municipal sustainability initiative - capital...project descriptions and amounts include accepted...
TRANSCRIPT
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
City Accepted Amount
AIRDRIE
Complete phase 3 of the Genesis Place expansion, including construction of ice rinks and multi-purpose space.
$9,083,702
Redevelop a facility to accommodate the transportation and public works departments.
$1,669,541
Design and construct an emergency services station in the Gateway neighbourhood.
$4,295,200
BROOKS
Construct the Brooks Regional Ball Park. $2,200,000
CALGARY
Contribute funding to the Oakridge Community Association to replace the ice plant at the Oakridge Community Centre.
$301,400
Contribute funding to the Calgary Rugby Union for the rehabilitation of a building at the Calgary Rugby Park.
$292,215
Contribute funding to the Triwood Community Association for the rehabilitation of the Triwood Arena.
$625,000
Construct Peigan Trail SE from 52 Street SE to Stoney Trail. $2,240,000
EDMONTON
Design and engineer the southeast to west light rail transit line. $14,100,000
Design and construct a riverfront promenade in West Rossdale. $2,918,642
Design and construct a pedestrian bridge with access to Terwillegar Park.
$7,607,099
Design and construct the north light rail transit extension from the downtown core to the Northern Alberta Institute of Technology, including land and light rail vehicle purchases.
$21,028,000
Expand the river valley trail system, and install boat launches and docks in several locations.
$4,346,914
Design and install a connected fire alarm and security system at Fort Edmonton Park.
$1,400,000
Design and construct a traveling exhibition gallery adjacent to the Telus World of Science facility.
$3,500,000
Construct roads, streetlighting and sidewalks in the Magrath Heights neighbourhood as part of the Anthony Henday interchange upgrade.
$1,000,000
Upgrade the fire rescue training tower, including structural modifications and installation of a gas burning system.
$2,616,000
Construct a fire station in the Lewis Estates neighbourhood and purchase associated fire response vehicles.
$13,628,000
Upgrade the closed circuit television systems in police facilities. $1,700,000
Page 1This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
EDMONTON
Replace the roofs on several city arenas. $2,950,000
Replace escalators at the Shaw Conference Centre. $11,070,000
Replace the outdoor pool in Borden Park with a natural swimming pond and upgrade associated amenities.
$13,347,000
Construct a seniors and multicultural centre in Mill Woods. $8,200,000
Rehabilitate roads, sidewalks, and street lighting in the Windsor Park neighbourhood.
$10,000,000
Construct a park in the Cameron Heights neighbourhood. $1,914,000
Replace utility systems in Fort Edmonton Park. $6,019,000
Rehabilitate roads, sidewalks, and street lighting in the Woodcroft neighbourhood.
$9,288,000
Rehabilitate roads, sidewalks, and street lighting in the King Edward Park neighbourhood.
$16,550,000
Rehabilitate roads, sidewalks, and street lighting in several neighbourhoods.
$41,187,000
Rehabilitate roads, sidewalks, and street lighting in the Canora neighbourhood.
$8,500,000
Upgrade several arterial roads. $4,138,000
Rehabilitate existing and install new street and walkway lighting. $11,800,000
FORT SASKATCHEWAN
Rehabilitate and expand the Sportsplex. $3,300,000
Prepare design and engineering plans for a Royal Canadian Mounted Police facility.
$500,000
GRANDE PRAIRIE
Contribute funding to the River of Death and Discovery Dinosaur Museum Society for the construction of the Philip J. Currie Dinosaur Museum.
$1,000,000
Rehabilitate a portion of the City Service Center roof. $1,145,000
Rehabilitate sidewalks in several locations. $1,211,000
Rehabilitate storm water outfalls and retention ponds, and install a storm water monitoring system.
$1,000,000
Rehabilitate portions of roads. $1,636,380
Upgrade 105 Avenue, including replacing storm water infrastructure and creating an entrance to Muskoseepi Park.
$2,500,000
Rehabilitate 132 Avenue between 102 Street and 84 Street. $2,990,000
LACOMBE
Jointly upgrade the Barnett Arena parking lot with Lacombe County.
$645,694
Page 2This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
LACOMBE
Jointly rehabilitate the exterior of the Kinsmen Aquatic Centre with Lacombe County.
$244,545
Jointly upgrade the Barnett Arena rink with Lacombe County. $131,920
Construct soccer fields. $341,547
Expand and upgrade the Bruns Storm Water Pond. $548,000
Install a storm water line under 45 Street and 55 Avenue. $3,299,248
Jointly purchase an emergency response vehicle with Lacombe County.
$104,000
Purchase a garbage truck. $268,000
LEDUC
Rehabilitate a portion of 47 Street. $292,000
Purchase land to construct a fire hall. $470,000
Upgrade the Alexandra Arena. $630,000
Upgrade the main pool at the Leduc Recreation Centre. $300,000
Rehabilitate roads in the Linsford residential subdivision. $247,000
Purchase a street sweeper. $290,000
Rehabilitate roads in the Meadowview residential subdivision. $640,000
Rehabilitate portions of several arterial roads. $2,170,000
LETHBRIDGE
Construct a public operations depot with a snow dump site, sand and salt storage facility, and office and storage facility.
$2,565,000
Rehabilitate buildings and replace water, wastewater, and storm water infrastructure at Exhibition Park.
$3,573,000
Expand the police headquarters. $10,591,000
Rehabilitate several parks, including replacement of playground structures and walkways.
$2,561,000
MEDICINE HAT
Replace and upgrade a natural gas fueling station. $1,400,000
Replace the Central Park Water Playground, including construction of a new pad and replacement of water playground structures.
$660,000
Construct an extension of Parkview Drive, including a leisure trail and storm water line.
$5,300,000
Replace traffic and street lights with energy efficient fixtures. $1,500,000
Rehabilitate the plaza in front of City Hall. $700,000
Expand the airport passenger terminal. $3,000,000
Page 3This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
MEDICINE HAT
Expand the west end section of the Hillside Cemetery. $700,000
Rehabilitate the Maple Avenue bridge and upgrade the Maple Avenue and 1 Street intersection.
$2,200,000
Construct sports fields and a parking lot in the Ranchlands subdivision.
$1,237,000
Renovate an emergency communications centre and upgrade radio dispatch systems.
$1,500,000
RED DEER
Install water and wastewater lines for the Riverview Park subdivision.
$3,103,000
Complete phase 2 of the revitalization of Gaetz Avenue, including street and sidewalk upgrades.
$4,741,000
Design and construct a walking trail to connect the Mckenzie Trails to the River Bend Recreation Area.
$3,416,000
Design and construct a skateboard park. $1,428,000
Design and construct a spray park. $1,161,000
Rehabilitate several roads. $7,300,000
Install water and wastewater lines for the Sullivan Quarter and Burnt Lake Industrial Park.
