JAWAHARLAL NEHRU URBAN RENEWAL MISSION BASIC SERVICES FOR URBAN POOR KOCHI, KERALA Presented by The indian institute of architects -cochin center

Upload: nithish-joseph-monson

Post on 14-Apr-2015

63 views

Category:

Documents


0 download

DESCRIPTION

Initial site analysis, and understanding of the slum redevelopment project in mundemvelli, kochi

TRANSCRIPT

Page 1: Mundamveli Preliminary Report

JAWAHARLAL NEHRU URBAN RENEWAL MISSION

BASIC SERVICES FOR URBAN POORKOCHI, KERALA

Presented byThe indian institute of architects

-cochin center

Page 2: Mundamveli Preliminary Report

Mundamveli Shanthom ColonyRehabilitation of

Page 3: Mundamveli Preliminary Report

intr

odu

ctio

n

• Kochi is one of the major cities in south india.

• Various panchayaths along with the Cochin corporation constitute the kochi-CPD

Page 4: Mundamveli Preliminary Report

intr

odu

ctio

n

• Kochi has isolated as well as concentrated areas of slum dwelling.

• Major slum settlements are in the south-western part of kochi

Page 5: Mundamveli Preliminary Report

intr

odu

ctio

n

Page 6: Mundamveli Preliminary Report

Colony

Apartment

Canal

Community hall in

trodu

ctio

n

Page 7: Mundamveli Preliminary Report

Solid Waste Management system

Tenure issues Occupation status

Community facilities

Drinking Water Supply

Access to social amneties

Sanitation

Social Security

• Encroached Govt Land • Each household with

U/A no for issuing Ration Card

No Social amneties like Anganvadi, Community Hall, Health Centre

Males-Coolie workers Females- Housemaids

• Insufficient sanitation facilities • Near by ponds for this purpose.• Flooding is common

• No one public tap inside the colony • Public taps on the road used.

• The Kudumbashree neighbourhood group• Crime prone Area.

All waste are dumping to the nearby sewage canal.

No direct access to Market and other community facility.

Page 8: Mundamveli Preliminary Report

Existing layout

Exis

ting

con

dit

ion

Houses

CanalHi-Tension CableMurram Road

Page 9: Mundamveli Preliminary Report

Existing Individual Unit

Exis

ting

Con

dit

ion

Living Rm

Bed Rm 2Bed Rm

Kitchen

Page 10: Mundamveli Preliminary Report

Scope of work

Social and community facilities

Basic Awareness and Training

Ancillary Facilties(electricity, water,Sanitation)

Social Security

Housing and Tenure

Environmental Improvement

Common Necessities( Road, Drainage,Street Lighting,)

Civic amenties

Scope of work

Pro

ject

Desc

rip

tion

Page 11: Mundamveli Preliminary Report

Detailed requirements

Pro

ject

Desc

rip

tion

10m2

6m2

1.5m2

3m2

Kitchen

Living Room

Toilet

BedRoom

Carpet Area-25m2

Plinth Area-30m2

Kerala standards higher

Therefore max plinth area=40m2

Individual Buildings

Page 12: Mundamveli Preliminary Report

Detailed requirements

Pro

ject

Desc

rip

tion

Social InfrastructureAdequate amount of social Infrastructure according to the number of residents is to be provided Eg: 1Anganwadi /100houses

• Roads

• Playground

• Sewar

• Biogas Plant

• Rain water harvesting

• Garden’s and landscaped area

• Anganwadi

Infrastructure should be inter-linked for optimum functioning.Eg: Solid Waste can be used in the garden

Page 13: Mundamveli Preliminary Report

Budget and funding

Pro

ject

Desc

rip

tion

Page 14: Mundamveli Preliminary Report

SHARE

State GovtGOIBeneficiaryOthers50%

30% 20%

Budget and funding

Pro

ject

Desc

rip

tion

10%

Page 15: Mundamveli Preliminary Report

Social benefits

Pro

ject

Desc

rip

tion

• Reliable Infrastructure

• Rise in social status

• Essential Needs taken care of.

• Protection from natural and human threats

Page 16: Mundamveli Preliminary Report

Drawings

Curr

ent

desi

gn

Page 17: Mundamveli Preliminary Report

RoofPillar

Wall

Ventilation

Comparison with existing slum unit

Curr

ent

desi

gn

Page 18: Mundamveli Preliminary Report

Piling issue

short

com

ing

s

• The site is on a landfill area. Hence the soil Is loose.

