Page 2: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1 Key Skills:

Assignment: 1 - Selecting appropriate methods of measuring & marking out and equipment DRILL DRIFT

Using the table below you must write down the appropriate method of marking out the body of the ‘DRILL Drift” then list the most suitable measuring and marking out equipment you would need to use.

Component Marking out methodMeasuring and Marking Out

Equipment

Drill Drift

Page 3: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 1a ii Grading Criteria: P1 Key Skills:

Assignment: 1 - Selecting appropriate methods of measuring & marking out and equipment Drill Gauge

Using the table below you must write down the appropriate method of marking out the body of the ‘Drill Gauge’ then list the most suitable measuring and marking out equipment you would need to use.

Component Marking out methodMeasuring and Marking Out

Equipment

Drill Gauge

Page 4: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 1a iii Grading Criteria: P1 Key Skills:

Assignment: 1 - Selecting appropriate methods of measuring & marking out and equipment TOOL TRAY

Using the table below you must write down the appropriate method of marking out the body of the ‘TOOL TRAY’ then list the most suitable measuring and marking out equipment you would need to use.

Component Marking out methodMeasuring and Marking Out

Equipment

Tool Tray

Page 5: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 1b Grading Criteria: P1 Key Skills:

Assignment: 1: Measuring and Marking Out

Measuring and Marking Out

Whilst you are in the workshop, you are required to select suitable measuring and marking out methods and equipment for three different applications. You will be making a Drill Drift, a Drill Gauge and a Tool Tray.

This means that you are expected to use your knowledge and understanding of the methods and equipment for measuring and marking out discussed in Task 1a.

During your sessions in the workshop, you will be observed working in this way. Use photos and notes in the space below

to demonstrate your skills.

YOU MUST MAKE SURE YOU GET YOUR OBSERVATION SHEET SIGNED TO ACHIEVE THIS GRADE CRITERIA.

Page 6: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Describe the appropriate measuring and marking out equipment for marking out the drill drift body, the Drill Gauge and the tool traySheet 1

Page 7: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Describe the appropriate measuring and marking out equipment for marking out the drill drift body, the Drill Gauge and the tool traySheet 3

Page 8: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Describe the appropriate measuring and marking out equipment for marking out theSheet 4

drill drift body, the Drill Gauge and the tool tray

Page 9: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Describe the appropriate measuring and marking out equipment for marking out the drill drift body, the Drill Gauge and the tool tray

Sheet 1

Surface plate Drill gauge, Drill Drift

Providing a large flat surface on which to place the work piece – small portable plate in workshop

Provides a datum flat surface on which to place the work piece. A scribing block or height gauge can then be used from the datum. Sometimes an angle plate is placed onto the plate.

Drill GaugeAngle plate Providing a flat surface on which to place the work piece at 90 degrees to the surface plate

Irregular shapes without flat surfaces can be clamped to the angle plate and marked out using a scribing block – Is also used to keep thin material vertical when marking out

Drill gauge, Drill Drift

Scribing Block Used for scribing lines parallel to the surface plate and transferring heights

When placed onto the surface plate, adjust the height and scribe along the work piece. Adjust to the datum and transfer height to another part of the work piece.

Drill gauge, Drill Drift, Tool tray

Steel Rule Measuring to an accuracy of 0.5 millimetres

Used for measuring on work piece or setting other tools such as height gauge

T

Page 10: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Describe the appropriate measuring and marking out equipment for marking out the drill drift body, the Drill Gauge and the tool traySheet 2

Combination Set Drill gauge , Drill drift

Measuring angles, adjustable The set is provided with a steel rule, and three attachments: compound – angle measurement 0-180 degrees; Set square – angle 90 degrees: Vee – locating the centre of round bar

Drill gauge, Drill Drift, Tool Tray

Engineers square

Proving an edge 90 degrees to another datum edge

The square is placed against a datum edge or used to check the square ness of an object. The edge must be kept flat

Drill gauge, Drill Drift, Tool Tray

Dividers Marking circles and transferring distances The dividers allow the accurate marking out of circles. They are adjustable using a small screw. They can be used to check dimensions an mark radii

T

Page 11: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2 - Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Equipment name

Used on components

(name)Equipment is used for How it is used/what it does

Drill Gauge, Drill Drift, Tool Tray

Describe the appropriate measuring and marking out equipment for marking out the drill drift body, the Drill Gauge and the tool tray

e

Sheet 3

Height Gauge Drill Gauge, Drill Drift

Measuring and marking out from a datum

The height gauge is used to accurately mark out parallel lines and to check the height of datum's on components. Some have a Vernier gauge

Drill Gauge, Drill Drift, Tool Tray

Scriber Used for scribing lines onto work piece

A sharp instrument that is used for general marking out normally alongside a straight edge such as an engineers square

Marking Blue Coats the surface of work piece Highlights the scribed line when scratch onto with a scriber point

T

Page 12: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2a Grading Criteria: P2 Key Skills:

Assignment: 2: Describe the measuring & marking out equipment used for marking out the 3 components (Task 1a)

Measuring and Marking Out

On this page, annotate photographs of your three different practical pieces of work with descriptions on the measuring and marking out methods you used.