$6,300,000
Upgrade the roads, sidewalks, and underground infrastructure at the intersection of Taylor Drive and Ross Street.
$14,199,000
Replace portions of a road. $1,103,000
SPRUCE GROVE
Rehabilitate Spruce Grove City Hall, including installing a cooling system and security enhancements, and expanding the file room.
$240,300
ST. ALBERT
Complete phases 3 and 4 of the Riel Park redevelopment, including replacement of rugby and soccer field infrastructure.
$4,500,000
Reconstruct Delage Crescent and Linwood Crescent. $1,300,000
Upgrade a portion of Veness Road, including resurfacing and drainage improvements.
$3,500,000
Construct a transit centre and park and ride facility. $10,000,000
Complete the construction of the East St. Albert water supply line. $2,205,000
Upgrade the storm water system, including installation of new conduit and outfall retrofits.
$2,160,000
Rehabilitate portions of several roads. $2,000,000
Purchase and rehabilitate a building to accommodate the Royal Canadian Mounted Police and other city departments.
$1,600,000
Page 4This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
ST. ALBERT
Extend water, wastewater, and storm water lines to the Erin Ridge North neighbourhood.
$2,403,000
WETASKIWIN
Expand the landfill. $234,899
Specialized Municipality Accepted Amount
CROWSNEST PASS, Municipality of
Replace a portion of water, wastewater, and storm water lines along 15 Avenue.
$513,845
Rehabilitate a portion of a wastewater line along 20 Avenue. $98,503
Replace a portion of a waterline along 134 Street North. $160,936
Purchase a tandem truck and a tractor. $138,000
Replace a portion of water and storm water lines along 134 Street South.
$787,579
Repave portions of several roads. $118,200
MACKENZIE COUNTY
Construct a water reservoir, pumping station, and waterlines. $900,000
Purchase a fire tanker for the Hamlet of La Crete fire department. $316,347
Rehabilitate the arena ice plant in the Hamlet of Fort Vermilion. $173,100
Rehabilitate the roof of the administration building in the Hamlet of Fort Vermilion.
$150,000
Purchase graders. $460,961
Rehabilitate drainage channels east of the Town of High Level. $541,000
STRATHCONA COUNTY
Design and construct the Emerald Hills Aquatics and Wellness Centre.
$18,315,834
Rehabilitate a portion of Beauvista Drive, including sidewalks and traffic calming measures.
$3,690,076
Upgrade Baseline Road from 34 Street to Anthony Henday Drive. $3,749,730
Rehabilitate and expand the Kinsmen Leisure Centre. $1,702,453
Rehabilitate and expand the Royal Canadian Mounted Police facility.
$7,980,416
Construct an emergency services outdoor training centre. $1,301,500
Upgrade the Glen Allan Recreation Centre. $4,938,750
WOOD BUFFALO, Regional Municipality of
Construct a wastewater line. $24,500,000
Page 5This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
WOOD BUFFALO, Regional Municipality of
Widen a portion of Confederation Way and Thickwood Boulevard. $10,855,547
Municipal District Accepted Amount
ACADIA NO. 34, M.D. OF
Expand the wastewater lagoon in the Hamlet of Acadia Valley. $344,000
ATHABASCA COUNTY
Pave several subdivision roads. $1,470,000
Jointly pave an access road with the Summer Village of Whispering Hills.
$261,724
BARRHEAD NO. 11, COUNTY OF
Reconstruct a portion of Township Road 604. $4,634,867
BEAVER COUNTY
Replace the Agricultural Services Shop. $475,000
Purchase a truck tractor. $170,000
Rehabilitate the transportation shop. $140,000
Replace a wheel loader. $130,000
Replace graders. $528,000
Complete several road projects including oiling portions of several roads, contruction of the Poe Road access, and rehabilitation of Township Road 462.
$700,000
BIG LAKES, M.D. OF
Purchase a tractor mower. $117,400
Gather geographic information system data. $142,550
Construct a wastewater lagoon and forcemain in the Hamlet of Joussard.
$815,465
Purchase a fire truck. $119,000
Construct a salt and sand shed. $400,000
Pave roads in the Hamlet of Joussard. $104,373
BIRCH HILLS COUNTY
Purchase crushed gravel for road maintenance. $1,503,000
CARDSTON COUNTY
Purchase a grader. $367,236
Rehabilitate a portion of Range Road 214. $180,000
Purchase a bulldozer. $166,000
Page 6This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
CARDSTON COUNTY
Rehabilitate a portion of Range Road 230. $216,000
Replace fuel storage tanks. $60,000
Construct a public works shop. $3,700,000
Purchase a fire truck. $275,000
Purchase grass fire responder trucks. $120,000
CLEARWATER COUNTY
Rehabilitate several roads. $4,798,842
CYPRESS COUNTY
Construct and rehabilitate several roads. $1,428,335
Construct an equipment storage structure and replace a sand storage shed.
$1,500,000
Replace a road maintenance reclaimer. $431,000
Replace graders. $604,000
Replace a fire truck. $330,000
FLAGSTAFF COUNTY
Purchase a supply of gravel. $1,000,000
Purchase an emergency response vehicle. $120,000
Rehabilitate portions of Range Road 114. $1,600,000
Replace bridge structures. $237,000
FOOTHILLS NO. 31, M.D. OF
Jointly construct a field house with the Town of Okotoks. $10,000,000
Construct the Heritage Heights Arena. $8,750,000
Construct a regional fire training centre. $450,000
Construct a waterline from the Town of High River to the Hamlet of Cayley water treatment plant, construct a booster station, and upgrade the Cayley water treatment plant.
$400,600
Rehabilitate the Fish Creek Ranch water treatment plant. $780,000
Install water and wastewater lines to the Heritage Pointe Fire Hall. $550,000
Purchase a grader. $380,000
FORTY MILE NO. 8, COUNTY OF
Purchase an excavator. $166,000
Page 7This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
GRANDE PRAIRIE NO. 1, COUNTY OF
Upgrade the Wedgewood Drive and Resource Road intersection, including the construction of turning lanes and installation of signals.
$750,000
Pave a portion of Range Road 54. $1,382,000
Expand the existing administration building by constructing an adjacent facility.
$714,398
GREENVIEW NO. 16, M.D. OF
Pave a portion of Range Road 13. $3,498,180
Rehabilitate portions of Range Road 65 and Range Road 222. $4,439,161
LAC STE. ANNE COUNTY
Purchase graders. $906,520
Rehabilitate a portion of Township Road 590. $148,295
Rehabilitate a portion of Range Road 33. $215,000
Rehabilitate a portion of Range Road 35. $170,000
Rehabilitate a portion of Range Road 80. $130,000
Rehabilitate a portion of Range Road 84. $495,000
Rehabilitate a portion of Township Road 544. $320,000
Rehabilitate a portion of Township Road 574. $130,000
Rehabilitate a portion of Township Road 572. $130,000
LACOMBE COUNTY
Purchase a gravel and snow plow truck. $240,000
Rehabilitate portions of Centerview, Lockhart, and Barnett roadways.
