Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
Annexure IV
FORM 1
(for seeking clearance for projects attracting CRZ Notification)
I. BASIC INFORMATION
S.
No.
Item Details
1. Name of the Project Proposed Beach Resort Project
2. Location or Site Alternatives under
consideration
Village : Sagartirth, Tank & Temb,
Taluka : Vengurla,
District : Sindhudurg,
State : Maharashtra
3. Size of the Project (in terms of total
area)
Total Site Area: 2,19,084 sq.m.
The detailed area statement is enclosed as
Annexure 1
4. CRZ Classification of the Area The land area between high tide line (HTL)
upto 500 m setback has been classified as
CRZ III except the area in the northern part
where some stabilized sand dunes are
located within the proposed site is classified
as CRZ-IA.
The land area between low tide line (LTL) and
high tide line (HTL) is termed as the intertidal
zone, has been classified as CRZ – IB
The CRZ Map indicating HTL, LTL and CRZ
Classification by NIO which is authorized by
MoEF is enclosed as Annexure 2
5. Expected Cost of the Project Rs. 2,97.6 Cr. (Cost Break-up is given in
Annexure 3)
6. Contact Information Mr. Saranjit Singh Bawa
M/s. Elite Township Pvt. Ltd.
C/o Ireo Pvt. Ltd.
Ireo Campus, Main Project Office
Sector 59, Near Village Behrampur,
Gurgaon- 122101, Haryana
Fax – 0124 – 4795100
Email – [email protected]
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
II. ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, and the like)
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
1.1 Permanent or temporary change
in land use, land cover or
topography including increase in
intensity of land use (with respect
to local land use plan)
No As per the Sindhudurg District Tourism Plan,
the proposed project site falls under
Exclusive Tourism Zone (T-5) category. The
Copy of indicating the same is enclosed as
Annexure 4.
1.2 Details of CRZ classification as per
the approved Coastal Zone
Management Plan?
Yes The land area between high tide line (HTL)
upto 500 m setback has been classified as
CRZ III except the area in the northern part
where some stabilized sand dunes are
located within the proposed site is classified
as CRZ-IA.
The land area between low tide line (LTL)
and high tide line (HTL) is termed as the
intertidal zone, has been classified as CRZ –
IB
The CRZ Map indicating HTL, LTL and CRZ
Classification by NIO which is authorized by
MoEF is enclosed as Annexure 2
1.3 Whether located in CRZ-I area? Yes The area in the northern part where some
stabilized sand dunes are located within the
proposed site is classified as CRZ-IA.
The land area between low tide line (LTL)
and high tide line (HTL) is termed as the
intertidal zone, has been classified as CRZ –
IB
1.4 The distance from the CRZ-I areas - Within the Project Site, Refer Annexure 2
1.5 Whether located within the
hazard zone as mapped by
Ministry of Environment and
Forests/National Disaster
Management Authority?
NA Not Applicable
1.6 Whether the area is prone to
cyclone, tsunami, tidal surge,
subduction, earthquake etc.?
Yes The project area falls under seismic zone III
(i.e. moderate damage risk zone) as per the
Seismic Zoning Map of India (IS 1893, Part-I,
2002). Necessary seismic factors suggested
by NBC 2005 shall be incorporated suitably
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
while designing the structures to safeguard
against earthquake risks.
According to existing records, the seismic
activity in and around the Arabian Sea is non-
existent and hence the possibility of a
tsunami hitting the project site is negligible.
The frequency of cyclonic storms in
Sindhudurg district is low compared to most
of the coastal zones in the country with only
3 cyclonic storms being recorded during the
period 1891- 2002. However storm surges
from non-cyclonic storms, particularly during
high-tide frequently cause erosion of land in
coastal talukas including Vengurla.
Howerver, Sagartirth, Tak and Temb villages
do not fall in the high-risk zone for
inundation due to storm surge.
1.7 Whether the area is prone for
saltwater ingress?
