mock-up detector simulation 제 9 회 reno collaboration meeting
DESCRIPTION
Mock-up detector simulation 제 9 회 RENO collaboration meeting. I. S. Jeong*, C. W. Park RENO Collaborators. Contents: 1) MockUp Introduction 2) Structure Summary a. Bridges(Target, Gamma-Catcher) b. Chimney(Short Chimney) c. PMT Holder d. Baffle - PowerPoint PPT PresentationTRANSCRIPT
Mock-up detector simulation
제 9 회 RENO collaboration meeting
I. S. Jeong*, C. W. ParkRENO Collaborators
Contents:1) MockUp Introduction2) Structure Summary a. Bridges(Target, Gamma-
Catcher) b. Chimney(Short Chimney) c. PMT Holder d. Baffle e. Updated Version(Optional) f. New Positioning 3) Analysis(Quick-Check)
MockUpDefinition of MOCK-UP: In common usage, a mockup is a scale model of a structure or device, usually used
for teaching, demonstration, testing a design, etc. - WIKIPEDIA
Figure 1.RENO Main(full-sized) detector
Figure 2.RENO Mock-Up detector
Name Material
OV IV NV Rho M
liter liter liter g/cm3 Kg
MockUp Target 170 151
MockUp GC 1186.9
1194
MockUp Detector
7892
Bridge(Target)
290mm
G4double tXaxis0 = 216.5 G4double tXaxis1 = 0 G4double tXaxis2 = -216.5 G4double tXaxis3 = -216.5 G4double tXaxis4 = 0 G4double tXaxis5 = 216.5
G4double tYaxis0 = 125G4double tYaxis1 = 250G4double tYaxis2 = 125G4double tYaxis3 = -125G4double tYaxis4 = -250G4double tYaxis5 = -125
Target Position(Z=-445mm)
Unit:mm
confirmation
Bridge(Gamma-Catcher)
Curvature
Height and width
Radius
Radius of buffer tank: 1100mm
√Gap Between bridge & Stainless steel: 5mmGamma-Catcher Bridge Length: 490mm → 495mm
Thickness of stainless steel:5mm
Implementation
G4double gXaxis0 = 357.2G4double gXaxis1 = 0G4double gXaxis2 = -357.2G4double gXaxis3 = -357.2G4double gXaxis4 = 0G4double gXaxis5 = 357.2
G4double gYaxis0 = 206.23G4double gYaxis1 = 412.5G4double gYaxis2 = 206.23G4double gYaxis3 = -206.23G4double gYaxis4 = -412.5G4double gYaxis5 = -206.23
Gam
ma-C
atc
her
Posit
ion
(Z=
-850m
m)
Chimney(Short Chimney)
Short ChimneyMiddle Chimney
PMT Holder
Prototype Holder Test in the Drum
Holder Parameter
Realistic Holder
PMT middle holder’s design confirmation
d:depthD:DiameterH:HeightT:Thickness
37.1847°
Baffle(Top,Bottom)
Top Baffle
Bottom Baffle
Confirmation
After adjustmentTop & Bottom
Baffle(Side)
Side
Side Baffle
CABLE WAY
Updated Version(Optional) Baffle – Cont’ More Realistic for the Top
CABLE WAY
Updated Baffle(Top)
277mm
231.5mm
New Positioning for the Baffle Analysis
• Because Baffles is over the buffer region,we couldn’t know how it run.
Baffle 이 Buffer 를 넘어버려 이들의 Effect 를 볼 수 없음
Etc(Viton Analysis) - ready
SiliconPAD 가 없을 경우
SiliconPAD 가 있을 경우
Viton 에 대한 geometry
P.E. Analysis(Quick-Check)
1) Nothing2) Only Target Bridge
3) Only Gamma-Catcher Bridge4) All Bridge
5) Only Holder6) Only Baffle
7) Holder & Baffle
Bridge Analysis
Nothing
Only Target
Only Gamma-Catcher
All Bridge
Status Photoelectron
Nothing 739.7 0.6
Only Target 746.7 0.6
Only Gamma-Catcher
742.3 0.6
All Bridge 747.5 0.6
Holder & Baffle Analysis
Only Holder
Only Baffle
Baffle with Holder
Status Photoelectron
Only Holder 721.2 0.6
Only Baffle 728.2 0.6
Baffle with Holder
714.6 0.6
Offset Analysis
+ 10mm offset
- 20mm offset
Source Calibration( Ge)68
SummaryChimney, Bridge(Target, Gamma-Catcher),
Holder, Baffle, Viton 등 축소형 검출기를 위한 MC 에
모두 구축되어 있음 (cable 제외 )
Todo listMC(for MockUp) Stability Check
Energy, Vertex Calibration using the Source(Co137, Ge68...)
Backup
Quick ComparisonWithout Bridge
With Bridge
TYVEKWithout TYVEK(X-axis) With TYVEK(X-axis)
Without TYVEK(Z-axis) With TYVEK(Z-axis)
Overlapped noTYVEK(X & Zaxis) Overlapped TYVEK(X & Zaxis)