middle east africa company - meac-ec.ch · middle east africa company quality m e a c activities of...

22
MIDDLE EAST AFRICA COMPANY INFRASTRUCTURE

Upload: others

Post on 26-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

INFR

ASTR

UC

TUR

E

Page 2: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

OUR SERVICE

Services offered by M E A C

Technical-financial consultancy Market surveys Technicaland financial feasibility studies Localisation studies Energysaving studies Technical-financial assessments Strategiclogistic studies Industrial directive plans Preliminary planningInput data and optimisation of layout Formulation of thearchitectural and structural Project Definition of the systemsEstimation of investment and running costs Detailedconstruction programs Works program Plans andauthorisations Definite and executive plans Metriccalculations and detailed cost estimates Provisioning TendersSubmission of tenders on behalf of customers Comparison ofoffers Writing of contracts and orders Works direction andsupervision Planning and supervision of times Direction andtechnical supervision Check and control of suppliesTechnical direction of works Supervision of progress,payments and final ccounts Budget control Tests duringoperations and after completion Assistance in setting upMaintenance manuals and as-built drawings Final Lay-outsSpecifications for machinery,equipment, furnitureArchitectural Planning (calculations, drawings,specifications) for :

● Civilian works

● Structural works

● Mechanical plant

● Control systems

● Electric systems

● Instrumental systems

Page 3: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

QUALITY

M E A C activities of planning plants, mechanical, electrical for industrial and

civilians buildings, as well as the provisioning and supply components, areregulated by operational procedures conform to UNI

REACHING THE OBJECTIVESThe organisation al structure the interdisciplinary competence, the methods,the operative tools, the internal controls, all guarantee to the clients a highquality service in any situation and throughout the various stages of the project.

PROFESSIONALISMOur wide range of experience gained in many and varied operations can beadapted to meet clients requirements.

FLEXIBILITYThe staff training and the long-standing experience, in addition to continuousupdating, allow us to satisfy any needs.

ORGANISATION

Coordination between M E A C and clients, along with the the best and up-

to-date engineering techniques, allow the strict observance of time, cost andquality set.

TRASPARENCY

The M E A C is an engineering company totally independent, not linked to

industrial or financial groups.

Page 4: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

Eugenio CORMIO sr. EngineerPietro VIGNOLO sr. EngineerAlberto VIGNOLO sr. ArchitectDomenico SCAGLIUSI sr. EngineerMichele BELLUCCI sr. EngineerDomenico ACITO Manager

Coordinator

Paolo SANDRI Project Manager Federico STRINGA Design SurveyorGianpaolo GENTILE Design SurveyorFrancesco ZONNO Design SurveyorAntonio GLACIALE Design SurveyorTony PARTIPILO Design SurveyorMichele SPECIALE Design Surveyor

Nicola ILLUZZI Quantity SurveyorDomenico LABBATE Quantity SurveyorGiorgio ZILETTI Quantity SurveyorIsabella CORMIO Secrertary / Adm. Daniela ACITO Adm. executiveAnna MALERBA AdministrationLena DI BELLO AdministrationGiovanni RUSSO MarketingDario ACITO MarketingN°13 Worksite Technicians

CollaboratorsPietro CORONA EngineerMonica JORA Landsc Designer Maurizio FERRARI SurveyorDino MAGRI SurveyorRosanna Lentini Geologist

Company Associated with 40 + 30 engineers

MEAC uses up-to-date computerised tools, thatsupport effectively the various stages of work, atmanagement level of committed, calculation andpreparing graphics. This allows to optimize compliancewith the timing, cost and technical quality of theproject.

STAFF

MIDDLE EAST AFRICA COMPANY

Page 5: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

RESEARCH & DEVELOPMENTET

MIDDLE EAST AFRICA COMPANY

The MEAC, in favorable

environments and

special supports and

helps the end user to

the research and

development of the

financial part.

Page 6: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

S o m a l i a K e n y aC a m e r u nZ a m b i a

I t a l i a M a c e d o n i a M a l a y s i a

A l g e r i a

R o m a n i a

REFERENCE IN THE WORLD

MIDDLE EAST AFRICA COMPANY

I r a q

Page 7: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

+ 3500 projects in the world

MEACENGINEERING CONSTRUCTION

MIDDLE EAST AFRICA COMPANY

Page 8: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

TODINIA32 Torino-Bardonecchia Road network access tothe Word Skiing Championship 1997 -Val di Susa Ringroad of Oulx, access to Sauze of OulxExecutive Project

Autonomous Province of TrentoVariations and arrangements of the SS No. 43 "Valleyof Non" -Road stretch Mollaro-Taio - Adaptation andupdating of the Executive Project of Mollaro-Taioroad stretch and of Taio ring roadExecutive Project

