ministerul mediului Şi dezvoltĂrii durabile romania programming meeting water consultants 5 th of...

35
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

Upload: shona-joy-hensley

Post on 31-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Programming MeetingWater Consultants

5th of March 2008Novotel

1

Page 2: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Short-commings of first MPs

Missing or insufficient elements: MP Summary Summary for each chapter (Abstract) => key

results No clear separate lists of agglomerations No clear calculation algorithm applied for main

agglomerations following a standard pattern used for data costs base.

No clear CF priority list as a result of options analysis and prioritisation

2

Page 3: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Short-commings of first MPs

No specific definition of problems No clear maps for representation of the

agglomerations no clear phasing no transparent lists of investments no real options studied no clear, limited number of prioritisation and

selection criteria

3

Page 4: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

What should be improved?

Overall Summary Summary for each Section (quantify) Summary of specific information (see next

slide) Two separate lists and maps of

agglomerations (water supply and wastewater)

MP strategic options for each county

4

Page 5: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Specific information and plans summary

5

Page 6: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

What should be improved?

Criteria for investments Investment phases (templates provided) Contribution to objectives (Accession

Treaty)/model List of actions needed and prioritised

investment (including investment costs => templates)

Unit cost table

6

Page 7: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Definition of Agglomerations

Draft Methodology prepared by MESD

7

Page 8: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Approach for Definition of Agglomerations

Implementation Plan Master Plan Feasibility Study

8

Page 9: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIAA) Definition of agglomerations in

Master Plan

Identification of all agglomerations at county level (maps and data base)

“Clustering” of Agglomerations based on techno-economic assessment

Options Analysis (central/de-central) Discussion with stakeholders Preparation of Long-term investment

plan

9

Page 10: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

B) in Feasibility Study

Detailed option analysis Preparation of final/detailed maps

and data base on selected agglomerations

10

Page 11: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIAInterpretation of “Definitions for

UWWTD”Scenario c):

Legal requirements (compliance dates article 3 and 4,5 UWWTD) defined by P.E. of each individual agglomeration

Treatment standard defined by P.E. Of biggest agglomeration. No legal requirement for tertiary treatment if all agglomerations in the “cluster” are below 10.000 P.E. However, other Environmental Directives to be considered (WFD, Bathing Water Directive)

11

Page 12: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIAInterpretation of “Definitions for

UWWTD”Scenario b):

Splitting one settlement in two parts (i.e. River crossing the town) is not allowed

Development of future population load to be considered

12

Page 13: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Scenarios “Definitions of UWWTD”

13

Page 14: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Border Line

Cluster Line

Agglomeration

WWTP Interconnection

“Clustering” of Agglomeration

14

Page 15: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Boundary of Agglomeration

15

Page 16: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Definition of Agglomerations

EXAMPLES for AGGLOMERATIONSPrepared by Consultants

16

Page 17: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

How to define an Agglomeration in practice

Define boarders for all agglomerations in the county (settlements very close to each other might be merged to one agglomeration => consider also future development)

Classification of agglomerations in categories Below 2,000 p.e. 2000 – 1,0000 p.e. Above 10,000 p.e.

17

Page 18: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Example RomanExample Roman

page 18

Example for Agglomerations – Detailed Definition of Boundaries

Page 19: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

How to define an Agglomeration in practice

Analyse case-by-case based on the criteria such as: Distance between agglomerations and topography

(altitude) Population/industrial density (p.e./ha) Unit costs for investments (sewer, WWTP, etc.) Specific Investment Costs (in €/p.e.) and specific

Operational Costs (in €/p.e.) => NPV Others (i.e. Recipient water available, land for WWTP

extension, existing capacities, etc.)

19

Page 20: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

How to define an Agglomeration in practice

Prepare option analysis for all agglomerationsconsidering criteria above) One single WWTP versus separate WWTP Storage tanks for small agglomerations / small

WWTP Etc.

