mine warfare c4isr 25 july ‘01. outline “transformation” m/mhc c4i modernization architecture...

24
Mine Warfare C4ISR 25 July ‘01

Upload: myrtle-carpenter

Post on 11-Jan-2016

223 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Mine WarfareC4ISR

25 July ‘01

Page 2: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Outline

“TRANSFORMATION”• M/MHC C4I Modernization• Architecture for C4ISR in a Mine Environment

– Background

– Purpose

– Products

– POA&Ms, short and long term

– Related Efforts

Page 3: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

C4I Ship Modernization (IT-21) and D-30 Process

• IT-21 install for MCM includes:– ADNS (Automated Digital Network System)– CFCP (COTS Fleet Communications Package)– GCCS-M (NT)– INMARSAT B HSD

• MCM Schedule:– 8 MCMs by ‘01 (2 Japan, 2 Bahrain, 4 CONUS)– 4 MCMs in ‘02 per D-30 process– 2 MCMs in ‘03 per D-30 process

Page 4: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

C4I Modernization (IT-21) and D-30 Process

• IT-21 install for MHC includes:– ADNS “F” Variant (smaller, less expensive)– CFCP – GCCS-M (NT) – INMARSAT B HSD

• MHC Schedule:– 10 of 12 MHCs get INMARSAT B HSD in ‘01– Other components begin in ‘02 subject to CLF prioritization/funding– CMWC position supports D-30 process

Page 5: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture for C4ISR in a Mine Environment

e -

far

Co

ta

Page 6: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture Background

• Numerous MIW C4I-related Initiatives and Programs:

– D-30 Process and C4I Modernization (IT-21)

– MCM/MHC LAN IPT

– MIW Network Centric IPT

– ICWS/GCCS-M Integration

– GCCS-M/MEDAL Interface Issues

– Organic MIW System C4I Integration

– Others

Page 7: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture Background

• MIW C4ISR Master Plan, SEP 97– Information needs updating

• ICWS• IT-21 installs for MCM/MHC• Siprnet • MEDAL• MCM/MHC LAN

– Does not adequately address organic systems– “Top 10” requirements list out of date– SPAWAR no longer uses “Master Plan” format

Page 8: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture Background

• Architecture for C4ISR in a Mine Environment

– DoD Architecture Framework Version 2.0, DEC ‘97• Establishes requirements for DoD C4ISR architectures• DASN RDA CHENG using as master reference for C4ISR

– CSS tasked to complete MIW C4ISR Architecture IAW Framework document in FY01

• Includes “Essential” products required for an Architecture• “Supporting” products will follow as necessary

– MIW Network Centric IPT• PMS 490 and N752 Co-Chair • Evolved into “Architecture working group”

Page 9: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture Background

• MIW Architecture Working Group• Core Group:

• Requirements: N752, N62, CMWC, NAVOCEANO• Systems: PEO MUW (490/210), PEO A, SPAWAR 051• Fleet: UMCM, SMCM, AMCM IPT reps, OMCM IPT rep

• Other Participants:• DASN MUW• PEO MUW - EOD, 403, 411• SPAWAR - 04F, 155, 157, 158, 182• CNO - 096, N2, N76, N77• SWDG• ONR, NAWC AD, NAVAIR, JHU/APL, ARL/UT

Page 10: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Purpose of the Architecture• Focused, Fleet-based reference for C4ISR

systems requirements– exposes shortfalls in C4ISR– drives acquisition resource priorities– driven by (common) TACTICS

• Basis for C4I Support Plans, required for all

Operational Rqmts Documents (ORDs)• Master reference for:

– systems integration requirements– interoperability in combined/joint environment

• Forcing function for integration of CVBG/ARG

and supporting MCM assets

Page 11: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture “Essential” Products• “All” Views

– AV-1: Overview and Summary Information

– AV-2: Integrated Dictionary

•“Operational” Views– OV-1: High-Level Operational Concept Graphic

– OV-2: Operational Node Connectivity Description

– OV-3: Information Exchange Requirements

• “Systems” Views:

– SV-1: Systems Interface Descriptions

• “Technical” Views:

– TV-1: Data/Systems Implementation Standards

Page 12: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture Context

• Includes dedicated and organic MIW systems

expected to be in the fleet in ‘05 - ‘07• Addresses three operational MIW environments:

– Peacetime: Battlespace Preparation– SLOC Scenario (MCM and Mining)– Amphibious Landing Scenario (MCM and Mining)

Page 13: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

RMS

DDG

MCM-1

MHC-51

MH-60S withAMCM suite

MH-53E withAMCM Suite

LMRS

MCMC,EOD MCM

MCMC, EOD MCM

CONUS

OTC, MIWC, MH-60SAMCM crew

CV

DDG crew (RMS operators)MH-60S AMCM crew

SSN

SSN Crew(PUMA, LMRS operators)

BOUNDARY

CMWC, NAVOCEANO,NAVEODTECHDIV, ONI,

# Fleet CDR, CSS,

Forward DeployedFacility

NAVOCEANO SHIPS

MCMDIVMH-53E AMCM Crew

Sweeps(SLQ-38/38)

SQQ-32, SLQ-48

Surveillance andReconnaissance

“OV-1” for Peacetime Battlespace Preparation

Side Scan Sonar

Side Scan Sonar

Amana

MinelikeContacts

Page 14: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

RMSDDG

MCM-1

MHC-51

MH-60S withAMCM suite

MH-53EAMCM

MSC

LMRS

MCMC, MET/METOC OA,BMT, EOD MCM,

MH-53E AMCM crew

MCMC,EOD MCM

MCMC, EOD MCM

CONUS

OTC, CWC, MIWC,MET/METOC OA,

EOD MD, MH-60S AMCMcrew, BMT

CV

DDG crew (RMS operators)MH-60S AMCM crew

RHIB

SSN

SSN Crew(PUMA, LMRS operators)

