metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous...

22
Metalcraft Roofing DETAIL LIST Date Revision Metcom 965 COMMERCIAL VERTICAL CLADDING CVMET965 E 00 COVER SHEET E 01 PARAPET AND BALUSTRADE CAPPING 1.0 28.02.2019 E 02 SCUPPER W/ RAINWATER HEAD 1.0 28.02.2019 E 03 SOFFIT 1.0 28.02.2019 E 04 BUTT WINDOW HEAD 1.0 28.02.2019 E 05 BUTT WINDOW SILL 1.0 28.02.2019 E 06 BUTT WINDOW JAMB 1.0 28.02.2019 E 07 RECESSED WINDOW HEAD 1.0 28.02.2019 E 08 RECESSED WINDOW SILL 1.0 28.02.2019 E 09 RECESSED WINDOW JAMB 1.0 28.02.2019 E 10 METERBOX HEAD 1.0 28.02.2019 E 11 METERBOX SILL 1.0 28.02.2019 E 12 METERBOX JAMB 1.0 28.02.2019 E 13 INTERNAL CORNER 1.0 28.02.2019 E 14 EXTERNAL CORNER 1.0 28.02.2019 E 15 SOAKER FLASHING 1.0 28.02.2019 E 16 CHANGE IN CLADDING 1.0 28.02.2019 E 17 CLADDING ABUTMENT 1.0 28.02.2019 E 18 BOTTOM OF CLADDING (FLUSH) 1.0 28.02.2019 E 19 BOTTOM OF CLADDING (RECESSED) 1.0 28.02.2019 E 20 3D WINDOW FLASHINGS 1.0 28.02.2019 E 21 3D RAINWATER HEAD 1.0 28.02.2019

Upload: others

Post on 19-Jan-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

MetalcraftRoofing

DETAIL LIST DateRevision

Metcom 965

COMMERCIAL VERTICAL CLADDING

CVMET965

E 00 COVER SHEET

E 01 PARAPET AND BALUSTRADE CAPPING 1.0 28.02.2019

E 02 SCUPPER W/ RAINWATER HEAD 1.0 28.02.2019

E 03 SOFFIT 1.0 28.02.2019

E 04 BUTT WINDOW HEAD 1.0 28.02.2019

E 05 BUTT WINDOW SILL 1.0 28.02.2019

E 06 BUTT WINDOW JAMB 1.0 28.02.2019

E 07 RECESSED WINDOW HEAD 1.0 28.02.2019

E 08 RECESSED WINDOW SILL 1.0 28.02.2019

E 09 RECESSED WINDOW JAMB 1.0 28.02.2019

E 10 METERBOX HEAD 1.0 28.02.2019

E 11 METERBOX SILL 1.0 28.02.2019

E 12 METERBOX JAMB 1.0 28.02.2019

E 13 INTERNAL CORNER 1.0 28.02.2019

E 14 EXTERNAL CORNER 1.0 28.02.2019

E 15 SOAKER FLASHING 1.0 28.02.2019

E 16 CHANGE IN CLADDING 1.0 28.02.2019

E 17 CLADDING ABUTMENT 1.0 28.02.2019

E 18 BOTTOM OF CLADDING (FLUSH) 1.0 28.02.2019

E 19 BOTTOM OF CLADDING (RECESSED) 1.0 28.02.2019

E 20 3D WINDOW FLASHINGS 1.0 28.02.2019

E 21 3D RAINWATER HEAD 1.0 28.02.2019

Page 2: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PRE-FINISHED PARAPET CAP FLASHINGNO FIXINGS IN TOP OF FLASHING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER

METALCRAFT METCOM 965VERTICAL CLADDING

METALCRAFT MSS PURLINBY ENGINEER

CONTINUOUS TIMBER PACKING

MIN

. 5.0

DPC TO PROVIDE SEPARATION OFMETAL CAPPING AND TIMBER,SHOWN DASHED

5 GAP

20

15

ALTERNATIVE OPTIONBIRDS BEAK EDGE

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW

HEMMED EDGE

STOPENDS TO WALL CLADDING

COMPRESSIBLE FOAM SEAL. REFER TOMRM CODE OF PRACTICE VERSION 3.0/2019 FOR REQUIRMENT.

