Mid-Atlantic Quality Assurance Workshop 2017Hershey, PA
![Page 2: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/2.jpg)
Brief History NJDOT HPTO Specification Review Examples of Field Projects Updated HPTO Spec for 2017 Open Discussion
![Page 3: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/3.jpg)
In 2005, Rutgers began working on a thin-lift mixture to be used for low volume applications In collaboration with Citgo Asphalt▪ Citgo recommending for towns/municipalities ▪ Sold under the name “FlexGard”
Meant for improving smoothness, structure, and “sealing” existing pavement Modeled after NYSDOT 6F mixture▪ NYSDOT frequently uses ¼” stone ▪ Neat binder
![Page 4: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/4.jpg)
In 2006, South Jersey asphalt supplier began recommending a high performance fine aggregate mix for heavy duty parking lots and for the south Jersey municipalities roads and AC Expressway Based on Superpave 4.75 mm NMAS (very fine 9.5 mm
NMAS) PG76-22, no RAP
No specification at time – placed for a few clients
![Page 5: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/5.jpg)
1,000 µ-strain, 15oC
100
1,000
10,000
100,000
10 100 1,000 10,000 100,000 1,000,000Loading Cycles (n)
Flex
ural
Stif
fnes
s (M
Pa)
12H76 #112H76 #2AE Stone #1AE Stone #2
Fatigue Cycles to Failure
12H76 (Ave.) = 2,732
AE Stone (Ave.) = 51,636
![Page 6: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/6.jpg)
0.00.51.01.52.02.53.03.54.04.55.05.56.06.57.07.58.0
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000Number of Loading Cycles
APA
Rut
ting
(mm
)
AE Stone 4% AV = 3.33 mm
AE Stone 7% AV = 4.31 mm
12H76 4% AV = 1.2 mm
12H76 7% AV = 2.6 mm
PASS
FAIL
![Page 7: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/7.jpg)
March 20o6 – Draft Specification developed based on early laboratory test results
Citgo Refinery Trials Using preliminary NJDOT “spec”, Citgo Asphalt installed
approximately 1,000 tons of HPTO on refinery road▪ Heavy tanker truck traffic▪ Existing thin pavement section showing extensive cracking▪ No milling prior to placement, just tack
Conducted forensic analysis Mixture testing▪ Loose mix and field cores
![Page 8: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/8.jpg)
![Page 9: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/9.jpg)
![Page 10: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/10.jpg)
![Page 11: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/11.jpg)
One year after placement, visual distress survey and field cores taken
Minimal cracking (reflective from previous cracking) Thin application area
HPTO “sealed” existing cracks Proper thickness
Existing Crack
![Page 12: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/12.jpg)
![Page 13: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/13.jpg)
HPTO Final Specification – 2007 1st spec in NJ to require performance testing▪ Added performance testing during design and
production
Mixture targeted for pavement preservation type applications▪ Found to also be a “superior” leveling course in areas
where extended staged construction was needed
![Page 14: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/14.jpg)
Job Mix Formula RequirementsSieve Size Percent Passing
3/8" 100#4 65 - 85#8 33 - 55#16 20 - 35#30 15 - 30#50 10 - 20
#100 5 - 15#200 5 - 8
Min. % Binder 7.0
0.6 - 1.2 < 0.1 %
Requirements
Volumetric Requirements for Design and Control of HPTO
Control 95.5 - 97.5 < 99.0 > 18.0%
Dust to Binder Ratio
Draindown, AASHTO
T305
Design 96.5 < 99.0 0.6 - 1.2 < 0.1 %> 18.0%
Required Density (% of Max. Sp. Gr.)