Group individual agglomerations in “clusters” of agglomerations (=> scenario c in Definitions of UWWTD)

20

Page 21: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

page 21

Agglomerations – Option AnalysisOption 1 without Nemtisor

Page 22: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

page 22

Agglomerations – Option AnalysisOption 2 with Nemtisor

Page 23: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Cost Data Base – Wastewater Networks

Settlement Size Area Density Sewer Length

Specific Connection

Rate Specific Length

P.E. ha P.E./ha m P.E./m m/P.E.

1.095 110 10 7.800 0,14 7,1

2.611 204 13 11.400 0,23 4,4

2.891 238 12 15.700 0,18 5,4

18.336 732 25 49.100 0,37 2,7

95.914 1.367 70 111.400 0,86 1,2

Density Specific Length

Specific Connection

Rate

P.E./ha m/P.E. P.E./m

10 6,34 0,16

15 4,44 0,23

20 3,44 0,2930 2,41 0,41

40 1,87 0,53

50 1,54 0,65

60 1,31 0,76

70 1,14 0,87

80 1,02 0,98

page 23

Page 24: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Agglomerations – Option Analysis and Cost Tables

Name of Agglomeration: Targu-Neamt (ID der Agglomeration als Dateiname verwenden!)

ID of Agglomeration: NT_013 (Name County_Fortlaufende Nummer)

Data Base

Infiltration Water in Wastewater System 30,00 %

p.e.ak Factor for max. Dry Weather Run-Off 10,00 1/x

Name of Settlemen

tID of Settlement Capita

Supplement Industry

%

Supplement Industry

p.e.

Sp.e.c. Water Cons.

