meeting agenda - ucaiugiec61850.ucaiug.org/2017iop-norleans/iop documents... · web viewmeeting...

15
Page 1 Meeting Agenda Contents Meeting Agenda....................................................... 1 Discussion Items....................................................1 Reports.............................................................1 Publicity: Paul/Chan..............................................1 Boot Camp Report - Herb...........................................1 SCL Group: Christoph..............................................1 Time Sync: Bernhard...............................................2 R-GOOSE: Herb.....................................................2 Security: Herb....................................................3 Integrated Application and Test Cases.............................3 High Level Use cases and Abstract Test Cases (coordinated by Joel) 4 Logistics............................................................ 6 Known Participants and Witness.......................................9

Upload: others

Post on 20-Jan-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 1

Meeting Agenda

ContentsMeeting Agenda..........................................................................................................................................1

Discussion Items......................................................................................................................................1

Reports....................................................................................................................................................1

Publicity: Paul/Chan.............................................................................................................................1

Boot Camp Report - Herb....................................................................................................................1

SCL Group: Christoph...........................................................................................................................1

Time Sync: Bernhard............................................................................................................................2

R-GOOSE: Herb....................................................................................................................................2

Security: Herb......................................................................................................................................3

Integrated Application and Test Cases................................................................................................3

High Level Use cases and Abstract Test Cases (coordinated by Joel)...................................................4

Logistics.......................................................................................................................................................6

Known Participants and Witness.................................................................................................................9

Page 2: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 2

Discussion Items

Invoice discussion – Who hasn’t received their invoices?o ABBo Belden o Siemenso SEL – need to registero RTDS – needs to add a witness and need an invitation letter.o OMICRONo Ampion- wrong invoice received , need a witness invoice o Vizimaxo ABBo Triangleo SEL

Areas of Participation form review (only 2 vendors have filled it in)?

Need to be filled in by mid-July. Joel to review matrix questions with Herb and follow up via email 18 Aug. (US power) Spreadsheet to be updated with number of devices, equipment type, and power

requirements

Hotel rooms – Kay – still open Some rooms available, but OK to book elsewhere because some nights are not available. Dean – RTDS needs invitation – Kay to provide this week. Entergy to coordinate with Kay. Shipping information needed. Kay to verify Request for testing schedule - Herb to put together a high level and post it

ICD Files due mid-August. Each vendor to create folder under http://iec61850.ucaiug.org/2017IOP-NOrleans/IOP

%20Documents/Forms/AllItems.aspx?RootFolder=%2f2017IOP%2dNOrleans%2fIOP%20Documents%2fVendor%20ICD%20Files&FolderCTID=&View=%7b206D92CC%2dA596%2d437A%2d9092%2d153EDDF0F32C%7d Any additional product documentation can be added to that folde.

Reports

Page 3: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 3

Publicity: Paul/Chan

In EPRI Publicity – Paul to follow-up. Will be pushed to LinkedIn, Ensto-e Friday Roundup, Karlheinz, PES, PSRC, T&D World, PACWorld.

Paul will post Boot Camp information to LinkedIn. DoneRalph will contact Ensto-e Friday Roundup. Done

Boot Camp Report - Herb

Brochure is complete. Link on the website.

Infrastructure

a. Connections between switches will be 1 G copper.b. Connections between IEDs, Routers, and Switches 100M copper.

i. Switches should be capable of auto-negotiationc. Infrastructure vendors should bring “sparse” capability for optical LCST

SCL Group: Christoph

Need ICT vendors to participate in this group. No Update

ICD files needed ASAP

R-GOOSE Configuration will be done

SED exchange ED.1/ED.2 Exchanges Later Binding tests may not be possible since IED. Decision: IEDs will have unique names throughout the IOP system.

Time Sync: Bernhard

Current Status:

Making good progress with the definition of test cases.

Page 4: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 4

The next meeting will be on July 26th Still lacking HSR and PRP test cases, work in progress Next Meetings 8/9 and 8/17

GPS Experimentation License – underway (Paul is coordinating)

From previous meetings

Topics discussed for testingo GPS Security (Spoofing, Jamming)o HSR & PRP in combination with PTPo GLONASS simulationo Leap second handling in IEC 61850 ED 2.1 – Move to integrated application testingo GPS Repeater may need to be over coax.

