EXECUTIVE SUMMARY As part of the course curriculum of degree of Master of Business Administration of Mahatma Gandhi University I am required to undertake an organisation study in an organization in second semester. I have done this study in MRF Ltd Kottayam Unit in Kerala. MRF Ltd is the most reputed tyre manufacturer in India. MRF is the first Indian company to compete in the international tyre industry. This rich heritage prompted me to choose this company for my study. In MRF Ltd during my four weeks of study I mainly focused on the functioning of various departments and the overall structure of the organization The objectives of my study are, to know the tyre industry in general and the organizational structure of the company, various functioning of the company, and different departments of the company. The scope of this organizational study includes a general understanding of the importance of tyre industry, the functional department of the company, especially marketing and HR, organization structure of the company and a SWOT analysis. The scope of this organizational study includes a general understanding of the importance of tyre industry, the functional department of the company, especially marketing and HR, organization structure of the company and a SWOT analysis. 1

Upload: tony-jacob

Post on 09-Nov-2014

2.342 views

Category:

Documents


341 download

DESCRIPTION

AN ORGANISATON STUDY REPORT

TRANSCRIPT

Page 1: MRF PROJECT REPORT

EXECUTIVE SUMMARY

As part of the course curriculum of degree of Master of Business Administration of Mahatma Gandhi

University I am required to undertake an organisation study in an organization in second semester. I

have done this study in MRF Ltd Kottayam Unit in Kerala.

MRF Ltd is the most reputed tyre manufacturer in India. MRF is the first Indian company to compete

in the international tyre industry. This rich heritage prompted me to choose this company for my

study. In MRF Ltd during my four weeks of study I mainly focused on the functioning of various

departments and the overall structure of the organization

The objectives of my study are, to know the tyre industry in general and the organizational structure

of the company, various functioning of the company, and different departments of the company.

The scope of this organizational study includes a general understanding of the importance of tyre

industry, the functional department of the company, especially marketing and HR, organization

structure of the company and a SWOT analysis.

The scope of this organizational study includes a general understanding of the importance of tyre

industry, the functional department of the company, especially marketing and HR, organization

structure of the company and a SWOT analysis.

1

Page 2: MRF PROJECT REPORT

INDUSTRIAL PROFILE

Rubber industry in India

The Indian goods industry is now more than 80 years old. The 1st factory has been set up in 1920 at

Calcutta. Today the industry consists of 3500 manufacturing units.

The rubber goods industry plays a very important role in the development of road transport sector.

The industry can be broadly classified in to tyre and non-tyre section. The rubber goods unit

consumes three types of rubber; natural rubber, synthetic rubber and reclaimed rubber. The rubber

industry’s performance in physical term was not up to the mark of some years, but its financial

performance was good. The industry is the third largest contributor to the nation exchequers by way

of duties and taxes.

Tyre is a covering for the outer rim of a wheel. The main feature of rubber tyre ability to absorb the

shock and strain created by bumps in the road; provide a comfortable ride and protect many kinds

of cargos, the rubber in a rubber tyre supports the weight of a vehicle. Another important feature of

their ability to grip the road.

The pneumatic tyre was invented in 1845 by Robert.W.Thomson, a Scottish engineer. In 1970 the 1 st

solid rubber tyre appeared in English. John and Dunlop, a Scottish Veterinary surgeon improved on

Thomson’s invention in 1988.

Tyre is rather a contrast industry especially when its linkage with Indian economic growth is

concerned. There are 22 major tyre companies in the country, 10 are larger undertaking producing a

wide range of tyre including bus and truck tyres. There are 12 medium sized companies.

The tyre industries were classified under 3 heads;

The 1st generation companies viz: Dunlop and Firestone (New Bombay Tyre International Ltd) were

set up in the last 30’s and early 40’s.

The 2nd generation companies then come up in 60’s .they are MRF tyres, CEAT, GOOD YEAR and

PREMIER.

The 3rd generation companies that were setup in 70’s .they are JK Tyres, VIKRANT, APPOLO and

MODI tyres.

2

Page 3: MRF PROJECT REPORT

Indian tyre markets

Market for tyres can be broadly classified or segmented in to 3 categories;

Original Equipment Market (OEM)

Replacement Market

Export Market

Maintain demand is generated by the replacement market where business volume is high. While the

OE demand is a linear function of Automobile production whose growth in turn is determined by

overall economic situation and the government policy. India is still in cross ply tree age when

advanced countries are in to radial tyres and tubeless tyres.

Though the tyre majors have been twinkling of getting into truck radial segment but no official

moves have been made by the major tyre companies. This point out that radial tyres are not actually

suited for Indian environment.

Tyre industry in India is predominantly dependent on natural rubber as against synthetic rubber,

experts say that the ratio of natural rubber usage to synthetic rubber could be as high as 80:20 but it

is just the opposite in abroad.

Global ranking of Major Tyre Companies (as per Sept.2008)

1. Michelin

2. Bridgestone

3. Goodyear

4. Continental

5. Sumitomo

6. Pirelli

7. Yokohama

8. Kumho

9. Cooper

10. Toyo

11. Hankok

12. MRF

13. Oksta

14. Shanagai

15. Chingshi

3

Page 4: MRF PROJECT REPORT

Indian Tyre Industry-Salient Features

1. Adaptability & absorption

Successful and fast absorption of international technology and availability of technical

expertise and professional to absorb and implement technological advancements.

2. Innovativeness

Several innovations were introduced to apply international technologies to manufacture

tyres suitable for Indian road conditions.

3. Exports

Sustained exports for over a decade to more than 50 countries. All large tyre companies

are exporting tyres of which 30%exports is to USA.

4. Technology progression

Within a span of 4 decades, technology had progressed as well as tyre industry had moved

from cotton (reinforcement) carcass to high performance radical tyres’

5. Wide product range for diverse usage

From a Moped/Light motor cycle tyre weighting 1.5 kg. To an earth mover tyre weighting

1.5 tone tyre industries in India, manufactures them all.

6. Indigenous & ready availability

New vehicle manufacturers while launching as a series of their latest models have easy

access to and ready availability of indigenous tyres of their respective specification and

matching of international standards.

4

Page 5: MRF PROJECT REPORT

POLICIES OF MRF

QUALITY POLICY OF MRF

It is to maintain market leadership through continuous quality improvement.

To achieve this goal, all the MRF plants and the corporate office shall pay particular attention to the

following;

Product/process improvements by field/plant performance monitoring and prompt service

to the customer.

Up gradation of machinery to meet the increasing needs of the customer.

Continuous training of all employees in order to acquire necessary skills and knowledge.

At the plant level, respective Senior General Manager/General Managers are assigned the

responsibility of carrying out the quality systems by collaborating with corporate functions.

SAFETY POLICY OF MRF

It is the policy of our company that the Safety and Health of our employees shall be our first priority.

It is the responsibility of everyone in this organisation, regardless of the position he occupies, to

ensure that everyone in the factory returns home to his beloved ones without any injury today and

every day.

We shall observe this policy not only in letter but also in spirit and offer “ACCIDENT FREE SAFE

PRODUCTION” for the benefit of one and all. ENVIRONMENTAL POLICY OF MRF is to be

manufacturing our products in an environmentally friendly and safe manner.

To achieve this goal, all the MRF plants, together with corporate office shall;

Minimize the impact of our manufacturing activities on the environment, especially the air,

water and soil.

Comply with all applicable regularity requirements.

Develop environmental performance evaluation procedures for continuous monitoring.

Optimise the consumption of resources (water, energy and raw materials) by minimising

wastages, recovering and recycling where ever possible.

Up gradation of the machinery and pollution control equipment when required.

Train all the employees to perform their activities in an environmentally responsible safe

manner.

5

Page 6: MRF PROJECT REPORT

At the plant level, the respective Senior General Managers/General Managers are assigned the

responsibility of carrying out the environmental system by collaborating with corporate functions.

TRAINING POLICY OF MRF

It helps to provide and develop knowledge, skills and behaviour of our employees to continuously

improve their performance.

To achieve this goal, all MRF plants together with the corporate office shall;

Identify and document training needs of each employee, through competence evaluation

each year.

Design and publish training calendar and schedule.

Provide training periodically based on identified needs and as per the document schedule.

Monitor and evaluate training process and outcomes to access and to decide the next

training cycle requirements.

At the plant level the respective Senior General Managers/General managers and Plant Managers

are assigned the responsibility of carrying out the training activities through Human Resources

Department of the plant and corporate office.

CORPORATE GOVERNANCE

MRF philosophy on corporate governance envisages the attainment of the highest level of

transparency, accountability and equity in all fact of its operations and all its interactions with its

furtherance to the above company has compiled with the crores.

6

Page 7: MRF PROJECT REPORT

Major market players and their market share

Some of the major players in Indian tyre industry are MRF, Ceat, JK industries, Apollo tyres,

Bridgestone India, Goodyear India, Falcon Tyres and TVS Srichakra.

Name of the company Market Share

MRF Ltd. (Market leader) 24%

Apollo tyres Ltd. 21%

JK Tyre & Industries 18%

Ceat Ltd. 13%

Others 24%

OBJECTIVES OF THE COMPANY

The main objective of the company is ‘to attain global standard through continuous improvement in

the quality products and service in order to maintain market leadership.’ The main strategy of the

company in today’s competitive world is ‘cut cost and win the battle.’

As the number of accidents in similar factories is comparatively more, the emphasis of the company

is ‘accident free safe production’.

MRF Ltd. achieves the objectives by taking the following actions;

Product/process improvement by performance monitoring and prompt service to the

customer

Up gradation of all the machinery to meet the increasing needs of customer.

Continuous training is given to all employees in order to acquire necessary skills and knowledge and

improve the quality of work life.

Vision and Mission

The vision of MRF is to be a significant global player delighting customers worldwide and achieve

excellence in manufacturing. Its vision is to be a world class system driven by a team of motivated

high performers and achieve profitable growth. MRF has well defined and clearly quality

environmental safety and health training and Human Resource Policies.

The vision of MRF is to realise their policies and implement the contents there in letter and spirit.

Though MRF is exulting to nearly 100 countries the manufacturing centres are located in India only.

7

Page 8: MRF PROJECT REPORT

MRF encourages being a multinational and for this purposes it is starting manufacturing in other

Asian countries like Sri Lanka.

MARKETING

Tyre and tyre related products are sold under the brand name “MRF” and distributed in domestic

markets through sales offices, dealers, and franchisees. Conveyor Belts are sold under the brand

name “MRF Muscle Flex” to customers directly from Conveyor Belting plant at Arkonam.

The major OEM (Original Equipment Manufacturers) customers of MRF tyres and re Ford India Ltd.,

General Motors India Ltd., Maruti, Hindustan Motors, TATA Motors, Ashok Leyland, Honda Siel, Hero

Honda, Bajaj, LML Ltd., Honda Motors & Scooters India Ltd., Mahindra & Mahindra, Eicher Motors,

New Holland, Volvo, etc. The major Conveyor Belting customers are Cement/Steel/Fertilizer/Thermal

Power Plants, Mines and Ports.

MRF exports tyres and tubes through authorised agents representing countries such as USA, Canada,

Mexico, Brazil, Chile, Australia, Philippines, Bangladesh, Sri Lanka, Korea, Egypt, Nigeria, South Africa,

Ghana, Kenya, Mauritius, UAE, Afghanistan, Pakistan, Iran, Syria, Bahrain, Qatar, Oman, Lebanon,

Greece, Turkey, Malta, UK, Uzbekistan, etc. MRF conveyor belts are exported to Australia, South

Africa, Europe, Canada, Middle East etc.

