Precast/Prestressed Concrete Institute (PCI) National Concrete Consortium San Antonio, Tx April 1, 2009 Precast/Prestressed Concrete Institute (PCI) National Concrete Consortium San Antonio, Tx April 1, 2009 William Nickas, P.E. Director, Transportation Systems Precast/Prestressed Concrete Institute Chicago, IL

Upload: hoangdien

Post on 28-Feb-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast/Prestressed Concrete Institute (PCI)

National Concrete Consortium San Antonio, Tx

April 1, 2009

Precast/Prestressed Concrete Institute (PCI)

National Concrete Consortium San Antonio, Tx

April 1, 2009 William Nickas, P.E.

Director, Transportation Systems

Precast/Prestressed Concrete Institute Chicago, IL

Page 2: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

2

RapidApproaches

MinimalDisruption

SuccessfulRenewal

Long-LivedFacilities

To develop a consistent, systematic approach to performing highway renewal that

• is rapid • causes minimum

disruption• produces long-

lived facilities

Goal

Page 3: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

3

TechnologyTechnology Project DeliveryProject Delivery

SuccessfulRenewal

Integrated approach

Page 4: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Concrete Bridges and the NBI dataConcrete Bridges and the NBI data

Post Tensioned Durability StrategiesPost Tensioned Durability Strategies

PCI Quality Systems & Plant CertificationPCI Quality Systems & Plant Certification

FHWA Long Term Bridge Program (LTBP)FHWA Long Term Bridge Program (LTBP)

Cooperative Agreement for PPCP with FHWACooperative Agreement for PPCP with FHWA

AgendaAgenda

Page 5: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

A Report Card on Concrete and Bridge Longevity

Data Reduced and Charted by:Heinrich O. BonstedtExecutive DirectorPrestressed Concrete Association of Pennsylvania

Page 6: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 6

Data Source

The National Bridge Inventory December 2008

Prepared according to a Standard Recording and Coding Guide that covers over 115 items

“By having a complete and thorough inventory, an accurate report can be made to Congress” and it provides the data necessary to “produce Defense Bridge and Federal Emergency Management Agency (FEMA) reports.”

Page 7: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 7

Page 8: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 8

Page 9: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 9

Page 10: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 10

Page 11: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 11

Page 12: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 12

Page 13: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 13

Page 14: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 14

Evaluation Objectives

Determine deficiency rates for bridgesEvaluate deficiency trendsCompare bridge material alternativesEstablish a basis for projections of service life expectancy

Page 15: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 19

Sources of Deficiencies

Super-structure conditionSub-structure conditionDeck conditionAppraisal Rating

Page 16: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 20

Page 17: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 21

Page 18: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 22

Page 19: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 23

Page 20: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 24

Concrete Observations

Deficiency rates for concrete bridges are decliningMarket share of concrete bridge material alternatives is increasingMore work is needed to refine projections of service life expectancy with current methods.

Page 21: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 25

Florida DOT efforts toward improving Post Tension Durability at UT, Austin ASBI Training April 2006 by William Nickas

Page 22: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 26

Page 23: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 27

Pile Deterioration

Page 24: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 28

Pier Deterioration

Page 25: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 29

Leakage at Segment Joints

Page 26: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 30Failure of Tendon Anchorage Pour back

Page 27: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 31Boot Removed showing Corrosion

Page 28: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 33Wedge Assembly

Page 29: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 34

Page 30: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 35

Page 31: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 36

Page 32: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 37

Page 33: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 38

Page 34: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 39

Borescope Inspection - Moderate

Page 35: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 40

Borescope Inspection - Bad

Page 36: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 41

Partial Grout

Page 37: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 42

85% of strength

Page 38: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 43

Page 39: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 44

Cracked Ducts

Page 40: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

PO

ST-T

EN

SIO

NIN

G S

TA

ND

AR

D D

ET

AIL

S

•Standardized Details with PCI

Proper Material is CriticalProper Material is Critical

Page 41: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 46

Pier 133 NB

SE Tendon

NE Tendon

Page 42: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 47

Field Book Notes

Page 43: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 48

New Grout Material Specification• Chloride Ion Limited .08% by weight (ASTM C1152)• Volume Change 0.0% @ 24 Hrs. (ASTM C1090)

<=0.3% @ 28 days• Compressive Strength >7,000 PSI (ASTM C942)• Initial Set Time Min. 3 hours (ASTM C953)

Max. 12 hours• Fluidity Test Immediately after mixing (ASTM C939)

