Page 1: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

2

454th OCCM AGENDA

AGENDA NOTES FOR 454th MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013

AT CSPGCL RAIPUR ITEM No 1 CONFIRMATION OF THE MINUTES

Minutes of 453RD meeting of Operation amp Coordination Sub-Committee of WRPC

held on 15th November 2013 at WRLDC Mumbai were forwarded vide letter No

WRPCOPNOCC-Minutes2013-1411806 dated 28112013

No comments have been received OCC may confirm the same ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF

NOVEMBER 2013 21 Frequency Particulars

During November 2013 the system frequency was below 497 Hz for 127 of

time against 101 of time during October 2013 The system frequency was within the

IEGC range of 497 Hz -502 Hz for 9089 of the time against 8919 of time during

October 2013 The average monthly frequency was 5001 Hz during November 2013

whereas it was 5003 Hz in the month of October 2013 Regarding operation in high

frequency range frequency during the month of November 2013 was above 5020 Hz

for 784 of time against 980 of time during October 2013

The detailed frequency particulars are enclosed at Annex- 21

The Sub-Committee may like to note

22 Operational Discipline

There was a net inter-regional export of 108600 MUs by WR against net export

schedule of 976 MUs The Sub-Committee may like to discuss

23 Voltage Profile Voltage profile at some of 765400 kV sub-stations during the month of

November 2013 furnished by WRLDC is enclosed at Annex-23

During the month the deviations of voltages from the accepted limit on either

side were recorded at the following locations in WR grid -

3

454th OCCM AGENDA

SNo 765400kV Sub-station

Max Voltageobserved (kV)

Date of incidence

Min voltage observed (kV)

Date of incidence

1 Indore 425 291113 376 141113 2 Itarsi 425 221113 - - 3 Karad 435 041113 - - 4 Dhule 428 111113 - - 5 Asoj 421 051113 - - 6 Kasor 425 031113 - - 7 Bhilai 428 291113 - - 8 Jetpur 437 211113 - - 9 Bina 427 241113 - - 10 Gwalior 418 251113 - - 11 Nagda 428 171113 - - 12 Khandwa 432 291113 375 181113 13 765kV Bina 812 251113 - - 14 765 kV

Gwalior 809 251113 - -

The Sub-Committee may like to discuss as above

24 UF Relay Operations

As per WRLDC records during November 2013 the system frequency didnrsquot touch

492 Hz The details of UFR operation received from constituents for the month of

November 2013 is enclosed at Annexure 24

GETCO has reported AUFLS on five occasions in November 2013 Matter was

discussed in 453rd OCC and Gujarat was advised to check the relay setting GETCO

may review the relay setting to avoid unintentional operation of UFR

The Sub-Committee may like to discuss

25 Power Cuts Load Restrictions Details of Power Cuts and Regulatory measures during November 2013 as furnished

by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during November 2013 are given in

Annex-26 The Sub-Committee may discuss

4

454th OCCM AGENDA

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during November 2013 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The proposed maintenance programme of generating units for December 2013 amp

January 2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period 32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of December

2013 amp January 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 453rd OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the November 2013 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the November 2013(Attached at

Annexure-32-C2)

As agreed during the 453rd OCC meeting the respective utilities may apprise the sub-

committee regarding reason for failing to avail approved outages

WRLDC furnished the statistics for planned vs availed outage during November 2013 is summarized below

S No Particulars of OCC approved Outage Number1 Number of transmission element outage

approved in OCC meeting 259

2 Number of transmission elements for which reliability consent was available

238

3 Number of outage availed 1484 Availed Outage as a of Approved Outage 621

5

454th OCCM AGENDA

21 outage requests were advised to be rescheduled due to line loading constraints arising after CGPL unit outage high demand in Maharashtra and other system constraints

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash December 2013 amp January 2014

Details of anticipated restricted amp un-restricted demands for the months of December 2013 amp January 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

December 2013 January 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11381 11540 159 11115 11340 225 MPPTCL 11446 11446 0 11500 11500 0 CSEB 2912 2975 63 2954 3025 71 MSETCL 17250 18200 950 17200 18300 1100 GOA 425 430 5 409 425 16 DD 350 350 0 340 350 10 DNH 646 650 4 635 635 0 WR 42422 44097 1675 41836 43822 1986 Constituents may furnish the anticipated station wise Availability amp Energy for the months of December 2013 amp January 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF NOVEMBER 2013 The details of schedule Vs actual generation demand drawl of power from grid exchanges etc are given in the following Annexures Annex 41 - Schedule Vs Actual Generation and Requirement for November 2013 Annex 42 - Peak Demand Schedule Vs Actual for November 2013 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for November 2013 Annex 47 ndash Details of level of Major Reservoirs in Western Region for November

2013

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

6

454th OCCM AGENDA

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06122013 2 PGCILWRTS-II 06122013 3 MPPTCL 10122013 4 NTPC 04122013 5 CSPTCL 04122013 6 GETCO 06122013 7 MSETCL 10122013

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi

(Chornia) 125 MVAR GETCO 25th July 2013

8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 2: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

3

454th OCCM AGENDA

SNo 765400kV Sub-station

Max Voltageobserved (kV)

Date of incidence

Min voltage observed (kV)

Date of incidence

1 Indore 425 291113 376 141113 2 Itarsi 425 221113 - - 3 Karad 435 041113 - - 4 Dhule 428 111113 - - 5 Asoj 421 051113 - - 6 Kasor 425 031113 - - 7 Bhilai 428 291113 - - 8 Jetpur 437 211113 - - 9 Bina 427 241113 - - 10 Gwalior 418 251113 - - 11 Nagda 428 171113 - - 12 Khandwa 432 291113 375 181113 13 765kV Bina 812 251113 - - 14 765 kV

Gwalior 809 251113 - -

The Sub-Committee may like to discuss as above

24 UF Relay Operations

As per WRLDC records during November 2013 the system frequency didnrsquot touch

492 Hz The details of UFR operation received from constituents for the month of

November 2013 is enclosed at Annexure 24

GETCO has reported AUFLS on five occasions in November 2013 Matter was

discussed in 453rd OCC and Gujarat was advised to check the relay setting GETCO

may review the relay setting to avoid unintentional operation of UFR

The Sub-Committee may like to discuss

25 Power Cuts Load Restrictions Details of Power Cuts and Regulatory measures during November 2013 as furnished

by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during November 2013 are given in

Annex-26 The Sub-Committee may discuss

4

454th OCCM AGENDA

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during November 2013 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The proposed maintenance programme of generating units for December 2013 amp

January 2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period 32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of December

2013 amp January 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 453rd OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the November 2013 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the November 2013(Attached at

Annexure-32-C2)

As agreed during the 453rd OCC meeting the respective utilities may apprise the sub-

committee regarding reason for failing to avail approved outages

WRLDC furnished the statistics for planned vs availed outage during November 2013 is summarized below

S No Particulars of OCC approved Outage Number1 Number of transmission element outage

approved in OCC meeting 259

2 Number of transmission elements for which reliability consent was available

238

3 Number of outage availed 1484 Availed Outage as a of Approved Outage 621

5

454th OCCM AGENDA

21 outage requests were advised to be rescheduled due to line loading constraints arising after CGPL unit outage high demand in Maharashtra and other system constraints

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash December 2013 amp January 2014

Details of anticipated restricted amp un-restricted demands for the months of December 2013 amp January 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

December 2013 January 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11381 11540 159 11115 11340 225 MPPTCL 11446 11446 0 11500 11500 0 CSEB 2912 2975 63 2954 3025 71 MSETCL 17250 18200 950 17200 18300 1100 GOA 425 430 5 409 425 16 DD 350 350 0 340 350 10 DNH 646 650 4 635 635 0 WR 42422 44097 1675 41836 43822 1986 Constituents may furnish the anticipated station wise Availability amp Energy for the months of December 2013 amp January 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF NOVEMBER 2013 The details of schedule Vs actual generation demand drawl of power from grid exchanges etc are given in the following Annexures Annex 41 - Schedule Vs Actual Generation and Requirement for November 2013 Annex 42 - Peak Demand Schedule Vs Actual for November 2013 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for November 2013 Annex 47 ndash Details of level of Major Reservoirs in Western Region for November

2013

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

6

454th OCCM AGENDA

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06122013 2 PGCILWRTS-II 06122013 3 MPPTCL 10122013 4 NTPC 04122013 5 CSPTCL 04122013 6 GETCO 06122013 7 MSETCL 10122013

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi

(Chornia) 125 MVAR GETCO 25th July 2013

8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 3: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

4

454th OCCM AGENDA

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during November 2013 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The proposed maintenance programme of generating units for December 2013 amp

January 2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period 32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of December

2013 amp January 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 453rd OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the November 2013 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the November 2013(Attached at

Annexure-32-C2)

As agreed during the 453rd OCC meeting the respective utilities may apprise the sub-

committee regarding reason for failing to avail approved outages

WRLDC furnished the statistics for planned vs availed outage during November 2013 is summarized below

S No Particulars of OCC approved Outage Number1 Number of transmission element outage

approved in OCC meeting 259

2 Number of transmission elements for which reliability consent was available

238

3 Number of outage availed 1484 Availed Outage as a of Approved Outage 621

5

454th OCCM AGENDA

21 outage requests were advised to be rescheduled due to line loading constraints arising after CGPL unit outage high demand in Maharashtra and other system constraints

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash December 2013 amp January 2014

Details of anticipated restricted amp un-restricted demands for the months of December 2013 amp January 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

December 2013 January 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11381 11540 159 11115 11340 225 MPPTCL 11446 11446 0 11500 11500 0 CSEB 2912 2975 63 2954 3025 71 MSETCL 17250 18200 950 17200 18300 1100 GOA 425 430 5 409 425 16 DD 350 350 0 340 350 10 DNH 646 650 4 635 635 0 WR 42422 44097 1675 41836 43822 1986 Constituents may furnish the anticipated station wise Availability amp Energy for the months of December 2013 amp January 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF NOVEMBER 2013 The details of schedule Vs actual generation demand drawl of power from grid exchanges etc are given in the following Annexures Annex 41 - Schedule Vs Actual Generation and Requirement for November 2013 Annex 42 - Peak Demand Schedule Vs Actual for November 2013 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for November 2013 Annex 47 ndash Details of level of Major Reservoirs in Western Region for November

2013

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

6

454th OCCM AGENDA

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06122013 2 PGCILWRTS-II 06122013 3 MPPTCL 10122013 4 NTPC 04122013 5 CSPTCL 04122013 6 GETCO 06122013 7 MSETCL 10122013

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi

(Chornia) 125 MVAR GETCO 25th July 2013

8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 4: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

5

454th OCCM AGENDA

21 outage requests were advised to be rescheduled due to line loading constraints arising after CGPL unit outage high demand in Maharashtra and other system constraints

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash December 2013 amp January 2014

Details of anticipated restricted amp un-restricted demands for the months of December 2013 amp January 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

December 2013 January 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11381 11540 159 11115 11340 225 MPPTCL 11446 11446 0 11500 11500 0 CSEB 2912 2975 63 2954 3025 71 MSETCL 17250 18200 950 17200 18300 1100 GOA 425 430 5 409 425 16 DD 350 350 0 340 350 10 DNH 646 650 4 635 635 0 WR 42422 44097 1675 41836 43822 1986 Constituents may furnish the anticipated station wise Availability amp Energy for the months of December 2013 amp January 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF NOVEMBER 2013 The details of schedule Vs actual generation demand drawl of power from grid exchanges etc are given in the following Annexures Annex 41 - Schedule Vs Actual Generation and Requirement for November 2013 Annex 42 - Peak Demand Schedule Vs Actual for November 2013 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for November 2013 Annex 47 ndash Details of level of Major Reservoirs in Western Region for November

2013

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

6

454th OCCM AGENDA

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06122013 2 PGCILWRTS-II 06122013 3 MPPTCL 10122013 4 NTPC 04122013 5 CSPTCL 04122013 6 GETCO 06122013 7 MSETCL 10122013

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi

(Chornia) 125 MVAR GETCO 25th July 2013

8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 5: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

6

454th OCCM AGENDA

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06122013 2 PGCILWRTS-II 06122013 3 MPPTCL 10122013 4 NTPC 04122013 5 CSPTCL 04122013 6 GETCO 06122013 7 MSETCL 10122013

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi

(Chornia) 125 MVAR GETCO 25th July 2013

8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 6: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

7

454th OCCM AGENDA

10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125

MVAR PGCIL August 2014

24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Dec- 2013 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013

4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II

Dec- 2013

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 7: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

8

454th OCCM AGENDA

5 765 kV Sasan-Satna-II Commissioned on

010613 GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

December -2013

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

December -2013

3 400 kV DC Mundra-Zerda line No 1 December -2013

4 400 kV DC Mundra-Zerda line No 2 December -2013

5 400 kV DC Vadinar-Amreli line December -2013

6 400kV Mundra-Hadala LILO to Halvad

December -2013

7 400 kV DC Amreli-Kasor line(Part-1) December -2013

MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa Test charged on

20082013

2 400 kV Khedamara- Raita DCDS January -2014

3 400kV DCDS Marwa-Raipur(Raita) January -2014

Test charge from Raipur end in August 2013

4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)

