
4294.00
BW-2-35
Providing and placing in position M-35 RCC precast piles of 1000 mm
dia in preformed bores made with hydraulic rig drilling / boring through all
type of strata including hard rock using portland cement with minimum
cement content as 400 kg. Per cum. and water cement ratio not exceeding
0.40 each with a load capacity as per design, transporting the precast pile
from casting yard to site of work, hoisting and holding the pile truly vertical
with the help of crane of required capacity, placing the pile in position
including grouting the annular space with cement grout (1 :2) (1 cement, 2
fine sand) between the pile and the preformed bore including cutting off
the surplus length of pile and dressing neatly including providing M.S.
black tube 30 mm dia through the centre of pile for grouting etc. complete
including cost of all boring work through all type of strata as specified and
directed but excluding the cost of reinforcement.
6954.00
BW-2-36
Providing and installing in position permanent M.S. liners for piles of
specified diameter and fabricated from 6.0 to 8.0mm thick plates as per
detailed drawings and designs including cutting, bending to required
shape, welding, painting with Red Oxide paint etc. complete as specified
and directed.
MT 78465.00
BW-2-37Levelling course for Pile cap - Providing and laying of PCC M15
levelling course 100mm thick below the pile cap.Cum 4150.00
Providing and cutting bending, hooking, laying in position and tying Mild
steel / HYSD bars for reinforcement as per detailed drawings for
R.C.C.work.BW-2-38-a a) HYSD bars MT 62100.00
BW-2-38-b b) Mild Steel bars MT 61199 00
-
8/13/2019 MCGM USOR Bridge 2013
25/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
(D) WEll FOUNDATIONS
Providing and constructing temporary island 16 m diameter for
construction of well foundation for 8m dia. Well.
BW-2-39-a Assuming depth of water 1.0 m and height of island to be 1.25m. Each 38565.00
BW-2-39-b Assuming depth of water 4.0 m and height of island 4.5 m. Each 228563.00
BW-2-40Providing and constructing one span service road to reach island location
from one pier location to another pier locationRmt 1928.00
BW-2-41
Providing, fabricating and setting out in requisite position Mild steel
weighing 40 kg per metre cutting edge for RCC wells including cutting,
bending to required shape as per detailed drawings and designs including
bolting, revetting or welding sections, dowels for anchoring the cutting
edge to well curb etc. complete as specifeid and directed.
MT 83902.00
Well curb
Providing and placing in position controlled cement concrete in M-25 grade
in well curbs with minimum cement content as 400 kg/cum. water cement
ratio not exceeding 0.40 and maximum size of coarse aggregate notexceeding 20 mm including necessary formwork to give form finish
surface, compacting by vibrators, curing etc. complete as specified and
BW-2-42-a a) Using concrete mixer Cum 6979.00
BW-2-42-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7237.00
Providing and placing in position controlled cement concrete in M-30
grade in well curbs with minimum cement content as 400 kg/cum. water
cement ratio not exceeding 0.40 and maximum size of coarse aggregate
not exceeding 20 mm including necessary formwork to give form finish
surface, compacting by vibrators, curing etc. complete as specified and
directed. (Excluding reinforcement).
BW-2-43-a a) Using concrete mixer Cum 7006.00
BW-2-43-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 8995.00
Providing and placing in position controlled cement concrete in M-35
grade in well curbs with minimum cement content as 400 kg/cum. water
cement ratio not exceeding 0.40 and maximum size of coarse aggregate
not exceeding 20 mm including necessary formwork to give form finish
surface, compacting by vibrators, curing etc. complete as specified and
directed. (Excluding reinforcement).
BW-2-44-a a) Using concrete mixer Cum 7133.00
BW-2-44-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7822.00
Well steining
BW-2-45
Providing and placing in position controlled cement concrete of M-15 grade
in PCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed.
Cum 5519.00
-
8/13/2019 MCGM USOR Bridge 2013
26/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-46
Providing and placing in position controlled cement concrete of M-20 grade
in PCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings andcuring etc. complete as specified and directed.
