MONITORING MONITORING SYSTEM SYSTEM OF OF EU STRUCTURAL FUNDS EU STRUCTURAL FUNDS : : P P HYSICAL INDICATORS HYSICAL INDICATORS International Conference for New Member States International Conference for New Member States February February 1-2 1-2 , 2012, Vilnius (Lithuania) , 2012, Vilnius (Lithuania) European Social Fund European Regional Development Fund Cohesion Fund The Ministry of Finance of the Republic of Lithuania

Upload: holmes-vega

Post on 02-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

MONITORING SYSTEM OF EU STRUCTURAL FUNDS : P HYSICAL INDICATORS. The Ministry of Finance of the Republic of Lithuania. International Conference for New Member States February 1-2 , 2012, Vilnius (Lithuania). European Social Fund European Regional Development Fund Cohesion Fund. - PowerPoint PPT Presentation

TRANSCRIPT

MONITORING MONITORING SYSTEMSYSTEM OF OF EU STRUCTURAL FUNDSEU STRUCTURAL FUNDS::

PPHYSICAL INDICATORSHYSICAL INDICATORS

International Conference for New Member StatesInternational Conference for New Member States

FebruaryFebruary 1-2 1-2, 2012, Vilnius (Lithuania), 2012, Vilnius (Lithuania)

European Social FundEuropean Regional Development FundCohesion Fund

The Ministry of Finance of the Republic of Lithuania

Aim and structure of the presentationAim and structure of the presentation

• Aim is to overview Lithuanian monitoring system of physical indicators, as background for the discussion on experience of other countries

• Structure:

– Planning process of indicators– Data gathering process– Progress made and problems

to be solved– Challenges for the future

Categories of physical indicatorsCategories of physical indicators

• NSRF: context indicators

• OP: context, core, result and product indicators

• Evaluations: impacts

Planning Process of IndicatorsPlanning Process of Indicators (I) (I)

Top-down ApproachTop-down Approach

OPERATIONAL OPERATIONAL PROGRAMMES:PROGRAMMES:

OP indicatorsOP indicators(priority level)

OP OP COMPLEMENTS:COMPLEMENTS:

OP OP andand national national

indicatorsindicators (measure level)

APPLICATIONS APPLICATIONS ANDAND CONTRACTS:CONTRACTS:

OP, national OP, national andand project project indicatorsindicators(project level)

GUIDELINES GUIDELINES FOR FOR

APPLICANTS:APPLICANTS:

OP OP andand national national indicatorsindicators

(calls for proposals)

Planning Process of IndicatorsPlanning Process of Indicators (II) (II)

• 4 OP: HRD, EG, PC, TA.

• 16 OP priorities. 195 OP measures. Each OP priority is implemented through approximately 12 OP measures.

• Each OP priority has approximately 10 OP indicators (5 output and 5 result indicators).

• Each OP measure has approximately 1 OP indicator and 3 national indicators.

• Total number of OP indicators: 160 (86 output and 76 result indicators).

• Total number of national indicators: 537 (282 output and 255 result indicators).

Methodological GuidelinesMethodological Guidelines

• Basic principles for the planning, monitoring and calculation of indicators are laid down in the Guidelines adopted by the Managing Authority.

• In accordance with these guidelines the general descriptions for the calculation of all indicators have been prepared by the ministries and approved at the committee for OPs management.

• Concrete descriptions for the calculation and measurement of indicators of the specific measures are being approved in every guidelines for applicants for a particular OP measure.

Code of indicator

Code of indicator at higher

level

Name of indicator

Explanation of indicator

Measurement of indicator Responsible institution

Unit of measurement

Type of calculation

Calculation formula

Source of information

Time

ExampleExampless of the Description of the Descriptionss of Indicator of Indicatorss

Data GatheringData Gathering

OP’sOP’s

OPOP complements complements

IT systemIT system

ContractsContracts

Payment claimsPayment claims

Project reports Project reports after project after project completioncompletion

Targets / baselines Achievements

Studies / Studies / evaluationsevaluations

ReportsReports

No Progress in 2007-2013

1. More specific and informative indicators. National indicators are used (when OP indicators are not sufficient for the monitoring of measures funded).

