C.No.11483/B.II/2/2010 T.R. & B (B.II) DEPT.,

Sub:- Railways Proposal for sanction of new lines in the State of Andhra Pradesh Nadikudi Srikalahasti survey Change of alignment via Addanki Reg.

Ref:- From the Chief Administrative Officer(Construction),

SC Railway, Secunderabad, Lr.No.W.Con.195/XV/V/

Vol.XIX/MR, dated 07.09.2010.

Please see the letter received from the CAO(Construction), South Central Railway, Secunderabad at P.1-7 cf.

The CAO(Con.), South Central Railway has informed that Smt. Panabaka Lakshmi, Honble Union Minister of State (MoS) for Textiles during the inspection of Chirala, Bapatla, Repalle stations accompanied by General Manager, South Central Railway and CAO(Con), South Central Railway. on 19.07.2010 have enquired about the route to be adopted for the proposed Nadikudi Srikalahasti Railway Line and desired that the new alignment is to be proposed taking into consideration of Addanki needs and the proposed new line should pass through Addanki. She has also mentioned that the proposed route through Addanki can be obtained and discussed with Mr. Ravi Kumar, MLA from Addanki and feasibility of this alignment through Addanki has to be examined.

In this regard, the CAO (Con.), South Central Railway has brought out the following points on Nadikudi Srikalahasti Survey:-

Survey has been carried out many times considering the alignment passing through Piduguralla(exg) (Take off point), Nakarikallu, Rompicherla, Savalyapuram(exg), Vinukonda(exg.), Gundlakamma(exg.), Dekanakonda, Darsi, Podile, Goutuvaripalle, Obulayapalli, Venkatapuram, Gilakapalem, Rapur, Alturupadu & joining at Venkatagiri (Existing station on Renigunta-Guduru section).

The existing lines between Nadikude-Piduguralla (21.15 Km); Savalyapuram Gunklakamma (23.01 km); Venkatagiri Srikalahasti (24 km) is made use of in the proposed alignment having a new line length of 308.70 Km.

(Contd2)

: 2 :

Survey was updated and submitted to Board on 18.02.2010 latest at a cost of Rs.1314 Cr. with ROR of 14.48%

Honble CM of A.P. vide letter dated 04.02.2010 to Honble Minister for Railways has informed that State Govt. of AP has committed for 50% of cost sharing for this project.

The ROR of the project has been arrived as 21.28% by considering 50% cost sharing from A.P. Govt.

In this connection he has enclosed a route map of Nadikudi Srikalahasti proposed alignment which may be perused at P.7 cf.

Further, he has mentioned that in case the alignment is connected to Addanki, from Gundlakamma and Darsi, there will be an additional distance of 49 Kms and corresponding cost will be about Rs.208 Crores(considering same rate per Km):-

As this project is under active consideration by Board for sanction, change of alignment at this stage is not preferable.

Change alignment through Addanki can be studied while taking up Final Location Survey between Gundlakamma Venkatagiri for arriving more details, after the sanction for Nadikudi Srikalahasti line and AP Govt. may ask for a new survey between Gundlakamma, Darsi via Addanki. It is also to indicate that earlier, a survey was sanctioned in 2002 for New railway line between Donakonda Vodarevu (113.5 Km length). The cost of the project was estimated at Rs.228.7 Crores with Rate of Return of (-) 6.95%. The project alignment was passing through Agraharam, Purimetla, Addanki, Inkollu and joining at Vetapalem on BZA Gudur section and again taking off from Chirala to Vodarevu via Gavirivaraipalem

Sruvey report submitted to Board on 20.08.2003 & Board

shelved the project in September,2003.

(Contd..3)

: 3 :

AP Govt. may ask for updating of Donakonda Vodarevu

survey passing through Addanki, considering the future port

activities at Vodarevu.

In view of the above, the CA(Con.), SC Rly has requested to communicate the consent from Govt. of A.P. for the suggestion made by Smt. Panabaka Lakshmi, Honble Union Minister of State, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki) since Govt. of A.P. has advised for 50% cost sharing for the above project.

Submitted for orders.

C.No.11483/B.II/2/2010

: 5 :

Please see the orders of Honble C.M. at para 15 and orders of Prl. Secretary at para 16 on page 4 ante.

Accordingly, a draft letter addressed to CAO(Construction), SC Railway, Secunderabad is submitted below for approval.

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS (B-II) DEPARTMENT

Letter.No.11483/B-II/2/2010 Dated: 01.10.2010

From

The Principal Secretary to Government,

Transport, Roads & Buildings Dept.,

A.P. Secretariat, Hyderabad.

To

The Chief Administrative Officer(Construction),

South Central Railway,

Rail Nilayam, Secunderabad.

Sir,

Sub:- Railways - Proposals for sanction of new lines in the State of Andhra Pradesh Nadikudi Srikalahasti Survey Change of alignment via Addanki Reg.

Ref:- Your Letter No.W.Con.195/XV/V/Vol.XIX/MR,

dated 07.09.2010.

*****

I invite kind attention to the reference cited.

2.I am directed to request you to go ahead with the earlier alignment in respect of Nadikudi Srikalahasti new Railway line Survey which was updated and submitted to Railway Board by you.

3.Further, in view of the future Port activities, I am directed to request you to update Donakonda Vodarevu survey passing through Addanki so that the request of Honble Union Minister of State for Textiles to connect Addanki would also gets addressed in due course of time.

Yours faithfully,

for Principal Secretary to Government.C.NO.11483/Ser.Iv/2/2010:5:

(Received From the Laxmi Narayan, Chief Engineer/Con-1, S.C.Railway, Secunderabad, Lr.No.W.Con/338/G/106(WC-2),

dt:01.07.2011.)

***

Please see the letter received from the Laxmi Narayana, Chief Engineer/Con-1, South Central Railway, Secunderabad, at pp 9-11 cf.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 crs has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

C.No.11483/Ser.IV/2/2010

:6:

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

In view of the above, the file may be sent to Finance (Expr.PW) Department for their remarks.

C.NO.11483/Ser.Iv/2/2010NOTE FOR CIRCULATION:7:

The subject matter in the file relates to release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 cr. has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

C.No.11483/Ser.IV/2/2010

:8:

In this connection the State Govt. committed for 50% of cost sharing for this project and also Honble CM informed to Honble Minister for Railways vide letter dated 04.02.2010.

When the proposal was referred to the Finance Dept. for their remarks then they have informed that no specific provision is available for this purpose in B.E.2011-2012. However, there is a provision of Rs.300.00 Crores made available for Railway Safety works under the head of account 5054-80-MH.001-GH.11-SH(04) construction of Roads and Bridges under Railway Safety works-530 Major Works-531.Other expenditure.

In view of the above it is for orders whether sanction may be accorded for release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project for 2011-12 under the above Head of Account for construction of a new Railway line between Nadikudi srikalahasti on 50:50 cost sharing basis between the Ministry of Railways and Government of Andhra Pradesh.

The file may be circulated to CM through CS for orders on Para ( ) above.

C.NO.11483/Ser.Iv/2/2010NOTE FOR CIRCULATION:10:

The subject matter in the file relates to release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 cr. has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

C.No.11483/Ser.IV/2/2010

:11:

In this connection the State Govt. committed for 50% of cost sharing for this project and also Honble CM informed to Honble Minister for Railways vide letter dated 04.02.2010.

When the proposal was referred to the Finance Dept. for their remarks, they have informed that no specific provision is available for this purpose in B.E.2011-2012. However, there is a provision of Rs.300.00 Crores made available for Railway Safety works under the head of account 5054-80-MH.001-GH.11-SH(04) construction of Roads and Bridges under Railway Safety works-530 Major Works-531.Other expenditure and they have also issued budget release order for an amount of Rs.1.00 Crore to meet the expenditure vide G.O.Rt.No.3577, Finance (Expr.PW) Dept., dated 14.09.2011.