Yes The hydro - geological investigation indicate
that the area comes under saline water belt
as per CGWB. The hydrogeology
investigation report is enclosed as Annexure
5
1.8 Clearance of existing land,
vegetation and buildings?
Yes About 273 Nos. of trees will be removed.
Details of trees to be removed are as follows:
Tree Species
Proposed final net tree
removal based on the
final adjusted site plan
Casurina - Casurina
equisitifolia 12
Cashew -
Annacardium
occidentale
29
Eucalyptus -
Eucalyptus globus 22
Mango –
Magnifera Indica 7
Accacia sp. 203
Total 273
The Plan showing trees to be preserved at
project site is enclosed as Annexure 6
1.9 Creation of new land uses? No As per the Sindhudurg District Tourism Plan,
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
the proposed project site falls under
Exclusive Tourism Zone (T-5). The Copy of
indicating the same is enclosed as Annexure
4.
1.10 Pre-construction investigations
e.g. bore hole, soil testing?
Yes Geo-technical investigation report is
enclosed as Annexure 7
1.11 Construction works? Yes The project involves the construction of
beach resort comprising of 160 Guest
Rooms, 16 Suites (1BR), 2 Suites (2 BR), 29
Villas (3BR), 5 Villas (2 BR), banquet halls,
restaurant and SPA.
1.12 Demolition works? No Not Applicable
1.13 Temporary sites used for
construction works or housing of
construction workers?
Yes Mostly, local labor will be employed.
Approximate 500 laborers will be employed
during the construction phase from nearby
areas during peak period of construction.
All the construction activities including
storage of raw materials will be confined to
the project site only.
1.14 Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes The above ground building structure will be
developed as beach resort having built-up
area 61926.22 Sqm.
Total excavated earth for the construction of
basement (footing) is estimated to be 30000
cum. From this around 50% of the excavated
earth would be required to refill the area
excavated for footing. So effectively the
unused/ excavated earth left will be around
15000 cum & the rest 15000 cum will be
utilized to raise the plinth of villas & in
maintenance of landscape.
The ground coverage of the all the buildings
are of the order of around 22000 sqm. If
effectively 0.5 m of raised filling is required
below the villas then another 11000cum of
earth will likely to get utilized.
Hence cut and fill will be balanced by volume
of earth which would be excavated. No extra
earth will be required. Total quantity is as
below:
S.N. Excavated
Earth (Cum)
Earth utilized
for Villa &
Unused
Excavated
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data Landscape
areas
( cum)
Earth (Cum)
1. 30000 15000 15000
1.15 Underground works including
mining or tunneling?
Yes The proposed development would include
following underground work
• Basement
• Underground fuel storage tank
1.16 Reclamation works? No
1.17 Dredging/reclamation/land
filling/disposal of dredged
material etc.?
Yes The quantity material to be trenched is
relatively small (approximately 11000 m3)
and the disposal of the dredged material is
not being envisaged (dredged material is
used to close the trench), the potential
impact due to the trenching activity is
minimal.
1.18 Offshore structures? Yes Laying of pipelines for (i) intake of sea water
to desalination plant and (ii) disposal of
rejects and treated wastewater from STP.
1.19 Production and manufacturing
processes?
No The proposed project is the construction of
beach resort project
1.20 Facilities for storage of goods or
materials?
Yes A temporary shed will be made for the
storage of materials within the site during
construction phase, which will be dismantled
after construction.
1.21 Facilities for treatment or
disposal of solid waste or liquid
effluents?
Yes Construction Phase:
i. Solid Waste
During the construction phase, construction
debris and solid waste from labor camp will
be generated.
Construction debris will be generated due to
various construction activities and will be
reused within the site for filling purposes and
for various other construction works.
Approximately at peak construction 500
laborers will be deployed for the proposed
development. It is estimated that 50 kg/day
(@ 0.1 kg/capita/day) of waste will be
generated from the labour camp and project
site.
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
ii. Liquid Effluent
During the construction phase, it is
estimated that 20 KLD of waste water will be
generated from the project site for which
septic tank will be provided. The generated
waste water shall be disposed through
mobile STP tankers.
