mmg steel factories brochure (dsf & rsf)
TRANSCRIPT
Mohammad Al-Mojil Group
MMG FABRICATION SERVICES
MMG FABRICATION SERVICES
COMMERCIAL LICENSES,
CERTIFICATES & CODES
PRODUCTION CODES AND STANDARD
ASME Section 1 and VIII
ANSI B31.1
B31.3
API 605
1104
ASME STAMPS “A” ,“PP”,“S”,“U”,“R”, “NB”
ISO 9001:2008
SASO/ISO 17025
COMMERCIAL LICENSES,
CERTIFICATES & CODES
• Commercial Registration expires on 13 December 2016
• ISO 9001-2008 ABS expires on 17 January 2017
• ASME Certificates: Assembly of Power Boilers ; Fabrication &
Assembly of Pressure Piping ; Manufacture & Assembly of Power
Boilers ; and Manufacture of Pressure Vessels expires on 05
April 2016
• The NB Certificates: Metallic Repairs and/or Alterations (R-4423) ;
and Register Boilers, Pressure Vessels, or Other Pressure Retaining
Items expires on 05 April 2016
OUR STRENGTH
• Controlled Environment
• More Economical
• High Productivity
• High Quality Output
• Flexibility
• Quick Response
• Feasible Field Shops
OUR STRENGTH
WELDERS’ CLASSIFICATION NO. EMPLOYED
Pipe Welders:
Gr 4- GTAW & SMAW (SS & CS) 190 - Qualified Welders
Gr 3- GTWA & SMAW (CS)
338 - Qualified Welders
Gr 2- SMAW (CS)
92 - Qualified Welders
Structural Welders:
Gr 1 – Butt – SMAW BUTT (CS) 245 - Qualified Welders
Gr 1 – Fillet – SMAW Fillet (CS) 1 - Qualified Welders
OUR CAPABILITIES (Services Offered)
a. Structural Steel Detailing: TEKLA
Structures – 7 Licensed Software
b. Piping Isometric Generation:
Smart Plant SPOOLGEN – 3 Licensed
Software
OUR CAPABILITIES
Services Offered
● Pipe spool and support fabrication/Painting.
● Pipe Rack, Platforms, Handrails, Ladders and
Structural Steel Fabrication/Painting
● Pressure Vessel/Tank fabrication/painting
● Mobile Conveyor Car Body Assembly
● Module Assembly
● Fired- Heaters
Manufacturing Capability
Size ½” Nominal pipe size
and larger, all wall thickness,
in all type of fusible materials
such as:
OUR FACILITIES
DAMMAM Steel Factory (DSF) RABIGH Steel Factory (RSF)
Dammam Steel Factory was established in 1995 while the Rabigh Steel
Factory is comparatively new having started its operations in mid 2007. Both
factories are semi-automated, relatively have the same production
capabilities, and are approved by Saudi Aramco, SABIC, Ma’aden, and SEC.
OUR FACILITIES
STEEL FACTORIES
FACILITIES
DAMMAM
(DSF)
RABIGH
(RSF)
Facility Overall Total Area 161,000 m2 165,000 m2
Main Fab-Shops Area 23,937 m2 15,583 m2
Carbon Steel Shops Six (6) Bays Two (2) Bays
Stainless Steel Shops Three (3) Bays One (1) Bay
Structural Steel Shops Five (5) Bays One (1) Bay
Welding Training Center One (1) Bay Bldg. (200 m2)
Main Office (2-Storey Bldg.) 1,404 m2 1,020 m2
X-Ray Pit / Bunker (2)-2 x 12 x 16 m NIL
Stress Relieving Furnace 12 x 3 x 3 m NIL
Main Laydown / Storage Area 101,528 m2 68,312 m2
Extension Laydown Area 13,190 m2 30,000 m2
DAMMAM STEEL FACTORY (DSF)
Main Fabrication Area – 23,937 m2
DAMMAM STEEL FACTORY (DSF)
LAYDOWN AREA – 101,528 m2
(Material Storage, Sand Blasting and Painting)
