EIS 666 Vol 2
Mining, rehabilitation and environmental management plan for
the Mineral Hill mine
Mining, Rehabilitation and Environmental Management Plan
for the
Prepared by RW. Corkery & Co Pty Limited.
NSW DEPT PRIMARY INDUSTRIES
ABO1 9298
Mining, Rehabilitation and Environmental Management Plan
for the
Mineral Hill Mine Volume 2
On behalf of:
Triako Resources Ltd (and subsidiary Buka Minerals N.L.) Cyprus Mines Corporation Joint Venture P.O. Box 87 CONDOBOLIN N.S.W. 2877
Telephone: (068) 93 7219 Facsimile: (068) 93 7268
Prepared by:
R. W. Corkery & Co. Pty Limited Geological and Environmental Consultants P.O. Box 80 ORANGE N.S.W. 2800
Telephone: (063) 62 5411 Facsimile: (063) 61 3622
February, 1989 Report No. 143/3
VOLUME 2
PLANS AS AT FEBRUARY, 1989
Plan I Local Sefting and Land Ownership Plate 5 Development of the 5001 Pit (16/2/1989). (Ref: 143/G6, 7, 8)
Plan 2 Site Layout Plate 6 Haul road leading to the main waste rock dump (background)
Plan 3 Tenement Location and Geology (16/2/1989). (Ref: 143/F19, 20)
Plan 4 Geological Cross Sections Plate 7 5001 waste rock dump (16/2/1989). (Ref: 143/G24)
Plan 5 Eastern Pit, Final Configuration Plate 8 Active tipping on the 5001 waste rock dump (16/2/1989) (Ref: 1 43/G9)
Plan 6 Eastern Pit, as at February 1989 Plate 9 Tailings disposal dam (middleground), collection sump (centre left)
Plan 7 Main Waste Rock Dump and main waste rock dump (background) (16/2/1989). (Ref: 143/G12,
Plan 8 Tailings Dam 13,14)
Plan 9 Site Layout Offices and Plant Plate 10 Entrance sign to Mineral Hill Mine (16/2/1989). (Ref: 143/F4)
Plan 10 Treatment Plant Flow Sheet Plate 11 Access road (Shire Road 47) upgraded (16/2/1989). (Ref: 143/175)
Plan 11 Water Management Plate 12 Internal haul road with topsoil windrowed at the sides (16/2/1989). (Ref: 143/G21)
Plan 12 Design of Water Management Structures Plate 13 Production groundwater bore PB-i (16/2/1989). (Ref: 143/1715)
Plan 13 Vegetation Plate 14 Construction phase of water management structures - tailings dam
Plan 14 Site Rehabilitation Programme (centre middle ground), collection sump (left middle ground)
Plan 15 Final Landform (17/10/1988). (Ref: Co4)
Plan 16 Environmental Monitoring Sites Plate 15 Construction phase - waste rock armouring of runoff dam wall
Plan 17 Archaeological and Historical Site Management (6/10/1988). (Ref: Co5) Plate 16 Sealed exploration drill holes within the tailings dam area
(19/10/1988). (Ref: Co6).
Plate 17 Creek diversion sown with grass in autumn 1988 (16/2/1989).