$1,550,247
Construct a service road. $190,036
Jointly install signal lights at an intersection with the Town of Blackfalds.
$225,500
Jointly construct the Blackfalds Fieldhouse with the Town of Blackfalds.
$750,000
Rehabilitate Milton Gadsby Lake Road. $181,943
LAMONT COUNTY
Purchase graders. $574,406
Purchase an excavator. $210,400
Purchase a trailer. $71,000
Construct a fire training centre. $100,000
Purchase a pumper truck. $320,000
Page 8This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
LAMONT COUNTY
Purchase a tractor and mowing equipment. $93,086
Purchase a spray truck. $114,000
LEDUC COUNTY
Replace a fire pumper truck. $445,000
Replace graders. $536,000
Contribute funding to Alberta Transportation for lane and intersection upgrades along a portion of Highway 625.
$607,000
Jointly purchase public transit buses and construct passenger shelters and sidewalks with the City of Leduc.
$275,000
Jointly repave a portion of Airport Road with the City of Leduc. $460,000
Replace and rehabilitate wastewater lines in the Hamlet of New Sarepta.
$281,000
LETHBRIDGE, COUNTY OF
Purchase an emergency rescue and command vehicle. $138,000
Purchase and install a sprinkler system in the municipal airport terminal.
$200,000
Rehabilitate portions of several gravel roads. $2,576,000
Purchase right-of-ways at various locations for future road widening.
$175,000
Purchase land and construct a storm water retention pond. $190,000
MOUNTAIN VIEW COUNTY
Rehabilitate portions of several roads. $605,000
Jointly repave Burnt Timber Road with the Municipal District of Bighorn.
$476,287
NORTHERN LIGHTS, COUNTY OF
Pave several service access roads and an intersection on Highway 35.
$775,000
Upgrade the airport lighting system. $500,000
PAINTEARTH NO. 18, COUNTY OF
Pave a portion of Township Road 370. $1,244,014
PARKLAND COUNTY
Construct broadband internet towers. $3,350,000
Construct a fire hall and purchase associated fire response vehicles.
$6,373,076
Replace tanker truck located in the Summer Village of Seba Beach.
$350,000
Page 9This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
PARKLAND COUNTY
Repave portions of Township Road 533 and Range Road 32. $604,058
Rehabilitate portions of road in the Acheson Business Park and Township Road 531A.
$3,340,000
Resurface portions of several roads. $1,586,697
PEACE NO. 135, M.D. OF
Replace a bridge culvert structure on Range Road 261. $75,000
Replace a bridge culvert structure on Range Road 245. $130,000
Replace a bridge culvert structure on Range Road 234. $72,711
Purchase a prefabricated kitchen facility for the Lac Cardinal Hall. $50,000
Jointly purchase a fire truck with the Village of Berwyn. $200,000
PINCHER CREEK NO. 9, M.D. OF
Upgrade North Burmis Road. $1,212,241
Construct an administration building. $4,200,000
PONOKA COUNTY
Reconstruct a portion of Range Road 284. $1,325,994
Reconstruct a portion of Range Road 30. $1,290,000
PROVOST NO. 52, M.D. OF
Rehabilitate portions of Range Road 91 and Township Road 402. $1,920,000
RANCHLAND NO. 66, M.D. OF
Purchase a grader. $150,000
RED DEER COUNTY
Realign Range Road 30 with the Medicine River bridge. $1,870,000
Construct an addition to the Dickson Jubilee Arena. $649,000
Rehabilitate a portion of Range Road 240 from Township Road 370 to Highway 42.
$1,240,013
Rehabilitate a portion of Township Road 362 from Range Road 253 to Range Road 260.
$1,681,564
Reconstruct a portion of Township Road 360 from Range Road 263 to Range Road 262.
$787,275
Reconstruct a portion of Township Road 374 from Range Road 264 to Range Road 265.
$625,000
Reconstruct a portion of Range Road 263 from Township Road 360 to Highway 590.
$1,574,075
Reconstruct a portion of Range Road 265 from Township 374 to Country Lane Estates.
$470,000
Page 10This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
RED DEER COUNTY
Reconstruct a portion of Range Road 271 from Township Road 364 to Township Road 362.
$1,428,000
Pave a portion of Range Road 40 from Township Road 350 to Township Road 354.
$1,360,000
ROCKY VIEW COUNTY
Construct an infrastructure and operations shop, including associated storage units.
$8,700,000
SADDLE HILLS COUNTY
Pave portions of Range Road 120 and Township Road 812. $1,659,059
SMOKY LAKE COUNTY
Enhance the Global Information System. $148,000
Pave portions of several roads. $1,083,345
SMOKY RIVER NO. 130, M.D. OF
Rehabilitate roads, including roadside widening and other safety improvements.
$222,505
Rehabilitate Kimlakes Road (Rural Route 201) from Highway 2 to Township Road 790.
$416,417
Upgrade the surface of several roads. $200,000
Reconstruct a portion of Range Road 201 from Highway 2 to Township Road 790.
$701,140
SPIRIT RIVER NO. 133, M.D. OF
Purchase graders. $630,000
Replace the municipal entrance signs. $40,000
Replace a bridge. $50,000
Replace a fire truck. $300,000
ST. PAUL NO. 19, COUNTY OF
Replace a gravel truck. $308,960
Replace graders. $1,424,180
STURGEON COUNTY
Contribute funding to the Town of Bon Accord to upgrade the arena.
$100,000
Contribute funding to the Sturgeon Agriplex Society for the expansion of the Sturgeon Agricultural Centre.
$100,000
TABER, M.D. OF
Rehabilitate portions of several roads. $1,238,952
Rehabilitate, replace, and construct sidewalks and roads. $836,461
Page 11This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
TWO HILLS NO. 21, COUNTY OF
Purchase a gravel crusher, loader, and excavator. $1,315,513
VERMILION RIVER, COUNTY OF
Rehabilitate Township Road 494 from Range Road 20 to Range Road 24.
$400,000
Construct a wastewater treatment facility in the Hamlet of Blackfoot.
$700,000
Upgrade the water pump system in the Hamlet of Islay, including replacement of electrical equipment and purchase of a back-up generator.