DAMMAM STEEL FACTORY (DSF)
• Six (6) BAYS CARBON STEEL SHOPS
• 15 m Wide x 100 m Long per Bay
OUR FACILITIES
SAW WELDING OF SPOOLS and ROLLING OF ANGLES
DAMMAM STEEL FACTORY (DSF)
POST WELD HEAT TREATMENT
• Furnace
3.0 m x 3.0 m x 12.0 m
25.0 Ton Capacity / Firing
Maximum Temperature, 800 ºC
• Local Heat Treatment Services is also available
RADIOGRAPHY (X-Ray Pits)
Welding Training Center
DAMMAM STEEL FACTORY (DSF)
AUTOMATIC BLASTING MACHINE (SPEEDO)
Dimension: 12 m (L) x 1.5 m (W) x 3 m (H)
Maximum Loading per hoist – 5000 kg (5 ton)
Steel grit / shot / wire cut – (1.0 ø ~ 2.0 ø mm)
Surface Preparation: Surface Cleanliness – GB8923-88, (ISO8501-1, 88)(SA2.5)
Surface Profile – RA 50 ~ 70 µm
Continuous Operational Hours - ≥ 16 hours
DAMMAM STEEL FACTORY (DSF)
HEAVY FABRICATION AREA
with 12 ton TRAVELING TOWER CRANE
PRODUCTION
PERSONNEL
Categories Numbers
Management 9
Supervision 7
Indirect 142
Direct 842
Total 1,000
PRODUCTION OUTPUT (10 hours per Day)
PIPING WORKS: Per Day Per Month
Preparation, Fit-Up & Welding 4,230 Dia.-Inch 110,000 Dia.-Inch
Painting 11,700 m2 304,000 m2
STRUCTURAL STEEL WORKS:
Preparation, Fit-Up & Welding
35 - 45 Tons Daily (Light & Medium Weight)
90 - 100 Tons Daily (Heavy & Extra Heavy Weight)
Painting 2,649 m2 Daily 70,000 m2 Monthly
EQUIPMENT @ DSF
DAMMAM STEEL FACTORY (DSF)
SHOP LAYOUT
RABIGH STEEL FACTORY (RSF)
Fabrication Area: 14,100 m²
Laydown Area: 68,300 m²
A B C D E F G H I J L M N O P Q R S T U V K W X Y Z A’ B’ C’ D’ E’ j’ k’ l’ m’ n’ a b c d e f g h
4
5
6
1
2
3
1
2
3
4
5
6
(STAINLESS STEEL)
BAY 1
STAINLESSS PIPES LAYDOWN
FIT-UP AREA
FIT-UP AREA
WELDING AREA
WELDING AREA
MATERIALS CUTTING
AREA
IN HSC
EQUIPMENT LINE UP
RSF PRODUCTION OFFICES
PLASMA CUTTING MACHINE
MAX 200 MAX 1650
OUT
ZBH 30
IN (CARBON STEEL)
BAY 2 CS PIPES LAYDOWN
MATERIALS CUTTING
AREA
FIT-UP AREA
FIT-UP AREA
LEGEND:
Fabrication Shop Equipment Layout & Process Flow
MILLER WELDING MACHINE 402 GOLDSTAR
MILLER SAW MACHINE DIMENTION 1250
PIPE CUTTING MACHINE CHAIN TYPE (3”-36” DIA.)
PLASMA CUTTING MACHINE (MAX 200) PLASMA CUTTING MACHINE (POWER MAX 1650) HSC HIGH SPEED CUTTER
POSITIONER MAX Ø = 45Ø
POSITIONER MAX Ø = 60Ø
ZBH 30
ZBH 100
ROTATOR X 5 TON CAPACITY
PLATE ROLLING MACHINE
OVERHEAD CRANE
STRUCTURE BENDING MACHINE
• • • • • • • • • • • • • • • • • • • • • • • •
SHEARING MACHINE
HYDRAULIC PRESS MACHINE
PUNCHING MACHINE
LATHE MACHINE
MILLING MACHINE
RADIAL DRILL MACHINE
BAY 1: HIGH SPEED CUTTER (6”<) = 1EA
PLASMA CUTTING MACHINE (MAX 200) = 1EA
PLASMA CUTTING MACHINE (POWER MAX 1650) = 1EA
MILLER WELDING MACHINE 402 = 35EA
ZBH 30 (POSITIONER) = 1EA
OVERHEAD CRANE = 3.2T X 2 & 5T X 2
BAY 2: HIGH SPEED CUTTER (6”<) = 1EA
PLASMA CUTTING MACHINE (MAX 200) = 1EA PLASMA CUTTING MACHINE (POWER MAX 1650) = 1
MILLER WELDING MACHINE 402 = 60EA
ZBH 30 (POSITIONER) = 2EA
OVERHEAD CRANE = 3.2T X 2 & 5T X 2
ZBH 100 (POSITIONER) = 2EA
3.2
TON
S - 2EA
5TO
NS - 2
EA
WELDING AREA OUT
HSC
PLASMA CUTTING MACHINE