COMPANY PROFILE

The drama of the Indian roads is in full blossom. All of the world’s automobile majors are here.

SUZUKI,HONDA,MITSUBISHI&TOYOTA FROM JAPAN,DAEWOO&HYUNDAI from Korea, GM&FORD

from USA,FIAT&MERCEDES from Europe. For most of these automobile companies MRF is the tyre of

their choice. MRF tyres goes for 1st tiement on FIAT UNO, FORD Escort, PEAL Astra , HONDA City

&FORD Ikon. The 1st DAEWOO Cielo too rolled out on MRF radials.

MRF was established in 1946. The company name is an acronym for “Madras Rubber Factory”. MRF

today is India’s largest manufacturers and market leader. In a short span of 50 years, it has become

one of the largest rubber companies both worldwide and in the Indian private sector. It is the only

tyre company straddle the sub continent with giant manufacturing facilities.

8

Page 9: MRF PROJECT REPORT

Raw materials

The main raw materials for tyre are:

Rubber (Natural or Synthetic)

Carbon Black

Nylon Cord

Chemicals

The tyre industry is a major consumer of the domestic rubber production. Natural rubber constitutes

80% of the material content in Indian tyre where us 20% is from Synthetic rubber (World Wide this

ratio of natural to synthetic rubber is 30:70). A part from this different type of chemicals is used in

tyres. Locally available natural rubber is an adding advantage for the industry, since it costs 25% of

the total raw material cost of the tyres, where the synthetic rubber accounts for 14% of the total raw

material cost (India imports 60% of its synthetic rubber requirements).

Companies’ product profile

MRF brands are the market leaders in almost every segment; MRF brands are,

Super lug (truck tyre)

Shakthi (tractor tyre)

Zigma (radial car tyre)

Though the years MRF has been ranked No.1 in various segments of the rubber industry. It is the

largest producer of produced retreads and perhaps the largest Asian today. In the global arena, MRF

is an active exporter to as many as 65 countries. It has become India’s largest and the world’s 12 th

largest tyre manufacturing company.

Automotive tyres are the main products of the company;

Truck tyres-Tube type and Tubeless type

Light truck tyres

Special Tyre for defence

Tyre for industrial application

Agricultural tractor and tiller tyres

Off the road tyres-solid tyres and earth mover tyres

Non-tyre products

9

Page 10: MRF PROJECT REPORT

Automotive tubes

flaps

Conventional tread rubber

Pre-cured tread rubber

Vulcanizing solution

Tyre repair materials

Conveyor Belts

MRF metal coat

MRF wood coat

MRF glass coat

The Muscle Man

The corporate ethos is perfectly represented by the brand symbol The MRF Muscleman- embodying

strength, reliability, & durability.

The mere mention of the world “MRF” is bound to bring the Muscle man to the mind of Indians. The

muscle man has evolved in 1964 soon after MRF began exporting tyres. Over the past 33 years it has

evolved from a mere corporate Mascot to a symbol of strength, reliability and durability. Now the

muscle man grew to become India’s most trusted and well recognised symbol for tyres.

In the 1960s the Indian tyre market was completely controlled by the large multinational

companies. Around this time MRF opened tyre factory at Thiruottiyur in Tamil Nadu. With that came

a task of recognising an appropriate corporate brand symbol. In this process of developing

suggestions for the symbol, some enterprising employees conducted an informal market survey by

interviewing people from all over the country about their expectations from a good tyre. But one

day a truck driver at a road side Dhaba somewhere in western India hit upon the rigid idea when he

said “a good tyre should have all the qualities of a pehelwan(strongman). And by this simple

statement, the muscle man was born.

Quality Management System in MRF

10

Page 11: MRF PROJECT REPORT

The company has a quality assurance department, which was established after the collaboration

with Mansfield tyres USA. Quality is assured through the process of auditing, reporting and

correcting. This includes auditing right from the purchase of raw materials.

AUDITING

PROCESS STABILISATION REPORTING

Major competitors

Apollo tyres

Ceat Ltd.

JK tyres

Goodyear Ltd.

Telco

Subsidiary institutions

Funskool india Ltd.

MRF Muscle flex Conveyor Belting

Product-o-drome

Paint & speciality coatings

MRF pretreads

MRF Pace Foundation

MRF Power house

MRF tyredrome

Devon Machines

Achievements of the company

11

CORRECTIVE & PREVENTIVE ACTION

Page 12: MRF PROJECT REPORT

It was late 1946 , a period that was characterised by the indomitable spirit of freedom , and the “will

to win” among Indians A young pioneer called K.M.MAMMEN MAPPILAI started a small toy balloon

manufacturing unit in a small shed at Thiruvottiyur in Chennai. There were no machines in the unit

but it had an employee with bubbling enthusiasm, innovate ideas and a great vision he was owner

himself.

Any product that could be made from rubber, without machine was produced. From today balloons

to latest cast squeaking toys, industrial gloves and contraceptive, the list is very long.

1949-MRF established its first office at 334, Tham bu Chetty Street, Chennai.

1952- The first machine (a rubber mill) was installed at the factory and MRF ventured in to

manufacture of tread rubber.

1955-MRF started competing with foreign companies operating in India by becoming the only Indian

company to manufacture superior, extruded, non-blooming and cushion backed tread rubber

1956- MRF becomes the market leader in tread rubber with 50% share of Indian market. MRF’s hold

on the market was so strong that the foreign companies started withdrawing from the tread rubber

business in India.

1961-MRF becomes a public limited company. MRF entered in to technical collaboration with

Mansfield Tyre Company of USA and a pilot plant for tyre manufacture was established at

Thiruvottiyur.

1963-Full fledged tyre plant and rubber research centre were inaugurated by Indian’s first Prime

Minister Pandit Jawaharlal Nehru.

With the manufacture of tyres MRF started marching ahead, capitalizing on its strengths,

overcoming its weaknesses, exploring all opportunities and converting every threat in to an

opportunity for growth.

1973-MRF launched Indian’s first NYLON car tyre.

1978-MRF launched Super Lug 78 which later becomes the largest selling truck tyre in India.

1979-MRF’s turnover crossed Rs.100 crores.

1980-MRF entered in to technical collaboration with BF Goodrich Tyre Company of USA. With third

began a significant exercise in quality improvement and new product development.

12

Page 13: MRF PROJECT REPORT

1984-MRF becomes the first tyre to be selected for fitment on Maruthi-800.

1986-MRF won 6 awards for quality improvement from B F Goodrich; pitted against 20 Tyres

Company’s worldwide. It also won the National Institution for Quality Assurance award in the same

year.

1987-MRF becomes the No.1 tyre company in India by crossing the Rs.300 crore turnovers. Since

then MRF has maintained its No.1 position to this date (2005).

1988-MRF place foundation was set up with Dennis Lillie as its director to nurture and develop the

talents of budding cricketers. It concentrated on developing pace bowlers and within a few years it

contributed pace bowlers to the Indian Cricket Team.

1989-MRF collaborated with world’s largest toy maker, Hasbro International and launched Funskool

India, the most modern toy project in Asia.

MRF collaborated with Vapocure of Australia to produce poly-urethane paint formulations.

MRF Zigma radials were launched along with MRF World Series Cricket which was one of the

country’s most spectacular cricketing and marketing events.

The 5th unit of MRF for manufacture of tyres and tubes was opened at Medak in Andhra Pradesh.

MRF tyres drome became India’s 1st tyre company owned wheel care complex.

MRF collaborated with Pirelli to manufacture conveyor belts called Muscle Flex. The same year MRF

brought the world boxing championship to India.

In this year the company bagged the Visvesvaraya award for the best business house in South India.

It also bagged the Haward business school award for best corporate performance.

1991-MRF moved in to its own corporate office which soon became a land mark in Chennai.

1996-In the golden jubilee year the company crossed a turnover of Rs.2000 crores and also set up a

new plant at Pondicherry for the manufacture of radial tyres.

1999-MRF was declared the most ethical company by the “Business World” in its survey.

2004-The company crossed a turnover of Rs.3000 crores.

MRF Ltd. KOTTAYAM UNIT

13

Page 14: MRF PROJECT REPORT

MRF tyres Ltd., Kottayam is one of the most modern plants and was set up in 1969 at Vadavathoor,

about 7 km from the Kottayam town in the state of Kerala, a hamlet lying on the outskirts of the

Kottayam district. About 10 crores of land was purchased in Vadavathoor village during 1968 and the

foundations stone for the factory building was laid by late Sri.K.M.Cherian. Availability of intelligent

and motivated labour, natural rubber in large quantity (Kottayam is the land of 3L’s-Latex, Letters

and Lakes), cheap power. Tariffs, tax concession and transportation facilities were the main reason

behind the choice of Kottayam as the 2nd manufacturing facility of MRF.

A factory with an area of 34200 sq.ft. was constructed during the period of 1968 – 1969 and a ban

bury(internal mixer) of 3A size with a capacity to mix 10MT per day was erected and commissioned

on 21st July 1969,with a strength of 7 workmen, but presently it is a most advanced technology

mixing unit and a fully fledged manufacturing unit producing truck and tractor tyres.

The commissioning of tyre plant in 1994 was the beginning of a new era in the history of Kottayam

unit. Initially tractor front tyres were produced and then it diversified in to passenger tyres, tractor

rear and truck tyres of various sizes. Cement house was also built to prepare various cements and

paints required at tyre plant and also for the production of vulcanizing solution.

Kottayam plant supplies mixed rubber to other plants of MRF and hence with the increase in

demand, it became essential to augment the mixing capacity of the plant. A new plant exclusively for

mixing was built with huge internal mixers (Banbury’s) which have automatic carbon and oil charging

facilities. It houses two Banbury’s of P270 type and one Banbury of F620 type. With a mixing capacity

of -600 tonnes per day, this is one of the largest mixing units in Asia.

MANAGEMENT

14

Page 15: MRF PROJECT REPORT

The success or the failure of a company is determined by the performance of its management. It has

to play a major role in functions of such as decision making. Management of MRF is lead by Mr. K.M.

Mammen, son of Mr. Mammen Mappillai who started this company almost 60 years ago.

BOARD OF DIRECTORS

K.M. Mammen Chairman & Managing Director

Arun Mammen Joint Managing Director

K.M. Philip Whole Time Director

TRADE UNIONS

MRFEU-MRF Employers Union

MRFEA-MRF Employees Association

MRFES- MRF Employees Sungh

MRF Kottayam unit has 4 plants;

1. Tube Plant

2. Tyre Plant

3. Mixing Plant

4. PCTR Plant

Production in Kottayam Plant

1. Automotive Inner Tube

2. Automobile Tyre

3. Retarding and repair material

4. Flap

5. Bladder

Products at Kottayam plant

Automotive tyres, tubes, conventional tread rubber, pre-cured tread rubber, repair materials,

vulcanizing solution, flap, bladder, curing bags and solid tyre.