Operation Phase:
i. Municipal solid waste
It is estimated that about 1.3 TPD of
Municipal solid wastes will be generated
from the proposed project site.
The generated solid wastes will be separated
at source and will be handled as per the
Municipal Solid Waste (Management &
Handling) Rules, 2000.
ii. Sludge from STP
An approximately 2.6 m3 per day of sludge
will be generated from the proposed STP.
The sludge from STP will be used as manure
in landscaping.
iii. Liquid effluent:
During the operation phase, an
approximately 310 KLD of waste water will
be generated, which will be treated in a STP
of 375 KLD capacity based on Membrane Bio-
Rector (MBR) Technique. The detail of
proposed STP of 375 KLD capacity is enclosed
as Annexure 8.
1.22 Facilities for long term housing of
operational workers?
No The proposed development is a beach resort
project and will not have facilities for long
term housing of operational workers.
1.23 New road, rail or sea traffic
during construction or operation?
No The site will be accessible by MSH4 Vengurla-
Shiroda Road (Coastal Highway).
1.24 New road, rail, air waterborne or
other transport infrastructure
including new or altered routes
and stations, ports, airports etc?
No Not Applicable
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
1.25 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No No closure or diversion of existing transport
routes is envisaged. Some of the roads which
will be used for haulage of construction
materials will be upgraded resulting changes
in traffic movement for short duration only.
1.26 New or diverted transmission
lines or pipelines?
Yes Laying of pipelines for (i) intake of sea water
to desalination plant and (ii) disposal of
rejects and treated wastewater from STP.
1.27 Impoundment, damming,
culverting, realignment or other
changes to the hydrology of
watercourses or aquifers?
No The project site has an undulating
topography with variation of lowest and
highest point. The existing ground levels
(EGL) at the time of the topographical survey
range from about RL 95.0 m in the southwest
(SW) to about RL 102.0 m in the northeast
(NE) direction. However, the proposed
development would not change the local
drainage.
1.28 Stream and river crossings? No Not Applicable
1.29 Abstraction or transfers of water
form ground or surface waters?
Yes The project involves the abstraction of
groundwater (1325 KLD) for which
application has been submitted to the
Regional Director, CGWB. The copy of receipt
of application submitted is enclosed as
Annexure 9
1.30 Changes in water bodies or the
land surface affecting drainage or
run-off?
Yes The internal storm water drainage from the
project site will be channelized through
proposed storm water drains, following the
slope of the project site.
The project will involve construction of
impervious areas and hence the quantity of
runoff will increase due to reduced
infiltration. This runoff will be collected
through a well-designed storm water pipe
network and will be channelized to rainwater
storage tank as the recharge of groundwater
is not feasible due to the high groundwater
table (1.5 m to 2.5 m below EGL as indicated
in the Hydro-geological Report)
1.31 Transport of personnel or
materials for construction,
operation or decommissioning?
Yes The workforce and material will be
transported to the project site via MSH4
Vengurla-Shiroda Road.
During the operation phase, sufficient car /
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No
Information / Checklist
Confirmation
Yes /
No
Details thereof (with approximately
quantities / rates. Wherever possible) with
source of information data
bus parking area will be provided within the
project premises in order to cater to the
increase traffic load
1.32 Long-term dismantling or
decommissioning or restoration
works?
No Not Applicable
1.33 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No Not Applicable
1.34 Influx of people to an area in
either temporarily or
permanently?
Yes Construction Phase
To the maximum extent possible, the local
labour shall be employed during construction
phase. However, semi-skilled manpower and
technical personnel shall be hired from
outside.
Operation Phase
Influx of population into the area is expected
as the area is mainly being developed for
tourism purpose.
1.35 Introduction of alien species? No Not Applicable
1.36 Loss of native species or genetic
diversity?