January -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC November -2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

December-2013

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 8: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

9

454th OCCM AGENDA

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

Ckt 1 commissioned on 04122013 Ckt 2 expected on --------

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

February -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013 VIPL (Butibori) 2 300 December-13

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 9: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

10

454th OCCM AGENDA

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14 MAUDA 2 500 JAN-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2013 to September 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING

Status of physical amp cyber security in Power Sector for the Second quarter (July

2013 to September 2013) have not been received from some of the constituents

The constituentsutilities may like to furnish the status

The Sub-Committee may like to note and furnish details in respect of above 83 LGBR PREPARATION FOR THE YEAR 2014-15 IN WESTERN REGION As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference) Quote ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 10: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

11

454th OCCM AGENDA

optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo

Unquote Accordingly WRPC shall prepare Load Generation Balance Report for the year 2014-

15 in respect of Western Region A meeting is proposed to be held on during second

week of Dec-13 at WRLDC wherein constituents are requested to attend the same

with following data

1 Generating Units proposed annual Maintenance programme in respect of your

system(also under your control area) for the year April 2014- March 2015

2 Annual Maintenance programme in respect of transmission elements in your

system for the year April 2014- March 2015

3 Monthwise restricted and unrestricted requirement of power (MW) and energy

(GWH)

4 Monthwise minimum requirement of power (MW)

5 Projected monthwise unitwise generation of power (MW) corresponding energy

(GWH) as furnished in Generation Target for the above period

6 Commissioning dates of new generating units

7 Expected dates of commissioning of new generating units likely to be

commissioned during the above period

8 Generating units commissioned for the year April 2013- March 2014

9 Month wise detail of proposed tied-up bilateral agreements Short term open

access sought for availing assistance from other agencies during the above

period

Constituentsutilities are requested to fix up date for above and attend the meeting

with above informationdata pertaining to their system

The Sub-Committee may like to discus ITEMS FROM WRLDC ITEM NO 91 IMPLEMENTATION OF THE REVISED AUFLS

Pursuant to the meeting taken by Chairperson CEA on 3rd Ocober2013 regarding synchronization of the Southern Region with NEW grid feeder wise details of AUFLS

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 11: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

12

454th OCCM AGENDA

scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from CEA

Western Region

StatesRequired Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1428 810 1098 815 969 820 GOA 25 25 25 25 UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2779 2070 2388 2085 2663 2105 1606

UFRs under procurement

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

Status of implementation as available with WRLDC is as under

bull Gujarat Madhya Pradesh and Chattisgarh have confirmed implementation of the recommended settings under all four stages

bull Maharashtra has confirmed implementation of the recommended setting under Stage-I Stage-II and Stage-III The relays for stage-IV (ie486 Hz) are under procurement

bull GOA DD and DNH have not implemented any stage of AUFLS Maharashtra GOA DD and DNH may apprise the status of the same

The Sub-Committee may like to discus ITEM NO 92UPDATION OF POWER MAPS

Correctness of power maps is very important for real-time operation as well as offline analysis and planning Under the aegis of the Forum of Load Despatchersrsquo an initiative was taken up by POSOCO-CBIP to develop geo-spatially correct power maps for the State Regional and National power grid with the help of professional cartographers Based on the inputs received from all the SLDCsRLDCs the power maps have been developed and a ldquopdfrdquo as well as ldquoAutoCADrdquo version of the maps been forwarded to all the SLDCs through email for validation All SLDCs are requested to verify the power maps and report the inaccuracies in the maps Feedback on difficulties encountered while integrating the AutoCAD maps in their SCADA system may also be reported WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor The Sub-Committee may like to discus

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 12: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

13

454th OCCM AGENDA

ITEM NO 93 TESTING OF FREQUENCY CONTROLLER AND FREQUENCY LIMIT

FUNCTION OF HVDC BACK TO BACK AT BHADRAVATI

The testing of frequency controller and frequency limit function of HVDC back to back at Bhadravati was facilitated on 22nd November 2013 between 1400 hrs to 1620hrs POWERGRID may apprise the sub-committee regarding the observations recorded during the test The Sub-Committee may like to discus ITEM NO 94COMMISSIONING OF NEW SYSTEM PROTECTION SCHEME IN

CONNECTION WITH SYNCHRONIZATION OF SR AND NEW GRID

Preparations are on full swing for synchronization of the Southern region with NEW grid In the 453rd OCC meeting AGM-WRLDC had intimated that the first circuit of 765 kV Sholapur-Raichur is expected to be synchronized by December 2013 end and the power transfer would be limited to 800 MW initially The activities associated with the synchronization are being periodically monitored by the Central Electricity Authority and the Ministry of Power Commissioning of certain identified System Protection Schemes is one of the prerequisites for synchronization The details of the SPS to be implemented in Western Region and the actions to be taken by different utilities are elaborated in the letter ref WRPCProtectionSPS20132046 dated 29112013 from MS WRPC to all the constituents OCC members may like to be apprised of the progress of implementation the SPS The Sub-Committee may like to discus ITEM NO 95 IMPLEMENTATION STATUS OF SPS UNDER PROGRESS

a SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)

An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting NTPC CGPL Power Grid may apprise the members on the progress on the issue 1 STATUS OF NTPCmdash a) During the 450th OCC held on 120813 NTPC intimated that they have got

the approval from their corporate centre and it was decided to implement the same within a month

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 13: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

14

454th OCCM AGENDA

b) During the 451st OCC held on 120913 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month c) 452 Meetingmdashno recording d) During the 453rd OCC held on 151113 NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month 2 STATUS OF CGPL

a) During the 452nd OCC held on 171013 Powergrid representative confirmed that Tele-Link was being provided at Mundra by them b) During the 453nd OCC held on 151113 Powergrid representative confirmed that TeleLInk was being provided at Mundra by them

b SPS at APL Tiroda

In the 453rd OCC meeting the implementation of SPS at APL using the signal from 400 kV Wardha (POWERGRID) was confirmed by MSETCL A special meeting was convened by WRPC to review the SPS at APL Tiroda post synchronization of 400 kV Warora-Chandrapur-stg-II line After the deliberations it was decided to include the following action in the existing SPS at Tiroda after studying the sensitivity of APL on Wardha flow gate by WRLDC APL and WRLDC may indicate the status

c SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgar a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load During last OCC Balco representative intimated that the SPS will be intimated by November end

Ms Balco may update the progress on the matter

Contingency Desired automatic action through SPS

1 Tripping of 400 kV Warora-Chandrapur-stg-2 Trip one unit of APL Tiroda

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 14: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

15

454th OCCM AGENDA

d Defense mechanism for high frequency

NTPC may update the status on tripping of KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) at high frequency During the 453rd OCC held on 151113 NTPC intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval

The Sub-Committee may like to discus ITEM NO 96 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS

UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more

than 15 days

Sl No Date of outage

Reason

GETCO 1 220 kV Bachau-Halvad-I 27092013 Tower collapse 2 220 kV Bachau-Halvad-II 27092013 Tower collapse 3 220 kV Bachau-Lalpar SC 27092013 Tower collapse 4 220 kV Bachau-Morbi SC 27092013 Tower collapse MPPTCL 400 kV Birsinghpur-Katni-I 14022013 Gas leakage in B-ph CB MSETCL 400 kV Deepnagar-

Bhusawal-II 18112013 R ph CB gas pressure

low CSPTCL 400220 kV Bhilai-III 14042013 Buchholz operated OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The Sub-Committee may like to discus ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 455th OCC Meeting

will be hosted by DD and may be scheduling on 16012014 and 17012014 DD may

confirm the same

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 15: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 21

maah navambar 2013

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5030 Hz BETWEEN 1400 Hrs amp 1500 Hrs Hrs ON 03112013

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4976 Hz BETWEEN 0600 Hrs amp 0700 Hrs Hrs ON 19112013

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5001 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5051 Hz AT 215500 amp 215000 Hrs ON 17112013 amp 26112013

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4948 Hz AT 181000 Hrs ON 07112013

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS NOVEMBER 2013 OCTOBER 2013 SEPTEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 007 016

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 127 094 135 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 502 Hz 9089 8919 8924 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 502 Hz AND 51 Hz 784 980 925

502 hTja AaOr 503 hTja ko baIca000 000 000 000

503 hTja AaOr 510 hTja ko baIca38 BETWEEN 510 Hz AND 515 Hz 000 000 000

510 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING NOVEMBER 2013

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr )

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 16: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 395 423 400 420 420 412 412 419 406 417 408 422 412 416 4002 421 394 421 397 425 412 425 405 417 403 419 410 420 408 414 4023 421 394 423 396 425 413 426 405 420 412 425 417 423 411 416 4024 421 394 421 399 435 418 423 402 421 408 421 410 428 419 419 3965 421 396 423 399 420 420 412 412 421 405 420 410 425 416 415 4016 421 393 421 394 423 420 412 412 418 405 419 409 422 412 415 4017 422 389 422 390 426 411 427 405 418 406 422 412 418 404 417 4018 422 395 423 396 427 411 428 403 416 399 422 411 418 406 421 4039 423 395 420 398 421 423 412 412 419 402 420 404 423 409 418 401

10 420 397 421 398 426 411 425 410 418 403 418 406 423 410 418 40211 421 393 420 392 427 405 428 408 418 402 419 406 422 410 417 39812 423 389 421 390 424 411 426 403 417 403 420 407 423 410 414 39813 419 390 421 392 423 423 412 412 418 401 419 406 423 409 418 40114 419 376 423 381 423 423 412 412 417 399 421 408 422 407 424 40115 421 386 424 392 425 407 423 409 415 403 418 407 420 403 420 40316 420 388 421 392 426 408 424 403 416 399 419 407 420 403 422 40217 423 388 424 389 423 423 412 412 419 403 419 407 427 412 420 40318 421 377 421 380 423 423 412 412 418 399 420 406 428 410 418 40219 419 391 420 391 423 423 412 412 416 397 420 406 426 410 422 40320 423 385 421 387 423 423 412 412 416 402 420 405 424 409 423 40221 422 388 420 390 423 423 412 412 416 402 419 407 424 409 437 40122 424 382 425 383 423 423 412 412 417 396 418 407 425 408 430 40823 423 393 422 395 423 423 412 412 419 403 420 405 425 409 419 40524 421 391 420 392 423 423 412 412 416 403 419 404 424 409 419 40325 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39926 424 398 423 397 423 423 412 412 417 403 419 404 426 413 417 39927 422 395 423 393 425 411 426 403 418 403 417 405 426 412 418 40128 422 389 422 387 423 423 412 412 417 403 415 406 426 411 415 40129 425 387 424 386 423 423 412 412 418 403 415 405 428 412 416 39630 423 397 422 396 423 423 412 412 416 402 414 402 426 414 419 393

425 376 425 380 435 405 428 402 421 396 425 402 428 403 437 393

ANNEXURE 23

Voltage Profile during the month of November 2013

Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 17: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

DateMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 422 401 415 396 427 401 431 404 761 744 795 769 803 762 803 7642 419 397 411 396 426 399 430 400 766 747 792 763 798 773 782 7523 420 398 415 396 426 397 428 396 765 748 790 759 800 767 796 7574 418 401 414 398 426 398 427 400 763 747 789 765 799 768 799 7635 420 399 413 395 424 398 430 400 763 747 792 761 797 760 799 7606 418 395 416 396 425 395 429 397 763 747 796 753 799 758 800 7577 421 394 417 389 425 390 429 393 763 747 799 757 805 747 804 7538 421 400 415 398 427 398 428 396 763 747 791 752 799 767 803 7629 424 397 415 395 426 397 427 398 763 747 795 754 802 757 807 76210 418 396 415 394 424 397 428 399 761 740 788 750 798 760 793 75611 421 396 410 394 424 390 426 393 757 738 782 749 796 760 798 75412 418 395 413 396 427 390 431 392 760 735 797 749 795 759 797 75213 420 392 413 391 428 390 428 393 754 734 781 742 794 764 797 74314 421 389 414 390 427 380 427 381 756 728 780 732 795 751 796 74215 420 394 411 392 427 393 430 394 762 737 789 745 796 756 796 75116 420 395 414 395 427 390 428 394 761 739 789 745 801 761 797 75517 424 393 415 393 428 392 429 391 764 738 796 742 798 757 806 74818 421 384 417 385 427 390 427 375 764 734 792 739 805 742 802 73619 419 397 417 395 426 392 428 390 762 738 787 744 802 761 795 75620 419 398 416 391 426 387 427 391 760 735 787 741 801 751 798 74421 419 391 415 390 426 391 429 393 757 748 784 747 800 752 796 75022 424 392 416 393 427 383 430 385 748 748 788 744 800 759 805 74923 421 395 415 397 427 394 427 398 748 748 789 748 800 764 796 75424 427 395 414 397 426 392 427 393 748 748 783 743 797 766 796 75725 426 401 418 397 426 400 430 401 748 748 791 759 809 757 812 75926 421 395 415 397 426 400 430 401 748 748 788 751 806 769 811 75627 422 397 415 395 426 395 429 396 759 741 786 745 798 761 800 75628 425 390 415 390 426 388 430 393 760 737 791 745 799 750 809 74529 424 389 417 393 426 387 432 392 762 736 792 748 800 766 810 74930 423 397 413 393 426 396 429 400 759 740 791 752 795 763 805 756