PLATES Plate 18 Stripping of topsoil - runoff dam area (24/6/1988). (Ref: Co7)
Plate 1 Mineral Hill Mine site layout looking east. The offices, workshops and Plate 19 Stockpile of topsoil stripped from the tailings dam area - sown in
treatment plant are located centre middleground. The tailings disposal autumn 1988 (19/10/1988). (Ref: CoB)
dam and waste rock dump are in the background (Feb, 1989)). Plate 20 Runoff dam bywash sown in autumn 1988 (19/10/1988). (Ref: Co9) (Ref: Col)
Plate 21 Seed and fertiliser trial plot No. 1 - sown in autumn 1988 (16/2/1989). Plate 2 First blast in the Eastern Pit - the access ramp (23/7/1988). (Ref: Co2) (Ref: 143/F22)
Plate 3 Development of the Eastern Pit during the construction phase (20/7/1988). (Ret: Co3)
Plate 4 Development of the Eastern Pit during the mining phase (16/2/1989). (Ref: 143/G18, 19)
TRIAKO RESOURCES LIMITED I
Plan 1 FEB. 1989
RW. CORKERY & CO. PTY. UMITED rE-= GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N° 143
LOCAL SETTING AND LAND OWNERSHIP
TRIAKO RESOURCES LIMITED
R E F E R E N C E
Minrng Lease Boundary
Watercourse
Contour (Interval = 5m)
Fence
Access Rood
Soil Storage
Low Grad. Ore Stockpile
Pa/en//al Low Grade Ore Stockpile
Exploration Area
SCALE 1:10 000
0-I 0 0/ 02 0-3 04 05km
F&W. CORKERY & CO. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N9 143
- C0l0Yo4,;,
Entn*ce Gate
Plan 2 FEB. 1989
SITE LAYOUT
ORIGINAL SUPPLIED BY
TR/AKO RESOURCES LIMITED.
RW. CORKERY & CO. PlY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT Nq 145
I A A fr A
32O
TRAKO RESOURCES LIMITED TRIAKO RESOURCES LIMITED
MINERAL HILL PROJECT TENEMENT LOCATION AND -
GEOLOGY
'I v v v} v v v v( \T— ----------------------------ij / V V V ::::::::::::::::::. —-------- ::::::ri::::::::
/ V V V
V V A A A
VIV V AAAA ..... I + .......... A A A A V V V ::.....:...ry.:::Bogong:: A A A /A + + A A A A + + + V V V V ......................S.. A A +/ + + + +
V V V ::::::::::::::::::: MI_8: Pb/Ag AE.L 1999 ................................ •
I.... IV V V .
s..Au ,. # A A A A A A A • ..... ++ + + + + ++ + + +
A A A A A A . + + + + 4 ... Pb/ A A A A A Cu/pu + + + + + V V V.Z A A A AIIA ++ + + + A A/A A V V V :::.::: Y......... A A A A + + + + . + + + + V V V AA4AAAAAUA .1.... A\d A A A A A IA A A IV V V .A A' A A A A A A. A
A A A A A JA AA A A A A A,.,A A A
-- . ............ -- A
A A A AlAAA A A VV A AA A A A A A - A A / A)AA A A A V V V V ..A A A.A2A A A A :... ....:::: A A\ A/A7A A A A
A - A A
A A V V j # A/A# Zn/j.bAAAA VV V V .Ik-A A A A A A A A A A A A A
A A A A A A A V V V............:.....:.:.:...: A A A A A A A A A A
A A A A A A V V v...... A A A A A A A A
A A A A A A A A
v\.v V V . A A A A A
\\ ............A A A A
A A A A ...... A Zn
A A A A Vy V •i•j.....................................A A A A A A
A Apk A A A...... .:.: V -_. ........................................A A A A A A
A A A A A V V A AAAAAA
, V 1 11
V ±i
I
MAP AREA J. ,...................... WUmath Zraii+e .
uarf - Fe!spar —T— A Porphyry • SYDNEY Hervey Group LA788J. rrrjEW SCUTH WALES
\i Baledmund Formation .
