1 Research Study No. 137 “IMPACT EVALUATION OF REVISED NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED AREAS (NWDPRA) DURING 10 th PLAN IN RAJASTHAN” V.D.SHAH AGRO-ECONOMIC RESEARCH CENTRE SARDAR PATEL UNIVERSITY VALLABH VIDYANAGAR 388120 GUJARAT JANUARY 2010

Upload: others

Post on 16-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

1

Research Study No. 137

“IMPACT EVALUATION OF REVISED

NATIONAL WATERSHED DEVELOPMENT

PROJECT FOR RAINFED AREAS (NWDPRA)

DURING 10th

PLAN IN RAJASTHAN”

V.D.SHAH

AGRO-ECONOMIC RESEARCH CENTRE

SARDAR PATEL UNIVERSITY

VALLABH VIDYANAGAR – 388120

GUJARAT

JANUARY – 2010

Page 2: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

2

Research Study No. 137

“IMPACT EVALUATION OF REVISED

NATIONAL WATERSHED DEVELOPMENT

PROJECT FOR RAINFED AREAS (NWDPRA)

DURING 10th

PLAN IN RAJASTHAN”

V.D.SHAH

AGRO-ECONOMIC RESEARCH CENTRE

SARDAR PATEL UNIVERSITY

VALLABH VIDYANAGAR – 388120

GUJARAT

JANUARY – 2010

Page 3: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

3

Foreword

Rainfed areas constitute about two-third of the total cultivated land of the country.

The green revolution considered the cornerstone of India‟s agricultural growth, by-passed

the development of rainfed areas and remained confined primarily to the irrigated tracts. The

target of 4 % agricultural growth envisaged in the national agriculture policy (NAP) not

possible to achieve without substantially contribution of rainfed farming in the incremental

agricultural output. The NAP seeks to promote integrated development of rainfed areas

through holistic watershed approach. Watershed approach is low-cost location specific

technology. It is a vehicle for achieving the twin objectives of enhancing production and

simultaneously preserving the natural resources. For the development of rainfed areas of

the country, ministry of agriculture, GoI, launched comprehensive programme entitled

“National Watershed Development Project for Rainfed Areas (NWDPRA)” during the

seventh plan. While there are many visible gains, first generation NWDPRA found lacking

mainly on community participation. The NWDPRA has been restructured in 2001 by

retaining the technical aspects of older NWDPRA and incorporating the lessons learnt from

successful watershed projects, especially on community participation. For bringing

uniformity in approach among various agencies implementing NWDPRA/ WDPs, ministry of

agriculture (MoA) and rural development (MoRD), GoI issued jointly formulated and adopted

guidelines “WARSA-JANSHABHAGITA (WJ).” As per WJ, NWDPRA is now planned,

implemented, monitored and maintained by watershed communities. During Xth plan period

(2002-07), the revised NWDPRA was implemented in the country as per WJ in 6315

watersheds covering 23.30 lakh hectares of 28 states and 2 UTs. As Xth plan end up in

2007, it would be worthwhile to evaluate effectiveness, relevance, sustainability and various

beneficial impact and weakness of this revised NWDPRA programme. Keeping this in view,

ministry of agriculture, GoI asked agro-economic research centre, vallabh vidyanagar to

undertake this impact assessment study of revised NWDPRA in Rajasthan.

The study was conducted in 4 watersheds of Rajasthan, treated under Xth plan

NWDPRA. The selected watersheds were Kirap (Ajmer), Sakariya (Chittorgarh), Modak-

VI (Kota) and Dhar (Udaipur). From each selected watershed, 40 beneficiaries and 40 non-

beneficiaries were selected by stratified random sampling. The field-data were collected for

the agricultural year 2006-07 and pre-project year 2001-02.

In the study, impact was assessed by comparing parameters of pre-project with post-

project and beneficiary with non-beneficiary. This evaluation study shows that NWDPRA

Page 4: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

4

holds the key to the development of vast rainfed areas of the country. The revised NWDPRA

made remarkable impact in respect of improvement in water level of wells, shift in crop-

pattern, productivity of crops, gross and net farm income, assets position, fodder and bio-

mass, employment opportunity, milk productivity, drinking water availability, livelihood

support to land-less etc. The people‟s awareness and participation level at different stages

of the programme was found below expectation. For all selected watersheds, worked out

BCR, IRR and NPV clearly indicates that investment on NWDPRA is economically very

attractive and viable. The study result suggests that NWDPRA deserve to be replicate on a

larger scale for positive transformation of rainfed agriculture economy of the country.

Shri V.D. Shah, Research Officer in the centre, put in lots of efforts and hard work

for preparing this enrich and excellent evaluation report. Special thanks are due to

Dr. Mahesh Pathak, Hon. Advisor of the centre, for providing overall guidance, help and

encouragement at all stages of this study. Prof. Kazi M.B. Rahim, Hon. Director, AERC,

Visva-Bharti, Shantiniketan (W.Bengal) have developed the initial framework and provided

guidance at different stages of the study. The author has also benefited from the interaction

with various personnel of The Directorate of Watershed Development and Soil

Conservation (WDSC), Govt. of Rajasthan. Sample farmers showed enthusiasm and

provided related data to field survey team, Shri. V.D.Shah toured extensively for the

collection of secondary and primary data. Shri H.M.Verma supervised the field work

efficiently. Shri H.M. Verma, Shri R.N.Padhiar, Shri C.P.Patel, Shri S.B.Darji and Shri

Hitesh Makwana carried out field work very accurately and efficiently. Shri Hitesh

Makwana carefully carried out the data entry work, computerized data processing/

tabulation work with utmost accuracy. Dr. (Mrs.) R.A.Dutta, Shri J.J.Bhatt and Shri

J.B.Kahar also helped in project. Shri Hitesh Makwana and Shri Pinal Patel competently

handled the computerization entry of the draft of this study report.

The major findings and recommendations contained in this study deserve to be

carefully and closely examined by all concern for framing an appropriate frame work and

policy directions for watershed projects. It is hoped that this study will be found useful for

academicians, researchers, farmers and policy makers.

Vallabh Vidyanagar. Dr.H.P.Trivedi

January, 27, 2010.

Hon. Director

Page 5: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

5

ACKNOWLEDMENTS WITH THANKS FOR KIND HELP & CO-OPERATION

As a project leader, I would like to place on record my appreciation and sincere

thanks to below listed persons/ organizations for providing their heartiest support and

valuable time for this study.

(i) The secretary, Ministry of Rural Development & Panchayati Raj (MoRD &PR),

Govt. of Rajasthan (GoR). Jaipur-302005.

(ii) Shri Kunjilal Meena (Director), Watershed Development and Soil Conservation

Department (GoR), Pant Krishi Bhavan, Jaipur-302005.

(iii) Smt. Manju Rajpal (Director), Watershed Development & Soil Conservation

Department (GoR), Pant Krishi Bhavan, Jaipur-302005.

(iv) Shri Anand Singh Gehlot (Ex.En, LR), Watershed Development & Soil

Conservation Department (GoR), Pant Krishi Bhavan, Jaipur-302005.

(v) Mahendra Thapial (Asst. Ex.En, LR), Watershed Development & Soil

Conservation Department (GoR), Pant Krishi Bhavan, Jaipur-302005.

(vi) Shri G.D.Varindani (Ex.En,LR) and office staffs, Ajmer Zilla Parishad, Ajmer

(vii) Shri Manoj Varma (Ex.En, LR) and office staffs, Chittorgarh Zilla Parishad,

Chittorgarh.

(viii) Shri Dinesh Vyas (Ex.En, LR), Shri Mohanlal Gatora (Asst.Ex.En) and office

staffs, Udaipur Zilla Parishad, Udaipur.

(ix) Shri D.K.Jain (Ex.En, LR) and office staffs, Kota Zilla Parishad, Kota.

(x) Block level watershed development officers (BDO) of selected watersheds.

(xi) Sarpanch Shree, WDT, WC and WA of Kirap (Ajmer), Sakariya (Chittorgarh),

Modak-VI (Kota) and Dhar (Udaipur) watersheds.

(xii) Sample farmers and all others who directly or indirectly provided kind help and

support at different stages of this study.

(xiii) Staff of Agro-Economic Research Centre and Cost of Cultivation Scheme,

Vallabh Vidyanagar for extending help as and when needed.

Vallabh Vidyanagar Vasant. D.Shah (Project Leader)

Page 6: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

6

CONTENTS

Page

FOREWORD………………………………………. I - II

ACKNOWLEDMENT……………………………… III

LIST OF TABLE…………………………………… V-VIII

CHAPTER - 1 INTRODUCTION………………………………….. 1-16

CHAPTER - 2 BRIEF REVIEW OF AGRICULTURE

AND NWDPRA IN THE STATE………………….. 17-29

CHAPTER - 3 BRIEF PROFILE AND REVIEW OF PROJECT

WORK IN SELECTED WATERSHEDS………… 30-61

CHAPTER - 4 FARM LEVEL AGRO-ECONOMIC

IMPACT OF NWDPRA……………………………. 62-126

CHAPTER - 5 ECONOMIC APPRAISAL………………………… 127-133

CHAPTER - 6 SUMMARY & CONCLUSIONS………………….. 134-149

ANNEXURE -I to VII……………………………. 150-157

BIBLIOGRAPHY…………………………………… 158-160

ANNEXURE- A & B. 161

Page 7: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

7

LIST OF TABLES

Table No.

Title Page

1.1 Degraded Lands Developed under Various Watershed Development

Programmes since Inception upto the Tenth Five Year Plan.

8

1.2 Number of Watersheds under Different Programme in Rajasthan 8

1.3 Detail of Selected Sample Watersheds and Sample Households 14

2.1 The Characteristics of Agro climatic Zones of Rajasthan. 17

2.2 Details of Land Use Pattern, Climate, Rainfall, Irrigation, and Agriculture in

Rajasthan State

19

2.3 District -wise number of watersheds Effective areas and blocks - covered

under NWDPRA (Tenth plan) in Rajasthan.

23

2.4 Year- wise Financial and Physical Fact Sheet of NWDPRA for Xth FYP. 25

2.5 Activity wise Physical & Financial achievements under NWDPRA

Programme Xth Plan (2002-07)in Rajasthan.

27

3.1 General Information of Selected watersheds 31

3.2 Information regarding village population under selected watersheds-2001-02. 33

3.3 Education Level of Villagers of Selected Watersheds-2001-02. 34

3.4 Irrigation sources and source-wise irrigation in selected watersheds (Pre

project & Post project)

37

3.5 Category-wise operational holdings and change in irrigation in villages

under selected watersheds.

38

3.6 Live stock position in the villages under selected watersheds 40

3.7 Information regarding Self Help Groups (SHGs) and Users Groups (UGs)

of the Villages under Selected Watersheds.

44

3.8 Physical and financial target and achievement under NWDPRA

programme-Kirap Watershed

47

3.9 Physical and financial target and achievement under NWDPRA

programme-Sakariya Watershed.

49

3.10 Physical and financial target and achievement under NWDPRA

programme- Modak-VI Watershed.

52

3.11 Physical and financial target and achievement under NWDPRA

programme- Dhar Watershed.

56

Page 8: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

8

4.1 Information Regarding Cast-wise Family Size of Sample Households in

Selected Watersheds

64

4.2 Information regarding working population in sample households 65

4.3 Education Level of Family Member of Beneficiary Households 66

4.4 Occupational Pattern of economical active members of Sample

Households

67

4.5 Category-wise average size of land holding of sample households - 2006-07 68

4.6 Land Holding Pattern of Sample Households in selected watersheds 70

4.7.1 Crop pattern of sample households in Kirap watershed-2001-02 and 2006-

07

72

4.7.2 Crop pattern of sample households in Sakariya watershed-2001-02 and

2006-07

73

4.7.3 Crop pattern of sample households in Modak-VI watershed-2001-02

and2006-07

75

4.7.4 Crop pattern of sample households in Dhar watershed-2001-02 and 2006-07 76

4.8.1 Changes in Crop-pattern over 2001-02-Beneficiary HHs. 78

4.8.2 Changes in Crop-pattern over 2001-02- Non-beneficiary HHs. 79

4.9 Cropping Intensity of Sample Households in Selected watersheds 80

4.10.1 Crop-wise changes in cost of cultivation in Kirap watershed 82

4.10.2 Crop-wise changes in cost of cultivation in Sakariya watershed 82

4.10.3 Crop-wise changes in cost of cultivation in Modak-VI watershed 83

4.10.4 Crop-wise changes in cost of cultivation in Dhar watershed 84

4.11.1 Input-wise cost per Hect.(Rs.) of cropped area.-Kirap 85

4.11.2 Input-wise cost per Hect.(Rs.) of cropped area.-Sakariya. 86

4.11.3 Input-wise cost per Hect.(Rs.) of cropped area.-Modak-VI 87

4.11.4 Input-wise cost per Hect.(Rs.) of cropped area.-Dhar 88

4.12 Yield of Main Crops in Selected Watersheds. 90

4.13 Crop wise per Hect. Production of By-product of Major crops. 92

4.14 Average Farm Harvest Price (Rs. /Qtl.) of Main Product of the Major Crops-

2001-02 and 2006-07.

93

4.15 The value of Gross Produce (MP+BP) Per Hectare. 94

4.16 Net Farm Income per Hectare and Output-Input Value Ratios for Selected

Watersheds.