30 minutes after mixing• Bleed @4 Hours 0% (ASTM C940)• Permeability @ 28 days Max 2500 Coulombs (ASTM 1202)

Page 44: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 49

New Type Low Bleed Grout 10 hours old…..No bleed void

Page 45: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 50

Example Post-Tensioning Tendon Classifications

Essential

87

109

654321

Critical

Very High

High

Moderate

P/C SBS External– EJ SpansP/C SBS External– Typical Spans

Drop in PT Girders; ¼ Point HingeP/C BC – Continuity at EJ

P/C BC – Anchor on FaceP/C BC – Anchor in BlisterP/C BC – Bottom ContinuityCIP Cantilever & ContinuityFlat Slab - TransverseP/C BC – Top Continuity

Page 46: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 51

FDOT Post-Tensioning Strategy

Anchor Protection

Fully Grouted TendonsMultiple Tendons Paths

Enhanced PT Systems

Watertight Bridges

FDOT PTStrategy

Page 47: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 52

Requirements

• 4 Levels of Protection• Semi Standard Details• Anchorages Sealed at all Times

Requirements

• Anchorage Accessibility• Low Point Injection• Semi-Standard Drawings• Certified Grouters and Inspectors• Controlled Rates of Grouting• Flow Rate Testing of Ejected Material• Inspect Voids and Secondary Grout

Requirements

• Pre-Approved PT Systems• Pre-Bagged Grout• Three-Level Continuous Protection• Plastic Ducts with Improved Cell Class• Positively Sealed Ducts• Permanent Plastic Anchor Caps• Pressure Testing

Requirements

• No Dry Joints• Pre-formed Tapered Holes• Drip Notches at Anchorages• Bottom Slab Drains• Sealed Surfaces of Secondary Pours• Wearing Surfaces for Ride not Protection• No Permanent Tensile Stresses

Flor

ida

PT S

trate

gy

Enhanced PT Systems

Fully Grouted Tendons

Watertight Bridges

Anchor Protection

Requirements

• Maximize Use of Smaller Tendons• No Impact Due to Loss of Critical Tendon• Compensation for Loss Due to Corrosion

Multiple Tendon Paths

Page 48: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

A non-Florida Project

Page 49: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 54

Page 50: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 55

Page 51: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pcipci 5656

Why not always use Plastic Duct ?Why not always use Plastic Duct ?

Page 52: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

pci 57Mid-Bay Bridge

www.dot.state.fl.us/structures

Temporary Design Bulletin (Post-Tensioning Issues)

Page 53: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

• PCI is an international trade association and Technical Institute – Promotes technical understanding and use

of high-quality precast and prestressed concrete

– Full staff of technical and marketing specialists

Page 54: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

• Over 350 Producer Member plants – Architectural, structural, and specialty

precast concrete products and structures– Every U.S. PCI Producer Member plant

must be PCI Certified– PCI Membership is not required to be PCI

Certified– Over 80 Technical Committees

Page 55: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

• Approximately 200 Supplier Associate Members

• 100 Erector Associate Members – PCI Qualified/Certified Erector Program

• Over 1,300 Professional Members – Academics, design professionals,

and other industry stakeholders – Provide much of the technical

knowledge contained in PCI design guides and other technical publications

Page 56: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

PCI Publications• Design Manuals and Guidelines• Quality Control Manual• PCI Journal, Ascent, and Aspire

Magazines

Page 57: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

• Codes and Standards– PCI works very closely with code bodies,

such as ACI, ICC, ASTM, AASHTO, etc.

• Industry Events– PCI works with FHWA in producing the

National Bridge Conference

Page 58: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

About PCIAbout PCI

• Research & Development– DSDM Seismic Project– FHWA Precast Pavement

Project

TeTeTe

Side Walls

Load Cell

Floor Diaphragms

Shake Table

ReactionWall

Steel Base withCantilever Outriggers

6 ft – 6 in

Page 59: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

These concepts and ideas are early findings sharedby the team  during the 2009 TRB Briefing of FHWAand the Researchers.

Program manager is:Dr. Hamid Ghasemi (202-493-3042)[email protected]

He is the official POC for information regarding the program, rather than Rutgers.

In addition for information regarding the LTBP pilot program,they can contact:John Penrod (202-493-3051)[email protected],He is a member of the LTBP project team and will be managing the pilot program activities.