.\\o
Majuba Volcanics Li00
Mineral Hill Volcanics SCALE 0 4km
Grilambone Group
14700'
Plan 3 FEB. 1989
TENEMENT LOCATION
AND GEOLOGY
Ab o o\6 I' 0 01 P ? 1
EASTERN PIT CROSS SECTION
TRIAKO RESOURCES LIMITED 1
REFERENCE
- - Pit Out//ne
Ore Zone
Dr//I Hole
Ore Intersect/on
0 o 0 0 (\J w 0 0' 0' 0 0' 0) - I I I
5001 PIT CROSS SECTION
Sur foce
—RL 500 RL 500 -
RL 450 -
RW. CORKERY & CO. PTY. UMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N? 143
CCES
PUMP SUM? . SECTION,'
LONGITUDINAL SECTION
WESTERN AREA UNDERGROUND MINE
Plan 4 FEB. 1989
GEOLOGICAL CROSS SECTIONS
pin
ul
TRIAKO RESOURCES LIMITED
RW. CORKERY & CO. PlY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N9 143
SCALE 1:1500
20 0 20 40 60 80 lOOm Plan 5 EASTERN PIT FINAL CONFIGURATION
TRIAKO RESOURCES LIMITED1
91
30021
.- 297- 31
297- 37 s— \
REFERENCE
Contour (Interval = 5m)
Boundary of P/f
30551 Spot Height (m, 4.HL)
29596*10*
59
295
• 295-06
298- 31
28•
295—_%s4s("
+29442
29531 -98
294 • 294-76 295-17
,Z959 .294-98
296-09 .297-94
295 6
29524
89 .291-45
5./62
29490+295-18
.290-46 295-21
29524 290.48*
295-59 29555+
29603 + 296-61
.54 1
05-92
/ 305
+ 30572
304- 15
.30605
306-12 305-79 300 33•
305-51• 13 . 29545
• 296 28 30937
299-16 03
298-99 \
300- 55 300-02
+30226 301-79
303-09
30376 I
130542
R.W. CORKERY & CO. PTY. LIMITED - GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N9 143
SCALE I : 1 500
20 0 20 40 60 80 lOOm 1 Plan 6
EASTERN PIT AS AT FEBRUARY 1989
TRIAKO RESOURCES LIMITED I
REFER ENCE
Can/our (Interval Bin)
-, Fence
Bat/er Slope
SCALE I : 2500
50 /00 /50m
LEVEL OF DUMP FEBRUARY, 1989 CAPPING OF OXIDE
340
300
N
280
SECTION AA' 280
RW. CORKERY & CO. PTY. UMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N° 143
SCALES
HORIZONTAL 1 2500
VERTICAL 1 1250
VERTICAL EXAGGERATION = 2
Plan 7 Feb. 1989
MAIN WASTE ROCK DUMP
TRIAKO RESOURCES LIMITED
_
Proposed Trial Rehabilitation Plot Initial Decant Tower
£
J-Central Decant Tower
porory Bund
-
SCALE I : 2500
50 0 50 /00 /50m
RW. CORKERY & CO. PTY. UMITED GEOLOGICAL ANO ENVIRONMENTAL CONSULTANTS
PROJECT N° 143 ell vrt
qt
Plan 8 Feb., 1989
T A I L I N G S DA
/ POTABLE W TER
CORE SHED
ION LPG lANK
00 corpark
MALE ABLUTION
I ii 1 FEMAL
I I ABLUT CRIB ROOM
ADM IN. OFFICE WORKSHOP
CYANIDE MIX TANK —1
TRIAKO RESOURCES LIMITED
kaaaa
Di:JEJDO DDED
I 1 CONCENTRATE 000001 STORAGE I (II) I
TANKS
FINE N° 2
conve or cV5 D (
LEACH
MILLS ILO
Conveyor C V 4 FINEORE BIN N° I
7YARD TCH\
LI
C 0
-
r
Cn
Ix
-f LI SCALE 1:500 - z conveyor CVI
5 0 5 /0 /5 20 25
SCREEN
ORE RECIEVAL HOPPER
RW. CORKERY & CO. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N9 143
SOURCE. United Constructions Pty. Ltd Drawing 780-10- 02.