Casale Monferrato City (Alessandria Province) Urban Management Sector and territorial - works for the extension and adjustment of the road bridge of Casale Monferrato on the river Po and works connectedProject

ITINERA S.p.APalermo-Messina Highway - Extension-BuonfernelloPatti - 2° road stretch: S. Stefano di Camastra-S.Agata di Militello - Road stretch: S. Agata of Militello-Caronia - Lot 24 bis "Pizzo Turda"Executive Project

Page 9: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

LICIS S.p.AS.S n°590 of "Valley Cerrina" - Road stretch: Torino-Casale Monferrato - Urgent works for thecontinuation of variation S.S n° 590 incorrespondence of San Mauro Torinese townExecutive Project

GRASSETTO S.p.AS.S n°590 of "Valley Cerrina" - Road stretch: Torino-Casale Monferrato - Urgent works for thecontinuation of variation S.S n° 590 incorrespondence of San Mauro Torinese townExecutive Project

COOPCOSTRUTTORIS.S. n°388 of "Mongrando" - Road stretch: Biella-connection S.S n°228 - Executive works project of thevariant construction between Biella (connection S.S.n°230 of "Massazza") and Mongrando (connectionS.S n°419 of "Serra") with the elimination of side streetsof Biella, Occhieppo lower and Mongrando towns.Lot 1/B from street 53° Fanteria to the Bolume streamand completion of Lot 1Executive Project

GARBOLI-CONICOS S.p.ARealization of the East-West link to the town ofCuneo and interconnections of extraurban networkwith function of variantExecutive Project

Page 10: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

VIALIT S.p.ASanremo town civic centre - Imperia Province -Project for the internal transformation of the existingbuilding to create a different use of existing spacesExecutive Project

R.T.I: INC GENERAL CONTRACTOR S.p.A , C.R.C SrlPalermo-Messina highway - Extension Patti-Buonfornello - Executive project - 2° road stretch: S.Stefano of Camastra-S. Agata of Militello - section:Caronia-S.Stefano of Camastra - Lot 25bis"Pagliarotto"Executive Project

R.T.I: INC GENERAL CONTRACTOR S.p.A , C.R.C SrlPalermo-Messina highway - Extension Patti-Buonfornello - Executive project - 2° road stretch: S.Stefano of Camastra-S. Agata of Militello - section:Caronia-S.Stefano of Camastra - Lot 26 "Portale"Executive Project

RHIAG S.p.AIndustrial complex Viale del Ghisello 16-Milano-Property RHIFIM S.p.A. Milano - Renter RHIAG S.p.AMilanoExecutive Project

Underpass Soc. Cons. a.r.lVehicular underpass of Repubblica Square - TorinoExecutive Project

Page 11: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

UNIECO S.c.r.lUnieco purification plant - Company Po Sangone -Final filtration system of purification of the purificationplantExecutive Project

LAUROS.S 33 "Del Sempione" - Road stretch: GravellonaToce-Iselle - Verbania Province - Works to modernizethe section between km. 131750 and the borderstate - Lot 1°Executive Project

MARCOLINovara Province - S.S n° 229-32-341-11 and 211-Executive of project of external link to the town ofNovara - Lot 4: between the S.S 211 (km. 47+150) andthe S.S 11 (km. 90+400)Executive Project

COGEFAState street 590 - Road stretch Torino-CasaleMonferrato - Torino Province - Urgent works for thecontinuation of the variant to the SS 590 incorrespondence to the San Mauro townExecutive Project

CONSTRUCTION CIR S.r.lInfrastructure road project of the State road S.S 125"ORIENTALE SARDA" - Road stretch: Priamo- Capo Boi- Executive project - Lot 1Executive Project

Page 12: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

Annunziata scarlMessina City - Project for the construction of themotorway junction Giostra, nord motorwayconfluence from junction Giostra to Annunziata,motorway junction Annunziata - 3° Lot - Confluencenord - junction AnnunziataExecutive Project

R.T.I: INC GENERAL CONTRACTOR S.p.A-RUSCALIADELIO S.p.A - C.E.C. SrlMessina-Palermo Highway - Patti-Buonfornelloextension - 1° road stretch Buonfornello - S.Stefano ofCamastra - Section: S. Stefano-Tusa - Lot: 27 ter"Torremuzza"Executive Project

COOPCOSTRUTTORIS.S 131 "Carlo Felice" - Adjusting works of the stateroad and the elimination of intersections-MogorojunctionsExecutive Project

LAURO, RUSCALIAS.S. 232-Panoramica Zegna- Road stretch: Cascina

Donna-Bocchetto Sessera - Section: Cossato-Vallemosso- Construction project of the variant fromthe connection on S.S. 142 -Biellese- in Cossato townto Volpe village. Cossato yard - II° Lot fromParlamento hamlet to Volpe hamletExecutive Project

