TABLE OF CONTENTS
1 CREATION OF VENDOR MASTER THROUGH BDC .................................. 2 2 CREATION OF MERCHANDISE CATEGORY THROUGH BDC .............. 25 3 CREATION OF MERCHANDISE CATEGORY (MANUALLY) ................... 37 4 CREATION OF ARTICLE THROUGH BDC.................................................. 40 5 CREATION OF ASSORTMENT MODULE THROUGH BDC ..................... 67 6 LISTING OF THE ARTICLES TO THE ASSORTMENT MODULE........... 82 7 ASSORTMENT MODULE ASSIGNMENT TO SITES (LOCAL
ASSORTMENT).................................................................................................. 89 8 CREATION OF CONDITION RECORDS ...................................................... 93 9 CREATION OF PURCHASE ORDER ............................................................100 10 PO RELEASE.....................................................................................................106 11 STOCK ENTRY .................................................................................................120 12 INWARD OF STOCKS INTO DC ....................................................................129 13 STOCK REPORT...............................................................................................133 14 MATERIAL DOCUMENT LIST ......................................................................135 15 INVOICE VERIFICATION..............................................................................138 16 CHECKING GR/IR BALANCES .....................................................................142 17 CREATION OF STOCK TRANSPORT ORDER (MANUALLY) ..................144 18 CREATION OF DELIVERY AGAINST THE STO........................................149 19 POSTING OF GOODS ISSUE ..........................................................................155 20 DISPLAY OF STOCK IN TRANSIT ................................................................ 161 21 INWARD OF STOCKS INTO THE STORE ...................................................164 22 DISPLAY OF STOCKS IN THE STORE.........................................................169 23 DISPLAY OF STOCK IN TRANSIT ................................................................ 171 24 RETURN TO VENDOR ...................................................................................173 25 CREATION OF SERVICE MASTER & SUBSEQUENT PROCESSING (FOR
PLANNED COSTS)...........................................................................................178 26 CREATION OF SERVICE MASTER & SUBSEQUENT PROCESSING (FOR
UNPLANNED SERVICES OR COSTS WITH LIMITS)............................... 202 27 SUBCONTRACTING (WHEN JOB IS DONE BY SUBCONTRACTOR)....218 28 SUBCONTRACTING (WHEN JOB IS DONE BY SUBCONTRACTOR)... 232 29 PHYSICAL INVENTORY ............................................................................... 237 30 RESERVATION................................................................................................ 254 31 SCHEDULING AGREEMENT....................................................................... 265 32 CONSIGNMENT PROCESS ........................................................................... 285 33 PURCHASE REQUISITION............................................................................301 34 RP RUN ............................................................................................................. 306 35 MASS CHANGE.................................................................................................317 36 DISCONTINUATION/DELISTING OF ARTICLES FROM SITE .............321
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 1 CREATION OF VENDOR MASTER THROUGH BDC
T.CODE ZBDCXK01
Steps:
2
1. Fill up the vendor details in the predefined BDC format in MS Excel.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
the data (without the header rows) from the sheet.
. Copy2
3
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 3. Paste the data on to a new file.
4
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: . Save the new file in Text Tab Delimited type. 4
5
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
5. Click OK.
6
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
7
Steps: 6. Click Yes.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
8
Steps: 7. Close the sheet. 8. Click No.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
9
Steps: 9. Enter T. Code: ZBDCXK01.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
10
Steps: 10. Choose Call Transaction. 11. Choose Display all screens for processing on foreground or Background processing for processing on background.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 12. Click Execute. (Or press F8).
11
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
12
Steps: 13. Click 14. Select the path to the txt file that you have earlier saved.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
5. The path has been selected.
16. Click on Transfer.
1
13
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
7. Press Enter.
1
14
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 18. Press Enter.
15
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 19. Press Enter.
16
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 20. Press Enter.
17
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 21. Press Enter.
18
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 22. Press Enter.
19
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
3. Press Enter. 2
20
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
21
Steps: 24. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
5. Press Enter. 2
22
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 26. Press Enter.
23
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
7. The Vendor has been created.
2
24
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 2 CREATION OF MERCHANDISE CATEGORY THROUGH BDC
T.CODE ZBDCWG21
Steps:
se category (MC) details in the predefined BDC format in MS Excel. 1. Fill up the merchandi
25
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
a (without the header rows) from the sheet.