In view of the above it is for orders whether sanction may be accorded for release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project for 2011-12 under the above Head of Account for construction of a new Railway line between Nadikudi srikalahasti on 50:50 cost sharing basis between the Ministry of Railways and Government of Andhra Pradesh.

The file may be circulated to CM through CS for orders on Para ( ) above.

C.No.11483/ser.IV/2/2010

: 14 :

Please see the notes of this department in circulation at paras 37 46 on pages 10 - 11 ante and the orders of the Honble CM at Sl.No.09 of the statement on page 13 ante.

Accordingly, a draft order is submitted below for approval.

ABSTRACT

Transport Department- Construction of new BG line Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Issued.

---------------------------------------------------------------------

TRANSPORT, ROADS & BUILDINGS (SER.IV) DEPARTMENT

G.O.Rt.No.

Dated: .11.2011

Read the following:-

1.Govt.Letter dated:04.02.2010 addressed to Honble Union

Minister of Railways GOI, New Delhi by Honble C.M.

2.From CE, Lr.No.W.Con/338/G/106 (WC-2), Dated:01.07.2011

3.G.O.Rt.No.3577, Finance (Expr.PW) Dept, Dated:14.09.2011.

****

O R D E R:

The Chief Engineer, South Central Railways in his letter 2nd read above has informed that the Ministry of Railways have sanctioned survey work for Board was sanctioned New BG line Nadikudi Srikalahasti on cost of sharing basis. The anticipated abstract cost of the project as per initial Survey Report is Rs.1.00 Crore. The estimate has been prepared at a cost of Rs.1.00 Crore for final location survey to take up the work.

Ministry of Railways have sanctioned survey work for Reconnaissance Engineering-cum-Traffic survey for New BG line between Nadikudi Srikalahasti

The Government of A.P in the 1st read above has conveyed the commitment of 50% cost of share of the said project, due to which the ROR was revised to 21.18%.

The estimate for Final Location Survey at a cost of Rs.1.00 crore has already been sanctioned by GM and tenders are being invited for conducting final location Survey and Ministry of Railways have allotted Budget grant of Rs.1.00 Crore for the above said work. Thus State Government is also required to deposit funds to the extent of Rs.1.00 crore for the year 2011-2012 towards State Governments share.

:2:

In the reference 2nd read above, the General Manager, South Central Railway, Secunderabad has requested to deposit an amount Rs.1.00 crore towards 50% share to take up final location survey.

Government after careful consideration hereby accord administrative sanction for an amount of Rs.1.00 crore (Rs.One Crore Rupees only) towards 50% share for conducting final location survey.

The expenditure sanctioned in para above shall be debited to the Head of Account 5054-80-MH.001- GH.11-SH (04) Construction of Roads and Bridges under Railway Safety Works-530-Major Work-531-Other Expenditure. The Engineer-in-Chief (R&B), Administration & NH, Hyderabad shall draw and disburse the above amount to the Chief Engineer (construction) Office of the Chief Administrative Officer, South Central Railways, Secunderabad.

Thus order issues with the concurrence of the Finance Department vide their U.O.Note No.22410/815/Expr.PW/A2/2011, Dated:15.09.2011.To

The Engineer In Chief (R&B), Administration & NH,

Hyderabad.

The General Manager, South Central Railway, Rail Nilayam, Secunderabad.

The Accountant General, A.P., Hyderabad

The Pay and Accounts Officer, Hyderabad

The Chief Engineer / Con 1, South Central Railway, Secbad.

Copy to Finance (Expr.PWD) Dept.

ABSTRACT

Transport Department- Construction of new BG line between Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Issued.

---------------------------------------------------------------------

TRANSPORT, ROADS & BUILDINGS (SER.IV) DEPARTMENT

G.O.Rt.No.

Dated: .11.2011

Read the following:-

1.Govt.Letter dated:04.02.2010 addressed to Honble Union

Minister of Railways GOI, New Delhi by Honble C.M.

2.From CE, Lr.No.W.Con/338/G/106 (WC-2), Dated:01.07.2011

3.G.O.Rt.No.3577, Finance (Expr.PW) Dept, Dated:14.09.2011.

****

O R D E R:

The Chief Engineer, South Central Railways in his letter 2nd read above has informed that the Ministry of Railways have sanctioned survey work for Ministry of Railways have sanctioned survey work for Reconnaissance Engineering-cum-Traffic survey for New BG line between Nadikudi - Srikalahasti,and the report at a cost of Rs.1313.99 cr. With ROR of 15.45% was submitted to Board on 11.02.2010.

The Government of A.P in the 1st read above has conveyed the commitment of 50% cost of share of the said project, due to which the ROR was revised to 21.18%. Board was sanctioned New BG line between Nadikudi - Srikalahasti on cost of sharing basis.

The estimate for Final Location Survey at a cost of Rs.3.08 crore has already been sanctioned by GM and tenders are being invited for conducting final location Survey and Ministry of Railways have allotted Budget grant of Rs.1.00 Crore for the above said work. Thus State Government is also required to deposit funds to the extent of Rs.1.00 crore for the year 2011-2012 towards State Governments share.

:2:

In the reference 2nd read above, the General Manager, South Central Railway, Secunderabad has requested to deposit an amount Rs.1.00 crore towards 50% share to take up final location survey.

Government after careful consideration hereby accord administrative sanction for an amount of Rs.1.00 crore (Rs.One Crore Rupees only) towards 50% share for conducting final location survey.

The expenditure sanctioned in para 5 above shall be debited to the Head of Account 5054-80-MH.001- GH.11-SH (04) Construction of Roads and Bridges under Railway Safety Works-530-Major Work-531-Other Expenditure. The Engineer-in-Chief (R&B), Administration & NH, Hyderabad shall draw and disburse the above amount to the Chief Engineer (construction) Office of the Chief Administrative Officer, South Central Railways, Secunderabad.

Thus order issues with the concurrence of the Finance Department vide their U.O.Note No.22410/815/Expr.PW/A2/2011, Dated: 15.09.2011.To

The Engineer In Chief (R&B), Administration & NH,

Hyderabad.

The General Manager, South Central Railway, Rail Nilayam, Secunderabad.

The Accountant General, A.P., Hyderabad

The Pay and Accounts Officer, Hyderabad

The Chief Engineer / Con 1, South Central Railway, Secbad.

Copy to Finance (Expr.PWD) Dept.GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS (Ser.IV) DEPARTMENT

Memo.No.11483/Ser.IV/2/2011 Dated:10 .01.2012.

Sub:- T.R. & B Dept. Railways - Construction of new BG line between Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Sanction accorded Release of amount Reg.

Ref: 1. G.O.Rt.No.1097, TR&B(Ser.IV) Dept., dt:18.11.2011.

2. From CAO (Construction), SC Railway, Secunderabad

Lr.No.W.Con.338/G/106 (WC.2), dated 13.12.2011.

***

The attention of the E-in-C(R&B), Administration & NH, Hyderabad is invited to the reference 1st cited wherein he was requested to draw the amount of Rs.1.00 Crores and deposit to the Chief Engineer(Construction), O/o CAO, SC Railway, Secunderabad.

In the reference 2nd cited (Copy enclosed), the CAO (Construction), SC Railway, Secunderabad has requested to deposit the amount.

He is, therefore, requested to release the above said amount immediately to CE (Construction), SC Railway, Secunderabad under intimation to Government.

D.LAKSHMI PARTHASARATHY

PRINCIPAL SECRETARY TO GOVERNMENT

To

The Engineer-in-Chief(R&B),

Admn. & NH, Hyderabad. (w.e.)

Copy to CAO (Con.), SC Railway,

Secunderabad for information.