$141,000
Upgrade the water treatment plant in the Hamlet of Blackfoot. $460,000
VULCAN COUNTY
Rehabilitate several roads. $750,000
Replace graders. $516,878
Upgrade the drainage system in the Hamlet of Mossleigh. $571,000
Replace a gravel tractor. $122,400
WAINWRIGHT NO. 61, M.D. OF
Pave Township Road 442 from Highway 610 to Highway 41. $2,305,429
WARNER NO. 5, COUNTY OF
Rehabilitate portions of several roads. $1,628,835
WESTLOCK COUNTY
Rehabilitate portions of several gravel roads. $650,000
Purchase an emergency response vehicle. $180,000
Construct a lagoon in the Hamlet of Busby. $400,000
Install water and wastewater lines to industrial park lots. $144,000
Rehabilitate Township Road 612 east of Highway 44. $400,000
WETASKIWIN NO. 10, COUNTY OF
Contribute funding to the Alder Flats Agricultural Society to replace the roof on the Alder Flats Curling Rink.
$45,000
Contribute funding to the Buck Lake Agricultural Society to replace siding on the Buck Lake Community Centre.
$9,500
Contribute funding to the Buck Lake Stampede Society to replace the bleachers at the Buck Lake Stampede Grounds.
$200,000
WHEATLAND COUNTY
Replace a portion of a wastewater main and waterline main in the Hamlet of Gleichen.
$269,500
Pave Range Road 245 from Highway 564 to Township Road 264. $1,320,000
Page 12This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
WHEATLAND COUNTY
Design upgrades to the water treatment plant in the Hamlet of Gleichen.
$225,000
WILLOW CREEK NO. 26, M.D. OF
Purchase fire trucks. $1,700,000
Purchase bulk fuel storage tanks. $200,000
Purchase a medical clinic. $600,000
Purchase gravel trucks and graders. $750,000
Rehabilitate a portion of Stavely Road. $1,000,000
YELLOWHEAD COUNTY
Pave and extend a portion of Highway 947. $10,699,458
Town Accepted Amount
ATHABASCA
Pave a portion of Old Colinton Highway. $1,000,000
Rehabilitate and replace sections of asphalt, curbs, and gutters. $73,750
BARRHEAD
Purchase mobile bleachers. $50,000
Construct a washroom and change facility at Rotary Splash Park. $100,000
Construct tennis courts. $250,000
Purchase a loader. $131,578
BASHAW
Replace water valves and repair a waterline. $53,649
BEAUMONT
Replace playground equipment and install litter bins in several parks.
$120,800
Rehabilitate the Ken Nichol Regional Recreation Centre. $850,800
BLACK DIAMOND
Upgrade portions of several roads including wastewater lines, sidewalks, curbs, and gutters.
$522,492
Contribute funding to the Quad Regional Water Partnership for the construction of waterlines and rehabilitation of a water treatment facility.
$1,274,089
Install solar panels on the municipal office building. $33,372
Repave the municipal office parking lot. $43,748
Page 13This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
BON ACCORD
Purchase a gravel truck. $80,000
Rehabilitate portions of 50 and 51 streets. $257,000
BONNYVILLE
Install fire hydrants and extend water and wastewater lines along 50 Avenue.
$1,222,562
BOWDEN
Purchase a garbage truck. $189,000
CALMAR
Install a waterline along 51 Street from 43 Avenue to 49 Avenue. $434,982
Upgrade the intersection at Highway 30 and 43 Street. $434,982
CARDSTON
Purchase a pump house blower and related equipment, and a storage shed.
$31,500
Rehabilitate a portion of the wastewater line on Main Street. $50,000
Stabilize a portion of the St. Mary River bank. $75,000
Construct a new pool and upgrade the existing pool's change room facility.
$600,000
CARSTAIRS
Rehabilitate Centre Street and Gough Road parking lots. $103,500
Install off season turf in the Carstairs Memorial Complex. $90,000
Construct a walking path along Highway 2A. $63,250
Install a water distribution pump. $30,000
Rehabilitate portions of several roads. $981,771
Construct a wastewater line. $550,000
CHESTERMERE
Construct a police station. $4,000,000
Reconstruct West Chestermere Drive, including curb, gutter, and drainage upgrades.
$5,500,000
CLARESHOLM
Upgrade a wastewater lift station. $1,306,501
Rehabilitate a portion of 59 Avenue from 4 Street to 8 Street, including installing waterlines, wastewater lines, curbs, and gutters.
$574,784
COALDALE
Construct water distribution, wastewater, and storm water systems. $773,264
Page 14This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
COALDALE
Rehabilitate Fairway Drive Road. $281,486
Replace a wastewater line on 19A Avenue. $100,000
Construct parking and a sidewalk for a multi-use facility. $100,000
Install a storm water line. $135,000
COALHURST
Construct a public works storage facility. $100,000
Upgrade Imperial Meadows Park, including constructing a walking path and a gazebo, and installing benches.
$55,000
Upgrade the garbage truck and purchase garbage bins. $125,000
COCHRANE
Purchase a wheel loader. $330,000
Prepare the design and site for an aquatic centre. $3,000,000
Construct a pathway extension to Glen Summit. $490,000
Develop Riverfront Park. $2,000,000
Purchase a truck equipped with a plow and sander dump box. $400,000
Design and construct an RCMP station. $2,800,000
CORONATION
Upgrade a wastewater lagoon. $21,922
Rehabilitate a wastewater main. $50,000
Install water and wastewater lines for a new subdivision. $150,000
Purchase a handheld water meter reader. $15,000
Purchase a street sweeper. $20,000
Purchase a gravel truck. $30,000
Jointly purchase a fire emergency communication system with the County of Paintearth and the Special Areas Board.
$12,500
Purchase a grader. $70,000
Jointly construct a physician residence with the County of Paintearth.
$190,000
Renovate the town office. $90,000
DAYSLAND
Rehabilitate water and wastewater lines on 52 and 58 Street. $32,281
Replace a portion of sidewalk on 50 Street. $31,780
Construct and rehabilitate curb stops and gutters at several locations.
$100,000
Page 15This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
DAYSLAND
Replace portions of water and wastewater lines on 48 Street. $40,300
Purchase a wastewater line camera. $17,000
Purchase a mower with broom attachment. $19,500
Replace a portion of sidewalk on 51 street. $50,000
Purchase a quick response vehicle. $16,000
Purchase a street sweeper. $60,000
Purchase a tractor. $125,000
DEVON
Upgrade the wastewater treatment plant. $62,500
Replace bleachers and boards at the Dale Fisher Arena. $485,000
Rehabilitate and replace portions of wastewater lines. $300,391
Purchase a loader with attachments. $180,000
Rehabilitate lift stations. $61,100
Purchase reflective decals for fire vehicles and media equipment for a fire training room.
$62,700
DRAYTON VALLEY
Rehabilitate a portion of Power Center Boulevard. $420,000
ECKVILLE
Upgrade the water treatment plant, including construction of a water well, piping, electrical, and filter system improvements.
