model psoc-15.10.2015

Upload: vlsijp

Post on 24-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 MODEL psoc-15.10.2015

    1/2

    Model Examination-IIBranch: EEE Date&Time :15.10.2015&9.15-12.15am Year/em:I!/!II Max Mar"#: 100$%ect code&Title: 'ac$lt( In-char)e:!.*nandh"$mar

    EE2+01-,oer (#tem eration and control ,art-* 10x220

    *n#er *ll the 3$e#tion#

    1.Defne spinning reserve (May/June-2014) 2.Dierentiate load curve and load duration curve(Nov /Dec-12) 3.Defne stiness o interconnected system 4.What is AG! ".What are the types o e#citation system $.ompare shunt and series capacitors %.&ist the constraints in unit commitment pro'lem

    (.Dra) the incremental cost curve or hydro and thermalplants *.What is +,-!list the unctions o +,- 1.Defne net)or/ topology in po)er system(Nov/Dec-2012) ,art- B 5x140

    *n#er *ll the 3$e#tion#

    11.a0i0A generating station has a ma#imum demand o

    2,W a load actor o $ a plant capacity actor o 4(

    and a plant use actor o (.ind the

    10Daily energy produced 205eserve capacity o

    the plant

    30maimum energy that could 'e produced daily i the

    plant

    )ere running all the time.

    10

    40What is load orecasting! +#plain the types o load

    orecasting. $0

    or0

    '0i0 A generating station has the ollo)ing daily load

    cycle (Dec-12)6ime7r0 8$ $81 1812 128

    1$

    1$82 2824

    &oad,W0 2 2" 3 2" 3" 2Dra) the load curve and calculate

    i0,a#imum demand ii0Average load

    iii09nits generated:day iv0&oad actor

    (0

    ii0What are system level and plant level control!

    (0

    12.a0i06)o synchronous machine )ith the ollo)ing data are

    operating ;n parallel to eed a common load o 3,W.

    ,achine 1< Governor speed droop

  • 7/25/2019 MODEL psoc-15.10.2015

    2/2

    14a0i0;n a po)er system having t)o units the loss

    coeEcients are

    CmmF

    0024.00005.0

    0005.0001.0

    ;ncremental cost o the t)o units are given 'y

    dci:dpG1F .(?G11$H dci:dpG2F.(?G212 ind the optimal

    ?G1 and ?G2 or F 2(Dec-12)

    (0

    ii0-tate the unit commitment pro'lem. With the help o

    a Io) chart e#plain or)ard dynamic programming solution

    method o unit ommitment pro'lem.

    (0

    or0

    '0i0+#plain the &am'da8iteration method or

    fnding the solution o economic dispatch includingtransmission losses. (0

    ii0Derive the co8ordination e=uation )ith losses.

    40

    iii0+#plain the term J;ncremental operating costK.

    (Dec-12) 40

    1"a0i0What is +! What are its maBor unctions in

    ?-! (0

    ii0+numerate the various operating states and the

    control strategies o a po)er system. (May-15)

    (0

    or0

    '0i0+#plain the unctions o -ADA )ith a neat

    diagram.

    (Dec-12)

    (10

    ii0What is the necessity o security analysis and

    control! $0

    'ac$lt( In- char)e Exam cell coordinator

    6D/EEE