// FORWARDED BY ORDER // SECTION OFFICER

C.No.11483/Ser.IV/2/2011:15:

(From CAO (on.), SC Rly, Secunderabad Lr.No.W.Con338/G/106 (WC.2), dated 15.09.2010)

* * * *

Please see the letter received from the CAO (Construction), SC Rly., Secunderabad at 29 cf.

The CAO(Con.), SC Rly has informed that sanction for an amount of Rs.1 Cr towards 50% share of Govt. of AP for conducting final location survey to new BG Railway Line between Nadikudi Srikalahasti. The Final Location tender is under finalization and acceptance letter will be issued shortly.

The GM, SCR has requested to deposit an amount of Rs.1 Cr towards 50% share of AP Govt. for conducting Final Location Tender for the above work. to deposit the State Govt. share of Rs.40.00 Crores.

In this connection it is submitted that an amount of Rs.1 Cr towards the 50% State Govt. Share during the year 2011-12 was already released vide G.O.Rt.No.1097, TR&B(Ser.IV) Dept., dated 18.11.2011 wherein the E-in-C(R&B), Admn.& NH, Hyderabad was requested to draw the amount and deposit to the CE(Con), O/o CAO, SC Rly. Therefore, the E-in-C(R&B), Admn.& NH may be requested to deposit the amount of Rs.1 Cr to SC Rly immediately.

Subject to orders, a draft memo is submitted below for approval.

C.No.11483/Ser.IV/2/2010

:16:

With reference to the orders of the Prl.Secy (T) at para 61 on page 15 ante.

A statement showing with the all pending Railway projects with the total cost of the Projects, cost share of the State Government and the status of Project is prepared and submitted below at flag A. (Issued a Memo.No.11483/Ser.IV/2/2011,dt.10.1.2012)

(Received a letter From G. Ravi Kumar, MLA,Addanki, and Smt.Panabaka lakshmi, Honbble Minister of State for Texttiles )

***

Please see the letter received from the M.L.As Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt Panabaka Lakshmi, M.L.A., at page cf.

The survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is very important because it is an alternate railway line to existing Vijayawada- Chennai Railway Line. You may be aware that the Vijayawada- Chennai main line is getting dislocated every year due to natural calamities line cyclones, heavy rains, floods etc. Fortunately, the line sanctioned in the last Railway Budget and also understood that the final location survey is in progress.

The proposed new Railway line would be passing through Guntur, Prakasam and Nellore Districts connecting upland areas. The people of Prakasam Districts have represented to me to connect Addanki which is a headquarter of Assembly Constituency and also important town.

Consider the request and do needful favor for to arrange to expedite to commence the works in the proposed new line duly providing sufficient funds in the ensuring railway budget 2012-2013 and to consider changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District to meet the needs and aspirations of the people of my constituency.

:16:

NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

In this connection, it is submitted that Govt vide letter dated .01.10.2010 have directed the S.C. Railway to go ahead with the earlier alignment in respect of Nadikudi - Srikalahasthi new Railway line, and also requested the S.C.Railway to update Donakonda Vadarevu survey passing through Addanki so that the request of Honble Union Minister of State for Textiles to connect Addanki would also gets addressed in due course of time. The said proposals are not yet to received till today.

Further, it is submitted that the Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government as agreed by Honble Chief Minister vide letter dated:04.02.2010., and vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 CR towards the 50% State Govt. Share during the year 2011 2012, was already released for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti.

In view of the above position, it is submitted for orders on the request of Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki).

:18:

NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of the representation of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

In this connection, it is submitted that the CE(Con.), SC Rly. Has furnished the above proposal of Smt. Panabaka Laxmi, Honble Union Minister of State for change of alignment of Nadikudi Srikalahasti via Addanki and the same has been examined and decided not to change the alignment and go ahead with the existing alignment. However, as suggested by the SC Railway has been requested to update Donakonda Vodarevu survey passing through

Addanki so that the request of Honble Union Minister of State to connect Addanki would also get addressed in due course of time.

Accordingly, the same has been intimated vide Govt letter dated 01.10.2010. No proposals in this regard has been received from SC Railway so far.

Further, it is submitted that the Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government as agreed by Honble Chief Minister vide letter dated:04.02.2010., and vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 CR towards the 50% State Govt. Share during the year 2011 2012, was already released for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti.

On the other side, GM, SC Railway has requested to providing land free of cost and to bear 50% of remaining cost of the project by government of Andhra Pradesh.

When consulted Finance (Expr.PW) Dept with above information, have stated that since the increased cost does not fit into Govt.Policy, the proposal is not agreed to in Finance.

In view of the above position, the file may be circulated to Honble C.M. through CS/M(Tr) for orders, on the request of

1) Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki).

2) Providing land free of cost and to bear 50% of remaining cost of the project As requested by the GM, SC Railway, Secbad. C.No.11483/Ser.IV/2/2010

:16:

Please see the notes of this department at paras 69-77 on page 18-19 ante and the notes of the finance department at paras 78-79 on page 20 ante.

When the file was referred to finance department for their remarks on the request of Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki). They are requested to put up a comparative statement with the details and to indicate Budget head of account and the provision available.

In this connection, it is submitted that the following comparative statement wit the details below:

Earlier proposalNow proposed

A) cost of the project1314 Cr. 1524 Cr.

Due to change of alignment 49 KM & 210 Cr. cost escalation(approx)

B)percentage of the state share50%50%

C) ROR15.45% ---

D) whether the proposal within the policy guide linesThis project was agreed by the Govt. before issue of the policy guidelines.This proposal does not exist within the policy guide lines.

Further, it is submitted that earlier proposal and the new proposal are in variation is the change of the alignment via addanki. GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

Transport Department- Construction of new BG line Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders - Change of head of Account Amendment Orders Issued.

----------------------------------------------------------------------------TRANSPORT, ROADS & BUILDINGS (SER.IV) DEPARTMENT

G.O.Rt.No.745

Dated: 01.08.2011.

Read the following:-

1. G.O.Rt.No.413, TR&B (Ser.IV) Dept. dated 07.05.2011.

2. From the Finance (BG-I) Dept., U.No.15800/323/A2/BG-I/

2011, dated: 18.6.2011

*****

ORDER:-

In the circumstance reported by the Finance (BG-I) Department in their note 2nd read above Government hereby issue the following amendment to the G.O.1st read above.AMENDMENT

For the Head of Account mentioned in Para 7 in G.O.1st read above, the following shall be substituted:

5054-Capital Outlay on R&B, 80- General, M.H.800- Other Expenditure, G.H-11- Normal State Plan, S.H (04)- Construction of Roads and Bridges under Railway Safety Works, 530- Major Works, 532-Lands (Charged).

2.This order issues with the concurrence of the Finance Department vide their U.No.15800/323/A2/BG-1/2011, Dated: 18.06.2011.(BY ORDER AND IN THE NAME OF THE GOVERNER OF ANDHRA PRADESH)

DINESH KUMAR

PRINCIPAL SECRETARY TO GOVERNMENT

To

The District Collector, Guntur.

The Account Assistant General, Andhra Pradesh, Hyderabad.

The Director of Treasuries & Accounts, Hyderabad.

The Director of Works Accounts, Hyderabad.

Copy to:

Chief Commissioner of Land Administration , AP, Hyderabad.

Engineer in Chief, R&B (NH, Admn.), Hyderabad.

The District Treasury Officer, Guntur.

The Revenue Divisional Officer, Guntur.

The Finance (Expr.PW) Deptt., SF/SCs.// FORWARDED BY ORDER // SECTION OFFICER

C.No.13500/Ser.IV/2/2010

: 15:

(Issued Memo.No.13500/Ser.IV/2/2010-6, Dated: 7.6.2011) (Received U.O.No.15800/323/A2/BG-I,dated18/6/2011, from Finance Department)

Please see the notes of this Department at paras 46-49 on page 14 ante, and the U.O. note received from Finance Department at page 354 cf.