96

Page 9: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

9

4.17 Disposal of Main product of Major Crops in Selected Watersheds 99

4.18 Average Increase in Water level of Beneficiary Wells over Non-beneficiary -

2006-07. (Increase in feet)

100

4.19 Activities undertaken under NWDPRA on own land (Only Beneficiary) 101

4.20 Planting of Horticulture, trees and Grass/ Shrubs under NWDPRA 102

4.21.1 Adoption of Improved Farming Practices by Sample Households in Kirap

Watershed

104

4.21.2 Adoption of Improved Farming Practices by Sample Households in Sakariya watershed

104

4.21.3 Adoption of Improved Farming Practices by Sample Households in Modak-

VI Watershed

105

4.21.4 Adoption of Improved Farming Practices by Sample Households in Dhar

Watershed

105

4.22 Changes in Live stock position 106

4.23 Changes in 2006-07 over 2001-02 in per HHs./year days. 108

4.24 Impact of NWDPRA on milk productivity & milk consumption 108

4.25 Change in on farm employment days for Sample HHs. In 2006-07 110

4.26 Details of Out-Migration of Sample Households 111

4.27 Changes in Assets in 2006-07over 2001-02 112

4.28 Source wise Net Annual Income in 2006-07 and Change over 2001-02. 114

4.29 Per Household Item-wise Annual Expenditure in 2006-07 and Change over

2001-02

116

4.30 Perception of Sample Beneficiaries on activities on Arable Land 117

4.31 Effectiveness of Bunding activities 118

4.32 Beneficiaries Perception on Non-Arable Land, Drainage Line, FPS and

LLS Activities

120

4.33 Awareness & participation of beneficiaries in respect of planning and

implementation of NWDPRA

122

4.34 Beneficiaries perception on Impact of watershed treatments on quality of life 125

4.35 Views of Non-beneficiaries on NWDPRA 126

5.1 BCR, IRR and NPV of selected watersheds 128

5.2 Performance Indicators of the selected watersheds 130

5.3 Pre and Post project scenario of the selected watersheds

(For Sample Beneficiary HHs.)

131

Page 10: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

10

Chapter:-1

Inrtoduction

1.1 Back Ground: In India, of the total 142 million hectare arable land, rainfed areas constitute about 63

percent. It is estimated that irrigated areas which accounts for nearly 37 percent of total

arable land contributes about 55 percent of total foodgrains production, whereas 63 percent

of rainfed areas accounts for only 45 percent of the foodgrains output. Even if we continue

to develop irrigation potential with the current rate of 0.8 million Hect. per annum, another 20

million additional hectares of cultivated area will be brought under irrigation in the next 25

years or so. This will still leave (69 mill.Hect.) nearly half cultivated areas of the country

under rainfed /dryland conditions.

Untill eighty, the green revolution that our country witnessed was confined primarily to

the irrigated tracts only and it by-passed the development of rainfed /dryland areas.

Furthermore, during green-revolution era, the policy thrust for irrigated areas ensured

foodgrain self-sufficiency in the shortest time period but in the process, it overlooked the

development needs of the vast areas of rainfed farming.Rainfed areas having majority of our

rural poor and marginal farmers have suffered in the past not receiving differentiated

technological, institutional, infrastructural and investment support. These areas are

characterised by high incidence of poverty, low health and education status, high distress in

farming, low employment and vulnerability to high risks.

The basic problem of rainfed areas is one of a vicious cycle that start with degradation

of natural resources like soil-water through poor management leading to low productivity,

low income and low investment. This in turn leads to over exploitation of the existing natural

resource base. With the policy of large investment in irrigated agriculture, the objective of

raising food production has been achieved but at the same time, neglect of rainfed areas

has created and aggravated unintended agricultural, socio-economic and ecological

imbalances between irrigated and rainfed areas. In early 80‟s, government realized these

disparities and adopted participatory watershed development approach to improve rural

livelihoods and reinforce farming system to increase productivity in a sustainable manner of

rainfed areas.

Till 1980, despite various rural and agricultural development programmes implemented

by Govt. of India, agricultural sector remained at the mercy of erratic and uneven rainfall

causing not only significant variation in agricultural production and income. For feeding the

Page 11: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

11

fast rising population, it is necessary to enhance aggregate productivity of agricultural sector

on a sustainable basis. In this contex, the role of the rainfed areas in productivity/production

enhancement and improving livelihood is inevitably important.

Rainfed farming is complex, diverse and risk prone and it is characterized by low

productivity, low capital investment and low input usage. The high variability of rainfall is

causing instability of crop yield, production and income. The challenge before Indian

agriculture is to adopt suitable measures to ensure sustainable growth in the productivity of

rainfed farming with increased employment and income. It has been realised that the rainfed

areas suffer from wind and water erosion, inadequate water availability and degradation of

the eco-system. Therefore, for improving productivity and eco-system of rainfed areas, the

efforts to conserve as much rain water in situ as possible and harvesting and storage of

excess run-off water assume vital importance. The best way to achieve these is adoption of

low cost integrated watershed approach. Therefore, at present, the national and all state

governments are assigning very high priority in planning to the holistic and sustainable

development of rainfed areas through adoption of watershed development approach.

Watershed development refers to the conservation, regeneration and the judicious use

of all the natural resources like land, water, plants, animal and human resource within a

watershed area. It tries to bring about the best possible balance in the environment between

natural resources on one side and man and grazing animals on the other.

“Technically watershed is a geo-hydrological unit or a piece of land that drains at a

common point”. In other words, “a watershed is an area with a common drainage point,

implying that rainwater falling within watershed flows through one or more natural courses

and converges at a common point”. Thus watershed unit spatially comprises of three

features, namely, arable land, non-arable land including pasture, forest and wastelands and

network of natural drainage lines. These three sub-sectors of watershed are treated as one

organic geo-hydrological entity in project planning for scientific utilisation of land and water.

Watershed may be of any size and shape and comprise of one or several villages. The

watershed development broadly involves the following components/sectors:

i) Human resource development (Community development)

ii) Soil and land management (Conservation and use)

iii) Water management (Conservation and use)

iv) Afforestation and agro-forestry

v) Pasture and fodder development

vi) Agriculture development

Page 12: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

12

vii) Livestock management

The Investment requirement for creation of irrigation for one hectare land through

major irrigation projects is estimated in the range of Rs. 25000-100000 whereas watershed

approach requires a substantially lower investment of Rs. 4000-8000. Thus, all round

development of rainfed agriculture can be achieved through adoption of low cost but most

effective watershed approach.

A number of projects for productivity enhancement, development of degraded

lands and improving the livelihood of the people of rainfed areas are being implemented

based on the watershed approach by different ministries/ departments of central

government, state government, NGOs, externally aided projects and privately by local

communities. Among these projects, the largest project in terms of scope and extent is “The

National Watershed Development Project for Rainfed Areas” (NWDPRA), being

implemented by the Ministry of Agriculture, Govt. of India during the Seventh Plan from July

1986. On the basis of lessons learnt and experience gained, NWDPRA was refined and

restructured in 1990-91 and it was implemented during eight and ninth five year plan. Again,

it was redesigned in the year 2001and revised guidelines were published in the name of

“WARASA-JAN SAHBHAGITA”. During tenth plan period (2002-2007), the NWDPRA was

implemented as per guideline WARSA-JAN SAHBHAGITA.

1.2:-Overview of Watershed Development Programme (WDP) and NWDPRA in

India:

Historically, watershed development programmes (WDP) have their origin in different

soil-water conservation (SWC) measures during drought years. As a result, WDPs in their

early phase became more of a conservation oriented rather than productivity focused

investment. Drought-prone Area Development programme (DPAP) was taken up in the year

1973-74 for the development of rainfed areas in fifty four districts spread over 13 states. The

DPAP was designed to combat adverse effects of drought on crop production, productivity,

livestock, water and human resources. The primary objective of the DPAP was promotion of

overall economic development through boosting up adoption of technology and creating

additional employment. Intensive area development programme (IADP) was also launched

by the GOI. The higher emphasis of these programmes on civil works, employment

generation and drought relief approach did not allow them to gain foot hold in the rural areas

as a rainfed farming development intervention. A committee appointed by the planning

commission, GOI and headed by Prof.C.H.Hanumantha Rao reviewed the DPAP

programme and strongly suggested programme with an approach based on watershed area

Page 13: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

13

development. The GOI also introduced other programmes for development of dry land areas

such as “Integrated Dry Land Agriculture Programme” (IDAP) “Command Area Development

programme” (CADP) etc. These programmes laid high emphasis on employment generation

and very less on productivity enhancement, drought proofing and promoting the natural

resources in a manner that ensures sustainable growth in production, employment, income

and rural economy.

“The Desert Development Project” (DDP) was also introduced in 1977-78 with the

primary objective of restoring ecological balance and arrest the formation of deserts through

shelter belt plantation and conservation of soil and water. The GOI, with technical back up of

“Central Research Institute for Dry land Agriculture” (CRIDA) launched 47 model watershed

projects in 1982. The Integrated Wastelands Development Project (IWDP) was launched in

1989-90 with the main objective of development of govt. wasteland and common property

resources. The IWDP aimed at an integrated development of wastelands based on

village/micro watershed plan for improving the economic conditions of the resource poor

rural population.

“The Technology Development Extension and Training” (TDET) scheme was

launched in 1993-94 for promotion of technologies for development of wastelands. “The

Watershed Development Programme in Shifting Cultivation Areas” (WDPSCA) was

launched in 1994-95 for North-East states. This programmes sought to control shifting

cultivation and control degradation of land due to JHUM cultivation. From the above

mentioned programmes, majority programmes were implemented and guided by “Ministry of

Rural Development” (MORD).In addition to those above centrally sponsored schemes;

several state governments including Rajasthan are implementing various schemes for soil

and moisture conservation on watershed basis. An important milestone for the policy of

development of rainfed farming emerged in the Sixth Five Year Plan. First the time, in the

sixth plan, GOI decided to undertake integrated and comprehensive development of rainfed

areas based on treatment for soil and moisture conservation, checking erosion of arable

land and encourage natural vegetative cover of non-arable land through watershed

development approach. For that, water harvesting structures and development of small

watersheds (50 to 100 hectares) were suggested as a strategy. On the basis of experience

gained from adoption of watershed approach, GOI launched a centrally sponsored scheme

of “National Watershed Development Project for Rainfed Area” (NWDPRA) in Seventh Five

Fear Plan in July 1986. It covered 99 districts spread over 16 states of the country. This

NWDPRA has been restructured in 1990-91.It focused mainly on development of natural

Page 14: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

14

resources to enhance sustainable productivity, restoration of ecological balance, improve

people‟s participation, management of common property resources and augmenting

household income through household production systems and overall economy of the

people of rainfed areas. This NWDPRA was implemented during VIII plan (1990-97) in 2561

blocks covering 25 states and 2 Union Territories (UTs) of the country where less than 30

percent of cultivated area is under assured means of irrigation. Again NWDPRA has been

restructured during IX plan and it ensured greater decentralization, higher flexibility in choice

of technology and higher community participation. During IX plan, it was implemented in 28

states and 2 union Territories (UTs.) and total area of 2.25 million hectares was treated by

spending about Rs.1030 Crores.

1.3:-Review of Literature:

A number of researchers and various institutions conducted impact assessment

studies of NWDPRA implemented during eighth and ninth plan period. Despande and

Rajasekaran (1995), V.D.Shah and Patel (1998), Shah Amita (1998,2001), Sharma R.K

(1996),Despande and Narayanmoorty (1999),Chopra Kanchan (1998), Ministry of Rural

Development, GOI, ICAR etc. attempted to analyse impact of Watershed Development

Programmes for rainfed farming. All these studies established that NWDPRA interventions

have led to positive changes in crop-pattern, water-recharging in wells and water bodies,

area under irrigation, cropping intensity, improved crop-productivity, reduced soil-erosion

and surfacerunoff, generated positive incremental income and employment from farm-

enterprises, dairy enterprises etc. Majority of studies found it economically viable and

financially feasible. It also improved availability of drinking water, fodder and reduced

intensity of human and cattle migration. These studies also noted that owing to several

constraints, achievements have not been at desired level. In many watersheds poor rate of

people‟s involvement at planning, implementation and post-project management and

unwillingness of local communities to maintain the completed structures and plantation on

common property resources, political rivalry in the village etc. were found as important

constraints. The top-down approach of programme failed to create motivation among local

communities and poor co-ordination among different line departments was also found

responsible for sub-optimal achievement. In several studies, it was observed that lack of

enough flexibility to WDT to alter designed programme/ components to suit the local needs,

lack of monitoring by external agencies, non-allowance of transfer of surplus fund allocated

for one component to other component, poor quality of structures/ assets created under

project etc. also impaired the impact level of NWDPRA. The Energy and Resources

Page 15: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

15

Institute, New Delhi carried out mid term evaluation of 10th plan NWDPRA in 4 districts of

Gujarat and 7 districts of Rajasthan. By and large these studies indicated that NWDPRA has

quite positive impact on crop productivity, cropping intensity and economic returns. The cost

benefit analysis revealed positive impacts of programme with high benefit cost ratio, NPV

and IRR. These studies indicated that lower cost norms of NWDPRA are one of the major

constraints. In these studies more efforts are suggested for extending benefits to landless

and improving animal husbandary sector. It also suggested to define the role of village

panchayats in order to sustain the initiatives in post project period.