15

Page 16: MRF PROJECT REPORT

International Certifications for Kottayam Plant

ISO9001:2000

ISO14001:1996

ISO TS:16949

CQC

KOTTAYAM PLANT-FACTS AND FIGURES

Built up area - 6 Lakh sq.feet

Management staff - 252

Regular Work Men - 1115

Casual Work Men - 399

Total finished goods production - 3400 MT/month

Mixed stock sent to other unit - 7000 MT/month

Tyre production - 52000 tyres/month

Tubes, envelope and curing bags total production - 263000/month

Flap production - 82000/month

Tread rubber production (conventional) - 160 MT/month

PCTR production - 330 tonnes/month

Repair materials - 83 tonnes/month

Vulcanising solution - 32500 litres/month

ORGANISATION CHART OF MRF CORPORATE OFFICE

16

Board of Directors

Joint Managing Director

Chairman & Managing Director

Page 17: MRF PROJECT REPORT

Employee details

DEPARTMENTS

17

Kottayam Goa Arakonam Medak Pondicherry Thiruvattiyur

Manufacturing Units

Whole time Director

Director Material & Export Division Director Research &

Development

Director Accounts

Director Engineering

Director Marketing

Director Manufacturing

Page 18: MRF PROJECT REPORT

MRF Ltd. gives an insight about the functioning of the departments. Each department is headed by

the General Manager who possesses expertise, knowledge in the area under his supervision.

The various departments at MRF Kottayam are;

Production Department

Production Planning Department

Quality Assurance Department

Technical Engineering Department

Plant Purchase Department

Raw materials Store Department

Shipping (Dispatch) Department

Industrial Engineering Department

Safety Department

Security Department

Human Resource Department

Finance and Accounts Department

PRODUCTION DEPARTMENT

In the most of the organisation production is the primary function. Production is simply means that

the raw materials are converted into finished products. Hence all other functions are support

functions. In Kottayam MRF unit production is carried out in 4 plants. They are;

Tube plant

Tyre plant

Mixing plant

PCTR plant (Produced Tread Rubber Production)

The following are the main functions of the production department;

1. Planning for production process

In each month they prepared a monthly plan about the production in a plant. Based on the

monthly plan given by the central planning, plant planning department will prepare a simulation plan

by dividing the month in to 3 segments of 10 days each. The simulation plan given by plant planning

for the month is taken as a guideline and each plant plans the production for each process. In the

planning process they will considered the availability of raw materials. Small changes are made in

18

Page 19: MRF PROJECT REPORT

the simulation plan to reduce the number of sizes running at a time and also to reduce the number

of size change-over with the objective of improving production efficiency.

2. Material order (indent) or receipt

The daily requirements of raw materials are calculated at each plant after considering the available

inventory and the scheduled production for the next day. Raw material order is prepared by the Raw

material Store. The Raw material Store makes arrangements to deliver the ordered materials at the

plant. The receipts of materials are acknowledged to the Raw material Stores by production by

signing all the copies of the transfer/issue certificates. In case of in-process materials indent is given

in advance (1 to 3 days advance) to the concerned plants which produce that material. Raw

materials Store keep all the records of the raw material purchased and delivered and also control

and maintain the raw materials in the plant.

3. Processing

Processing is carried out as per the technical specification BSP (Basic Standard Practice), and the

work instruction of the respective department. If the production process is start only after satisfying

the standard qualifications of raw materials. Once the process is stabilised, the process parameters

are checked and recorded. If any parameter is not confirming to the specified limits, then necessary

correction is made and then production process is continued.

4. Product identification and traceability

The objective of proper identification and traceability is to prevent mix-up of products and to ensure

traceability of products at various stages. The primary responsibility to ensure this lies with the

production. This applies to raw materials, in-process materials and finished goods.

There is specific way to identify each material at each stage. For example, in the case of extruded

tubes, details like size, month code, year code, plant code, date of extrusion, extruder operator

code, and ‘Made from imported butyl’ are printed.

Traceability is ensured in different ways. For example, while extruding treads, the details of stock

(like stock code, date and shift of mixing, batch numbers) used for extruding those treads are

entered in the traceability register.

5. Inspection

19

Page 20: MRF PROJECT REPORT

The activity of inspection covers raw materials, process parameters, in-process materials and

finished goods. Inspection is done to ensure that the materials, equipment and storage area are free

from any contamination. Proper identification of the materials, FIFO (First in First Out), ageing

(minimum and maximum), and test status (whether the material is tested and okayed or is pending

for test or is it rejected after testing) are checked. Dimension checks are done during in-process

operations. Visual checking is done on in-process materials for defects like cured lumps, air traps,

wrinkles, improper cutting, improper splicing etc. Process parameters like temperature, pressure,

water flow, etc. are also checked. Visual inspection of finished product is carried out by production.

6. Control of non-confirming products

During processing, if any non-conformance is noticed in the product, it is held with a NCM (Non

conforming Material) tag, which is filled up in duplicate with details like the material that has been

held, size/code, defect, quantity held, and the location where the material is kept. It has separate

space for writing down the disposal and also the disposal follow up.

The red copy is tied to the non conforming material and the white copy is given to the Production

Supervisor who in-turn gives it to technical department for disposal. The disposal for the non

conforming product is given by the Technical Department (within 48 hours in normal cases) and this

is written on the red copy which is attached to the material.

7. Corrective and preventive action

Corrective action: - When a non conformity is noticed either in process or product immediate

corrective action is taken to rectify the defect, so that the process or product is not affected any

mistakes.

Preventive action: - Recurring non conformities which are noticed in process by production, quality,

technical or engineering are taken up for discussion in the weekly Quality Assurance meeting to

initiate preventive action in consultation with the concerned departments. In case of occurrence of

non conforming process or product due to operational lapse, the concerned people are trained. In

other cases, the proposed preventive action is recorded in the minutes of the meeting and the

responsibility of implementing it is assigned to the concerned departmental person as decided in the

meeting. This is followed up in the subsequent meeting and reviewed for the effectiveness. If the

preventive action calls for a change in procedure/work instructions, this is discussed in the weekly

Quality Assurance meeting and a joint decision is taken by the department heads.

20

Page 21: MRF PROJECT REPORT

Structure of Production Department

PRODUCTION PROCESS

Production is the primary function of the company and hence all other functions are support

functions. In Kottayam MRF unit production is carried out in 4 plants.

21

PLANT PRODUCTION MANAGER

MANAGER PRODUCTION

ASSISTANT MANAGER (TUBE

PLANT)

ASSISTANT MANAGER (TYRE

PLANT)

ASSISTANT MANAGER

(MIXING PLANT)

ASSISTANT MANAGER (PCTR

PLANT)

SUPERVISORS SUPERVISORS SUPERVISORS SUPERVISORS

WORKMEN WORKMEN WORKMEN WORKMEN

Page 22: MRF PROJECT REPORT

Plant 1: Tube Plant

Assistant Manager of production in plant 1(Tube plant) is in-charge of the whole tube plant. He is

entrusted with the responsibility of formulating plans for manufacturing tubes, co-ordinating the

manufacturing activities in the plant and facilitating the smooth manufacturing of the product.

Production process in Tube Plant

Artificial rubber called butyl rubber is used for manufacturing of tubes. It is mixed with carbon black

and chemicals, and then extruded in various sizes. After sufficient cooling it is sent for pre-cutting to

the required length, value fixing and splicing. Then it is moved to freezing table for cooling the splice

joined and is shaped on forming ring to the required size. Then it is taken and kept inside tube curing

presses for vulcanization. After the set time the tube is unloaded from the press and sent for

inspection. Then the tubes are deflated using vacuum and tube core is inserted. These sizes are

segregated and packed as per standards.

Plant 2:-Tyre Plant

Assistant Manager of production in plant 2 (Tyre Plant) exercises control over the entire plant. He is

responsible over the attainment of maximum productivity and in ensuring that the profitability is as

per the production schedule laid. Here various types of tyres are manufactured basically for Trucks,

Tractors and passenger cars.

Production process in tyre plant

Grey fabric is passed through calendaring machine for coating both sides with rubber. From there it

goes to a machine called Fabric Cutter for cutting to different lengths as per specifications. Steel

wires are passed through bead extruder for coating with rubber and wounded on specific wheels as

per specifications. On tyre building machine, green tyres are made using calendared fabric, bead,

tread etc. Green tyres are vulcanized in tyre curing presses by using steam heated moulds. After this

the tyres are inflated to retain its properties followed by trimming, inspection and dispatching.

22

Green Fabric Calendaring Cutting Bead Making

Vulcanization Curing

Page 23: MRF PROJECT REPORT

Plant 3:-Mixing Plant

The Assistant Manager of production in Plant 3 is in charge of the Mixing Plant. He is the responsible

person for any process that done in the Mixing Plant.

Production process in Mixing Plant

Ordinary rubbers is mixed with the Carbon Black, chemicals and rubber process oils in the specific

qualities in rubber mixing equipment called Ban bury. From there it is dumped into the dump mill

and passed through batch of tanks in sheet form for cooling and stored on metal skids. Samples from

each batch are tested and the batch is certified for use. This compound rubber is sent to tyre and

PCTR plant, Tyre plant and other units of MRF.

Plant 4:-PCTR Plant

Assistant Manager of production in plant 4 controls and facilitates the smooth manufacturing of its

profits.

Production process in PCTR plant

23

Inflation Tyre Building

Trimming Inspection Despatch

Rubber mixing Dump mill Cooling Metal skids

Compound Rubber Extruder Cooling Leaf Trucks

Packaging Inspection Trimming Vulcanisation

Page 24: MRF PROJECT REPORT

Pre-cured tread rubber is used for re-trading of tyres. Compound rubber is mixed in mixing mills and

extruded to the required size using extruders and passed through conveyors for cooling. These slugs

are stored in leaf trucks for ageing. From there, it goes for the vulcanization in curing presses. After

curing excess flash materials are trimmed off and go for inspection. Then it is sent to the stretch-

wrapping machine for packing.

Production in Kottayam plant

1. Automotive inner tube:- this component is kept inside the tyre and which when inflated

centers strength and impacts profile to the tyre. The material used for its production is butyl

rubber because of its capability to retain air inside for a long time.

2. Automobile tyre:- this is the basement on which the whole super structure of automobile

rests. Here only conventional or bias tyres of passenger, light trucks, trucks and farm

equipments are manufactured.

3. Re-treading materials:- both conventional and Pre-Cured Tread Rubber (PCTR) and

manufactured here. While the conventional tyre requirements a longer curing time in the

case of PCTR the already moulded bride profile is kept on the top of worn out tyre and

pressurized with the intermediary of steam.

4. Flap:- This is kept in between tube and the tyre. This serves as a protector health for the

tube from the external changes of the tyre and also as insulation medium, which filters the

passage of the heat from the tyre to the tube. This is generally used for bigger tyres.

24

Page 25: MRF PROJECT REPORT

HUMAN RESOURCE DEPARTMENT

Organisation structure of the HR Department

The human resource development is known as the heart of an organization. It performs a number of

activities concerned with the employees of their organization. It interacts with other departments to

25

Plant Human Resource Manager

Manager Human Resources

Deputy Manager Training

Canteen

Family Welfare Co-

ordinator

Time Office

Assistant Manager Welfare

Security Officer

Page 26: MRF PROJECT REPORT

ensure effective running of the company. HR department consist of five staffs, one HR Manager, one

Training Manager, one Welfare Officer, and two Time Office Staffs.