. Paste the data on to a new file.
2. Copy the dat 3
26
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ew file in Text Tab Delimited type.
Steps: 4. Save the n
27
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Click OK. 5
28
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps: S . Click Yes. 6
7. Close the sheet. . Click No.
8
29
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Enter T. Code: ZBDCWG21. 9
30
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
0. Choose Call Transaction. y all screens for processing on foreground or Background processing
r processing on background. 2. Click Execute. (Or press F8).
111. Choose Displafo1
31
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
o the txt file that you have earlier saved.
3. Click1
4. Select the path t1
32
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps: S 5. The path has be1 en selected.
6. Click on Transfer.
1
33
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 17. Press Enter.
34
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 18. Press Enter.
35
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 19. Merchandise category has been created.
36
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 3 CREATION OF MERCHANDISE CATEGORY (MANUALLY)
T.CODE WG21
37
Steps: 1. Enter the Merchandise Category (MC) name.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
38
Steps: 2. Enter MC Description
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 3. Save. 4. MC has been created.
39
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 4 CREATION OF ARTICLE THROUGH BDC A
T.CODE ZBDCMM41
Steps:
p the vendor details in the predefined BDC format in MS Excel. 1. Fill u
40
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
41
Steps: 2. Copy the data (without the header rows) from the sheet.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
42
Steps: 3. Paste the data on to a new file.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
43
Steps: 4. Save the new file in Text Tab Delimited type.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Click OK.
5
44
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 6. Click Yes.
45
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Close the sheet. 8. Click No.
46
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
9. Enter T. Code: ZBDCMM41. 10. Choose Call Transaction. 11. Choose Display all screens for processing on foreground or Background processing for processing on background. 12. Click Execute. (Or press F8).
47
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
48
Steps:
3. Click
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
14. Select the path to the txt file that you have earlier saved.
49
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
15. The path has been selected.
6. Click on Transfer.
1
50
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps: S 7. Press Enter. 1
51
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 18. Press Enter.
52
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
9. Press Enter.
53
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
0 Press Enter. 2 .
54
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 21. Press Enter.
55
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
2. Press Enter.
2
56
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 23. Press Enter.
57
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
58
Steps: 24. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
5. Press Enter.
2
59
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
6. Press Enter.
2
60
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 27. Press Enter.
61
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
8. Press Enter. 2
62
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
63
29. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 30. Press Enter.
64
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
65
Steps: 31. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ted.
Steps: 32. The article has been crea
66
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 5 CREATION OF ASSORTMENT MODULE THROUGH BDC
T.CODE ZBDCWSO1
67
Steps: 1. Fill up the vendor details in the predefined BDC format in MS Excel.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
68
Steps: 2. Copy the data (without the header rows) from the sheet.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
w file.
Steps:
69
3. Paste the data on to a ne
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
70
Steps: 4. Save the new file in Text Tab Delimited type.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
71
5. Click OK.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
72
Steps: 6. Click Yes.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Close the sheet. 8. Click No.
73
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 9. Enter T. Code: ZBDCWS01.
74
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
ose Call Transaction. lay all screens for processing on foreground or Background processing
0. Cho1
75
11. Choose Dispfor processing on background.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
76
Steps: 12. Click Execute. (Or press F8).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
77
Steps:
k
ave arlier saved.
13. Clic 14. Select the path to the txt file that you h e
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
path has been selected.
er.
15. The
78
16. Click on Transf
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
79
Steps: 17. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
80
18. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
81
Steps: 19. Assortment Module has been created.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 6 LISTING OF THE ARTICLES TO THE ASSORTMENT AMODULE
T.CODE WSO2
Steps:
82
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 1. Enter the Assortment Module name.
83
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Enter the Assortment Module description.
2
84
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Enter the articles that will come under the module. 3
85
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Press Enter.
4
86
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Click Skip all errors. 5
87
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Articles has been assigned to the assortment module.
6
88
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 7 ASSORTMENT MODULE ASSIGNMENT TO SITES (LOCAL ASSORTMENT)
T.CODE WSO5
Steps:
. Enter the Assortment Module Name.
1
89
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. Enter the stores local assortment code (site code) in the assortment column.