1.4:-NWDPRA of X five year plan (10th FYP):

Prof. C. Hanumantha Rao committee was appointed in 1993 to appraise the impact of

the work done under NWDPRA, DPAP and DDP projects. The committee reported various

shortcomings in the ongoing NWDPRA project. The committee observed that the

programmes have been implemented in a fragmented manner by different departments

through rigid guidelines without well-designed plans prepared on watershed basis by

involving inhabitants. Except in few places, in most of the areas achievements were far

below the expectation. Ecological degradation has been found proceeding unabated with

reduced forest cover. Keeping in view the above mentioned shortcomings of NWDPRA and

to make this programme more participatery, sustainable and equitable, Prof.Hanumanth

Rao committee prepared new guidelines of X plan NWDPRA in 2001, and named it as

“WARASA (Watershed Areas Rainfed Agricultural System Approach) JAN SAHBHAGITA”

This new guideline of NWDPRA retained all technical strengths of the older NWDPRA and

incorporated lessons learnt from the successful watershed and community participation

projects. For bringing uniformity in approach among various agencies implementing

watershed based programme/ NWDPRA, Ministry of Agriculture (MOA) and Ministry of Rural

Development (MORD) adopted jointly formulated guidelines “WARASA JAN SAHBHAGITA

(WJ)”. As per new guidelines, the Watershed Development Programme is now planned,

implemented, monitored and maintained by watershed communities themselves. In

guidelines, there has been a radical shift of “Top down management approach” to “Bottom-

up management approach” in organising the watershed programme. This Xth plan

NWDPRA aims to bring about desired dynamism in rainfed areas, enhancing productivity on

a sustainable basis, through enduring people‟s movement for watershed development. It

also aims to create alternate employment and income generation options for rural

community including landless and thereby reduce inequality between irrigated and rainfed

areas. The sequence of activities and their operational modalities would vary according to

Page 16: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

16

local situation. Hence, the new guideline is flexible so that desired modification could be

effected at different levels. The other important elements of new guidelines are democratic

decentralisation in decision making, transparency in approach to empower the community,

building upon indigenous innovations, convergence of activities/schemes of government and

NGO and shifting from subsidy oriented development to self reliant development etc.The

broad objectives of X Plan NWDPRA were as follows:

1:- Conservation, development utilisation and sustainable management of natural

resources like land, water, plant, animal and human resources.

2:- Enhancement of agricultural productivity and production in a sustainable

manner.

3:- Restoration of ecological balance in the degraded and fragile rainfed eco

systems by greening these areas through appropriate mix of trees, shrubs

and grasses.

4:- Reduction in regional disparity between irrigated and rainfed areas.

5:- In addition to food, fodder and fuel to create sustained employment

opportunities for the rural community including the landless and enhancement

of activities for livelihood support, particularly for under privileged sections.

During Xth five year plan, the revised NWDPRA was implemented in the country in

6315 watersheds covering area of 23.30 lakh hectares by spending about Rs. 1148 crores

(See table 1.1). Upto the end of Xth five year plan, total area of 93.09 lakh hacters have

been developed under NWDPRA by spending of Rs. 3025.56 crores.In India, upto the end

of Tenth plan, under various watershed development programmes of MOA, MORD and

MOEF, total area of 508.99 lakh hecters have been developed by spending Rs. 19251. 22

Crores. (See table 1.1).

In Rajasthan state, centrally sponsored NWDPRA programme is in operation since

1986-87 and at the end of the Xth five year plan (2006-07) it covered 31 districts (out of 32)

of the state. During the tenth plan under NWDPRA, programme total 1138 watersheds

(including 320 pilots) covering 201 blocks spread over 31 districts were taken up for

development by spending about Rs. 202 crores.The Ministry of Rural Development and

Panchayati Raj,Govt.of Rajasthan is a state level implementing/ nodal agency. In 2007, total

8642 watershed projects under different programmes including NWDPRA were under

implementation (See table 1.2).

Page 17: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

17

Table 1.1

Degraded Lands Developed in India under Various Watershed Development Programmes since Inception upto the

Tenth Five Year Plan.

(Area in Lakh Hectares and Expenditure in Rs Crore)

Sr. No.

Ministry/ Scheme and year of Start

Progress since Inception up to Ninth Plan

………………………

Progress in Tenth Plan* (2002-07)

……………………….

Total since Inception up to Tenth Plan*

……………………….

Area Expr. Area Expr. Area Expr.

(A) Ministry of Agriculture (Department of Agriculture and Co-operation)

NWDPRA (1990-91)

69.79 1877.74 23.30 1147.82 93.09 3025.56

RVP and FPR (1962 and 1981)

54.88 1516.26 9.98 727.98 64.86 2244.24

WDPSCA (1974-75)

2.58 166.27 1.35 129.31 3.93 295.58

RAS (1985-86)

5.81 76.39 1.30 45.35 7.11 121.74

WDF (1999-2000)

0.00 0.00 0.59 26.02 0.59 26.02

EAPs

13.35 2039.81 4.80 1927.54 18.15 3967.35

Sub Total 146.41 5676.47 41.32 4004.02 187.73 9680.49

(B) Ministry of Rural Development (Department of Land Resources)

DPAP (1973-74)

68.95 3284.74 68.32 1557.76 137.27 4842.50

DDP (1977-78)

33.56 797.38 45.17 1152.50 78.73 1949.88

IWDP (1988-89)

37.34 616.51 62.22 1821.64 99.56 2438.15

EAPs

1.40 18.39 3.60 274.28 5.00 292.67

Sub Total 141.25 4717.02 179.31 4806.18 320.56 9523.20

(C) Ministry of Environment and Forests

NAEP (1989-90) 0.70 47.53 0.00 0.00 0.70 47.53

Total (A+B+C ) 288.36 10441.02 220.63 8810.20 508.99 19251.22

Note: *Includes tentative achievement of 2006-07

Source: Report of the Working Group on Natural Resources Management for the Eleventh Five Year Plan (2007-12), Planning

Commission, Government of India (February,2007).

Table 1.2

Number of Watersheds under Different Programme in Rajasthan.

Sr. No.

Programme No. of Watersheds

1 CDP (Controlling Desert

Extension)

3352

2 DDP 3385

3 DPAP 925

4 IWDP 82

5 NWDPRA 818*

6 Bilaspur 53

7 TAD 27

8 TOTAL 8642

*Excluding 320 pilot watersheds of DDP and DPAP.

Page 18: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

18

1.5:-Criteria for selection of watershed and Cost Norms under X plan NWDPRA:

The selection of blocks, micro watershed and cost norms under X plan NWDPRA

have been governed by following criteria:

1.5.1) Selection of blocks:

All the community development blocks having less than 30 percent of their cultivated

land under assured means of irrigation are qualified for selection for the project.

1.5.2) Selection of micro- watershed:

A macro watershed with the help of topography maps will be divided into sub-

watersheds and micro watersheds. Each micro watershed will have an area of about 500

ha. This micro watershed will be a unit for the watershed association.

1.5.3) Unit Cost:

The maximum permissible unit cost in the project was Rs. 4500 per Ha. for area with

less than 8 % slope and Rs. 6000 per Ha. for area having slop higher than 8 %.

1.5.4) Allocation of funds to major components:

A broad allocation of funds for major components of the project is given below:-

1.5.5) Utilisation Pattern of Fund:

i) Management fund:- Out of 10.0 percent allocation for administration fund, 4.0 percent

may be used for direct release to watershed committee (WC), 5.0 percent to PIA and 1.0

percent may be retained at the district / state level nodal agency. The proposed amount for

WC may be used towards honorarium for watershed secretary and volunteers, rent for

watershed office etc. The administration fund for PIA may be used towards salary of 4 WDT

Sr. No.

Components Allocation of funds

(%)

A MANAGEMENT:

i) Administrative cost

ii) Community organisation

iii) Training programme

SUB-TOTAL

10.0

7.5

5.0

22.5

B DEVELOPMENT:

i) Natural Resource Management

ii) Farm production system for land

holding families

iii) Livelihood support system

for land- less families

SUB-TOTAL

50.0

20.0

7.5

77.5

C Total 100.0

Page 19: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

19

members, T.A/D.A. of WDT, transport and other contingency items. Of the 7.5 percent for

community organisation, maximum 3.0 percent may be given to WC towards honorarium to

village based community organizers and remaining 2.5 percent may be used by district head

quarter for publicity of the programme, guidelines, provision for corpus fund etc. Of the 5.0

percent for training programme, 2.0 percent will be given to PIA towards exposure visits and

training to WA, WC, SHG and UGs; 2.0 percent to district nodal agency for training for PIA,

WDT etc; and the remaining 1.0 percent will be retained at state head quarter for supporting

national and state level training organisations for orientation and training to senior officers,

organisation of workshop, infrastructure build up etc.

(ii) Development fund: - The 50 percent fund for natural resource development is to be

utilized for conservation and development of land and water. For conservation and

development of these resources a minimum contribution of 10 percent for individual oriented

activities and 5 percent for community oriented activities would be collected from the users

or user group. The contribution from SC/ST may be minimum of 5 percent. The 20 percent

fund for farm production system (for land owning families) is to be used for three sub-

components, namely, testing and demonstration of new technologies, diversification of

production system (Planting of horticulture & agro forestry crops, household production

system) and adoption of proven technologies (in agriculture and allied sectors). The funds

for planting of horticulture, agro-forestry crops may be used as 50 percent grant from the

project and 50 percent contribution from the participants. The funds for adoption of proven

technology is to be used as a revolving fund to be provided through mature user groups

against a specific micro plan. The 7.5 percent fund for livelihood support system (for

landless and marginal farm households) is to be used for improving the income, nutrition

and food supplement from existing livelihoods as well as for adoption of new micro-

enterprises. This amount will be used as a matching share to the revolving fund through

SHG against a specific micro plan.

1.5.6)Type of committees/Groups to be organized under NWDPRA:

For planning, implementation and effective monitoring of the project and to have

active involvement of watershed community at all the stages of the project there is a

provision to organize following committees/Groups.

(i) State Level Watershed Committee (SWC):- This committee may be chaired by chief

secretary/ principal secretary of concerned department and may have members from the

concerned line departments of the state government. The committee may meet once in six

months to review progress, resolve management issue and provide policy directives.

Page 20: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

20

(ii) District Nodal Agency/committee (DNA):- As per guidelines of NWDPRA, district nodal

committee will be constituted under the Chairmanship of District Head of Nodal Department.

It will consist 4 members from major line departments in the district, 1 from NGO, 1 from

DRDA, 1 from KVK/research organization and 1 from PWD/irrigation department. This

committee is a sub-committee of District Watershed Committee (DWC). DNA is supposed to

carry out overall management and supervision of the programme, selection of new

watersheds, preparation of strategic plan of watersheds, arrangement of training for WDT,

WC, and WA, approval of standard schedule of rates (SSR), release of funds to PIA and

WC, monitoring and evaluation of programme, preparatory work for those decisions which

are required to be taken by DWC etc. This committee will meet atleast once in a month.

(iii) District Watershed Committee (DWC):- The district collector or chairman of zilla

parishad will be the chairman of this committee. Its members would be drawn from

concerned district line departments, KVK, NGO, peoples organizations, research

organizations, chairman of selected watershed association etc.The committee is supposed

to review the progress of watershed project, resolve management and administrative

problems, guide in implementation, identify policy issues etc. The head of DNA will act as

convenor of DWC meeting. The DWC will meet on a quarterly basis.

(iv) Project Implementing Agency (PIA):- The DWC is the authority to decide on the

selection of PIA for talking up the watershed development project. The PIA may have line

departments of the state government, semi-government organisations or NGOs.

(v) Watershed Development Team (WDT):- From the administrative funds, PIA will appoint

4 persons on a contractual/temporary basis to work on a full time basis as Watershed

Development Team (WDT).Atleast one WDT member should be a woman. The other three

members should be graduates in subject disciplines of relevance to the watershed e.g. civil/

agricultural engineering, agriculture forestry, animal science etc. The headquarter of WDT

will be kept at one of the watershed villages.

(vi) Watershed Association (WA):- It is a general body comprising all members of the

watershed community who agree to participate in the watershed development project. It

would be registered under societies registration act. The WA will carry out review of

progress during implementation phase and approve strategic and annual action plan.

(vii) Watershed Committee (WC):- The watershed committee is an executive body of the

WA and it will carry out the day to day activities of the watershed development project under

overall supervision and control of WA. The WC includes 4 nominated members from SHGs,

5 from User Groups, 1 from Gram Panchayat and 1 form WDT. While forming WC, it will be

Page 21: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

21

ensured that WC has atleast two women members and the SC/ST is adequately

represented. The president of WA will also be chairperson of the WC.

(viii) User Groups (UGs):- User Groups include those members who are land owners

within the identified watershed area. These members are motivated to get organized into

small homogenous groups known as UG.The UG may be organized on ground of credit and

thrift activity or as per their social affinity and compatibility.

(ix) Self Help Groups (SHGs):- Self Help Groups include those who are landless or

marginal size land holders. Such members are motivated to get organised into small

homogenous groups based upon their livelihood, compatibility, social affinity etc.Credit and

thrift activity is used to organise them into groups. Preference may be given to groups with

women members.SHG are organised with the help of village level community organisers.

(x) Pattern of Project Financial: - During Xth FYP, NWDPRA was implemented with 90%

central share (72%grant in aid & 18% loan) and 10% state matching share.

1.6:-Need of the study:

As stated earlier, NWDPRA was restructured considerably in 2001 and since 2002-03; it is

in operation in 6315 watersheds covering 28 states and 2 UTs. As tenth plan is over by the end

of year 2006-07, it became imperative to conduct impact assessment study of the project to to

look in depth at the effectiveness, relevance and sustainability of different project activities,

nature and extent of agro-economic benefits of the project at farm level, overall changes in

socio-economic and institutional parameters, participation level of watershed community at

different stages of the project, overall reaction/opinion of the watershed community on the

project, post project management etc. In order to effect further improvement in the project

guidelines, identification of constraints affecting the outcomes of the project is essential. The

best way to do so is to undertake comprehensive, systematic impact assessment study of

completed X plan NWDPRA using farm level data. Keeping this in view, Ministry of Agriculture,

Government of India, asked Agro-Economic Research Center, Vallabh-Vidyanagar to undertake

a study on “Impact evaluation of revised national watershed development project for

rainfed areas (10th plan) in Rajasthan” with the objectives specified below. This common

study is to be conducted in the states of West Bengal, Bihar, Rajasthan, Maharashtra and

Madhya Pradesh and coordinated by A.E.R.C, Visva-Bharti.