$750,000
Upgrade the storm water drainage system, including conduit replacement and reconfiguration of the back alley.
$120,307
EDSON
Rehabilitate portions of several roads. $79,609
Construct water wells. $302,870
Construct a parking lot adjacent to Kinsmen Park. $318,085
Pave a public works yard. $197,950
Purchase a gravel truck. $134,350
Purchase an excavator. $201,000
Purchase a garbage truck. $151,760
Rehabilitate park trails. $210,866
Replace lighting at the municipal airport. $150,000
Purchase a security camera system. $87,500
Page 16This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
FAIRVIEW
Replace playground equipment in the Bickle Heights subdivision. $50,000
Purchase a wide area mower. $50,000
Replace the animal shelter. $40,000
Jointly construct a water collection and irrigation system for the local spray park with the Heart of the Peace non-profit group, and jointly install a salt chlorination system in the aquatic centre with the Municipal District of Fairview.
$32,932
Rehabilitate the ice plant of the Fairview Fairplex Arena. $35,000
Replace a folding machine and postage meter. $31,462
FALHER
Purchase a lawn mower. $21,000
Replace curbs, gutters, and sidewalks in several locations. $80,900
FORT MACLEOD
Contribute funding to the Fort Macleod Playground Committee to replace the playground equipment at Centennial Park.
$40,000
Replace the existing public works building with a multi-use facility. $1,200,000
GIBBONS
Reconstruct a cul-de-sac on 49 Avenue. $264,180
Construct a cultural centre. $1,888,718
Purchase a gravel truck. $193,808
HANNA
Repave the Hanna Agri-Sports Complex parking lot, including installation of curbs and gutters.
$200,000
Purchase a vacuum truck. $320,000
HARDISTY
Rehabilitate portions of several roads. $219,642
HIGH LEVEL
Prepare a design for the expansion and upgrade of the arena. $200,000
Contribute funding to the Golden Range Society to rehabilitate the Town Hall Annex.
$56,000
Purchase lawn mowers. $60,000
Repave several streets and replace sidewalks. $145,788
Repave several streets. $252,967
HIGH PRAIRIE
Replace the roof of the High Prairie Municipal Library. $85,000
Page 17This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
HIGH RIVER
Jointly construct a fire training facility with the Municipal District of Foothills.
$300,000
Upgrade George Lane Park, including construction of a new playground and remodelling of washroom facilities.
$300,000
Stabilize a portion of the Highwood River bank. $225,000
Construct a field house. $7,500,000
HINTON
Upgrade water and wastewater lines along Drinnan Way. $300,000
Purchase a bucket truck, dump truck, and wastewater flusher truck. $255,000
Design wastewater system upgrades. $653,500
Upgrade the Government Civic Centre and expand its parking lot. $300,000
Upgrade a booster station and replace a waterline. $2,965,000
Replace the water and wastewater supervisory control and data acquisition systems.
$170,000
INNISFAIL
Rehabilitate a portion of 50 Street including road, sidewalk, and water, wastewater, and storm water lines.
$4,461,360
IRRICANA
Rehabilitate a wastewater lagoon. $27,000
KILLAM
Rehabilitate portions of several roads. $100,000
Upgrade a portion of 46 Street, including paving and installation of curb and gutter.
$200,430
LAMONT
Replace a portion of water and wastewater lines. $1,143,690
LEGAL
Replace a front-end loader and purchase attachments. $14,550
Purchase a bucket truck. $20,000
MILLET
Replace the arena ice rink cooling and heating system. $87,400
MORINVILLE
Prepare a design and engineering plan to upgrade the East Boundary Road.
$200,000
Page 18This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
MUNDARE
Construct an intersection along Highway 15 for the Whitetail Crossing subdivision.
$225,620
Replace sidewalks and repave roads. $235,000
NANTON
Upgrade the water treatment plant. $290,000
Purchase a skid steer. $37,400
OKOTOKS
Jointly construct a field house with the Municipal District of Foothills.
$10,525,000
Purchase a loader with a snow blower attachment. $300,000
OLDS
Rehabilitate the lighting system in the Olds Aquatic Centre. $177,068
Replace valves at water pump stations. $100,000
Replace a snowplow sander truck. $139,000
Pave existing recreational trails. $75,005
Replace a dehumidifier and forced air units in the recreation centre.
$265,000
Construct and rehabilitate portions of the road, storm water, water, and wastewater systems.
$483,000
Jointly purchase a replacement fire truck with Mountain View County.
$215,000
Replace the arena ice resurfacer. $175,000
ONOWAY
Rehabilitate portions of Payne Avenue and Trailer Court Road. $53,000
Rehabilitate several alleyways. $34,000
Rehabilitate storm water catch basins. $40,000
Rehabilitate a main water valve. $68,200
Purchase a mower. $13,488
Purchase playground equipment for Shaul Park. $35,514
Resurface portions of Lac Ste. Anne Trail. $51,127
OYEN
Rehabilitate portions of 4 Street and 1 Avenue East, including installing curbs, gutters, and replacing water and wastewater lines.
$783,269
PEACE RIVER
Replace portions of several sidewalks. $75,000
Page 19This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
PEACE RIVER
Construct a fire training facility. $231,000
Purchase a multi-functional photocopier and computers. $70,500
Purchase a rapid response truck and a command vehicle. $200,000
Install a chairlift at Misery Mountain Ski Area. $752,325
Purchase a maintenance truck, gravel trucks, and grader. $505,000
PICTURE BUTTE
Complete phase 2 of Factory Drive paving. $191,925
Rehabilitate the Lions Aquatic Centre. $55,000
PINCHER CREEK
Upgrade Castleview Park, including parking improvements and addition of recreational amenities.
$117,000
Replace a lift station and wastewater line. $250,000
Construct park trails. $100,000
Install a waterline. $200,000
Prepare a functional plan for an expansion of a multi-purpose recreational facility.
$75,000
Contribute funding to the Pincher Creek and District Municipal Library for renovation of the facility.
$75,000
PONOKA
Upgrade a wastewater lift station. $150,000
Purchase a grader. $160,000
Construct a road, electrical power, and street lighting on 67 Street from 39 Avenue to 36 Avenue.
$100,000
Upgrade an arena and provide services to a splash park. $103,000
Extend the storm water main into the Hudson's Green area. $116,000
Construct portions of 36 Avenue and 67 Street. $374,000
RAYMOND
Construct a treated water line. $763,281
Complete phase 2 of the regional water treatment plant construction.
$812,039
REDCLIFF
Rehabilitate a portion of Railway Avenue South. $182,400
Upgrade a road, including road replacement and sidewalk construction.
$348,000
Upgrade pumps at the water treatment facility. $292,600
Page 20This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
REDCLIFF
Evaluate the wastewater system and prepare a system upgrade plan.