l/Cap/d

Waste Water Contribution

%Total p.e. ha

Pop. DensityCap./ha

Qd m³/d Qmax m³/s

VANATORI-NEAMT 161 5.212 15% 0 135 100 5.994 412,8 12,6 1.052 0,0292

HUMULESTI 92 5.968 15% 0 135 100 6.863 238,0 25,1 1.204 0,0335

BLEBEA 93 2.745 10% 0 135 100 3.020 109,6 25,0 530 0,0147

TARGU-NEAMT 162 12.368 15% 0 165 100 14.223 493,8 25,0 3.051 0,0847

Totals for Agglomeration 26.293 30.100 1.254,2 24,0 5.837 0,1621

Already connected Total p.e. to Network and WWTP 0

Additionally connected Total p.e. 30.100

100%

Investment Cost

Civil Works

Pos. Quantity Unit Unit Cost Total Euro Category

1 Wastewater System Vanatori-Neamt 26.912 m 175 4.709.603 4

2 Wastewater System Humulesti 16.848 m 175 2.948.357 4

3 Wastewater System Blebea 7.757 m 175 1.357.535 4

4 Wastewater System Targu-Neamt, 50 % new for rehabilitation and extension 17.475 m 175 3.058.185 4

5 Gravity Line Vanatori Neamt - Humulesti, DN 400 1.600 m 240 384.000 2

6 Gravity Line Humulesti - Blebea, DN 500 1.850 m 300 555.000 2

7 PS Humulesti Noi 1 lump sum 15.000 15.000 3

8 Pressure Line Humulesti Noi - Humulesti, 110 x 6,6 1.300 m 80 104.000 3

9 Gravity Line Humulesti Noi - Humulesti, DN 200 360 m 155 55.800 2

10 PS Blebea 1 lump sum 36.000 36.000 3

11 Pressure Line Blebea - WWTP, 355 x 32,2 2.300 m 190 437.000 3

12 WWTP Targu Neamt is sufficient for 17.000 P.E., Plant has to be extended 1 lump sum 1.768.460 1.768.460 1

Subtotal 15.428.939

Electromechanical Works

Pos. Item Quantity Unit Unit Cost Total Euro Category

1 1 lump sum 1.178.973 1.178.973 1

2 PS Humulesti Noi 1 lump sum 23.000 23.000 3

3 PS Blebea 1 lump sum 26.000 26.000 3

Subtotal 1.227.973

Summary of Investment

Total Investment Euro 16.656.912

Sp.e.cific Investment related to Total p.e. in Agglomeration Euro/p.e. 553

Allocation according to Master Plan structure

No. Item Description Unit Quantity Unit Cost Total Costs

NT_013

2.1 WWTP pieces 1 2.947.433 2.947.433

2.2 Main Collector m 3.810 261 994.800

2.3 Pumping Station Pumping Station including Pressure

pieces 2 320.500 641.000

2.4 Wastewater Network m 68.992 175 12.073.680

connect. rate / specific costs 100% p.e. 30.100 553

16.656.912

Operation Cost

Pos. Item Quantity Unit Unit Cost Total Euro/year

1 WWTP Targu Neamt O&M 1 lump sum 300.997 300.997

2 PS Humulesti Noi O&M 1 lump sum 1.800,00 1.800

3 PS Humulesti Noi Electricity 8.000 kWh 0,15 1.200

4 PS Blebea O&M 1 lump sum 2.000,00 2.000

5 PS Blebea Electricity 143.000 kWh 0,15 21.450

6 Wastewater Network O&M 0,5 % of Investment Cost of Wastewater Network and Main Collectors 1 lump sum 65.350 65.350

392.797

Discounted Present Value (Barwert)

Interest Rate 3,00 %

Project p.e.riod 30,00 years

Writing Off p.e.riod Civil Works 30,00 years

Writing Off p.e.riod Electromechanical Works 15,00 years

Discount Factor Civil Works 0,4120 -

Discount Factor E-M Works 0,6419 -

Discount Factor Op.e.ration Cost 19,6004 -

Total Investment Euro 16.656.912

Discounted Reinvestment Civil Works (none in 30 years) Euro 0

Discounted Reinvestment E-M Works Euro 788.189

Discounted Operation Cost Euro 7.698.995

Discounted Present Value (Barwert) Euro 25.144.096

Option 1, without Nemtisor

Item

WWTP Targu Neamt is sufficient for 17.000 P.E., Plant has to be extended

Operation Cost

Pos. Item Quantity Unit Unit Cost Total Euro/year

1 WWTP Targu Neamt O&M 1 lump sum 270.897 270.897

2 PS Humulesti Noi O&M 1 lump sum 1.800,00 1.800

3 PS Humulesti Noi Electricity 8.000 kWh 0,15 1.200

4 PS Blebea O&M 1 lump sum 2.000,00 2.000

5 PS Blebea Electricity 143.000 kWh 0,15 21.450

6 Wastewater Network O&M 0,5 % of Investment Cost of Wastewater Network and Main Collectors 1 lump sum 65.350 65.350

362.697

Discounted Present Value (Barwert)

Interest Rate 3,00 %

Project p.e.riod 30,00 years

Writing Off p.e.riod Civil Works 30,00 years

Writing Off p.e.riod Electromechanical Works 15,00 years

Discount Factor Civil Works 0,4120 -

Discount Factor E-M Works 0,6419 -

Discount Factor Op.e.ration Cost 19,6004 -

Total Investment Euro 16.656.912

Discounted Reinvestment Civil Works (none in 30 years) Euro 0

Discounted Reinvestment E-M Works Euro 788.189

Discounted Operation Cost Euro 7.109.027

Discounted Present Value (Barwert) Euro 24.554.128

Operation Cost

Pos. Item Quantity Unit Unit Cost Total Euro/year

1 WWTP Targu Neamt O&M 1 lump sum 270.897 270.897

2 PS Humulesti Noi O&M 1 lump sum 1.800,00 1.800

3 PS Humulesti Noi Electricity 8.000 kWh 0,15 1.200

4 PS Blebea O&M 1 lump sum 2.000,00 2.000

5 PS Blebea Electricity 143.000 kWh 0,15 21.450

6 Wastewater Network O&M 0,5 % of Investment Cost of Wastewater Network and Main Collectors 1 lump sum 65.350 65.350

362.697

Discounted Present Value (Barwert)

