mucool collaboration meeting february 2002 steve geer february 2002

11
MUCOOL Collaboration MUCOOL Collaboration Meeting Meeting February 2002 February 2002

Post on 20-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

MUCOOL Collaboration MeetingMUCOOL Collaboration MeetingFebruary 2002February 2002

Steve Geer February 2002

Page 2: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 2

WELCOMEWELCOMEto theto the

MUCOOLMUCOOL&&

MICEMICEMEETINGSMEETINGS

Page 3: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 3

EXISTING MUCOOL MISSION STATEMENTDesign, prototype, & bench-test all cooling channel components

& eventually test a cooling section in a muon beam

DRAFT REVISED MUCOOL MISSION STATEMENTDesign, prototype, & bench-test all cooling channel components

& make an engineering beam-test of a cooling section

The emergence of MICE has The emergence of MICE has an impact an impact onon the mission of MUCOOL the mission of MUCOOL

Page 4: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 4

MUCOOL InstitutionsMUCOOL Institutions

RF DevelopmentANLFNALIITLBNLNWU (?)Univ. Mississippi

Beam DiagnosticsANLFNALIITUniv. Chicago

Absorber R&DFNALIITKEKNIUUIUCUniv. MississippiUniv. OsakaUniv. Oxford

SolenoidsLBNL

Cooling ExperimentANLBNLFNALIITLBNLPrincetonUCLAUIUCUniv. MississippiUniv. Indiana

16 Institutions from US, Europe, and Japan

Page 5: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 5

Spokesman: Steve GeerBNL Contact: Rick FernowLBNL Contact: Bob Rimmer

R&D Co-ordinators

RF: A. Moretti, R. RimmerAbsorbers: D. KaplanLab G Instrumentation Tests: N. SolomeyMUCOOL Test Area: M. PopovicMUCOOL Test Area Instrumentation: D. ErredeSolenoids: Coming Soon

http://www.fnal.gov/projects/muon_collider/cool/cool.html

MUCOOL OrganizationMUCOOL Organization

Page 6: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 6

Some MUCOOL AccomplishmentsSome MUCOOL Accomplishments

Liq. H RF Liq. H RF Liq. H

Page 7: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 7

The MUTAC Report Says:The MUTAC Report Says:

“Ionization cooling remains the primary R&D issue for the collaboration. The most difficult part is the develop-ment and integration of the hardware, which is the goal of the MUCOOL efforts.”

Page 8: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 8

Why is MUCOOL so Challenging ?Why is MUCOOL so Challenging ?

We need to be able to operate a system in which Liquid Hydrogen is separated by a baking foil from an ignition source containing the energy of 10,000 light bulbs, and all of this is within a system of SC solenoids that might quench from time-to-time. The system must operate as 1012 charged particles pass, & WE NEED TO GET SAFETY APPROVAL.

We need to understand high gradient NCRF Cavity operationin Multi-Tesla magnetic fields, going well beyond the current state-of-the-art. We must understand and solve our present cavity breakdown problems.

Page 9: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 9

Status in December 2002Status in December 2002 ? ?

201 MHz Cavity Designed805 MHz R&D Ongoing201 MHz Cavity Construction Begun ? Cavity Solenoid Design Begun ?805 MHz and/or 201 MHz test system installation about to begin ? Absorber filling systems installation about to beginFirst Absorber Test Setup Designed – Safety Process Advanced

Page 10: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 10

Long-Range MUCOOL ScheduleLong-Range MUCOOL Schedule

Plan 1 – Test Capability Milestones

Complete Test Area Construction DEC 02Complete LH2 Filling Systems JUN 03Complete 805 MHz Test Systems JUN 03Complete 201 MHz Test Systems SEP 04Complete Solenoid SEP 05Complete Beam Installation SEP 05Full Test Capability DEC 05

Depends on funding levels, but it is useful to have a plausible Strawman plan:

Page 11: MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002

February 2002 Steve Geer 11

WE HAVE LOTS OFWE HAVE LOTS OF RESULTS & PLANSRESULTS & PLANS

TO DISCUSSTO DISCUSS