Plan 9 FEB. 1989
SITE LAYOUT, OFFICES AND PLANT
TRIAKO RESOURCES UMifED
FLOTATION GOLD/HIGH COPPER ORE
CARBON IN PULP PLANT GOLD/ LOW COPPER ORE
CYCLONE OVERFLOW
TANKS
CRUSHING
RUN OF MINE ORE
STO)
PRIMARY JAW CRUSHER
<150 mm
SECONDARY CONE CRUSHER
<20mm
'I; VIBRATING SCREEN
<12mm
ORE BINS
/\ I4GH COPPER LOW COPPER
ORE ORE
TO GRINDING
CYCLONE OVERFLOW
I, SCAVENGER FLOTATION
I 1--j
CONCENTRATE
I CLEANER FLOTATION
TAILINGS
COPPER/GOLD CONCENTRATE
1 THICKENER
1 FILTER
I STOCKPILE IN STORAGE SHED
GOLD ROOM LOADED CARBON
SODIUM SODIUM CYANIDE HYDROXIDE
STRIPPING COLUMN
PR EGNANT ELUATE
I ELECTROLYTIC
REACTIVATION CELL
KILN
GOLD DEPOSITED I
I ON STEEL VOOL CARBON RECYCLE
I BARRING FURNACE
1 GOLD BUILLION
GRINDING
ORE <12mm
WATER LIME
BALL MILL
'I, CYCLONE
>12mm >100pm
OVERFLOW <100 urn
ACTIVATED CARBON
ADSORPTION TANKS
AIRLIFT
4, CARBON
RECOVERY SCREEN
4, ACID WASH
4,
TO GOLD ROOM
TAILS
TAILINGS DAM
4, WATER RECYCLE
TRASH SCREEN
SODIUM CYANOE
R.W. CORKERY & CO. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
Source: Mining and Mineral Processing Ply Ltd Figure 2.9 of the Environmental Impact Statement, dated November, /987
Plan 10 FEB. 1989
TREATMENT PLANT FLOW SHEET
I I I MI 33
I I I I I
ML340
I I I I I I I
TRIAKO RESOURCES LIMITED I
REFERENCE
Mining Lease Boundary
Watercourse
- --- Contour (Interval = 5m)
- - Fence
Access Road
Soil Storage
- - Collection Drain £ £
Diversion Bank
__ J Sect/on through Water Management Structures (See Plan /2)
(I
SCALE I: tO 000
- 0/ 0 0-1 0-2 03 04 0-5km
-
I I I I I
RW. CORKERY & Co. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N 143
Plan 11 FEB. 1989
WATER MANAGEMENT
Natural Surface
GRAVEL FILL I00% PASSING 75mm - -5°/ PASSING 0075rrin
150 SLOTTED PLASTIC PIPE
GEOTEXTILE
VARIES IL 30620 TO IL 30800(EVENLY GRADED)
25m
I RL VARIES
L VARIES IL 305000 SUITABLE SPOIL TO IL 306000 FROM DRAIN
NOTE: SPOIL ROCK FROM DRAIN EXCAVATION BY SPREADING OVER EMBANKMENT
5Om
Natural Surface
E 0
SELECT GRAVEL7 3Om
GEOTEXTI LE LAP lOm OVER CLAY LAP O5m OVER PRECEDING LAYER 2
Natural Surface
CLAY FILL
SECTION AA
2
OTHER FILL-ROCK SPOIL fl FROM MINE
- REMOVE SOIL COVER TO ROCK
TAILINGS DAM
TRIAKO RESOURCES LIMITED
r
RAISE ACCESS ROAD IN 4Om
INCREMENTS TO SUIT INCREASE IN HEIGHT OF DECANT TOWER
E ROCK FILL OVER TAILING TAILINGS
Natural Surface
SECTION DD ACCESS ROAD BUND O5m
300mm OF DUMPED ROCK 25m FLATTEN DOWNSTREAM
OVER UPSTREAM BATTER FROM I2 IN CLAY
FACE AND TOP OF DAM I TO :25 IN ROCK.
RL 307 000 RL 306-700 TO CLAYFILL
CLAY FILL Natural
2
11 CUT OFF TO WEATHERED ROCK_ i
SECTION BB PROCESS WATER DAM SECTION EE CUT OFF DRAIN
TAILINGS DAM
SECTION CC DIVERSION DRAIN SECTION FF SEEPAGE DRAIN
Plan 12 FEB. 1989
DESIGN OF WATER MANAGEMENT STRUCTURES RW. CORKERY & CO. PlY. LIMITED
GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS PROJECT N° 143
NOTE: SECTIONS NOT TO SCAL E
SEE FIGURE /0 FOR LOCATION OF SECTIONS.
