More that a third of Luandans do not have access to drinking water. The informal water market in Luanda, pumping river water into water trucks to sell and then re-sell in city bairros, brings in more than 250 million dollars a year, according to a recent study by Development Workshop. On August 28, 2014 DW director and founder, Allan Cain, spoke to the Angola Field Group about the serious challenges of Community Water Management. Mr. Cain also launched a new video as part of his presentation. DW has been working for the last several years with the Ministry of Water and Energy on the development of a new national "Community Water Strategy". The policy was developed as part of the Angolan Government’s Water for All Program. MoGeCA promotes an approach involving local communities in the planning, construction and management of water points, as a basic strategy promoting local development. Community management is defined here as a form of cooperation between the community and the government – local authorities and the Provincial Directorate of Energy and Water (DPEA) – or local water companies. It aims to improve water supply to the population in a way that each actor promotes the sustainability and maintenance of water supplies. A MOGECA book has been published and printed as result of DW´s more than 30 years working in the water sector, together with government structures. The book is a manual on Community Water Management and has become the Angolan National Policy on sustainable water management. Each book comes with a set of cards to be used at training to explain the target groups how to reach sustainable water and waste management in their communities. Download a copy (in Portuguese) on DW’s website. http://dw.angonet.org/forumitem/1429

TRANSCRIPT

Page 1: Mo geca presentation in english   28th aug 2014

República de AngolaMINISTERIO DE ENERGIA E ÁGUASDIRECÇÃO NACIONAL DE ÁGUAS

Community Water Management Model – MoGeCA

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Luanda, 28th August 2014

Page 2: Mo geca presentation in english   28th aug 2014

Estrutura da Apresentação

1. Summary Model 2. General principles for design 3. Levels of Governance - Rural Zone 4. Cost Recovery - Rural Zone 5. Levels of governance - Peri-Urban

Zone 6. Actors and their roles 7. Information flow 8. Sustainability Model 9. Composition of Manual MoGeCA

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 3: Mo geca presentation in english   28th aug 2014

Resumo do Modelo

• MoGeCA promotes the creation of long term social capital and builds local capacity in community participation in solving their own problems, independent of external stakeholders •  Community management - a form of cooperation community / local government / DPEA (or water companies, if any) - the improvement of water supply to the population •  Promotes the association through collective action in the construction and management of water points.• Emphasizes the need for cost recovery to ensure the economic sustainability of the water systems. •  Model is inclusive for management of community supply systems including: drilling, well or protected spring & public water points connected to a wider networks (through standposts)

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 4: Mo geca presentation in english   28th aug 2014

Princípios Gerais do Modelo (I)

Principle of decentralized local-level management•   Effectiveness and efficiency, promotion of ownership by:

• BMEA and EMEA• GAS, CCCA and ACA

Principle of Community Participation • Participatory democracy: election of GAS, CCCA and ACAs •  Access to information and consultation in building •  Operational and financial management of the service• Performance monitoring

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 5: Mo geca presentation in english   28th aug 2014

Princípios Gerais do Modelo (II)

Principle of Cost Recovery •   Prepayment system defined and agreed •   40% w / BMEA (contract); 60% w / Community / GAS •   Management by BMEA and by GAS in the future •   More formal peri urban situation (Assoc. Legal,

subcontracting, etc.)

Principle of the Establishment of Partnerships •   Legal framework of interventions •   Coordination and complementarity of actions •   Mechanisms of communication and accountability.

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 6: Mo geca presentation in english   28th aug 2014

Dept. SocialMobilization Nacional

Províncial

Municípal

Local(Village)

DNA

DPEA

CCCA

GAS

GAS

GAS

GAS GAS

GAS

GAS

GAS

Provincial Sector of Social Mobilization

BMEA

Levels of Governance Rural MoGeCa

C C

Adm. Municipal

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 7: Mo geca presentation in english   28th aug 2014

Cost Recovery - Rural Areas

Water Piont BMEAManagement

ContaGAS

BMEA

Consumers

GAS

60%

40%

Subsidies

SustainableManagement

MaintenanceAdministration

Service visits

WellBorehole

Laundry

Drinkingfountain

Stanpost

UserPayments

FundsFunds

RepairPayments

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 8: Mo geca presentation in english   28th aug 2014

Nacional

Província

Município

Local(Bairro)

DNA

DPEA

Depto. Mobilização Social

Secção Provincial de Mobilização Social

EMEA/BMEA

Levels of Governance MoGeCA - periurban

ACA

CCGAS

C

CC

C CC

CCC C

PE

Comuna

GAS

GAS

Adm. Municipal

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 9: Mo geca presentation in english   28th aug 2014

Actors and their roles

MunicipalAdministrationBMEA/EMEA

Bairro/AldeiaGAS/CCCA

Serviço deabastecimento

de água

DNANational

WaterDirectorate

DPEASocial

Mobilizationsection

External partners

NGOs

ComunaAdministration

ACA(peri-urbana)