Page 13: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

ARCIDIOCESI DI VERCELLIPiemonte Region - Vercelli Province - Vercelli City -ARCIDIOCESI DI VERCELLI - Recovery throughrestoration of areas of Vercelli Episcopacy, for theDuomo Cathedral Treasury Museum, CapitularArchive and Library - Executive project integrated ofthe 2°Lot of worksExecutive Project

COOPCOSTRUTTORISalerno Highway - Reggio Calabria - Roas stretch 2°-Section 4° - Lot 2° from km. 213+500 to km. 222+000(junction Altomonte - Serra tunnel of the hospital) -Works adjustment to the class 1 (first) of thestandards CNRExecutive Project

R.T.I.: C.E.C Srl - INC GENERAL CONTRACTOR S.p.AMessina-Palermo Highway - Patti-Buonfornelloextension - 1° road stretch Buonfornello - S.Stefano ofCamastra - Section: Tusa-Castelbuono - Lot 30 Bis "TORRE FINALE"Executive Project

R.T.I.: INC GENERAL CONTRACTOR S.p.A- C.E.C SrlMessina-Palermo Highway - Patti-Buonfornelloextension - 1° road stretch Buonfornello - S.Stefano ofCamastra - Section: Tusa-Castelbuono - Lot 29 quater"PIANO PARADISO"Executive Project

Page 14: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

R.T.I.: C.E.C Srl - INC GENERAL CONTRACTOR S.p.AMessina-Palermo Highway - Patti-Buonfornelloextension - 1° road stretch Buonfornello - S.Stefano ofCamastra - Section: Tusa-Castelbuono - Lot 30 - 1°section "POLLINA"Executive Project

R.T.I.: INC GENERAL CONTRACTOR S.p.A- C.E.C SrlMessina-Palermo Highway - Patti-Buonfornelloextension - Executive project - 1° Road stretch: Buonfornello-S. Stefano of Camastra - Section: Tusa-Castelbuono - Lot 30ter "Tunnel Cozzo Minneria" 1°

section Executive Project

FE.I.RARailway Line PA-ME - Line realization of double track -section Pace del Mela - Rometta from km. 1 +411.66 to km. 4 +858.46Executive Project

Sige Noto S.c.a.r.l.Highway Siracusa-Gela 1° road stretch: Siracusa-Rosolini - Lot: 4 "Noto"Executive Project

Reggio Calabria ProvinceNew construction and partial adjustment ex S.S. 112 DIR. Road Bovalino - Platì - Xillastro - Bagnara

Executive Project

Page 15: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

SITRACI S.p.APreliminary project of the Asti South-West bypass, linking the A21 "Torino-Piacenza " to the toll of Asti West and the South Asti bypass (S.S. N.231), overtaking the river Tanaro, by viaduct and connection on the Lot 2.1 of the Asti-Cuneo in constructionPreliminary Project

Sige Noto S.c.a.r.l.Highway Siracusa-Gela 1° road stretch: Siracusa-Rosolini - Lot: 5 "Rosolini"

Executive Project

ATIVA S.p.AAdaptation of Bruere interchange of the motorway system, Torino bypass. Representative of the ATI with 46%Final Project & Executive Project

IRCES 95 INGG.PISA SrlExecutive Project of the works construction of the fast flowing traffic road S. Simone-S. teodoro(Stazzareddu town) - Lot 5Executive Project

Autonomous Province of TrentoVariations and arrangement of the S.S. n° 43 of "Valle di Non" - Road stretch: Mollaro-Taio and of Taio ring road - Expertise of variant N°3Final Project & Executive Project

Page 16: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

COOPCOSTRUTTORIS.S 236 "Goitese" - Modernization of Montichiari-Mantova section - Variant of Montichiari - 2° sectionfrom Via Mantovana Vecchia to Vighizzolo, connecting with the SS 236 - Completion variant ofMontichiariExecutive Project

Asti ProvinceS.P n. 27 "Castello d'Annone - Nizza Monferrato" -Expansion of the bridge on the Tanaro river in the town of Rocchetta TanaroExecutive Project

METRO TRE S.C.A.R.L.SATTI S.p.A Automatic underground of Torino - Line 1 - Section Fermi - Pozzo Strada - Lot 3°Executive Project

Monginevro ScarlS.S 24 of "Monginevro" - Ski Championships 1997 -works to make accessible the section between Oulx-Cesena Torinese - I section - Section from "Morettahamlet" and Cesena Torinese - Intervention of 2 phase - Completion works between sections 62 and 204Executive Project

SICOGEN SrlTorino Highway-Ivrea - Restructuring and consolidation of the bridge over the stream OrcoExecutive Project