No Not Applicable
1.37 Any other actions? No Not Applicable
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply)
S. No. Information/checklist
confirmation Yes/No
Details thereof (with approximate quantities
/rates, wherever possible) with source
of information data
2.1 Land especially undeveloped or
agricultural land (ha) Yes
The land is undeveloped (2,19,084 sq m) and has
vegetation of Ipomea Pescarpae, Vitex, Nigunda
with occasional cactus backed with casuarinas
and other vegetation are existing on the coast.
Within the project site and along the boundary,
coconut plantation and other vegetation exist
there.
2.2 Water (expected source & Yes Water Requirement
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No. Information/checklist
confirmation Yes/No
Details thereof (with approximate quantities
/rates, wherever possible) with source
of information data
competing users) unit: KLD During construction phase, water requirement is
about 80 KLD (including construction &
domestic), considering ~ 500 labors, which will
be deployed at the peak construction period. The
domestic water requirement for labours will be
25 KLD.
During the operation phase, the estimated total
water demand for project is about ~791 KLD, out
of which ~ 496 KLD fresh water demand & ~295
KLD will be met through treated water supply for
landscaping, flushing & partial HVAC cooling.
The detailed estimated water calculation and
water balance diagram is enclosed as Annexure
10.
Source of Water:
During the construction phase,
Tanker water supply from safer zone will be used
for fulfilling the water requirement.
During operation phase
The estimated fresh (raw) water demand for the
project is about 496 KLD, out of which 200 KLD
will be met from public supply system for which
we have obtained the permission from
Maharashtra Jeevan Pradhikarana, Nagar' v
Gramin Yojana Up Vibhag, Savantvadi. As there
is no other source available to fulfill the
requirement of balance 296 KLD of fresh (raw)
water, it is proposed to draw this quantity of
water from the groundwater.
The treated wastewater (295 KLD) from the STP
will be used for flushing, partial cooling and
horticulture purposes
2.3 Minerals (MT) No Not Applicable
2.4
Construction material stone,
aggregates, sand/soil (expected
source MT)
Yes
Quantity of Material
Concrete: 42000 cum
Reinforcement Grade 500: 4000 MT
Aggregate 20 mm downward: 46000 cum
Coarse sand: 26000 cum
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No. Information/checklist
confirmation Yes/No
Details thereof (with approximate quantities
/rates, wherever possible) with source
of information data
Brickwork: 21000 cum
Materials for construction would be brought
from the nearest available source.
Excavated earth and top soil shall be conserved
and reused during the site leveling and green
belt development respectively.
2.5 Forests and timber (source MT) No Not Applicable
2.6
Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes
Power Requirement
The power requirement for the operation phase
is estimated in terms of the total maximum
demand load for the proposed project, which is
approximately 2956 KW that will be sourced
from state electricity board.
Power Back-up
100 % power back-up using DG sets 7 Nos with
Capacity 750 KVA will be installed.
Boiler:
2 Nos. Boilers with capacity 1500 kg/hr of each
will be installed
Fuel Requirement (Type & Quantity): Low
Sulphur Diesel (1013.74 kg/hr)
2.7 Any other natural resources (use
appropriate standard units) No Not Applicable
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.
S.
No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
3.1
Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health or
the environment (flora, fauna, and
water supplies)
Yes
During the construction and operation phase
there will be use of hazardous materials such
as – oil, lubricants, paints etc. as classified by
the MSIHC rules. Proper management of such
material & wastes will be implemented as per
“The Hazardous Waste Management, Handling
& Trans boundary Movement (Amendment)
Rules, 2000".
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S.
No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
3.2
Changes in occurrence of disease
or affect disease vectors (e.g.
insect or water borne diseases)
No Not Applicable
3.3
Affect the welfare of people e.g.
by changing living conditions? Yes
The establishment of the new project will
bring more developmental activities in and
around the project area and there will be an
enhancement in the living standards of local
people. Local people will be benefited due to
the employment opportunities and income
generation.
3.4
Vulnerable groups of people who
could be affected by the project
e.g. hospital patients, children,
the elderly etc.,
No Not Applicable
3.5
Any other causes, that would
affect local communities,
fisherfolk, their livelihood,
dwelling units of traditional local
communities etc
No Not Applicable
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S. No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2
Municipal waste (domestic and or
commercial Management Rules)
wastes)
Yes
Construction Phase:
During the construction phase, construction
debris and solid waste from labor camp will be
generated.