•Training BMEA, GAS, ACA •Rates & Fees•coordination •Supervision and monitoring

•pilot projects •Support staff training •Promotion of the model and fund-raising

•Mobilization policies •Training of senior staff •Supervision and monitoring

•Repair and maintenance of rural points •Management of funds •Operation of urban systems

•Represent consumer interests •Management of EU funds •Partnering with BMEA / EMEA

•Operation waterpoints •Preventive maintenance and basic repairs •Collecting financial contributions •Hygiene promotion

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 10: Mo geca presentation in english   28th aug 2014

Sustainability Model (I)

Definition • is working and is being used • appropriate level of benefits • continued beyond the life of the equipment • institutionalized management (community management, partnerships with

government) • O & M costs, administration and replacement covered the local level, with limited

external support and viable • without negative impact on the environment

Influencing Factors • Community • technical • environmental • legal and institutional framework • financial

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 11: Mo geca presentation in english   28th aug 2014

Sustentabilidade do Modelo (II)

Processes that influence • community demand •  response by supporting institutions •  community participation in all phases of the project •  choice of technology in the context of the operation and maintenance •  integration of water, sanitation, hygiene and environment •  gender sensitive •  shared responsibility between the community and the municipality •  public - private partnerships, if appropriate •  capacity building

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 12: Mo geca presentation in english   28th aug 2014

Sustentabilidade do Modelo (III)

• Recuperação de custos - Plano de recuperação de custos:

• identificação dos custos de operação e manutenção• garantia da vontade máxima de pagar• definição das responsabilidades financeiras• optimizando os custos de operação e manutenção• definição duma tarifa apropriada e equitativa• desenho dum sistema de gestão financeira efectiva• organizando acesso a fontes alternativas de finanças

• Factores técnicos – complexidade da tecnologia contra o seu custo– habilidades técnicas exigidas para a operação e manutenção da tecnologia– disponibilidade, acessibilidade e preço de peças sobressalentes– custo da manutenção

3.6 Reforço de capacidades

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 13: Mo geca presentation in english   28th aug 2014

Outsourcing and MoGeCA• The goal of decentralization in the system introducing greater

flexibility and greater adaptation to local needs and pressures. • The strategy of "outsourcing" of local management of water

services has been launched simultaneously with MoGeCA. • It is seen as more democratic and responsive to consumer

demands for their rights to water. • Local and regional authorities are enhanced when they are given

responsibilities to make decisions. • The management becomes simpler and more transparent,

respecting consumer rights and customer-responsive. • The concept of outsourcing local delivery of water services to the

Community Water Association ACAs and Water and Sanitation Groups (GASs) can be a sustainable and cost effectively way to implement the MoGeCA model.

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 14: Mo geca presentation in english   28th aug 2014

The MoGeCA Manual

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 15: Mo geca presentation in english   28th aug 2014

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Composition of the MoGeCA Manual

Page 16: Mo geca presentation in english   28th aug 2014

1. Social Mobilizer Guide

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 17: Mo geca presentation in english   28th aug 2014

2. Training Manuals

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 18: Mo geca presentation in english   28th aug 2014

3. Training Manual for Social Mobilizers

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 19: Mo geca presentation in english   28th aug 2014

4. Training Manual for Bridadas

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 20: Mo geca presentation in english   28th aug 2014

5. Training Manual for Water and Sanitation Groups (GAS)

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 21: Mo geca presentation in english   28th aug 2014

6. Data Sheet for the monitoring of water systems

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 22: Mo geca presentation in english   28th aug 2014

7. Water for All

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 23: Mo geca presentation in english   28th aug 2014

8. Brochure for Private Sector Operators

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 24: Mo geca presentation in english   28th aug 2014

9. Data Sheet for Maintenance of Pumps

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Page 25: Mo geca presentation in english   28th aug 2014

10. Monitoring of water services using VerAgua

Using GSMA Celphone networks for water-point monitoring

Page 26: Mo geca presentation in english   28th aug 2014

Example 1

From a list of indicators to call a number according to the appropriate situation

Connect and let the number ring for some time. The call turns off by itself and is FREE

A. B.

Water is flowing

Page 27: Mo geca presentation in english   28th aug 2014

Example 2

Select from the list that corresponds to the situation that exists on-site

Call the number to call and leave multiple times. It turns off by itself. It's FREE

A. B.

2 hours of supply

Page 28: Mo geca presentation in english   28th aug 2014

Example of online mapped resultsThe program will be set to display maps and photos each water-point with running water and other information considered relevant

Page 29: Mo geca presentation in english   28th aug 2014

"The MoGeCA, is an example of social responsibility and freedom to information. Has, as a base, four fundamental

principles, namely: the decentralized management of water points; the community participation; the recovery

of costs and the establishment of institutional partnerships. "

Luis Filipe da SilvaSecretary of State for Water

Luanda – 22 de Março de 2012

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia

Angola - Luanda Fevereiro 2008

União Europeia

Angola - Luanda Fevereiro 2008

União EuropeiaUnião Europeia