Steps:
90
2
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
91
Steps: 3. Press Enter. . Click on save button. . Or key down (CTRL+S).
4
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. The assortment module has been assigned to the sites (through sites local assortment). 5
92
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 8 CREATION OF CONDITION RECORDS A
T.CODE MEK1
Steps:
1. Enter T. Code: MEK1
93
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 2. Choose the Condition Type for which condition records need to be maintained.
94
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
3. The Condition Type has been selected.
95
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 4. Choose the access key at which the condition records need to maintained.
96
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 5. The access key has been selected.
97
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
6. The condition records are entered.
98
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
ave u
ition has been saved.
7. Click on s b tton. . Or key down (CTRL+S).
8. The cond records
99
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 9 CREATION OF PURCHASE ORDER A
T.CODE ME21N
Steps: 1. Enter T. Code ME21N
100
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Enter the Vendor Code.
. Enter Purchasing Organization.
. Enter Purchasing Group. 5. Enter Company Code.
23
101
4
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Select the required article type. 6
102
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Enter the article no. 8. Enter Quantity. 9. Enter the site 10. If necessary enter the value for respective condition type and tax code.
103
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
1. Click on save button. . Or key down (CTRL+S).
1
104
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 12. Purchase Order has been created.
105
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 10 PO RELEASE A
T.CODE ME21N, ME29N
106
Steps: 1. Create the Purchase Order.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. Purchase Order has been created.
Steps:
107
2
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
108
Steps: 3. Enter T. Code MIGO to inward the stocks.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Enter PO No.
. System does not let the user do the inward as the PO is not released.
S 45
109
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Enter T. Code ME29N.
S 6
110
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Check the status on the REL button.
S 6
111
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. Click on the REL button to release the PO from Level1.
Steps:
112
7
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
113
Steps: 8. Now click on the REL button to release the PO from Level2.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. PO has been released.
Steps:
114
9
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
0. Save
S
115
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
1. Action is saved.
S
116
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 12. Now enter T. Code MIGO.
117
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
3. Enter the PO no. 4. Click on Item OK.
S 11
118
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
5. Now the article document can be posted as the PO has been released.
S 1
119
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 11 STOCK ENTRY
T.CODE ZMGE
120
Steps: 1. Enter ZMGE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
S
121
2. Click on Create Gate Entry.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Enter Site.
S
122
3
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Enter the PO & the invoice numbers.
S
123
4
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
. Scan the articles.
S 5
124
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 6. Save. .
125
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Click on yes.
126
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 8. Enter Gate Entry (G.E) no. in the GE details tab in MIGO.
127
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Press enter and proceed the inward process as mentioned earlier.
2
128
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 12 INWARD OF STOCKS INTO DC
T.CODE MIGO
129
Steps: 1. Enter T. Code MIGO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
oods are being received against the P.O)
3. Press Enter.
Steps: 2. Enter the P.O no. (As the g
130
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
131
Steps: 4. Click on
5. Click on save button. Or key down (CTRL+S).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
. Article Document has been posted, i.e. the stocks have been in warded.
132
6
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 13 STOCK REPORT
T.CODE MB52
133
Steps: 1. Enter the article no. 2. Enter Site. 3. Enter Storage Location. 4. Click on Execute button
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 5. Stocks are showing to be in-warded.
134
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 14 MATERIAL DOCUMENT LIST
T.CODE MB51
Steps: 1. Enter T. Code MB51.
135
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
136
Steps: 2. Enter Article No. 3. Enter Site. 4. Enter Storage Location 5. Enter Vendor
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
137
6. Stocks are showing to be in-warded.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 15 INVOICE VERIFICATION A
T.CODE MIRO
138
Steps: 1. Enter Company Code (if the system asks).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
teps:
2. The Company Code has been entered.
S
139
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
140
Steps: 3. Enter Invoice Date. 4. Enter Amount 5. Enter Tax Code (if required). 6. Click on save button
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. IV has been done.
7
141
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Y 16 CHECKING GR/IR BALANCES ACTIVIT
T.CODE MB5S
142
Steps: 1. Enter Vendor 2. Enter Purchasing Organization. 3. Enter Article. 4. Enter Purchasing Document (P.O.) No. 5. Click on Cleared Items Too. 6. Click on Execute button.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Here one can check the quantity invoiced against the quantity received.