BASE PLANS FROM MACDONALD WAGNER PTV LTD DRWG. N° UNCII5 / 02.
TRIAKO RESOURCES LIMITED
R E F E R E N C E
Mining Lease Boundary
''----- Watercourse
Contour (interval 5m)
Existing Access Road / Track
Proposed Access Road
I I /.luggo
Grey Box / White Cypress
IIIiM(II 8,,nb/e Box/White Cypress
White Cypress Pine
Mallee (Owyers Green Ma/lee)
1 00 oj I 00 q Be/oh
SCALE I :10,000
0/ 0 Cl 02 03 04 05k1n
Plan 13 FEB. 1989
VEGETATION
I I I I I I I I I I I I I I I I I I I 1 I
/
RW. CORKERY& CO. YIY. LIMITED SOURCE Figure 36 of Env,ronnienfa/ Impact
GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS Statement, dated November 1987
PROJECT N° 143
REFERENCE
Access Road
- FeQce
Soil Storage
Tree Planting (/989)
SCALE 1:8000
Tree Planting Programme 1989
Location Configuration
Tree Numbers Row I Row II
Iron Bark Cyprus P. Mallie G. Casuarin Total
Main Waste Rock 2 rows x 300 m each 30 30 30 30 120 Dump Waste Rock Dump 2 rows x 45 m each 45 45 45 45 180 (5001) Gravel Pit Staggered plantings 10 10 10 10 40
Access road and low Staggered plantings 15 15 15 15 60 grade ore
400
Main Access/ Tailings Block plantings Aleppo pine 25 Dam
T.e..l ii. 425
, -
Pcrkers Hill
I,
/
RUNOFF DAM
/
E VOL.,l02OOm
ASTERN PIT
JMt McrshlI VOL,5300m3
TAL PLO1
t0fl
UNDERGROUND MINE WESTERN
7 [PIIII
ROWS (90)
I '
Z \* 7 \%%
- 5001 WASTE ROCK
DUMP t
TRIAKO RESOURCES LIMITED
Grass Sowing Programme
Sowing Period I Areas
- All soil stockpiles Spring 1988 Creek diversion
- Road verges Runoff dam bywash
Maintenance resowiriq of above areas Autumn 1989 : Office entrance and pTant area vicinity
- Drains/waterways around tailings dam
I *See Section 7.2 for details of sowing mix of grasses and fertilizer application
I 0/ 0 0/ 02 03 04 05km - - - -
:J VOL,3OOOOm
I I R I I I I I I I 1 I I I
. via, ,Ui I IIJCI
*Spj plantings are to be alternated 10 m apart in row and staggered conguratioflS - -
2 ROWS
2
I I I I I
STAMYE PLANTINGS (eo
(60)
Plan 14 FEB. 1989
SITE REHABILITATION PROGRAMME
RW. CORKERY & CO. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT Nq 143
ALEPPO PINE (25)
- CO/7o26
11; 7
r aw. CORKERY & CO. PTY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N 143
I TRIAKO RESOURCES LIMITED
j c
\ \ / cne
/ cøCp/ -
Western Underground ----'f-- c Mine sealed.
N 0
I
/
POSSIBLE \--1 -- oic
EXTENSION lt
1t _c/
OX
it '—o PROBABLE ? 7 CONFIGURATION 1 (
j \ SCALE 1:10000
- 0-1 0 0-I 0-2 0-3 04 0-5km
N
F-A
Boulder barrier to prevent access to pit.