2. Descriptions of OP and additional national indicators are prepared in advance and are known for the applicants during the preparation of the project.

3. Data on the achievements are collected using IT system: data from e-forms of payment claims is automatically imported to the IT system and is being aggregated electronically.

4. Data on the achievements are collected together with data on project activities and financial data. Funds are not allocated to beneficiaries until the data on the achievements of physical indicators indicated in the e-forms of payment claims is not confirmed.

Progress made Progress made

In progress…In progress…

• Amendment of indicators and their targets set in the OP’s.

• Unification of the descriptions of the same OP indicators.

• Preparation of the methodology for application of financial sanctions for beneficiaries.

• Creation of risk managements tools for the achievement of indicators and their targets.

• Development of an instrument for simulation/ prognosis of likelihood of achieving targets.

Example 1: main principles Example 1: main principles for application for application of of financial sanctionsfinancial sanctions for beneficiaries for beneficiaries

• If value of indicator is decreased or not achieved directly due to the decrease or non-fulfillment of scope of project activity, then implementing body should adopt decision to decrease funds allocated to the project or to return part of the disbursed funds proportionately according to the scope of decreased/non-fulfilled project activity.

• If value of indicator is decreased or not achieved because of the influence of external factors which do not depend on (non)activity of beneficiary, then decision to decrease funds allocated to the project or to return part of the disbursed funds is not taken.

• If the value of indicator is decreased or not achieved because of the non-effective performance of project activity, then it should be adopted decision to decrease or return part of the funds proportionately according to the scope of non-effectively performed project activities or decreased/non-achieved part of the indicator in project budget following the methodology prepared in advance by implementing bodies.

Example 2: Example 2: risk managementsrisk managements tool for the tool for the achievement of indicatorsachievement of indicators

Risk level is assessed comparing:

• Share of targets of physical indicators planned in the OP or its complements with shares of contracted values of physical indicators and allocations.

• Share of targets of physical indicators planned in the OP or its complements with shares of achieved values of physical indicators and expenditure paid.

• Share of contracted values of physical indicators and allocations with shares of achieved values of physical indicators and expenditure paid.

Example 3: an instrument for annual forecasts of likelihood of achieving targets

• The aim of the instrument is to see tendencies of achieving targets from the beginning of the period until the end of the period (2015) and to get forecast of the achievements in each upcoming calendar year.

• The basis of forecast is data from contracts:

– Targets that should be achieved during the project will be assigned to that calendar year in which the project is supposed to be finished.

– Targets that should be achieved after the project completion will be assigned to that calendar year after the project implementation which is attributed to certain indicators.

• Weakness: forecasts will be available only for the targets set in the contracts.

Problems to be solvedProblems to be solved

• Annual plans for achievement of physical indicators are not prepared and intermediate targets are not set.

• No any formal linkage between physical and financial indicators in planning process (at OP or project levels).

• Financial sanctions for the beneficiaries are not applied systematically in case of underachievement of physical indicators.

Challenges for the futureChallenges for the future

• Result-based managementResult-based management: : – Setting of mid-term targets for outputs and results in

performance framework.

– Unit costs for indicators? Integrated financial and physical progress planning and periodic monitoring.

– Performance review leading to performance bonus or financial sanctions. Annual plans for the achievement of physical indicators are needed?

• New logic for result indicatorsNew logic for result indicators (in ERDF):– Data collection from projects and external sources.

Use of national statistics for result indicators.

– Evaluation of EU structural funds’ impact to the changes of result indicators. Contribution of other factors.

• Contrafactual evaluations. Can physical indicators provide sufficient information?

• …?