miramar cyclewaycycleways.wellington.govt.nz/assets/modules/documentgrid/17080… · phase 2,...

19
DRAFT pg 1 PHASE 2, URBAN & LANDSCAPE DESIGN - PRELIMINARY CONCEPT Miramar Cycleway - August 2017 MIRAMAR CYCLEWAY

Upload: others

Post on 04-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

DRAFT

pg 1

PHASE 2, URBAN & LANDSCAPE DESIGN - PRELIMINARY CONCEPTMiramar Cycleway - August 2017

M I R A M A R C Y C L E W A Y

Page 2: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 2

Intentionally blank

Page 3: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 3

View 1 View 3

View 2 View 4

Existing Views

View 1

Page 4: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 4

N

Phase 2 - Section 1OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Asphalt paving- Cycleway

Flush separationbetween paths

Concrete paving- Footpath

Bank & median planting

Renga Renga Lily Flax Pohutukawa

Page 5: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 5

Phase 2 - View 1OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Phase 2, Option 1 & 2- View 1

Page 6: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 6

N Asphalt paving- Cycleway

Flush separationbetween paths

Concrete paving- Footpath

Light bollards Renga Renga Lily Flax

Planting under trees

Phase 2 - Section 2OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 7: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 7

Phase 2, Option 1 & 2 - View

Phase 2 - View 2OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 8: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 8

NRenga Renga Lily Upright flax Amenity/colourful

plantingBike racks Street lightsPaved connectionsFlush separation

between pathsConcrete paving

- Footpath- Cycleway, vary

finish or continue paving unit

Planting in buildoutsPlanting under trees

Light bollards

Phase 2 - Section 3OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 9: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 9

Phase 2, Option 1 - View 3

Phase 2 - View 3OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 10: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 10

N

Paved connections Renga Renga Lily Timber seating under trees

pg 16

28.07.2014

Example : Anyang Art ParkSouth Korea

At Anyang Art Park this look out tunnel is one of many interesting installations that make the viewer think and interact with the exhib-its, pushing the viewer to actuvely explore the art.

Flush separationbetween paths

Upright flaxConcrete paving- Footpath

- Cycleway, vary finish or continue

paving unit

Planting under trees

pg 9

28.07.2014

Example : Artefact festival in Leuven, Belgium.

Kitchain is a modular kitchen-based system, designed turn the ritual of cooking and eating into a social event.

The system can be assembled into various structures and turned into one large kitchen where it is possible to cook, eat and relax in one or more groups.

Kitchain is suitable for events like festivals and it is currently installed at the Artefact festival in Leuven, Belgium. It is designed by Antonio Louro and Benedetta Maxia.

Cafe style seating under trees

Light bollardsAmenity/colourful planting

Planting in buildouts

Phase 2 - Section 4OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 11: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 11

Phase 2 - View 4OPTION 1Off road one way cycleway with two way connection to Miramar Wharf

Page 12: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 12

N

Phase 2 - Section 1OPTION 2Off road two way cycle way

Asphalt paving- Cycleway

Flush separationbetween paths

Concrete paving- Footpath

Bank & median planting

Renga Renga Lily Flax Pohutukawa

Page 13: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 13

Phase 2 - View 1OPTION 2Off road two way cycle way

Phase 2, Option 1 & 2- View 1

Page 14: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 14

N Asphalt paving- Cycleway

Flush separationbetween paths

Concrete paving- Footpath

Light bollards Renga Renga Lily Flax

Planting under trees

Phase 2 - Section 2OPTION 2Off road two way cycle way

Page 15: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 15

Phase 2, Option 1 & 2 - View

Phase 2 - View 2OPTION 2Off road two way cycle way

Page 16: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 16

N

Renga Renga Lily Upright flax Amenity/colourful planting

Bike racksPaved connectionsFlush separationbetween paths

Concrete paving- Footpath

- Cycleway, vary finish or continue

paving unit

Planting in buildoutsPlanting under trees

Light bollards

pg 14

28.07.2014

Example : Choorstraat – Papenhulst by Buro Lubbers

Between 2000 and 2004 a former cloister in the historic centre of ‘s-Hertogenbosch has been trans-formed into a luxurious apartment building. Only the front facade in the street has been remained. Behind this façade, contemporary architecture gives the inner court a new image.

The starting point for the design was to create a quality boost to the city by the addition of special housing and the transformation of the private courtyard to a semi-public square. The new square would be an attractive addition to the series of urban open spaces in town, such as the market, the squares Kerkplein and Parade, the gardens of the Orangerie and the Casino, and the Vughterdriehoek. The courtyard has a private char-acter, it is a hidden while open spot in the busy city. It provides space to relax, to sit, to dream, to eat, to look, to stay and to listen to the carillon of the Sint-Jans-Cathedral. The modesty of the design created a site that radiates serenity and allure.

Cafe style seating under trees

Phase 2 - Section 3OPTION 2Off road two way cycleway

Page 17: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 17

Phase 2, Option 2 - View 3

Phase 2 - View 3OPTION 2Off road two way cycleway

Page 18: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design Section Scale1:50 @ A1 / 1:100 @ A3

DRAFT

pg 18

Npg 9

28.07.2014

Example : Artefact festival in Leuven, Belgium.

Kitchain is a modular kitchen-based system, designed turn the ritual of cooking and eating into a social event.

The system can be assembled into various structures and turned into one large kitchen where it is possible to cook, eat and relax in one or more groups.

Kitchain is suitable for events like festivals and it is currently installed at the Artefact festival in Leuven, Belgium. It is designed by Antonio Louro and Benedetta Maxia.

Cafe style seating under trees

Paved connections Renga Renga Lily Timber seating under trees

pg 16

28.07.2014

Example : Anyang Art ParkSouth Korea

At Anyang Art Park this look out tunnel is one of many interesting installations that make the viewer think and interact with the exhib-its, pushing the viewer to actuvely explore the art.

Flush separationbetween paths

Upright flaxConcrete paving- Footpath

- Cycleway, vary finish or continue

paving unit

Planting under trees

Amenity/colourful planting

Planting in buildouts

Light bollards

Phase 2 - Section 4OPTION 2Off road two way cycleway

Page 19: MIRAMAR CYCLEWAYcycleways.wellington.govt.nz/assets/Modules/DocumentGrid/17080… · Phase 2, Option 1 - View 3 Phase 2 - View 3 OPTION 1 Off road one way cycleway with two way connection

Miramar Cycleway - August 2017Phase 2, Urban and Landscape Design

DRAFT

pg 19

Phase 2 - View 4OPTION 2Off road two way cycleway