20mm HORIZONTAL CAVITYBATTEN

Z

CLE

AR

AN

CE

25m

m M

IN.

CLE

AR

AN

CE

25m

m M

IN.

Z

CATEGORY A

1. NORMAL EXPOSURE2. ROOF PITCH >10°

MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH)

MIN. 75mm (VERTICALLY DOWN FACE - PROFILED)

CATEGORY B

1. EXPOSED (HIGHER RISK) & WIND LOAD EXCEEDS 1.5 kPa.2. ROOF PITCH <10°

MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH)

MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)

Z

ALTERNATIVE SOLUTION AS PER MRM CODE OF PRACTICE

SITUATION 1

1. LOW, MEDIUM, HIGH WINDZONES, WHERE ROOF PITCH ≥ 10°

MIN. 50mm

SITUATION 2

1. ALL ROOF PITCHES IN VERY HIGHWIND ZONE2. LOW, MEDIUM, HIGH WIND ZONESWHERE ROOF PITCH ≤ 10°

MIN. 70mmZ

SITUATION 3

1. FOR ALL ROOF PITCHES INEXTRA HIGH WIND ZONES

MIN. 90mm

ACCEPTABLE SOLUTION AS PER E2/ASI

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

PARAPET AND BALUSTRADE CAPPING

E 0128.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 3: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

50

25

METALCRAFT METCOM 965VERTICAL CLADDING

METALCRAFT METCOM 965VERTICAL CLADDING

PERMEABLE WALLUNDERLAY, SHOWNDASHED

20mm HORIZONTALCAVITY BATTEN

WALL FRAMING

CAVITY CLOSER

RETURN MEMBRANE INTORAINWATER HEAD

CONTINUOUS MEMBRANEDRESSED THROUGH BASE ANDUP SIDES OF OPENING WITHUPPER EDGES SEALED AGAINSTCLADDING. RETURN ALONG BACKOF RAINWATER HEAD

RAINWATER HEAD

RETURN MEMBRANEAT END OF LIP

MEMBRANE ON ROOFSUBSTRATE

8g WAFER-TEK SCREW

TRUE ROOF LINEBEHIND

PRE FINISHED SELF TAPPINGSCREW WITH RUBBER WASHER

RAINWATER HEADOVERFLOW BELOWOPENING LEVEL,1.5 xDOWNPIPE DIAMETER

PRE FINISHED SELF TAPPING SCREWWITH RUBBER WASHER SEPARATE BATTEN

AND CLADDING WITHDPC AS REQUIRED

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

SCUPPER W/ RAINWATER HEAD

E 0228.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 4: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

INTERNAL WALL LINING

METALCRAFT MSS PURLIN BY ENGINEER

20mm HORIZONTAL CAVITYBATTEN

SEPARATE BATTEN ANDCLADDING WITH DPC ASREQUIRED

BARGE BOARD

SOFFIT LINING

METALCRAFTMSS PURLIN BYENGINEER

PRE-FINISHED SELFDRILLING/TAPPING SCREWWITH RUBBER WASHER

INTERNAL CEILING LINING

COMPRESSIBLE FOAM SEAL. REFER TO MRM CODEOF PRACTICE VERSION 3.0 /2019 FORREQUIRMENT.

PRE-FINISHEDSOFFIT FLASHING

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FORFLASHING, FIXED INTO SUBSTRATE

PERMEABLE WALL UNDERLAY,SHOWN DASHED

METALCRAFT METCOM 965VERTICAL CLADDING

PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEKSCREW

STOPENDS TO WALL CLADDING

MIN. 50mm

CLA

DD

ING

CO

VE

R

60m

m(M

IN. 35m

m)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

SOFFIT

E 0328.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 5: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALL UNDERLAYDRESSED INTO OPENING WITHFLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