It is submitted that the as per the orders issued in G.O.Rt.No.413, T,R&B Dept., dated: 07.05.2011, the District Collector, Guntur has requested the proposal to the Government for release of an amount of Rs.15,19,701/-for reimbursement of the funds deposited.

In the connection, it is submitted that the E in C (R&B), Administration & N.H., Hyderabad/LAO/RDO, Guntur, has already been requested to send the necessary proposal in the prescribed formats immediately vide memo dated: 12.05.2011. The proforma particulars received from the E in C (R&B), Administration & N.H., Hyderabad may be sent to Finance (BG) Dept, for issue of orders for release of an amount of Rs.15, 19,701/- from the Contingency Fund.The Finance Department has informed that the Sanction order vide G.O.Rt. No. 413, dated: 07.05.2011, the Head of Account has been indicated wrongly, the correct HOA is as stated below.

5054 Capital Outlay on R&B, 80 General, MH800 - Other Expenditure, GH 11 Normal State plan, S.H. (04) - Construction of Roads and Bridges under Railway Safety Works, 530 - Major Works, 532 - Lands (Charged). ::16::

Further stated that the Finance Department has requested this Dept. to amend the G.O, accordingly send the proposal for concurrence.

In view of the above, a draft order is prepared and submitted below for approval.

(From E-in-C(R&B), ADmn.&NH, Hyderabad Lr.No.10014/ EE(TEC)/DEE-1/AEE/2012-4, dated 16.03.2012)

***

Please see the notes at pages ante and the letter received from E-in-C at pp. cf.

The E-in-C(R&B), Admn.&NH has informed that the Government has accorded the administrative sanction for an amount of Rs.1.00 Crs. towards 50% share for conducting final location survey of New BG line between Nadikudi- Srikalahasti and the amount has been released to EE(R&B) Division, Tirupathi in 12/2011 so as to pay to Railways.

He has further informed that the EE(R&B), tirupathi has submitted that the pay & Account Officer (W & P) Finance Tirupathi has informed that an amendment to the G.O. cited is required duly directing the Pay & Account Officer (W &P) Finance Tirupathi to process the payment instead of Pay & Account Officer Hyderabad as mentioned in the G.O. Further, the PAO (W & P) Finance Tirupathi desired to submit estimate, agreement, vouchear etc. in this regard, it is to submit that the R&B department does not have any document.

In view of the above the E-in-C(R&B) has requested to issue the necessary instructions to PAO (W&P), Finance, Tirupathi, so as to avoid lapsing of fund released as the same cannot be deposited to railways as directed in the said GO. In this regard, he has enclosed the objection raised by the PAO, Tirupathi which may kindly be perused at P. 5 cf.

In this connection, it is submitted that an amount of Rs.1.00 Cr. has been released towards 50% share for conducting Final Location Survey of Nadikudi Srikalahasti New BG Line vide G.O.Rt.No.1097, TR&B (Ser.IV) Dept., dated 18.11.2011 and the E-in-C(R&B), Admn.&NH is authorized to draw and disburse the amount to CE(Construction), O/o CAO, SC Railway, Secunderabad.

In view of the above, it is submitted for orders, whether necessary instructions may be issued the PAO (W&P), Finance, Tirupathi to release the sanctioned amount of Rs.1.00 Cr. towards the 50% share of the location survey of Nadikudi Srikalahasti New BG Railway Line and deposit the same with SC Railways as desired by the E-in-C (R&B), Admn.&NH to avoid lapsing of fund.

Subject to orders, a draft Memo is submitted below for approval.

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS (Ser.IV) DEPARTMENT

Memo.No.11483/Ser.IV/2/2011 Dated: .03.2012.

Sub:- T.R. & B Dept. Railways - Construction of new BG line between Nadikudi-Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Sanction accorded Release of amount Reg.

Ref: 1. G.O.Rt.No.1097, TR&B(Ser.IV) Dept., dt:18.11.2011.

2. From Pay & Accounts Officer, Finance (W&P),

Tirupathi Lr.No.PAO/W&P/TPT/Sn.I/A.I/2011-12/No.501,Dated:23.02.2012 addressed to EE, R&B Division, Tirupathi.

3.From EE(R&B),Tirupathi Lr.No.108/RSW/ROBS/RUBS/ A3/2011-12,dt:28.02.2012 Addressed E-in-C(R&B), Admn. & NH, Hyderabad.

4.From E-in-C(R&B), Admn.&NH, Hyderabad Lr.No.10014/Ee(TEC)/DEE-1/AEE/2012-4,dt:16.3.2012

***

The attention of the Pay and Accounts OfficerW&P), Finance, Tirupathi is invited to the references cited.

In the reference 4th cited, the E-in-C(R&B), Administration & NH, Hyderabad is informed that Pay and Accounts Officer Finance (W&P) Tirupathi desired to submit estimate, agreement, voucher etc. with regard to release an amount of Rs.1.00 Crore sanctioned in the reference 1st cited. He has also requested necessary amendment may also be issued to PAO (W&P), Tirupathi instead of PAO, Hyderabad in the said GO to enable to release the amount.

In this regard, the PAO has informed that the above amount of Rs.1.00 Cr. has been released towards 50% share for conducting Final Location Survey of Nadikudi Srikalahasti New BG Line vide G.O.Rt.No.1097, TR&B (Ser.IV) Dept., dated 18.11.2011.Duly obtaining the concurrence of Finance Dept. The said amount has to be deposited with SC Railways to enable them to incur the expenditure towards Final Location Survey as per the concurrence for sharing of 50% cost of the Project given by the State Government to Railways.

The PAO Finance (W&P) Tirupathi, is therefore requested to release the amount immediately and deposit the same with CE (Construction), O/o CAO, SC Railway, Secunderabad immediately without further delay so as to avoid lapsing of fund.

The E-in-C(R&B), Admn.&NH is requested to direct the concerned to submit the bill forthwith to PAO(W&P), Finance, Tirupathi to release the above said amount and to deposit the same with CE(Construction), O/o CAO, SC Railway, Secunderabad.

To

The Pay & Accounts Officer, Finance (W & P) Tirupathi,

The EE (R &B) Division, Tirupathi,

The E-in-C(R&B), Admn.&NH, Hyderabad.

C.No.11483/Ser.IV/2/2010

:21:

Please see the notes of this department at paras 69-77 on page 18-19 ante and the notes of the finance department at paras 78-79 on page 20 ante.

Accordingly, the information may be obtained from the SC Railway, Secunderabad.

Subject to order, a draft letter is submitted below for approval.

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS DEPARTMENT

Letter.No. 11483/Ser.IV/2/2010 Dated: .04.2012To

The Chief Administrative Officer (Construction) (we).

South Central Railway,

Rail Nilayam,

Secunderabad.(W.e)

Sir,

Sub:- Railways Proposals for sanction of new lines in the State of Andhra Pradesh- Nadikudi- Srikalahasti Survey- Change of alignment via Addanki- Regarding.

Ref:-Letter received from the Sri Gottapati Ravi

Kumar, MLA, Addanki, dated: Nil.

****

I invite your kind attention to the reference cited.

2.I am directed to request you kindly to furnished information on the following early to this Govt.

Sl.

NoItemEarlier agreedNow proposed (via Addanki)

1Cost of the project

2% of State share

3R.O.R

4Whether the proposal within the policy guidelines

Yours faithfully,

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS(Ser.IV) DEPARTMENT

Letter.No. 11483/Ser.IV/2/2010 Dated:27.06.2012From

The Deputy Secretary to Government,

T, R&B Department,

A.P.Secretariate,

Andhra Pradesh.

To

The Chief Administrative Officer (Construction) (we).

South Central Railway,

Rail Nilayam,

Secunderabad.(W.e)

Sir,

Sub:- Railways Proposals for sanction of new lines in the State of Andhra Pradesh- Nadikudi- Srikalahasti Survey- Change of alignment via Addanki- Regarding.