1.7:-Objectives:

The specific objectives of the study are as follows:-

1:- To evaluate the overall changes in agro-economic, socio-economic parameters

due to interventions of the programme.

Page 22: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

22

2:- To assess the qualitative performance of the NWDPRA programme.

3:- To locate the problems/ constraints faced at different stages of the programme

and to suggest remedial strategies to eliminate it.

4:- To cross-examine the information on programme implementation provided by the

nodal agency.

5:- To have suitable policy implications, if need be.

1.8:- Sampling Design:

1.8.1) Selection of sample watersheds:

In Rajasthan, 1138 micro watersheds covering 201 blocks were taken up for

development under Xth plan NWDPRA programme. In order to fulfill the objectives of the study,

it was decided to select 4 sample watersheds covering four different agro-climatic zones. In the

first stage, four districts, namely, Ajmer, Chittorgarh, Kota and Udaipur were selected in

consultation with the state nodal agency. In the second stage, one watershed taken up under X

plan NWDPRA was selected from each selected district in consultation with the senior officials

of the district/ state level implementing agency. All the villages falling under the selected

watersheds were selected for the study. For selection of non- beneficiary households, the

nearby non- watershed village was selected for each selected watershed. The list of selected

districts, blocks and villages is given in Table 1.3.

1.8.2) Selection of sample households:

The farmers having operational area in the catchment areas of the selected watershed

and recipient of incentives/ treatment under NWDPRA programme are treated as beneficiaries.

The landless households who were recipients of any benefits or member of SHGs/UGs formed

under NWDPRA are also treated as beneficiaries. The farmers having operational area outside

the catchment areas of watershed and non-recipient of benefits under NWDPRA/other

watershed programmes are treated as non-beneficiaries.

For each sample watershed, 40 beneficiary and 40 non-beneficiary households were

selected by following stratified sampling. For selecting 40 beneficiary households, all beneficiary

households of selected watershed were classified into 5 size groups, namely, Marginal (0-<1

ha.), Small (1-<2 ha.), Medium (2-<4 ha.), Big (4ha.and above) and Landless. And from each

size group, 8 households were selected in a ran-dom manner. By following same procedure, 8

non-beneficiary households were selected for each size group. Thus, for each selected

watershed, 80 sample households comprising of 40 beneficiary and 40 non-beneficiary were

selected.

Page 23: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

23

Table 1.3

Detail of Selected Sample Watersheds and Sample Households

In all, from 4 selected sample watersheds, total 320 sample households were selected

for the study.

The non-beneficiary households were selected either from non-watershed areas of the

villages of selected watershed or near by non-watershed villages.

1.9:- Reference year:

From the selected sample farmers, field data were collected by recall for the agricultural

year 2006-07 and pre-project year 2001-2002.

1.10:-Data Collection:

To fulfill the objectives of the study, both primary and secondary data are required. The

primary data for the study were collected from sample households through recall method in one

round. The data were collected through specific well structured pre-tasted schedules and

questionnaires containing questions on land holdings, crop-pattern, cropping intensity, farming

practices, crop-production, productivity, agro-allied activities, treatments undertaken under

NWDPRA, relevance, adequacy and sustainability of the treatment / technology adopted, cost of

cultivation of crops, extent of people participation in the programme,animal husbandry, other

economic activities etc.

The secondary data were collected from literature, published materials as well as from

concerned different nodal offices at the state, district, block and watershed levels. The

watershed association (WA) and watershed committee (WC) were also approached for

collection of secondary data.

Agro

Climatic

Zone

District

(Block)

Watershed

Name

Selected

Village

No. of Beneficiary No. of Non- Beneficiary

MF SF MDF

LF LL

T MF SF MDF LF LL

T

III A Ajmer

(Masuda) Kirap Kirap 8 8 8 8 8 40 8 8 8 8 8 40

IV A Chittorgarh

(Chhoti sadari) Sakariya

Sakeriya 8 8 8 8 8 40 - - - - - -

Sandikheda - - - - - - 8 8 8 8 8 40

V Kota

(Kherabad) Modak-VI

Dhuniya 8 8 8 8 8 40 - - - - - -

Nimana - - - - - - 8 8 8 8 8 40

IV B Udaipur

(Badgaon) Dhar

Dhar 8 16 8 - 8 40 - - - - - -

Badanga - - - - - - 8 16 8 - 8 40

Grand Total 32 40 32 24 32 160 32 40 32 24 32 160

Note: MF= Marginal Farmer, SF= Small Farmer, MDF=Medium Farmer,LF=Large Farmer, LL= Landless, T= Total

Page 24: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

24

1.11:- Analysis Approach:

For measurement of impact of some aspects of the project, “Before and After” approach

of evaluation is used. For this purpose information is collected for two different time-periods pre-

project year 2001-02 and project completion year 2006-07.The data collected for the year 2001-

02 have high memory bias due to very long time- period gap.

The development and improvement of agriculture and social sector is a continuously

changing process and influenced by a number of factors. In NWDPRA implemented villages,

even if NWDPRA project was not implemented, some development and improvement in

agriculture and other allied sectors was bound to take place. Therefore, difference between

post-project and pre-project parameters show combined impact of NWDPRA project as well as

of other agricultural development schemes implemented by state/central / NGO and

development work undertaken on farm by farmer himself. Therefore, to have a realistic

assessment of impact of NWDPRA, it becomes necessary to isolate impact of non-NWDPRA

factors. This can be done by measuring the quantum of improvement in different aspects of

agriculture in nearby non-NWDPRA village during the same time period. With this in view,

primary data were collected from the sample households (Non-beneficiary) of non-NWDPRA

village. The comparison of data of non-beneficiary with beneficiary households will be helpful to

know the realistic impact of NWDPRA. Therefore, in many cases to ascertain impact signal of

NWDPRA, the data of beneficiary households are compared with non-beneficiary households.

1.12:- Limitation of the methodology:

i) The crop areas and yields depend on rainfall, climate and other seasonal conditions.

Typically, it is not possible to have same seasonal conditions in pre and post project year in all

the 4 selected watersheds. Therefore, changes in output between the two points of time can not

be taken as a fully reliable measure of the impact of the project alone.

ii) The improvement in soil-moisture and ground water regimes which affect land

productively may not be fully manifested immediately after the works are completed and may

take more time to unravel. This is all the more so in respect of trees planted in upper

catchments as it takes long time to grow to their maximum dimensions. Therefore, it is difficult to

measure exact magnitude of benefits which watershed can bring to the communities

iii) The nature of impact and benefits of the project are mainly of two types-direct and

indirect and short-term and long-term. Some benefits like improvement and regeneration of soil,

prevention of degradation of soil and environment are not easy to measure in value terms. It is

also difficult to decide life-span of these changes. In view of these difficulties, attempt has not

been made to measure the quantum of such benefits.

Page 25: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

25

1.13:- Organisation of Study Report:

The study report is divided into six chapters. An introduction to watershed approach, a

brief details of 10th plan NWDPRA, objectives and methodology of study have been discussed in

the first chapter. Chapter two provides briefly the characteristics of agriculture in the state,

details about nodal agency of NWDPRA and target and achievement of 10th plan NWDPRA at

state level. Chapter three broadly provides details of selected watersheds on agriculture,

implementation of NWDPRA and other related aspects. Agro-economic impact analysis based

on primary data has been presented in chapter four. In chapter five, economic analysis based

on primary data, constraints identified, brief observations about NWDPRA, conclusions and

recommendations for possible improvement have been covered. Summary and conclusion have

been given in chapter six.

%%%%%%%%%%%The End%%%%%%%%%%%%

Page 26: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

26

Chapter:-2

Brief review of Agriculture and NWDPRA in the state

For improving rural livelihoods through participatory watershed development, efficient

and sustainable use of available water resources and application of location specific farming

techniques with proper mix of crops and livestock which would enhance productivity in a

sustainable manner is essential. Therefore, before reviewing the performance of NWDPRA

in Rajasthan, it will be pertinent to have a glance at a few watershed related agricultural and

other characteristics of the state.

2.1 Population, Climate and Land Use Pattern of state:

Rajasthan is the second largest state of India accounting for 10.4 percent of the

country‟s total land mass. With a population of 5.65crore, its share in India‟s population is

5.49 percent. Total geographical area of the state is 342.66 lakh ha. and net area sown is

around 51 percent. The north-west region of the state comprising 61 percent of the total

area is either desert or semi desert which depends on rains only for water requirement. The

forest area is about 7.75 percent. The climate is arid/ semi arid and minimum and maximum

temperature for the year 2004 was 3º Celsius to 48º Celsius respectively. On the basis of

agro-climatic characteristics, state is divided into 10 agro-climatic zones (see table 2.1).

Table:-2.1

The Characteristics of Agro climatic Zones of Rajasthan.

Zone

Area (Million Ha.) District

Covered

Range Rainfall

(mm)

Temp Cº Major Crops

Soils

Total Net

Sown Max. Min. Kharif Rabi

Ia 4.74 2.34 Barmer &

Part of Jodhpur

200-370 40.0 8.0 Pearlmillet, Mothbean, Sesamum

Wheat, Mustard, Cumin

Desert Soils and sand dunes aeolian soil, Coarse sand in

texture some places calcareous

Ib 2.10 1.60 Sriganganagar, Hanumangarh

100-350 42.0 4.7 Cotton,

Clusterbean

Wheat, Mustard,

Gram

Alluvial deposits calcareous, high soluble salts & exchangeable

sodium

Ic 7.70 2.44 Bikaner,

Jaisalmer, Churu

100-350 48.0 3.0 Pearlmillet, Mothbean,

Clusterbean

Wheat, Mustard,

Gram

Desert Soils and sand dunes aeolian soil, loamycoarse in

texture & calcareous

Cont…

Page 27: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

27

Conti. of Table 2.1

IIa 3.69 2.68 Nagaur,

Sikar,Jhunjhunuu, Part of Churu

300-500 39.7 5.3 Pearlmillet,

Clusterbean,Pulses

Mustard, Gram

Sandy loam, sallow depth red soils in depressions

IIb 3.00 1.93 Jalore,Pali,

Part of Sirohi, Jodhpur

300-500 38.0 4.9 Pearlmillet,

Clusterbean,Sesamum

Wheat, Mustard

Red desert soils in Jodhpur,jalore & Pali sierozems in Pali & Sirohi

IIIa 2.96 1.77 Jaipur,Ajmer, Dausa, Tonk

500-700 40.6 8.3 Pearlmillet,

Clusterbean, Sorghum

Wheat, Mustard,

Gram

Sierozens, eastern part alluvial,west north west lithosols,

foot hills,brown soils

IIIb 2.77 1.41

Alwar,Dholpur, Bharatpur,

S.Madhopur, Karauli

500-700 40.0 8.2 Pearlmillet, Cluserbean, Groundnut

Wheat, Barley,

Mustard, Gram

Alluvial prone to water logging, nature of recently alluvial

calcareous has been observed

iva 3.36 0.92

Bhilwara,Sirohi, Part of Udaipur,

Part of Chittorgarh

500-900 38.6 8.1 Maize,PulsesS

orghum Wheat, Gram

Soil are lithosolsat foot hills & alluvials in plains

ivb 1.72 0.57

Dungarpur, Part of

Udaipur, Banswara, Chittorgarh

(part)

500-1100 39.0 7.2 Maize,PaddySorghum, Black

gram

Wheat, Gram

Predominantly reddish medium texture,well drained

calcareous,shallow on hills, deep soil in valleys

v 2.70 1.27 Kota, Jhalawar,

Bundi,Baran. 650-1000 42.6 10.6

Sorghum, Soyabean

Wheat, Mustard

Black of alluvial origin,clay loam, groundwater salinity.

Source:- Vital Agriculture Statistics (2004-05),DA, Rajasthan,Jaipur.

2.2 Agriculture, Monsoon, Rainfall and Irrigation:

Agriculture plays an important role in Rajasthan economy as about 27 to 32 percent

of GSDP is generated by this sector and about 70 percent of its population is dependent on

agriculture and allied sectors for livelihood. The agriculture prospects largely depend on

timely arrival of monsoon, quantum of rainfall and even distribution of rainfall over time span.

The behaviour of monsoon is usually erratic and remains active for about 3 months. The

average annual rainfall of the state is 575 mm. The average annual rainfall in 2004 -05 was

513 mm. (See table 2.2) and it ranged from a low of 84 mm. (Jaisalmer) to 1354 mm. (Baran

district). The scanty and erratic rainfall and unfavorable natural conditions are the limiting

factors against shaping of dynamic agriculture in the state. The drought conditions exist

almost in every alternate year. The soil-erosion and salinity are also causing adverse impact

on agriculture. In view of all these adversities for the state, adoption of NWDPRA for

preventing soil erosion, increasing ground water resources and irrigation through harvesting

rain water and efficient and sustainable use of available water resources assumes vital

importance.

Page 28: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

28

Table:2.2

Details of Land Use Pattern, Climate, Rainfall, Irrigation, and Agriculture in Rajasthan State: Sr.