Equipment – still in need for suppliers for transparent clocks Agreement reached that everybody submits what equipment will brought to IOP – Bernhard to

send out questionnaire Key finding: October is closer than one might think

R-GOOSE: Herb

Participants: Triangle, SISCO, GE, CISCO, Vizimax, Moxa, Belden, CISCO, Helinks

Preliminary R-GOOSE test cases posted. Need Firewall vendor input (CISCO, Palo Alto, Beldin will provide).

SCL testing will become part of the test campaign.

Security: Herb Final Meetings calendared in Sept

Added new potential test cases:o GOOSE Replay based upon the draft 62351-6 documento Syslog and NERC Loggingo RBAC

Page 5: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 5

Integrated Application and Test CasesFinal Meetings calendared in Sept

o Need to find an infrastructure lead.o Discuss remote file access purposes (security related)o Settings Group Test cases – Fred (OMICRON) will coordinate with Juno Resiliency of GOOSE publishers (maybe from SCADA publisher)oo Comments on Integrated Application set-up to Jun by 2017-04-24.

1 SCT vendor per bay. SCT vendors will provide a resource to perform the bay/substation engineering task in advance of the IOP and during the IOP.

Grid Software – will generate SSD for the Integrated Application Helinks Kalkitech (ABB (under discussion), Siemens).

Page 6: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 6

Software has been developed to allow exchange of GOOSE over the Internet. The software has been posted at: http://iec61850.ucaiug.org/2017IOP-NOrleans/IOP%20Documents/GOOSE%20to%20GOOGLE%20Bridge%20(AS-IS%20Software)/XMPPBridge.zip

GoogleTalk was found to have performance problems and OOD packet delivery (non-conformant to XMPP). New software being tested using MQTT. May be looking for somebody to host the MQTT broker. Triangle Microworks has set up hosting but performance issues are still being evaluated. Initial latency measurements are worse than GOOGLETalk, but has no dropped messages.

Decision: Since GOOGLE Talk has service drop outs, the MQTT version should be used. Instructions and revised software is posted. Triangle Microworks has

provided a publically available MQTT broker located at: 45.20.211.173

High Level Use cases and Abstract Test Cases (coordinated by Joel)

See the following folder: http://iec61850.ucaiug.org/2017IOP-NOrleans/IOP%20Documents/General%20Integrated%20Demo%20Information/Test%20procedure%20drafts

Joel will put together a matrix of the ACSI services tested.

Item Responsible People Estimated Comp “Submitted”IED Isolation for maintenance and testing in the field

Herb FalkAndreas Klien

Yes

IED Replacement Bruce Muschlitz 10-03-2017 YesIED Addition to Bay Vladen 17-03-2017 YesIED Failure/power down Michael Haecker 10-03-2017 YesClock Failure – Station Bus Peter Pfisterer (TUV-

SUD)Yes

Network Failure Bruce Muschlitz 10-03-2017 YesMerging Unit Failure Dean 31-03-2017 YesEAP/Failure Herb, Chan/IT 17-03-2017 YesClock Failure – Process Bus Peter Pfisterer YesCyber Intrusion of GOOSE Herb Falk 17-03-2017 YesReporting to SCADA Masters Mark and Ursla – 12-04-2017 Yes

Page 7: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 7

CopadataSOE Testing (Logging) Vladan 12-04-2017 YesSecurity Event Monitoring (Syslog, SNMP, IEC 62351-7)

Frances, Herb 12-04-2017 In progress as part of security test cases

Secure IEC 61850 MMS Joel, Ralph, Herb 12-04-2017 In progress as part of security test cases

Leap Second Test (Based upon 2.1)PTP and SNTP

Herb ,Joel, jean-sebastian, Eric, Vinoo

Jean-Sebastian working on it.

Clock/GPS Time Discontinuity Herb and JoelSettings GroupMatrix of ACSI Services Covered – email: [email protected]

Joel Ongoing until all test cases are complete.