427 384 418 385 428 380 432 375 766 728 799 732 809 742 812 736

seoni Gwalior BinaBina Gwalior Nagda Khandwa Sipat

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 18: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Nov-13 0 0 0 0 0 0 0 02 02-Nov-13 0 0 0 0 0 0 0 03 03-Nov-13 0 0 0 0 0 0 0 04 04-Nov-13 0 0 0 0 0 0 0 05 05-Nov-13 0 0 0 0 0 0 0 06 06-Nov-13 0 0 0 0 0 0 0 07 07-Nov-13 0 0 0 0 0 0 0 08 08-Nov-13 0 0 0 0 0 0 0 09 09-Nov-13 1 32 0 0 0 0 0 0

10 10-Nov-13 0 0 0 0 0 0 0 011 11-Nov-13 1 671 0 0 0 0 0 012 12-Nov-13 0 0 0 0 0 0 0 013 13-Nov-13 0 0 0 0 0 0 0 014 14-Nov-13 0 0 0 0 0 0 0 015 15-Nov-13 0 0 0 0 0 0 0 016 16-Nov-13 0 0 0 017 17-Nov-13 1 39 0 0 0 0 0 018 18-Nov-13 0 0 0 0 0 0 0 019 19-Nov-13 0 0 0 0 0 0 0 020 20-Nov-13 0 0 0 0 0 0 0 021 21-Nov-13 0 0 0 0 0 0 0 022 22-Nov-13 1 77 0 0 0 0 0 023 23-Nov-13 0 0 0 0 0 0 0 024 24-Nov-13 0 0 0 0 0 0 0 025 25-Nov-13 0 0 0 0 0 0 0 026 26-Nov-13 0 0 0 0 0 0 0 027 27-Nov-13 0 0 0 0 0 0 0 028 28-Nov-13 0 0 0 0 0 0 0 029 29-Nov-13 0 0 0 0 0 0 0 030 30-Nov-13 0 0 0 0 0 0 0 0

Max 1 77 0 0 0 00 0 0Total 4 2151 0 0 0 0 0 0

220 38 152 550

Maharashtra

Recommonded Load relief at 488 Hz 486 Hz

Gujarat

NIL NIL

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month NOVEMBER 2013

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 19: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Annexure 25 Power CutRestrictions in Western Region for the month of November-2013

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs)

Min (Hrs)

Average (Hrs)

21 Three-Phase Supply(DLF)

01112013 30112013 2356 2339 2347

21 Three-Phase Supply(Irrigation)

01112013 30112013 1046 0951 1024

21 Three-Phase Supply(Mixed)

01112013 30112013 2355 2334 2342

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 20: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01112013 30112013 2358 2347 2355 32 District Head Qtrs 01112013 30112013 2359 2351 2356 33 Tehsil Head Qtrs 01112013 30112013 2357 2344 2350

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samaya Restriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 011113 to 051113 From 061113 to 301113

SaUnya Nil

0-85MW 0-975 MW

SaUnya Nil

0000 0000

SaUnya Nil 2400 2400

SaUnya Nil

15 MUsday 108 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01112013 30112013 1000 0800 0900

22 Single-Phase Supply 01112013 30112013 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 21: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

1689 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 000 (Av) 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0078 - -

000 -

3 HT Industries 000 (Av) Total Energy Cutday 0078 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 011113 to 301113 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 23112013 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 22: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का नव बर2013का वःता रत यौरा

Details of forced unit outages during the month ofNov2013

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 सजन Sugen 1

गजरात Gujarat 3825 101 10-Sep-13 545 17-Nov-13 Gen protection operated

2 डब यट पीएस WTPS - 3

गजरात Gujarat 210 946 18-Oct-13 352 11-Nov-13 BTL

3 एसएलपीपी SLPP - I

गजरात Gujarat 125 2317 22-Oct-13 NA 10-Nov-13 LHS problem

4 उकई UKAI - 6

गजरात Gujarat 500 027 1-Nov-13 1011 9-Nov-13 Turbine problem

5 एःसार ESSARVADINAR

गजरात Gujarat 600 2352 3-Nov-13 1719 15-Nov-13 Less requisi tion

6 एपीएलAPL-5 गजरात Gujarat 660 1206 13-Nov-13 440 1-Dec-13 CTL

7 एसएलपीपी SLPP-2

गजरात Gujarat 125 1127 26-Nov-13 805 2-Dec-13 Lignite problem

8 एपीएल APL -8 गजरात Gujarat 660 125 24-Nov-13 447 2-Dec-13 HT heater problem

9 आरजीपीपीएल RGPPL-3B

महारा Maharashtra

320 2158 28-May-13 Ready Ready No requisition

10 आरजीपीपीएल RGPPL-2A

महारा Maharashtra

350 910 6-Jun-13 Ready Ready No requisition

11 आरजीपीपीएल RGPPL-3A

महारा Maharashtra

320 828 6-Jun-13 Ready Ready No requisition

12 आरजीपीपीएल RGPPL-1B

महारा Maharashtra

320 2230 25-Jun-13 Ready Ready No requisition

13 आरजीपीपीएल RGPPL-1A

महारा Maharashtra

320 2147 27-Jun-13 Ready Ready No requisition

14 टाटा TATA-6

महारा Maharashtra

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

15 आरजीपीपीएल RGPPL-2B

महारा Maharashtra

230 1503 8-Aug-13 Ready Ready No requisition

16 वीआईपीएल VIPL-I

महारा Maharashtra

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 23: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 भसावल Bhusawal-5

महारा Maharashtra

500 1516 18-Oct-13 अनपल ध Still out

अनपल ध Still out

ESP problem

18 जएसडब य JSW-2

महारा Maharashtra

300 001 21-Oct-13 1020 16-Nov-13 No buyer

19 डब यपीसीएल WPCL-1

महारा Maharashtra

135 624 3-Nov-13 2017 14-Nov-13 ID fan problem

20 चिपर CPUR - I

महारा Maharashtra

210 1212 3-Nov-13 2023 06-Nov-13 Poor bunkering

21 पल Parli - 6

महारा Maharashtra

250 1529 5-Nov-13 645 12-Nov-13 CHP problem

22 पल Parli - 7

महारा Maharashtra

250 639 6-Nov-13 017 12-Nov-13 CHP problem

23 कोराड Koradi - 5

महारा Maharashtra

200 1130 7-Nov-13 817 13-Nov-13 Flame failure

24 डहाण Dahanu - 2

महारा Maharashtra

250 2344 8-Nov-13 544 12-Nov-13 Valve leakage

25 पल Parli -4

महारा Maharashtra

210 749 9-Nov-13 1051 09-Nov-13

Drum level low

26 खापरखड़ा Kkheda-3

महारा Maharashtra

210 1703 9-Nov-13 0553 11-Nov-13 Flame failure

27 कोराड Koradi 6

महारा Maharashtra

210 1806 17-Nov-13 847 21-Nov-13 BTL

28 नािसक Nasik-3

महारा Maharashtra

210 2030 18-Nov-13 342 21-Nov-13 Super heater tube leakage

29 पल Parli-4

महारा Maharashtra

210 1630 20-Nov-13 645 30-Nov-13 CTL

30 चिपर Cpur-7

महारा Maharashtra

500 2204 21-Nov-13 943 26-Nov-13 BTL

31 एपीएमएल APML-1

महारा Maharashtra

660 2000 19-Nov-13 1038 26-Nov-13 BTL

32 इ डयाबल India Bull-1

महारा Maharashtra

270 1459 22-Nov-13 अनपल ध Still out

अनपल ध Still out

PG test

33 खापरखड़ा Khaperkheda-1

महारा Maharashtra

210 1220 24-Nov-13 अनपल ध Still out

अनपल ध Still out

COAL SHORTAGE

34 चिपर Cpur-7

महारा Maharashtra

500 2139 25-Nov-13 1549 28-Nov-13 BTL

35 कोरबा प म Korba(W)-5

छ ीसगड Chhattisgarh

500 858 17-Nov-13 858 23-Nov-13 BTL

36 कोरबा प म Korba(W)-2

छ ीसगड Chhattisgarh

210 2233 22-Nov-13 335 28-Nov-13 Annual inspection

37 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 9-Nov-13 Ready Ready Less requisi tion

38 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

39 ल को Lanco-1

LANCO 300 658 23-Nov-13 925 27-Nov-13 BFP tripped

40 वदना Vandana-1

वदनाVANDANA

135 2042 31-Oct-13 242 17-Nov-13 Turbine problem

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 24: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

41 एमको EMCO - 2

जीएमआर GMR

300 1707 21-Oct-13 अनपल ध Still out

अनपल ध Still out

BTL

42 सीजीपीएल CGPL-20

सीजीपीएल CGPL

830 458 25-Oct-13 2037 30-Nov-13 GT Inspection

43 सीजीपीएल CGPL-30

सीजीपीएल CGPL

800 814 14-Nov-13 909 24-Nov-13 Fire on coal conveyer belt

44 सीजीपीएल CGPL-50

सीजीपीएल CGPL

800 549 14-Nov-13 1716 22-Nov-13 Fire on coal conveyer belt

45 सीजीपीएल CGPL-10

सीजीपीएल CGPL

800 1153 14-Nov-13 अनपल ध Still out

अनपल ध Still out

Fire on coal conveyer belt

46 सीजीपीएल CGPL-40

सीजीपीएल CGPL

800 1503 14-Nov-13 2309 24-Nov-13 Fire on coal conveyer belt

47 वदना Vandana-1

वदना VANDANA 135 404 17-Nov-13 अनपल ध Still out

अनपल ध Still out

Turbine problem

48 ससानSASAN - 3 आरईएलREL 660 1943 22-Nov-13 331 28-Nov-13 Reheater temp high

49 गाधार Gandhar GT-1

एनट पीसीNTPC 219 1231 17-Sep-13 603 22-Nov-13 Less requisi tion

50 गाधार Gandhar GT-2

एनट पीसीNTPC 219 1131 28-Oct-13 NA 13-Nov-13 Less requisition

51 कावासKawas 2A एनट पीसीNTPC 164 055 31-Oct-13 2309 19-Nov-13 Less requisition

52 कावास KAWAS 2B

एनट पीसीNTPC 164 2212 2-Nov-13 Ready Ready Less requisi tion

53 कावास KAWAS GT 1B

एनट पीसीNTPC 164 012 3-Nov-13 Ready Ready Less requisi tion

54 मौदाMouda-1 एनट पीसीNTPC 500 2121 3-Nov-13 2113 14-Nov-13 Less requisi tion

55 िसपतSipat - 2 एनट पीसीNTPC 660 1400 4-Nov-13 959 12-Nov-13 Less requisi tion

56 कावास Kawas GT 1B

एनट पीसीNTPC 164 012 5-Nov-13 858 14-Nov-13 Less requisi tion

57 कावासKawas 1A एनट पीसीNTPC 164 035 6-Nov-13 1322 12-Nov-13 Less requisi tion

58 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 028 13-Nov-13 1241 18-Nov-13 BTL

59 कावास Kawas GT 1A

एनट पीसीNTPC 164 031 16-Nov-13 610 23-Nov-13 Less requisi tion

60 गाधार Gandhar GT-2

एनट पीसीNTPC 219 2010 16-Nov-13 2302 19-Nov-13 Less requisi tion

61 िसपत Sipat - 5

एनट पीसीNTPC 500 1257 20-Nov-13 1044 24-Nov-13 Electrical fault

62 गाधारGandhar-2 एनट पीसीNTPC 219 2151 21-Nov-13 1027 30-Nov-13 Less requisi tion

63 कावासKawas 2A एनट पीसीNTPC 164 2117 26-Nov-13 अनपल ध Still out

अनपल ध Still out

Less requisition

64 मौदाMouda-1 एनट पीसीNTPC 500 1345 30-Nov-13 अनपल ध Still out

अनपल ध Still out

BTL

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 25: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का नव बर2013 का वःता रत यौरा

Details of planned unit outages during the month of Nov2013 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 पल ParlI-3

महारा Maharashtra

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

2 चिपर Chandrapur-5

महारा Maharashtra

500 101 14-Jul-13 अनपल ध Still out

अनपल ध Still out

AOH

3 कोरबा पव KORBA-(E)-5

छ ीसगड Chhattisgarh

120 1102 7-Sep-13 अनपल ध Still out

अनपल ध Still out

AOH

4 ट स TAPS-2

एनपीसीएल NPCL

160 2042 24-Nov-13 अनपल ध Still out

अनपल ध Still out

Maintenance work

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 26: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

