Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating parts for the module assembly fixtures. Shipping and testing boxes are presently in an iterative design mode to determine the best and most cost effective way to proceed. Planning for testing and quality control is in progress. Installation procedures are being coordinated by SLAC and

Upload: maurice-forde

Post on 31-Mar-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Module Assembly Update

Ohio State University and Princeton University are presently preparing facilities for module assembly.

Both universities are fabricating parts for the module assembly fixtures.

Shipping and testing boxes are presently in an iterative design mode to determine the best and most cost effective way to proceed.

Planning for testing and quality control is in progress.

Installation procedures are being coordinated by SLAC and Princeton engineers.

(information in this document is based on 9x8 double layer tubes)

Page 2: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

27'

24'

54'

SHIPPING ANDSTORAGE AREA

LOADING AREA

COMPLETE OVERHEAD CRANE COVERAGE

TESTING AREA

EXISTINGEXPERIMENT

CLEAN ROOM UTILITIES

CLEAN ROOM

(ALL OF HIGH BAY)

75'

30'

24'

Shown below is a footprint of the Princeton high bay area where tubes will be received and tested ,after assembly the modules will be tested and stored here. Ohio State will have a similar facility.

Page 3: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

60'

30'

GLUE FIXTURES TESTING, STORAGE, & SHIPPING BOX

ACORN TABLES

This shows the Princeton Elementary Particles area where modules will be assembled and put into their testing and shipping boxes. Ohio State will build like assembly fixtures and have a similar set up.

Page 4: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

PIVOT POINT

LIFT EYE

IAROCCI TUBE

Y-AXIS REINFORCEMENTSTAINLESS STEEL

PHI READOUT PLANE

HOLD DOWN COVER PLATE

The module assembly fixture is designed to assemble 10 different size modules for a total of 354 modules needed. Both Princeton and Ohio State will have 4 assembly fixtures for production. The fixtures are designed to pivot vertical for removal of the modules in their most rigid orientation. Presently design is done for 9x8 double layer tubes but the fixtures can be adapted to accommodate large single cell modules.

Page 5: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Below is a 3-D rendering of the assembly fixtures.

Page 6: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

21.438 [544.51]

25.063 [636.59]

1.500 [38.10]

0.500 [12.70]

0.750 [19.05]

23.563 [598.49]

0.250 [6.35]

0.250 [6.35]

24.016 [610.01]0.250 [6.35]

2.875 [73.03]

0.250 [6.35]

0.750 [19.05]Single Module Cartridge Box

5 Module Box

3.187 [80.96]

1.500 [38.10]

23.516 [597.31]

Below is a 5 module box which will receive 5 cartridge containing first tubes from Italy and then modules for testing and shipment.

Page 7: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Five module box with cartridge boxes inserted. With 5 cartridgesinserted the box will weigh approximately 300 pounds.

Astro-Lam Foam

3/4" Plywood

1/2" Plywood

1 1/2 x 1 1/2 Fir

3/4" Pine

1/4" Plywood

Aluminum Foil

Standard Module

Page 8: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Proposed design for source scan apparatus. Tubes and then modules will be scanned at Princeton and Ohio State. The source is motor driven on a 4m rail and is moved and pinned by hand to the center of each tube.

Page 9: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

View of source holder and shutter

Page 10: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

The graphic below represents a study done by Vito Casarriti on the vertical stiffness of modules. The results show that a minimum of 5 tubes is needed for the appropriate handling rigidity. Six tubes per module will be the standard for better utility routing.

Page 11: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Proposed Stiffening Rib

0.750 [19.05]

0.040 [1.02]

0.375 [9.53]

1.000 [25.40] TYP.

R0.125 [R3.18]

A stainless steel rib to be inserted between the tubes that comprise a module will add rigidity to the module in the horizontal position. The module will still need to be handled in the vertical position but the ribs will add needed strength for installation and operation. Holes down the center of the rib do little to degrade the strength of the rib and it allows flow of epoxy from one tube to the next giving a better bond than only stainless to PVC.

Page 12: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Below are the numbers of 7 and 8 cell tubes per layer in a sextant. The nominal gap is from recent information from Jim Krebs and Sandro Calcaterra that was used for RPC design. The designed “dead space” is nominally 2cm. NOMINAL DEAD LAYER 8 CELL 7 CELL GAP SPACE 1 18 5 1928mm 25.3mm 2 23 0 1986mm 33.3mm 3 23 1 2049mm 22.4mm 4 22 3 2113mm 20.5mm 6 26 0 2240mm 32.6mm 8 25 3 2367mm 19.8mm 10 29 0 2494mm 31.9mm 12 30 1 2640mm 18.1mm 14 29 4 2783mm 21.3mm 16 33 2 2973mm 21.5mm 17 32 4 3037mm 20.6mm 18 34 3 3130mm 18.7mm

Page 13: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

8 8 8 8 8 8

8 8 8 8 8 8

77 7 7

8 8 8 8 77 7

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

8 8 8 8 8 8

3 1

13

13

13

22

13

14

14

23

15

15

15

1

1

Layer

1

2

3

4

6

8

10

12

14

16

17

18

CIRCLED NUMBERS ARE NUMBER OF MODULES PER SEXTANT

508.4

508.4

508.4

508.4

508.4

508.4

508.4

508.4

508.4

508.4

508.4

508.4 563.3

BLUE RECTANGLE 8 CELL TUBE RED RECTANGLE 7 CELL TUBE

77 7 7 7

8 8 8 8 8

373.5

423.5

498.4

8 8 8 8 8 7

563.3

8 8 8 8 7 7 7

593.3

8 8 8 8 8 8 8

423.5

8 8 8 8 8 8 8 7 7 7

423.5

8 8 8 8 8

7

8

8 8 8 7 7

8 8 7 7 7 7

393.5

583.3

383.5

403.5

468.4

423.5

8 8 8 8 8

Shown below are module arrays with their widths in millimeters along with the numberof 7 and 8 cell tubes for each module for one sextant. The module widths include stainlesssteel reinforcement between the tubes but not on the outer edges.

Page 14: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

21

6

3

4 5

1210

7

9

8

11

13

14

1615

17

18

1600400 800

550

525

1075

1600

SIDE PLATES

HORIZONAL PLATE

Modules will be installed without corner plates or center plates in place but for replacement of a module the center plate must be removed on the horizontal sextants and one of the center plates must be removed on the side sextants corner plates remain installed.

Page 15: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

This table is of the barrel layer openings provided by SLAC for RPC design. The sizes in millimeters represent the opening minus 5mm on

each side.

Page 16: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

This table is the actual production sizes of the barrel RPC’s

Page 17: Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating

Installation fixtures that will be used for brass installation and module installation are being drawn up at SLAC. Brass deflection problems are being considered at SLAC and Princeton.

Ohio State and Princeton are working on quality control procedures for the tubes and modules at their respective sights. SLAC will also be implementing a quality control plan for the modules when they arrive at on sight.