mod subaqueous flowtite

22
Manufacturing Meeting, Spain, January 2005 Manufacturing Meeting, Spain, January 2005 Subaqueus Applications with Flowtite Pipes 1

Upload: lcs13262

Post on 25-Jun-2015

220 views

Category:

Documents


14 download

TRANSCRIPT

Page 1: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005 Manufacturing Meeting, Spain, January 2005

Subaqueus Applications with Flowtite Pipes

1

Page 2: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Pipe laminate structure

SKIN

SKIN

CORE

EXT. SURF.

INT.SURF.

LINER

TOTAL THICKNESS

EXTERIOR

INTERIOR

2

Page 3: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Site Supervision service

If any request or any requirement, field supervision is provided to achive a

satisfactory installation. Field engineers and technicians can advise the

purchaser or the installer to help him achieve a satisfactory installation.

• Field engineers supervise the installation of GRP pipes,

• Follow the errection closely and submit their comments and recommendations

to achive satisfactory pipe installation,

• Assist to the installer for decision of installation technics and applications,

• Assist to project firms for computation and determination of thrust block

dimensions,

• Field technicians assist the workers to achieve satisfactory coupling joint and

backfilling.3

Page 4: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Subaqueous Installatıon of GRP Pipes

GRP pipes are used for subaqueous applications such as;

Waste water outfall,

Cooling water outfall,

Sea water intake for

Drinking water supply,

Cooling water supply,

Etc...

Submarine crossing.

4

Page 5: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

GRP lock couplings allow angular deflections.

Pipe Joint Systems

GRP TEST COUPLING JOINTGRP TEST COUPLING JOINT

Coupling Joint is a flexible joint system.

Allows preliminary check for each joint under water

5

Page 6: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Depending on pipe diameter two, three or four pieces of marine harness lugs are fixed surrounding the ends of the pipes.

It is recommended to remove stud bolts before backfilling in order not to prevent flexibility of GRP couplings.

MMarariine ne HHarness arness LLugug

Marine harness lugs are used to keep together preassembled pipe strings of several pipes during loading, transfering, and sinking operations and also to assist divers for joining operation under water.

Steel lugs are fixed with filament winding method using glassfiber &resin

6

Pipe Joint Systems

Page 7: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Trench Excavatıon & Backfıllıng

- Excavator, dredger or trencher is used for excavating the trench.

- Excavator or clamshell bucket or flex tubes are used for backfilling.

7

Page 8: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Subaqueous Installation Techniques

Single pipe installation

Multiple pipe installation

Multiple pipe installation, providing pipe string

Depending on project requirements and site or weather conditions different installation techniques are used.

8

Page 9: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Pipes are lowered to water and joined under water one by one, SiSingle ngle PiPipepe

Subaqueous Installation Techniques

9

Page 10: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Two or three section of pipes are preassembled on land or barge then lowered to water and joined under water,

Multiple Pipes

Subaqueous Installation Techniques

10

Page 11: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Joining of Pipes under Water

Generally, come along jacks with steel clamps are used for joining of pipes.

Depending on marine conditions marine harness lugs are used to join the pipes under water.

11

Page 12: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Pipe Alingment while Joining

Depending on project reuirement, marine and weather conditions different equipments are used for alingment of pipe ends to join.

Hydraulic Sea Horse

Steel Truss

Specail GRP Coupling

12

Page 13: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Trench Backfilling

Excavator or clamshell bucket or flex tubes are used for backfilling.

Backfilling is provided by the divers under water.

13

Page 14: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Long pipe sections (100m-300m-500m...) are preassmbled on land or barge and lowered to water and joined under water.

MULTIPLE PIPES PROVIDING PIPE STRING

Subaqueous Installation Techniques

14

Page 15: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

TOW Techniques

• Controlled depth tow

Depending on shape of the sea bottom, weather conditions and adequacy of equipment different tow methods can be selected.

• Surface tow

float and sink

sub surface tow

bottom pull

off-bottom tow

Page 16: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Onshore-Offshore Transition Zone

Sand bags may be used to prevent floating of pipes and washing out backfill from wave actions.

16

Page 17: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Onshore-Offshore Transition Zone

Pipes are launched to the sea with different methods as shown on the pictures.