The functions of the Human Resource Development include;

Any employee newly recruited will be exposed to the following areas;

Introduction about the company

Evolution of the concept of quality and its relevance to the contemporary industrial

production

Safety

External competitive environment and organisational culture

Factory discipline

Basic process flow in the plant in which they are placed

The following are the various activities being undertaken in HR Department

Recruitment and selection of employees &General Administration

Performance Appraisal

Industrial Relations and Labour Management

Training

Contract services

Recruitment, Selection, Placement, Induction and Orientation

In the case of management staff, the functions of recruitment, selection, and placement is done by

corporate HR department. Induction and Orientation is given by plant HR. This is to align the

objectives and goals of the individual with that of the company, so that the synergy produces

benefits to the company as well as to the individual.

In the case of workmen, selection is done by plant HR department through a written test followed by

an interview. Then they are given induction and orientation before being sent to the plant for on the

job training. Induction and orientation for workmen is given for one day in which they are given

inputs on the following;

Workers are selected at 100% merit basis. Experience is considered as an additional qualification.

MRF provides the tradition of selecting the relatives of the existing employees wherever a vacancy

arises provided the relative is fit and suitable for the job.

Application Blank

26

Page 27: MRF PROJECT REPORT

Antecedent Verification

Selection List

Physical Examination

Selection Interview

Appointment

Training

Training is provided to employees who will help to improve performance, skill and knowledge and

will result in larger outcome and increased efficiency. In MRF training is a continuous process.

Training is provided to improve-knowledge, skill and behaviour.

Conceptual training is provided for improving the knowledge. Once taught these are implemented.

Quality training us also provided to teach about importance of quality. Several activities like

brainstorming sessions were used for this.

Safety training is provided to employees to get an idea about safety measures to be followed in

order to reduce unfavourable situation and to reduce wastage.

Usually on the job training is used to train workers and supervisors along with classroom training.

Initially for new employees conceptual, quality and safety training are given to make them aware

about the nature of work. This training is given for Three months (classroom). For the first six month

after initial training (classroom) the employee will be treated as trainee. Then on the job training is

given. In this training the senior workers while working give guidance about the way of performing

under the supervision of company supervisors. After the completion of six months as trainees they

are treated as apprentices for the next sixteen months. Then the next six months they will be on

probation. After successful completion of probation, employees are confirmed.

.

Mode of Training

Training is given to improve the facts of human personality namely Knowledge, Skill, Behaviour.

27

Page 28: MRF PROJECT REPORT

Knowledge Based Training: - This training comprises of a training process known as

conceptual training. In this method, the employees are taught that they are implemented in

the organisation so as to improve the proper functioning of an organisation.

Skill Based Training: - This type of training includes mainly technical training.

On the Job Training: - this training is usually meant for the men at work place as well as

supervisors. This includes activities, Assignments, Operation, and Machinery.

Off the job Training: - This type of training is usually given to all employees from General

Manager to Workmen.

Welfare

Labour welfare is the statutory lode controlled by the Factories Act for the benefits of the employees

within the existing industrial system, working and sometimes living and cultural conditions of the

employees beyond that which is required by the law, keeping in par with the custom of the industry

and the conditions of the market.

Labour welfare the aims at providing the physical psychological and general well being of the

working population. Labour welfare is carried by the Welfare Officer. The Welfare Officer takes care

of the physical and general well being of the employees.

The following are the functions;

1. To maintain harmonious relations between the factory management and workers by

establishing contact and holding consultation.

2. To notice the grievance of the workers to the management and act as a Laison Officer

between the management and labour.

3. To study and understand the problems of labour at workplace in order to help the factory

management to shape and formulate labour policies. And to interpret the policies to the

workers in their language.

4. To help the factory management to ask questions relating to the training of new workers,

Apprentices, Supervisors and control of notice board and information bulletins to further the

education of workers and to encourage their attendance at technical institutes.

5. To advice on provision for welfare facilities such as housing facilities, food stuff, recreational

facilities etc.

6. To promote the relation between the concerned departments of the factory and workers

this will bring about efficient productivity. And to advice the workers to adapt or adjust

themselves to their working environment.

28

Page 29: MRF PROJECT REPORT

7. To watch industrial relations in a view by using his influence in an event of a dispute arising

between factory management and workers and help to bring down settlement by persuasive

efforts.

Medical insurance schemes

E.S.I and special medical insurance: - Employees are covered under various health schemes based

on their wage pattern. If it is below Rs: 7500 per month they are covered under employee’s state

insurance. If it is above Rs: 7500 per month they are put under a special insurance scheme (amount

equal to ESI will be given in cash).

Personnel accident insurance:-Work men are insured to a certain amount for accidents that may

occur while on duty and to a limited amount while off duty.

Hospitalisation insurance scheme: - Both workmen and spouse are eligible for Hospitalisation

insurance scheme.

Wages and salary administration

Wages of the workmen is fixed based on the long term agreement. It is paid to the workmen based

on the work done on each day as piece rate system. The work done on each day is recorded in work

sheets and it is routed through time office to the account section where wages to be paid are

calculated and paid. Wages to be paid for the casual workmen fixed and revised from time.

In case of management staff, salary is fixed by corporate HR. Plant HR co-ordinates the periodical

appraisal of performance which is the basis for salary revision. Salary for staff is paid on the basis of

attendance and this is monitored by the office which is functions of HR. Time office does the

functions of time keeping, attendance monitoring and up keep of leave records.

Allowance

The workmen are provided Dearness allowances, fringe benefits, Bonuses and other payments

according to the rules and regulations of the company. There are also overtime wages and

attendance bonuses. Overtime bonuses are given to people a person who normally works beyond

their time; such as lunch time, night shift, etc. Allowances include attendance bonuses. This is also

given to employees working outside factory premises, night shift etc.

Promotion

29

Page 30: MRF PROJECT REPORT

Promotion means shifting an employee to a position in the same hierarchy. This may be due to

seniority and performance. Promotion depends upon the parameters such as Seniority, Merit and

Suitability of the job etc. For some promotions a test is also done and an interview is also provided.

Industrial Relations and Labour Management.

The company has very good cordial industrial relations. The two trade unions of the company are

MRF Employees Union(INTUC)

MRF Employees Union(CITU)

The trade union consists of an organisation. They also have a level of hierarchy. The local leaders of

the trade unions are the Secretary, Treasurer, and a Convener. The external leader comprises of

President, Vice President and General Secretary.

The workmen category of MRF is controlled by a Long Term Agreement every three years.

Negotiations and Conciliation between Management and workmen are made over the table through

continued discussions. This is mainly organised by HR with the help of Industrial Engineers and other

departments involved.

1.2.3.

30

Page 31: MRF PROJECT REPORT

4. ACCOUNTS DEPARTMENT

31

Plant Accounts Manager

Officer Shipping

Officer Engineering

Purchase

Assistant Manager

Engineerin Stores

Assistant Manager

Plant Accounts

Manager

(Raw Material Stores)

Wages Officer

CostingOfficer

Casher

Supervisor

Supervisor

SupervisorSupervisor

Supervisor

Supervisor

Material Handling Workmen

Page 32: MRF PROJECT REPORT

ACCOUNTS DEPARTMENT

This is the one of the most important department of all the companies. Because it deals all the

financial transactions are controlled and managed by the Accounts Department. An efficient

Accounts Department helps the smooth running of the company. This department keeps account of

all the financial transactions of the company. The accounting period of MRF is from October 1 st of

one year to September 31st of the next year. MRF has a fully computerised accounting system that

facilitates fast operations of its various functions. All the transactions of productions unit starting

from the issue of goods received to the final documentation is computerised. Funds are obtained for

capital structuring from both internal and external sources. The internal sources include capital

reserve, debentures, shareholders and the external sources include banks such as SBI, Canara Bank

etc. The strategy that the company has adopted is to go for credit transaction and payment will be

made with one month time.

Raw materials stores manager

Raw material stores manager is related with the buying issue of raw materials that for using raw

materials. He evaluates and takes decision about raw materials that is transferred to production and

mixing unit. He has the main duty of testing and Okaying of raw materials. The procurement of raw

materials is done by raw materials stores based on the raw materials required as computed by the

planning department.

Engineering stores department

All the engineering items are stored and issued by the engineering stores.

Assistant manager engineering stores

Manager engineering stores arranges machinery and manpower requirements or the unit’s. He

makes decision about plant layout designing, modification and flowchart etc.

Offices shipping

The storage dispatch of the finished goods is carried out by the shipping department. Finished goods

are sending to the depots and from there to the nationwide dealer’s networks .For the overseers

marketing the finished products are sent to exports go down and from there to various destinations

all over the world.

Shipping Officer

32

Page 33: MRF PROJECT REPORT

His duty to transferring of finished goods and raw materials to the distant office and to another

plant. He engages Lorries for transportation of goods as per the agreement financial budget. He

takes the about the sales tax and other relevant information to the production department. He

checks various allowance and bonus paid to the employees.

Engineering purchases department

This department does purchase of the engineering items. The personal from the engineering

department identify the various items and based on which purchase made. The items purchased are

rooted to engineering Stores Officer engineering purchase reports to the unit.

Source of finance

Shareholders fund

Share capital

Reserves and surplus

Loan fund

Application of finance

Investments

Current asset

Lartment at the plant level

Financial accounts

Cost accounts

Wages and salaries

Sales tax

Financial accounts

This branch deals with all types of cash payments and receipts. This will include payment for

engineering and raw material purchase, petty cash payments, operation and reconciliation of bank

accounts, payment to the government in the form of taxes and levies, payment of PF, payment of

Loan outstanding, payments in lieu of travel bills of employees, canteen expenses, payment to

contractors, payment of leave travel allowance, medical re-imbursement etc. Cash receipts in the

case of scrap sales and any other receipt will also come under this branch of accounts.

Cost accounts

33

Page 34: MRF PROJECT REPORT

This branch deals with forecasting, budgeting, analysing and reporting the income and the

expenditure of the company. The budget for the expenditure is prepared by using standard costing

principles and it is compared with the actual expenditure. Any variation from the budget (whether

positive or negative) is analysed to find the exact reason and it is reported to the top management.

Wages and salary

Computation of wages and salaries are done by this section of accounts department. Wages of

workmen are fixed in the long term agreement and is calculated on a daily basis depending on

various factors like grade, number of hours worked, the output achieved etc.

Sales Tax

This section handles all matters related to sales tax. A monthly return for sales tax is filed on behalf

of sales depots. VAT (Value Added Tax) system has been introduced and all matters related to this

are also looked after by this branch of accounts. “C Forms” are issued for purchases from outside the

state and “F Forms” are issued for receipt of goods from depots.

Financial Performance

Two interim dividends of 30% each for the year ended 30th September, 2005 were declared by the

Board of Directors on 21-07-2005 and on 25-10-2005. The Directors now recommend to the Annual

General Meeting the declaration of final dividend of 140% for the year ended 30-09-2005. With this,

the total dividend for the entire year works out to 200%. The total amount of dividends aggregates

to Rs 8.48 Crores. The directors recommend that after making provision for taxation and proposed

Dividend, the amount of Rs 30.64 Crores be transferred to General Reserve. With this, the

Company’s Reserves and surplus stand at Rs. 749.81 Crore

5. QUALITY ASSURANCE DEPARTMENT

34

Page 35: MRF PROJECT REPORT

Structure of Quality Assurance Department

It deals with quality checking and inspecting, defective analysis, godown inspection, and defective

analysis. Quality is considered as the most effective tool to improve productivity, to achieve cost

effectiveness, to improve profitability and market share and to remain competitive in the global

market. In the business environment of today, quality impacts not only products and services but

also many other relevant entities such as process, systems, people and organisation.