$100,000
Rehabilitate a portion of Dirkson Drive. $172,500
Rehabilitate 3 Avenue, including installation of a waterline. $52,000
REDWATER
Rehabilitate portions of wastewater lines. $150,000
RIMBEY
Rehabilitate a portion of 51 Avenue including asphalt, water, and wastewater mains.
$500,000
Prepare a parks and recreation master plan. $50,000
Replace equipment at several playgrounds. $68,000
Purchase a maintenance truck. $32,780
Inspect and replace the road and wastewater main on a portion of 58 Avenue.
$300,000
ROCKY MOUNTAIN HOUSE
Rehabilitate portions of several roads, including replacement of water and wastewater lines.
$422,865
SEDGEWICK
Install a wastewater line along Spruce Street. $36,555
SEXSMITH
Extend 103 Street, including sidewalk construction and installation of water, wasterwater, and storm water lines.
$836,484
SLAVE LAKE
Purchase a fire truck. $286,960
SMOKY LAKE
Purchase a skid steer with a brush mulcher attachment. $28,266
Pave existing and construct new walking trails in North Creek Park. $100,000
Replace entrance signs. $58,000
Purchase a maintenance truck. $30,000
SPIRIT RIVER
Contribute funding to the Spirit River and District Agricultural Society for the construction of a swimming pool.
$50,000
Replace water and wastewater lines along 44 Avenue from 50 Street to 52 Street.
$286,190
Page 21This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
ST. PAUL
Rehabilitate a portions of several sidewalks. $1,000,000
STETTLER
Expand and rehabilitate the town shop. $600,000
Design and construct sidewalks in several locations. $460,000
Construct a wastewater line. $110,000
Replace portions of water mains. $220,000
Replace a portion of a storm water line. $200,000
Replace a portion of a storm water line. $80,000
Rehabilitate a water reservoir. $75,000
Rehabilitate several roads. $60,000
STONY PLAIN
Rehabilitate a portion of Boulder Boulevard Road, including wastewater line and storm water improvements.
$3,078,401
STRATHMORE
Construct a potable water reservoir. $2,946,293
Install a wastewater discharge line. $1,013,200
SUNDRE
Renovate the administration building. $40,000
Replace a wastewater line. $787,370
Purchase a town entrance sign. $75,000
Purchase geographic information system software. $15,750
SWAN HILLS
Purchase a hook lift truck with attachments. $260,000
Purchase a picker truck with plow attachment. $90,000
Replace flooring and chairs in the Keyano Centre. $19,000
SYLVAN LAKE
Complete phase 4 of the Lakeshore Drive redevelopment. $1,060,000
Pave a portion of the Community Centre parking lot. $140,000
Complete phase 4 of the Centennial Park improvements project, including installation of signage and furniture, and construction of park shelters.
$1,100,000
Purchase land for a new fire hall. $750,000
Page 22This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
TABER
Upgrade a storm water outfall channel, including installation of culverts.
$250,000
Rehabilitate the Taber Centre for the Performing Arts. $200,000
THREE HILLS
Upgrade 7 Avenue, including road improvements and installation of water and wastewater mains.
$196,696
Purchase land and construct an arena parking lot. $137,315
Purchase self-contained breathing apparatus for the Three Hills Fire Department.
$57,592
Prepare a water treatment plant assessment study. $53,000
Upgrade the water main on 1 Street North. $128,063
Purchase a tangible capital asset management system. $34,500
Replace sidewalks. $40,000
Construct multi-use sports fields. $135,000
Upgrade the water main and storm water conduit on 6 Avenue. $48,750
Construct Anderson Park, including walking trails, picnic areas, and an amphitheatre.
$252,444
Rehabilitate a portion of 1 Avenue East. $100,000
Prepare a solid waste landfill assessment study. $40,000
Purchase a gravel truck. $80,000
TOFIELD
Construct an addition to the public works maintenance shop. $200,000
Contribute funding to the Tofield Agricultural Society to replace playground equipment at the C.W. Sears School.
$30,000
Purchase a loader-mounted snowblower. $100,000
Construct a splash park at the Tofield Fairgrounds. $50,000
TWO HILLS
Contribute funding to the Sports Activity Council to renovate the Two Hills Centennial Arena.
$59,800
Contribute funding to the Two Hills Fire Department Association to purchase breathing apparatus and other specialized fire fighting equipment.
$41,000
Rehabilitate wastewater manholes and pump propellers at the lift station.
$24,514
Purchase lawn mowers. $27,800
Replace an air conditioning unit in the administration building. $60,000
Page 23This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
VALLEYVIEW
Reconstruct Highway Street and other roads, including road widening and installation of drainage infrastructure.
$739,974
Replace the outdoor swimming pool boiler and arena ice plant condenser.
$25,000
Prepare an engineering study for an upgrade to the water treatment plant.
$29,220
VEGREVILLE
Improve drainage around the Emergency Services Building. $300,000
Purchase a hydrovac and wastewater line cleaning truck. $515,000
Upgrade the fire communications system, including the construction of a repeater tower.
$80,000
VERMILION
Purchase signs and construct flower beds. $62,500
Pave a parking lot and rehabilitate adjacent parks. $75,883
Rehabilitate the Vermilion Stadium roof. $508,100
VIKING
Purchase a loader. $60,000
Install a video security system at the Carena Complex. $18,000
Replace an equipment storage building and a security fence. $120,000
Purchase an industrial pressure washer. $16,485
Purchase infrastructure management software. $2,529
VULCAN
Pave 1 Street South and replace a portion of the water and wastewater lines.
$125,000
Rehabilitate the wastewater lagoon site, including conversion of the lagoon into a storm water retention pond.
$595,624
WEMBLEY
Extend water and wastewater lines to the museum site. $750,000
WHITECOURT
Rehabilitate the entrance to Rotary Park, including the driveway, drainage, and entrance sign.
$98,648
Install a railway pedestrian crossing at 47 Street. $545,800
Rehabilitate the public works shop and construct an addition to the facility.
$1,020,000
Rehabilitate the Whitecourt Curling Rink. $207,090
Page 24This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
Village Accepted Amount
ACME
Assess the water distribution system and upgrade waterlines. $150,000
ALIX
Prepare a wastewater lagoon assessment study. $125,000
Rehabilitate a portion of a wastewater main along Main Street. $35,000
Replace a portion of water main along 53 Street and install hydrants.
$219,000
AMISK
Purchase a lawn mower. $25,000
Develop a water source to supply the water treatment plant. $65,000
ARROWWOOD
Purchase and install water meters. $23,737
BARNWELL
Purchase a carbon dioxide feed system for the water treatment plant.