Ref:-1. Letter received from the Sri Gottapati Ravi

Kumar, MLA, Addanki, dated: Nil.

2. Lr.No.11483/Ser.IV/2/2010-2,dt:2.5.2012.

****

I invite kind attention to the reference 2nd reference cited, wherein it was requested to furnish information on the following early to this Government. But the information is still awaited.

Sl.

NoItemEarlier agreedNow proposed (via Addanki)

1Cost of the project

2% of State share

3R.O.R

4Whether the proposal within the policy guidelines

2. Therefore, I am directed to request you kindly to furnish the information to this State Government as early as possible.

Yours faithfully,

For Deputy Secretary to Government

C.No.11483/Ser.IV/2/2010

:26:

Please see the notes of Prl.Secy (Tr.) at para 95 on page 25 ante and the notes of Finance Dept at para 96 on prepage.

When the file was referred to Finance Dept for their remarks on the Proposal with the additional cost of the alignment of the Nadikudi Srakalahasti through Addanki is sharing by the Govt. they have requested to furnish the following information.

1) Does this increased cost fit into the existing policy for funding Railway projects.

2) How much have we deposited with Railways so far on other projects.

It is submitted that the SC Railway has informed that there will be additional distance of 49 KMs, if it is passing through Addanki and additional cost will be about Rs.208 Cr (considering same rate/Km). This increased cost does not fit into the existing Policy i.e., G.O.Ms.No.110, dated:25.08.2011. the ROR of the Nadikudi Srikalahasti New Railway line is 21.18% (with 50% cost shaing by A.P Govt) and ROR of 14.48, when full cost is borne by the Railways, in accordance with above G.O when the ROR is more than 12% will not be considering on cost sharing by the State Government.

In this connection, it is submitted that the request from Honble Minster of State, GOI, Smt.Panabaka Lakshmi informed that the interest of Public to consider changing the alignment of Nadikudi Srikalahasti lint to connect Addanki as proposed above. Hence we may agree for the proposal with the additional cost.

Further it is submitted that the total amount of Rs.111,95,45,000/- to deposited with Railways towards the state Government share for the various Railway Projects so far. This information is kept at Flag A for kind perusal.

C.No.11483/Ser.IV/2/2010

:27:

On the other side, GM, SC Railway has requested to providing land free of cost and to bear 50% of remaining cost of the project by Govt of Andhra pradesh.

In this connection, it is submitted that the GM, SC Railway have requested to providing land free of cost addition to the previous consent (i.e., 50% share of the cost of the construction of the project) of the Govt. the present request does not existing the policy of Govt. This proposal may not be considered in accordance with G.O.Ms.No.110,dt:25.08.2011.

With the above information the file may be sent to Finance Department for information and their remarks in the matter as desired by their note at para 96 N.F on prepage.

Govt. to Deposited with Railways so far on other Projects

S.NoProjectAmount (lakhs)

1Construction of new BG line between Kadapa Bangalore (255.4 Kms) on 50:50 cost sharing basis Release of Rs.95.45 lakhs towards share of State for conducting Final Location Survey during the year 2008-09 95.45

Construction of new BG line between Kadapa Bangalore (255.4 Kms) on 50:50 cost sharing basis Release of Rs.40 Crores towards share of State during the year 2010-11 4000

Construction of new BG line between Kadapa Bangalore (255.4 Kms) on 50:50 cost sharing basis Release of Rs.29 Crores towards share of State during the year 2010-11 2900

2Construction of new BG line between Nadikudi-Srikalahasti on cost of sharing basis for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey100

3Doubling and Electrification of Vijayawada Gudiwada Bhimavaram Narasapur and Gudiwada Bhimavaram Narasapur and Gudiwada Machilipatnam (175 km) sections and Bhimavaram Nidadavolu (46 kms) section. for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey100

4Construction of New Broad Guage line between Tumkur and Rayadurg Via Kalyanadurg on cost sharing basis. Release of Rs.40 Crores towards share of State during the year 2012-134000

TOTAL11195.45

Brief note on New B.G Railway between Nadikudi Srikalahasti (via) Addanki

The Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government as agreed by Honble Chief Minister vide letter dated: 04.02.2010., further, the CE(Con.), SC Rly. Has furnished the proposal of Smt. Panabaka Laxmi, Honble Union Minister of State for change of alignment of Nadikudi Srikalahasti via Addanki and the same has been examined and decided not to change the alignment and go ahead with the existing alignment. However, as suggested by the SC Railway has been requested to update Donakonda Vodarevu survey passing through Addanki so that the request of Honble Union Minister of State to connect Addanki would also get addressed in due course of time.

In view of the above, the State Government vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 CR towards the 50% State Govt. Share during the year 2011 2012, was already released for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti as requested by the GM, SC Railway.

At this stage, Smt Panabaka Lakshmi, Honble Minister of State for Textiles has now again request to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the people of Addanki are in Prakasam District. The SC Railway informed that there will be additional distance 49 KMs, if it is passing through Addanki and additional cost will be about 208 Crore.

On the other side, GM, SC Railway has requested to providing land free of cost and to bear 50% of remaining cost of the project by Govt of Andhra pradesh.

:18:

NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of the representation of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

In this connection, it is submitted that the CE(Con.), SC Rly. Has furnished the above proposal of Smt. Panabaka Laxmi, Honble Union Minister of State for change of alignment of Nadikudi Srikalahasti via Addanki and the same has been examined and decided not to change the alignment and go ahead with the existing alignment. However, as suggested by the SC Railway has been requested to update Donakonda Vodarevu survey passing through

Addanki so that the request of Honble Union Minister of State to connect Addanki would also get addressed in due course of time.

Accordingly, vide Govt.Lr.No.dt.01/10.2010, the CAO, SC Railways was informed that to go ahead with the earlier alignment in respect of Nadikudi Srikalasti new Railway line and also requested to update Donakonda Vodarevu survey passing through Addanki. But, no proposals in this regard have been received from SC Railway so far.

Further, it is submitted that the Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government as agreed by Honble Chief Minister vide letter dated:04.02.2010., and vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 CR towards the 50% State Govt. Share during the year 2011 2012, was already released for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti.

C.No.11483/Ser.IV/2/2010

:26:

On the other side, GM, SC Railway has requested to providing land free of cost and to bear 50% of remaining cost of the project by government of Andhra Pradesh.

When consulted Finance (Expr.PW) Dept with above information, have stated that since the increased cost does not fit into Govt.Policy, the proposal is not agreed to in Finance.

In view of the above position, the file may be circulated to Honble C.M. through CS/M(Tr) for orders, on the request of

1) Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki).AND

2) Providing land free of cost and to bear 50% of remaining cost of the project As requested by the GM, SC Railway, Secbad. NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of the representation of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Smt. Panabaka Laxmi, Honble Union Minister of State and Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

In this connection, it is submitted that the CE(Con.), SC Rly. Has furnished the above proposal of Smt. Panabaka Laxmi, Honble Union Minister of State for change of alignment of Nadikudi Srikalahasti via Addanki and the same has been examined and decided not to change the alignment and go ahead with the existing alignment. However, as suggested by the SC Railway has been requested to update Donakonda Vodarevu survey passing through

Addanki so that the request of Honble Union Minister of State to connect Addanki would also get addressed in due course of time. C.No.11483/Ser.IV/2/2010

:26:

Accordingly, vide Govt.Lr.No.dt.01/10.2010, the CAO, SC Railways was informed that to go ahead with the earlier alignment in respect of Nadikudi Srikalasti new Railway line and also requested to update Donakonda Vodarevu survey passing through Addanki. But, no proposals in this regard have been received from SC Railway so far.

Further, it is submitted that the Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government.