143
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 17 CREATION OF STOCK TRANSPORT ORDER (MANUALLY)
T.CODE ME21N
Steps:
. Enter T. Code ME21N
1
144
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 2. Enter relevant document type for stock transport order (STO).
145
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
4. Enter Article 5. Enter Quantity 6. Enter receiving Site. 7. Click on save button
Steps: 3. Enter Supplying Site
146
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 8. Click on Save.
147
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
.
Steps: 9. STO has been created
148
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 18 CREATION OF DELIVERY AGAINST THE STO
T.CODE VL10B
149
Steps: 1. Enter T. Code VL10B
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
150
Steps: 2. Enter Shipping Point.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
151
3. Enter STO no.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
152
Steps: 4. Select the line showing the STO no. 5. Click on background.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
153
Steps: 6. Click on
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
154
Steps: 7. System shows the delivery no. created against the STO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 19 POSTING OF GOODS ISSUE
T.CODE VL02N
Steps: 1. Enter T. Code VL02N.
155
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
156
Steps: 2. Enter the outbound delivery no. 3. Press Enter.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 4. Now go to picking view.
157
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 5. Now enter the Picked Quantity. 6. Enter Storage location.
158
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 7. Click on Post Goods Issue.
159
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 8. PGI is complete.
160
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 20 DISPLAY OF STOCK IN TRANSIT
T.CODE MB5T
Steps: 1. Enter T. Code MB5T.
161
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
2. Enter Article No. 3. Enter Receiving site. 4. Enter Issuing site 5. Press Execute (F8).
S
162
teps:
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
een out-warded is showing as in-transit stocks.
Steps: 6. Stocks that have b
163
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Y 21 INWARD OF STOCKS INTO THE STORE ACTIVIT
T.CODE MIGO
164
Steps: 1. Enter T. Code MIGO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
165
2. Select Goods receipt against Outbound Delivery.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
166
3. Click on Item OK.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps:
167
4. Click on post button.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
168
Steps: 5. Article document posted.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 22 DISPLAY OF STOCKS IN THE STORE
T.CODE MB52
169
Steps: 1. Enter T. Code MB52. 2. Enter Article. 3. Enter Site. 4. Enter Storage Location 5. Execute (press F8 button).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
170
Steps: 6. Stocks are showing to be in-warded into the store.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 23 DISPLAY OF STOCK IN TRANSIT
T.CODE MB5T
171
Steps: 1. Enter T. Code MB5T. 2. Enter Article. 3. Enter Receiving Site. 4. Enter Issuing site. 5. Execute (F8).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 6. As the stocks have been in-warded the is no stock showing as in-transit.
172
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 24 RETURN TO VENDOR
T.CODE MIGO
Steps: 1. Enter T. Code MIGO.
173
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
Steps: 2. Select Return Delivery against article document. 3. Enter the article document no. against which the stocks are going to be returned.
174
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
4. Click Item OK. 5. Enter reason for movement.
175
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
176
Steps: 6. Click on Post.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
177
Steps: 7. Article document has been posted.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 25 CREATION OF SERVICE MASTER & SUBSEQUENT PROCESSING (FOR PLANNED COSTS)
T.CODE AC03, ME21N, ML81N
Steps: 1. ENTER T. CODE AC03
178
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
179
Steps: 2. ENTER THE DETAILS
179
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
180
STEPS: 3. SAVE
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 4. DATA SAVED.
181
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
182
STEPS: 5. ENTER T. CODE ME21N
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 6. FILL UP THE DETAILS
183
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
184
STEPS: 7. FILL UP THE DETAILS
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 8. CLICK ON SAVE
185
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
186
STEPS:
9. DATA SAVED
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
TEPS:
10. ENTER T. CODE ML81N
S
187
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
188
STEPS: 11. CLICK ON OTHER PURCHASE ORDER
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
TEPS:
12. ENTER PO NO.
S
189
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
190
STEPS: 13. CLICK ON CREATE ENTRY SHEET
190
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 14. ENTER DETAILS
191
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 14. CLICK ON SERVICE SELECTION
192
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
193
STEPS: 15. CLICK ON ENTER
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
ON SERVICES
16. CLICK
194
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 16. ALTERNATELY ONE CAN PRESS F9
195
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 17. FILL UP THE DETAILS
196
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 18. CLICK ON ACCEPT
197
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
198
STEPS: 19. CLICK ON SAVE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
TEPS:
20. CLICK ON YES.
S
199
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 21. CLICK ON YES.