Construction debris will be generated due to
various construction activities and will be
reused within the site for filling purposes and
other various construction works.
Approximately at peak construction 500
laborers will be deployed for the proposed
development. It is estimated that 50 kg/day
(@ 0.1 kg/capita/day) of waste will be
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
generated from the labour camp and project
site.
Operation Phase:
i. Municipal solid waste
It is estimated that about 1.3 TPD of Municipal
solid wastes will be generated from the
proposed project site.
The generated solid wastes will be separated
at source and will be handled as per the
Municipal Solid Waste (Management &
Handling) Rules, 2003.
ii. Sludge from STP
An approximately 2.6 m3 per day of sludge will
be generated from the proposed STP. The
sludge from STP will be used as manure in
landscaping.
4.3
Hazardous wastes (as per
Hazardous Waste Management
Rules)
Hazardous waste like used oil / spent oil (1652
liter / year) from DG sets will be generated.
It is proposed to store hazardous waste (Spent
oil/used oil) in HDPE drum at secured location
under lock & key arrangement, as per clause
no. 5.1 of Hazardous Waste Management
Rules.
The collected / stored hazardous Waste will be
sold out to the authorized recycler of MPCB.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge
from effluent treatment Yes
2.6 m3
per day of dried sludge will be
generated from the Sewage Treatment Plant
(STP), which will not be hazardous in nature;
hence can be reused in horticulture.
4.7 Construction or demolition wastes Yes
Construction activity will generate minimum
onsite waste during the construction phase.
To the extent possible, the generated
construction waste i.e. waste concrete,
mortar, left over aggregate and debris shall be
used for back filling and development of paved
areas.
4.8 Redundant machinery or
equipment No Not Applicable
4.9 Contaminated soils or other
materials No Not Applicable
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. No.
Information/Checklist
confirmation
Yes/ No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data.
5.1
Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes
Emissions from mobile sources:
The vehicular movement due to the proposed
project will lead to emissions of Sox, NOx, and
CO. The emission rates for the parameters:
Parameter Emission Rate (Kg/hr/m2)
PM10 - 2.31x10-7 Kg/hr/m2
PM2.5 - 2.41x10-7
Kg/hr/m2
NOx - 1.53x10-7
Kg/hr/m2
CO - 1.91x10-7
Kg/hr/m2
Emissions from DG Sets:
Total 7 Nos. DG sets having 750 kVA capacity of
each will be installed for proposed project. The
emission rate of each DG set are as under:
Parameter Emission Rates
CO 0.65 gm/kW-hr
NO 7.85 gm/kW-hr
PM 0.166 gm/kW-hr
HC 0.25 gm/kW-hr
Emissions from Boiler:
Total 2 Nos. Boilers of 1500 kg/hour capacity
of each will be installed for proposed project.
The emission rate of each boiler are as under:
Parameter Emission Rates
SO 1.69 kg/hr
NO < 100mg/cum
PM < 50mg/cum
5.2 Emissions from production
processes No
The proposed project is a construction of
beach resort and does not involve any
production process.
5.3 Emissions from materials handling Yes During construction phase fugitive emission
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No.
Information/Checklist
confirmation
Yes/ No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data.
including storage or transport from material handling, loading/unloading and
transport of the material may take place and
will be limited to the construction site only.
5.4
Emissions from construction
activities including plant and
equipment
Yes
Fugitive emissions during construction phase
are likely to be generated due to operation of
construction equipment such as batching plant
and construction activities and vehicles used
for transportation of construction material.
The major sources of air pollution during
construction phase include dust generation
from vehicular movement and due to
operation of batching plant and DG sets. The
mitigation measures proposed to reduce the
air pollution includes application of dust
suppressants, graveling, water sprinkling,
reducing vehicle speed by provision of speed
breakers and providing covered storage areas
for construction materials.
