Mr. Al Hammonds
Manufacturing and Quality Director
Strategic Partnership for Industrial Resurgence
The Center for Industrial Effectiveness, University at Buffalo
And
Instructor, UB Department of Industrial Engineering
Lean Manufacturing
And
Six Sigma
EAS 590 – February 25, 2004 used again March 2, 2005
![Page 2: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/2.jpg)
Flow Manufacturing Modules/Agenda
Identifying the Value Streams
Improve Flow
Determine Resources to Meet Customer Demand
Process Design for Flow
Identify the Value Streams and Draw Product SynchronizationCalculate Total Product Cycle Time and Identify Critical Path Prepare the Financial Report Card (Optional)
Prepare the Process Flow Chart and Lead Time Reduction GraphEliminate Non-Value Added Time on the Critical Path to Reduce TPc/tStabilize the Processes in Preparation for Flow
Prepare Process Map and Product SynchronizationsGather Data from the Production ProcessCalculate Takt TimeDetermine Required Machine and Labor Resources
Calculate Planned Cycle TimeAssign Work Elements to Machines and OperatorsEstablish Material & Information FlowFinalize and Validate the DesignFormalize & Implement
Plant Wide Flow Plan
Identify Activity RelationshipsAnalyze Material Flow DensityEstablish Block Layout
![Page 3: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/3.jpg)
Flow Manufacturing Manual
• Establish a Team• Define the Problem• Gather and Analyze Data• Redefine Operations and
Procedures • Formalize and Validate Changes• DO IT AGAIN!
Design New or Modify Existing Manufacturing Systems:
![Page 4: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/4.jpg)
Flow Manufacturing Contents• 6 “How-To” Chapters
• Value Stream Identification• Improve Flow • Determining Resources to Meet Customer
Demand• Process Design for Flow• Plant-Wide Flow Plan• Financial Report Card
![Page 5: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/5.jpg)
Flow Manufacturing Contents• 9 Operational Definitions
1. Process Integration & Flexible Work Cells
2. Elimination of Waste
3. Constraint Management
4. Level Scheduling
5. Delphi PDP
6. Simulation for Flow Manufacturing
7. Value Stream
8. Lean Guidelines Equipment & Workstations
9. Synchronous Assist Devices
![Page 6: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/6.jpg)
Value Stream•Definition
•Within Manufacturing, the Value Stream is defined as:
“The set of all specific actions required to bring a specific product through the physical transformation task proceeding from raw materials to a finished product in the hands of the customer.”
![Page 7: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/7.jpg)
Value Stream
• Objectives
1. Understand the Definition and Purpose of Value Streams.
2. Understand Total Product Cycle Time.
3. Understand how to Analyze a Value Stream.
![Page 8: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/8.jpg)
FM-05 Plant Wide Flow Plan
PLATE
SAW
RECEIVE
STORE
PAINT
TURN GRINDMILL
ASSY
WELD
Material Flow in a Process Oriented Layout
Material Flow in a Product Oriented Layout
RECE
IVE
GEN
ERAL
SER
VICE
S
PAINT
WELD
TURN
SAW
SAW
STO
RE
PAINTTURN
MILL ASSY
GRIND
PLATE
ASSY
![Page 9: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/9.jpg)
FM-02 Improving Flow•Purpose
•Reduce TP c/t Using Quality Network Leadtime Reduction:
•Value Added / Non-Value Added
•Process Flow Chart
•Lead Time Reduction Graphic
•Interdependent Element Analysis
![Page 10: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/10.jpg)
Lead Time Reduction Graphic Tool
ORIGINAL
Non-ValueAdded
ValueAdded
Process 2Process 1
Process 3Wash
Process 4
PLANNEDIMPROVEMENTS
Non-ValueAdded
ValueAdded
Process 1/2
Process 3/Wash
Process 4
POTENTIAL WITHCOMBINATION
Non-ValueAdded
ValueAdded
Process 1/2/3/Wash/4
Electronic Version Available (Developed by Global Manufacturing
Systems Group)
![Page 11: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/11.jpg)
Improving Flow - Implementation
• Map out Process with VA / NVA time.
• Ask WHY? WHY? WHY? WHY? WHY?
• Generate Solutions considering all of the interdependent elements.
• IMPLEMENT Improvements.
![Page 12: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/12.jpg)
FM-03 Determine Resources
This phase collects the data needed for flow process design and determines the machine and labor resources required to meet customer demand.
Purpose
![Page 13: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/13.jpg)
FM-03 Determine Resources
• Engage the team in the data gathering process.
• Learn the tools of data gathering.
• Capture work elements as completely as possible.
Objectives
![Page 14: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/14.jpg)
Takt Time
Takt Time = Scheduled Runtime
Total Customer Requirements
Scheduled Run Time:Time scheduled to run per day - breaks, lunches,meetings, planned maintenance
![Page 15: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/15.jpg)
Process Design for Flow - Strategies
• Defining Flow Concepts• Planned Cycle Time• Defining Machine and Manual Operations• Defining Material and Information Flow• Finalize Layout• Formalizing Best Practices
![Page 16: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/16.jpg)
One piece flow is the goal
Buffers only needed where an imbalance between operations exists - use formula
Strategically place buffers
Use standard quantities that fit in the operator envelope
Buffer Size Determination
![Page 17: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/17.jpg)
Validate Process Design / Finalize Layout
• Validate and Optimize Process Design• Verify machine and operator cycle times are
below Planned Cycle time.• Perform computer or manual simulation if
necessary.