$45,000
Pave portions of 8 Avenue and 4 Street West. $149,500
BARONS
Purchase a fire truck and expand the fire hall. $75,000
Purchase a boom lift. $30,000
Construct sidewalks. $20,000
Replace breathing apparatus for the fire department. $20,500
BAWLF
Rehabilitate wastewater lines. $376,617
Expand the fire hall. $93,400
BERWYN
Jointly purchase a fire truck with the Municipal District of Peace. $32,754
BITTERN LAKE
Purchase a dump trailer for and install a motorized gate at the waste management facility.
$30,000
Replace and upgrade playground equipment. $65,000
Install a wheelchair access ramp at the community hall. $15,000
Extend the waterline to the skating rink. $30,000
Upgrade the community centre kitchen. $28,000
Page 25This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
BOYLE
Upgrade a wastewater lift station. $63,664
Purchase a sidewalk sweeper and a riding lawn mower. $15,000
Rehabilitate sidewalks. $100,000
Rehabilitate and replace water valves and hydrants. $50,000
Rehabilitate and replace gas lines and meters. $100,000
BRETON
Replace a portion of road. $184,725
CARBON
Rehabilitate wastewater lines along portions of Essex Street and Cardock Avenue.
$114,000
CARMANGAY
Replace fire hydrants. $20,000
CAROLINE
Purchase a lift station pump and wastewater line camera. $16,895
Rehabilitate sidewalks. $40,225
Upgrade a water treatment plant, including replacement of valves, pipes, and rehabilitation of pump motors.
$61,004
Replace the heating, ventilation and air cooling system in the administration building.
$18,000
CEREAL
Construct landscaping and install a sign at the Cereal Fire Hall. $6,500
Purchase and install community welcome signs. $14,500
Rehabilitate the Cereal Arena ice plant. $14,900
Renovate the C.J. Peacock Centre, including paving the parking lot.
$70,000
Construct and pave roads. $80,000
Purchase a garbage truck. $46,000
Rehabilitate the gymnasium floor. $23,500
Replace the roof of the Cereal Prairie Pioneer Museum. $28,500
Rehabilitate the public works shop and storage buildings. $10,000
Replace siding and windows at the pumphouse. $6,950
Rehabilitate the arena and the curling rink. $18,000
CHAMPION
Purchase various pieces of maintenance equipment. $33,594
Page 26This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
CHAMPION
Purchase a tractor with attachments. $42,804
CHAUVIN
Rehabilitate sidewalks, curbs, and gutters. $31,000
Install waterlines. $30,000
Pave a portion of 3 Avenue. $125,000
Upgrade a wastewater lift station. $42,000
CLYDE
Pave portions of several roads. $247,000
COWLEY
Purchase and install water meters. $97,000
Replace waterlines and install shut-off valves. $120,000
Replace a portion of a wastewater line. $260,000
CREMONA
Prepare a wastewater lagoon design. $37,500
DELIA
Replace wastewater lines, manholes, and service connections along Main Street and 1 Street.
$414,674
DEWBERRY
Purchase water meters. $6,721
Purchase a garbage truck. $43,606
Purchase a variable frequency drive for the water treatment plant. $10,000
Contribute funding to the Alberta Central East Water Corporation for the construction of a regional waterline.
$71,047
DONALDA
Resurface portions of Bond Street West and Lee Avenue. $20,000
Rehabilitate the municipal water tower. $82,000
Replace water and wastewater lines between Olson Street, Wallace Street East, and Railway Avenue.
$134,192
Contribute funding to the County of Stettler for the purchase of a regional fire truck.
$25,000
DONNELLY
Rehabilitate a parking lot and several back alleys. $8,000
Purchase a Zamboni and replace an overhead door in the Guy-Donnelly Sportex.
$35,000
Page 27This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
DONNELLY
Construct a wastewater line at the municipal campground. $8,000
Construct a sidewalk and rehabilitate the concrete parking pad at the firehall.
$40,000
Replace a portion of a wastewater line along 1 Street. $15,000
Replace a portion of a wastewater line at the municipal administration building.
$21,000
DUCHESS
Rehabilitate several wastewater lines. $28,909
Replace a garbage truck. $175,000
Replace the storm water drain along 2 Street and replace a portion of the road.
$221,500
Replace a portion of Louise Avenue. $86,500
EDGERTON
Replace portions of road along 51 Street, 56 Avenue, and 57 Avenue.
$179,817
FOREMOST
Purchase a backhoe. $10,246
Construct roads, curbs, gutters, water, and wastewater lines to a subdivision.
$289,000
GIROUXVILLE
Improve 50 Avenue from 51 Street to the village boundary, including associated roads, curbs, gutters, sidewalks, landscaping, and storm water lines.
$204,301
GLENDON
Resurface Main Street. $162,444
Rehabilitate a lift station, including electrical, mechanical, and instrumentation upgrades.
$143,750
Rehabilitate a wastewater lagoon. $133,000
Replace well water pumps. $30,000
HAY LAKES
Upgrade the surface drainage system. $213,667
HEISLER
Purchase a fire pumper truck. $90,000
HILL SPRING
Expand and rehabilitate the community hall. $129,785
Page 28This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
HOLDEN
Install back-up generators for wastewater lift stations. $80,000
HUGHENDEN
Purchase a mower. $10,000
Purchase tractor attachments. $12,000
Construct a public works shop. $200,000
HUSSAR
Purchase a lawn mower, water tank, and trailer. $9,600
Upgrade the water distribution system, including replacement of waterlines and fire hydrants.
$418,500
HYTHE
Replace a portion of a wastewater line. $450,633
INNISFREE
Rehabilitate the public works building. $100,000
Purchase a trailer with recycling bins. $30,000
Purchase a heavy-duty truck for hauling equipment. $30,000
Construct a golf course and a driving range. $30,000
Rehabilitate a waterline along a portion of 49 Street and a wastewater line along a portion of 51 Street.
$82,981
Purchase a loader with a sweeper attachment. $45,000
KITSCOTY
Construct a sidewalk. $31,164
Expand the fire hall. $275,000
Extend water, wastewater, and storm water lines along a portion of 53 Avenue.
$250,000
Develop a lakeside area into a park. $125,000
LINDEN
Construct a retaining wall and upgrade the storm water system along 1 Street.
$433,224
LOMOND
Replace playground equipment. $80,000
Upgrade the water treatment plant. $378,000
LONGVIEW
Upgrade the water treatment plant. $412,500
Page 29This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
LOUGHEED
Rehabilitate a portion of 52 Street from Railway Avenue to Townsend Avenue.
$170,000
Purchase a skid steer. $46,500
MARWAYNE
Revitalize the downtown including sidewalks, boulevards, roadways, and street lighting.
$492,560
Construct a storm water conduit. $746,000
MINBURN
Purchase waste collection bins. $9,504
MORRIN
Install water and wastewater lines in a new subdivision. $138,000
MUNSON
Construct a public works facility. $133,911
MYRNAM
Rehabilitate the waterline and sidewalk on Main Street. $71,250
Purchase maintenance equipment, including a wastewater line camera system and a snow blade.