5.5
Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes
Dust emissions will be generated due to site
development activities and vehicular
movement. Water sprinkling will be carried
out, and tarpaulin cover will be provided over
stored raw material to reduce dust emission.
5.6 Emissions from incineration of
waste No
No incineration is proposed within the project
premises.
5.7
Emissions from burning of waste
in open air (e.g. slash materials,
construction debris)
No
Burning of waste is prohibited in open areas
within the project premises.
5.8 Emissions from any other sources No
Emission due to DG sets, Boiler and vehicular
movement have been considered in point no.
5.1 as mentioned above.
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S. No Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data with source of
information data
6.1
From operation of equipment e.g.
engines, ventilation plant,
crushers
Yes
Construction Phase:
Noise and vibrations will be generated due to
the operation of construction equipments.
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data with source of
information data
The impact of noise and vibrations will be
controlled by providing personal protective
equipments (PPEs) like ear plugs, ear muffs etc.
for workers. The noise vibrations will also be
controlled by using damped tools and
minimizing the number of hours for their
usage. The time of exposure in high noise areas
will be reduced by job rotation and night time
operations will be discouraged. Hence,
insignificant impacts due to construction
machinery are envisaged.
The noise level from construction equipments
at a distance of 50 ft. from the source will be as
per EPA (Environment Protection Act), is given
below:
Backhoe/Loader 85 dB (A)
Concrete Mixer Truck 81 dB (A)
Mobile cranes 81 dB (A)
Dump Truck 89 dB (A)
Generator 75 dB (A)
Pile Driver 101 dB (A)
Jack Hammer 90 dB (A)
During the operation phase, the major source
of noise will be the vehicular movement and
the operation of DG sets.
The DG sets will be provided with acoustic
enclosures so as to keep the noise level within
the prescribed standards of CPCB and shall
confirm to Noise Rules.
Proper traffic management plan will be
implemented. Adequately wide roads will be
developed within the project premises to cater
to two-way traffic internally, within the
project site. Noise reduction strategies like
green belt development along the internal and
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data with source of
information data
peripheral roads will be done to reduce the
vehicular noise.
6.2 From industrial or similar
processes No Not Applicable
6.3 From construction or demolition No Not Applicable
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational
traffic Yes
Construction Phase
Noise will be generated due to vehicular
movement of vehicles involved in the
construction activities. However, it will be less
in intensity and duration. To the extent
possible, construction activity will not be
carried out during night.
Operation Phase
Noise will be generated due to traffic
movements. A comprehensive traffic
management plan will be implemented to
facilitate smooth traffic flow within and near
the project site.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea.
S. No. Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
7.1 From handling, storage, use or
spillage of hazardous materials Yes
The proposed project will involve use of
hazardous material like chemicals, lubricants,
paints etc as classified by the MSIHC rules.
Proper measures will be implemented as per
The Hazardous Waste Management Handling
and Transboundary Movement (Amendment)
Rules, 2000 to avoid contamination of the any
natural resources.
Underground Fuel Storage tank and gas bottle
Bank will be provided at secured location with
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No. Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
lock & key arrangements.
7.2
From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
Yes
The reject from the desalination plant and
excess treated wastewater (if available) will be
release into the sea through single pipeline.
7.3
By deposition of pollutants
emitted to air into the land or into
water
No
The DG set and boilers will be provided with
adequate stack height to disperse the
pollutants effectively and will be used only in
case of power failure. Hence any resultant
contamination of land or water would be
unlikely.
7.4 From any other sources No Not Applicable
7.5
Is there a risk of long term build
up of pollutants in the
environment from these sources?
No Not Applicable
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
S. No. Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
8.1
From explosions, spillages, fires
etc from storage, handling, use or
production of hazardous
substances
No
This is basically a beach resort construction
project, which does not involve any major
hazardous construction activity. Hence,
chances of explosions, spillages, fires are
minimal. During construction, all the laborers
will be provided with suitable protective
equipment (PPE) as required under the health
and safety norms. Training and awareness
about the safety norms will be provided to all
supervisors and laborers involved in
construction activity.