Quality of design and quality of manufacture

A low level of quality can be caused by weakness either in the design of the product, or in its

manufacture. It is therefore appropriate to distinguish between quality of design and quality of

manufacture.

Two products which have the same use but which are designed in different ways can be of different

quality of design. There is then a difference in their inherent ability to fulfil the intended use. Quality

of design is evident in the specifications to which the product will be manufactured

A product may confirm in varying degrees to the specification. These varying degrees of confirmation

to the specification will lead to varying degrees of quality of manufacture.

35

Manager Quality Assurance

Quality Assurance in-charg

(tube plant)

Quality Assurance in-charge

(tyre plant)

Quality Assurance in-charge

(mixing plant)

Quality Assurance in-charge

(PCTR plant)

Supervisor Supervisor Supervisor Supervisor

Operators Operators Operators

Page 36: MRF PROJECT REPORT

.Functions of Quality Assurance Department

Quality Assurance Department has the primary aim of customer satisfaction. Hence its primary duty

is to ensure that any customer complaint (which is actually customer feedback) should be taken

seriously and it should be communicated to all concerned authority. Problem solving tools are

employed to ensure that the problem is solved and error proofing methods are adopted to ensure

that such problems don’t occur again.

The quality system requirements of the customers are collected and all efforts are taken to ensure

that the requirements are met. This is done be employing statistical process control techniques and

by training the operators.

The next function is to improve the profitability of the company by reducing defects and waste

generation. This is done by initiating projects for waste reduction and forming task forces for close

follow up. Specific targets are fixed in each area for waste reduction and quality improvement and it

is done in co-ordination with all other connected departments.

The main function of quality assurance department is process audit and final product inspection.

This will include monitoring the inspection status of incoming materials, in-process materials,

process parameters and finished product inspection. Ensuring identification and traceability of all

materials is also the function of Quality Assurance.

Each process and product has specifications and tolerance which are given by technical department.

A document called Basic Standard Practice is also available which says how the process is to be

carried out, what are the ‘do’s and ‘don’ts of each process etc. Work instructions are made available

which gives the specific activities to be performed while carrying out the process.

The performance of the products (first quality yield, scrap, seconds and repair level) are recorded

and monitored on a daily basis so that any abnormal deviation can be easily detected and attacked.

Quality Assurance co-ordinates the removal of scrapped items so that the exact data can be

obtained on the reasons for the scrap and the exact quantity of material scrapped. These data are

used to find out the root cause for the generation of scrap, the various factors that contribute to

varying levels of scrap and the cost to the company due to poor quality.

Quality Assurance also initiates studies for implementing new systems and procedures on the

principles of continuous improvement. FMEA (Failure Mode Effect Analysis) is carried out and

36

Page 37: MRF PROJECT REPORT

control plan is also prepared to ensure that the causes of failure are avoided before they happen.

Educating workmen on quality standards and the consequences of not following quality norms is

also done.

Whenever a tool change (tyre/tube/flap/bladder/PCTR mould change or tyre building drum change)

is done, the relevant parameters are checked by Quality Assurance and certification is done before

commencing production. In such a case, if it involves time change (curing time change when mould is

changed) or media change (changing from steam cure to air cure and vice versa in case of tube

curing) such parameters are also checked and certified.

Tube plant

Certain categories of tubes require a secondary inspection by QA (after an inspection by production

inspectors) to ensure that no defective tube goes to the customer. They are tubes sent to Original

Equipment customers, tubes used for off The Road tyres, radial, defence, project tubes, tubes for

wheel test and road test. QA co-ordinates the inspection and despatch of such tubes.

All balances used for weighing oil, polymer and chemicals are checked with standard weights. Green

tube weights are checked at random to find out whether it is operating at the specified level. If it

operates above the specified level, then the company looses since a higher than required amount of

material is going in to the product and if the weight operates at the lower level, it can affect the

quality of the product.

Tyre plant and PCTR plant

Market leader products follow up and performance monitoring is done to closely follow its

improvements. Weekly follow-up of dirty moulds is done for tyre, PCTR and flap moulds. It is

communicated to all concerned and is followed up so that dirty moulds are removed from

production line for cleaning.

Bladder life analysis is done to find out the optimum number of cures that a particular size of

bladder will give. This will be helpful in getting the maximum utilisation of the bladder with minimum

of tyre scrap. The analysis will also point out any abnormal phenomenon so that the reason for it can

be probed and possible solutions found out.

37

Page 38: MRF PROJECT REPORT

Whenever a new process or product is introduced, the first 100 tyres are followed up and the

performance is recorded. This helps us to decide whether any change has to be introduced, any

improvements to be made or whether the same conditions can be continued.

Mixing plant

Raw material godown inspection is done and reports are published. Any follow up action to be

initiated in relation with the observations in RM godown is co-ordinated by QA. Carbon godown

inspection and audit is done to check for correct carbon usage, FIFO (First In-First Out method), and

OK status. All chemical weighing balances are checked using standard weights. Oil temperature is

also checked.

38

Page 39: MRF PROJECT REPORT

6. TECHNICAL DEPARTMENT

39

Manager Plant Technical

Technical In-charge (Tube

Technical In-charge (Tyre

Technical In-charge (Mixing

Technical In-charge (PCTR

Supervisor Supervisor Supervisor Supervisor

Operators Operators Operators Operators

Page 40: MRF PROJECT REPORT

TECHNICAL DEPARTMENT

Technical Department at the corporate level carries out R&D activities and the results of those

activities are transferred to the plants. Some of the activities carried out at corporate technical are

new product development, new compound development, designing and inspection of new moulds,

selection and evaluation of new and alternative sources, selection and evaluation of alternative

materials, finished product testing and analysis, heat engineering and assisting plants in problem

solving.

Raw material Testing

All raw materials are tested and released if they confirm to the specifications. When the material is

received, raw material stores personnel arrange for collection of samples from the received

materials as per sampling plan. The sample is given to raw material testing lab along with sample

transfer note/visual inspection report.

Raw materials are tested as per BSP (Basic Standard Practice), standard test procedure and are

compared with the specification issued by corporate technical. If the material confirms to the

specification, the material is released for production. If the material does not confirm to

specification, more samples are tested and released if it is OK. If any of the re-tested samples are not

OK, then the samples are sent to corporate lab and the material is accepted or rejected based on

corporate advice. If the material is rejected, then raw material rejection note is prepared and the

material is returned to the supplier by raw material stores.

Positive recall

This is a process in which raw material/work-in –process materials are released for production

without testing in case of urgency. In such cases, head-plant technical will issue letters to stores,

production and quality assurance with all relevant details. The wonk-in-process materials and

finished goods produced using that material will be kept properly identified at all stages till the

material is tested and disposals given. Compounds mixed or other units can be despatched even

before testing is done provided the testing can be completed and result communicated to the

receiving plant before the material is unloaded.

In-process material testing

In-process materials are tested by technical as per the plan to check whether any deviation from the

specification has happened either in the material used or in the process.

40

Page 41: MRF PROJECT REPORT

Finished product testing

Finished product testing is done both in the plant and at corporate technical departments. This is

done to ensure that the product produced confirms to the required standards. In case of tyres, ply

adhesion, mounted tyre dimension (after mounting the tyre on the rim), and cut tyre analysis are

done in the plant. For PCTR and Flap, cured dimensions and weight are checked. De-mattia and

tensile tests are done on cured tubes.

Issue of specifications

Specifications are issued from corporate technical and this is used as a guideline to issue plant

specifications. Based on the corporate specification, fine tuning is done to adopt the specification to

the plant processing conditions by trial and error method and from experience.

Process control

Process control is effected by surveillance checks or tests conducted regularly. The data generated

during tests and surveillance audits are used to control the process. Changes are made if required in

the specifications to achieve processability targets, the changes are documented through plant

change letters.

If there is any problem, the process/product will be analysed for variations in raw material, or

process conditions. Any deviations found will be corrected or alternative source of raw material will

be tried. Process will be repeated to check whether it is OK.

New product introduction

Whenever a new product is introduced, a TPOR (Technical Programme Opening Report) is received

from corporate technical along with corporate specification, project schedule and new size

production plan. Based on the TPOR, a micro plan will be prepared by Head-plant technical and it

will be approved by the originator of TPOR. This is then given to the concerned technical in-charge

who prepares the activity plan. Plant specification is generated based on the corporate specification.

Trial production is scheduled and products are manufactured under follow up.

Mixing of Cements, Lubricants and Paints

Mixing of Cements, Lubricants and Paints are done in cement house under the direct supervision of

technical department. Simulation plan is received from plant planning for PCTR solution and

41

Page 42: MRF PROJECT REPORT

vulcanising solution. Monthly requirement of cements and paints required for consumption within

tyre plant is calculated from monthly simulation plan.

Monthly stock requirements are calculated from the simulation plan and the quantity of stock

required is communicated to mixing plant. Raw material indent is given to raw material store.

Mixing, testing and releasing of cements, paints and lubricants are done as per the documented

procedure. If properties are OK, then the material is released. If the properties are not OK, then the

non conforming material procedure is followed to dispose off the material.

Finished product re-classification

Finished products which do not confirm to fist quality norms are kept separately and are jointly

inspected by production, technical and Quality Assurance. Based on joint decision, the material is

either sent as seconds, repaired or scrapped.

Tool inspection

Tool inspection means inspection of any mould (Tyre, Tube, PCTR, Flap, Bladder, Envelope, Curing

bag etc.) or tyre building drum. For new size moulds, plant technical does the mould inspection

based on the drawing. After inspecting the new size moulds, plant technical will inform engineering

to OK or reject the moulds. In case of non-conformities, plant technical is authorised to release the

moulds conditionally based on joint inspection with production, and quality assurance, provided

corporate approval is received for the production of a definite quantity or for a definite period. In

case of regular size mould/drums/bead rings/PI rims, plant technical does the inspection based on

inspection certificate or test report.

Tool change

Whenever there is a tool change (mould changes in case of tyre, tube, PCTR, flap, bladder, air bag

and envelope) the concerned specification is given by plant technical department. In case of a new

size tool, it has to be Okayed by technical before being put in production.

Design change process

Design change is first introduced through a TPOR (Technical Programme Opening Report)or a

TA(Technical Authorisation). The necessary specification, formulation, drawing and tools are

arranged. A micro plan is prepared whenever TPOR is organised. The micro plan is approved by the

originator of TPOR.

42

Page 43: MRF PROJECT REPORT

Necessary specifications are issued and proper communication is given to production and Quality

Assurance through trial intimation letter. All the relevant processing parameters observed while the

project is being done will be compiled and sent to the originator of the TPOR. The final design

review, verification and validation will be done by the originator of TPOR.

Heat engineering

Heat engineering is a process by which we arrive at the curing specifications and fix cure time.

Validation of cure time is also done periodically to find out whether any variation has occurred

compound properties which necessitates a change in cure time. Blow point study and thermocouple

study are normally used as tools in heat engineering.

Control of non-conforming product

It is the responsibility of technical department to dispose of the non-conforming materials in a

suitable manner. Non-conforming materials are tied with a red tag (Non-conforming material tag)

which contains all the relevant details like the MRF code of the held material, quantity, reason for

holing, date and shift of production, date and shift of holding etc.

Technical in-charge reviews the non-conformance and takes a decision on the method of disposal

and this is recorded on the conforming material tag. The disposal is then followed up by production.