No. Particulars Unit Rajasthan State

1 Land Use Pattern (2003-04):

1) Geographical Area Ha. 34266151 (100.00 %)

2) Forest Area Ha. 2660600 (7.76 %)

3) Net Area Sown Ha. 17394433 (50.76 %)

4) Gross Cropped Area Ha. 21664039 (63.22 %)

5) Cropping Intensity % 124.50

2 Rain fall (2004-05):

1)Normal mm. 575.1

2)Actual mm. 512.6

3) Minimum (Jaisalmer) mm. 84.3

4) Maximum (Baran) mm. 1354.0

3 Irrigation (2003-04):

1) Net Irrigated Area (NIA) Ha. 5239014

2) Gross Irrigated Area (GIA) Ha. 6393277

3) Irrigation Intensity % 122

4) Source wise gross irrigated area as % to

GIA

- -

a) Canal % 29.81

b) Wells/ Tubewells % 68.32

4 Temperature (2004):

1) Minimum C° 3

2) Maximum C° 48

5 Crop Area as % to GCA (2004-05):

1) Cereals % 39.79

2) Pulses % 16.75

3) Food grains % 56.54

4) Oilseeds % 24.08

5) Others % 19.38

6 Use of Fert. Nutrients (NPK) (2003-04):

1) Kharif Kg./Ha. 18.78

2) Rabi Kg./Ha. 65.48

3) Overall Kg./Ha. 35.41

7 Important Crops:

1)Cereals Bajara, Maize, Wheat, Jowar

2) Pulses Moth, Gram, Moong, Udad

3) Oilseeds Mustard,Soyabean,Sesamum,Taramira,G’nut

Source:-Vital Agriculture Statistics 2004-05, Directorate of Agriculture, Rajasthan.

Agriculture in Rajasthan is primarily rainfed and in 2003-04, only 29.51 percent of

gross cropped area was irrigated. Even in irrigated area, some times farmers were not able

to give adequate number of watering to the crops mainly due to inadequate water in the

Page 29: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

29

wells. This situation prevent farmers from harvesting potential crop-yield. The source-wise

data reveals that Wells / Tube wells are the prime sources of irrigation and about 68.32

percent of GIA was irrigated by them. The area irrigated by canals was 29.81 percent of GIA

(See table 2.2). The irrigation intensity was only 122 and cropping intensity was 124.50. The

ground water resources of the state are facing serious problem of decline in the water table

and hence in low rainfall situation, number of watering given to crops were inadequate which

in turn affects the crop-productivity in a big way.

2.3 Crop Pattern and Productivity:

The cropping pattern data (2003-04) of the state reveal that Bajra, Maize and Jowar were

the major kharif rainfed cereal crops covering about 98 percent of total area under kharif

cereals. Wheat was the most important irrigated rabi cereal covering about 10 percent of

GCA. Among pulses, Moth, Gram, Moong, and Udad were the important crops covering

more than 98 percent of total area under pulses. Nearly 16.75 percent of GCA was under

pulses. The foodgrains crops dominate the cropping pattern covering about 56.54 percent of

GCA. Among oilseeds, Mustard, Soyabean, Sesamum and Groundnut were the important

crops covering 24.08 percent of GCA.Among other crops, Cotton was the important crop

(See table 2.2). Among different states of India, Rajasthan ranked first in terms of area

under Bajra, Maize, and Mustard, and it ranked second for Gram. In terms of production,

Rajasthan ranked first in Bajra and Mustard whereas it ranked second in Maize and third in

Soyabean. Rajasthan is a leading producer of coriander, guar and cumin. The average per

hectare fertilizer nutrients consumption (2003-04) in the state was 18.78kgs. for kharif, 65.48

kgs. for rabi crops and overall at 35.41 kgs. The average per hectare consumption varied

from district to district. The higher dependence on rainfall, soil type and farmer‟s economic

condition and low risk bearing capacity were mainly responsible for lower per hectare

fertilizer consumption.

2.4 NWDPRA and Other Watershed Development and Soil Conservation

Programme in Rajasthan:

Soil and water conservation programmes in the state are being executed since

fifties, earlier by agriculture department and after 1991 by the Directorate of Watershed

Development and Soil Conservation (WDSC). Under soil conservation and watershed

development schemes, two main approaches are being adopted. The first, “Command Area

Development” is being implemented where water availability for irrigation has been ensured

through canals. The second approach “Watershed Area Development” is adopted in areas

where rains are uncertain and erratic and agriculture fully depends on rains.

Page 30: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

30

At present, following schemes/ programmes are in operation in the state under

watershed development and soil conservation.

(i) National Watershed Development Programme for Rainfed Areas-Xth FYP

(NWDPRA)

(ii) Integrated Wasteland Development Programme (IWDP)

(iii) Desert Development Programme (DDP)

(iv) Combating Desertification Programme (CDP)

(v) Drought Prone Area Programme(DPAP)

(vi) Watershed Based Project in Catchments of Bisalpur Dam.

(vii) Innovative Programmes and externally aided projects by private trust (e.g.

ITC) and on public private partnership (PPP) basis.

(viii) Watershed based projects implemented by NGOs such as Sewa Mandir

(Udaipur), Aravalli, N.M.Sadguru Foundation, Wasco etc.

2.5 Organizational and Administrative set up for NWDPRA in Rajasthan:

An appropriate organizational and administrative set up holds the key to successful

planning and implementation of multi-sectoral NWDPRA programme. Government of

Rajasthan formed the Watershed Development and Soil Conservation (WDSC) Department

in 1991-92 for implementing all watershed and soil-conservation programmes.During Xth

FYP, upto year 2002-03, NWDPRA programme was implemented by WDSC department

and its field offices at block /district level worked as PIA. But with the introduction of 23rd

constitutional amendment in 2003-04, WDSC department was merged with Panchayati Raj

(PR) department and from June-2004, onward, Panchayat Samities are working as PIA for

NWDPRA. Asst.Executive Engineer (Land Resource) of the department working at the

panchayat samiti a head of PIA. At state level, the programme is being supervised and

monitored by state nodal agency, namely, Directorate of WDSC.

The NWDPRA is monitored at watershed level by Watershed Association (WA), at

block level by PIA i.e. Panchayat samities, and at district level by zilla parishad.District-wise

monitoring at Directorate office of WDSC. District progress cards are being sent by zila

parishad to Directorate level showing activity-wise physical and financial progress, funds

Page 31: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

31

spent on activities, and various issues. Directorate is sending quarterly/ annual progress

report in the prescribed proformas to MOA, GOI.

During Xth FYP, NWDPRA was implemented with 90% central share (72% grant-in-

aid and 18% loan) and 10 % state matching share as per existing GOI guidelines (WJ).

Presently, funds are released by MOA, GOI to the administrative department (Agriculture),

Govt.of Rajasthan (GOR).State agriculture department, GOR, further releases funds to

various departments / agencies engaged in the implementation of different schemes. Under

NWDPRA, it is released to the P.D. account of CEO of the zillla perishads (RD Cell). Later,

CEO transfers this fund to different district nodal agencies, PIAs and Watershed Committees

(WC).Fund is utilized against approved strategic plan and annual action plan.

2.6 Area Covered Under NWDPRA in Rajasthan during X Plan:

As mentioned in Table 2.3,in Xth FYP total 1138 micro watersheds (Including 320 pilot

watersheds)covering 201 blocks spread over 31 districts were taken up for development

under NWDPRA Programme. With the permission from MOA, GOI, in violation of guidelines,

DPP/ DPAP blocks were also selected for NWDPRA. The main reasons for including

DDP/DPAP blocks for NWDPRA was acute shortage of funds for DDP/DPAP and other

watershed schemes at the time of selection of Xth FYP NWDPRA and very high demand for

undertaking watershed works. The total effective area covered by these 1138 micro

watersheds was 545496 Ha. (See table 2.3) Among districts, the effective area covered

under micro watersheds was highest for Chittorgarh (52630 Ha.) and it was lowest for

Jaisalmair (3000 Ha.).

Table:- 2.3

Page 32: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

32

District -wise number of watersheds Effective areas and blocks - covered under NWDPRA (Tenth plan) in Rajasthan.

Sr.No.

district

No of NWDPRA W/S

No of blocks

Effective Areas (Ha.)

Pilot Tenth plan

Total Pilot Tenth plan

Total

1 Ajmer 6 51 57 8 3000 25050 28050

2 Nagaur 0 44 44 11 0 21824 21824

3 Tonk 10 33 43 6 4751 15567 20318

4 Bhilwara 47 36 83 11 23090 17850 40940

5 Chittorgarh 60 56 116 14 27450 25180 52630

6 Rajsamand 25 24 49 7 10607 11140 21747

7 Alwar 16 3 19 4 7618 1500 9118

8 Dausa 15 21 36 5 7261 10500 17761

9 Jaipur 19 19 38 7 9265 9185 18450

10 Churu 0 12 12 6 0 6000 6000

11 Jhujhunu 0 36 36 8 0 18000 18000

12 Sikar 0 26 26 8 0 12930 12930

13 Barmer 0 33 33 8 0 15500 15500

14 Bikaner 0 17 17 5 0 8500 8500

15 H.garh 0 16 16 2 0 8000 8000

16 Jalore 0 20 20 5 0 9932 9932

17 Sirohi 13 24 37 5 6119 11201 17320

18 Jaisalmair 0 6 6 3 0 3000 3000

19 Jodhpur 0 41 41 9 0 20375 20375

20 Pali 0 49 49 10 0 24500 24500

21 Jhalawar 11 25 36 6 4492 11769 16261

22 Baran 4 12 16 6 1887 5160 7047

23 Bundi 12 0 12 2 5967 0 5967

24 Kota 0 10 10 2 0 4746 4746

25 Bharatpur 16 8 24 5 7171 3945 11116

26 Dholpur 9 11 20 4 4500 5305 9805

27 Karoli 13 27 40 5 6125 13297 19422

28 S.Madhopur 13 18 31 5 6445 8657 15102

29 Banswara 0 50 50 8 0 23547 23547

30 Dungarpur 0 38 38 5 0 18450 18450

31 Udaipur 31 52 83 11 14788 24350 39138

Total 320 818 1138 201 150536 394960 545496

Source:- Directorate of watershed Development and Soil Conservation(WDSC), Jaipur.

Page 33: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

33

2.7 Financial and Physical Target and Achievement of NWDPRA during Xth

FYP in Rajasthan:

The table 2.4 provides year-wise information on actual release and expenditure of funds,

actual area covered in relation to targeted area under NWDPRA programme in Rajasthan

during Xth FYP. From the table, following points are noteworthy:

1:- During the entire project period of 2001-02 to 2006-07 (till Sept. 2007), against the

target amount of Rs. 24699.17 lacs, the total amount released was Rs. 20273.08 lacs.

(82.08%).

2:- During the total project period, 99.02 percent of the total amount released was

utilized and only Rs.95.30 lacs remained unspent.

3:- Since 2001-02 was the preparatory phase year, there was a delay in initiating the

activities such as entry point activities, institution and capacity building and detailed

project report (DPR).Hence, from the total allocated amount of 492.76 lacs, actual

expenditure incurred during the year was only 27.48 percent.

4:- In some years, late released of funds worked as constraint in spending the targeted

amount.

5:- So far as physical achievement in terms of area coverage under the programme is

concerned, it can be said that though it was uneven in different years, on the whole it

was quite satisfactory.

6:- In year 2003-04, actual area covered under programme exceeded the area

proposed.

Page 34: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

34

Table : -2.4

Year- wise Financial and Physical Fact Sheet of NWDPRA for Xth FYP.

(Rs. In lacs & Area in Ha.)

Sr. No.

Year

Financial (Rs. In lacs) Physical

No. of Water sheds

Opening balance

(Rs.)

Actual Release

(Rs.) Total (Rs.)

Actual Expenditure

(Rs.)

Expenditure in %

Unspent Balance

(Rs.)

Target (Ha.)

Actual Achievement

(Ha.)

Achievem

ent in%

1 2 3 4 5 6 7 8 9 10 11 12

1 2001-02 320 - 492.76 492.76 135.39 27.48 357.37 - - -

2 2002-03 818 357.37 3122.39 3479.76 2389.41 68.67 1090.35 40000 38960 97.40

3 2003-04 _ 1090.35 3474.99 4565.34 3705.87 81.17 859.47 77448 84424 109.01

4 2004-05 _ 859.47 5491.69 6351.16 3401.61 53.56 2949.55 83500 81714 97.86

5 2005-06 _ 2949.55 3906.02 6855.57 4878.96 71.17 1976.61 124157 111570 89.86

6 2006-07* (till

sept. 07) _ 1976.61 3785.23 5761.84 5666.54 98.35 95.30 141825 122038 86.05

Total 1138 7233.35 20273.08 27506.43 20177.78 73.36 7328.65 466930 438706 93.96

Note:- Amount released include Rs. 37.43 lac through State Budget during 2002-03 & 2003-04. Note:- Amount released include Rs. 37.43 lac through State Budget during 2002-2003 & 2003-04.

Source:- Directorate of watershed development and soil conservation, Jaipur, Govt.of Rajasthan.

Page 35: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

35

2.8 Activity-wise Physical and Financial Achievement of NWDPRA in

Rajasthan during Xth Plan:

The Table 2.5 provides activity-wise data on target and achievement of NWDPRA

implemented during Xth Plan in Rajasthan state. The major observations emerging from this

table are as below:

(i) The expenditure incurred on various activities of the project taken together was only

81.69 percent (Rs.20177.79 lakhs) of the total proposed outlay.

(ii) Out of the proposed outlay of Rs. 5557.31 lakhs for management component, only

63.16 percent was utilized. The amount spent on PIA was very low at 4.96 percent

and administration cost was only 57.92 percent of the total proposed outlay for it.