I / Overflow to
-X Eastern Pit
NOFF DA EMAINS
RE FE R EN CE
External Mining Leases Boundary
Watercourse
Existing Contour (Interval = 5m)
'- -- ---. Proposed Con/our
- 1.1/ne Perimeter Fence
Access Road
gc---- .. -
n - - -- -
I --- - -
N N
---- Og
\. \, Plan 15 FEB. 1989
FINAL LANDFORM
I I 1 I I I L I I 1 I I I
I I I
ML 333 M HN - ___-----
ML33
GRADE
/ \ IPIT CK P IL
5001 WASTE ROCK - DUMP
NT co
4 HW- ii ML 338
Ff frg
- 0g
SCALE 1:10 000 / 0 / 2 3 4 5km
ML340
ML52
ML5G
ML339
R.W. CORKERY & CO. PTY. UMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N° 143
I I I I I I I I I I I I I I I I I I I I I
MHW-.3
ML334 50c
ML5267 0/ I;{/
;;•
/ 1
Mt Marsha/I
WESTERN I ( ( •-; / U.NDERGOUND MINE
/-4\---- ! 1)y-
L3a9
ERN PIT
ML 336
ML335 HW -2
ML5499
RUNotF DAM
I
ç __ 46?65
LOW GRADE ORE ;STOICKPILE
MHI- 2 ) \
M-4 c1 ML 337
TRIAKO RESOURCES LIMITED 1
R E F E R E N C E
Mining Lease Boundary
-.--- Watercourse
Contour (Interval = 5m)
— - Fence
Access Rood
Soil Storage
Water Sampling Site
Waler and Stream Sediment Sampling Site
A Noise Monitoring Site
* Blast Monitoring Site
Residence
S Groundwater Production Bore
"Wilmaf/,o"
Glenloy,, •
"Glen inga .A MHN-3
40aks
•WL'estrange MHB-I Bog MHB- o;
MHN-• "Wi/go
SCALE 2 0 2 4 6km
Plan 16 FEB. 1989 ENVIRONMENTAL MONITORING SITES
TRIAKO RESOURCES
NOTE Protective fence constructed around carved tree.
QMH5 REFERENCE
Mining Lease Boundary
Scarred Tree
0 Carved Tree
Fence
Access Rood
o Open Campsite
* Iso/a/ed F/nd
FMH4--1 Significant Archaeological Site
Application for Consent to Destroy
Old Mine Shaft
c '4-6-II
Dam Bywash
1F5 Parkers Hill *
N
N / Mt Marshall
/ WESTERN / UNDERGROUND MINE
MHH
PIT
RUNOFF DAM
Stamp
/ LOW GRADE ORE r STOCKPILE
NOTE Stamp battery has been claimed and removed by local landowner during 1988.
Iodide Shaft MAIN WASTE
ROCK DUMP
SCALE I: 10 000
0/ 0 0/ 02 03 04 05 frm
I•TAILINGS ll 111
IMHl4I
* 1F4
RW. CORKERY & CO. PlY. LIMITED GEOLOGICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT N? 143
H15 Plan 17 FEB. 1989
ARCHAEOLOGICAL AND HISTORICAL SITE MANAGEMENT
--
t '- - - -. --.--- - - - -: - -. - -" - -
3 ' - - •47*
-z - f- '!
- t
- -- - - 1'
-; - - - - - -
, 1$: - -
fir 59
*
( -
l r F( - S.. 7j
- -
- *
'
------------ 401
77777
44. - -- . - -- - - - - -. ,---.--
r
Plate 1: Mineral Hill Mine site layout looking east. The offices, workshops and treatment plant are located centre middleground. The tailings disposal dam and waste rock dump are in the background (Feb, 1989)). (Ref: Col)
C
Plate 2: First blast in the Eastern Pit - thr access ramp (23/7/1988). (Ref: Co2)
Plate 3: Development of the Eastern Pit during the construction phase (20/7/11988).( Ref: Co3
IV
-41114 -:
--P 1 -
-
___t•_ -
- --:
-; - - -- . - - •
Aim
4
Plate 4: Development of the Eastern Pit during the mining phase (16/2/1989). (Ref: 143/G18, 19)
--
* - *
I ½i: ' I - - - -. S - - -I - • - - -
L ___ ___ -
"-S. -.,, '-S
.,S -. -'-S. -. -'5-
S_S. - 5••
A.
- -. -- - 414.
Yv.