43

Page 44: MRF PROJECT REPORT

7. ENGINEERING DEPARTMENT

Structure of engineering department

44

Plant engineering Manager

Manager, Electrical maintenance plant (Tube, Tyre, Mixing,

PCTR)

Civil Engineer Manager, Mechanical Maintenance Plant (Tube, Tyre, Mixing,

PCTR)

Supervisors Instrumentation Engineer Supervisors

Electricians Mechanics

Page 45: MRF PROJECT REPORT

8. ENGINEERING DEPARTMENT

The department comprises of engineers, mechanics, electricians and technicians. The mechanical,

electrical instrumentations, civil and environmental engineering wings come under this department.

The main functions are new machinery lay-out preparation, erection and commissioning of new

machinery, preventive maintenance, breakdown maintenance, condition monitoring and over

hauling of machinery and other related equipments.

Erection, commissioning, operation and maintenance of utility items like generator, boilers,

compressors, pumps, freezer lines and cooling towers and maintenance of material handling systems

like lift, hoist, chain block, gantry and forklifts are done by engineering. The maintenance of

equipments at pump house and training centres are also done.

Mechanical Maintenance

Preventive maintenance: - All equipments that need preventive maintenance are listed out. It is

ensured that equipment history and manuals are available for all the machines. A preventive

maintenance schedule is prepared after a careful analysis of break downs in the machines and based

on the personal experience of the maintenance personnel. The annual maintenances schedule thus

prepared is divided into weekly schedules.

Preventive maintenance schedule for the particular week is taken and the necessary materials, tools,

manpower and spares are arranged. Necessary clearances are obtained from planning and

production (for production equipments) and the machine is released for maintenance. The

scheduled maintenance activities are carried out based on work instructions and experience. Then

the machine is checked and handed over to production.

Based on the number and nature of breakdowns in each machine during the year, the preventive

maintenance schedule is reviewed and a new schedule is prepared for the next year.

Breakdown maintenance: - the defective machinery is identified either by production or by

engineering and a maintenance request is generated. In case of production detecting the flaw,

production raises the maintenance request and in the case of engineering detecting the flaw,

engineering raises the maintenance request and arranges for the tools, maintenance personnel and

spare parts. The machine is then released for maintenance. The required maintenance jobs are

carried out and the machine is thoroughly checked. If the machine is OK, then it is handed over to

45

Page 46: MRF PROJECT REPORT

production. Otherwise necessary corrections are again done. Every month, down time analysis is

done and permanent corrective actions are initiated in case of recurring failures.

Mean Time between Failure (MTBF) and Mean Time To Repair are the measures adopted to track

the improvement.

Other jobs (mechanical)

A part from preventive and break down maintenance the following jobs are done by mechanical

engineering.

Condition monitoring and planning for preventive maintenance.

Vibration analysis, wear derbies analysis, clearance recording, temperature monitoring etc.

for machinery.

Carrying out activities for the compliance of quality parameters concerning equipment

functions.

Planning and carrying out opportunity maintenance.

Energy conservation activities.

Generating purchase requisition of engineering materials, inviting quotation, approval of

quotation, audit local and imported spares, procurement, inspection and approval. Making

drawings of spare parts and finalising specifications whenever required.

Prepare maintenance budget and work on cost optimisation.

Vendor development to carry out maintenance related jobs.

Maintain equipment data, machine history, breakdown analyses, maintenance records and

material procurement data.

Job allotment and bills settlement of contract workmen engaged in engineering jobs.

Issuing safety permits and supervision hot work, working at height, work at a confined

space, excavation and usage of portable electrical equipments.

Erection, commissioning and maintenance of storage and dispensing facilities for process oil,

furnace oil, diesel and solvent.

Maintenance of facilities for filtering, purification and storage of drinking water.

Tool inspection (mechanical):- Whenever moulds, PI rims, bead rings, building drums etc are

received, engineering stores will intimate engineering department. For new sizes of moulds,

engineering informs Plant Technical Department for branding checks and the branding are checked

based on the drawings. In case of regular sizes, inspection is done based on inspection certificates or

test report and is okayed or rejected as the case may be.

46

Page 47: MRF PROJECT REPORT

Tool (Mould) change

Whenever a mould change is required, planning gives a request to production and in-turn

production gives the request to engineering. Engineering carries out the mould change operation.

The first production inspection is done and the mould change is certified by engineering, production

and quality assurance before the mould is released for production. If it is not OK, engineering will do

the necessary corrections and submit it for certification again. Whenever the mould becomes dirty

and needs cleaning, quality assurance intimates production and production intimates engineering.

Then the mould is removed and sand blasted (cleaned) before being put in to production again.

Before removing the mould form the press, last tyre inspection is done to check whether there is any

damage to the mould. If there is any problem, it is corrected before being put back in to production

line. Any repair carried out on the mould is recorded in the mould history card.

Change of tyre building drum also follows a similar procedure.

PCTR mould change is done by production workmen and any major problem is attended by

engineering. Flap mould and tube moulds are also changed by engineering by following similar

procedures.

While mould changes and drum changes are done by mechanical engineering, electrical settings like

time setting in tyre curing, light setting in case of tyre building drum etc are done by electrical.

Tool management

All moulds and drums will be identified and the master list will be maintained by mechanical

engineering department. Master list will contain identification number, size and quality. Drum and

mould will be stored in respective area. Preventive maintenance is carried out as per the Process

Module “Equipment Maintenance”- preventive. Finished product from the running mould will be

inspected by production\ QA for appearance. If appearance is bad, production will take up with

Engineering for clearing \ repair. Mould \Drum repair carried out is entered in the history card.

Boiler and allied systems

MRF Kottayam unit has two boilers of 15 tonnes per hour capacity and one boiler of 20 tonnes per

hour capacity. All the boilers come under the IBR (which means that they have to comply with Indian

Boiler Regulations). Hence any major work done on these boilers have to be done after getting

permission from the factories and boiler inspectorate.

47

Page 48: MRF PROJECT REPORT

The water that is sent in to the boiler has to be purified to avoid corrosion, pitting and scale

formation inside the boiler. The water is first sent in to a clarifier to remove colloidal impurity. Then

it is passed through a pressure filter for filtering any solid matter. It is then sent in to softener plant

to remove the hardness of water. Water is then sent to a deareator to remove the nascent oxygen.

The treated water sent in to the boiler is converted in to steam which is to be sent for heating

purposes. The steam produced is measured in Tones per Hour.

Electrical maintenance

MRF-Kottayam unit falls under the EHT(Extra High Tension) consumer category. All consumers who

use 66KV and above are included in this category. The incoming supply for our unit is 110KV.

Normally we get power from Pallom sub-station but we have a provision to get supply from Pala

sub-station also in case of emergency. The total connected load of our unit is roughly 30000HP. The

maximum demand is 10000KVA.

For backup power supply, we have 3 generators of 1000KVA each and one generator of 5000KVA

capacity.

Erection and commissioning of new machinery (Electrical)

In case of erection of new machinery, the following procedure is followed;

A scheme is prepared with input information from corporate electrical. The required load and

existing capacity is verified and viability or alternate sources are studied. Work schedule is prepared

by prospective contractors and submitted along with their quotation.

After verifying whether the contractor is verified to do the job, contractor is fixed and work order is

given to him. A schematic diagram as per the standards of electrical inspectorate is prepared. Then is

forwarded to electrical inspectorate and they in-turn scrutinise the proposal and intimate any

changes to be incorporated. When this is done, initial approval is obtained from electrical

inspectorate and work commences. After the election is over, electrical inspectorate is informed and

an inspection is done by them. If the conditions are satisfactory then a safety certificate is issued

which states that the system is safe for energisation. The machine is to be charged only after all

these formalities have been completed. All documents related to the above process have to be

maintained.

Any changes in the load requirement or usage should be promptly communicated to the electricity

board but does not require any sanction if the total load remains within the contract load. Otherwise

48

Page 49: MRF PROJECT REPORT

prior sanction has to be obtained. All protection relays should be tested and certificates maintained

every 2 years. Periodic calibration of energy meters, and yearly electrical inspection by Electricity

Board will be co-ordinated by electrical engineering.

Preventive maintenance (Electrical):- All equipments that needed preventive maintenance are listed

out. It is ensured that equipment history and manuals are available for all machines. A preventive

maintenance schedule is prepared after a careful analysis of break downs in the machine and based

on the personal experience of the maintenance personnel. The annual maintenance schedule thus

prepared is divided in to weekly schedules.

Preventive maintenance schedule for the particular week is taken and the necessary materials, tools,

manpower and spares are arranged. Necessary clearances are obtained from planning and

production (for production equipments) and the machine is released for maintenances. The

scheduled maintenance activities are carried out based on work instructions and experience. Then

the machine is checked and handed over to production.

Based on the number and nature of breakdowns in each machines during the year, the preventive

maintenance schedule is reviewed and a new schedule is prepared for the next year.

Breakdown maintenance (Electrical):- The defective machinery is identified either by production or

by engineering and a maintenance request is generated. In case of production detecting the flaw,

production raises the maintenance request and in the case of engineering detecting the flaw,

engineering raises the maintenance request and arranges for the tools, maintenance personnel and

spare parts. The machine is then released for maintenance. The required maintenance jobs are

carried out and the machine is thoroughly checked. If the machine is OK, then it is handed over to

production. Otherwise necessary corrections are again done. Every month, down time analyses is

done and permanent corrective actions are initiated in case of recurring failures.

Mean time between failure (MTBF) and Mean time to repair (MTTR) are the measures adopted to

track the improvement.

Instrumentation

A master list of all the instruments which have to be calibrated is prepared by instrumentation

engineering. All the instruments are given unique numbers so that it is easy to trace and track the

instruments for calibration. A software programme is prepared in which the equipment number,

description, last calibrated date, frequency of calibration etc. are fed. From the software, monthly

list of equipments to be calibrated is generated and the instruments are calibrated as per work

49

Page 50: MRF PROJECT REPORT

instructions and standard calibration procedures. Most of the instruments are calibrated in-house

while some of the instruments are calibrated by external agencies.

Calibration sticker is pasted on the instrument showing the date of calibration and the due date for

calibration. Calibration report is prepared for all calibrated instruments. Calibration certificate is

obtained for instruments that are calibrated by outside agencies. If any instrument shows an error or

deviation beyond acceptance level then the user is informed about it. The correction factor to be

applied is recorded and intimated.

All the balances weigh bridges are to be certified by government agencies before commissioning

(original verification) and re-verification is done every year. This is ensured by instrumentation.

Civil Engineering

Civil engineering department does the work of preparation of project proposals, drawing and

estimates as per requirements for construction and extension of new factory buildings, equipment

foundation, plant offices(aluminium partitions and false ceiling) construction of cable and pipe line

trenches, construction of roads, storm water drains and site development work (using mechanical

means).

Laisoning with government agencies and local bodies for getting approval of building plans and

permits is also the function of civil engineering. Projects are executed on item rate contracts.

Finalisation of contract rates and issue of work orders are done by civil engineering department.

Supervision and providing technical support are done along with the job of recording the work done,

taking measurements and check measuring contract bills.

Maintenance of all civil structures is the function of civil engineering. Periodic repair of concrete

floor, A/C sheet roofing and valley gutters, maintenance of plumping and sanitary fittings such as

toilets, washing facilities etc. de-silting of storm water drains, and annual re-painting of buildings

(white washing and colour washing) are the maintenance activities.

