meeting agenda - home - iec 61850 user groupiec61850.ucaiug.org/2017iop-norleans/iop...
TRANSCRIPT
Page 1
Meeting Agenda
Reports:
o Publicity: Paul
Background informational document produced. Need to get to Kay.Need work on the Website.
Need to get visibility on who has signed up for the Boot Camp.
Paul will provide feedback on the web-page.
o SCL Group: Christoph
Report: No Report
Issue that is being addressed:
Potential issue with representing SCADA systems in substations and substation devices exchanging information with other substations.
Page 2
Requires unique naming of SCADA systems and IEDs including the substations into which they are going to exchange information.
How does this impact Functional Naming?
Decision: Will have unique names throughout the IOP system.
Time Sync: Bernhard
This is a critical one that needs to get started soon.
R-GOOSE: Herb
Participants: Triangle, SISCO, GE
Infrastructure vendors to be determined.
Security: Herb , Frances, Joel
Tony to round up firewall and router vendos. Juniper Palo Alto – in contact CISCO – will participate Siemens RuggedCom SEL – Amandeep to check
Page 3
Belden/ Hirschmann - Bernhard NovaTech ?? -- Bruce IS5??? – Jean Sebastian
Integrated Application and Test Cases
o Bay engineering Going to modify/simplify Entergy Diagram
Change S9711 and S9730 to breakers. Intra-bay application
Application focus group Herb, Dean, Joel, Jun,Paul Inter-bay application
Transfer Trip: Application focus group Herb, Dean, Joel, Jun,Paul
1 SCT vendor per bay. SCT vendors will provide a resource to perform the bay/substation engineering task in advance of the IOP and during the IOP.
Grid Software Helinks Kalkitech (ABB, Schneider, Siemens, Efacec need more information).
Bay single-line diagrams (Cigre or Entergy). Decided on Entergy diagram.
Software has been developed to allow exchange of GOOSE over the Internet. The software has been posted at: http://iec61850.ucaiug.org/2017IOP-NOrleans/IOP%20Documents/GOOSE%20to%20GOOGLE%20Bridge%20(AS-IS%20Software)/XMPPBridge.zip
Have the separate groups started meeting?
High Level Use cases and Abstract Test Cases (coordinated by Joel)
See the following folder: http://iec61850.ucaiug.org/2017IOP-NOrleans/IOP%20Documents/General%20Integrated%20Demo%20Information/Test%20procedure%20drafts
Joel will put together a matrix of the ACSI services tested.
Page 4
Item Responsible People Estimated Comp “Submitted”
Page 5
IED Isolation for maintenance and testing in the field
Herb FalkAndreas Klien
Yes
IED Replacement Bruce Muschlitz 10-03-2017IED Addition to Bay Vladen 17-03-2017IED Failure/power down Michael Haecker 10-03-2017Clock Failure – Station Bus Peter Pfisterer (TUV-
SUD)Yes
Network Failure Bruce Muschlitz 10-03-2017Merging Unit Failure Dean 17-03-2017EAP/Failure Herb, Chan/ITClock Failure – Process Bus Peter Pfisterer ?Cyber Intrusion of GOOSEReporting to SCADA MastersSOE Testing (Logging)Security Event Monitoring (Syslog, SNMP, IEC 62351-7)Secure IEC 61850 MMSLeap Second Test (Based upon 2.1)PTP and SNTP
Allen Goldstein 17-03-2017
Clock/GPS Time Discontinuity
Fix Witness resource page – Kay.
Boot Camp: Herb
We can expand the room/participation in the Boot Camp if needed.
How should we facilitate non-UCA member sign-up for the Boot-Camp?
Page 6
Boot Camp Agenda
DAY 1
Introductions Project Management: The good, the bad, and the ugly (2-3 hours) High Level Overview of the IEC 61850 standards (4 Hours)
o Objectso Services
GOOSE Sample Values
Ethernet Network Design for 61850
Day 2
61850 Resiliency (1-2 hours with maybe some hands on)o Ethernet Redundancy (HSR and PRP)o Time Sync
How to test (maybe some hands on?) (2 hours)o Unit testingo System Testing
Appropriate Use of Simulation NERC CIP and IEC 61850 (1 hour)
Overview of the Interop (30 minutes)
Page 7
Logistics
URL for IOP Site: http://iec61850.ucaiug.org/2017IOP-NOrleans/default.aspx
Email Exploder: [email protected]
Boot Camp: October 13-14
IOP: Setup: October 13, Testing October 14-19
Hotel: New Orleans Downtown Marriot at the Convention Center 859 Convention Center Blvd New Orleans, LA 70130 Phone: 504-613-2888
web: http://www.marriott.com/hotels/fact-sheet/travel/msymc-new-orleans-downtown-marriott-at-the-convention-center/
IOP Reservation Link: https://aws.passkey.com/go/UCAIOP (room rate $189 + tax/night)
Participation fees:
Page 8
UCA Members (USD)
Non-member(USD)
Comments
Participating Company $ 6,500 $ 8,000 Includes one Individual if staying at the IOP hotel
Individual Staying at the IOP Hotel
$ 1,000 $ 1,350 For non-members, the fee includes UCA membership.