1 AECo C 60 0512201 13122013 Boiler Annual Maintenance2 WTPS 3 210 0101201 30012014 AOH

2NIL

3 Craiva]kMila CSPGCL

31

DSPM-I

I

250 100213 310114 HPT amp IPT Turbine are under repair at BHELHardwar expected delivery by Dec2013

32 Korba West-III 2 210 18114 110214 COH33 Korba West-IV 4 210 101213 020114 AOH

441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH

5 koMd``Iya xao~ Central Sector51 TROMBAY 5 500 240114 120214 AOH52 KORBA 1 200 051213 291213 AOH53 KAWASH GT2B 106 050114 040314 R amp M WORK54 CGPL 10 800 251113 200114 R amp M WORK

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING DECEMBER 2013 AND JANUARY 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 27: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Date Time Date Time

1 765kV Sasan- Main Bus-1B Dia-6(Bay-16amp17) 1-Jan-14 800 10-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

2 765kV Sasan- Main Bus-1BBay 13 - Jack Bus Dia-5(Bay-13)

1-Jan-14 800 10-Jan-14 1800 Cont Jumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

3 400 Bhilai-Koradi 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 400 DC Korba-Birsingpur 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Korba-Bhilai 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 220 Korba-Budhipadar 3 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Akola-Wardha 1amp 2 1-Jan-14 800 31-Jan-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

8 400 Boisar-Padghe 1-Jan-14 800 31-Jan-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode WRTS-I WRTS-I For IO

9 400 Lamboti-Solapur PG 1-Jan-14 900 1-Jan-14 1700 Daily QMwork MSETCL MSETCL10 220 220 KV Bus I at Khandwa 2-Jan-14 1000 2-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R11 400 Bhadrawati-Chandrapur 2 2-Jan-14 1000 2-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

12 400 400 kV Bus1 at Gandhar 2-Jan-14 800 2-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

13 400 Bhadrawati-Chandrapur 4 3-Jan-14 1000 3-Jan-14 1400 Daily AMP Works WRTS-1 WRTS-1 R

14 400 Lilo of Khedamara-Marwa 3-Jan-14 800 3-Jan-14 1800 Daily Crossing works of 765KV 765 KV Champa - Dharmjaygarh

CSPTCL WRTS-I C

15 400 V-HVDC Ckt-1 3-Jan-14 830 3-Jan-14 1730Daily Basis Rectification of hot spots NTPC NTPC

16 400 VSTPS 400 KV Main Bus-2 3-Jan-14 830 4-Jan-14 1730 Cont For rectification of hot spots of Main-Bus and HVDC-1 line NTPC NTPC

17 400 400 kV Bus2 at Gandhar 3-Jan-14 800 3-Jan-14 1800 DailyDefective clamp connector replacement NTPC NTPC

18 400 400 KV Indore-Nagda Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I19 220 Omkareshwar-Khandwa Ckt 3-Jan-14 900 3-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

20 220 Damoh(PGCIL) - Tikamgarh PGCIL

3-Jan-14 900 3-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

21 400 Deepnagar-Aurangabad II 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL22 400 Kalwa-Khargar 3-Jan-14 900 3-Jan-14 1700 Daily QMwork MSETCL MSETCL23 400 400kV Bus 1 at Dehgam 4-Jan-14 1000 4-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R24 HVDC HVDC West -Bus-2 4-Jan-14 1000 4-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R25 400 400 KV ISP-Nagda Ckt 4-Jan-14 900 4-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

Reason System Agency Type

Annexure-32-AOutage Planning of Transmission elements during the month of January -2014

SN KV Line From To Basis

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 28: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -201426 220 Malanpur-Auriya Ckt 4-Jan-14 900 4-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI27 400 Dhule-Babhleswar ckt 1 4-Jan-14 900 4-Jan-14 1700 Daily QMwork MSETCL MSETCL

28 220 Vapi(PG)-Bhilad (Getco) 2amp3 (Common DC tower) 5-Jan-14 800 6-Jan-14 1800 Daily LILO of 400kV Navsari-Boisar at Loc

no 56-57 for Magarwada GIS SS PGCIL WRTS-II C

29 400 50MVAr Bus Reactor at Satna 6-Jan-14 1000 6-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R30 400 400kV Bus 2 at Dehgam 6-Jan-14 1000 6-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R31 400 BUS-1 at Bhadrawati 6-Jan-14 1000 6-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R32 765 BUS-1 at Seoni 6-Jan-14 1000 6-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R33 220 Haldarva - Jhanor - 2 (NTPC) 6-Jan-14 900 6-Jan-14 1800 Daily PMM work PGCIL GETCO

34 400Interconnecting transformer(ICT)1 at Gandhar 6-Jan-14 11-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

35 400 400KV Tie Main CB Bay - II (ICT -II)

6-Jan-14 800 6-Jan-14 1700 daily For maintenance work MPPTCL EHT- Mamp I

36 220 Malanpur-Auriya Ckt 6-Jan-14 900 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI37 220 Anuppur - Kotmikala Ckt - I 6-Jan-14 1000 6-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI38 400 Bhusawal-Aurangabad 6-Jan-14 900 6-Jan-14 1700 Daily QMwork MSETCL MSETCL39 400 Karad-Kolhapur Ckt II 6-Jan-14 900 6-Jan-14 1700 Daily Annual maintenance work MSETCL MSETCL40 220 TAPS-BOISAR 7-Jan-14 800 8-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL41 220 220kV Bus 1 at Dehgam 7-Jan-14 1000 7-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

42 220 220kV Vapi (PG) - Khadoli 1 7-Jan-14 900 7-Jan-14 1700 Daily For Annual Maintenance Work PGCIL WRTS-II R

43 400 63MVAr Bus Reactor at Satna 7-Jan-14 1000 7-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R44 220 Bhatapara - Bhatapara 7-Jan-14 1000 7-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1

45 400 Raipur-Raigarh 4 7-Jan-14 800 13-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-I KSK C

46 400 KSK-DB Power 7-Jan-14 800 10-Jan-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IDBKSK

KSK C

47 400 KSK-DB Power and DB Power-Raigarh

7-Jan-14 800 8-Jan-14 1800 Cont Crossing work of upcoming 765 KV DC Raigarh-Raipur line

KSKDBWRTS-I

WRTS-I C

48 765 BUS-2 at Seoni 7-Jan-14 1000 7-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R49 400 KV SUGEN JHANOR LINE BAY EQU 7-Jan-14 0375 7-Jan-14 075 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R

50 400 KV SUGEN BUS 1 7-Jan-14 900 7-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE 400 KV SUGEN JHANOR LINE BUS 1 ISOLATOR

TPL-SUGEN TPL-SUGEN R

51 400 Sipat 400KV Bay-23 (ICT-2 tie bay)

7-Jan-14 0800 7-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC52 400 400 KV Indore-Nagda Ckt 7-Jan-14 900 7-Jan-14 1600 daily For maintenance work MPPTCL EHT- Mamp I53 400 400 KV Rajgarh-Ssp Ckt-I 7-Jan-14 900 7-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

54 400 315 MVA 400220kV ICT at Shujalpur

8-Jan-14 1000 8-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

55 220 220kV Bus 2 at Dehgam 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 29: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -2014

56 400 400kV Satpura Koradi 8-Jan-14 900 8-Jan-14 1800 Daily Erection of new CGL make CBFor maintaining electrical clearance PGCIL WRTS-II C

57 400 400kV Vindhyanchal Satna 1 8-Jan-14 1000 8-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R58 220 Raigarh-Raigarh 1 8-Jan-14 1000 8-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R

59 400 KV UNOSUGEN PIRANA LINE BAY EQUIPMENTS 8-Jan-14 900 8-Jan-14 1800 DAILY

OFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

60 400 Sipat 400KV Bay-24 (ICT-2 main bay)

8-Jan-14 0800 8-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC61 400 400 KV Rajgarh-Ssp Ckt-II 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I62 220 Mehgaon-Auriya Ckt 8-Jan-14 900 8-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI63 220 Damoh Sagar PGCIL Ckt 8-Jan-14 900 8-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI64 220 Chhegoan-Khandwa Ckt -II 8-Jan-14 900 8-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI65 400 Karad-Jaigad II 8-Jan-14 900 8-Jan-14 1700 Daily QMwork MSETCL MSETCL66 400 400kV Vindhyanchal Satna 2 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R67 400 400kV Gandhar Navsari 1 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R68 220 220kV Transfer Bus at Dehgam 9-Jan-14 1000 9-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R69 400 BUS-1 at Wardha 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R70 220 Raigarh-Raigarh 2 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works CSPTCL WRTS-1 R71 220 BUS-1 at Boisar 9-Jan-14 1000 9-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

72 400 KV SUGEN VAPI LINE BAY EQUIPMENTS

9-Jan-14 900 10-Jan-14 1800 DAILYOFFLINE WASHING AND ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

73 400 KV SUGEN BUS 1 9-Jan-14 900 11-Jan-14 1800 DAILY OFFLINE WASHING AND ANNUAL P TPL-SUGEN TPL-SUGEN R74 220 Anuppur - Kotmikala Ckt - II 9-Jan-14 1000 9-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

75 765 1500MVA 765400kV ICT 1 at Indore (PG)

10-Jan-14 900 11-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

76 400 400kV Rajgarh Nagda 1amp2 10-Jan-14 800 10-Jan-14 1800 Daily For Power Line Crossing of 765kV Vadodara Indore Line

MPPTCL WRTS-II C

77 220 BUS-2 at Mapusa 10-Jan-14 1000 10-Jan-14 1800 Daily Terminal tighting work WRTS-I WRTS-I R78 400 BUS-2 at Wardha 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R79 220 BUS-2 at Boisar 10-Jan-14 1000 10-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

80 400 Korba-Bhilai-2 10-Jan-14 800 10-Jan-14 1800 Daily crossing work of upcoming 765 kV Champa-Raipur DC

WRTS-I WRTS-I C

81 765Sipat 765KV Bay-1 ( ICT-1 Main bay)

10-Jan-14 0800 10-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC82 220 Chhegoan-Khandwa Ckt -I 10-Jan-14 900 10-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI83 400 Deepnagar-Aurangabad I 10-Jan-14 900 10-Jan-14 1700 Daily QMwork MSETCL MSETCL

84 765kV Sasan-Main Bus-2ASatna Line-2 Line Reactor - 2 11-Jan-14 800 31-Jan-14 1800 Cont

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment

RELIANCE RELIANCE

85 400 400kV Gandhar Navsari 2 11-Jan-14 1000 11-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 30: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -2014

86 400 Raipur-KSK 11-Jan-14 800 13-Jan-14 1800 Continuous

Lilo 400KV Raipur-Raigarh 4 at KSK end

WRTS-IKSK KSK C

87 220 Transfer Bus at Boisar 11-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R88 220 Haldarva - Jhanor - 2 (NTPC) 11-Jan-14 900 11-Jan-14 1800 Daily PMM work PGCIL GETCO

89 400 KV SUGEN UNOSUGEN LINE BAY EQUIPMENTS 11-Jan-14 900 11-Jan-14 1800 DAILY

ANNUAL PREVENTIVE MAINTENANCE BAY EQUIPMENTS

TPL-SUGEN TPL-SUGEN R

90 400 Dhule-SSarovar I 11-Jan-14 900 11-Jan-14 1700 Daily QMwork MSETCL MSETCL

91 400 Bhachau Ranchodpura 1 amp 2 13-Jan-14 800 20-Jan-14 1800 Cont For Canal Shifting Work at Location no 327

PGCIL WRTS-II C

92 400 400kV Satpura Koradi 13-Jan-14 900 13-Jan-14 1800 Daily Testing and commisioning of new CGL make CB

PGCIL WRTS-II C

93 400 400kV Vindhyanchal Jabalpur 1 13-Jan-14 900 13-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

94 400 Korba-Bhilai (CSPTCL) 13-Jan-14 800 13-Jan-14 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line

CSPTCL WRTS-I C

95 220 Transfer Bus at Mapusa 13-Jan-14 1000 11-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R96 400 New Koyna-Karad ckt 1 13-Jan-14 830 13-Jan-14 1730 Daily QMwork MSETCL MSETCL97 400 Balco-Birsingpur 14-Jan-14 1000 14-Jan-14 1800 Daily Bay maintenance at Balco WRTS-I Balco R

98 400 DC Tamnar-Raipur 1amp 2 14-Jan-14 800 15-Jan-14 1800 Continuous

Crossing work of upcoming 765 KV DC Raigarh-Raipur line

JINDAL WRTS-I C

99 400 DC Korba-Raipur 3 amp 4 14-Jan-14 800 14-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa

WRTS-I WRTS-I C

100 400 Sipat- Raipur line 2 14-Jan-14 0800 15-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC101 220 Pithampur-Rajgarh Ckt - I 14-Jan-14 900 14-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 31: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -2014102 400 400kV Vindhyanchal Jabalpur 2 15-Jan-14 900 15-Jan-14 1800 Daily For Insulator Repalcement Work PGCIL WRTS-II R

103 400 315 MVA 400220kV ICT 1 at Rajgarh

15-Jan-14 1000 15-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

104 400 Vandana-Birsingpur 15-Jan-14 1000 15-Jan-14 1800 Daily Bay maintenance at Vandana WRTS-I Vandana105 765 BUS-1 at Wardha 15-Jan-14 1000 15-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

106 400 Solapur-Parli 2 15-Jan-14 1000 16-Jan-14 1800 Daily Erection of spare765400KV ICT bushing

WRTS-I WRTS-I R

107 220 Pithampur-Rajgarh Ckt - II 15-Jan-14 900 15-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI108 220 GWL(PGCIL)-Malanpur Ckt-I 15-Jan-14 900 15-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

109 400 315 MVA 400220kV ICT 2 at Rajgarh

16-Jan-14 1000 16-Jan-14 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

110 400 400KV Bus I at Khandwa 16-Jan-14 1000 16-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R

111 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I C

112 765 BUS-2 at Wardha 16-Jan-14 1000 16-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

113 400 Ranchi-Sipat 1 amp 2 16-Jan-14 900 17-Jan-14 1800 DailyCrossing work of upcoming 765 KV Champa - Dharmjaygarh SC amp 765 KV DC Jharsuguda-Korba

WRTS-I WRTS-I IR

114 400 400 KV Nagda-Rajgarh Ckt-I 16-Jan-14 900 16-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I115 220 GWL(PGCIL)-Malanpur Ckt-II 16-Jan-14 900 16-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI116 400 Lonikand-Chakan 16-Jan-14 900 16-Jan-14 1700 Daily QMwork MSETCL MSETCL

117 765 1500MVA 765400kV ICT 2 at Indore (PG)

17-Jan-14 900 19-Jan-14 1600 Daily For completing balance Construction Related issues

PGCIL WRTS-II C

118 400 400KV Bus II at Khandwa 17-Jan-14 1000 17-Jan-14 1800 Daily For Annual Maintenance Work PGCIL WRTS-II R119 220 BUS-1 at Seoni 17-Jan-14 1000 17-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R120 400 400 KV Nagda-Rajgarh Ckt-II 17-Jan-14 900 17-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I121 220 Khandwa-Nepanagar Ckt 17-Jan-14 900 17-Jan-14 1600 daily For maintenance work MPPTCL EHT -MampI122 400 Padgha-Talegaon 17-Jan-14 900 17-Jan-14 1700 Daily QMwork MSETCL MSETCL

123 400 Korba-Bhilai-1 18-Jan-14 800 18-Jan-14 1800 Daily crossing work of upcoming 765 kV DC Raigarh-Raipur line

WRTS-I WRTS-I C

124 220 BUS-2 at Seoni 18-Jan-14 1000 18-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R125 220 Vapi -Vapi (PG) 18-Jan-14 900 18-Jan-14 1800 Daily PMM work GETCO GETCO126 400 Dhule-SSarovar II 18-Jan-14 900 18-Jan-14 1700 Daily QMwork MSETCL MSETCL

127 400 400KV DAMOH-BRISHINGPUR 1(PGCIL) 19-Jan-14 800 19-Jan-14 1700 Daily

AMP oF Terminal Equipments amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

128 400 400KV DAMOH-BRISHINGPUR 2(PGCIL) 20-Jan-14 800 20-Jan-14 1700 Daily

AMP oF Terminal EquipmentS amp Capacitance and Tan Delta measurement of Bay CTs

PGCIL WRTS-II R

129 400 400kV Khandwa Seoni 1 20-Jan-14 1000 20-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R130 765 BUS-1 at Bilaspur 20-Jan-14 1000 20-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R131 220 Ichhapore-Kawas-1 20-Jan-14 800 20-Jan-14 1800 Daily PMM work PGCIL GETCO

132 400Interconnecting transformer(ICT)2 at Gandhar 20-Jan-14 25-Jan-14 Cont Annual Bay Maintenance NTPC NTPC

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 32: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -2014133 400 New Koyna-Karad ckt 2 20-Jan-14 830 20-Jan-14 1730 Daily QMwork MSETCL MSETCL134 400 400kV Khandwa Seoni 1 21-Jan-14 1000 21-Jan-14 1400 Daily For CVT Replacement Works PGCIL WRTS-II R135 765 BUS-2 at Bilaspur 21-Jan-14 1000 21-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

136 400 Sipat-Raipur 3 21-Jan-14 800 21-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

137 220 Ichhapore-Kawas-2 21-Jan-14 800 21-Jan-14 1800 Daily PMM work PGCIL GETCO

138 400KV Korba- Lanco 21-Jan-14 900 22-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

139 400 Sipat- Ranchi line 1 21-Jan-14 0800 22-Jan-14 1900 Daily Annual Preventive maintenance job NTPC NTPC140 400 400KV Seoni -Bhilai Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I141 220 Badod - Kota Ckt 21-Jan-14 900 21-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI142 400 Koradi-Khaparkheda II 21-Jan-14 900 21-Jan-14 1700 Daily QMwork MSETCL MSETCL143 400 TAPS-PADGHE CKT-1 22-Jan-14 800 23-Jan-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL

144 400 400kV Bus 1 at Indore 22-Jan-14 900 25-Jan-14 1600 Daily For replacement of 400kV Isolator MOM boxes in all bays

PGCIL WRTS-II C

145 400 Raipur-Sipat 1 amp 2 22-Jan-14 800 22-Jan-14 1800 Daily Crossing work of upcoming 765 KV Raigarh-Raipur line

WRTS-I WRTS-I C

146 220 Bhilad-Vapi (PG)-2 22-Jan-14 900 22-Jan-14 1800 Daily PMM work PGCIL GETCO147 220 Badod - Modak Ckt 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

148 220 Damoh(PGCIL) - Damoh I C - I 22-Jan-14 900 22-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI

149 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 900 22-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI150 400 Chandrapur-Khaparkheda 22-Jan-14 900 22-Jan-14 1700 Daily QMwork MSETCL MSETCL

151 220 DC Korba-Budipadar (CSPTCL) 23-Jan-14 800 24-Jan-14 1800 DailyCrossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCL WRTS-I C

152 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 900 23-Jan-14 1700 daily For maintenance work MPPTCL EHT -MampI

153 400KV Korba Bus sectionalizer-2( bus 2-4)

24-Jan-14 900 25-Jan-13 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

154 400 Deepnagar-Khadka I 24-Jan-14 900 24-Jan-14 1700 Daily QMwork MSETCL MSETCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 33: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Outage Planning of Transmission elements during the month of January -2014

155 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I C

156 400 Korba-Khedamara (yet to be charged) 25-Jan-14 800 25-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

157 220 SC Korba-Budipadar 3 (PGCIL) 25-Jan-14 800 25-Jan-14 1800 Daily

Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

WRTS-I WRTS-I IR

158 400 Bus-1 at Waluj (MSETCL) 27-Jan-14 900 27-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C

159 400 Khedamara-Raita 27-Jan-14 800 27-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

160 400 400KV Katni - Damoh Ckt 27-Jan-14 900 27-Jan-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

161 765kV Sasan- ICT-2 Dia-6 28-Jan-14 800 30-Jan-14 1800 Cont Clamp-Connector Tightness RELIANCE RELIANCE

162 400 Bus-2 at Waluj (MSETCL) 28-Jan-14 900 28-Jan-14 1800 Daily New bay termination works MSETCL WRTS-I C163 220 BUS-1 at Solapur 28-Jan-14 1000 28-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R164 220 Bhilad-Vapi (PG)-3 28-Jan-14 900 28-Jan-14 1800 Daily PMM work PGCIL GETCO

165 220 Navsari -Nasik-1 28-Jan-14 900 29-Jan-14 1800 Cont Isolator replacing work GETCOMSETCL

GETCO

166 400 Vindhyachal - Mahan line 28-Jan-14 830 29-Jan-14 1730 Cont Replacement of R Y amp B-Ph CT NTPC NTPC167 220 SEONI - CHHINDWARA CKT I 28-Jan-14 900 28-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI168 400 Koradi-Khaparkheda I 28-Jan-14 900 28-Jan-14 1700 Daily QMwork MSETCL MSETCL169 220 BUS-2 at Solapur 29-Jan-14 1000 29-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

170 400 Marwa TPP- Raipur DC (yet to be charged) 29-Jan-14 800 29-Jan-14 1800 Daily Crossing works of 765KV Dc Raipur-

Champa amp Raigarh-Raipur line CSPTCL WRTS-I C

171 400KV Korba- Mahan 29-Jan-14 900 30-Jan-14 1900 Cont Annual Preventive maintenance and testing

NTPC NTPC

172 220 Transfer Bus at Solapur 30-Jan-14 1000 30-Jan-14 1800 Daily AMP Works WRTS-I WRTS-I R

173 220 Navsari -Nasik-2 30-Jan-14 1000 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

174 220 Vapi -TAPS 30-Jan-14 900 30-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

175 220 SEONI - CHHINDWARA CKT II 30-Jan-14 900 30-Jan-14 1800 daily For maintenance work MPPTCL EHT -MampI176 400 Jejuri-Lonikand 30-Jan-14 900 30-Jan-14 1700 Daily QMwork MSETCL MSETCL

177 220 Bhilad-TAPS 31-Jan-14 900 31-Jan-14 1800 Daily PMM work GETCOMSETCL

GETCO

178 400 Deepnagar-Khadka II 31-Jan-14 900 31-Jan-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 34: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Date Time Date Time1 400 315 MVA 400220kV ICT at Bina 20-Dec-13 900 20-Dec-13 1400 Daily For Annual Maintenance Work PGCIL WRTS-II R

2 400 315MVA 400220kV ICT 3 at Vapi 20-Dec-13 800 21-Dec-13 1800 Daily For yearly Annual Maintenance Works PGCIL WRTS-II R

3 400 400kV Itarsi Indore 1 20-Dec-13 1000 20-Dec-13 1800 DailyFor Reactor Back Up Impedance Relay Retrofitting at Indore end and Annual Maintenance Work

PGCIL WRTS-II R

4 400 Bus-2 at Raipur 20-Dec-13 900 21-Dec-13 1800 Daily Bus-2 splitting work at Raipur WRTS-I WRTS-I C

5 400 DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 20-Dec-13 800 21-Dec-13 1800 Daily Crossing work of 400kv MC

Aurangabad - AurangabadRelianceMSETCL WRTS-I C

6 400 Chorania-Kasor 20-Dec-13 800 20-Dec-13 1800 Daily Maintenance work GETCO GETCO7 765 Sipat 765KV 400KV ICT-1 20-Dec-13 800 20-Dec-13 1900 Daily Protection scheme modification NTPC NTPC

8 765 Sasan-Satna Line-1 Line Reactor 21-Dec-13 800 31-Dec-13 1800 Contionious

Equipment ConnectionsCircuit Breaker and CT TestingJumper Installations amp ConnectionsIsolator Allignment

RELIANCE RELIANCE

9 400 Korba-Raipur 3 21-Dec-13 800 21-Dec-13 1800 Daily CVT replacement at Raipur WRTS-I WRTS-I R10 220 Ranasan-Dehgam (PG)-2 21-Dec-13 800 21-Dec-13 1800 Daily Maintenance work GETCO GETCO11 220 Raipur-Khedamara 23-Dec-13 1000 23-Dec-13 1800 Daily CVT replacement at Raipur CSPTCL WRTS-112 400220315MVA ICT 1 at Mapusa 23-Dec-13 1000 23-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R13 400220315MVA ICT 2 at Mapusa 24-Dec-13 1000 24-Dec-13 1800 Daily OLTC Inspection WRTS-I WRTS-I R

14 400 400kV Satpura Itarsi 26-Dec-13 900 26-Dec-13 1800 Daily Testing and commisioning of new CGL make CB PGCIL WRTS-II C

15 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay) 26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

16 400 VSTPS Bus- Coupler-2 26-Dec-13 830 28-Dec-13 1730Continuous Basis

AMP of Bus-Coupler bay cum Bus-Reactor NTPC NTPC

17 400 VSTPS 400 KV Bus Reactor 26-Dec-13 830 28-Dec-13 1730Coninuous Basis AMP NTPC NTPC

18 400 Vadavi-Dehgam (PG) - 1 27-Dec-13 800 28-Dec-13 1800 Daily Maintenance work GETCO GETCO

19 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay) 27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC

20 400 400kV Satpura Koradi 28-Dec-13 900 28-Dec-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line will be taken into service through TBC CB

PGCIL WRTS-II C

21 220Vapi(PG)-Bhilad (Getco)1 and Vapi(Getco)-Bhilad (Getco) (Common DC Tower)

29-Dec-13 800 30-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C

22 400 Chorania-Kasor 30-Dec-13 800 31-Dec-13 1800 Daily Maintenance work GETCO GETCO