No major hazardous material and waste shall
be stored within the project site. No chemical
dealing or process activity is involved in this
project; hence chances of chemical hazard and
accidents are also not there. Appropriate fire-
fighting measures have been considered
during the design of proposed project and the
proposed fire fighting plan is enclosed as
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No. Information/Checklist
confirmation Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
Annexure 11.
8.2 From any other causes No Not Applicable
8.3
Could the project be affected by
natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc)?
No
Refer Point no. 1.6
9. Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality
S. No. Information/Checklist
confirmation Yes/ No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
9.1
Lead to development of
supporting. utilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.: Supporting
infrastructure (roads, power
supply, waste or waste water
treatment, etc.) housing
development extractive industries
supply industries other.
Yes
There will be a cumulative positive impact on
the environment in terms of better
infrastructure, more organized commercial
development and more employment
opportunities at local level for both skilled and
unskilled personnel during the operation &
construction phase and better aesthetics of
the area.
9.2
Lead to after-use of the site, which
could have an impact on the
environment
No Not Applicable
9.3 Set a precedent for later
developments
Yes The design shall propose eco-friendly
construction and operation methods and
technology and can act as a positive
precedent.
9.4
Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
No The area is earmarked for beach resort
development and the existing land is a barren
land, on which this upcoming project would
come up.
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
III. Environmental Sensitivity
S. No. Areas Name/ Identity
Aerial distance (within 15
km.)Proposed project location
boundary
1
Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
NA
2
Areas which are important or
sensitive for ecological reasons -
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
Coastal Zone Proposed Resort is ~ 0.07 Km away
from the shore line.
3
Areas used by protected,
important or sensitive species of
flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
Nil
4 Inland, coastal, marine or
underground waters Arabian Sea Abutting to the project site, W
5 State, National boundaries
National
Boundary Site is abutting to Arabian Sea, W
State Boundary Goa State Boundary (~8 km, S)
6
Routes or facilities used by the
public for access to recreation or
other tourist, pilgrim areas
Road MSH4 Vengurla-Shiroda Road
(Abutting to Site, E)
Rail Sawantwadi Railway Station (17 km,
NE)
7 Defense installations No Not Applicable
8 Densely populated or built-up area
Village Sagartirth 0.2 km (SE)
Village Temb 0.8 km (NE)
Village Tank 1.2 km (N)
Vilage Shiroda 1.8 km (SSE)
Vengulra 7.5 km (N)
9
Areas occupied by sensitive man-
made land uses (hospitals,
schools, places of worship,
community facilities)
Sunni Masjid
(~10.95 km )
Chapel of our
Lady of Carmin
(~7.13 km)
Harmal
Form 1
Proposed Beach Resort Project,
Village Sagartirth, Tank & Temb,
Taluka Vengurla, District Sindhudurg, Maharashtra
Elite Township Pvt. Ltd.
S. No. Areas Name/ Identity
Aerial distance (within 15
km.)Proposed project location
boundary
Panchkroshi High
School (~ 11.81
km)
Hospital (~ 11.50
km)
10
Areas containing important, high
quality or scarce Resources
(ground water resources, surface
resources, forestry, agriculture,
fisheries, tourism, minerals)
No
11
Areas already subjected to
pollution or environmental
damage. (those where existing
legal environmental standards are
exceeded)
No
12
Areas susceptible to natural
hazard which could cause the
project to present environmental
problems (earthquakes,
subsidence, landslides, erosion,
flooding or extreme oradverse
climatic conditions)
Yes
Sindhudurg District is located near the
coast, so will be affected by the
Cyclones.
The project area falls under seismic
zone III (i.e. moderate damage risk
zone) as per the Seismic Zoning Map
of India (IS 1893, Part-I, 2002).
Necessary seismic factors suggested
by NBC 2005 shall be incorporated
suitably while designing the structures
to safeguard against earthquake risks.
Date:
Place:
Signature of the applicant