Page 60: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Team Organization

Roadmap: First Five Years

Page 61: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Process and Timeline

Page 62: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Defining and Measuring Bridge Performance

What Does Bridge Performance Mean?

Is it a measure of cost?

Is it a measure of condition?

Is it a measure of traffic service?

Is it a measure of load capacity/safety?

And what purpose will measuring bridge 

performance

serve?

Defining and Measuring Bridge Performance

Page 63: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Defining and Measuring Bridge Performance

Study Goal

Develop Performance Measures that:

Define bridge performance in terms of things we 

can measure•

Determine cost effective design/maintenance 

strategies•

Evaluate serviceability and durability

Establish accurate traffic safety evaluation

Provide an accurate measure of load capacity

Defining and Measuring Bridge Performance

Page 64: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Factors in the Difficulties of Measuring Bridge  Performance

Bridge Inspection Policy

QA/QC

Personnel / Inspector Qualifications and 

Training•

Programmatic Considerations

Bridge Load Rating

Documentation

New Technologies

Bridge Deterioration Database

Communications

Research Needs

Defining and Measuring Bridge Performance

ASCE/SEI White Paper Bridge Inspection and Rating

Page 65: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

2007 Structurally Deficient NHS Bridges

Defining and Measuring Bridge Performance

Page 66: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Objectives of NDE Performance Monitoring

Ultimate Objectives

Develop and implement plan for high quality quantitative  data collection using NDE technologies that will:

»

Enable

condition monitoring that will be objective  and linked to bridge performance measures

»

Improve

understanding of deterioration processes  and bridge performance

»

Advance

predictive methods and bridge management  practices

Bridge Monitoring: NDE

Page 67: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Serviceability: Degradation and Improvement

A-$2 B-$10

C-$50

D-$100

Age

Ser

vice

abili

ty

Cost to improve serviceability:A - Initial ConstructionB - Preventive MaintenanceC - Corrective MaintenanceD - Reconstruction

LTBP Monitoring

Bridge Monitoring: NDE

Page 68: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

73

Precast/Prestressed Concrete InstitutePrecast/Prestressed Concrete Institute(PCI)(PCI)

Federal Highway AdministrationFederal Highway Administration(FHWA)(FHWA)

Page 69: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

74

PRECASTING PLANTSPRECASTING PLANTS

A A manufacturing operationmanufacturing operation……

……not offnot off--site construction!site construction!

Page 70: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

75

PCIPCI--FHWA Cooperative Agreement FHWA Cooperative Agreement

““Advancement of Precast Prestressed Advancement of Precast Prestressed Concrete Pavement SystemConcrete Pavement System

throughthrough Technology TransferTechnology Transfer

andand Development of Industry GuidanceDevelopment of Industry Guidance

forfor Design and EngineeringDesign and Engineering””

Page 71: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

76

PCIPCI--FHWA Cooperative Agreement FHWA Cooperative Agreement

•• NonNon--ProprietaryProprietary•• Manufactured in PCIManufactured in PCI--Certified Plants Certified Plants •• ““Precast Prestressed Concrete PavementsPrecast Prestressed Concrete Pavements””

(PPCP)(PPCP)

Page 72: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

77

What is PPCP?What is PPCP?

–– 22--way way prestressingprestressing–– Combination of Combination of pretensioningpretensioning/post/post--tensioningtensioning–– OrOr 22--way postway post--tensioningtensioning–– Bonded/grouted PBonded/grouted P--T systemT system

Page 73: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

78

Typical PPCP PanelTypical PPCP Panel

Page 74: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

79

Typical PPCP Panel LayoutTypical PPCP Panel Layout

Page 75: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

80

Typical PPCP Panel LayoutTypical PPCP Panel Layout

Page 76: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

81

Typical PPCP Panel LayoutTypical PPCP Panel Layout

Page 77: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

82

BenefitsBenefits

WHY PRESTRESSED CONCRETE?WHY PRESTRESSED CONCRETE?–– Reduces/eliminates slab cracking (maintenance)Reduces/eliminates slab cracking (maintenance)–– Reduced number of joints Reduced number of joints

(maintenance/smoothness)(maintenance/smoothness)–– Reduced Slab Thickness (8Reduced Slab Thickness (8”” vs. 12vs. 12””) )

•• Material savingsMaterial savings•• Allows for replacement of pavement inAllows for replacement of pavement in--kindkind

–– Ability to span voids/unsound support layersAbility to span voids/unsound support layers–– Proven LongProven Long--Term Performance Term Performance