Type

Annexure-32-BOutage Planning of Transmission elements during the month of DECEMBER-2014

SN KV Line From To Basis Reason System Agency

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 35: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Annexure-32-C1

List of Emergency Outages availed in Nov 2013

SlNo

Element kV Agency From

Date To Date

Remarks

1 SUGEN ICT ‐ III

400220 TPGL 1‐Nov 1‐Nov Hotspot

2 KAWAS‐ICHHAPORE SC 220 WR‐2 2‐Nov 3‐Nov Hot spot attending

3 BADOD‐KOTA SC 220 MPPTCL 7‐Nov 7‐Nov Hot spot attended

4 NAGDA‐DEHGAM I 400 WR‐2 8‐Nov 8‐Nov Emergency sd

5 INDORE‐ASOJ II 400 WR‐1 9‐Nov 9‐Nov

Emergency sd ‐broken wave trap conductor

6 WARORA‐TIRORA‐II 400

WRTM Reliance 10‐Nov 10‐Nov To attend hot sopt at wavetrap

7 VAPI‐NAVSARI‐I 400 WR‐2 10‐Nov 10‐Nov Hot spot

8 VAPI‐NAVSARI‐II 400 WR‐2 11‐Nov 11‐Nov Hot spot

9 PUNE‐PARLI‐I 400

WRTM Reliance 12‐Nov 12‐Nov To attend hotspot

10 PUNE‐ICT‐I

400220 WR‐1 12‐Nov 12‐Nov Hot spot

11 PUNE‐PARLI‐II 400

WRTM Reliance 13‐Nov 13‐Nov Hot spot

12 RP SAGAR‐GSAGAR‐I 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot at mp end

13 DAMOH‐DAMOH(PG)‐II 220 MPPTCL 15‐Nov 15‐Nov R ph wave trap hot spot

14 DAMOH‐DAMOH‐2 220 MPPTCL 15‐Nov 15‐Nov To attend hot spot

15 MAPUSA‐TIVIM‐II 220 GOA 17‐Nov 17‐Nov Hot spot

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 36: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

SlNo

Element kV Agency From

Date To Date

Remarks

16 CPUR‐PADGHE HVDC POLE‐I 500 MSETCL 18‐Nov 18‐Nov OIL LEAKAGE AT PADGHE

17 NAGDA‐INDORE‐SC 400 MPPTCL 18‐Nov 18‐Nov WAVE TRAP CAUGHT FIRE

18 SASAN‐SATNA‐1 765 SASAN 19‐Nov 20‐Nov To attend hot spot

19 RAIPUR‐WARDHA‐1 400 WRTS‐1 20‐Nov 20‐Nov To attend hot spot

20 KOLHAPUR‐MAPUSA‐1 400 MSETCL 20‐Nov 20‐Nov

Replacement of B phase bay isolator

21 SIPAT‐RANCHI‐1 400 WR‐1 24‐Nov 24‐Nov

EMERGENCY SHUTDOWN (INSUATOR WORKS)

22 WARDHA 765KV BR 0 WR1 25‐Nov 25‐Nov EMERGENCY OUTAGE

23 NAGDA‐RAJGARH‐II 400 MPSEB 27‐Nov 30‐Nov EMERGENCY OUTAGE BY MPSEB

24 VAPI‐ICT‐II

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

25 VAPI‐ICT‐I

400220 WR‐2 29‐Nov 29‐Nov HOTSPOT

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 37: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

OCC Outages Not Availed in Nov 2013Sl No KV Line Reason Agency Remark

1 220 Malanpur-Auriya Ckt-I 1-Nov-13 900 1-Nov-13 1700 daily For maintenance work MPPTCL Not Availed2 220 Malanpur-Auriya Ckt-II 2-Nov-13 900 2-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

3400 Raipur-Bhadrawati 2 6-Nov-13 1000 6-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

4400 BPSCL(JP Bina)-Bina

(MPPTCL) SC 6-Nov-13800

7-Nov-131800

ContCrossing of 765 kV Jabalpur-Bina line (Pathria-Bina part) amp 765 kV Bina-Gwalior 3 BPSCL Not Availed

5 400 Karad-Solapur (PGCIL) 6-Nov-13 900 6-Nov-13 1700 Daily QMwork MSETCL Not Availed6 220 Kawas - Navsari - 1 6-Nov-13 6-Nov-13 For fixing DT string in railway crossing Not Availed

7400 Raipur-Bhadrawati 3 7-Nov-13 1000 7-Nov-13 1400 Daily

Inspection of submerged tower amp Strathening of cross arm due to heavy rain WRTS-I Not Availed

8 220 GWL(PGCIL)-Gwalior Ckt-I 7-Nov-13 900 7-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

9 400 315MVA ICT 3 at Wardha 8-Nov-13 1000 8-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

10 400 Bhusawal-Akola 8-Nov-13 900 8-Nov-13 1700 Daily QMwork MSETCL Not Availed11 220 Navsari - Navsari - 1 8-Nov-13 900 8-Nov-13 1800 Daily For fixing DT string in railway crossing GETCO Not Availed12 400 Bus Reactor at Wardha 9-Nov-13 1000 9-Nov-13 1400 Daily AMP Work WRTS-I Not Availed

13 400 Padgha-HVDC (AC) I Interconnector 9-Nov-13 0800 10-Nov-13 1800 Cont QMwork MSETCL Not Availed

14220 Kawas - Haldarwa1 10-Nov-13 900 13-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

15 220 Haldarva - Jhanor - 2 (NTP10-Nov-13 900 10-Nov-13 1800 Daily PMM Work GETCO Not Availed

16400 Satpura Itarsi Line 10-Nov-13 1100 10-Nov-13 1800 Daily

Dismantling of existing TELK make CB For maintaining electrical clearance outage is required After dismantling line

POWERGRID Not Availed

17 400 Jabalpur-Sasan 10-Nov-13 900 12-Nov-13 1800 Daily Insulator replacement POWERGRID Not Availed

18 400 FSC 1 at Wardha 11-Nov-13 900 11-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed

19

400KV Bay-7 amp Bay-8

250MVA TT-1 at Sasan 11-Nov-13 900 13-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformer and its NGT 4) De-dusting Cleaning and tightness in M Boxes 5) De-dusting Cleaning tightness amp testing of 33KV Bus

SASAN Not Availed

20400 ICT2 at Shujalpur 11-Nov-13 900 11-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

21 400 Karad- Lonikand 11-Nov-13 900 14-Nov-13 1700 Cont LA amp CVT Repl MSETCL Not Availed22 400 Raipur-Tamnar 1 12-Nov-13 1000 12-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed

From To

Annexure-32-C2

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 38: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

23 400 FSC 2 at Wardha 12-Nov-13 900 12-Nov-13 1800 Daily AMP Work(No line outage) WRTS-I Not Availed24 400 Indore -Nagda DC 12-Nov-13 800 12-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

25400 ICT1 at Rajgarh 12-Nov-13 900 12-Nov-13 1300 Daily AMP of ICT amp associated bay equipment POWERG

RID Not Availed

26 400 Akola-Nandgaonpeth 12-Nov-13 900 12-Nov-13 1700 Daily Quaterly Maintainance Work MSETCL Not Availed27 400 Chorania - Vadavi-1 12-Nov-13 800 12-Nov-13 1800 Daily PMM Work GETCO Not Availed

28 220 GWL(PGCIL)-Malanpur Ckt-II 12-Nov-13 900 12-Nov-13 1700 daily For maintenance work MPPTCL Not Availed

29 400 Raipur-Tamnar 2 13-Nov-13 1000 13-Nov-13 1400 Daily DGA of Reactor bushing oil Jindal Not Availed30 400 Khandwa-Dhule 2 13-Nov-13 900 14-Nov-13 1800 Daily Insulator Replacement WRTS-2 Not Availed

31

400 Gandhar - Dehgam DC

13-Nov-13

0800

14-Nov-13

1800 Cont

For crossing of 400kV Vadodara -Pirana DC line amp Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

POWERGRIDNTP

C Not Availed

32400 50 MVAR Shunt reactor

of VChal-Mahan line 14-Nov-13 900 18-Nov-13 1900 Continuous

Shunt Reactor Filtration (Line will be taken out for 1 hr each on 14 and 18 Nov 13) NTPC Not Availed

33 400 Lonikand- Lonikand-II ckt-2 14-Nov-13 900 14-Nov-13 1700 Daily LA amp CVT Repl MSETCL Not Availed

34 400 SSNL-Dhule-1 15-Nov-13 800 15-niv 1800 Daily PMM Work GETCO Not Availed

35400

Jhanor-Sugen Line15-Nov-13

80016-Nov-13

1800Continiou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

36 400 Bus 1 at Seoni 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed37 220 Bus 1 at Pune 15-Nov-13 1000 15-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

38 400 Bus-1 at Aurangabad (Waluj)MSETCL 15-Nov-13 800 15-Nov-13 1800 Daily Checking of jumper connection amp tightning MSETCL Not Availed

39 400 Koradi-Nandgaonpeth 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed40 400 Kalwa-Padgha Ckt II 15-Nov-13 900 15-Nov-13 1700 Daily QMWork MSETCL Not Availed41 400 Lonikand II-Lonikand I 15-Nov-13 900 15-Nov-13 1700 Daily QMwork MSETCL Not Availed42 200 Kawas-Vav 1 15-Nov-13 900 15-Nov-13 1800 daily CT ampCVT Testing NTPC Not Availed

43 400 Raipur-Sipat 1 amp 2 17-Nov-13 700 22-Nov-13 1800 Cont Restoration of lines from ERS to permanent tower for Ms Lafarge Ltd WRTS-I Not Availed

44 400 Padgha-Tarapur CktI 17-Nov-13 900 17-Nov-13 1700 Daily QMwork MSETCL Not Availed45 400 Bus 2 at Seoni 18-Nov-13 1000 18-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

46 220 BINA(PGCIL)-Shivpuri Ckt 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

47 220 Pithampur-Rajgarh Ckt - I 18-Nov-13 900 18-Nov-13 1700 daily Tighting of Jumper cone ampArching Horn amp

other maintenance work MPPTCL Not Availed

48

400Parli-Parli 1 along with Bus-1 at MSETCL Girwali SS with TBC free

19-Nov-13 800 19-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-1 amp Trasfer Bus WRTS-I Not Availed

49 765 Bilaspur-Seoni 1 with Line Reactor 19-Nov-13 1000 21-Nov-13 1800 Daily AMPWarranty test of reactor( Line will be

out only for 1 hr for taking out LR) WRTS-I Not Availed

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 39: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

50 400 Bus 1 at Wardha 19-Nov-13 800 19-Nov-13 2000 Daily AMP Work WRTS-I Not Availed

51

400KV Bay-1

Bay-2 amp Bay-3

1000 MVA ICT-1 19-Nov-13 900 21-Nov-13 1800 Cont

1) Testing of CB CT Isolator LA 2) Clamp-Connector Tightness Checking 3) PM of Transformers and its NGT 4) De-dusting Cleaning and tightness in M Boxes

SASAN Not Availed

52400 Bus 2 at Pirana 19-Nov-13 900 19-Nov-13 1800 Daily AMP POWERG

RID Not Availed

53 400 Nagda - Rajgarh DC 19-Nov-13 0800 19-Nov-13 1800 Daily Stringing of 765kV Indore - Vadodara line MPPTCL Not Availed

54400 Gandhar-Navsari1 19-Nov-13 1000 19-Nov-13 1700 Daily AMP POWERG

RID Not Availed

55 400 Karad-Jaigad I 19-Nov-13 900 19-Nov-13 1700 Daily Annual Maintenance work MSETCL Not Availed56 400 Asoj - SSP 19-Nov-13 800 19-Nov-13 1800 Daily PLCC wiring work GETCO Not Availed57 400 Chorania - Vadavi-2 19-Nov-13 800 19-Nov-13 1800 Daily PMM Work GETCO Not Availed

58

400 Rajgarh-Ssp Ckt-I 19-Nov-13 900 19-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

59400 Sipat 400KV Bay-5 ( Tie -

Raipur-3-Lanco) 19-Nov-13 900 21-Nov-13 1900 ContFor replacement of 5 nos 400KV CTs(One hr on 19 Nov 13 and 1 hr on 21 Nov 13) NTPC Not Availed

60

400Parli-Parli 2 along with Bus-2 at MSETCL Girwali SS with TBC free

20-Nov-13 800 20-Nov-13 1800 Daily

Replacement of PG isolator fixed contacts of Bus-2 amp Trasfer Bus WRTS-I Not Availed

61 400 Bus 2 at Wardha 20-Nov-13 1000 20-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

62220 kV Bus 1 at Pirana 20-Nov-13 900 20-Nov-13 1800 Daily AMP POWERG

RID Not Availed

63400 Gandhar-Navsari2 20-Nov-13 1000 20-Nov-13 1700 Daily AMP POWERG

RID Not Availed

64 400 Satpura Itarsi Line 20-Nov-13 1100 20-Nov-13 1300 Daily Testing and commisioning of new CGL make CB