17

Page 18: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Marmara Ereğlisi / Tekirdağ / TURKEY

480 MW

Client Unimar Enerji Yatırımları A.Ş.

STFA Marine Construction Co.

:

: Location

Capacity

Main Contractor

:

:

Date : Feb 2005 – June 2005

Cooling Water Discharge

Unimar Power Plant Cooling Water Outlet

DN2400mm-600mm, PN6Atm, SN 5000N/m2 L= 240m

Page 19: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

102 MW

İçdaş Çelik Enerji Tersane Ulaşım San. A.Ş

DETEK Marine Construction Co.

Sep 2004 – March 2005

Sea Water Inlet & Outfall Pipes

ClientLocation

Capacity

Main Contractor

Date

:

:

:

:

:

DN2200mm, PN6Atm, SN 5000N/m2 L= 196m

Çanakkale / Biga / TURKEY

Biga Autoproducer Power Plant Cooling Water Inlet & Outlet

19

Page 20: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

ADASU Genel MüdürülüğüADASU Genel Müdürülüğü

ZihniÜstünoğulları İnşaat A.Ş.ZihniÜstünoğulları İnşaat A.Ş.Jan 2005 – continueJan 2005 – continue

Lake Water Inlet PipesLake Water Inlet PipesDN1600mm, PN6Atm, SN 5000N/mDN1600mm, PN6Atm, SN 5000N/m22 L= 1500m L= 1500m

ClientClientLocationLocation

Main ContractorMain Contractor

DateDate

: :

: :

: :

: :

Adapazarı / TURKEYAdapazarı / TURKEY

Adapazarı Gölprizi Drinking Water Project

20

Page 21: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Constanta / ROMANIAConstanta / ROMANIAATHENA SA Construction Co.ATHENA SA Construction Co.

ATHENA SA Construction Co.ATHENA SA Construction Co.

June 2005 – continueJune 2005 – continue

Waste Water OutletWaste Water Outlet

Constanta North & Eforie South Wwtp Waste Water Outfall

ClientClientLocationLocation

Main ContractorMain ContractorDateDate

: :

: :

: :

: :

DN1500mm, PN6Atm, SN 10000N/m2 L= 4250mDN1500mm, PN6Atm, SN 10000N/m2 L= 4250mDN 700mm, PN6Atm, SN 10000N/m2 L= 1360mDN 700mm, PN6Atm, SN 10000N/m2 L= 1360m

GRP Test CouplingGRP Test Coupling

21

Page 22: Mod subaqueous flowtite

Manufacturing Meeting, Spain, January 2005

Adana- Ceyhan / TURKEYAdana- Ceyhan / TURKEY

1210 MW1210 MW

Project Company Project Company İSKEN A.Ş.İSKEN A.Ş.

InvestorInvestor STEAG AG STEAG AG

Marine ConsultantMarine Consultant

Siemens, Babcock, Gama Tekfen JV & SimkoSiemens, Babcock, Gama Tekfen JV & Simko

: :

: : LocationLocation: :

Net capacityNet capacity

Main ContractorsMain Contractors

: :

: :

: :

Project DurationProject Duration : : 2000 - 20032000 - 2003

MECC Marine & Land Eng & Consulting Co.MECC Marine & Land Eng & Consulting Co.

SubcontractorSubcontractor : : STFA Marine Cons. Co. STFA Marine Cons. Co.

Intake Line/ Sea-Pump HouseIntake Line/ Sea-Pump House

DN2600mm, PN6Atm, SN 5000N/m2 L= 800mDN2600mm, PN6Atm, SN 5000N/m2 L= 800m

Seaoutfall Line/ Seal Pit – SeaSeaoutfall Line/ Seal Pit – Sea

İskenderun Sugözü Coal Fired Power Plant

DN2800mm, PN6Atm, SN 6500N/m2 L= 1570mDN2800mm, PN6Atm, SN 6500N/m2 L= 1570m

Cooling Line/ Pump House-Seal PitCooling Line/ Pump House-Seal Pit

DN2400mm, PN6Atm, SN 6500N/m2 L= 4750mDN2400mm, PN6Atm, SN 6500N/m2 L= 4750m

22