200
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
2. DATA IS SAVED. 2
201
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY ER & SUBSEQUENT
PROCESSING (FOR UNPLANNED SERVICES OR COSTS 26 CREATION OF SERVICE MAST
WITH LIMITS)
T.CODE ME21N, ML81N
202
STEPS: 1. ENTER T. CODE ME21N.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 2. ENTER THE DETAILS
203
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 3. MENTION THE LIMITS 4. ENTER G/L ACCOUNT, COST CENTER DETAILS
204
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 5. CLICK ON SAVE.
205
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 6. PO CREATED.
206
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
207
STEPS: 7. ENTER T. CODE ME21N
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 8. CLICK ON OTHER PURCHASE ORDER
208
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
209
STEPS: 9. ENTER PURCHASE ORDER NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 10. THE SCREEN WILL LOOK LIKE THIS
210
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 11. CLICK ON CREATE ENTRY SHEET
211
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
TEPS:
12. FILL UP THE DETAILS
S
212
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 13. AS THE VALUE EXCEEDS THE LIMIT SO SYSTEM GIVES THE ERROR MESSAGE.
213
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
4. ENTER DATA FOR WHICH VALUE LIES WITHIN LIMIT. THE DETAILS.
115. FILL IN
214
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
215
STEPS: 16. CLICK ON ACCEPT
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 17. CLICK ON YES
216
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 18. SERVICE ENTRY SHEET CREATED
217
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 27 SUBCONTRACTING (WHEN JOB IS DONE BY SUBCONTRACTOR)
T.CODE ME21N, MB1B (MVT 541), MIGO
STEPS: 1. ENTER T. CODE ME21N
218
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 2. ENTER DETAILS (FOR SUBCONTRACTING ITEM CATEGORY SHOULD BE L.
219
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 3. CLICK ON COMPONENTS
220
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 4. ENTER THE COMPONENT DETAILS
221
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 5. PO CREATED.
222
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 6. ENTER MB1B
223
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 7. ENTER THE DETAILS (NOTE THAT MVT USED HERE IS 541).
224
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 8. CLICK ON TO PURCHASE ORDER.
225
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 9. ENTER PO NUMBER.
226
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
0. SELECT THE LINE. 1
227
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 11. CLICK ON SAVE.
228
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 12. ENTER T. CODE MIGO
229
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 13. ENTER THE PO NUMBER
230
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 14. POST THE DOCUMENT
231
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
CTIVITY 28 SUBCONTRACTING (WHEN JOB IS DONE BY TRACTOR)
ASUBCON
T.CODE ME21N, MB1B (MVT 541), MB1B (MVT 542)
232
STEPS: 1. CREATE THE SUBCONTRACING PO (LIKE EARLIER). 2. PROCESS TRANSFER POSING (MB1B-MVT-541). 3. ENTER MB1B
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
. ENTER THE DETAILS 45. CLICK ON TO PURCHASE ORDER
233
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 6. ENTER PO NO.
234
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 8. SELECT THE ITEM & CLICK ON SAVE BUTTON.
235
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 9. DOCUMENT POSTED.
236
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
ACTIVITY 29 PHYSICAL INVENTORY
T.CODE MI01, MI04, MI20 & MB52 (FOR VIEWING STOCK REPORT IN A SITE)
STEPS:
1. ENTER T. CODE MI01.
237
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 2. ENTER THE DETAILS
238
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
TEPS:
. ENTER ARTICLE DETAILS
239
S 3
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
240
4. SAVE TO CREATE PI DOCUMENT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 5. ONE CAN CHECK THE SYSTEM STOCK USING T. CODE MB52.
241
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 6. SYSTEM STOCK IS VIEWED.
242
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 7. ENTER T. CODE MI04.
243
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
. ENTER PI DOCUMENT NO.
STEPS: 8
244
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 9. ENTER ACTUAL QUANTITY/ QUANTITY COUNTED.
245
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 0. SAVE THE DATA.
246
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 11. ENTER MI20.
