mp 296 mp 297 mp 00 298 20 8 1 s h tpuc.sd.gov/commission/dockets/hydrocarbonpipeline/2007/... ·...
TRANSCRIPT
NWI_23716
W_UTM14_AERIAL_15593
W_UTM14_AERIAL_15594
W_UTM14_AERIAL_18141
SHEET 14 OF 20 SHEETS
STA. 1691+20 TO STA. 1821+28
1833-03-ML-02-014 2
MAT
CH
LIN
E
16
90+0
0
MAT
CH
LIN
E
18
20+0
0
1690
+00
ML-SD-CK-0664.0000
1701
+19
ML-SD-CK-0665.0000 ML-SD-CK-0666.0000
1754
+14
ML-SD-CK-0667.0000 ML-SD-CK-0668.0000
1807
+61
ML-SD-CK-0669.0000
AS-BUILT ALIGNMENT
1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.
KEYSTONE MAINLINE (NPS 30 2009) FERNEY SECTION
SPREAD 3B DISCIPLINE 03
UEI
LOYS ALVIN GRAY, III SD CE9004
1833
176T
H S
TRE
ET
RD
-SD
-CK
-066
5.00
00
1727+55
1691
+20
1821
+28
80'FBE & ARO
BR.
1728
+36
1729
+16
3,716'FBE
2
5,216'FBE
111'FBE & ARO
BR.
1781
+32
1782
+43
3,885'FBE
MA
TCH
LIN
E
1691
+20
MA
TCH
LIN
E
1821
+28
1701
+19
FE
NC
E
1727
+46
ED
GE
OF
RO
AD
1727
+55
CL
176T
H S
TRE
ET
1727
+62
ED
GE
OF
RO
AD
1754
+14
FE
NC
E
1780
+42
TE
LEP
HO
NE
LIN
E
1780
+51
ED
GE
OF
RO
AD
1780
+62
CL
CO
UN
TY R
OA
D 4
8
1780
+72
ED
GE
OF
RO
AD
1780
+91
TE
LEP
HO
NE
LIN
E
1781
+06
FE
NC
E (B
AR
BE
D W
IRE
)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
1702
+40
FE
NC
E
1728
+19
P.I.
00°
30'3
4" R
T.
1728
+68
ED
GE
OF
RO
AD
1728
+77
CL
176T
H S
TRE
ET
1728
+85
ED
GE
OF
RO
AD
1731
+24
P.I.
03°
40'0
5" R
T.
1755
+37
FE
NC
E
1779
+32
P.I.
01°
40'5
0" R
T.17
80+3
3 P
.I. 0
3°13
'20"
LT.
1781
+67
TE
LEP
HO
NE
LIN
E
1781
+76
ED
GE
OF
RO
AD
1781
+87
CL
CO
UN
TY R
OA
D 4
8
1781
+97
ED
GE
OF
RO
AD
1782
+16
TE
LEP
HO
NE
LIN
E
1782
+31
FE
NC
E
1782
+62
P.I.
00°
01'2
8" L
T.
1786
+05
P.I.
07°
13'1
1" R
T.
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
1726
+97
P.I.
00°
30'3
4" R
T.
1730
+01
P.I.
03°
40'0
5" R
T.
1778
+07
P.I.
01°
40'5
0" R
T.17
79+0
8 P
.I. 0
3°13
'20"
LT.
1781
+37
P.I.
00°
01'2
8" L
T.
1784
+80
P.I.
07°
13'1
1" R
T.
ML-SD-CK-0664.0000ML-SD-CK-0665.0000
ML-SD-CK-0666.0000
ML-SD-CK-0667.0000
ML-SD-CK-0668.0000ML-SD-CK-0669.0000
176T
H S
TREE
T
CO
UN
TY R
OAD
48
(177
TH S
TREE
T)
1820
+00
CO
UN
TY R
OA
D 4
8R
D-S
D-C
K-0
667.
0000
1780+62
MP296 MP
297
1692
+54
5.8
' CV
R.
1707
+45
5.0
' CV
R.
1728
+44
7.1
' CV
R.
1737
+80
5.2
' CV
R.
1748
+08
5.9
' CV
R.
1755
+35
5.2
' CV
R.
1781
+77
6.6
' CV
R.
1784
+81
5.0
' CV
R.
1793
+79
6.1
' CV
R.
1800
+18
5.2
' CV
R.
1819
+12
6.2
' CV
R.
12,817'30" O.D. X 0.386" W.T., API -5LX-70 W/FBE COATING2191'30" O.D. X 0.516" W.T., API -5LX-70 W/FBE COATING &3
NATURAL GROUND
TOP OF PIPE
PIPELINE WARNING SIGNS 6 EACATHODIC TEST STATION 2 EAAERIAL MARKER 0 EA
PIPELINE MARKERS 0 EA
3 2 3 2
1702
+41
1775
+35
1726
+97
P.I.
00°
30'3
4" R
T.
1730
+01
P.I.
03°
40'0
5" R
T.
1778
+07
P.I.
01°
40'5
0" R
T.17
79+0
8 P
.I. 0
3°13
'20"
LT.
1781
+37
P.I.
00°
01'2
8" L
T.
1784
+80
P.I.
07°
13'1
1" R
T.
1732
+81
1735
+64
ABRASION RESISTANT OVERCOAT
LAT. 44.826104LONG. -97.940484
LAT. 44.840560LONG. -97.939587
1781
+55
UN
DE
RG
RO
UN
DP
OW
ER
LIN
E17
82+8
0 U
ND
ER
GR
OU
ND
PO
WE
RLI
NE
(177
TH S
TRE
ET)
(177
TH S
TRE
ET)
(177
TH S
TRE
ET)
MA
TCH
LIN
E
1690
+00
MA
TCH
LIN
E
1820
+00
MP298
LAT. 44.811836LONG. -97.943576
1706
+64
M.P
. 296
1759
+44
M.P
. 297
1812
+24
M.P
. 298
1781
+76
P.I.
02°
14'2
7" R
T.
1781
+76
P.I.
02°
14'2
7" R
T.17
83+0
2 P
.I. 0
2°14
'27"
RT.
1787
+19
P.I.
00°
51'2
3" R
T.
1788
+45
P.I.
00°
51'2
3" R
T.17
87+1
9 P
.I. 0
0°51
'23"
RT.
TEST SECTION 3B-1ILTO-025-2010
(20)
1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.
2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.
3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.
4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.
5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.
8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.
9) CPS CALCULATION DATE: MAY 2010.
10) ORION STATION SERIES NUMBER: 1182700.
6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.
11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 13922+16 AND DIVIDE BY 5280.
7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75 AND OCTOBER 10, 2009 FOR M.P. 301.75 TO M.P. 343.98.
10/02/08
M.P. 295.71 TO M.P. 298.17
FOR
CO
NTI
NU
ATI
ON
SE
E D
WG
.18
33-0
3-M
L-02
-015
FOR
CO
NTI
NU
ATIO
N S
EE
DW
G.
1833
-03-
ML-
02-0
13
5.6'
CV
R.
3.0'
CLR
. (A
BO
VE
)
5.0'
CV
R.
3.5'
CLR
. (A
BO
VE
)
5.5'
CV
R.
1.5'
CLR
. (A
BO
VE
)