Ndes (50 Gyrations)
Ndes (100 Gyrations)
Voids in Mineral Aggregate (VMA)
FAA > 45% (AASHTO T304)Fine aggregate from stone sand(no natural sands)
Sand Equivalency > 45% (AASHTO T176)
![Page 15: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/15.jpg)
Asphalt Binder Polymer-modified binder▪ Originally PG76-22 (now PG64E meeting % Recovery curve)▪ RTFO Elastic Recovery > 65% @ 25oC (AASHTO T301)
Performance Specification Utilize the Asphalt Pavement Analyzer (AASHTO T340)
for stability check ▪ Mix design verification and production control (1st Lot and
every other Lot after)
![Page 16: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/16.jpg)
- AASHTO T340- 100 lb wheel load; 100 psi hose pressure- Tested at 64oC for 8,000 loading cycles- Samples at 5 +/- 0.5% air voids- APA Rutting
- < 4 mm to PASS for Design- < 5 mm to PASS for Production
![Page 17: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/17.jpg)
![Page 18: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/18.jpg)
![Page 19: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/19.jpg)
MP 30.2 to 35.5 44 million ESAL Full depth Bituminous Concrete Pavement Three 12 foot lanes with 12 foot outside shoulder
and 4 foot inside shoulder. Previous Resurfacing approximately 8 years old. Pavement Management Data (right lane) Average IRI = 91 inches/mile Average Rut Depth = 0.2 inches Average SDI = 1.7 (Rating 1 to 5)*
* Fatigue cracking was major issue
![Page 20: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/20.jpg)
Mill 1” depth – in areas with extensive cracking to remove crack sealer and in transition areas.
Tack using PG 64-22. Pave 1” HPTO. No treatment on the outside shoulder except
for replacing the rumble strip.
![Page 21: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/21.jpg)
Average Air Voids = 5.8% (based on field cores)Skid Resistance (SN40) = 51
▪ Recommended minimum skid number for 65 mph roadway is 43.
IRI = 87 inches/mileRut Depth = 0.1 inches Average SDI = 3.9 (Rating 1 to 5)
![Page 22: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/22.jpg)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
30.0 30.5 31.0 31.5 32.0 32.5 33.0 33.5 34.0 34.5 35.0 35.5
Surf
ace
Dis
tres
s In
dex
(SD
I)
Milepost
2008 - Before HPTO2010 - 1.5 Years After HPTO2012 - 3.5 Years After HPTO
NJDOT Rehabilitation Trigger: SDI ≤ 2.4
![Page 23: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/23.jpg)
![Page 24: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/24.jpg)
Deteriorating PCC pavement High vertical deflections at
joints Heavy traffic volume HPTO used as a “superior”
leveling course over faulted PCC Staged construction would
require it left open to traffic for 8 months▪ 11/2009 to 7/2010
![Page 25: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/25.jpg)
I280 Schedule Issues with undersealing (severe upheaval at PCC
joints – too much grout!) All joint area required diamond grinding Pushed HPTO paving schedule to start in November,
2009 Addition of WMA additive was used for Improved workability and compactability PCC Patch and Joint Material
![Page 26: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/26.jpg)
100
125
150
175
200
225
250
275
300
325
0 5 10 15 20 25 30Time After Placement (minutes)
Tem
pera
ture
(F)
1-Inch Thick
2-Inch ThickAir and Pavement Temperature = 45F
8 minutes 25 minutes
Placed Immediately Over PCC
![Page 27: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/27.jpg)
HPTO left open to traffic from November 2009 to July 2010
![Page 28: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/28.jpg)
![Page 29: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/29.jpg)
Since 2008, 19 different pavement locations with HPTO To date, generally good performance when
compared to conventional HMA Since used primarily as Pavement Preservation
treatment, important to consider existing pavement condition prior to placement.
![Page 30: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/30.jpg)
HPTO placed on 19 different pavement sections since 2008
Evaluated changes in SDI to evaluate performance of HPTO on New Jersey pavement sections
Compared performance life for different scenarios All data averaged Where HPTO was placed on pavement with pre-existing
SDI > 2.4 Where HPTO was placed on pavement with pre-existing
SDI < 2.4 Comparison of typical Mill 2”/Pave 2” An SDI value of 2.4 is a trigger for rehabilitation