• The soil cannot sustain the load of a multistoried building, hence a pile foundation is to be used.

• On using piled foundation , the project cost runs beyond the budget

Page 19: Mundamveli Preliminary Report

Bland design

short

com

ing

s

The layout is a monotonous array buildings without any need based pattern or arrangement

Page 20: Mundamveli Preliminary Report

Learn

ing

fro

m t

he p

ast

As part of JNURM the Two G+2 towers were constructed in this location in 2008.

A study of its current condition and Relevant feedback would provide sufficient insight on the impact of this project.

Page 21: Mundamveli Preliminary Report

Funding issue

Learn

ing

fro

m t

he p

ast

• Only 2 towers of the project was constructed due to unavailability of funds.

• The 2 Tower were designed to be part of system , hence they failed to function independently.

Page 22: Mundamveli Preliminary Report

• Worn-out Paint

• Broken Septic tanks

• Un-serviced common facilities

• A Conception that maintenance is the responsibility of the Govt

maintenance issue

Learn

ing

fro

m t

he p

ast

Page 23: Mundamveli Preliminary Report

• A skeptic view towards multi storied buildings.

• Insecurity of not owning a piece of land.

• Lack of co-operation to share common facilities

• Reluctance of donating land to the common pool.

Social Reluctance

Learn

ing

fro

m t

he p

ast

Page 24: Mundamveli Preliminary Report

• Misuse by Subletting , Reselling the units.

• No Provision for expansion once the family grows.

• The Design couldn’t ensure a Social-Decorum

Other issue

Learn

ing

fro

m t

he p

ast

Page 25: Mundamveli Preliminary Report

Row Housing

Alt

ern

ati

ve o

pti

on

s

• Repitative array of an individual house• Wall sharing results in considerable cost savings.

Page 26: Mundamveli Preliminary Report

Row Housing

Alt

ern

ati

ve o

pti

on

s

Type 1: Single Storied

Page 27: Mundamveli Preliminary Report

Row Housing

Alt

ern

ati

ve o

pti

on

s

Type 2: Duplexes

Page 28: Mundamveli Preliminary Report

Lightweight roofs

Dry wall/

Plastic/fiber windows and doors

Lightweight roofs

Light weight structures

Alt

ern

ati

ve o

pti

on

s

• Light weight material would reduce the load on the foundation.

• It would remove the need of piled foundation.

Page 29: Mundamveli Preliminary Report

Light weight structures

Alt

ern

ati

ve o

pti

on

s

Page 30: Mundamveli Preliminary Report

prefabrication

Alt

ern

ati

ve o

pti

on

s

Page 31: Mundamveli Preliminary Report

Flexible houses

Alt

ern

ati

ve o

pti

on

s

Page 32: Mundamveli Preliminary Report

Composite habitat

Alt

ern

ati

ve o

pti

on

s

Page 33: Mundamveli Preliminary Report

Row H Pre-Fab Flexible CompositeSingle-Str

Inadequate no of units

Light Weight Structures

Design Challenge

Skeptic View

Modularity

Efficiency

Anthropometric consideration

comparison

Alt

ern

ati

ve o

pti

on

s

Page 34: Mundamveli Preliminary Report

comparison

Alt

ern

ati

ve o

pti

on

s

• Inadequate no of units• Light-Weight Structure.• Personal Plot For user.

Single-Str & Row housing

• Modularity and Mass Production• Challenging to design• Easy to assemble• Light weight• Efficient

Prefabrication

• Modularity• Challenging to Design• Efficient• High Maintenance Required• Highly Skeptic Outlook expected

Flexible

• Modularity• Challenging to Design• Efficient• The sense of community created• Human Psychological and • anthropometric need considered

Composite Habitat

Page 35: Mundamveli Preliminary Report

Setting Goals

Movin

g F

orw

ard

Upon comparison of various options , certain goals were set

• To find alternative Public/private Sponsorship to supplement the Govt Funding.

• To Convince the people about the advantages of multi-storied buildings , as well as following a ‘Need’ Based Design Approach.

• Better Technology (like prefabrication) to be used for constructing multi-floor buildings on the soft soil of the site.

• Going for single storied building would be highly ineffective due to the lack of land

Page 36: Mundamveli Preliminary Report

Con

clu

sion

Challenge in hand

1. To Design a new generation prototype with the given constraints, which can be successfully replicated in different locations

2. To Elevate the quality of life of the residents of Mundamveli, By creating a social environment

2. To ensure successful execution of the project.