Interest Rate 3,00 %

Project p.e.riod 30,00 years

Writing Off p.e.riod Civil Works 30,00 years

Writing Off p.e.riod Electromechanical Works 15,00 years

Discount Factor Civil Works 0,4120 -

Discount Factor E-M Works 0,6419 -

Discount Factor Op.e.ration Cost 19,6004 -

Total Investment Euro 16.656.912

Discounted Reinvestment Civil Works (none in 30 years) Euro 0

Discounted Reinvestment E-M Works Euro 788.189

Discounted Operation Cost Euro 7.109.027

Discounted Present Value (Barwert) Euro 24.554.128

page 24

Page 25: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Agglomerations – Option Analysis

Selected: Option 1, Nemtisor and Targu Neamt separate Agglomeration Cluster

OptionDiscounted Present

Value Euro

Option 1,Decentralized Solution

Nemtisor own WWTP 6.790.385

Targu Neamt own WWTP 24.554.128

Total 31.344.514

Option 2,Centralized Solution, Nemtisor and Targu Neamt one WWTP

31.681.108

page 25

Page 26: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

How to define an Agglomeration in practice

Prepare map on county level indicating: all agglomerations (3 categories according to size) agglomeration boarders (each single agglomeration) Boarder of “cluster of agglomerations” Existing sewer network Existing and proposed WWTP/storage tanks Existing and proposed sewer trunk lines and

pressure mains (interconnection of agglomerations) and main pumping station

Administrative boarders Rivers

26

Page 27: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Countywide defined agglomerations

Agglomeration Cluster

Examples for Agglomerations – County Level

Page 28: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

How to define an Agglomeration in practice

Prepare data base for all agglomerations including (at least): Name of agglomeration Generated load (p.e.): total, existing, extension Compliance date Specific investment costs, operation costs and

NPV (€ / p.e.) Scoring rate for Ranking Total investment costs for wastewater

28

Page 29: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Selection of priority investments

Two step approach: Step 1: Mandatory criteria

Compliance date 2015 ROC established

Step 2: Ranking Size of agglomeration (highest weight) Health improvement Environmental improvement Efficiency improvement

29

Page 30: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Criteria for Ranking

30

N° CRITERIA INDICATOR

A Size of agglomeration and improvement of connection rate

Total generated load in Population equivalent

Additional load connected in Population equivalent

B Health Risk

B1 water supply system without adequate sanitation system Number of households connected to the water supply but not connected

to the sewer system (or individual/adequate sewer treatment

B2 Existence of sewerage network % of households connected to the sewerage network

B3 Physical condition of sewerage network % of sewer network highly depreciated or with insufficient capacity (high

exfiltration to groundwater, sewerage overflow, etc.)

C Environmental Pollution

C1 Surface water pollution: Existing central sewerage network with

no or inadequate wastewater treatment

% of collected wastewater load discharged without treatment to the

receiving water

C2 Groundwater pollution: Existence of adequate wastewater

collection and treatment facilities

% of total generated wastewater load (p.e.) collected and treated with

effluent quality compliant to UWWTD

Example for criteria and indicators for Wastewater

Page 31: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Investment Scenarios for priority investment

1. Low Scenario (priority investments up to budget limit given by MESD

2. Medium Scenario minimum investments to reach compliance until 2015

3. High Scenario extended investments including additional agglomerations with compliance date beyond 2015 proposed in phase I

31

Page 32: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Final Selection of Priority Investments

Discuss with MESD Investment SCENARIO (based on criteria and investment scenario)

Agree on agglomerations to be included in CF project

Prepare priority investment table (template for priority investment costs)

32

Page 33: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIAAgglomeration boarders for

selected Priority Investment Measures

Prepare detailed map for selected priority investment measures (Scale 1 : 25.000) Detailed boarders of agglomerations Cluster boarders Existing/Proposed Infrastructure

(WWTP, main sewers etc.) Review/confirm option analysis

33

Page 34: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Phasing of Investment Measures

Based on agreed priority investment measures:

Prepare Long-term investment table (template for long term investment costs)

Prepare Map with phasing of agglomerations (categorise in 3 main phases)

34

Page 35: MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1

MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA

Approval by Local Authorities (LA)

Approval of LA on investment list is mandatory!!

Maps of agglomerations should be included in the Urbanism Plan (by LA)

FS might start in parallel with MP approval for the endorsed investments