![Page 31: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/31.jpg)
0.0
1.0
2.0
3.0
4.0
5.0
0 1 2 3 4 5 6 7 8 9 10
SDI
Yrs After Construction
Average (n=10) Best FitSDI Rehab Trigger
![Page 32: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/32.jpg)
0.00.51.01.52.02.53.03.54.04.55.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Surf
ace
Dist
ress
Inde
x (S
DI)
Yrs After Construction
HPTO SDI > 2.4
HPTO SDI < 2.4
HMA Mill 2"/Pave 2"
![Page 33: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/33.jpg)
![Page 34: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/34.jpg)
34
Example: New Jersey HPTO – AASHTO T340
0.00
0.10
0.20
0.30
0.40
0.50
30.0 32.0 34.0 36.0 38.0 40.0 42.0
Aver
age
Rutt
ing
(inch
es)
Milepost
5/27/2015 6.565/28/2015 6.235/29/2015 6.56/3/2015 6.846/4/2015 3.666/5/2015 3.876/9/2015 3.92
6/10/2015 4.326/11/2015 3.986/12/2015 3.736/17/2015 3.836/18/2015 2.946/19/2015 2.736/24/2015 3.99
APA (mm)Date
![Page 35: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/35.jpg)
Some issues in 2015 regarding failing HPTO mixtures specified using PG64E-22 asphalt binder Minimal previous issues prior to PG64E use (i.e. –
AASHTO M320)
5/27/2015 77 76.6 PG76 0.36 59 PG64E 73.6 68.3 6.565/28/2015 78.8 78.8 PG76 0.18 72.9 PG64E 69.5 64.5 6.235/29/2015 79.6 79.6 PG76 0.17 74.4 PG64E 69.9 64.5 6.56/3/2015 78.3 78.7 PG76 0.16 75.5 PG64E 69.6 63.5 6.846/4/2015 86.5 79 PG76 0.17 92.4 PG64E 58.9 58.4 3.666/5/2015 84.2 78.6 PG76 0.14 77.6 PG64E 65.4 64.8 3.876/9/2015 87 81.1 PG76 0.061 89.2 PG64E 60.7 60.1 3.92
6/10/2015 83.7 81.7 PG76 0.1 80.2 PG64E 66 61.8 4.326/11/2015 86.3 80.9 PG76 0.051 91.3 PG64E 60.8 58.4 3.986/12/2015 82.4 81.2 PG76 0.048 91.3 PG64E 66.8 60.4 3.736/17/2015 87.5 81.8 PG76 0.046 92.2 PG64E 60.6 57.9 3.836/18/2015 87.6 82.6 PG82 0.041 92.4 PG64E 61.2 59.2 @ 82C 2.946/19/2015 86.5 82.3 PG82 0.041 92.4 PG64E 59.2 59.2 @ 82C 2.736/24/2015 83.8 79.5 PG76 0.074 89.1 PG64E 62 59.7 3.99
PG GradeRTFOOriginalDate APA (mm)δ @ 76C (RTFO)δ @ 76C (Orig)MSCR Grade% RecJnr
(1/kPa)
![Page 36: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/36.jpg)
0
10
20
30
40
50
60
70
80
90
100
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
% R
ecov
ery
Jnr (1/kPa)
Existing 64ELimit
![Page 37: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/37.jpg)
Asphalt Binder Grade – no longer specifying a PG grade Use polymer modified asphalt binder that is
specially formulated for meeting the mix performance criteria in this specification. Consult with the asphalt binder supplier to obtain the appropriate material for the specific mix design. Submit a certificate of analysis (COA) showing the PG continuous grading (AASHTO R 29) for the asphalt binder used in the mix design.
![Page 38: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/38.jpg)
Asphalt Binder Grade – continued For QA testing of the asphalt binder, the ME may
sample the asphalt binder during production of the mix and compare the results with the COA submitted at the time of mix design. If the high and low temperature test results are within 5% of the results from the same temperature on the COA, then the ME will consider the asphalt binder comparable to the binder used during mix design.
![Page 39: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/39.jpg)
Asphalt Mixture Testing – Addition of the Overlay Tester The ME will approve the JMF if the average rut
depth for the 6 specimens in the asphalt pavement analyzer testing is not more than 4 mm in 8,000 loading cycles and the average number of cycles to failure in the Overlay Tester is greater than 750. If the JMF does not meet the APA and Overlay Tester criteria, redesign the HPTO mix and submit for retesting.
![Page 40: Mid-Atlantic Quality Assurance Workshop 2017 Hershey, PA · PDF fileImproved workability and compactability ... HPTO on New Jersey pavement sections ... 6/5/2015 84.2 78.6 PG76 0.14](https://reader034.vdocument.in/reader034/viewer/2022051723/5ab3f67b7f8b9adc638ba6b6/html5/thumbnails/40.jpg)
Pay Adjustment
Table 902.08.03-1 Performance Testing Pay Adjustments for HPTO Test Requirement Test Result PPA APA @ 8,000 loading cycles, mm (AASHTO T 340)
5.0 maximum t ≤ 5.0 5.0 < t ≤ 12.0
t > 12.0
0 -50(t-5)/7
-100 or Remove & Replace Overlay Tester, cycles (NJDOT B-10)
750 minimum t ≥ 750 750 > t ≥ 450
t < 450
0 -(750-t)/6
-100 or Remove & Replace