Drill Drift

Drill Gauge

Tool Tray

Page 13: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 2b Grading Criteria: M1 Key Skills:

Assignment: 2 - Recommend corrective action for unsafe or defective marking out equipment

Defective Measuring and Marking Out Equipment

Reporting defective and/or unsafe equipment

During your work, marking out each of your three components, you may come across ‘defective’ equipment. What should you do with it?

• it may be defective in that it is totally un-usable

• it may be useable but inaccurate

• It may be un-safe to the user

Using a ‘Defective Equipment Report sheet’, you will produce a report for three pieces of faulty equipment stating:

• the correct name of the piece of faulty equipment

• the defect/fault (what is the problem)

• the implications of the fault if it was continued to be used

• the appropriate remedial/corrective action to make the equipment non-defective/safe

Defective equipment report

Page 14: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3a i Grading Criteria: P3 Key Skills:

Assignment: 3 - Prepare a ‘Work Plan’ for the marking out of components

Using the chart below, prepare an appropriate ‘Work Plan’ for the ‘Drill Drift’.

Component Name: Date: Name:

Stage No. Process Tools & Equipment Health & Safety Quality Check

Time Check

Page 15: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3a ii Grading Criteria: P3 Key Skills:

Assignment: 3 - Prepare a ‘Work Plan’ for the marking out of components

Using the chart below, prepare an appropriate ‘Work Plan’ for the ‘Drill Gauge’.

Component Name: Date: Name:

Stage No. Process Tools & Equipment Health & Safety Quality Check

Time Check

Page 16: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3a iii Grading Criteria: P3 Key Skills:

Assignment: 3 - Prepare a ‘Work Plan’ for the marking out of components

Using the chart below, prepare an appropriate ‘Work Plan’ for the ‘Tool Tray’.

Component Name: Date: Name:

Stage No. Process Tools & Equipment Health & Safety Quality Check

Time Check

Page 17: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3b Grading Criteria: P4 Key Skills:

Assignment: 3 - Mark out the three different applications to the prepared work plan

For this task, you will be observed carrying out the task of marking out the three components to your work plan.

Ensure that you have the correct tools and equipment available.

You will be observed throughout the process and will be assessed on the following:

Processes: Correct processes used

Tools & Equipment: Correct tools and equipment used and used correctly

Health & Safety: Suitable H&S measures used throughout

Quality Check: That you are constantly checking you work throughout.

Time Check: You are aware of the time constraints and work within them

MAKE SURE YOU COMPLETE A LOG BOOK . USE PHOTOS, SKETCHES AND NOTES TO ILLUSTRATE YOUR WORK.

Page 18: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3c Grading Criteria: M2 Key Skills:

Assignment: 3 - Mark out the three different applications to the prepared work plan

For this task, you will be observed carrying out the task of marking out the three components to your work plan.

To gain a ‘Merit’ grade for this task, you will need to carry out appropriate checks to ensure that your marking out of the components are to the requirements of the drawings provided and that the appropriate machining and material removal techniques are considered. Again, you will be observed for this – you should ask questions about the drawings if you feel that not enough information is provided.

Page 19: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3d Grading Criteria: D1 Key Skills:

Assignment 3: - justify the choices of datum, work-holding equipment and measurement techniques used to mark out the three different applications.

For each of the three work pieces covered in the previous tasks, you must ‘JUSTIFY’ your CHOICE of measuring and marking out

equipment.

Justify ( GIVE REASONS WHY) you decided to mark out your first ’DATUMN LINE’, the EQUIPMENT chosen (its use) and the TECHNIQUES used.

CRITICALLY EVALUATE your decisions giving good reasons and EXPLAIN these (why you chose them), say WHAT you

did, and HOW you did it.

Sheet No:

Page 20: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 3d Grading Criteria: D1 Key Skills:

Assignment 3: - justify the choices of datum, work-holding equipment and measurement techniques used to mark out the three different applications.

(Continued)

Sheet No:

Page 21: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 4a Grading Criteria: P5 Key Skills:

Assignment: 4 - leaving the work area in a safe condition; cleaning of equipment; disposal of waste; storage of measuring and marking out equipment

Leaving the work area in a safe condition; cleaning of equipment; disposal of waste; storage of measuring and marking out

equipment is an important part of an engineers job.

You must give ‘SIX’ examples of where the above practice has taken place and explain the implications of NOT doing it

correctly. Use headings for each of the examples and bullet points for your examples of ‘Good Practice’. (Continue on

separate sheet)

1.

2.

3.

4.

5.

6.

Sheet No:

Page 22: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 4a Grading Criteria: P5 Key Skills:

Assignment: 4 - leaving the work area in a safe condition; cleaning of equipment; disposal of waste; storage of measuring and marking out equipment

(Continued) Leaving the work area in a safe condition

Sheet No:

Page 23: Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring

Name: Candidate No:

Unit 18: Engineering Marking Out Task: 4b Grading Criteria: P5 Key Skills:

Assignment 4: Demonstrating safe working practice and good housekeeping.

Demonstrating Safe Working Practice and Good Housekeeping

Whilst undergoing practical activity, you must be able to demonstrate safe working practice and good housekeeping. You will be observed during your practical sessions to ensure that this takes place during your routine and during all practical activity.

YOU MUST MAKE SURE YOU GET YOUR OBSERVATION SHEET SIGNED TO ACHIEVE THIS GRADE CRITERIA.