$40,000
Purchase a building for use as a police station. $150,000
NAMPA
Rehabilitate and replace portions of several roads and sidewalks. $167,900
NOBLEFORD
Construct roads, including water and wastewater lines for an industrial subdivision.
$666,265
PARADISE VALLEY
Purchase a snow blower and a blade attachment. $11,550
Repave portions of 1 Street and East Street. $16,314
ROSEMARY
Rehabilitate a wastewater line on Tulip Street. $43,957
Extend the waterline along Centre Street. $14,000
Pave a portion of Aster Street and Gwen Avenue. $96,720
RYCROFT
Purchase a tractor. $41,570
RYLEY
Purchase computers. $9,800
Page 30This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
RYLEY
Replace a grader. $52,000
Replace the heating, ventilation, and air conditioning system in the community hall.
$50,000
SPRING LAKE
Develop Spring Rose Park, including construction of trails and rest areas.
$22,000
Construct a walking trail in the Spring Lake Ranch subdivision. $50,000
Purchase a mower. $20,000
STIRLING
Construct a new slope and walking path on the Kipp Coulee berm. $135,000
STROME
Construct a storage facility and upgrade the public works yard. $8,288
VETERAN
Purchase a lawn mower. $20,742
Replace a fire truck and associated equipment. $64,000
Purchase a street sweeper. $36,500
Install new cabinets, countertops, and backsplash at the community hall kitchen.
$7,000
Contribute funding to the Veteran Curling Club for electrical system upgrades.
$12,686
WABAMUN
Upgrade the Wabamun pier. $110,000
Purchase and install water meter readers. $90,000
WARBURG
Purchase a grader. $75,000
Pave a portion of 56 Avenue. $450,000
WARNER
Rehabilitate and replace water valves. $530,703
WILLINGDON
Replace water valves. $30,000
YOUNGSTOWN
Construct a building for the wastewater lift station. $240,000
Replace the ice pad in the arena. $20,000
Expand the Youngstown Municipal Library. $20,000
Page 31This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
YOUNGSTOWN
Replace the furnace and air-conditioning units in the administration building.
$30,000
Replace the air conditioner in the Youngstown Community Hall. $10,000
Summer Village Accepted Amount
BETULA BEACH
Replace a pier. $21,000
Construct walking paths. $38,000
Upgrade the Betula Rest park area. $30,000
Rehabilitate roads and construct drainage along Spruce Street. $75,000
Construct an outdoor washroom facility. $4,071
BONNYVILLE BEACH
Replace flooring, furniture, and kitchen appliances in the administration office and community hall complex.
$16,000
GHOST LAKE
Pave Ghost Lake Village Road. $31,203
GULL LAKE
Design a wastewater collection system. $115,000
HALF MOON BAY
Construct a covered gathering shelter. $45,000
HORSESHOE BAY
Replace the septic tank at the Martin Recreation Center. $10,000
Contribute funding to the County of St. Paul for the construction of a fire hall.
$90,000
JARVIS BAY
Install a storm water conduit. $22,633
KAPASIWIN
Expand and rehabilitate a sports field. $4,800
Replace fencing, install a gate, and improve landscaping at a tennis facility.
$5,000
Construct a playground. $32,300
Rehabilitate and expand a recreation building. $87,500
Page 32This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
NORGLENWOLD
Jointly purchase an administrative building for use with the summer villages of Birchcliff, Half Moon Bay, Jarvis Bay, and Sunbreaker Cove.
$375,000
Install a storm water collection line along Rustic Crescent. $60,000
ROCHON SANDS
Prepare a wastewater engineering study. $21,347
Prepare an infrastructure study. $29,715
Purchase a snowplow. $22,600
Assess water and wastewater infrastructure. $50,000
ROSS HAVEN
Prepare a wastewater collection system design. $100,000
SANDY BEACH
Purchase and install playground equipment in a park. $150,000
SILVER SANDS
Rehabilitate Silver Sand Drive and a portion of Township Road 540.
$311,740
SOUTH BAPTISTE
Rehabilitate Baptiste Drive and other streets, including upgrades to culverts, guard rails, and traffic signs.
$449,000
SOUTH VIEW
Pave portions of several roads. $116,707
SUNBREAKER COVE
Upgrade parking and a walkway at the Glenn's Cove beach. $48,750
SUNDANCE BEACH
Renovate and expand the community hall. $8,000
VAL QUENTIN
Construct recreational trails. $100,000
WEST BAPTISTE
Rehabilitate West Baptiste Drive and connecting service roads. $408,649
WHITE SANDS
Construct a recycling facility. $30,000
Purchase a mower. $14,200
Construct a boat launch. $25,000
Upgrade the solid waste transfer station. $15,100
Page 33This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
Improvement District Accepted Amount
IMPROVEMENT DISTRICT NO. 349
Contribute to phase 1 of the Forest Heights wastewater trunk line extension in the City of Cold Lake.
$565,623
Special Area Accepted Amount
SPECIAL AREAS BOARD
Rehabilitate portions of several roads. $8,950,705
Purchase a fire truck for the Town of Hanna. $350,000
Purchase graders. $1,544,000
Purchase fire trucks for the villages of Veteran and Youngstown. $700,000
Contribute funding to the Village of Youngstown to expand and upgrade the Youngstown Library.
$100,000
Metis Settlement Accepted Amount
FISHING LAKE METIS SETTLEMENT
Purchase and install a modular unit to house a library and community support programs.
$651,868
KIKINO METIS SETTLEMENT
Purchase a vacuum truck and front wheel loader. $178,153
Purchase a fire truck. $40,000
PADDLE PRAIRIE METIS SETTLEMENT
Purchase and install radio transmitters and booster towers on municipal buildings.
$40,000
Purchase a mower attachment. $20,000
Rehabilitate portions of the water distribution system and purchase equipment for the water treatment plant.
$205,866
Rehabilitate the Communiplex, including ice plant replacement, roof repairs, and electrical upgrades.
$150,000
Pave a portion of a road. $65,327
PEAVINE METIS SETTLEMENT
Rehabilitate the Duck Lake bridge. $64,050
Construct a playground and playing fields. $88,790
Extend a waterline and install fire hydrants. $106,633
Rehabilitate several roads. $380,000
Page 34This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL
2012 Accepted Projects Report
Other Accepted Amount
TOWNSITE OF REDWOOD MEADOWS ADMIN SOC
Purchase a loader. $36,150
Upgrade equipment at the water treatment plant. $25,000
Replace wastewater lines. $142,133
Purchase a water pump with trailer. $80,540
Replace a fire rescue truck. $331,000
Page 35This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of June 19, 2013.