• Formalize Layout• Exact location of equipment to scale.• Incorporate material flow.• Apply workplace organization.• Show any buffers or storage points.
![Page 18: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/18.jpg)
Process Design for Flow - Implementation
• Generate Concepts
• Determine Planned Cycle Time
• Define Operations and Draft PFP Chart
• Map Material and Information Flow
• Finalize Layout
• Formalize Best Practices using PFP
![Page 19: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/19.jpg)
FM-06 Financial Report Card• Plant and Product
– End Items / Product Mix– Product Cost Percentages (Mat’l/Labor/Overhead)
• Inventory– Inv $ by RAW, WIP, FGI
• Productivity– Uptime / Overtime / Staffing (Salaried & Hourly)
• Quality– Scrap & Rework Costs / PPM
• Floor Space• Flow Manufacturing
– Total Product Cycle Time – Work Content, Non-value Added, Value Added
Focused on Identifying Potential Savings
![Page 20: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/20.jpg)
Six Sigma / Kaizen / Lean What does it all mean?
Essential Tools for Survival
Presented by:Thom MarraFebruary, 2004
![Page 21: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/21.jpg)
Six Sigma / Kaizen / Lean – Why does any of this matter?
The Old Testament
• Customer Satisfaction
• Quality (for its own sake)
• Cost Reduction
• Market Share
• Market Research
![Page 22: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/22.jpg)
Six Sigma / Kaizen / Lean – Why does any of this matter?
The New Testament
• Customer Loyalty
• Customer Retention
• Zero Defections
• Lifelong Customers
![Page 23: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/23.jpg)
Culture - SWOT
• Strengths (core competencies)
• Weaknesses
• Opportunities
• Threats
• Different Strokes for different folks
![Page 24: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/24.jpg)
People – Power in the People
Typica l O rgan iza tion C hart
C E O
![Page 25: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/25.jpg)
Six Sigma vs. Kaizen
![Page 26: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/26.jpg)
Kaizen
• A problem solving methodology• A systems approach• 7 QC tools• 7 Management tools - Affinity diagram, Tree
diagram, Process decision program chart (PDPC), Matrix diagram, Interrelationship digraph (I.D.), Prioritization matrices, Activity network diagram
• Teams / everyone• Kaizen is a process oriented way of thinking. It
rewards for improvement in the process & trusts (has faith) the results will follow.
![Page 27: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/27.jpg)
Six Sigma
• Six Sigma means something different to every company: a goal, a philosophy, a tool box, customer focus, a management system
• 3.4 defects per million opportunities• Stresses breakthrough improvement, not
incremental improvement• Should be part of a larger business system• Emphasizes a very structured approach –
DMAIC• Bottom-line driven
![Page 28: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/28.jpg)
History of Six Sigma
• The statistical tools created < 1980’s• Zero defect concepts introduced – Crosby (late 70’s
early 80’s)• The PC & statistical software – late 80’s• Methodology created (MAIC) (Motorola, Allied Signal,
GE) – late 80’s early 90’s• Today – a metaphor for Business and Process
Excellence
![Page 29: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/29.jpg)
Six Sigma – Why Do Six Sigma?
• Money
• Customer Satisfaction
• Quality
• Impact on Employees
• Growth
• Competitive Advantage
![Page 30: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/30.jpg)
Six Sigma – Why not Six Sigma?
• The company has a strong, effective performance and process improvement effort in place
• Current changes are already overwhelming
• Potential gains aren’t sufficient to finance the investments
![Page 31: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/31.jpg)
Six Sigma – What to Solve?
• Project cost savings
• Customer satisfaction deliverables
• Processes
• Problems
• Targeted location
• Design
• Supplier processes
![Page 32: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/32.jpg)
Six Sigma – Roles
• Executive
• Champion
• Process owner
• Master Black Belt
• Black Belt
• Green Belt
• White Belt
![Page 33: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/33.jpg)
Data driven
![Page 34: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/34.jpg)
Data driven
““Statistics is the art and science of Statistics is the art and science of
discovering what is at first difficult to discovering what is at first difficult to
see and later becomes obvious.”see and later becomes obvious.”
- Author unknown- Author unknown
![Page 35: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/35.jpg)
Uncertainty
![Page 36: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/36.jpg)
Variability
![Page 37: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/37.jpg)
Statistics
![Page 38: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/38.jpg)
Six Sigma - DMAIC
• Define
• Measure
• Analyze
• Improve
• Control
![Page 39: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/39.jpg)
![Page 40: Mr. Al Hammonds Manufacturing and Quality Director Strategic Partnership for Industrial Resurgence The Center for Industrial Effectiveness, University](https://reader030.vdocument.in/reader030/viewer/2022032701/56649c925503460f9494d658/html5/thumbnails/40.jpg)
Six Sigma - DFSS
DFSS – Design for Six Sigma
• QFD – Quality Function Deployment
• Robust Design and Process
• FMEA – Failure Mode and Effects Analysis
• Design for X
• Special design tools