40
,
I
Plate 5: Development of the 5001 Pit (16/2/1989). (Re;. 143/G6, 7, 8)
'*•-----:•--'-----' " '-'-":"" IN 'N V S .,...,.. . . . . /
. 5
Up
-
- .•• - -
.,. - .
5- .5 .,--
W' 5- ' ':-'' •5.S_
"'A l .. --- .. AIM '-' - * _ 5
• J-S _S'SS. " i'- - - •;_ t. 5- *
S - 5-5.th .,,
I Platt 6: Haul road leading to the main waste rock dump (background) (16/2/1989). Ref: 143/F 19, 20)
-:.;: A:. .- . •••:-• - •: : - y •' - -
- p
I-
I Ii I I
I I I I I
Plate 7 5001 waste rock dump (16/2/ 1989). (Ref: 143/G24) Plate 8: Acti'c tipping on the 5001 waste rock dump (16/2/1989)
(Ref: 143/G9)
MR
IE
A.
- - I
-- --
- ,.- a_Ia -
- .'-. 1 1 -. F -
. f •1 • - - ' ..' - -.. - -
- . •• .• - - . .-... . . . .... .-.-.. .-9 ...
Plate 9: Tailings disposal dam (middleground), collection sump (centre left) and main waste rock dump (background' (16/2/1989). (Ref: 143/G12, 13, 14)
- --
Plate 11: Access road (Shire Road 47) upgraded (16/2/1989). (Ref: 143/F5)
I
I tr HILL
z -
I #' PROJECT JOINTtWnJReP'TWteJ
I pO RESOURCES LTD (19q7) b4*iI
CYPRUS MINES C0RPOMIJO& (101) &&AJ Tr91J IW)WW
- - IREED consmuciici.
AA lU TfESS CNTRTORS. -,
'fcrr b?tL 4*V 91øJtfl) TOW6 WASTE /W 11Xi1)(11 lt)V4r5 ce
I - '°
MEW
Plate 10: Entrance sign to Mineral Hill Mine (16/2/1989). (Ref: 143/F4)
- ••j-* mp *
, -
77
z
- 4
: ---
F,-
I
I
I
I
fl I
I
Plate 12: internal haui road with topsoil windrowed at the sides l'iaie 13: Production groundwater bore PB-i (16/2/1989). (Rel: 143/F1) (16/2/1989). (Ref: 143/G21)
.... .-.
4
- -. -
Plate 14: Construction phase of water management structures - tailings dam (centre middle ground), collection sump (left middle ground) (17/10/1988). (Ref: Co4)
Plate 15: Construction phase - waste rock armouring of runoff dam wall (6/10/1988). (Ref: Co5)
d.
-
—
Plate 16: Sealed exploration drill holes within the tailings dam area Plate 17: Creek diversion sown with grass in spring 1988 (16/2/1989). (19/10/1988). (Ref: Co6) (Ref: 143/1725)
III -
IN
...,.
(Pqt
..;i -.-
Plate 18: Stripping of topsoil - runoff dam area (24/6/1988). (Ref: Co7)
- . .. .
- -.- .................-- - - • _._ ... 4. - . •., • -
:- - _. . - • . ._; .• . -.•.. - ••.• ••
-
- • . • • - : .
•-.- • . - - - - - _;•
Jw
Plate 19: Stockpile of topsoil stripped from the tailings dam area - sown in
spring 1988 (19/10/1988). (Ref: Co8)
-. . .•. . p
4'-
Al
•••
,- 1 -
I )
-••
47~
-4.-! IP
' am
Plate 20: Runoff dam bywash sown in spring 1988 (19/10/1988). (Ref: Co9)
Plate 2: Seed and fertiiser trial plot No. 1 - sown in spring 1988 (16/2/1989). (Ref: 143/F22)
rIRIAKO RESOURCES LID EIS
666
Mining, rehabilitation and Vol 2
- environmental management plan for
- the Mineral Hill mine
I I I I I I I I 1 I I
TRIAKO RESOURCES LTD EIS
666
Mining, rehabilitation and Vol 2
environmental management plan for
the Mineral Hill mine
I I I I I I I I I I