Earlier, the Honble Chief Minister vide letter dated: 04.02.2010 addressed to Honble Minister for Railways has informed that State Government of A.P has committed for 50% of cost sharing for this project.

Accordingly, the State Government vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 Cr. towards the 50% State Govt. Share during the year 2011 2012, was already administrative sanction for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti.

In this context, Smt. Panabaka Laxmi, Honble Union Minister of State and Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

On the other side, GM, SC Railway has requested to providing land free of cost and to bear 50% of remaining cost of the project by government of Andhra Pradesh.

When consulted, the Finance (Expr.PW) Dept with above information, have stated that since the increased cost does not fit into Govt.Policy, the proposal is not agreed to in Finance.

C.No.11483/Ser.IV/2/2010

:27:

In view of the circumstances stated on prepage, the file may be circulated to Honble C.M. through CS/M(Tr) for orders, on the request of

1) Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki).

AND

2) Providing land free of cost and to bear 50% of remaining cost of the project As requested by the GM, SC Railway, Secbad.

EMBED Word.Document.8 \s

_1418302270.doc C.No.11483/B.II/2/2010 T.R. & B (B.II) DEPT.,

Sub:- Railways Proposal for sanction of new lines in the State of Andhra Pradesh Nadikudi Srikalahasti survey Change of alignment via Addanki Reg.

Ref:- From the Chief Administrative Officer(Construction),

SC Railway, Secunderabad, Lr.No.W.Con.195/XV/V/

Vol.XIX/MR, dated 07.09.2010.

Please see the letter received from the CAO(Construction), South Central Railway, Secunderabad at P.1-7 cf.

The CAO(Con.), South Central Railway has informed that Smt. Panabaka Lakshmi, Honble Union Minister of State (MoS) for Textiles during the inspection of Chirala, Bapatla, Repalle stations accompanied by General Manager, South Central Railway and CAO(Con), South Central Railway. on 19.07.2010 have enquired about the route to be adopted for the proposed Nadikudi Srikalahasti Railway Line and desired that the new alignment is to be proposed taking into consideration of Addanki needs and the proposed new line should pass through Addanki. She has also mentioned that the proposed route through Addanki can be obtained and discussed with Mr. Ravi Kumar, MLA from Addanki and feasibility of this alignment through Addanki has to be examined.

In this regard, the CAO (Con.), South Central Railway has brought out the following points on Nadikudi Srikalahasti Survey:-

Survey has been carried out many times considering the alignment passing through Piduguralla(exg) (Take off point), Nakarikallu, Rompicherla, Savalyapuram(exg), Vinukonda(exg.), Gundlakamma(exg.), Dekanakonda, Darsi, Podile, Goutuvaripalle, Obulayapalli, Venkatapuram, Gilakapalem, Rapur, Alturupadu & joining at Venkatagiri (Existing station on Renigunta-Guduru section).

The existing lines between Nadikude-Piduguralla (21.15 Km); Savalyapuram Gunklakamma (23.01 km); Venkatagiri Srikalahasti (24 km) is made use of in the proposed alignment having a new line length of 308.70 Km.

(Contd2)

: 2 :

Survey was updated and submitted to Board on 18.02.2010 latest at a cost of Rs.1314 Cr. with ROR of 14.48%

Honble CM of A.P. vide letter dated 04.02.2010 to Honble Minister for Railways has informed that State Govt. of AP has committed for 50% of cost sharing for this project.

The ROR of the project has been arrived as 21.28% by considering 50% cost sharing from A.P. Govt.

In this connection he has enclosed a route map of Nadikudi Srikalahasti proposed alignment which may be perused at P.7 cf.

Further, he has mentioned that in case the alignment is connected to Addanki, from Gundlakamma and Darsi, there will be an additional distance of 49 Kms and corresponding cost will be about Rs.208 Crores(considering same rate per Km):-

As this project is under active consideration by Board for sanction, change of alignment at this stage is not preferable.

Change alignment through Addanki can be studied while taking up Final Location Survey between Gundlakamma Venkatagiri for arriving more details, after the sanction for Nadikudi Srikalahasti line and AP Govt. may ask for a new survey between Gundlakamma, Darsi via Addanki.

It is also to indicate that earlier, a survey was sanctioned in 2002 for New railway line between Donakonda Vodarevu (113.5 Km length). The cost of the project was estimated at Rs.228.7 Crores with Rate of Return of (-) 6.95%. The project alignment was passing through Agraharam, Purimetla, Addanki, Inkollu and joining at Vetapalem on BZA Gudur section and again taking off from Chirala to Vodarevu via Gavirivaraipalem

Sruvey report submitted to Board on 20.08.2003 & Board

shelved the project in September,2003.

(Contd..3)

: 3 :

AP Govt. may ask for updating of Donakonda Vodarevu

survey passing through Addanki, considering the future port

activities at Vodarevu.

In view of the above, the CA(Con.), SC Rly has requested to communicate the consent from Govt. of A.P. for the suggestion made by Smt. Panabaka Lakshmi, Honble Union Minister of State, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki) since Govt. of A.P. has advised for 50% cost sharing for the above project.

Submitted for orders.

C.No.11483/B.II/2/2010

: 5 :

Please see the orders of Honble C.M. at para 15 and orders of Prl. Secretary at para 16 on page 4 ante.

Accordingly, a draft letter addressed to CAO(Construction), SC Railway, Secunderabad is submitted below for approval.

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS (B-II) DEPARTMENT

Letter.No.11483/B-II/2/2010 Dated: 01.10.2010

From

The Principal Secretary to Government,

Transport, Roads & Buildings Dept.,

A.P. Secretariat, Hyderabad.

To

The Chief Administrative Officer(Construction),

South Central Railway,

Rail Nilayam, Secunderabad.

Sir,

Sub:- Railways - Proposals for sanction of new lines in the State of Andhra Pradesh Nadikudi Srikalahasti Survey Change of alignment via Addanki Reg.

Ref:- Your Letter No.W.Con.195/XV/V/Vol.XIX/MR,

dated 07.09.2010.

*****

I invite kind attention to the reference cited.

2.I am directed to request you to go ahead with the earlier alignment in respect of Nadikudi Srikalahasti new Railway line Survey which was updated and submitted to Railway Board by you.

3.Further, in view of the future Port activities, I am directed to request you to update Donakonda Vodarevu survey passing through Addanki so that the request of Honble Union Minister of State for Textiles to connect Addanki would also gets addressed in due course of time.

Yours faithfully,

for Principal Secretary to Government.

C.NO.11483/Ser.Iv/2/2010

:5:

(Received From the Laxmi Narayan, Chief Engineer/Con-1,

S.C.Railway, Secunderabad, Lr.No.W.Con/338/G/106(WC-2),

dt:01.07.2011.)

***

Please see the letter received from the Laxmi Narayana, Chief Engineer/Con-1, South Central Railway, Secunderabad, at pp 9-11 cf.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 crs has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

C.No.11483/Ser.IV/2/2010

:6:

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

In view of the above, the file may be sent to Finance (Expr.PW) Department for their remarks.

C.NO.11483/Ser.Iv/2/2010

NOTE FOR CIRCULATION

:7:

The subject matter in the file relates to release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 cr. has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

C.No.11483/Ser.IV/2/2010

:8:

In this connection the State Govt. committed for 50% of cost sharing for this project and also Honble CM informed to Honble Minister for Railways vide letter dated 04.02.2010.

When the proposal was referred to the Finance Dept. for their remarks then they have informed that no specific provision is available for this purpose in B.E.2011-2012. However, there is a provision of Rs.300.00 Crores made available for Railway Safety works under the head of account 5054-80-MH.001-GH.11-SH(04) construction of Roads and Bridges under Railway Safety works-530 Major Works-531.Other expenditure.