EXTRA PERMEABLE WALLUNDERLAY OVER WINDOW HEADFLASHING, SHOWN DASHED

INTERNAL WALL LINING

METALCRAFT METCOM 965 VERTICALCLADDING

DOUBLE GLAZING WINDOW JOINERY

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

WINDOW HEAD LINER

LINE OF WINDOW JAMBLINER BEHIND

STOPENDS TO HEAD FLASHING,SHOWN DASHED

LINE OF JAMB FLASHING BEHIND

METALCRAFT MSS PURLINS BYENGINEER

PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER

PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING

PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL

CAVITY CLOSER AS REQUIRED TONZBC

DR

IP E

DG

E T

O C

LA

DD

ING

MIN

. 15m

m G

AP

5m

m G

AP M

IN. 75m

m W

ITH

OU

T H

EM

ED

GE

MIN

. 50m

m C

OV

ER

MIN

. 10m

m C

OV

ER

SU

GG

ES

T M

IN. 50m

m

DIM

EN

SIO

N T

O S

UIT

20mm HORIZONTAL CAVITY BATTEN

SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

BUTT WINDOW HEAD

E 0428.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 6: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965 VERTICALCLADDING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

PRE-FINISHED WINDOW SILL FLASHING

LINE OF WINDOW JAMBLINER BEHIND

WINDOW SILL LINER

MIN. 8mm PACKER

AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB

INTERNAL WALL LINING

STOPENDS TO SILL FLASHING,SHOWN DASHED

LINE OF JAMB FLASHING BEHIND

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

20mm HORIZONTAL CAVITY BATTEN

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL

DOUBLE GLAZING WINDOW JOINERY

METALCRAFT MSS PURLIN BYENGINEER

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICEVERSION 3.0 /2019 FOR REQUIRMENT.

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

SEPARATE BATTEN AND CLADDING ASREQUIRED WITH DPC

WINDOW SILL SUPPORT BAR

5m

m G

AP

MIN

. 8m

m C

OV

ER

CLA

DD

ING

CO

VE

R

60m

m(M

IN. 35m

m)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

BUTT WINDOW SILL

E 0528.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 7: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PRE-FINISHED WINDOW JAMB FLASHING

DOUBLE GLAZING WINDOW JOINERY

LINE OF SILL FLASHING BELOW

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED FIXING BRACKET WITH PRE-FINISHED POP RIVET BEDDED IN SILICONEOR PRE-FINISHED 8g WAFER-TEK SCREW

METALCRAFT METCOM 965 VERTICALCLADDING

MIN.10mm COVER

5mm GAP

INTERNAL WALL LINING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

LINE OF WINDOW SILL LINER BELOW

WINDOW JAMB LINER

TIMBER PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAYFOR FULL WIDTH/DEPTH SILL

METALCRAFT MSS PURLIN BYENGINEER

SUGGEST MIN.50mm

DIMENSION TO SUIT

PRE-FINISHED SECONDARYFLASHING, IF REQUIRED

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING

LINE OF HEAD FLASHING ABOVE

LINE OF HEAD FLASHING ABOVE

SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED

5m

m G

AP

20mm HORIZONTAL CAVITYBATTEN

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

BUTT WINDOW JAMB

E 0628.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 8: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALL UNDERLAYDRESSED INTO OPENING WITHFLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

EXTRA PERMEABLE WALLUNDERLAY OVER WINDOW HEADFLASHING, SHOWN DASHED

INTERNAL WALL LININGMETALCRAFT METCOM 965 VERTICALCLADDING

DOUBLE GLAZING WINDOW JOINERY

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

WINDOW HEAD LINER

LINE OF WINDOW JAMBLINER BEHIND

STOPENDS TO HEAD FLASHING,SHOWN DASHED

LINE OF JAMB FLASHING BEHIND

MIN

. 10m

m C

OV

ER

METALCRAFT MSS PURLINS BYENGINEER

PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER

PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING

SU

GG

ES

T M

IN. 50m

m

DIM

EN

SIO

N T

O S

UIT

PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL

CAVITY CLOSER AS REQUIRED TONZBC

5m

m G

AP

DR

IP E

DG

E T

O C

LA

DD

ING

MIN

. 15m

m G

AP

MIN

. 75m

m W

IHT

OU

T H

EM

ED

GE

MIN

. 50m

m C

OV

ER

20mm HORIZONTAL CAVITY BATTEN

SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED

STOP ENDS, SHOWN DASHED

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

RECESSED WINDOW HEAD

E 0728.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 9: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965 VERTICALCLADDING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