Cum 5933.00
Providing and placing in position controlled cement concrete ofM-20grade
in RCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed. (Excluding
reinforcement)
BW-2-47-a a) Using concrete mixer Cum 5972.00
BW-2-47-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6367.00
Providing and placing in position controlled cement concrete of M-25
grade in PCC well steining as per detailed design and drawings with
minimum cement content of 400 kg/cum, water cement ratio not exceeding
0.40 and-maximum size of aggregate not exceeding 20 mm including form
work to give form finish surface, compacting by vibrators, necessary
bracings and curing etc. complete as specified and directed.
BW-2-48-a a) Using concrete mixer Cum 6353.00
BW-2-48-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6568.00
Providing and placing in position controlled cement concrete ofM-25grade
in RCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed. (Excluding
reinforcement)
BW-2-49-a a) Using concrete mixer Cum 6397.00
BW-2-49-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6634.00
Providing and placing in position controlled cement concrete of M-30 grade
in PCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings andcuring etc. complete as specified and directed.
BW-2-50-a a) Using concrete mixer Cum 6398.00
BW-2-50-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6918.00
Providing and placing in position controlled cement concrete ofM-30grade
in RCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed. (Excluding
reinforcement)
BW-2-51-a a) Using concrete mixer Cum 6422.00
BW 2 51 b b) With Batching Plant Transit Mixer and Concrete Pump Cum 6987 00
-
8/13/2019 MCGM USOR Bridge 2013
27/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
Providing and placing in position controlled cement concrete ofM-35grade
in RCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed (Excluding
reinforcement).
BW-2-52-a a) Using concrete mixer Cum 6539.00
BW-2-52-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7170.00
Providing and placing in position controlled cement concrete ofM-40grade
in RCC well steining as per detailed design and drawings with minimum
cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and
maximum size of aggregate not exceeding 20 mm including form work to
give form finish surface, compacting by vibrators, necessary bracings and
curing etc. complete as specified and directed (Excluding
reinforcement).
BW-2-53 - With Batching Plant, Transit Mixer and Concrete Pump Cum 7494.00
Sinking of 6 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-54-a Depth below bed level upto 3.0 M Rmt 3296.00
BW-2-54-b Beyond 3m upto 10m depth Rmt 4594.00
Beyond 10m upto 20m
BW-2-54-c Add 5% for every additional meter depth of sinking over the rate of sinkingfor the previous meter
Rmt 6067.00
Beyond 20m upto 30 m
BW-2-54-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 11378.00
BW-2-54-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .13654.00
Beyond 30m upto 40 m Rmt
BW-2-54-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meter27033.00
BW-2-54-gAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .
Rmt 32439.00
Clayey soil ( 6m dia. Well )
BW-2-55-a Depth below bed level upto 3.0 M Rmt 4623.00
BW-2-55-b Beyond 3m upto 10m depth Rmt 10132.00
Beyond 10 m upto 20 m
BW-2-55-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 13383.00
BW-2-55-d Add for dewatering @ 5% of cost, if required. Rmt 14052.00
Beyond 20m upto 30 m
BW-2-55-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meter Rmt 25104.00
BW-2-55-f Add 5% of cost for dewatering of the cost, if required Rmt 32949.00
-
8/13/2019 MCGM USOR Bridge 2013
28/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-55-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 31380.00
Beyond 30m upto 40 m
BW-2-55-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meter
Rmt 59644.00
BW-2-55-i Add 5% of cost for dewatering, if required Rmt 75151.00
BW-2-55-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 71573.00
Soft rock (6m dia well )
BW-2-56 Depth of soft rock strata upto 3m Rmt 16577.00
Hard rock (6m dia well )
BW-2-57 Depth of soft rock strata upto 3m Rmt 16482.00
Sinking of 7 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-58-a Depth below bed level upto 3.0 M Rmt 4831.00
BW-2-58-b Beyond 3m upto 10m depth Rmt 6367.00
Beyond 10m upto 20m
BW-2-58-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 8409.00
Beyond 20m upto 30 m
BW-2-58-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 15772.00
BW-2-58-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour) .Rmt 18927.00
Beyond 30m upto 40 m
BW-2-58-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 37470.00
BW-2-58-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.Rmt 44964.00
Clayey soil ( 7m dia. Well )
BW-2-59-a Depth below bed level upto 3.0 M Rmt 6367.00
BW-2-59-b Beyond 3m upto 10m depth Rmt 9071.00
Beyond 10 m upto 20 m
BW-2-59-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 11980.00
BW-2-59-d Add for dewatering @ 5% of cost, if required. Rmt 12579.00
Beyond 20m upto 30 m
BW-2-59-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 22472.00
BW-2-59-f Add 5% of cost for dewatering on the cost, if required Rmt 29494.00
BW-2-59-g Add 25% of cost for Kentledge including supports, loading arrangementand Labour ). Rmt 28089.00
Beyond 30m upto 40 m
-
8/13/2019 MCGM USOR Bridge 2013
29/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-59-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 53389.00
BW-2-59-i Add 5% of cost for dewatering, if required Rmt 67270.00
BW-2-59-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).