Work permits are issued to the workmen to ensure their safety. These are done after carefully

checking the conditions. The following permits are given- height permit for working at a height

above 3 meters, portable electrical equipment permit, confined area work permit, excavation permit

and hot work permit. Once the work permit is given, proper supervision is to be ensured.

Environmental Engineering

50

Page 51: MRF PROJECT REPORT

This branch of engineering is mainly concerned with monitoring of factors which affect environment

(as a result of manufacturing activity) and finding ways by which they are minimised or eliminated.

Water pollution, air pollution and sound pollution are the main factors that come under the preview

of environmental engineering in the present context.

Water treatment: - Effluent water is sent into anaerobic digester (where it does not have any

contact with air). Here 85% to 90% of suspended solids settle down to form the sludge. The water

from which suspended solid are removed are then sent to an aerator and clarifier where 90% to 95%

of suspended solids are removed. This is then chlorinated and it is called treated water. Treated

water is used for roof cooling and for irrigation. 300 kilo litres of water are treated per day in this

process. Another 300 kilo litre of water is treated per day using a parallel process which is as follows-

effluents are sent to anaerobic digester where 85% to 90% of suspended solids settle down. Later it

is sent to SAFF (Submerged Aerated Fixed Film) tank where a bio film is developed on PVC media.

Diffusers provided below the media aerate the systems. This leads to a reduction of 90% to 95% of

suspended solids. It is then sent to a parallel plate separator tank where the suspended solids are

further removed. It is then chlorinated and used for roof cooling and irrigation.

A wet land is also created on a trial basis where the effluent water is aerated by the roof of a special

type of reed (plant) which degrades the organic matter and thus purifies water. The capacity is 20 to

25 Kilo litres of water per day.

Air Pollution

It is being monitored by engaging and outside agency. Particulate matter in air is measured and

compared against standards of permissible levels. To control air pollution they have provided their

ban buries used for mixing rubbers and chemicals, with big filters(pulse jet and shaker type) the

dust-laden air is passed through shaker type filters. The dust is trapped o n the bags and the clean air

is gone out. These bags are shaken with a leaver at periodic intervals is dislodged the dust from the

bags, the dust is collected in a hopper and discharged. In pulse jet system, the bags are cleaned by a

brief burst of compressed air at programmed intervals of time.

Sound Pollution

It is measured in terms of decibels and compared with the standards of permissible levels. This is

done at specified spots twice a year.

51

Page 52: MRF PROJECT REPORT

9. INDUSTRIAL ENGINEERING DEPARTMENT

Structure of Industrial Engineering Department

52

Plant Industrial Engineering Manager

Industrial Engineer Assistant Manager Planning

Enterprise Resource Planning (ERP)

Supervisors

Workmen

Page 53: MRF PROJECT REPORT

10. INDUSTRIAL ENGINEERING DEPARTMENT

The main function of this department are standard fixation, plant layout modification and designing,

machinery and manpower requirement study, auditing of production calculation and pollution

control.

MAJOR ACTIVITIES

Conducting studies for fixing Standards and Crew Strength in all areas.

Negotiating with Unions for setting standards.

Participating in discussions for settling labour disputes.

Manpower requirement assessment.

Factory Layout planning.

Expansion Project Co-ordination.

Resource Planning- Manpower, Machinery and Equipments.

Design of Wages system and incentive monitoring.

Long Term Agreement related works.

Calculation of Chairman’s Awards.

Calculation of Production Bonus.

Preparation and publication of Management Information Systems (MIS) Reports.

Special Studies like benefits and feasibility of outsourcing, relative merits and demerits of

different methods of manufacture etc.

Computation of machine utilisation.

ERP (Enterprise Resource Planning) Activities :- Maintenance of leased line connectivity

between factory and head office and other plants, maintenance of network connectivity in

all areas of the plant, administration of local e-mail service, maintenance of computers,

printers and other accessories.

53

Page 54: MRF PROJECT REPORT

EINGINEERING STORE

This is a place where the engineering spares, consumables and new equipments are received and

stored before being delivered to the user point. The minimum inventory level and re-order level are

specified for each material based on the frequency of requirement, availability, lead time to procure,

cost, storage capacity etc. the minimum inventory levels are checked and purchase requisition is

raised for the required items. The ordered materials are received at the gate by the security

personnel if it is accompanied by the purchase order.

‘Goods passed in/out’ stamp shall be put on the Delivery challan/Invoice during inward entry by the

security. When the materials arrive at stores the delivery challan/Invoice is checked for the ‘Goods

passed in/out’ stamp. Verification of documents is done to confirm whether the quantity mentioned

in the purchase order and the actual quantity mentioned in the delivery challan/invoice match. Then

the materials are unloaded in engineering store or at the respective plants where it is to be used.

Physical verification of the received material is also done, for quality and quantity.

The material is identified by GAE (Goods Arrival Entry) number. Information is passed on to purchase

department and vendor on Excess/Shortage/Rejection of any material with a copy to accounts

department. Excess material is sent back and shortage quality if any is procured forms the vendor.

In case of engineering materials, the concerned indenter is informed to take delivery of the material

after proper inspection. The inspection of moulds, drums, filler rings and rubber products are also

done by Engineering. GRN (Goods Received Note) is prepared if the material is accepted. Rejected

materials are sent back to the vendor on information from purchase with intimation to security.

The okayed material is kept in the storage area and is issued as and when required. Engineering

store is also does the job of sending materials to vendors/workshops for repair based on Engineering

indent. A copy of the requisition is sent to purchase for preparing work order and gate pass copy is

issued to security. Receipt of material after repair is cross-checked with DC (delivery Challan)/WO

(Work Order) copy/GP (Gate Pass) copy and entered in GP list and issued to indenter. All transfers to

other plants are based on Material Transfer Note from concerned areas. A copy of IPTM (Inter Plant

Transfer Memo) is sent to Accounts/Security department.

54

Page 55: MRF PROJECT REPORT

RAW MATERIAL STORES

Raw material stores will receive a copy of the raw material requirement for the month which is

prepared and sent by plant planning. This is also sent to central planning and central purchase by

plant planning. Based on the requirement, central purchase arranges for procurement of materials

and issues a delivery schedule to the plant. Delivery schedule is the schedule by which the supplier

will release the specified quantity of material at the specified dates to the plant.

Raw materials, consumables, fuel etc are received at the factory gate in line with the delivery

schedule and purchase orders. The documents are verified to ensure that the materials are from

approved sources and the correct quality as ordered is delivered.

Weighment of the load is done. GAE (Goods Arrival Entry) is made and the load is re-directed to the

unloading point through the security department. The unloading point is usually the raw material

goes down, but sometimes the materials are unloaded at the plants where it is consumed. In case of

fuel, oil etc. it is unloaded at the storage area.

At the unloading point, visual inspection is carried out and then the material are stored with proper

identification tags showings the primary status of the material (Hold \Pending for test). Each

material has a specified storage and it is placed in that storage area.

Sample transfer \visual inspection report is prepared and samples are collected for testing as per the

documented sampling plan. The sampled bag is identified and the sample is sent to technical

department for testing. GRN (Goods Received Note) is prepared at this point.

After testing the samples, Technical department informs the test result through the material

releases \ rejection\hold note printed at the bottom portion of the sample transfer\visual inspection

report. Based on the test result green colour sticker captioned “OK” is affixed if the material is OK,

Red colour sticker captioned “REJECTED” is affixed if the material is not fit for use and ORANGE

colour sticker captioned “HOLD” is affixed if it needs further tests to arrive at a concrete decision.

55

Page 56: MRF PROJECT REPORT

11. SAFETY DEPARTMENT

Important terms and definitions

Accident: - Accident is an unintended, uneven occurrence resulted from and during the course of

work resulting in bodily injury or death of affected persons or damage to properties or both.

Safety: - Safety is the systematic way of eliminating the causes of accident. It is based on the

principle that does not happen and are caused. In other words, all accidents have causes and

elimination of these causes will eradicate the accidents and as well.

Unsafe Act: - An action, which may cause an accident to self or others or results in damage of

properties or both. Statistics reveals this to be 85% of total accident causes.

Unsafe Condition: - A situation, which may cause an accident to any one or result in property

damages or both. Statistics reveals this to be 15% of total accident Causes.

MRF has a well defined SAFETY AND HEALTH POLICY which is as follows.

It is the policy of our company that the SAFETY AND HEALTH of our employees shall be our FIRST

priority. It is the responsibility of everyone in this organisation, regardless of the position he

occupies, to ensure that everyone in the factory returns home to his beloved ones without any injury

today and every day.

We shall observe this policy not only in letter but also in spirit and offer “ACCIDENT FREE SAFE

PRODUCTION” for the benefit of one and all.

Implementation of this policy

At Kottayam plant, our General Manager is responsible to implement this policy at unit level. This

responsibility has been further re-delegated to Department Managers or Department-in-charges (at

Department level), Plant Managers or Plant-in-charges (at Plant level) and Shop floor Officers,

Supervisors or Assistants (at Shop floor).

Procedures and guidelines

56

Page 57: MRF PROJECT REPORT

Necessary procedures, Rules and Guidelines for the effective implementation of this policy, without

prejudice to the statutory requirements, are formulated by Chief Safety Officer and Plant Safety

Officer. They will also render necessary advice and assistance to all Management Staff in the

effective implementation of this policy at respective Sections, Plants, Departments and the Unit as

the whole.

PREVENTION (of Accidents)

I. Training

Training will alleviate ignorance on Safe/Standard work practices and will enhance Safety.

Training will include

Induction Training on Basic Safety aspects

Induction training will cover general safety procedures, safety rules and other

guidelines. This will also cover the proneness of a factory atmosphere to accidents as

compared to outside world, general safe practices and safety precautions to be

followed on dangerous machines. Induction training will also brief on safety devices

on machines and personal protective equipment.

Safety officer will be the faculty for Induction Training (on Safety).

On the job Training

Along with the points on specific activities related to the nature of work of the new

Employee, this training should cover aspects on applied safety related to the specific

machines and specific section. Shop Floor Officer/Supervisor will be the faculty for

this training.

II. Enforcement of Safety Rules and Guidelines

This is regarded as one of the most important area of Accident prevention. This is being

done by closely monitoring the activities of the subordinate staff or workmen in the

respective Sections, Plants or Departments to prevent any unsafe act or safety violation.

This responsibility has been assigned to the respective Shop Floor Supervisor or Officer (at

shop floor level), Plant Manager or Plant-in-charge (at plant level), Department Manager or

Department-in-charge (at Department level).

The tool used for this is Job Safety Instructions which has to be imparted to subordinate

before and during the course of work.

III. Safety Audit

57

Page 58: MRF PROJECT REPORT

Being done by Safety Officer or Chief Safety Officer (during his visit), gathers useful

information on Unsafe conditions, Unsafe acts and on the level of enforcement of Safety

Rules and Procedures which they immediately bring in to the attention of the respective

staff\Management staff for corrective action under intimation to Unit Chief. Plant Safety

Officer will also assist the staff\ Management staff in the corrective action, if required.

IV. Corrective and preventive action

Unsafe acts and unsafe conditions which are not rectified will be discussed in Safety

Committee Meeting. The decision of the meeting is regarded as final and binding on this

entire unit.

In addition a detailed presentation on the analysis of accident is made in this Meeting by

Safety Officer.