PRE-FINISHED WINDOW SILL FLASHING

LINE OF WINDOW JAMBLINER BEHIND

WINDOW SILL LINER

MIN. 8mm PACKER

AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB

INTERNAL WALL LINING

STOPENDS TO SILL FLASHING,SHOWN DASHED

LINE OF JAMB FLASHING BEHIND

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

20mm HORIZONTAL CAVITY BATTEN

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL

DOUBLE GLAZING WINDOW JOINERY

METALCRAFT MSS PURLIN BYENGINEER

COMPRESSIBLE FOAM SEAL. REFER TOMRM CODE OF PRACTICE VERSION 3.0/2019 FOR REQUIRMENT.

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

CLA

DD

ING

CO

VE

R

60m

m(M

IN. 35m

m)SEPARATE BATTEN AND CLADDING

WITH DPC AS REQUIRED

WINDOW SILL SUPPORT BAR

5m

m G

AP

MIN

. 8m

m C

OV

ER

STOPENDS TO WALL CLADDING

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

RECESSED WINDOW SILL

E 0828.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 10: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PRE-FINISHED WINDOW JAMB FLASHING

DOUBLE GLAZING WINDOW JOINERY

LINE OF SILL FLASHING BELOW

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW

METALCRAFT METCOM 965VERTICAL CLADDING

5mm GAP

MIN. 10mm COVER

INTERNAL WALL LINING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

LINE OF WINDOW SILL LINER BELOW

WINDOW JAMB LINER

TIMBER PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FOR FULLWIDTH/DEPTH SILL

METALCRAFT MSS PURLIN BYENGINEER

SUGGEST 50mm

DIMENSION TO SUIT

PRE-FINISHED SECONDARYFLASHING, IF REQUIRED

LINE OF SILL FLASHING BELOW

PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING

LINE OF HEAD FLASHING ABOVE

5m

m G

AP

SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED

20mm HORIZONTALCAVITY BATTEN

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

RECESSED WINDOW JAMB

E 0928.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 11: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALL UNDERLAY DRESSEDINTO OPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

EXTRA PERMEABLE WALL UNDERLAYOVER WINDOW HEAD FLASHING,SHOWN DASHED

METALCRAFT METCOM 965 VERTICALCLADDING

PRE-FINISHED HEAD FLASHINGWITH 15° FALL

PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILLAND JAMB

METER BOXSTOPENDS TO HEAD FLASHING,SHOWN DASHED

LINE OF JAMB FLASHING BEHIND

PRE-FINISHED 'U' BRACKET FIXED TOMETERBOX BEFORE INSTALLATION

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

INTERNAL WALL LINING

METALCRAFT MSS PURLINS BYENGINEER

PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING

CAVITY CLOSER AS REQUIRED TO NZBC

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

5m

m G

AP

DR

IP E

DG

E T

O C

LA

DD

ING

MIN

. 15m

m C

OV

ER

MIN

. 75m

m W

ITH

OU

T H

EM

ED

GE

MIN

. 50m

m C

OV

ER

20mm HORIZONTAL CAVITY BATTEN

SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

METERBOX HEAD

E 1028.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 12: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965 VERTICALCLADDING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

METER BOX

MIN. 8mm PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

METALCRAFT MSS PURLIN BYENGINEER

INTERNAL WALL LINING

LINE OF JAMB FLASHING BEHIND

20mm HORIZONTAL CAVITY BATTEN

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FOR FULLWIDTH/DEPTH SILL

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

PRE-FINISHED FLASHING FIXED TOMETAL ANGLE TO BE CONTINUOUSAROUND METER BOX

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW

SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED

STOPENDS TO SILL FLASHING, SHOWNDASHED

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION3.0 /2019 FOR REQUIRMENT.