Individual not staying at the IOP Hotel
$ 2,000 $ 2,350 For non-members, the fee includes UCA membership.
Boot Camp fees and logistics:
The Boot Camp has the ability to provide training for 30-40 people. Reservations are first come and will be based upon payment of a registration fee of $250.
WG10 Meetings will be held at Entergy (October 23-27). Entergy is located at:
Entergy639 Loyola AveNew Orleans, LA 70113
Page 9
Known Participants and Witness
Participating Companies1 ABB2 ArcInfo3 CISCO4 Copadata5 Doble6 Efacec7 GE-Alstom8 GENTEC9 Grid Software10 Kalkitech11 NovaTech12 NREC13 OMICRON14 OSII15 Reinhausen16 RTDS17 Schneider18 Schweitzer19 Siemens20 SISCO21 Sprecher-automation22 Subnet Solutions23 Toshiba24 Triangle Microworks25 Vizimax
Witnessing Companies1 Amprion2 BPA3 CenterPoint Energy4 CEPRI5 ComEd6 ConEd7 DNV/GL8 Eandis9 EDF10 Entergy11 Entso-e/Elia
Page 10
12 EPRI13 Hydro Quebec14 It4power15 National Grid16 NERC17 NIST18 NYPA19 Reliability First20 SCE21 SWECO22 Tesco23 TÜV SÜD
24 UCA
Page 11
Hold Over
1) Introduction
2) Discuss philosophy of testing for this IOP –a) Integrated application
i) Multiple Bays with IEDs and HMIsii) Communication inter and intra baysiii) Process bus with multiple Merging unitsiv) Multiple grandmastersv) LSVS/LGOSvi) Mod/Beh Testingvii) Testing isolation and field testingviii) Application possibilities
(1) Transfer Trip Zone1->Zone 2(2) Breaker Fail (similar to Cigre)
ix) ED2<->ED1 IOP (maybe have a separate bay for ED1 devices?)x) SCADA/Gateway (e.g. IEC 61850-90-2 and IEC 61850-7-1) xi) 90-5/Synchrophasor testingxii) NERC/CIP perimeter testing last two days?xiii) HSR/PRP
Jun (Doble), Joel Greene, Herb to come up with high level constructs.
b) Sub-testing areasi) Time Sync (Chan to liaison with IEEE ICAP)ii) NERC/CIP (Herb and Scott, Chan to add user input)
(1) Firewall/Router iii) SCL (may not be needed if integrated application is good enough)iv) RGOOSE
3) Marketinga) Entergy to put press release together – Chan to leadb) EPRI will also socializec) What do we want to do with Press attending/reporting on the IOP?
Page 12
Questions to discuss
1. Discuss people being added to the group that have little or no intent to participate or witness (call them lurkers for now).
So accept “lurkers” until they become disruptive.
2. Boot Camp Agenda and lead. – Herb to organize.
3. Students – Chan to work on scholarship application form. Kay to work out a mechanism to accept corporate donations to a scholarship fund for students. Companies that contribute to the fund get to review and accept the students. Companies should send candidate universities and professor contact information to Chan. Companies that decide that they want certain universities/students present need to indicate that and donate to the fund.
4. Network Infrastructure testing
5. NIST set of questions from January 18, 2017a. Who is bringing clocks…
i. 61850-9-3 and C37.238 2011. C37.238 2017 a possibility.b. External determination Time Inaccuracy – yes it will be testedc. Holdover testing – probably yesd. NIST to provide detail about usage of IOP Information desire.e. Kay will check about government rate in our block or rooms.
6.
SCL Testing Testing Ideas
1. Is it possible to mention explicitly test cases including ENTSO-E requirements on SCL: information exchange between functions ; virtual IEDs ; telecommunication network configuration; ... This is of course depending on the WG10 and Jörg TF progress but there are probably already some possibilities ...
Time Sync TestingWill be facilitated by Bernhard Baumgartner ([email protected]).
Page 13
Action ItemsCreationDate
Item Needed by
Closed
1 17-11-2016 Everybody who doesn’t have UCA IDs, get them and send them to Herb.
2 17-11-2016 Jun, Joel, and Herb to start high level discussions on integrated testing. Joel to take the lead. Joel to schedule the first meeting.
10-02-2017
3 17-11-2016 Need leads for Time Sync area (Omicron to check and respond if they still want to lead)
15-12-2016
21-11-2016
4 17-11-2016 Scott and Herb to work out high level concepts for NERC/CIP 14-12-2016
5 17-11-2016 Chan to lead user use case development6 17-11-2016 Chan and Paul to lead on the socialization and marketing for
the IOP.7 09-02-2017 Participants need to declare number and type of equipment
and LN capability that they intend to bring. Delay in submitting this may result in not being included in the integrated application. Looking for transformer diff, Blocking scheme, breaker failure, transfer trip, line differential, line distance, POTT, etc…
April 15, 2017
8 09-02-2017 Fix Witness resource page – Kay.