•• 66”” CIP postCIP post--tensioned pavement constructed in 1985 tensioned pavement constructed in 1985 (near West, Texas)(near West, Texas)

•• Virtually no maintenance in 23 yearsVirtually no maintenance in 23 years

Page 78: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

83

Picture of Connection detailsPicture of Connection details

Page 79: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

84

Getting ready to post tension the PC pavementGetting ready to post tension the PC pavement

Page 80: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Precast Concrete PavementsPrecast Concrete Pavementspcipcipcipci

85

PCIPCI--FHWA Cooperative Agreement FHWA Cooperative Agreement

Cooperative Effort to Engage Industry and AgenciesCooperative Effort to Engage Industry and Agencies

Page 81: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Concluding and Departing Thoughts Concluding and Departing Thoughts

• Manufactured Concrete offers further enhancements opportunities when used properly in routine projects and ABC

• Higher Concrete strengths and innovative engineering is extending span ranges for concrete,

• We all as an industry should guard against New Specifications and code changes allowing unintended consequences,

• Loads, Stresses, and Environment all contribute to the total Durability of the Concrete not just the mix design

Page 82: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Dr. Galambos writes DEFINITION: RESEARCH

Dr. Galambos writes DEFINITION: RESEARCH

• THE ACTIVITY THAT CONNECTS THEORY WITH PRACTICE

• COMPUTATION METHODS

• PHYSICAL AND COMPUTATIONAL EXPERIMENTS

• ORGANIZATION OF DATA AND DESIGN ACTIVITIES

• ETC.

Page 83: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Dr. Galambos writes FEATURES OF STRUCTURAL DESIGN

CREATION OF A STRUCTURE THAT WILL

Dr. Galambos writes FEATURES OF STRUCTURAL DESIGN

CREATION OF A STRUCTURE THAT WILL

• PERFORM SATISFACTORILY DURING ITS INTENDED LIFETIME

• NOT COLLAPSE OR EXPERIENCE EXCESSIVE DAMAGE DURING ITS INTENDED LIFETIME

• BE ECONOMICAL TO DESIGN, BUILD AND MAINTAIN

• SERVICEABILITY

• SAFETY

• ECONOMY

Page 84: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Dr. Galambos write EXPECTATIONS FROM STRUCTURAL

DESIGN

Dr. Galambos write EXPECTATIONS FROM STRUCTURAL

DESIGN• GENERAL PUBLIC

• STRUCTURAL ENGINEER

• BUILDING AUTHORITY

• CODE COMMITTEE

• STRUCTURE IS UNCONDITIONALLY SAFE AND RIGID

• SAFETY, SERVICEABILITY, ECONOMY DURING INTENDED LIFETIME WHEN USED FOR PLANNED FUNCTION

• CODE REQUIREMENTS MUST BE MET

• CHANCE OF EXCEEDING A LIMIT STATE DURING

Page 85: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Dr. Galambos writes HOW TO ATTAIN SAFE

STRUCTURAL DESIGNS?

Dr. Galambos writes HOW TO ATTAIN SAFE

STRUCTURAL DESIGNS?• MINIMIZE HUMAN

ERROR

• QUALITY CONTROL

• ENSURE THAT CHANCE OF EXCEEDING LIMIT STATE IS ACCEPTABLY SMALL

• LOAD STANDARDS AND DESIGN CODES

Page 86: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

REQUIREMENTS FOR THE DESIGN OF THE INDIVIDUAL STRUCTURE

APPLICABLE LEGAL BUILDING CODES

MODEL BUILDING CODES

MATERIAL CODES, LOAD STANDARDS,DESIGN SPECIFICATIONS

Dr. Galambos writesPYRAMID OF DESIGN REQUIREMENTS

Page 87: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Concluding and Departing Thoughts Concluding and Departing Thoughts

• Structural Engineering Congress in London in 1960’s….

• “Structural Engineering is the art of assembling materials we do not fully understand, to resist loads that we cannot accurately estimate, in a fashion that the general public does not understand the extent of our ignorance”

Page 88: National Concrete Consortium San Antonio, Tx April 1, · PDF fileSuper-structure condition ... • Fluidity Test Immediately after mixing (ASTM C939) ... 312.583.6776. wnickas@pci.org

Concrete BridgesConcrete BridgesAnd other Transportation Delivery

Opportunities

THANK YOU!

And other Transportation Delivery Opportunities

THANK YOU!

William Nickas, P.E.Director, Transportation [email protected]