POWERGRID Not Availed

65220 Kawas - Vav1 20-Nov-13 900 23-Nov-13 1800 Daily Replacement of defective insulators strings

with Polymer InsulatorsPOWERG

RID Not Availed

66 400 Lamboti-Parli 20-Nov-13 900 20-Nov-13 1700 Daily QMwork MSETCL Not Availed

67765 Tie Bay of Bina Ckt-2 at G 20-Nov-13 800 20-Nov-13 1700 Daily

Commissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior PGCIL Not Availed

68 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

69400

315MVA ICT 1 at Pirana 20-Nov-13 800 30-Nov-13 1800 Contineou

s

Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT

PGCIL Not Availed

70 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL Not Availed

71 HVDC HVDC Pole 1 at Bhadrawati 21-Nov-13 800 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 40: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

72400 Raipur-Bhadrawati 1 amp

Bhilai-Bhadrawati 21-Nov-13 900 21-Nov-13 1800 Daily Inspection of river crossing tower WRTS-I Not Availed

73 220Bus 2 at Pirana 21-Nov-13 900 21-Nov-13 1800 Daily AMP POWERG

RID Not Availed

74 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I Not Availed

75 400 Wardha -Parli 1 amp 2 22-Nov-13 900 23-Nov-13 1800 continuous

Crossing works of 765kV DC Raipur- Wardha 1 WRTS-I Not Availed

76 765 Bilaspur-Seoni 2 with Line Reactor 22-Nov-13 1000 25-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

77 400 Bus 2 at Bilaspur 22-Nov-13 1000 22-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

78220 kV TBC at Pirana 22-Nov-13 900 22-Nov-13 1800 Daily AMP POWERG

RID Not Availed

79 400 Satpura Koradi Line 22-Nov-13 1100 22-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

80 400 Raipur-Wardha 1 22-Nov-13 700 23-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

81

400

Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune

22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at Pune WRTS-I Not Availed

82 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 Conti Stringing of 765kV Bina -Jabalpur line and completion of balance construction works PGCIL Not Availed

83 400 Bus Reactor at Parli 23-Nov-13 900 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed84 765 Bus 1 at Wardha 23-Nov-13 1000 23-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

85 400 Bhusawal-Babhaleshwar 23-Nov-13 900 23-Nov-13 1700 Daily QMwork MSETCL Not Availed

86 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

87 400 Mouda-IEPL 24-Nov-13 900 25-Nov-13 1800 Daily Insulator replacement WRTS-I Not Availed88 400 Sipat-Ranchi 1 24-Nov-13 800 24-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

89 400 Raipur-Wardha 2 24-Nov-13 700 25-Nov-13 1800 Daily Balance construction activity at loc no 45 WRTS-I Not Availed

90 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL Not Availed

91 765 Bus 2 at Wardha 25-Nov-13 1000 25-Nov-13 1800 Daily AMP Work WRTS-I Not Availed92 400 Sipat-Ranchi 2 25-Nov-13 800 25-Nov-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I Not Availed

93400 Wanakbori - Asoj SC 25-Nov-13 0800 25-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

GETCO Not Availed

94400220 ICT 1 Bina 25-Nov-13 900 25-Nov-13 1800 Daily For installation of online DGA amp dryout

system POWERG

RID Not Availed

95 400 KSK-Raipur and KSK-DB Power 25-Nov-13 800 25-Nov-13 1800 Daily Crossing work of upcoming 765 KV

DCRaigarh-Raipur line KSK Not Availed

96 200 Jhanor-Haldarwa Line 1

25-Nov-13800

26-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 41: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

97 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC Not Availed

98 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily

Basis AMP NTPC Not Availed

99 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC Not Availed

100220

Jhanor-Haldarwa Line 125-Nov-13

80026-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

101 400 400kV Bay of ICT-1 at BA 25-Nov-13 800 29-Nov-13 1800 Continuous GIS Annual Bay Maintenance Work BALCO Not Availed

102 765 Bilaspur-Korba 2 Line Reactor 26-Nov-13 1000 28-Nov-13 1800 Daily AMPWarranty test of reactor WRTS-I Not Availed

103 765 Bus 1 at Bilaspur 26-Nov-13 1000 26-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

104

220 Badod - Kota Ckt 26-Nov-13 900 26-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work MPPTCL Not Availed

105 765 Bus 2 at Bilaspur 27-Nov-13 1000 27-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

106400 Indore - Asoj 2 27-Nov-13 0800 27-Nov-13 2000 Daily

For stringing of 400kV Asoj - Vadodara DC line

POWERGRID Not Availed

107 400 Vadavi-Bhachau 2 27-Nov-13 800 27-Nov-13 1800 Daily PMM Work GETCO Not Availed

108

40025Mvar Reactor - II (Tertiary) Iinstalled at ICT -III At 400 kv ss Nagda

27-Nov-13 800 27-Nov-13 1700 daily

For post mansoon maintenance work

MPPTCL Not Availed

109

220 Badod - Modak Ckt 27-Nov-13 900 27-Nov-13 1800 daily

For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work MPPTCL Not Availed

110 220 Jhanor-Haldarwa Line 2

27-Nov-13800

28-Nov-131800

Continious

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance NTPC

Not Availed

111220

Jhanor-Haldarwa Line 227-Nov-13

80028-Nov-13

1800Continuou

s

Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance

NTPC Not Availed

112 765 Bus 1 at Seoni 28-Nov-13 1000 28-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

113400 Sipat-Raipur 3 29-Nov-13 800 29-Nov-13 1800 Daily

Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line WRTS-I Not Availed

114 765 Bus 2 at Seoni 29-Nov-13 1000 29-Nov-13 1800 Daily AMP Work WRTS-I Not Availed

115 400 Akola-Aurangabad 2 29-Nov-13 900 29-Nov-13 1800 Daily Shifting of line reactor from Waluj to PGCIL WRTS-I Not Availed

116 400 Raipur-Raigarh IV 30-Nov-13 800 30-Nov-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line KSK Not Availed

117 400 Satpura Koradi Line 30-Nov-13 1100 30-Nov-13 1700 Daily For retrofitting of Old Telk CB WRTS-II Not Availed

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 42: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

maah navambar 2013 kI yaaojanaabaQd banaama vaastivak ]padna evaM ]plabQata

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 642 76

]k[- Ukai - 2 097 75]k[- Ukai - 3 1267 76]k[- Ukai - 4 1457 75]k[- Ukai (Total) 42 150 3462 152 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 143 2]k[- ela baI saI eca Ukai LBCH - 2 157 3]k[- ela baI saI eca Ukai LBCH (Total) 2 3 300 5 0038

3 kDanaa Kadana - 1 343 62 0005kDanaa Kadana - 2 083 62 0000kDanaa Kadana - 3 235 61kDanaa Kadana - 4 343 62 0000kDanaa Kadana (Total) 16 120 1004 124 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 0 0 347 9 0012 6 kula jalaIya TOTAL(H) 60 273 5113 225 0315

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 42 60 3982 62 38712 TaoronT pavar ilaimaToD yauinaT DI 85 120 5584 124 50863 TaoronT pavar ilaimaToD yauinaT [- 0 0 8411 123 70964 TaoronT pavar ilaimaToD yauinaT ef 74 121 8489 124 73785 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 0 0 000 0 00009 Qauvarna tapIya Dhuvaran - 6 0 0 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 113611 Qauvarna tapIya Dhuvaran - GT 2 000 0 169612 Qauvarna tapIya Dhuvaran - STG 2929 12413 ]ka[- yauinaT 1 Ukai -1 70 100 807 90 119414 ]ka[- yauinaT 2 Ukai -2 70 100 000 0 010615 ]ka[- yauinaT 3 Ukai -3 36 200 11110 203 961016 ]ka[- yauinaT 4 Ukai -4 140 200 11724 202 1064017 ]ka[- yauinaT 5 Ukai -5 19 50 12459 210 1022918 ]ka[- yauinaT 6 Ukai -6 13574 529 1428919 gaaMQaInagar 1 Gandhinagar - 1 70 100 000 0 008720 gaaMQaInagar 2 Gandhinagar - 2 70 100 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 136 210 3541 210 366822 gaaMQaInagar 4 Gandhinagar - 4 145 210 5298 212 592823 gaaMQaInagar 5 Gandhinagar - 5 37 210 7299 215 768624 vaNakbaaorI 1 Wanakbori - 1 0 0 11932 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 145 210 7171 21226 vaaNakbaaOrI 3 Wanakbori - 3 145 210 8018 21027 vaaNakbaaOrI 4 Wanakbori - 4 89 150 5760 21028 vaaNakbaaOrI 5 Wanakbori - 5 145 210 6577 21029 vaaNakbaaOrI 6 Wanakbori - 6 145 210 6560 21230 vaaNakbaaOrI 7 Wanakbori - 7 145 210 8242 21231 ]trna Utran GT 1 0 0 000 0 039132 ]trna Utran GT 2 0 0 000 0 000033 ]trna UTRAN - GT- 3 0 0 000 0 0000

34 ]trna UTRAN - GT-4 0 0 000 10 0388

35 ]trna UTRAN - STG-I 0 0 000 0 0000

36 ]trna UTRAN - STG-II 0 0 000 0 0000

Anaulagnak 41

0 0

SCHEDULE VS ACTUAL GENERATION amp AVALABILITY FOR NOVEMBER 2013Actual vaastivakSchedule yaaojanaa

0 0

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 43: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

37 isaka Sikka - 1 70 110 3911 118 456138 isaka Sikka - 2 70 110 2417 118 323439 kcC ilagnaa[-T Kutch Lignite - 1 45 70 4657 73 1023640 kcC ilagnaa[-T Kutch Lignite - 2 45 70 4803 7241 kcC ilagnaa[-T Kutch Lignite - 3 47 75 4522 6742 kcC ilagnaa[-T Kutch Lignite - 4 0 0 2756 69 562343 saUrt ilagnaa[-T Surat Lignite - 1 6335 128 709844 saUrt ilagnaa[-T Surat Lignite - 2 4634 129 588445 saUrt ilagnaa[-T Surat Lignite - 3 6668 126 734746 saUrt ilagnaa[-T Surat Lignite - 4 5827 129 680947 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 7141 111 1023648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4403 11149 jaI Aa[- pI saI ela GIPCL GT - 1 1068 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1682 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1781 3452 jaI Aa[- pI saI ela GIPCL ST - 1 2635 5053 jaI Aa[- pI saI ela GIPCL GT - 4 1004 95 000054 jaI Aa[- pI saI ela GIPCL ST - 2 526 4955 [- esa esa e Aar ESSAR GT - 1 000 0 025556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 035 149 000360 jaI pI [- saI GPEC GT - 2 1070 166 028861 jaI pI [- saI GPEC GT - 3 098 146 000662 jaI pI [- saI GPEC STG 261 7863 jaI esa [- jaI GSEG GT - 1 000 0 119464 jaI esa [- jaI GSEG GT - 2 1633 5065 jaI esa [- jaI GSEG STG 832 2466 Sugen (GT 1 + GT 2) 0 0 7606 257 744667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 294457 5465

kula tapIya Total (T) 5277 7992 531013 7793 359455kula jalaIya+tapIya Total (H+T) 6130 9359 536126 8011 359770ivaMD [najaI- Wind Energy 41848kula jalaIya+tapIya+hvaa Total (H+T+Wind) 577974 10519ivainamaya Exchanges (+) 138326 saIimat jaa- maaMga Restricted Energy Req 7240 716301

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr(50share) 50 114 7597 19311 gaaMQaI saagar Gandhi Sagar 2742 114 007012 raNaa p`tap sagar RPSagar 7671 172 004013 javaahr sagar Jawahar Sagar 4781 99 0020

2 ponca Pench 40 75 4015 164 00703 baargaI Bargi 50 90 2820 92 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 130 315 12918 315 03106 banasaagar Bansagar-2 (Deolondh) 0 0 000 07 banasaagar Bansagar-3 (Silpara) 30 60 1229 32 00708 banasaagar Bansagar-4 (Zinaha) 0 0 1301 22 00809 maoDIKoDa Medikheda 30 60 348 62

10 ibarisaMGapur Birsingpur 15 20 175 20 002011 Tavaa Tawa 0 0 000 012 rajaGaaT Rajghat 20 30 627 20 009013 Omkareshwar 210 360 13051 391 054514 [Midra saagar Indira Sagar 610 990 31733 1001 1103

kula jalaIya TOTAL(H) MPPGCL 1185 2114 71799 2392 2444

90 150

600

350 480

Schedule yaaojanaa

140

95 140

Actual vaastivak

173 240

60 100

95

430

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 44: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL3 naaisak 3 Nasik Unit -3 105 140 11326 2004 naaisak 4 Nasik Unit -4 85 115 11715 1975 naaisak 5 Nasik Unit -5 133 180 12926 1966 Tambao 4 Trombay Unit -4 0 0 000 07 Tambao 5 Trombay Unit -5 250 500 32350 5048 Tambao 6 Trombay Unit -6 130 500 000 09 Tambao 8 Trombay Unit -8 0 0 17209 254

