MICS4 Survey Design Workshop
Multiple Indicator Cluster SurveysSurvey Design Workshop
General Structure of a Survey Plan
MICS4 Survey Design Workshop
Country Survey Plan
• Country teams will be required to draft and present a ‘country survey plan’ on the last day of the workshop
MICS4 Survey Design Workshop
Country Survey Plan
• 5-10 minutes presentations• Presentation by the UNICEF officer or the
survey coordinator• Followed by short general discussion• There will be preparatory discussion and
group work
MICS4 Survey Design Workshop
Country Survey Plan
• Sessions specifically allocated to group work on Country Survey Plans
MICS4 Survey Design Workshop
Country Survey Plan
• Power point presentation is encouraged• Handouts are optional
• Please copy all power point presentations to the workshop laptop– All presentations will be copied to USB disks that
will be distributed to all participants
MICS4 Survey Design Workshop
Country Survey Plan
• Between now and the time of your presentation, facilitators will work with groups of countries both during workshop hours and after the workshop hours, if needed
• Bilateral meetings will also be organized to meet with country teams, if needed
• Country teams will use ‘Country Survey Plan’ Template to develop/finalize their plans[Word file - MICS4 Country Survey Plan Template.doc]
MICS4 Survey Design Workshop
Presentations
• Countries planning a MICS– Initial or draft ‘Country Survey Plan’ is expected to
be presented– A revised ‘Country Survey Plan’ is expected to be
submitted after the workshop
MICS4 Survey Design Workshop
Presentations
• Countries planning a mixed survey– MICS-DHS,– DHS-MICS,– MICS-other, or– Other cases
– Initial plans and preparations for surveys
MICS4 Survey Design Workshop
Presentations
• Countries not planning a survey and/or recently completed one
– May present summary information on• completed surveys• content• data availability• future data collection plans
MICS4 Survey Design Workshop
CSP should answer….
• Implementing agency, MICS/Survey Team and Governance Structure
• Questionnaires– Which modules will be retained, which modules will not
be used?– Any issues regarding specific questions or question
groups?
MICS4 Survey Design Workshop
CSP should answer….
• Sampling– What will be the sample size?– Sample frame? Updating necessary?– What will be the general design characteristics of the
sample?– What will be the level of aggregation?
MICS4 Survey Design Workshop
CSP should answer….
• Survey Instruments Needed– Equipment and supply needs
• Training of Fieldwork Staff– Timing, participants, length
•Fieldwork– Timing, constraints, team composition, duration, logistics,
monitoring
MICS4 Survey Design Workshop
CSP should answer….
• Data Entry and Data Processing– Timing, data entry team, duration, monitoring
• Budget– How much will the MICS4/major budget line items
cost? – Available funding and funding needs– Budget template [excel file] will be available[Separate session on budget calculations]
MICS4 Survey Design Workshop
CSP should answer….
• Timetable– What is the timetable envisaged for MICS4
activities?[Separate session on Timetable]
• Major Challenges and Support from UNICEF– What are the major challenges?– What kind of technical support will be needed? In what
areas? Who from?
‘Getting Started’ Document
• General information• Tables
– Timetable template– Budget template– Costing framework
Next session:Timetable and Budget Calculations