Project Title : Unilever - Biomass BoilerProject Code : B-E15-008Senior : Susan N. Paner (SNP)Duration : May 2015 to ---
Revision No. Date Details of Revision0.0 4/28/2015 Start of Modelling of Structure1.0 5/1/2015 Updated Archi Drawing based from Data given by Thermax2.0 5/9/2015 Intermediate Beams were inserted per level on the Model3.0 5/13/2015 Updated model as per AD
3.1 5/18/2015 Updated model as per AD4.0 5/20/2015 Control room was incorporated on the model5.0 5/22/2015 Changes in loadings of the structure are applied
5.1 5/23/2015 Wind load in Control Room was computed and applied separately6.0 5/27/2015 Pedestal and FTB was inserted on the model
6.1 5/28/2015 Col. Sizes for both models satisfied all criteria6.2 5/29/2015 Reduction on Ratio of Steel Design and Reapplication of loading
7.0 6/1/20157.1 6/2/2015 Reapply loadings on roof deck using 2-way slab tributary areas
8.0 6/3/20159.0 6/10/2015 Structures was remodeled
10.0 6/18/2015
Redefine the effective length of columns and rotated the column at the back
Additional column was added on the model. Reapplication of loadings are necessarry.
Additional beam between grid D & E was modeled on the structure and was loaded based from the forces provided by THERMAX. (PZ ZXW1 DF02-1).
-
References RemarksAD-A1-1/04-29-15 Inactive Legend:AD-A1-1/04-30-15 Inactive AD Archi Drawing
InactiveAD-A1-1/05-11-15 InactiveAD-A1-1/05-18-15 Inactive
As per SNP InactiveAs per SNP Inactive
InactiveAs per SNP Inactive
InactiveAs per SNP InactiveAs per SNP InactiveAs per SNP InactiveAs per SNP InactiveAs per SNP Inactive
As per SNP Active
UNILEVER