10 Tambao 7A gaOsa Trombay -7A (Gas) 6311 128 281911 Tambao 7ba Trombay -7B (WHR) 4176 7112 kaoraDI 5 Koradi Unit -5 65 85 7079 16013 kaoraDI 6 Koradi Unit -6 75 100 7160 17214 kaoraDI 7 Koradi Unit -7 75 100 10270 19015 Bausaavala 2 Bhusawal Unit -2 110 150 9852 17016 Bausaavala 3 Bhusawal Unit -3 100 135 10498 18517 Bausaavala 4 Bhusawal Unit -4 250 335 6944 33518 Bausaavala 4 Bhusawal Unit -5 0 0 1043 21019 parlaI 3 Parli Unit -3 0 0 000 020 parlaI 4 Parli Unit -4 0 0 7199 17821 parlaI 5 Parli Unit -5 0 0 10904 18322 parlaI 6 Parli Unit -6 155 210 9695 22423 parlaI 7 Parli Unit -7 40 55 9998 23924 KaprKoDa 1 Khaperkheda Unit -1 80 110 6017 17525 KaprKoDa 2 Khaperkheda Unit -2 100 135 8948 17026 KaprKoDa 3 Khaperkheda Unit -3 350 470 9768 19127 KaprKoDa 4 Khaperkheda Unit -4 11963 20528 KaprKoDa 5 Khaperkheda Unit -5 135 180 24134 52230 parsa Paras-3 135 180 12183 24031 parsa Paras-4 200 430 14520 25532 ]rna Uran (Gas) 200 430 17465 47933 ]rna Uran (WHR) 100 220 9436 154 586234 caMd`pur 1 Chandrapur Unit -1 100 135 7318 15635 caMd`pur 2 Chandrapur Unit -2 100 135 9276 19436 caMd`pur 3 Chandrapur Unit -3 90 120 11370 21137 caMd`pur 4 Chandrapur Unit - 4 70 95 11716 038 caMd`pur 5 Chandrapur Unit -5 80 110 000 45539 caMd`pur 6 Chandrapur Unit -6 190 255 25985 42440 caMd`pur 7 Chandrapur Unit -7 150 200 20268 041 DhaNaU 1 Dahanu Unit-1 17967 250 1606742 DhaNaU 2 Dahanu Unit-2 16048 250 1491543 CPP 000 000 199959 31240044 RGPPL Share 200 300 006 0

kula tapIya Total (T) 6290 9090 621000 15509 353192MAH Wind Generation 12846 0kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 702633 17591 399125

T ivainamaya Exchanges (+) 375754saIimat jaa- maaMga Rest En Req 10500 1078386

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 2145 30ivainamaya Exchanges 31826saIimat jaa- maaMga Rest En Req 280 425 33971 529

C (F) dmana AaOr dIva DAMAN amp DIU 20740 292ja (G) dadra nagar hvaolaI DNH 45300 651

kula DD ampDNH (T) 133 242 66040 942

Actual vaastivak

0 0

372 500

Schedule yaaojanaa

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 45: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 5766 94 252902 AmarkMTk II AMK II Unit -2 6232 943 AmarkMTk III AMK III Unit -5 0 0 13989 219 04 satpura I Satpura-I(60Share) 50 67 1453 80 40205 satpura II Satpura-II Unit 6 9626 170 206806 satpura II Satpura-II Unit 7 11152 1757 satpura II Satpura-II Unit 8 5831 190 160408 satpura II Satpura-II Unit 9 8519 1709 satpura III Satpura-III Unit 10 10695 243 13170

10 esajaITIpIesa 1 SGTPS Unit - 1 10530 194 2045011 esajaITIpIesa 2 SGTPS Unit - 2 9915 19012 esajaITIpIesa 3 SGTPS Unit - 3 6213 186 1445013 esajaITIpIesa 4 SGTPS Unit - 4 5152 17614 esajaITIpIesa 5 SGTPS Unit - 5 291 390 29304 51615 SSTPS 584 363 0940

kula tapIya Total (T) 1057 1409 134377 2459 129450kula jalaIya+tapIya Total (H+T) 2572 4036 206176 5165 131894Injection from WIND 3696 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 209872 5165ivainamaya Exchanges (+) 228479 saIimat jaa- maaMga Rest En Req 7409 438351

ga (C) CHHATTISGARH CltaIsagaZjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 55 120 355 120 00802 Gangrel 6 19 127 10 00203 Mini Micro KWB 060 7

kula jalaIya TOTAL(H) CSEB 61 139 542 137 0110tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 2764 45 124802 kaorbaa (pU) Korba (E) Unit-2 30 50 2764 463 kaorbaa (pU) Korba (E) Unit-3 30 50 2764 414 kaorbaa (pU) Korba (E) Unit-4 30 50 2784 455 kaorbaa (pU) Korba (E) Unit -5 71 120 3685 120 208306 kaorbaa (pU) Korba (E) Unit -6 71 120 6682 1207 kaorbaa (p) Korba (W) Unit -1 125 210 11693 210 266108 kaorbaa (p) Korba (W) Unit -2 125 210 11693 2109 kaorbaa (p) Korba (W) Unit -3 125 210 11693 210 23820

10 kaorbaa (p) Korba (W) Unit -4 125 210 11693 21011 KORBA(EB) Extn - 1 0 250 000 0 066012 KORBA(EB) Extn - 2 149 250 17457 255 13700

kula tapIya Total (T) 102806 1568 9944013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 28293 388

kula tapIya Total (T+IPP) 911 1780 131099 1956kula jalaIya+tapIya Total (H+T) 966 1900 131641 2093 99550ivainamaya Exchanges (+) 34276 0saIimat jaa- maaMga Rest En Req 1619 165917 2093

Ga (D) MAHARASHTRA maharaYTjalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 74 300 14771 595 33802 kaoyanaa III Koyna III 49 150 7883 3203 kaoyanaa IV Koyna IV 165 600 22410 11304 kaoyanaa DIpIeca Koyna DPH 10 20 1219 395 TaTa jalaIya TATA Hydro 120 444 12998 470 28906 vaOtrNaa Vaitarna 3 60 050 607 eladarI Eldari 5 10 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 3 5 206 69 pOzana Paithan 0 0 1819 39

10 itlaarI Tillari 0 0 609 6011 BaIra Tola rosa Bhira Tail Race 9 80 745 4112 GaTGar Ghatghar 37 250 2476 25013 Anya CaoTo jalaIya Small Hydro (others) 32 47 1973 0

kula jalaIya TOTAL(H) 506 1966 68786 1715 6270

163122

142

82

128 163

191

194144

61

Schedule yaaojanaa Actual vaastivak

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 46: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma jaa- carma Auxillary Sr Station Name Energy Peak Energy Peak Consumption No (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 80 160 11707 160 1454012 tara`pur 2 TAPS Unit -2 80 160 9321 16013 tara`pur 3 TAPS Unit -3 300 480 39033 548 6841214 tara`pur 4 TAPS Unit -4 300 480 34630 54815 kakrapr 1 KAPS Unit -1 125 200 16227 548 3125716 kakrapr 2 KAPS Unit -2 125 200 15706 548

kula ena pI saI NPC Total 1010 1680 126625 25122 ena TI pI saI NTPC

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15189 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 15070 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14358 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 36645 51125 kaorbaa esaTIpIesa 5 KSTPS Unit-5 36142 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36274 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 35623 512

kula kaorbaa KSTPS Total 1510 2600 189299 2497 11568127 ivanQa esaTIpIesa 1 VSTPS Unit-1 14733 21128 ivanQa esaTIpIesa 2 VSTPS Unit-2 14637 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14868 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14713 215211 ivanQa esaTIpIesa 5 VSTPS Unit-5 10802 212212 ivanQa esaTIpIesa 6 VSTPS Unit-6 14122 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 34265 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 34657 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32525 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 33158 516217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34017 512

kula ivanQayaacala VSTPS Total 2294 4260 252497 3798 16207 31 saIpt -1 -SIPAT-1 37041 66500 32 saIpt -2 -SIPAT-2 28540 66400 33 saIpt -3 -SIPAT-3 37239 66500 34 saIpt -4 -SIPAT-4 28979 51200 35 saIpt -5 SIPAT-5 25022 51400

kula saIpt -SIPAT TOTAL 156821 286700 917141 kvaasa gaOsa 1e Kawas GT-1A 3710 11142 kvaasa gaOsa 1baI Kawas GT-1B 3418 11243 kvaasa esaTI 1saI Kawas ST-1C 3855 11844 kvaasa gaOsa 2e Kawas GT-2A 686 10445 kvaasa gaOsa 2baI Kawas GT-2B 201 10246 kvaasa esaTI 2saI Kawas ST-2C 443 110

kula kvaasa KGPS Total 193 630 12313 335 319951 gaMQaar gaOsa 1 Gandhar GT-1 2266 14752 gaMQaar gaOsa 2 Gandhar GT-2 1417 14553 gaMQaar gaOsa 3 Gandhar GT-3 3409 14854 gaMQaar esaTI 4 Gandhar ST-4 3609 197

kula gaMQaar GGPS Total 80 630 10701 535 376561 maaOda 1 Mauda -1 9977 502 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 186 500 9977 502 1069761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 006 22

RGPPL TOTAL 540 750 006 31 000271 esa esa pI SSP RBPH - 1 6673 19372 esa esa pI SSP RBPH - 2 4521 19373 esa esa pI SSP RBPH - 3 3667 19374 esa esa pI SSP RBPH - 4 5973 19475 esa esa pI SSP RBPH - 5 6386 19376 esa esa pI SSP RBPH - 6 6820 19377 esa esa pI SSP CHPH - 1 937 4178 esa esa pI SSP CHPH - 2 1094 3879 esa esa pI SSP CHPH - 3 608 39710 esa esa pI SSP CHPH - 4 993 38711 esa esa pI SSP CHPH - 5 1273 37

kula esa esa pI SSP Total 580 900 38944 1352 389481 kula poMca Pench Total 40 75 4015 164 007082 Jindal Injection 51385 083 Amarkantak Lanco 13589 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]padna Gross generation 2490430

(J) ]plabQata Availability 2431355 naoT ivainamaya Net Exchanges (+) -220095 ]plabQa jaa- Energy Availability 27500 2211260

Schedule yaaojanaa Actual vaastivak

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 47: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

maah navambar 2013 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR NOVEMBER 2013 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 11747 - - - 11747 301113 1200 4997

saIimat Restricted 11500

AsaIimat Unrestricted 11540 11747 0 12 0 11759 301113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6590 6590 041113 1800 4998

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9807 - - - 9807 301113 0900 4997

saIimat Restricted 11446

AsaIimat Unrestricted 11446 9807 0 9 0 9816 301113 0900 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6319 6319 051113 0400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 2770 2770 301113 1800 5004

saIimat Restricted 2900

AsaIimat Unrestricted 2975 2770 67 -4 0 2773 301113 1800 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1610 1610 051113 1400 5017

maharaYT MAHARASHTRApMjaIkRt Registered 17591 - - - 17591 131113 1200 4997

saIimat Restricted 18150

AsaIimat Unrestricted 18200 17591 716 18 0 18325 131113 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12144 12144 041113 0400 5016

gaaovaa GOApMjaIkRt Registered 425 529 - - 529 281113 1900 5000

AsaIimat Unrestricted 425 529 0 0 - 529 281113 1900 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 279 380 041113 1400

dmana evaM dIva DDpMjaIkRt Registered 253 - - 253 261113 1000 4991

AsaIimat Unrestricted 253 0 1 - 254 261113 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 650 - - 650 281113 1700 4993

AsaIimat Unrestricted 650 0 - 650 281113 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 481 481 291113

piScama xao~ WESTERN REGIONpMjaIkRt Registered 41927 - - - 41927 261113 1100 4996

saIimat Restricted 43928

AsaIimat Unrestricted 44097 41927 666 59 0 42652 261113 1100 4996

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28276 28276 051113 0400 5004 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10
Page 48: MEETING OF OPERATION & COORDINATION … 454th OCCM AGENDA AGENDA NOTES FOR 454th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC TO BE HELD ON 10TH DECEMBER 2013 AT CSPGCL

Anaulagnak 47Annex-47

maah navambar 2013 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39784 65684

10400 39921

Levels in Mtrs str maITr maoM

]ka[- Ukai

65465

10222

25995

25895

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF NOVEMBER 2013

ivavarNa Particulars

  • COVERING PAGEpdf
  • 454_OCC_Agendapdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32Apdf
  • 32Bpdf
  • Annexure-32-C1pdf
  • 32C2pdf
  • 411pdf
  • 412pdf
  • 414pdf
  • 413pdf
  • 415pdf
  • 42pdf
  • 43pdf
  • 47pdf
      1. Text1 10