64067.00
Soft rock ( 7m dia well )
BW-2-60 Depth of soft rock strata upto 3m Rmt 13392.00
Hard rock ( 7m dia well )
BW-2-61 Depth upto 3 m Rmt 19719.00
Sinking of 8 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soilBW-2-62-a Depth below bed level upto 3.0 M Rmt 5893.00
BW-2-62-b Beyond 3m upto 10m depth Rmt 7216.00
Beyond 10m upto 20m
BW-2-62-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 9532.00
Beyond 20m upto 30 m
BW-2-62-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 17881.00
BW-2-62-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 21457.00
Beyond 30m upto 40 m
BW-2-62-f Add 10% for every additional meter depth of sinking over the rate ofsinking for the previous meter
Rmt 6285.00
BW-2-62-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.Rmt 7543.00
Clayey soil ( 8m dia. Well )
BW-2-63-a Depth upto 3.0 M Rmt 7801.00
BW-2-63-b Beyond 3m upto 10m depth Rmt 10550.00
Beyond 10 m upto 20 m
BW-2-63-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 13933.00
BW-2-63-d Add for dewatering @ 5% of cost, if required. Rmt 14630.00
Beyond 20m upto 30 m
BW-2-63-e Add 7.5% for every additional meter depth of sinking over the rate ofsinking for the previous meter
Rmt 26133.00
BW-2-63-f Add 5% of cost for dewatering on the cost, if required Rmt 34299.00
BW-2-63-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 32666.00
Beyond 30m upto 40 m
BW-2-63-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 62088.00
BW-2-63-i Add 5% of cost for dewatering, if required Rmt 78231.00
BW-2-63-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 74505.00
Soft rock ( 8m dia well )
BW-2-64 Depth in soft rock strata upto 3m Rmt 14964.00Hard rock ( 8m dia well )
BW-2-65 Depth in hard rock strata upto 3 m Rmt 20399.00
-
8/13/2019 MCGM USOR Bridge 2013
30/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
Sinking of 9 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-66-a Depth below bed level upto 3.0 M Rmt 6000.00
BW-2-66-b Beyond 3m upto 10m depth Rmt 7905.00
Beyond 10m upto 20m
BW-2-66-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 10440.00
Beyond 20m upto 30 m
BW-2-66-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 19582.00
BW-2-66-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 23498.00
Beyond 30m upto 40 mBW-2-66-f
Add 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 46522.00
BW-2-66-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.Rmt 55827.00
Clayey soil ( 9m dia. Well )
BW-2-67-a Depth below bed level upto 3.0 M Rmt 8281.00
BW-2-67-b Beyond 3m upto 10m depth Rmt 11348.00
Beyond 10 m upto 20 m
BW-2-67-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 14987.00
BW-2-67-d Add for dewatering @ 5% of cost, if required. Rmt 15736.00
Beyond 20m upto 30 mBW-2-67-e
Add 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 28109.00
BW-2-67-f Add 5% of cost for dewatering on the cost, if required Rmt 36894.00
BW-2-67-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 35137.00
Beyond 30m upto 40 m
BW-2-67-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 66781.00
BW-2-67-i Add 5% of cost for dewatering, if required Rmt 84145.00
BW-2-67-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 80138.00
Soft rock ( 9m dia well )BW-2-68 Depth upto 3m Rmt 18419.00
Hard rock ( 9m dia well )
BW-2-69 Depth of hard rock strata upto 3 m Rmt 23418.00
Sinking of 10 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-70-a Depth below bed level upto 3.0 M Rmt 7055.00
BW-2-70-b Beyond 3m upto 10m depth Rmt 8397.00
Beyond 10m upto 20m
BW-2-70-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 11090.00
-
8/13/2019 MCGM USOR Bridge 2013
31/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-70-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 20802.00
BW-2-70-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 24963.00
