Manufacturing Engineering Co-op Position

8711 Wadsworth RoadWadsworth OH, 44281

www.hubbellpowersystems.com

Page 2: My co-op Presentation 1

The Company

International manufacturer of devices involved in high voltage power distribution and protection

Products include cable connectors, insulators, arrestors, and various other power line devices

Page 3: My co-op Presentation 1

Wadsworth Facility• Manufactures Metal Oxide Varistor (MOV) Blocks used in

power line insulators

• 15 minutes from University of Akron campus

• Small to medium scale comfortable environment

Page 4: My co-op Presentation 1

Wadsworth Facility

MOV Block

Page 5: My co-op Presentation 1

Co-op Experience Intro to manufacturing project engineering

Freedom to take control of projects

Ability to order materials and parts

Communication with other engineers and company vendors

Excellent supervision and guidance

Page 6: My co-op Presentation 1

Co-op Experience

Basic CAD experience

Design and prototype development

Page 7: My co-op Presentation 1

Co-op Experience Hands on work environment (not just a desk job)

Machine shop and fabrication skills

(Mill, Lathe, Band Saw…)

Page 8: My co-op Presentation 1

Co-op Experience Basic Spreadsheet and computer work

05

101520253035404550

3 1 1 0 0 0 0 1 0 0 0 01 1 1 0 0 0 0

100 0 0 0

1 0 0 0 0 0 0

23

0 0 0 01

0 0 0 0 0 0

8

0 0 0 04

4 3 1 1 0 0

1

0 0 0 0

Lighting Maintenance Results

person5person4person3person2person1

Monthly Inspection/Maintenance

Ligh

ts p

er p

erso

n

Page 9: My co-op Presentation 1

Co-op ExperienceHave your own personal office space

Make deliveries and pick ups to and from local businesses

Page 10: My co-op Presentation 1

Co-op ExperienceWide range of projects including mechanical pieces, electrical layouts, safety equipment…

Weekly tasks: Facility checks, Maintenance records…

Page 11: My co-op Presentation 1

Thermocouple Wire ProjectProject: Develop a self contained system to distribute thermocouple wire to the tunnel kiln for recording temperature data.

Step 1: Discuss initial design ideas with supervisor and other engineers involved

Step 2: Develop a CAD print to confirm the initial design and make changes if needed

Page 12: My co-op Presentation 1

Thermocouple Wire ProjectStep 3: Order required parts and outsource pieces that cannot be made in house. This requires getting a quote from a vendor.

Step 4: Fabricate components of the unit. Shown is a wheel made by an outside vendor.

Page 13: My co-op Presentation 1

Thermocouple Wire ProjectStep 5: Final assembly and installation!

From the CAD print, the unit consists of the wheel, rotary power supply, roller bearing, and an adjustable base post mounted to a movable pallet.

The design is functional and self contained for storage when not in use.

Page 14: My co-op Presentation 1

Review

A complete experience covering nearly all aspects of engineering and everyday work life

See projects through from problem to solution and implementation

Gain desirable hands on experience for future reference

Get paid to learn, but still help the company