247
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS: 2. ENTER THE DETAILS
248
1
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
249
STEPS: 13. POST DIFFERENCE IF ONE ACCEPTS THE DIFFERENCE OR OTHERWISE CHANGE COUNT TO RECOUNT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
250
STEPS: 14. SELECT THE ARTICLES FOR WHICH DIFFERENCE IS POSTED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
STEPS:
251
14. CHECK THE STOCK AGAIN TO SEE THE RESULTS OF POSTING.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
252
STEPS: 15. ENTER DETAILS IN TRANSACTION MB52.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
253
STEPS: 17. THE DIFFERENCE HAS BEEN TAKEN INTO ACCOUNT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
254
ACTIVITY 30 RESERVATION
T.CODE MB21, MB1A
STEPS: 1. ENTER MB21
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
255
STEPS: 2. ENTER THE DETAILS
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
256
STEPS: 3. ENTER THE DETAILS
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
257
STEPS: 4. SAVE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
258
STEPS: 5. ENTER MB1A
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
259
STEPS: 6. ENTER THE DETAILS
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
260
STEPS: 7. CLICK ON TO RESERVATION & GIVE THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
261
STEPS: 8. SELECT THE ARTICLE AND SAVE
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
262
STEPS: 9. DOCUMENT POSTED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
263
STEPS: 10. CHECK THE STOCK REPORT TO VIEW THE DIFFERENCE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
264
STEPS: 11. THE STOCKS HAVE BEEN CONSUMED BY THE RELEVANT COST CENTER.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
265
ACTIVITY 31 SCHEDULING AGREEMENT
T.CODE ME31L, ME38, MIGO
STEPS: 1. ENTER ME31L
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
266
STEPS: 2. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
267
STEPS: 3. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
268
STEPS: 4. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
269
STEPS: 5. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
270
STEPS: 6. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
271
STEPS: 7. CLICK ON SAVE. 8. CLICK YES.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
272
STEPS: 9. SCHEDULING AGREEMENT CREATED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
273
STEPS: 10. ENTER ME38.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
274
STEPS: 11. ENTER THE AGREEMENT NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
275
STEPS: 12. ENTER THE DETAILS AND PRESS F2.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
276
STEPS: 13. PRESS F2.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
277
STEPS: 14. MAINTAIN THE SCHEDULES.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
278
STEPS: 15. SAVE. 16. CLICK ON YES.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
279
STEPS: 17. AGREEMENT CHANGED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
280
STEPS: 18. ENTER T. CODE MIGO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
281
STEPS: 19. ENTER AGREEMENT NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
282
STEPS: 20. AS THE DETAILS ENTER DOESNOT COMPLY WITH THE AGREEMENT SYSTEM GIVES THE ERROR MESSAGE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
283
STEPS: 21. ENTER CORRECT QUANTITY. 22. CLICK ON ITEM O.K. 23. CLICK ON SAVE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
284
STEPS: 23. ARTICLE DOCUMENT POSTED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
285
ACTIVITY 32 CONSIGNMENT PROCESS
T.CODE ME21N, MIGO, MB1B
STEPS: 1. ENTER T. CODE ME21N
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
286
STEPS: 2. ENTER THE DETAILS. (NOTE THAT ITEM CATEGORY FOR CONSIGNMENT ITEMS IS K).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
287
STEPS: 3. THE DATA IS SAVED TO GET THE PO NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
288
STEPS: 4. INWARD THE STOCKS USING T. CODE MIGO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
289
STEPS: 5. DOCUMENT POSTED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
290
STEPS: 6. VIEW THE ARTICLE DOCUMENT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
291
STEPS: 7. ENTER THE ARTICLE DOCUMENT NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
292
STEPS: 8. CLICK ON ACCOUNTING DOCUMENTS. AS THESE ARE CONSIGNMENT STOCKS NO ACCOUNTING ENTRY IS FOUND.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