Page 17: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

Autonomous Province of TrentoVariations and arrangement of the S.S. n° 43 of "Valle di Non" - Road stretch: Mollaro-Taio and of Taio ring road - Expertise of variant N°6Final Project & Executive Project

Autonomous Province of TrentoVariations and arrangement of the S.S. n° 43 of "Valle di Non" - Road stretch: Mollaro-Taio and of Taio ring road - Expertise of variant N°9Final Project & Executive Project

Autonomous Province of TrentoVariations and arrangement of the S.S. n° 43 of "Valle di Non" - Road stretch: Mollaro-Taio and of Taio ring road - Expertise of variant N°13Final Project & Executive Project

MONTEROSA S.p.AAlagna Valsesia town (VC) Technical premises, upstream station, downstream station - CablewayFunifor "Pianalunga - Cimelegna-Pass Salati"Executive Project

Page 18: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

FE.I.RARailway Line PA-ME - Line realization of double track of the section Pace del Mela - Rometta from km. 0+000,00 to km. 1+411,66Executive Project

OLIMPIADI INVERNALI 2006, AGENZIA DI TORINO 2006Mountain cableways - Nuovo GarnelPreliminary Project & Final Project

OLIMPIADI INVERNALI 2006, AGENZIA DI TORINO 2006Mountain cableways - Fraiteve 3 (lot 4)Preliminary Project & Final Project

ATIVA S.p.ASS n° 24 variant - Alpignano Pianezza ring roadPreliminary Project & Final Project

Reggio Calabria ProvinceNew construction and partial adjustment ex S.S. 112 DIR. Road Bovalino - Platì - Xillastro - BagnaraExecutive Project

Page 19: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

OLIMPIADI INVERNALI 2006, AGENZIA DI TORINO 2006Engineering services related to the implementation of the four-seat chairlift plant to automatic "Trebials"Preliminary Project & Final Project

OLIMPIADI INVERNALI 2006, AGENZIA DI TORINO 2006S.S. n° 23 of "Sestriere" - variation to the town of PorteExecutive Project

COGEFA S.p.AConstruction project of the adaptation of Bruereinterchange Highway System , Torino bypassExecutive Project

PIANO LAGO CALCESTRUZZI SrlS.S. n° 460 of Ceresole - Road stretch: Caselle-Ceresole - Torino Province - Constuction works of embankment wall and of an artificial tunnel, hydraulic works and defence in the section between km. 60+350 and km. 60+700 in corrispondence of Rio

Arianas, following the flooding of 13-18 October 2000Executive Project

Page 20: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

TORINO PROVINCE Castagnole Provincial road, overpass at km. 1 +300 junction provincial road 6 of the Pinerolo to km. 21 +300. Planking restoration work Executive Project

COGEIS S.p.AHydraulic works and environmental of the Ivrea fluvial junction - 4° Lot functional - Fioranoembankment and provisional remodeling - finalproject suitable for integrated contract Executive Project

CARENA S.p.AImperia Province - Chiusavecchia town - S.S. 28 of"Colle di Nava" - Road stretch: Ponte di nava-Imperia- Executive project of Chiusavecchia variantExecutive Project

A.T.I.: LAURO S.p.A- COGEFATorino automatic underground - Line 1 - South extension - Section Porta Nuova-Marconi. Executive project of civil worksExecutive Project

Page 21: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

MIDDLE EAST AFRICA COMPANY

CARENA S.p.AASR 47/04 - SALERNO-Reggio Calabria Highway -Road stretch 2° - Section 4° - Lot 3° - from km. 221+443 to km. 225+800 - works to modernize and adapt to the class 1A standards C.N.R./80. Executive Project

SIS ScpaPrivate Tender with urgent procedure for the award of work: Macrolotto n.2: highway SA-RE - Works of modernization and adaptation in the following lots unified: highway SA-RC: works of modernization and adaptation to the type 1/a of the standards CNR/80 - Road stretch 1°, section 7°, Lot 1°. Highway SARE: works of modernization and adaptation Road stretch 1°, Section 7°, Lot 2°, from km 117+000 to km. 123+800Executive Project

Alessandria ProvinceOutside variant the town of Morano sul Po on Ex S.S. 31 Bis Monferrato Chivasso. Entrust the task for the final project of the viaduct on FF.SS. And on S.P 25, in corrispondence of the section 59Final Project

Mbiama - Warri RoadPreliminary Project, Final Project & Executive Project

Page 22: MIDDLE EAST AFRICA COMPANY - meac-ec.ch · MIDDLE EAST AFRICA COMPANY QUALITY M E A C activities of planning plants, mechanical, electrical for industrial and civilians buildings,

[email protected] www.meac-ec.ch