In view of the above it is for orders whether sanction may be accorded for release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project for 2011-12 under the above Head of Account for construction of a new Railway line between Nadikudi srikalahasti on 50:50 cost sharing basis between the Ministry of Railways and Government of Andhra Pradesh.

The file may be circulated to CM through CS for orders on Para ( ) above.

C.NO.11483/Ser.Iv/2/2010

NOTE FOR CIRCULATION

:10:

The subject matter in the file relates to release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project.

The Chief Engineer/Con-1, South Central Railway, Secunderabad has informed that the Ministry of Railways have sanctioned survey work for Reconnaissance Engg-Cum-Traffic survey for BG line between Nadikudi- Srikalahasti and the report at a cost of Rs.1313.99 cr with ROR of 15.45% was submitted to Board on 11.02.2010.

In this connection it is submitted that the Chief Minister, Government of Andhra Pradesh vide letter dated:04.02.2010 has conveyed the commitment of Government of Andhra Pradesh to share 50% cost of the above project, due to which the, ROR was revised to 21.18%.

Further stated that the work is sanctioned by Railway Board vide item 15 A of Pink Book 2011-2012 to be executed on cost sharing basis.

He has further informed that the Estimate for Final Location Survey at a cost of Rs.3.08 cr. has already been sanctioned by GM and tenders are being invited for conducting Final location Survey. For the current financial year, Ministry of Railways has allotted Budget Grant of Rs.1.00 cr. for the above work. Thus, State Government is also required to deposit funds to the extent of Rs.1.00 cr. for the year 2011-2012 towards State Governments share.

The CAO (Construction) South Central Railway, Secunderabad requested to provide funds to the extent of Rs.1.00 cr. towards State Governments share at the earliest.

C.No.11483/Ser.IV/2/2010

:11:

In this connection the State Govt. committed for 50% of cost sharing for this project and also Honble CM informed to Honble Minister for Railways vide letter dated 04.02.2010.

When the proposal was referred to the Finance Dept. for their remarks, they have informed that no specific provision is available for this purpose in B.E.2011-2012. However, there is a provision of Rs.300.00 Crores made available for Railway Safety works under the head of account 5054-80-MH.001-GH.11-SH(04) construction of Roads and Bridges under Railway Safety works-530 Major Works-531.Other expenditure and they have also issued budget release order for an amount of Rs.1.00 Crore to meet the expenditure vide G.O.Rt.No.3577, Finance (Expr.PW) Dept., dated 14.09.2011.

In view of the above it is for orders whether sanction may be accorded for release of an amount of Rs.1.00 Cr. (Rupees one crore only) as a matching share of 50% for Final Location Survey of the new B.G Railway line between Nadikudi srikalahasti Railway Project for 2011-12 under the above Head of Account for construction of a new Railway line between Nadikudi srikalahasti on 50:50 cost sharing basis between the Ministry of Railways and Government of Andhra Pradesh.

The file may be circulated to CM through CS for orders on Para ( ) above.

C.No.11483/ser.IV/2/2010

: 14 :

Please see the notes of this department in circulation at paras 37 46 on pages 10 - 11 ante and the orders of the Honble CM at Sl.No.09 of the statement on page 13 ante.

Accordingly, a draft order is submitted below for approval.

ABSTRACT

Transport Department- Construction of new BG line Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Issued.

---------------------------------------------------------------------

TRANSPORT, ROADS & BUILDINGS (SER.IV) DEPARTMENT

G.O.Rt.No.

Dated: .11.2011

Read the following:-

1.Govt.Letter dated:04.02.2010 addressed to Honble Union

Minister of Railways GOI, New Delhi by Honble C.M.

2.From CE, Lr.No.W.Con/338/G/106 (WC-2), Dated:01.07.2011

3.G.O.Rt.No.3577, Finance (Expr.PW) Dept, Dated:14.09.2011.

****

O R D E R:

The Chief Engineer, South Central Railways in his letter 2nd read above has informed that the Ministry of Railways have sanctioned survey work for Board was sanctioned New BG line Nadikudi Srikalahasti on cost of sharing basis. The anticipated abstract cost of the project as per initial Survey Report is Rs.1.00 Crore. The estimate has been prepared at a cost of Rs.1.00 Crore for final location survey to take up the work.

Ministry of Railways have sanctioned survey work for Reconnaissance Engineering-cum-Traffic survey for New BG line between Nadikudi Srikalahasti

The Government of A.P in the 1st read above has conveyed the commitment of 50% cost of share of the said project, due to which the ROR was revised to 21.18%.

The estimate for Final Location Survey at a cost of Rs.1.00 crore has already been sanctioned by GM and tenders are being invited for conducting final location Survey and Ministry of Railways have allotted Budget grant of Rs.1.00 Crore for the above said work. Thus State Government is also required to deposit funds to the extent of Rs.1.00 crore for the year 2011-2012 towards State Governments share.

:2:

In the reference 2nd read above, the General Manager, South Central Railway, Secunderabad has requested to deposit an amount Rs.1.00 crore towards 50% share to take up final location survey.

Government after careful consideration hereby accord administrative sanction for an amount of Rs.1.00 crore (Rs.One Crore Rupees only) towards 50% share for conducting final location survey.

The expenditure sanctioned in para above shall be debited to the Head of Account 5054-80-MH.001- GH.11-SH (04) Construction of Roads and Bridges under Railway Safety Works-530-Major Work-531-Other Expenditure. The Engineer-in-Chief (R&B), Administration & NH, Hyderabad shall draw and disburse the above amount to the Chief Engineer (construction) Office of the Chief Administrative Officer, South Central Railways, Secunderabad.

Thus order issues with the concurrence of the Finance Department vide their U.O.Note No.22410/815/Expr.PW/A2/2011,

Dated:15.09.2011.

To

The Engineer In Chief (R&B), Administration & NH,

Hyderabad.

The General Manager, South Central Railway, Rail Nilayam, Secunderabad.

The Accountant General, A.P., Hyderabad

The Pay and Accounts Officer, Hyderabad

The Chief Engineer / Con 1, South Central Railway, Secbad.

Copy to Finance (Expr.PWD) Dept.

ABSTRACT

Transport Department- Construction of new BG line between Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Issued.

---------------------------------------------------------------------

TRANSPORT, ROADS & BUILDINGS (SER.IV) DEPARTMENT

G.O.Rt.No.

Dated: .11.2011

Read the following:-

1.Govt.Letter dated:04.02.2010 addressed to Honble Union

Minister of Railways GOI, New Delhi by Honble C.M.

2.From CE, Lr.No.W.Con/338/G/106 (WC-2), Dated:01.07.2011

3.G.O.Rt.No.3577, Finance (Expr.PW) Dept, Dated:14.09.2011.

****

O R D E R:

The Chief Engineer, South Central Railways in his letter 2nd read above has informed that the Ministry of Railways have sanctioned survey work for Ministry of Railways have sanctioned survey work for Reconnaissance Engineering-cum-Traffic survey for New BG line between Nadikudi - Srikalahasti,and the report at a cost of Rs.1313.99 cr. With ROR of 15.45% was submitted to Board on 11.02.2010.

The Government of A.P in the 1st read above has conveyed the commitment of 50% cost of share of the said project, due to which the ROR was revised to 21.18%. Board was sanctioned New BG line between Nadikudi - Srikalahasti on cost of sharing basis.

The estimate for Final Location Survey at a cost of Rs.3.08 crore has already been sanctioned by GM and tenders are being invited for conducting final location Survey and Ministry of Railways have allotted Budget grant of Rs.1.00 Crore for the above said work. Thus State Government is also required to deposit funds to the extent of Rs.1.00 crore for the year 2011-2012 towards State Governments share.

:2:

In the reference 2nd read above, the General Manager, South Central Railway, Secunderabad has requested to deposit an amount Rs.1.00 crore towards 50% share to take up final location survey.