Beyond 30m upto 40 m
BW-2-70-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 49423.00
BW-2-70-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.Rmt 59308.00
Clayey soil (10m dia. Well )
BW-2-71-a Depth below bed level upto 3.0 M Rmt 9358.00
BW-2-71-b Beyond 3m upto 10m depth Rmt 11483.00
Beyond 10 m upto 20 m
BW-2-71-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 15166.00
BW-2-71-d Add for dewatering @ 5% of cost, if required. Rmt 15924.00
Beyond 20m upto 30 m
BW-2-71-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 28447.00
BW-2-71-f Add 5% of cost for dewatering on the cost, if required Rmt 37337.00
BW-2-71-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 35559.00
Beyond 30m upto 40 m
BW-2-71-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 67586.00
BW-2-71-i Add 5% of cost for dewatering, if required Rmt 85159.00
BW-2-71-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).81104.00
Soft rock (10m dia well )
BW-2-72 Depth of soft rock strata upto 3m Rmt 18728.00
Hard rock (10m dia well )
BW-2-73 Depth of hard rock strata upto 3 m Rmt 25774.00
Sinking of 11 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-74-a Depth from bed level upto 3.0 M Rmt 15860.00
BW-2-74-b Beyond 3m upto 10m depth Rmt 13687.00
Beyond 10m upto 20mBW-2-74-c
Add 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 18078.00
Beyond 20m upto 30 m
BW-2-74-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 33910.00
BW-2-74-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 40692.00
Beyond 30m upto 40 m
BW-2-74-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 80568.00
BW-2-74-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.
Rmt 96681.00
Clayey soil (11 m dia. Well )
BW-2-75-a Depth from bed level upto 3.0 M Rmt 15624.00
-
8/13/2019 MCGM USOR Bridge 2013
32/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
Beyond 10 m upto 20 m
BW-2-75-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 31622.00
BW-2-75-d Add for dewatering @ 5% of cost, if required. Rmt 33203.00
Beyond 20m upto 30 m
BW-2-75-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 59314.00
BW-2-75-f Add 5% of cost for dewatering on the cost, if required Rmt 77850.00
BW-2-75-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 74143.00
Beyond 30m upto 40 m
BW-2-75-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 140920.00
BW-2-75-i Add 5% of cost for dewatering, if required Rmt 177559.00
BW-2-75-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 169104.00
Soft rock (11m dia well )
BW-2-76 Depth of soft rock strata upto 3m Rmt 41766.00
Hard rock (11m dia well )
BW-2-77 Depth of hard rock upto 3 m Rmt 56986.00
Sinking of 12 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-78-a I) Depth below bed level upto 3.0 M Rmt 33389.00
BW-2-78-b Beyond 3m upto 10m depth Rmt 38426.00
Beyond 10m upto 20m
BW-2-78-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 50748.00
Beyond 20m upto 30 m
BW-2-78-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 95189.00
BW-2-78-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 114226.00
Beyond 30m upto 40 m
BW-2-78-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 226154.00
BW-2-78-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.
Rmt 271384.00
Clayey soil (12 m dia. Well )
BW-2-79-a Depth below bed level upto 3.0 M Rmt 37933.00
BW-2-79-b Beyond 3m upto 10m depth Rmt 58219.00
Beyond 10 m upto 20 m
BW-2-79-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 76889.00
BW-2-79-d Add for dewatering @ 5% of cost, if required. Rmt 80733.00
Beyond 20m upto 30 m
BW-2-79-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 144223.00
BW-2-79-f Add 5% of cost for dewatering on the cost, if required Rmt 189292.00
BW-2-79-g Add 25% of cost for Kentledge including supports, loading arrangementand Labour ).