The amount utilized for honorarium to village community organizers, support for IT at

village level publicity etc.was also found very much lower in relation to its proposed

outlay. The amount utilized for entry point activities as well as corpus for WDF was

some what higher than the proposed outlay. Expenditure incurred on training

programme for the staff was only 63.16 percent of the targeted amount. The number

of training programmes arranged at state / district level and PIA level were lower

than targeted numbers. Very low spending on PIA, administration and training was

mainly due to delay in appointment of staff and less number of appointments than

targeted for implementation of the project. This in turn directly affected the monitoring

of the project and timely implementation of the project activities.

(iii) It is interesting to note that as against allocated amount of Rs.12349.59 lakhs,

amount utilized for Natural Resources Management (NRM) was Rs. 13787.18 lakhs

(111.64%). This shows that in the project, NRM activities received higher

importance. Among NRM activities on arable land, soil and moisture conservation

activities hold prime importance and amount spent on it was 62.60 percent higher

than proposed. The increase in labour rate and material cost are also responsible for

higher spending on NRM. Among NRM activities undertaken on non arable land,

constructing water harvesting and run-off management structures were the main

activities.

(iv) The achievement of all the activities undertaken under Farm Production System

(FPS), except testing and demonstration of new technology was very poor. These

activities were not undertaken on proposed scale and intensity and hence

achievement was much below the expected level.

Page 36: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

36

Table :-2.5

Activity wise Physical & Financial achievements of Xth Plan (2002-07) NWDPRA in Rajasthan.

(Area in Ha.& Rs. In Lac)

Sr. No. Components /Activities Unit

Target Achievement Achievement %

Phy. Fin.(Rs.) phy. Fin.(Rs.) phy. Fin.(Rs.)

A Management Component :-

I Administration Cost :-

(a) State/District Hq. - 246.99 - 661.82 - 267.95

(b) Watershed committees - - - - - -

(i) salary No. - - - 622.69 - 0.00

(ii) Other expenses - - - 84.72 - 0.00

Sub Total (WC) - 987.97 - 707.41 - 71.60

(c) PIA - - - - - -

(i) Salary - - - 23.50 - 0.00

(ii) Other expenses - - - 37.78 - 0.00

Sub Total (PIA) - 1234.96 - 61.28 - 4.96

Sub Total (Adm. Cost ) 2469.92 1430.51 57.92

II Community Organizations :-

(a) Entry point activities of WC No. - 578.85 695 700.66 - 121.04

(b) Hon. to Com. Organizers No. - 319.26 532 83.43 - 26.13

(c) Expenses at District HQ. for :publicity, tech. input, support for IT etc.

- 760.24 107 144.80 - 19.05

(d) Corpus for WDF No. - 194.09 21 225.26 - 116.06

Sub Total - 1852.43 - 1154.15 - 62.30

III Training Programme :-

(a) State/District level training cost No. - 739.63 2062 388.45 - 52.52

(b) PIA: Training cost at identified Institutes No. - 495.33 6582 536.67 - 108.35

Sub Total - 1234.96 8644 925.12 - 74.91

Total Management Comp. - - 5557.31 - 3509.78 - 63.16

B Development Component :-

I Natural Resource Management (NRM) :-

(a) Arable Land :-

(i) Soil & Moisture Conservation Activities Ha. 105490 3855.28 211858 5685.51 200.83 147.47

(ii) Agronomic Conservation Practices Rmt. 27000 229.62 27181 67.87 100.67 29.56

(iii) Others Ha. - 2.85 11921 893.24 - 31341.75

Sub Total - 4087.75 - 6646.62 - 162.60

(b) Non Arable Land :-

(i) Run off Mana. Structures No. 7373 885.21 5786 578.38 78.48 65.34

(ii) Water Harvesti.structures No. 3423 1023.94 7841 1457.89 229.07 142.38

(iii) Dry Land Horticulture No. 295256 50.74 266006 34.13 90.09 67.26

(iv) Conservation & Development of Bio- Mass

Ha. 53785 1161.53 64177 414.76 119.32 35.71

Cont…

Page 37: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

37

(v) Others Ha. - 49.81 375121 271.85 - 545.77

Sub Total - 3171.22 - 2757.01 - 86.94

(c) Drainage Line Treatment :-

(i) Upper reaches No. 25767 834.45 50699 788.74 196.76 94.52

(ii) Middle reaches No. 18249 1352.81 23478 1258.08 128.65 93.00

(iii) Lower reaches No. 20050 2903.36 9531 2336.73 47.54 80.48

Sub Total - 5090.62 83708 4383.55 - 86.11

Sub Total (NRM) - 12349.59 - 13787.18 - 111.64

II Farm Production system for land owning Families (FPS) :-

(a) Est. of nurseries and production of seedlings

No. 1138 330.78 347723 59.63 30555.62 18.03

(b) Testing and demonstration of new technologies No. 140359 1375.44 453071 1895.52 322.79 137.81

(c) Diversification of Production system No. 265276 697.50 1170346 216.93 441.18 31.10

(d) Adoption of proven technologies.

No. 14140 415.14 60038 159.22 424.60 38.35

(e) Livestock Management No. 8118 463.73 1622 49.66 19.98 10.71

(f) Others No. - 1657.24 1779 80.45 - 4.85

Sub Total (FPS ) - 4939.83 - 2461.41 - 49.83

III Livelihood support system for land-less families

(a) Household production system No. 8148 328.13 1211 40.64 14.86 12.39

(b) Bio-mass based rural industry activities No. 3584 107.23 83 9.56 2.32 8.92

(c)

Dairy,Sericulture,Goat breeding, Bee Keeping, Mushroom Cultivation, Commercial Poultry etc.

No. 8370 253.28 172 48.15 2.05 19.01

(d) Livestock Management No. 9601 389.94 98 60.88 1.02 15.61

(e) Others - 773.86 952 260.19 - 33.62

Sub Total ( LSS) - 1852.44 - 419.42 - 22.64

Total (B) - 19141.86 - 16668.01 - 87.08

GRAND TOTAL (A + B) :- Ha. - 24699.17 438706 20177.79 - 81.69

Additional Information - - - - - -

1 Nos. of SHG - - - - - -

(a) Women Nos. - - 3850 - - 0.00

(b) Men Nos. - - 5018 - - 0.00

(C) Total Nos. - - 8868 - - 0.00

2 Amt. in SHG Bank Acct. Lakh Rs. - - 48038 - 0.00

3 Man days generated under NWDPRA

(a) Women Nos. - - 2132610 - - 0.00

(b) Men Nos. - - 1795147 - - 0.00

(C) Total Nos. - - 3927757 - - 0.00

Source: - Directorate of WD & SC, Jaipur, Rajasthan.

Page 38: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

38

(v) The livelihood support system for landless families (LSS) was undertaken on small

scale in many watersheds and hence expenditure incurred on these activities was only

22.64 percent of the proposed amount of Rs. 1852.44 lakhs.

(vi) The surplus amount of FPS and LSS activities was utilized to meet the additional

expenditure incurred on NRM activities, mainly carried out for the arable land.

(vii) During the X plan period, total 8868 SHGs were formed under NWDPRA programme.

Out of these SHGs, 3850 were women SHGs. The total amount in SHGs bank account

was Rs. 48038 lakhs. (See Table 2.5).

(viii) As per state level Directorate of Watershed Development and Soil- Conservation (WD

& SC), under X plan NWDPRA, the generation of additional employment was of

3927757 man days. (See Table 2.5).

2.9 State Level Watershed Committee (SLWC):

For periodic review and monitoring of overall progress of NWDPRA in the state, to

resolve management issues arising at various stages of implementation of programme and

to provide policy directives at various levels of the project, a State Level Watershed

Committee (SLWC) was formed in the year 2002-03, as per frame work given in the project

guideline WJ.However, with the introduction of 73rd amendment of constitution of India

during 2003-04, the NWDPRA implementing department WDSC was put under the control of

Panchayati Raj (PR) Department and subsequently it raised many legal problems on the

working and formation of SLWC.As the working of SLWC become a sub-judicial matter, the

formed SLWC became inactive/defunct during 200-06. Again, in February 2006, SLWC was

reformed and it was chaired by additional chief secretary (Development) and it included

members from the concerned line departments of the state government such as rural

development, agriculture, animal husbandry, forest, soil and water-conservation, State

Agriculture Universities (SAU‟s), ICAR,NGOs, training institutes, president of WA etc. As per

project guidelines, SLWC is supposed to meet regularly atleast once in six months for the

periodic review of the project. The table given below shows year-wise, number of meetings

of SLWC held

year 2002-03 2003-04 2004-05 2005-06 2006-07

Nos.of SLWC meeting held 1 1 0 0 1

The data in above table clearly reveals that instead of having atleast 10 meetings of

SLWC during the period 2002-2007, only 3 meetings were held. This in turn affected

negatively state level monitoring of the implementation of NWDPRA, the qualitative level of

project activities undertaken and overall project progress.

Page 39: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

39

Chapter:-3

Brief Profile and Review of Project Work In Selected Watersheds

As already stated earlier, 4 Sample Watersheds of 10th FYP namely Dhar (Badgaon

block) from Udaipur district, Sakariya (Chhotisadri block) from Chittorgarh district, Modak-VI

(Kherabad block) from Kota district and Kirap (Masuda block) from Ajmer district were

selected for the present study. For assessing the impact of the watershed project, a basic

knowledge and background information of the selected watersheds on main watershed

related aspects is obviously necessary. Therefore, in section-I of this chapter, broad profile

of the selected watersheds has been provided. Activity-wise review of the physical and

financial progress of the project work undertaken by PIA during period ending 2006-07 in

selected watersheds has been discussed in section-II. In section-III, problems faced in the

implementation has been discussed.

Section:-I (I) General profile of the selected watersheds (Pre Project):

The basic data relating to all 4 selected watersheds have been provided in Table-

3.1. The treatment areas of the Sakariya watershed is spread over 3 small villages whereas

each one of the remaining 3 selected watersheds namely Kirap (Masuda / Ajmer), Modak-VI

(Khairabad / Kota) and Dhar (Budgaon / Udaipur) covers the area of only one village (See

table 3.1). The four selected watersheds are falling in the four different agro-climatic zones

of the state (See table 3.1). All the villages covered by selected watersheds are well

connected by road.

(II) Location, Temperature and Rainfall:

All the 4 selected watersheds are not very far from their block headquarter and only

8 to 20 kms. away from the block headquarter (See Map).The longitude and latitude of all

the selected watersheds has been given in Table 3.1. The Dhar (Udaipur) watershed is

close to famous tourist city Udaipur.On account of natural beautification; Udaipur is

attracting heavy traffic of domestic and international tourist. Therefore, during off agricultural

season, sections of the unemployed people of Dhar watershed are visiting Udaipur for

earning their living through unskilled labour. The climate of these 4 watersheds is by and

large semi-arid characterised by 3 well defined seasons viz; monsoon, winter and Summer.

The maximum temperature in summer in 4 selected watersheds ranged from 44ºC (Dhar) to

48ºC (Modak-VI) (See table 3.1).In selected watersheds, minimum temperature in winter

ranged from 2ºC (Sakariya) to 7ºC (Dhar).

Page 40: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

40

TABLE :- 3.1

General Information of Selected watersheds

Sr. No.

Particular Watershed Name

Kirap Sakariya Modak-vi Dhar

1 District Ajmer Chittorgarh Kota Udaipur

2 Panchayat Samiti (P.S) Masuda Chhoti sadri Kherabad Badgaon

3 Villages Covered Kirap Sakariya,

Bargoti, B. Kundal

Dhuniya Dhar

4 Agro. climatic zone III a IV b V IV a

5 Watershed area available for treatment (Ha.) 500 500 370 500

6 Sanction Year 2002-03 2002-03 2002-03 2002-03

7 Total Sanction Cost ( Lac. Rs.) 22.50 22.50 16.65 22.50

8 Project Imp. Agency (PIA)

B.D.O Masuda P.S

A.EN.W.D & S.C

Nimbahera

B.D.O Kherabad

P.S

A.En WD & SC.

Udaipur

9 Location :- - - - -

(a) Longitude

74º 34' to 74º 35'

74º 46' to 74º 47'

75º 57' to 75º 59'

73º 30' to 73º 35'

(b) Latitude

20º 10' to 21º 15'

24º 23' to 24º 24'

24º 43' to 24º 45'

24º 35' to 24º 40'

10 Rainfall (mm)

(i) Average/Normal 305 600 980 600

(ii) During 2006-07 (Ref. year) 696 1010 910 980

11 Average Temperature (Cº) - - - -

(i) Summer (Min. -Max.) 30-45 20-47 32-48 28-44

(ii) Winter (Min. -Max.) 6-/30 2-/24 5 -/27 7- /32

(iii) Monsoon (Min. -Max.) 20 - 35 18 - 36 22 -40 21 - 36

12 Land use Details (Ha.) - - - -

1: Arable Land: (Ha.) 338.40 375 300 52

(i) Irrigated (Ha.) 37.60 65 50 20

(ii) Un-irrigated (Ha.) 300.8 310 250 32

(iii) % of irri.land (Ha.) 11.11 17.33 16.67 38.46

2: Non- Arable Land (Ha.) 161.6 125 70 448

(i) Pvt.Land (Ha.) - - - 303

(ii) Panchayat Land (Ha.) 120.96 125 70 59

(iii) Govt. Land (Ha.) 40.64 - - -

3 : Forest Land (Ha.) - - - 86

Total (1+2+3) (Ha.) 500 500 370 500

13 General Soil type Clay Loam and stony

Clay and Clay Loam

Black Alluvial Clay Loam

Sandy Loam

14 General Soil Depth (CM): - - - -

(i) 0 - 10 cm. (Ha.) - 170 50 250

(ii) 10 -50 cm. (Ha.) 100 330 200 170

(iii) Above 50 cm. (Ha.) 400 - 120 80

Total (Ha.) 500 500 370 500

15 General Slope % - - - -

(i) 0 - 3 % (Ha.) 410 500 370 50

(ii) 3 -10 % (Ha.) 90 - - 400

(iii) 10 -15% (Ha.) - - - 50

Total (Ha.) 500 500 370 500

16 Nos. of Open wells - - - -

(i) Before project 86 18 12 18

(ii) After project 86 26 12 24

17 Nos.of Tube wells - - - -

(i) Before project - 4 15 2

(ii) After project - 9 15 3

Page 41: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

41

Cont….