Government after careful consideration hereby accord administrative sanction for an amount of Rs.1.00 crore (Rs.One Crore Rupees only) towards 50% share for conducting final location survey.

The expenditure sanctioned in para 5 above shall be debited to the Head of Account 5054-80-MH.001- GH.11-SH (04) Construction of Roads and Bridges under Railway Safety Works-530-Major Work-531-Other Expenditure. The Engineer-in-Chief (R&B), Administration & NH, Hyderabad shall draw and disburse the above amount to the Chief Engineer (construction) Office of the Chief Administrative Officer, South Central Railways, Secunderabad.

Thus order issues with the concurrence of the Finance Department vide their U.O.Note No.22410/815/Expr.PW/A2/2011,

Dated: 15.09.2011.

To

The Engineer In Chief (R&B), Administration & NH,

Hyderabad.

The General Manager, South Central Railway, Rail Nilayam, Secunderabad.

The Accountant General, A.P., Hyderabad

The Pay and Accounts Officer, Hyderabad

The Chief Engineer / Con 1, South Central Railway, Secbad.

Copy to Finance (Expr.PWD) Dept.

GOVERNMENT OF ANDHRA PRADESH

TRANSPORT, ROADS & BUILDINGS (Ser.IV) DEPARTMENT

Memo.No.11483/Ser.IV/2/2011 Dated:10 .01.2012.

Sub:- T.R. & B Dept. Railways - Construction of new BG line between Nadikudi Srikalahasti on cost of sharing basis Accord of administrative sanction for an amount of Rs. 1.00 Crore towards 50% share for conducting Final Location Survey Sanction Orders- Sanction accorded Release of amount Reg.

Ref: 1. G.O.Rt.No.1097, TR&B(Ser.IV) Dept., dt:18.11.2011.

2. From CAO (Construction), SC Railway, Secunderabad

Lr.No.W.Con.338/G/106 (WC.2), dated 13.12.2011.

***

The attention of the E-in-C(R&B), Administration & NH, Hyderabad is invited to the reference 1st cited wherein he was requested to draw the amount of Rs.1.00 Crores and deposit to the Chief Engineer(Construction), O/o CAO, SC Railway, Secunderabad.

In the reference 2nd cited (Copy enclosed), the CAO (Construction), SC Railway, Secunderabad has requested to deposit the amount.

He is, therefore, requested to release the above said amount immediately to CE (Construction), SC Railway, Secunderabad under intimation to Government.

D.LAKSHMI PARTHASARATHY

PRINCIPAL SECRETARY TO GOVERNMENT

To

The Engineer-in-Chief(R&B),

Admn. & NH, Hyderabad. (w.e.)

Copy to CAO (Con.), SC Railway,

Secunderabad for information.

// FORWARDED BY ORDER //

SECTION OFFICER

C.No.11483/Ser.IV/2/2011

:15:

(From CAO (on.), SC Rly, Secunderabad Lr.No.W.Con338/G/106 (WC.2), dated 15.09.2010)

* * * *

Please see the letter received from the CAO (Construction), SC Rly., Secunderabad at 29 cf.

The CAO(Con.), SC Rly has informed that sanction for an amount of Rs.1 Cr towards 50% share of Govt. of AP for conducting final location survey to new BG Railway Line between Nadikudi Srikalahasti. The Final Location tender is under finalization and acceptance letter will be issued shortly.

The GM, SCR has requested to deposit an amount of Rs.1 Cr towards 50% share of AP Govt. for conducting Final Location Tender for the above work. to deposit the State Govt. share of Rs.40.00 Crores.

In this connection it is submitted that an amount of Rs.1 Cr towards the 50% State Govt. Share during the year 2011-12 was already released vide G.O.Rt.No.1097, TR&B(Ser.IV) Dept., dated 18.11.2011 wherein the E-in-C(R&B), Admn.& NH, Hyderabad was requested to draw the amount and deposit to the CE(Con), O/o CAO, SC Rly. Therefore, the E-in-C(R&B), Admn.& NH may be requested to deposit the amount of Rs.1 Cr to SC Rly immediately.

Subject to orders, a draft memo is submitted below for approval.

C.No.11483/Ser.IV/2/2010

:16:

With reference to the orders of the Prl.Secy (T) at para 61 on page 15 ante.

A statement showing with the all pending Railway projects with the total cost of the Projects, cost share of the State Government and the status of Project is prepared and submitted below at flag A.

(Issued a Memo.No.11483/Ser.IV/2/2011,dt.10.1.2012)

(Received a letter From G. Ravi Kumar, MLA,Addanki, and Smt.Panabaka lakshmi, Honbble Minister of State for Texttiles )

***

Please see the letter received from the M.L.As Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District and Smt Panabaka Lakshmi, M.L.A., at page cf.

The survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is very important because it is an alternate railway line to existing Vijayawada- Chennai Railway Line. You may be aware that the Vijayawada- Chennai main line is getting dislocated every year due to natural calamities line cyclones, heavy rains, floods etc. Fortunately, the line sanctioned in the last Railway Budget and also understood that the final location survey is in progress.

The proposed new Railway line would be passing through Guntur, Prakasam and Nellore Districts connecting upland areas. The people of Prakasam Districts have represented to me to connect Addanki which is a headquarter of Assembly Constituency and also important town.

Consider the request and do needful favor for to arrange to expedite to commence the works in the proposed new line duly providing sufficient funds in the ensuring railway budget 2012-2013 and to consider changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District to meet the needs and aspirations of the people of my constituency.

:16:

NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti has requested to consider the request and do needful favour for changing the alignment of Nadikudi Srikalahasti line to connect Addanki in Prakasam District, and to meet the needs and aspirations of the people of his Constituency.

In this connection, it is submitted that Govt vide letter dated .01.10.2010 have directed the S.C. Railway to go ahead with the earlier alignment in respect of Nadikudi - Srikalahasthi new Railway line, and also requested the S.C.Railway to update Donakonda Vadarevu survey passing through Addanki so that the request of Honble Union Minister of State for Textiles to connect Addanki would also gets addressed in due course of time. The said proposals are not yet to received till today.

Further, it is submitted that the Nadikudi Srikalahasti new line updated survey has been submitted by the office of the South Central Railway to the Railway Board on 18.02.2010 at cost of Rs.1314 crores with an ROR of 21.28% considering the 50% cost sharing by the State Government as agreed by Honble Chief Minister vide letter dated:04.02.2010., and vide G.O.Rt.No: 1097, Dated 18.11.2011 an amount of Rs.1 CR towards the 50% State Govt. Share during the year 2011 2012, was already released for conducting Final Location survey to new BG Railway Line between Nadikudi Srikalahasti.

In view of the above position, it is submitted for orders on the request of Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham Districti and Smt. Panabaka Lakshmi, Honble Minister of State for Textiles, GOI for change of alignment of Nadikudi Srikalahasti line (via Addanki).

:18:

NOTE FOR CIRCULATION

The subject matter in the file relates to consider the change of alignment of the proposed new Railway line between Nadikudi Srikalahasti to meet the needs of the People of Addanki area in Prakasam District.

It is submitted that Sri Gottipati Ravi Kumar, M.L.A., Addanki Constituency, Prakasham District while enclosing a copy of the representation of Smt Panabaka Lakshmi, Honble Minister of State for Textiles addressed to the Honble Minister for Railways, New Delhi, has stated that the survey for the proposed new Railway line between Nadikudi- Srikalahasti was sanctioned in 1997-98. The line is sanctioned in the last railway budget and also understood that the final location survey is in progress.

Further, he has informed that the proposed new Railway Line would be passing through Guntur, Prakasam and Nellore Districts, connecting upland areas, and stated that the people of Addanki and surrounding areas are requesting to connect Addanki in the proposed railway line between Nadikudi Srikalahasti which is the Head Quarter of the Constituency.

Sri Gottipati Ravi Kumar, M.L.A., Addank