STOPENDS TO WALL CLADDING

CLA

DD

ING

CO

VE

R

60m

m(M

IN. 35m

m)

PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

METERBOX SILL

E 1128.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 13: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965VERTICAL CLADDING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

METER BOX

TIMBER PACKER

FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED JAMB FLASHING FIXEDTO METERBOX BEFORE INSTALLATION

WEATHERSEAL ON BACKING ROD

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

INTERNAL WALL LINING METALCRAFT MSS PURLINBY ENGINEER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING

SUGGEST MIN. 50mm

DIMENSION TO SUIT

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

LINE OF HEAD FLASHING ABOVE

LINE OF SILL FLASHING BELOW

20mm HORIZONTAL CAVITYBATTEN

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

METERBOX JAMB

E 1228.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 14: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM965 VERTICAL CLADDING

20mm HORIZONTAL CAVITYBATTEN

PRE-FINISHED INTERNALCORNER FLASHING

INTERNAL WALL LINING

PRE-FINISHED FIXINGBRACKET WITH PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW

PERMEABLE WALLUNDERLAY, SHOWN DASHED

STRUCTURAL COLUMN BYENGINEER

METALCRAFT MSS PURLINBY ENGINEER

PRE-FINISHED FLAT HEADWAFER-TEK SCREW FORFLASHING

PRE-FINISHED SECONDARYFLASHING

SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED

SUGGEST MIN. 100mm

DIMENSION TO SUIT

SU

GG

ES

T M

IN. 100

mm

DIM

EN

SIO

N T

O S

UIT

PRE-FINISHED FLATHEAD WAFER-TEKSCREW WITH EPDMWASHER

5mm GAP

5m

m G

AP

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

INTERNAL CORNER

E 1328.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 15: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT MSS PURLIN BYENGINEER

20mm HORIZONTALCAVITY BATTEN

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING

PRE-FINISHED EXTERNALCORNER FLASHING

PERMEABLE WALL UNDERLAY,SHOWN DASHED

METALCRAFT METCOM 965VERTICAL CLADDING

STRUCTURAL COLUMN BY ENGINEER

SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW WITH EPDM WASHER

PRE-FINISHED FIXING BRACKETWITH PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW

5m

m G

AP

SUGGEST MIN. 100mm

DIMENSION TO SUIT

SU

GG

ES

T M

IN. 100

mm

DIM

EN

SIO

N T

O S

UIT

5mm GAP

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

EXTERNAL CORNER

E 1428.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 16: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALLUNDERLAY, SHOWN DASHED

METALCRAFT METCOM965 VERTICALCLADDING

PRE-FINISHED FLAT HEADWAFER-TEK SCREW WITHEPDM WASHERINTERNAL WALL LINING

SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED

METALCRAFT MSS PURLINBY ENGINEER

PRE-FINISHED SOAKERFLASHING TO LINE UP WITHWINDOW JAMB ABOVE

20mm HORIZONTAL CAVITYBATTEN

METALCRAFT MSS PURLIN BYENGINEER

SOAKER FLASHING ONLY REQUIRED TOLINE UP WITH WINDOW JAMB ABOVE.REFER TO MRM CODE OF PRACTICEVERSION 3.0 /2019 FOR REQUIRMENT.

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

SOAKER FLASHING

E 1528.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 17: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965 VERTICALCLADDING

PRE FINISHED SELFTAPPING SCREW WITHRUBBER WASHER

20mm HORIZONTAL CAVITYBATTEN

FIBRE CEMENT BOARDBY OTHERS

PRE FINISHED FLASHING,MATERIAL AS PER E2/AS1

PERMEABLE WALL UNDERLAY,SHOWN DASHED

SEPARATE BATTEN ANDCLADDING WITH DPC ASREQUIRED

SUGGEST MIN. 100mm

DIMENSION TO SUIT

SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

CHANGE IN CLADDING

E 1628.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 18: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

METALCRAFT METCOM 965VERTICAL CLADDING

WALL FRAMING

PRE FINISHED SELFTAPPING SCREW WITHRUBBER WASHER

DPC

FLASHING, MATERIAL ASPER E2/AS1

20mm HORIZONTAL CAVITYBATTENS

PERMEABLE WALLUNDERLAY, SHOWNDASHED

8g WAFER TEK SCREW

PRE-FINISHED SECONDARYFLASHING

SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED

5m

m G

AP

MASTIC BEAD ONBACKING ROD

RAWLPLUG

FLEXIBLE FLASHING TAPE

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

CLADDING ABUTMENT

E 1728.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 19: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALL UNDERLAY, SHOWNDASHED