Rmt 180278.00
Beyond 30m upto 40 m
-
8/13/2019 MCGM USOR Bridge 2013
33/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-79-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 342652.00
BW-2-79-i Add 5% of cost for dewatering, if required Rmt 431742.00
BW-2-79-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 411183.00
Soft rock (12m dia well )
BW-2-80 Depth of soft rock strata upto 3m Rmt 96500.00
Hard rock (12m dia well )
BW-2-81 Depth of hard rock strata upto 3 m Rmt 125737.00
Sinking of Twin D Type well ( other than pneumatic method of sinking
) through all types of strata namely sandy soil, clayey soil and rock
as shown against each case, complete as per drawing and technical
specifications. Depth of sinking is reckoned from bed level.
Sandy soil
BW-2-82-a Depth from bed level upto 3.0 M Rmt 7501.00BW-2-82-b Beyond 3m upto 10m depth Rmt 8155.00
Beyond 10m upto 20m
BW-2-82-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 10770.00
Beyond 20m upto 30 m
BW-2-82-dAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 20200.00
BW-2-82-eAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour .Rmt 24241.00
Beyond 30m upto 40 m
BW-2-82-fAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meter
Rmt 47994.00
BW-2-82-gAdd 20% of cost for Kentledge including supports, loading arrangement,
and Labour etc.Rmt 57593.00
Clayey soil (Twin D Type Well )
BW-2-83-a Depth below bed level upto 3.0 M Rmt 8998.00
BW-2-83-b Beyond 3m upto 10m depth Rmt 12702.00
Beyond 10 m upto 20 m
BW-2-83-cAdd 5% for every additional meter depth of sinking over the rate of sinking
for the previous meterRmt 16775.00
BW-2-83-d Add for dewatering @ 5% of cost, if required. Rmt 17614.00
Beyond 20m upto 30 m
BW-2-83-eAdd 7.5% for every additional meter depth of sinking over the rate of
sinking for the previous meter
Rmt 31466.00
BW-2-83-f Add 5% of cost for dewatering on the cost, if required Rmt 41299.00
BW-2-83-gAdd 25% of cost for Kentledge including supports, loading arrangement
and Labour ).Rmt 39332.00
Beyond 30m upto 40 m
BW-2-83-hAdd 10% for every additional meter depth of sinking over the rate of
sinking for the previous meterRmt 74759.00
BW-2-83-i Add 5% of cost for dewatering, if required Rmt 94196.00
BW-2-83-jAdd 20% of cost for Kentledge including supports, loading arrangement
and Labour).Rmt 89710.00
Soft rock (Twin D Type well )
BW-2-84 Depth of soft rock strata upto 3m Rmt 20774.00
Hard rock (Twin D Type well )BW-2-85 Depth of hard rock strata upto 3 m Rmt 27039.00
-
8/13/2019 MCGM USOR Bridge 2013
34/81
Schedule for Bridge Works
2013
ITEM CODE ITEM DESCRIPTION UNIT RATE
BW-2-86
Pneumatic sinking of wells with equipment of approved design, drawing
and specifications worked by competent and trained personnel and
comprising of compression and decompression chambers, reducers, two
air locks separately for men and plant & materials, arrangement for supply
of fresh air to working chambers, check valves, exhaust valves, shafts
made from steel plates of riveted construction not less than 6 mm thick to
withstand an air pressure of 0.50 MPa, controlled blasting of hard rock
where required, staircases and 1 m wide landing plate forms with railing,
arrangement for compression and decompression, electric lighting of 50 V
maximum, proper rooms for rest and medical examinations and
compliance with safety precautions as per IS:4138, all as per
clause1207.6 of Specifications.
Cum 95739.00
BW-2-87 Sand filling in wells complete as per drawing and technical specifications Cum 1766.00
BW-2-88 Providing steel liner 10 mm thick for curbs and 6mm thick for steining ofwells including fabricating and setting out as per detailed drawing
MT 76648.00
Providing and placing in position controlled cement concrete in bottom
plug of well foundations in wells or through tremie arrangement including
compacting by vibrators and curing where necessary etc. complete as
specified and directed. (10% extra cement to be added when concreting is
done under water).
PCC Grade M20
BW-2-89-a Using Concrete Mixer Cum 6310.00
BW-2-89-b Using Batching Plant, Transit Mixer and Crane/concrete pump Cum 6501.00
PCC Grade M25
BW-2-90-a Using Concr