Sr. No.

Particular Watershed Name

Kirap Sakariya Modak-vi Dhar

18 Nos. of SHG Formed 6 5 4 3

19 Total Nos of SHG members 78 53 59 30

20 Nos.of User groups (UG) 6 5 4 4

21 Total Nos. of UG members 30 47 106 40

22 Year of Deployment of WDT 2002-03 2002-03 2002-03 2002-03

23 Date of formation of WC 22-11-02 22-9-03 2002 1/4/2003

24 Watershed Association Reg. Date 16-1-03 2002-03 2002-03 29-3-04

25 Social audit conducted in Gram sabha (year) 2006-07

2007-08 2007-08 2007-08 2007-08

26 Total Amt.in WDF at project completion time

(Rs. In lakh) 1.85 0.952 1.05 1.23

27 Benefit-cost ratio (As per PIA) 1.30 1.44 1.50 1.29

Source:- (i) Project Completion Reports.

(ii) Directorate of Watershed Development and Soil conservation,

Jaipur, Govt. of Rajasthan.

In all the 4 selected watersheds, recharge level of wells, the net sown area, gross

cropped area and crop-productivity is highly dependent on the rainfall level and pattern.

Rainfall in all the 4 watersheds is highly variable, usually scanty, scattered and erratic which

has adverse impact on growth & yields of crops. Generally, monsoon has not more than 20-

22 rainy days. The success of any watershed programme is highly associated with the

rainfall behaviour. Data on average/normal rainfall of the selected watersheds is given in

Table 3.1. It ranged from 305 mm. in Kirap watershed to 980 mm. in Modak-VI watershed.

The rainfall in selected watersheds during the study year 2006-07 was far better and

somewhat in excess as compared to normal (See table 3.1). Therefore, the impact of

NWDPRA observed in this study in respect of water recharging in wells, cropping intensity,

crop-productivity, farm income etc. may be found a little better than actual impact level in the

normal year.

(III) Caste-wise population of villages under Selected Watersheds:-

Table 3.2 gives community-wise details of population of villages under selected

watersheds during pre-project year 2001-02.

Except Modak-VI watershed, the total population in each watershed ranged between

938 and 999. The overall male female ratio in selected villages worked out as 1: 0.94. In

selected village of Dhar watershed, there were 896 females per 1000 males. In Modak-VI

watershed village, there were 988 females per 1000 males.

Page 42: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

42

Table:-3.2

Information regarding village population under selected watersheds-2001-02.

Sr.

No.

Name of

the

communities

Kirap (Ajmer) Sakariya (Chittorgardh) Modak-VI (Kota) Dhar (Udaipur) Over all

Nos.

of

HHs.

Male Fem

ale

Total Nos.

of

HHs.

Male Fem

ale

Total Nos.

of

HHs.

Male Fem

ale

Total Nos.

of

HHs.

Male Fem

ale

Total Nos.

of

HHs.

Male Fem

ale

Total

1 General 154 247 236 483 12 36 35 71 15 75 70 145 6 14 16 30 177 342 327 669

2 SC 76 235 220 455 0 0 0 0 65 185 190 375 0 0 0 0 141 420 410 830

3 ST 0 0 0 0 176 471 446 917 60 170 165 335 178 513 456 969 364 1004 927 1931

4 Minorities

& Others 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 All Total 230 482 456 938 188 507 481 988 140 430 425 855 184 527 472 999 682 1766 1664 3430

Source:- District office of WD & SC located at zilla parishad of Ajmer, Chittorgardh, Kota, Udaipur.

Page 43: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

43

The community-wise examination of data shows absence of minority population in

villages of the selected watersheds. The Sakariya and Dhar watersheds are predominantly

tribal with ST population more than 94 percent. However, not a single household of ST was

reported in Kirap village watershed. In Kirap, 67 percent households were of general

communities and remaining 33 percent belonged to schedule caste (SC). In Modak-VI

watershed, majority households were of SC and ST. Thus, except Kirap, predominance of

SC and ST communities was observed in the villages of selected watersheds (Table 3.2).

(IV) Education Level:-

The data on education level of villagers of selected watersheds (except Dhar) have been

presented in Table 3.3. The table reveals that in each watershed atleast 62 percent villagers

were illiterate. Among literate population, majority had education upto primary standard IV.

The percentage of villagers having graduate / under-graduate level education was very low

and below 2 percent (See Table 3.3) in selected watersheds. Thus, literacy level of the

villagers of selected watersheds was very poor. The low level of literacy level is one of the

many reasons for slow and very low adoption of new agriculture technology. In selected

watersheds, as compared to males, the literacy level of women was found very low mainly

due to prevailing social customs and traditions.

Table:-3.3

Education Level of Villagers of Selected Watersheds-2001-02.

(% of total Villagers)

Education Level % of Villagers

Kirap Sakariya Modak-VI Dhar

Grad. & above - 0.51 0.58 N.A

U. Grad. 1.06 1.21 1.40 N.A

H.S.C (12th ) 4.48 3.75 4.44 N.A

V to XI 5.11 8.30 8.42 N.A

Up to IV 26.40 23.28 22.12 N.A

Illiterate 62.95 62.85 63.04 N.A

Total 100.00 100.00 100.00 N.A

Source:-District level department of WD & SC and Panchayat samiti.

Note:-N.A = Not Available.

(V) Land Use:-

The data on land use pattern of all the 4 selected watersheds is given in Table 3.1.

Out of the total area under project treatment, 67.70, 75.00, 81.08 percent was arable land in

Kirap, Sakariya and Modak-VI watershed respectively. However, Dhar watershed had only

10.40 percent arable land. Except Dhar, the percentage of irrigated arable land was very low

in remaining 3 watersheds, and it ranged between 11 to 17 percent only. In Dhar watershed,

Page 44: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

44

of the total sanctioned watershed area of 500 Ha, 89.6 percent (448 Ha.) was non-arable

with high rate of soil-erosion. Out of this 448 Ha.non-arable land, 303 Ha. was private land.

In Kirap, Sakariya and Modak-VI watersheds, the percentage of non-arable land varied from

19 to 33. In non-arable land in these 3 watersheds, majority portion of land belonged to

panchayat. Except Dhar watershed, no forest land was reported in remaining 3 selected

watersheds. In each selected watershed, except Modak-VI, out of the total geographical

area of watershed, area available for intervention treatments under NWDPRA was 500 Ha.

In Modak-VI watershed, it was 370 Ha. Out of these 4 watersheds, except Modak-VI, total

project cost sanctioned for each watershed was Rs. 22.50 lacs (Rs. 4500 per Ha.). The

project implementing agencies (PIA) of the selected watersheds are shown in Table 3.1.

(VI) Soil type:-

The data on soil type, soil depth and general slope are given for each selected

watersheds in Table 3.1. The soil of the Kirap watershed is predominantly clay loam and

stony. Whereas, it is black alluvial clay loam in Modak-VI, sandy loam in Dhar and clay and

clay loam in Sakariya watershed. Generally soil depth in Kirap watershed is above 50 cm.

whereas it is below 50 cm. in Sakariya, Modak-VI and Dhar watersheds. The soil slope in

Kirap, Sakariya and Modak-VI watersheds ranged between 1 to 3 percent and facing

problem of soil-erosion. In Dhar watershed, soil slope of majority areas (400 Ha.) is steep

and between 3 to 10 percent. Hence, it is highly prone to soil-erosion. In Dhar, the soil is

largely characterized by rocky and hilly terrain. The soil erosion occurs through both wind

and water and as a result, productive capacity of soil is declining to some extent. To prevent

soil- erosion and conserve moisture “in situ,” contour „V‟ ditches, vegetative barrier, contour

vegetative barrier, soil- stone bunds, vegetative bunds, construction/ installation of water

harvesting structures (WHs), systematic drainage system, dug-out ponds, nala-plugging,

planting of dry land horticulture crops and agro forestry trees etc. were recommended under

the project in the selected watersheds. The soil in all the four watersheds have generally

poor productivity. In selected watersheds, majority soil is low in organic carbon and nitrogen,

medium in phosphorus and rich in potash. In majority areas of all the 4 selected watersheds,

the soil is poorly drained and the capacity of soil to infiltrate and recharge water is poor. The

water table in upper and middle reaches is low in comparison to lower reaches.

(VII) Cropping Pattern:-

In pre-project period, in Kirap watershed, Maize, Bajra and Jowar were the main

cereal crops whereas, Udad was the main pulse crop. Wheat and Gram were the main rabi

crops. In Sakariya watershed, main kharif crops were Soyabean, Maize, Groundnut and

Page 45: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

45

Udad, whereas, Rapeseed, Gram and Wheat were the main rabi crops. In Modak-VI

watershed, Soyabean, Maize, Jowar and Udad were main kharif crops, whereas Coriander

(Dhanaya), Rapeseed, Gram and Wheat were the main rabi crops. The Khairabad (Modak-

VI) block is also famous for producing spice crop coriander. In Dhar watershed, Maize, Udad

were main kharif crops while Wheat, Gram and Rapeseed were main rabi crops. The sowing

of summer (Jayad) crops was negligible or nil in all the four selected watersheds. In non-

arable land of the selected watersheds, generally natural vegetative tree species like deshi

babul, khakhra, neem, mahua, sisam, khejri etc. were found. The grass species like

dhaman, stylohemato, dharo etc. were found on public land. The energy consumption needs

of the poor families of selected watersheds are fulfilled from fuel wood available from non-

arable/ forest land. In all 4 selected watersheds, farmers are generally adopting mono-

cropping system as major cultivable area is rainfed with very limited irrigation facilities.

There is no system of devoting specific compact area to orchard or horticultural plantation.

In selected watersheds, agriculture is characterized by frequent drought, sloppy land and

dominance of low value crops. The agricultural lands of these watersheds have poor

productivity. The seed replacement ratio (SRR) is very low and use of improved agricultural

technology is meager. Generally farmers are following traditional cultivation. Examinations of

the post project crop-pattern suggests some diversification in crop- pattern in favour of high

value crops, improvement in crop-productivity and cropping intensity.

(VIII) Irrigation and Irrigation Sources:-

The data on irrigation sources and source-wise irrigation during 2001-02 (pre-project)

and 2006-07 (Post-project) in villages of selected watersheds have been presented in Table

3.4 and 3.5. From the data given in Table 3.4, it is obvious that private open wells are the

main source of irrigation in all the selected watersheds. In Modak-VI and Sakariya

watersheds, majority of tubewells and few wells became either non-functional or dry due to

depletion of water and other reasons. Of the total irrigated area in 2001-02, the area

irrigated by wells, tubewells was 93 % for Kirap, 65 % for Sakariya, 71 % for Modak-VI and

89 % for Dhar. In Kirap, majority wells were either dry or non-functional. During 2001-02, of

the gross cropped area, irrigated area was 16. 72 % in Kirap, 21.82 % in Sakariya, 18.97 %

in Modak-VI and 15.62 % in Dhar (See table 3.5).

Page 46: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

46

Table:-3.4

Irrigation sources and source-wise irrigation in selected watersheds (Pre project & Post project)

Sr.

No. Watershed Items

Particulars

Nos. Irri.Area (Ha.) Change in Irri.Area

(Ha.)

2001-

02

2006-

07

2001-

02

2006-07 Actual %

1 Kirap (Ajmer)

Source wise Area

Irrigated (Ha.)

(i) Well 86 86 52.80 116.65 63.85 120.93

(ii) Tube-well

(iii) Others 4 6 2 50.00

Total Pvt.Irri.land (Ha.) 86 86 56.80 122.65 65.85 115.93

2 Sakariya

(Chittorgardh)

Source wise Area

Irrigated (Ha.)

(i) Well 18 26 54 58.50 4.50 8.33

(ii) Tube-well 4 9 24 27.30 3.30 13.75

(iii) Others 5 20 15 300.00

Total Pvt.Irri.land (Ha.) 22 35 83 105.80 22.80 27.47

3 Modak-VI (Kota)

Source wise Area

Irrigated (Ha.)

(i) Well 12 12 40.60 56.30 15.70 38.67

(ii) Tube-well 15 15 12 13.10 1.10 9.17

(iii) Others 4.32 9.60 5.28 122.22

Total Pvt.Irri.land (Ha.) 27 27 56.92 79.00 22.08 38.79

4 Dhar (Udaipur)

Source wise Area

Irrigated (Ha.)

(i) Well 18 24 20.64 26.93 6.29 30.47

(ii) Tube-well 2 3 1 1 0.00 0.00

(iii) Others 5 5.00

Total Pvt.Irri.land (Ha.) 20 27 21.64 32.93 11.29 52.17

Source: - District offices of WD & SC.

Page 47: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

47

Table:-3.5

Category-wise operational holdings and change in irrigation in villages under selected watersheds.