MAX 200 MAX 1650
WELDING AREA
ZBH 30
ZBH 30
ZBH 100
ZBH 100
3.2
TON
S - 2EA
5TO
NS - 2
EA
IN (CARBON STEEL)
BAY 3 C/S PIPES LAYDOWN
OUT
WELDING AREA
BAY 3: HIGH SPEED CUTTER (8”>) = 2EA
PIPE CUTTING MACHINE CHAIN TYPE = 6EA
PLASMA CUTTING MACHINE
MAX 200
PLASMA CUTTING MACHINE (MAX 200) = 1EA HYDRAULIC PRESS MACHINE = 1EA MILLER WELDING MACHINE 402 = 60EA
MILLER SAW MACHINE DIMENSION 1250 = 1EA MILLER SAW MACHINE DIMENSION 1250 = 2EA
ZBH 100 (POSITIONER) = 2EA
ZBH 100
ZBH 100
ZBH 30 (POSITIONER) = 2EA
ZBH 30
ZBH 30
OVERHEAD CRANE = 3.2T X 2 & 5T X 2
3.2
TON
S - 2EA
5TO
NS - 2
EA
IN
STRUCTURAL / PIPE SUPPORT
BAY 4
BAY 4: AUTO CUTTING MACHINE = 1EA
AUTO CUTTING MACHINE
AUTO CUTTING MACHINE PLATE ROLLING
MACHINE
PLATE ROLLING MACHINE = 1EA STRUCTURE BENDING MACHINE = 1EA
STRUCTURE BENDING MACHINE
RADIAL DRILL MACHINE
PUNCHING MACHINE = 2EA
PUNCHING MACHINE
PUNCHING MACHINE
LATHE MACHINE = 1EA
LATHE MACHINE
MILLING MACHINE = 1EA
MILLING MACHINE
SHEARING MACHINE = 1EA
• • • • • • • • • • • • • • • • • • • • • • • •
SHEARING MACHINE
MILLER WELDING MACHINE 402 = 50EA
(STRUCTURAL STEEL FABRICATION)
RADIAL DRILL MACHINE = 1EA
OVERHEAD CRANE = 10T X 1 / 15T X 2 / 20T X 1
10
TON
S - 1EA
15
TON
S - 2EA
20
TON
S - 1EA
MATERIALS CUTTING
AREA
FIT-UP AREA
FIT-UP AREA WELDING AREA
HYDRAULIC PRESS MACHINE
STT WELDING MACHINE = 4EA STT WELDING MACHINE = 4EA
FCAW WELDING MACHINE = 35EA
HSC HSC
OUT
RABIGH STEEL FACTORY (RSF) PRODUCTION
PRODUCTION OUTPUT (10 hours per Day)
PIPING WORKS: Per Day Per Month
Preparation, Fit-Up & Welding 3,850 Dia.-Inch 100,000 Dia.-Inch
STRUCTURAL STEEL WORKS:
Preparation, Fit-Up & Welding 8 - 10 tons Daily (Light & Medium Weight)
12 - 15 tons Daily (Heavy & Extra Heavy Weight)
PAINTING WORKS: Per Day Per Month
Surface Preparation and Airless Spray 800 m2 20,800 m2
PERSONNEL @ RSF
Categories Numbers
Management 3
Supervision 14
Indirect 163
Direct 459
Total 639
RABIGH STEEL FACTORY (RSF) OTHER FEATURES - RSF
RABIGH STEEL FACTORY (RSF) OTHER FEATURES
RSF - LIST OF MAJOR EQUIPMENT AND
RESOURCES AT BAY 1
ITEM # DESCRIPTION QTY. UNIT
1.0 Miller Welding Machine 402 Goldstar 35 EA.
High Speed Cutter ( 6"<) 2 EA.
Plasma Cutting Machine (Max 200) 1 EA.
Plasma Cutting Machine ( Power Max 1650) 1 EA.
ZBH 30 (Positioner) 1 EA.
Overhead Crane 5.0 Ton 2 EA.
Overhead Crane 3.2 Ton 2 EA.
Jacking Stand 35 EA.
Fixed Stand 70 EA.
RSF - LIST OF MAJOR EQUIPMENT AND
RESOURCES AT BAY 2
ITEM # DESCRIPTION QTY. UNIT
2.0 Miller Welding Machine 402 Goldstar 60 EA.
STT Machine 4 EA.
High Speed Cutter ( 6"<) 2 EA.
Plasma Cutting Machine (Max 200) 1 EA.
Plasma Cutting Machine ( Power Max 1650) 1 EA.
ZBH 30 (Positioner) 2 EA.
ZBH 100 (Positioner) 2 EA.
Miller SAW Machine Dimension 1250 1 EA.
Overhead Crane 5 Tons 2 EA.
Overhead Crane 3.2 Tons 2 EA.
Jacking Stand 78 EA.
Fixed Stand 106 EA.
RSF - LIST OF MAJOR EQUIPMENT AND
RESOURCES AT BAY 3
ITEM # DESCRIPTION QTY. UNIT
3.0 Miller Welding Machine 402 Goldstar 81 EA.
FCAW Welding Machine 35 EA.