Infrastructure team

Meeting held 17-07-2017 Participants:

o GEo Moxao Siemens/Ruggedcommo CISCOo Beldeno SEL will be joining next meeting

Accomplished/Decisions:o Tentative IP addressing (using class B address spaces)

Control center: 10.10.0.1 Substation 1: 10.11.0.1 Substation 2: 10.12.0.1

o All connections to IEDs are being planned as 100M Coppero Sparse optical connection capability to IEDs will be providedo DAN PRP “red-box” functionality will need to be provided by individual IED vendors or

IEDs will be connected as a SAN.o Switches will be PTP capable.o VLAN assignments:

Switch Management: VLAN 1 GOOSE VLAN 2 SV: VLAN 3

o PTP Grandmasters: Currently Siemens/RuggedComm and GE will be providing.

Page 8: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 8

Page 9: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 9

Logistics

URL for IOP Site: http://iec61850.ucaiug.org/2017IOP-NOrleans/default.aspx

Email Exploder: [email protected]

Boot Camp: October 13-14

IOP: Setup: October 14, Testing October 15-19

Hotel: New Orleans Downtown Marriot at the Convention Center 859 Convention Center Blvd New Orleans, LA 70130 Phone: 504-613-2888

web: http://www.marriott.com/hotels/fact-sheet/travel/msymc-new-orleans-downtown-marriott-at-the-convention-center/

IOP Reservation Link: https://aws.passkey.com/go/UCAIOP (room rate $189 + tax/night)

Page 10: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 10

Please note that the IOP Hotel is approximately a 20 minute walk from the WG10 meeting site.

WG10 Meetings will be held at Entergy (October 23-27). Entergy is located at:

Entergy639 Loyola AveNew Orleans, LA 70113

There are two hotels that are connected to the Entergy building (there are no official hotels for the IOP):

Hyatt Regency New Orleans601 Loyola AvenueNew Orleans, Louisiana, USA, 70113

Hyatt House New Orleans/Downtown1250 Poydras StNew Orleans, Louisiana, USA, 70113

Participation fees:

UCA Members (USD)

Non-member(USD)

Comments

Participating Company $ 6,500 $ 8,000 Includes one Individual if staying at the IOP hotel

Individual Staying at the IOP Hotel

$ 1,000 $ 1,350 For non-members, the fee includes UCA membership.

Individual not staying at the IOP Hotel

$ 2,000 $ 2,350 For non-members, the fee includes UCA membership.

Participation fees are due by July 1st.

Individual fees can vary after.

Kay will check on hotel cut-off - June.

Boot Camp fees and logistics:

The Boot Camp has the ability to provide training for 30-40 people. Reservations are first come and will be based upon payment of a registration fee of $250.

Page 11: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 11

WG10 Meetings will be held at Entergy (October 23-27). Entergy is located at:

Entergy639 Loyola AveNew Orleans, LA 70113

Page 12: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 12

Known Participants and Witness

Participating Companies1 ABB2 Belden3 CISCO4 Copadata5 Doble6 GE-Alstom7 GENTEC8 Grid Software9 Kalkitech10 Meinberg11 Moxa12 NovaTech13 NREC14 OMICRON15 OPAL-RT16 OSII17 OSIsoft18 Palo Alto19 Reinhausen20 RTDS21 Schneider22 Schweitzer23 Siemens24 SISCO25 Sprecher-automation26 Subnet Solutions27 Toshiba28 Triangle Microworks29 Vizimax

Witnessing Companies1 Amprion2 BPA3 CenterPoint Energy4 CEPRI5 ComEd6 ConEd7 DNV/GL

Page 13: Meeting Agenda - UCAIugiec61850.ucaiug.org/2017IOP-NOrleans/IOP Documents... · Web viewMeeting Agenda Contents Meeting Agenda1 Discussion Items1 Reports1 Publicity: Paul/Chan1 Boot

Page 13

8 Eandis9 EDF10 Entergy11 Entso-e/Elia12 EPRI13 Hydro Quebec14 It4power15 National Grid16 NERC17 NIST18 NYPA19 PNNL20 Reliability First21 SCE22 SWECO23 Tesco24 TÜV SÜD

25 UCA