INTERNAL WALL LINING

METALCRAFT METCOM 965 VERTICALCLADDING

PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING

CAVITY CLOSER AS REQUIRED TONZBC

PRE-PRIMED SKIRTING

CONCRETE SLAB

METALCRAFT MSS PURLIN BYENGINEER

PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER 20mm HORIZONTAL CAVITY BATTEN

PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL

3-5

mm

GA

P V

EN

TIL

AT

ION

GA

P

DR

IP E

DG

E T

O C

LA

DD

ING

MIN

. 15m

m G

AP

MIN

. 50m

m L

AP

DPC

25mm

APPLICATION

CLEARANCE AT GARAGE DOOR

35mm SHELTERED AREAS OR CLADDING ABUTTINGA DECK

75mm UNLINED BUILDINGS

100mm LINED BUILDINGS AND DWELLINGS.STONE CHIP GROUND SURFACE

150mm KEPT LAWN GROUND SURFACE

175mm PASTURE GROUND SURFACE

GROUND CLEARANCE IS NECESSARY BETWEEN BOTTOM OFPROFILED METAL CLADDING AND LARGE FLAT SURFACES

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

BOTTOM OF CLADDING (FLUSH)

E 1828.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 20: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

PERMEABLE WALL UNDERLAY OVERFLASHING, SHOWN DASHED

METALCRAFT METCOM 965VERTICAL CLADDING

PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL

MIN

. 50m

m L

AP

INTERNAL WALL LINING

PRE-PRIMED SKIRTING

CONCRETE SLAB

CAVITY CLOSER AS REQUIRED TONZBC

5 GAP

20

15

ALTERNATIVE OPTIONBIRDS BEAK EDGE

PRE-FINISHED FLAT HEADWAFER-TEK SCREW FORFLASHING

20mm HORIZONTAL CAVITY BATTEN

3-5

mm

VE

NT

ILA

TIO

N G

AP

MIN

. 75m

m C

OV

ER

SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED

DPC

25mm

APPLICATION

CLEARANCE AT GARAGE DOOR

35mm SHELTERED AREAS OR CLADDING ABUTTINGA DECK

75mm UNLINED BUILDINGS

100mm LINED BUILDINGS AND DWELLINGS.STONE CHIP GROUND SURFACE

150mm KEPT LAWN GROUND SURFACE

175mm PASTURE GROUND SURFACE

GROUND CLEARANCE IS NECESSARY BETWEEN BOTTOM OFPROFILED METAL CLADDING AND LARGE FLAT SURFACES

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev.

1 : 2

1.0

BOTTOM OF CLADDING (RECESSED)

E 1928.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

Page 21: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev. 1.0

3D WINDOW FLASHINGS

E 2028.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING

RECESSED WINDOW FLASHINGS

HEAD FLASHING

JAMB FLASHING

SILL FLASHING

ALUMINIUMWINDOWJOINERY

METALCRAFTMETCOM 965VERTICALCLADDING

Page 22: Metcom 965 · metalcraft metcom 965 vertical cladding metalcraft mss purlin by engineer continuous timber packing m i n. 5. 0 0 ° dpc to provide separation of metal capping and timber,

LIP OF DISCHARGE AT LOWEST POINTOF ROOF

DOWNPIPE

OVERFLOW BELOW OPENING LEVEL, 1.5 xCROSS-SECTION AREA OF DOWNPIPE

METALCRAFT METCOM 965VERTICAL CLADDING

50mm MIN

EITHER SIDE

200mm MIN

.

OPENING

75m

m M

IN.

OP

EN

ING

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.

ScaleDate Sheet

MetalcraftRoofing

Rev. 1.0

3D RAINWATER HEAD

E 2128.02.2019

Metcom 965

CVMET965

COMMERCIAL VERTICAL CLADDING