STT Machine 4 EA.
High Speed Cutter ( 8">) 2 EA.
Plasma Cutting Machine (Max 200) 1 EA.
Pipe Cutting Machine Chain Type (3"-36") 6 EA.
ZBH 30 (Positioner) 2 EA.
ZBH 100 (Positioner) 2 EA.
Miller SAW Machine Dimension 1250 2 EA.
Hydraulic Press Machine 1 EA.
Overhead Crane 5 Tons 2 EA.
Overhead Crane 3.2 Tons 2 EA.
Jacking Stand 78 EA.
Fixed Stand 106 EA.
LIST OF MAJOR EQUIPMENT AND RESOURCES
BAY 4
ITEM # DESCRIPTION QTY. UNIT
4.0 Punching Machine 2 EA.
Lathe Machine 1 EA.
Milling Machine 1 EA.
Structure Bending Machine 1 EA.
Radial Drill Machine 1 EA.
Plate Rolling Machine 1 EA.
Auto Cutting Machine 6 EA.
Miller Welding Machine 402 50 EA.
FCAW Welding Machine 35 EA.
Overhead Crane 15 ton SWL 2 UNITS
Overhead Crane 10 ton SWL 1 UNIT
Overhead Crane 20 ton SWL 1 UNIT
RSF - LIST OF MAJOR EQUIPMENT AND
RESOURCES
@ PAINTING/BLASTING SECTION
ITEM # DESCRIPTION QTY. UNIT
5.0 Compressor, 750 CFM 1 UNIT
Air Receiver 3 UNITS
Euroblast Sand Tower 4500 (Manual Blasting Machine) 3 UNITS
Automatic Blasting Machine w/ Conveyors & Hangers 1 UNIT
Graco Paint Pump WIWA 6 UNITS
Machine Pneumatic Painting Graco 4 UNITS
Gantry Crane w/ Generator, 10 ton Capacity) 4 UNITS
Generating Set Cap 23 kVA 2 UNITS
Gantry Crane w/ Generator, 20 ton Capacity) 2 UNITS
Generating Set Cap 50 kVA 1 UNIT
Recycling Machine Garnet 1 UNIT
6.0 Forklift 7 ton SWL 1 UNIT
Forklift 5 ton SWL 2 UNITS
Mobile Crane 30 - 40 ton SWL 1 UNITS
Truck w/ Trailer 2 UNITS
OUR CLIENTS
PIPERACK MODULARIZATION AT DSF (Saudi KAYAN Petrochemical Complex Project)
PIPERACK MODULARIZATION (Saudi KAYAN Petrochemical Complex Project)
PIPERACK MODULARIZATION (Saudi KAYAN Petrochemical Complex Project)
PIPERACK MODULARIZATION (Saudi KAYAN Petrochemical Complex Project)
FABRICATION AND SHOP ASSEMBLY
HOOPER & INLET DUCTS (MA’ADEN Aluminum Smelter Plant Project- Gas Treatment Centre)
HOOPERS
FABRICATION AND SHOP ASSEMBLY
HOOPER & INLET DUCTS (MA’ADEN Aluminum Smelter Plant Project- Gas Treatment Centre)
INLET DUCTS
FABRICATION AND SHOP ASSEMBLY
OF REACTOR & STACK (MA’ADEN Aluminum Smelter Plant Project- Gas Treatment Centre)
REACTOR
STACK
FABRICATION AND SHOP PRE-ASSEMBLY
OF HOT OIL HEATER (GAS SWEETING FACILITIES AT MESAIEED & DUKHAN)
Radiant Module Upper Stack Module
FABRICATION AND SHOP PRE-ASSEMBLY
OF HOT OIL HEATER (GAS SWEETING FACILITIES AT MESAIEED & DUKHAN)
Convection Module Lower Stack Module
PACKAGING (Shop Fabricated Items)
LOCATION
MMG – DAMMAM STEEL FACTORY
Strategic Location
MMG Rabigh Steel Factory is strategically located in the heart of Rabigh Industrial Area, which is only a few kilometers away from Petro Rabigh Petrochemical Plant. The factory is situated mid-way the two (2) major industrial cities in the Western Region, namely Jeddah and Yanbu, which is approximately 200 and 180 kilometers away respectively. MMG Rabigh Steel Factory is only about 60 kilometers away from King Abdullah Economic City.
Location Map
BUSINESS CONTACTS
HAFIZ - SHAFEI VP – Director - Operational
Tel. No. +966-13-842-1111 (9228)
Fax No. +966-3-842-3263 M: +966.59.911.94173
RAMAYYAN - BINNY BUSINESS DEVELOPMENT MANAGER
Tel. No. +966.13.842.1111 (9464)
M: +966.54.256.1615