293
STEPS: 9. ENTER MB1B TO TRANSFER THE STOCKS THAT HAVE BEEN SOLD TO OWN STOCK.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
294
STEPS: 10. ENTER THE DETAILS.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
295
STEPS: 11. ENTER THE ARTICLE NO. AND QUANTITY OF STOCKS SOLD. 12. SAVE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
296
STEPS: 14. DOCUMENT POSTED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
297
STEPS: 15. ENTER T. CODE MB03.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
298
STEPS: 16. VIEW THE ARTICLE DOCUMENT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
299
STEPS: 17. CLICK ON THE ACCOUNTING DOCUMENT.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
300
STEPS: 18. ACCOUNTING DOCUMENT REFLECTS THAT THE STOCKS HAS BECOME COMPANYS OWN STOCK. INVENTORY ACCOUNT IS DEBITED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
301
ACTIVITY 33 PURCHASE REQUISITION
T.CODE ME51N
STEPS:
1. ENTER T.CODE ME51N 2. ENTER THE DETAILS LIKE ARTICLE NO, VENDOR, REQUISITION
QUANTITY, SITE ETC.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
302
STEPS: 3. SAVE TO GENERATE PURCHASE REQUISITION NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
303
STEPS:
4. GO TO ME21N TO CREATE PO AGAINST THE PURCHASE REQUISITION. 5. ENTER THE PURCHASE REQUISITION NO, IN PURCHASE REQUISITION COLUMN AND THEN PRESS ENTER.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
304
6. ENTER THE VENDOR CODE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
305
STEP: 7. SAVE TO CREATE THE PO IN REERENCE TO PR.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
306
ACTIVITY 34 RP RUN
T.CODE MD03
STEPS: 1. CHECK THE WAREHOUSE STOCK THROUGH MB52.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
307
STEPS:
3. STOCK QUANTITY GETS DISPLAYED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
308
STEPS: 4. ONE CAN CHECK MATERIAL MASTER FOR THE ARTICLE FOR WHICH RP RUN WILL BE DONE
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
309
STEPS: 5. AS THE REORDER POINT IS 100, MAXIMUM STOCK LEVEL IS 512 AND SYSTEM STOCK IS 50, (THAT IS LESS THAN REORDER POINT), SYSTEM SHOUD RAISE PR FOR (512-50) = 462 UNITS WHEN RP IS RUN.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
310
STEPS:
5. ENTER TCODE MD03. 6. ENTER THE ARTICLE NO. 7. CLICK ON DISPLAY RESULTS BEFORE THEY ARE SAVED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
311
7. SAVE TO CARRY OUT THE RP. 8. NOTE DOWN THE PR NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
312
STEPS:
9. ENTER THE PR NO TO CREATE THE PO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
313
STEPS:
10. PRESS ENTER.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
314
STEPS:
11. ENTER THE NET PRICE, AND OTHER CONDITION DETAILS (IF REQUIRED).
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
315
STEPS:
12. SAVE THE PO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
316
NOTE: ONE CAN ALSO RUN THE RP SITEWISE THROUGH T.CODE MD01.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
317
ACTIVITY 35 MASS CHANGE
T.CODE MM46
STEPS:
1. ENTER OBJECT TYPE 2. SELECT THE TABLE
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
318
STEPS:
3. SELECT THE FIELDS & EXECUTE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
319
STEPS: 4. ENTER THE ARTICLE NO.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
320
STEPS: 5. ENTER THE NEW VALUE & SAVE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
321
ACTIVITY 36 DISCONTINUATION/DELISTING OF ARTICLES FROM SITE
T.CODE WSO1, WSO5
STEPS:
1. ENTER T. CODE WSO1. 2. SELECT MODULE TYPE AS EXCLUSION MODULE 3. ENTER MODULE NAME
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
322
STEPS: 4. ENTER THE ARTICLES TO BE DISCONTINUED.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
323
STEPS: 5. SAVE TO CREATE THE EXCLUSION MODULE.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
324
STEPS: 6. ENTER T. CODE WSO5
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
325
STEPS: 7. ENTER THE EXCLUSION MODULE NAME.
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
326
STEPS: 8. ENTER THE SITE (LOCAL ASSORTMENT) CODES
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
327
STEPS: 9. SAVE
-
End user Documentation MODULE-MM & SCM
Anirban Bose & Tilak Mendiratta 6/24/2008
328
STEPS: 10. NOW IF SOMEBODY TRIES TO CREATE A PO, SYSTEM DOES NOT LET HIM DO SO, AS THE ARTICLE HAS BEEN NOW DE-LISTED/DISCONTINUED FROM THE SITE.