A total analysis of accidents of the previous month is carried out in Monthly Quality Meeting

also.

V. Safety Awareness Promotional Activities

Boards have been displayed at all conspicuous points. Safety promotional literatures are

being released to increase awareness among employee. Safety competitions are conducted

during Safety Week Celebrations.

SAFETY RULES AND GUIDELINES

1. General

Every employee has to understand that he can do more for his own safety.

Only qualified and experienced hands can be employed on a job.

It is the responsibility of each employee of this organisation to ensure that the men

working under them follow relevant Safety Rules and guidelines.

Instructions have to be clearly understood and to be clarified then and there.

Employees have to use Personal Protective Equipment when and where required

inside the factory.

Employees should not come for work after consuming liquor, drugs etc.

Cautionary boards, sign boards etc., positioned in the factory have to be given due

recognition and adherence.

Do not use compressed air for cleaning dress or body.

2. Fire Safety

58

Page 59: MRF PROJECT REPORT

Smoking is strictly banned within the Factory.

Nobody shall tamper with any fire fighting equipment.

Each employee has to know the properties of solvents that can cause fire and take

precautions as and how suggested.

Follow the safe procedures to handle Gas cylinders.

Use flashback arrestor for Gas cylinders.

Do not use L.P.G cylinder for Gas cutting.

3. Electrical Safety

Only authorised electrical personnel can attend electrical installations and

accessories.

A responsible MRF Electrical engineer has to take responsibility for electrical works.

All those who are employed in Electrical works have to use relevant Personal

Protective Equipments like Shoes, Gloves etc.

Excavation permit has to be obtained for digging works as per work instruction

safety

Extra care has to be taken while working below high tension lines.

Ear thing and earth continuity of all equipment have to be ensure

Only tested and certified equipment shall be used for work.

4. Working at Height

Avail Safety Work Permit for working at Heights for all works above 02 meter height.

Use Safety belt and other Personal Protective Equipments wherever necessary as

per the requirements of the Permit and Work instruction-Safety.

Use crawling Boards, Guy rope, Safety Net etc. while working over Fragile Roofs.

Do not throw objects from height.

Use only good quality ladders while climbing up.

Use Tower Ladders or scaffolding when ordinary ladders are not sufficient.

Always entrust another man to hold a ladder from the bottom.

5. Major Works

Use barricades and Cautionary Boards while carry out major maintenance works.

Do not go below a lifted or hanging object.

Do not take your body parts close to any unguarded moving machine.

Before using any machine or equipment, please ensure that it is operable and free

from maintenances.

Use only tested and certified lifts, hoists, lifting tackles and pressure vessels.

59

Page 60: MRF PROJECT REPORT

Workmen should bring all unsafe condition and Acts immediately to the notice of

the supervisors.

6. Transport Safety

Do not sleep below a stopped vehicle.

Follow the speed limit within the compound.

Use only well maintained vehicle inside the Factory.

Only licensed drivers shall be permitted to drive a vehicle.

Projected material from trucks should be given identification with red flags/lights.

7. Work Permits

Safety Work Permit System has to be strictly followed wherever applicable as per

Work Instruction-Safety. The following works are graded as permitted jobs.

o Welding, Gas Cutting, Grinding and any other activity which can create spark

or fire.

o All works above 02 meters from floor level.

o Digging/Trench cutting works.

8. Accident Reporting and First Aid

All accidents have to be reported to the immediate superior of the victim, who in

turn will report it to all others including Unit chief, Department Head, Safety Officer

and Welfare Officer (as per the procedure published in this regard).

The immediate superior of the victim will arrange for an Ambulance, First Aid and

further treatment of the victim.

The follow up of the corrective action are discussed in Safety Committee Meeting

and Monthly Quality Meeting.

9. Machines

The Standard/Safe Operating Procedures published for each job has to be followed

strictly.

The Emergency stop device of each equipment has to be kept tested all the time.

The Guards of machines have to be in place all the time.

Only trained personnel shall be put on the operation of machines.

10. Contractors

All contractors and their workmen have to follow the points stipulated as per

Contractors Safety Manual.

60

Page 61: MRF PROJECT REPORT

Concerned MRF Management staff should issue this manual to the contractor or his

Supervisor under acknowledgement and should ensure the contractor and his

workmen follow them.

12. SECURITY DEPARTMENT

Industrial security in the public and private sector can be defined as protection of men, materials,

machines, buildings, classified information, and company operation and to provide protective service

against fire, theft, damage to the company assets and the installation. Protect the valuables of the

company as well of the employees.

The main functions of security department are

1. Control of access.

2. Check thefts/pilferages.

3. Checking In/Out of raw materials, empty vehicles, vehicles carrying finished goods, vehicles

carrying scrap items etc.

4. Maintenance and upkeep of fire fighting equipment, fire hydrant system, wet drill practice

and fire fighting training.

5. Control of movement of personnel and material at the gate.

6. Maintenance, upkeep and documentation of weigh bridge at main gate and at mixing plant.

7. Control and check of entry of contract workers.

In case of an accident in the factory, it is the responsibility of the Security Department to provide the

victim with first aid. The security department should also take them to the appropriate place by

using the ambulance if necessary. The inflow and out flow of inventory, personnel are regulated and

monitored by the Security Department.

Action on outbreak of fire-Types of fire/classification

Class A fire: - Fire in which a combustible material is burnt –EG wood ,Paper ,Textile etc

Extinguishing medium: - Water, Soda acid, water, carbon dioxide.

Class B fire: - Fire on oil, petrol, solvent, spirit etc.

Extinguishing Medium: - Sand, Foam, Carbon dioxide, DCP EXT.

Class C fire: - Fire in gases under pressure.

Extinguishing medium: - carbon dioxide, DCP water flooding.

61

Page 62: MRF PROJECT REPORT

Class D fire: - Fire on metals.

All workmen shall be liable on leaving, entering or while remaining inside the factory premises to be

searched by the security personnel. The search clause is made applicable to the workmen only. The

following are subjected to search at the exit gate.

Workmen

Contract Casual Labour

Suppliers

Drivers, Cleaners, and Private Vehicles

Commercial Vehicles

Company Vehicles

The important documents to be maintained are;

Standing orders/Security Manual

Duty Rosters (Staff and Watchmen)

General Diary

Visitors Register

Material Movement Register

Vehicle Register

62

Page 63: MRF PROJECT REPORT

13. SHIPPING (DESPATCH) DEPARTMENT

Finished goods will be received from Inspection/Packing area size wise, batch wise or lot

wise on the basis of Production Transfer Note. Physical verifications of goods are done at the

time of receipt and Receipt Tags are put. Proper storage and identification of finished goods

is the responsibility of shipping department.

Finished goods will be stored side wise on pallets with transfer slips showing the size,

quantity, date of receipt etc. Tractor rear tyres, Truck tyres and such others will be stacked

on floor. Stacking norms for finished goods, wherever specified will be followed.

Shipping will publish Daily Shipping Report wherein finished goods inventory as on date,

daily cumulative receipts and despatches are shown. Copy is sent to Plant Planning.

Daily Production Receipts and Transfer are fed into computer and Reports are generated.

Daily details are transmitted to Central Planning/EDP/Marketing and data are consolidated

for Report generation and monitoring. Allocation verses Despatch Report is published for

every 10 days period or otherwise as required and sent to Central Planning, Plant Planning,

and Plant Head etc.

Non-moving/Slow moving items report is published monthly and distributed to Central

Planning, Plant Planning, Quality Assurance, Plant Head, and Marketing etc. Shipping co-

ordinates with central planning to get allocation for non-moving and slow moving items.

Tread rubber/Cushion which exceeds the shelf life of 3 months and damaged products/tyres

packed with wrong tubes will be given to production.

Statutory Registers and returns as required are properly maintained and submitted. New

Defective Tyres are brought for repairs from outside godowns and inspections by Central

Excise Authorities are arranged. They are re-despatched after necessary repairs. Arranging

Sales Tax Permits from HO is a shipping department function. Preparation of Sales Tax

declaration and Road permits are also done.

Central Excise/Sales Tax Rules and regulations are observed and prompt payment of duty is

ensured. Any materials returned for re-work are brought to the factory after informing the

Central Excise Authorities.

63

Page 64: MRF PROJECT REPORT

14. PLANT PURCHASE DEPARTMENT

The items purchased by the plant can be categorised as follows;

Items which come under the head capital expenditure

Items which come under engineering spares (non-capital expenditure)

Stationary and miscellaneous items(items which don’t come under the preview of raw

materials)

Services (repairing of machinery)

Procedure followed for purchase

Any person who needs a material can make a purchase requesting but it has to be authorised by the

department head. This has to be routed through engineering store.

In case of items involving capital expenditure, it should be capital authorisation number. In case of

engineering spares of non capital nature, this is not required.

Based on the indent, necessary quotations are invited and Purchase Order is released. The copy of

purchased order is sent to the supplier, intender, accounts, stores, corporate office PEM and a file

copy for plant purchase.

Procedure followed for repairing

For Repair of equipment or machinery, indent is raised and it is authorised by PEM, and item is sent

to the party from Engineering Stores vide Gate pass. The item is dismantled and the exact nature of

work to be done is finalised and quotation is raised by the outside party. This is communicated to

the indenter. Further clarifications and follow up is done by the indenter. After getting the approved

repair quotation from the indent/department, necessary Work Order is released by purchased

department. Copies are distributed as in the case of spares.

64

Page 65: MRF PROJECT REPORT

SWOT analysis of tyre industry

Strength

Established brand names.

Extensive distribution network.

Good R&D initiatives by top players.

Product image, Product quality is good and the equipments have its own unique brand

name.

MRF is the Market in almost every segment of the Tyre Industry.

Locally available raw material.

Weaknesses

Cost pressures

Pricing pressures

Marketing Department is only at Corporate Office.

Labour Unrest.

Union Problem.

Opportunities

Growing economy especially automobile industry

Transportation development particularly changing road transportation dynamics

Access to global source for raw material at competitive price.

Global Standards and Global Competition.

As there is an increase in customers to Buy Vehicle.

Making tie up with new Auto Mobile companies coming to India.

Threats

Continuous increase in price of natural rubber

Cheaper import of tyres especially from China

Cyclic nature of automobile industry.

65

Page 66: MRF PROJECT REPORT

Competition.

Cost of Raw Materials.

CONCLUSION

In spite of cut throat competition in the tyre market segment, MRF has mobilised itself as the market

leader. The company has a considerable lead over its revels in the tyre market but having a stiff

competition from other global players. The company’s thrust increasing exports to countries in Latin

America, Middle East and Africa will also boost top line growth. The strong performance of MRF is a

combination of high growth in sales along with enhanced operations management and significant

cost saving. MRF tries to provide high quality and technology superior products to its customers.

The study was conducted only at the Kottayam unit, which is one of the six units of MRF Ltd. a

general study about functioning and performance of the MRF Ltd Kottayam was done. All

departments of this organization work together for the achievement of a common goal, that is to

maintain the market leadership and MRF have achieved this in all respect and MRF places No.1 tyre

manufactures in India.

This study has improved my practical knowledge in spite of theoretical Knowledge. Being a student

in the firm has been benefited me with so much confidence and awareness so as to capable of

orienting me to work in the firm has been turning point in my academic curriculum.

66

Page 67: MRF PROJECT REPORT

\

67

Page 68: MRF PROJECT REPORT

68