CMWC, NAVOCEANO,NAVEODTECHDIV, ONI,

# Fleet CDR, CSS

LCAC

LHA/LHD

LSD/LPD

CATF/CLF, MIWC, CWCMET/METOC OA,

EOD MD, MH-60S AMCMcrew, BMT

BFC, VSW MCM, EODMMS, SEAL, LCAC crew

MH-60S withAMCM suite

BOUNDARY

Surveillance andReconnaissance

SQQ-32, SLQ-48

Sweeps(SLQ-38/38)

mammals

divers

Other BG/ARG units

“OV-1” for Amphibious Assault Scenario

Page 15: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Ref No.

Information From To Size Rate

1Request for

AssetsMIWC OTC/CATF 3 MB x

Kb/sec

12MCM

Tasking MCMC

MCM Crew DDG Crew

MH-60 Crew SSN Crew,

etc...

1 MB y Kb/sec

21In Situ

METOC Data

MHC Crew MCM Crew

MH-60 Crew EOD MCM VSW MCM

MCM DIV 10 MB z Kb/sec

OV-3 Information Exchange Requirements

Sample

Page 16: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Ref No

Information From To Size Rate

1Request for

AssetsMIWC OTC/CATF 3 MB x

Kb/sec

12MCM

Tasking MCMC

MCM Crew DDG Crew

MH-60 Crew SSN Crew,

etc...

1 MB y Kb/sec

21In Situ

METOC Data

MHC Crew MCM Crew

MH-60 Crew EOD MCM VSW MCM

MCM DIV 10 MB z Kb/sec

Do we have the systems

to do this?

OV-3 Information Exchange Requirements

Page 17: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Architecture for C4ISRin a Mine Environment

Info ExchangeRequirements

AV-1

AV-2

OV-1

OV-2

TV-1

SV-1

OV-3OrganicMIW C4IInterface

ICWS/GCCS-MInterface

MEDAL

MCM/MHCLAN

IT-21Systems

Others...

FLEET INPUT

Page 18: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

C4ISR Short Term POA & M ‘01FEB: Distribute MIW C4ISR Master Plan & Draft

Architecture DocumentMAR: Next NCW IPT meeting

– 2-day “chop” session on Draft Architecture– Determine & Formalize SPAWAR role in MIW C4ISR

MAR: Send Draft to Fleet (MCMRONs, Organic Team)APR: Interim IPT meetingMAY: Next NCW IPT meeting

– Final “DC” Chop on Architecture– Long Term POA&M

JUN: Send Draft to Fleet (MCMRONs, Organic Team)• JUL/AUG: Architecture Briefs to the Fleet • SEP: Prepare Fleet-generated POM 04 C4ISR Issue Papers

Page 19: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

• Initial brief to senior fleet– Background: Requirement for Architecture– Our (top down) process and the shortfalls exposed

in Version 1– Our connection to Fleet Engagement Strategy and

Mainsteaming Mine Warfare– Long Term Plan for Architecture

• Connect top down to bottom up in IERs• C4I Support Plan

• POM-04 Issue paper reviews• Take aways:

– Reconciled POM-04 Issues– MIWC “Turnover Package” elements– Fleet Architecture POC’s

Architecture Briefs to Fleet

Page 20: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

MIWC “Turnover Package”• Elements that make up the MIWC’s continuous SA

– Battlespace preparation• Priorities/Tasking for Environmental Data Collection

- Q-routes and CVOAs• Threat (Mines and Tactics)

– Offensive MCM plan (C5F Countermining CONOPs ‘98)• Targeting priorities• I & W• ROE

– Status of MCM assets (dedicated & organic)

• IDTC inputs– MIW-related training requirements– Pre-deployment mine scenarios (JTFEX, BG/ARG IT)

Page 21: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Next Step when Architecture is “Done”

• MIW C4I Support Plan- C4ISP already a CJCS requirement for individual

systems - SPAWAR (051) C4ISP experts available to draft &

maintain- Can tailor C4ISP to include useful parts of ‘97

Master Plan- Prioritized C4ISR shortfalls- Tables and figures

• Establish MIDIS

Page 22: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

MIW Information Exchange Requirements Definition

Information System (MIDIS)• Access Database that stores C4ISR info as a

“dynamic” representation of OV-3

• Single location for information about activities, information exchange mechanisms and shortfalls

• Long term: Repository for actual data collected during ops/exercises in order to establish OV-3 that continuously reflects reality

Page 23: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

C4ISR Long Term POA & M

OCT ‘01: POM-04 C4ISR inputs

‘02: MIW C4I Support Plan

Begin adding ASW Considerations

‘03 - ’07: Update Architecture and C4ISP

regularly (periodicity TBD) to:

- Stay ahead of OMCM systems

introduction

- Incorporate technology upgrades

- Identify shortfalls

Page 24: Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Related Efforts• CVBG/ARG MIW CONOPS, CLF/CPF

• End-to-End OMCM Assessment, PEO MUW

• Mine Warfare Fleet Engagement Strategy, N752

• Mainstreaming Mine Warfare, N752

• Common Undersea Picture (CUP), ASTO/N74/PEO MUW

• Horizontal Integration, SPAWAR 051

• Naval Integrated Information Network IPT, SPAWAR 051/NAVSEA 05J