Sr.

No.

Category

of

farmers

Kirap (Ajmer) Sakariya (Chittorgardh) Modak-VI (Kota) Dhar (Udaipur)

Nos.

of

HHs.

% of

Land

acquired

% of Land

irrigated

Nos.

of

HHs.

% of

Land

acquired

% of Land

irrigated

Nos.

of

HHs.

% of

Land

acquired

% of Land

irrigated

Nos.

of

HHs.

% of

Land

acquired

% of Land

irrigated

2001-

02

2006-

07

2001-

02

2006-

07

2001-

02

2006-

07

2001-

02

2006-

07

1 Marginal 93 16.47 14.00 28.82 106 23.53 20.12 24.04 40 12.00 15.22 22.22 80 40.03 14.58 19.86

2 Small 80 35.29 15.83 32.83 49 22.07 23.85 26.95 50 26.33 14.75 16.46 27 26.93 13.68 23.69

3 Medium 20 15.29 18.00 40.60 29 25.16 23.01 26.46 20 22.00 17.52 30.05 11 24.29 15.82 23.95

4 Big 25 32.95 18.45 41.07 18 29.24 20.70 32.76 20 39.67 23.72 31.80 2 8.75 25.83 48.27

5 All 218 100.00 16.72 36.07 202 100.00 21.84 27.84 130 100.00 18.97 26.33 120 100.00 15.62 23.73

Source:-District offices of WD & SC.

Note:- Marginal (<1 Ha.),Small (1-2 Ha.),Medium (2- 4 Ha.),Big (> 4 Ha.).

Page 48: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

48

This shows that available irrigation to crops is very limited in selected watersheds

mainly due to limited water resources. On account of limited irrigation resources, the scope

of increasing area under rabi crops is also limited. In selected watersheds, rabi crops are

grown keeping in view the water availability for irrigation and conservation level of moisture

in soil. Hence, area under rabi crops fluctuate every year. During kharif season, under long

dry spell and moisture stress situation, farmers are giving lifesaving irrigation to crops

utilizing available water in the wells/tanks. In low rainfall year, water levels in wells are

gradually/ moving deeper as water level improvement in wells is very low due to poor water

recharge. Hence, in such situation, wells get depleted after pumping for a few hours. This

cause adverse impact on the area under rabi crops and also on cropping intensity. After

implementation of NWDPRA programme in selected watersheds, significant improvement

has been witnessed in respect of area irrigated and cropping intensity (See Table 3.5).

(IX) Operational Holdings and Occupation:-

The Category-wise data on land holdings for villages of 4 selected watersheds have

been presented in Table 3.5. From the table, the domination of marginal and small farmers

is evident in all the 4 selected watersheds. In Dhar watershed, 89.16 percent operational

holdings were marginal or small and acquired 57 percent of total operated areas. In

Sakariya watershed, 71.88 percent marginal and small holdings acquired 45.60 percent of

total cultivable land. In Modak-VI watershed, nearly 70 percent marginal and small holdings

acquired only 38.33 percent of total cultivable land. In Kirap watersheds, in total holdings,

share of marginal and small farmers was 79.35 percent and they acquired nearly 52 percent

of cultivable land.

The primary occupation of majority of the households in the villages of selected

watersheds is agriculture. The secondary occupation is livestock keeping/ dairy and wage

labour. As majority households own small landholdings, these households depend upon

wage employment during off agriculture season for meeting their subsistence needs.

(X) Livestock:-

The data on livestock during pre-project and post-project period in the villages under

selected watersheds is given in Table 3.6. Following agriculture, livestock rearing is the next

major source of income for the watershed community. The data clearly reveal that number of

bullocks shows remarkable declining trend in Modak-VI and almost insignificant change in

Sakariya and Dhar watersheds.

Page 49: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

49

Table:-3.6

Livestock position in the villages under selected watersheds

Livestock

Kirap Sakariya Modak-VI Dhar

Number %

Change

Number %

Change

Number %

Change

Number %

Change 01-02 06-07 01-02 06-07 01-02 06-07 01-02 06-07

Bullocks - - - 120 122 1.67 100 40 -60.00 180 176 -2.22

Cows 430 575 33.72 56 72 28.57 206 302 46.60 172 190 10.47

Cow calf,

he/she

210 219 04.29 45 51 13.33 151 240 58.94 85 92 8.24

Buffalo 350 421 20.29 5 12 140.00 25 45 80.00 92 72 -21.74

Buffalo calf

he/she

118 152 28.81 4 5 25.00

20 30 50.00 41 40 -2.44

Goats 210 278 32.38 78 97 24.36 160 210 31.25 391 440 12.53

Sheep 510 535 04.90 0 0 0.00 0 0 0.00 0 0 0.00

Camel 20 27 35.00 4 4 0.00 6 4 -33.33 3 4 33.33

Source:-District office of WD & SC located at zilla parishad.

Note: - % change denotes change in 2006-07 over 2001-02.

In view of inadequate fodder production, increasing feeding cost, very limited

opportunities to use bullocks for agricultural operations during rabi and summer seasons,

and easy availability of tractor and other machineries for agricultural operations, majority

farmers (except Dhar) found keeping of bullocks as most uneconomical and non-affordable.

In Dhar, due to hilly area and high slope, mainly bullocks are used for agricultural

operations. Generally majority of households own milch animals like cows, buffaloes & goat.

After implementation of NWDPRA, the number of milch animals such as cows, buffaloes and

goat shows upward trend in 2006-07. Also, number of milch animals of improved breeds

registered fair increase. After NWDPRA, fodder availability as well as milk market structure

improved to some extent and hence farmers and landless families opted for increasing milch

animals of better breed with a view to raise their income through sale of milk (See Table

3.6). However, due to poor management and feeding practices and majority of local breed

milch animals; milk yield per animal per day was found relatively low. Apart from cows and

buffaloes, small ruminants like goat play a vital role in sustaining livelihood of landless and

poor families. Goat rearing is common and very important among tribal and poor families of

selected watersheds. Generally stall feeding is given to cows and buffaloes during latter part

of the rabi and summer season

(XI) Drinking water facility:-

In all the 4 selected watersheds, hand pumps, wells and public taps are the main

sources of drinking water. Generally, villagers are not facing any paucity of drinking water

Page 50: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

50

during kharif and major part of the rabi season. In this period, drinking water is available

within a distance of 1 kms. or so. However, during summer season, the water table goes

down significantly and hence majority of wells and hand pumps goes dry. Villagers facing

problem of paucity of drinking water manage their daily requirement of drinking water from

the distant sources in the range of 1 to 4 kms. In village of Kirap watershed, during summer

season, villagers are relying on drinking water, supply through Govt. tankers. For livestock,

kheli (Awado/ storage of water for livestock), tanks and dug-out ponds are the main sources

of drinking water for cattle. Anicuts constructed under NWDPRA programme are also used

for drinking and bathing purpose for cattle. Women are also washing clothes using anicuts

water. Sometimes during summer season, problem of managing drinking water for livestock

is becoming acute which forcing large livestock holders for temporary migration to other

places.

(XII) Village Industry and Income Generation Activities:-

In all the villages of selected watersheds, no agro-processing, commercial poultry

farms or other manufacturing industries were observed. In all sample watersheds, generally

farmers had taken up dairy as allied activity for generation of recurring supplement income.

Except agriculture, wage opportunities in Sakariya and Kirap watersheds were negligible.

For the people of Modak-VI watershed, good opportunity for wage employment is available

in nearby stone mines, kota stone and Birla cement industries. The people of Dhar

watershed have also good employment opportunities in marble industry located in nearby

areas and in touring industries of famous Udaipur city. In all the watersheds, big livestock

holders, few landless and other families are migrating every year during summer season to

other places in search of employment. As per discussion with the villagers, after the

interventions of NWDPRA project, employment opportunities within the watershed villages

improved to some extent in agriculture and allied dairy sector.

(XIII) Institutional Aspects:-

PIA, WA, WC, WDT:-

(i) PIA:-

At the onset of the project in the year 2002, department of watershed development

and soil conservation (WD & SC) was the Project Implementing Agency (PIA) in selected

watersheds. However, after the merger of the WD & SC with the Rural Development and

Panchayat Raj department in 2004, the panchayat samiti of respective blocks took over as

PIA. The details of PIA for each sample watershed is given in Table 3.1. After conducting

few participatory exercises, strategic plan for the each selected watershed was hurriedly

Page 51: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

51

prepared by respective PIA in consultation with watershed community, junior engineer in

charge of watershed and subject experts of the watershed areas. The preparation of

strategic plan and approval of the same was delayed in Modak-VI, Sakariya, and Kirap

watersheds for a period of one to two year.

(ii) Watershed Association (WA):-

The WA is the general body comprising of all members of the watershed villages

who agree for participate in the NWDPRA project. As per norms laid down in WJ guidelines,

WA was formed in each selected watershed and registered under the Rajasthan societies

registration act. The year of registration of WA is shown in Table 3.1. In the initial stage of

the project, WA meetings were held regularly and attendance of members in the meetings

was fairly good but active participation was found wanting.

In the last 3 years of the project, the number of meetings held and attendance of

members in the meetings was found quite low. The general body meeting to be organized

atleast once every year did not meet regularly. In all 4 selected watersheds, role of WA was

below expectation mentioned in WJ guidelines.

(iii) Watershed Committee (WC):-

Watershed Committee (WC) in each selected watersheds was formed in 2002-03.

The executive members of WC were selected by WA. The selected members of WC

represent different sections of watershed community such as SHG, UG, SC, ST, Panchayat,

WDT, Farmer, Landless and women. The composition of WC of selected 4 watersheds was

as per details shown below:

Watershed Kirap Sakariya Modak-VI Dhar

Male members 8 11 5 8

Female member 3 - 3 4

Total member* 11 11 8 12

* Including president and secretary.

In Sakariya WC, all selected members were male. Thus in forming WC in Sakariya

watershed, WJ guideline norms of atleast two women members in WC was ignored. Except

Modak-VI, president of WA was not the chairman of the WC. As per WJ guidelines, WC is

an executive body of the WA and is supposed to carry out and monitor execution of project

activities under overall supervision and control of WA. In each selected watershed, only a

few members of the WC were found actively involved in the project activities. WC meetings

were held regularly in the initial stage of the project but later on meetings were not held

regularly and were organized only when the president and WDT felt the need of the same.

Page 52: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

52

In selected watersheds, the PIA organized training programme for the members of WC for

imparting training on various implementation issues of the project.

(iv) Watershed Development Team (WDT):-

In all the 4 selected watersheds, PIA formed Watershed Development Team (WDT)

by appointing persons on a contractual / temporary basis. Except Dhar watershed, each

WDT had 4 members. In Dhar, WDT was of one member only consisting of junior engineer

incharge of the project. As per WJ norms, atleast one WDT member should be a woman.

However, except Kirap‟s WDT, this norm was not followed in forming WDT. The appointed

WDT members were experts of various subject disciplines such as agricultural engineer,

forestry, animal science, social science etc. The payment to WDT was made from project

administrative funds.

(IV) SHGs and UGs:-

Table 3.7 gives details of the SHGs and UGs formed in four selected watersheds. In

each sample watershed, as per WJ norms, SHGs and UGs have been formed by PIA. The

primary purpose of forming SHGs was to strengthen them as a social and functional unit so

that they can raise their income and enable them to manage effectively their own need base

activities. The SHGs members were mainly landless, marginal and small land holders. PIA

organized training programmes for SHG members. In Kirap watershed, PIA identified all 6

SHGs under mature category and sanctioned revolving fund Rs. 1.50 lakhs for them (Table

3.7). In Dhar watershed also, revolving fund of Rs. 70000 was sanctioned for 3 mature

SHGs. No revolving fund was sanctioned for SHGs formed in Modak-VI watershed (See

table 3.7).

The details of SHGs involved in watershed management activities, number of SHGs

formed by women only, area of function of SHGs etc. have been shown in table 3.7. In Kirap

and Dhar watersheds, the involvement of SHGs in project implementation was moderate.

However, on account of inadequate support from WDT, timely non-availability of proper

direction from PIA, the overall working of the majority SHGs in selected watersheds was not

as per expectation laid down in WJ guidelines.The number of User Group (UGs) formed in

selected watershed have been shown in table 3.7. User Groups include members who are

land owners within the watershed areas. The UGs were organized on ground of credit and

thrift activity or according to their capability. Not a single UG of the 4 selected watersheds

had taken up thrift activity.

Page 53: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

53

Table:-3.7

Information regarding Self Help Groups (SHGs) and Users Groups (UGs) of the Villages under Selected Watersheds.

SI. No.

Particulars

Kirap (Ajmer) Sakeriya (Chittorgarh) Modak-VI (Kota) Dhar (Udaipur)

SHG UG SHG UG SHG UG SHG UG

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

Nos. Nos. of Mem.

1 Total No. of SHGs/ Ugs in the village. 6 78 6 30 5 53 5 47 4 59 4 106 3 30 4 40

2 No. of SHGs/ Ugs are involved in watershed management.

2 27 6 30 5 47 - - 4 59 4 106 3 30 - -

3 No. of SHGs/ Ugs framed by women only. 6 68 - - 1 10 - - 1 14 - - 1 10 - -

4 No. of SHGs/ Ugs framed only by women are involved in watershed management.

2 22 - - 1 10 - - 1 14 - - 1 10 - -

5 Area of function: Livestock keeping and development

Livestock development, krishi, sale of vegetables

Livestock development, Horticultural products

Agriculture, Nala nirman, Pasture development, sale of

vegetables, goat rearing

i) SHGs

ii) Ugs

Arable land (Conservation), DLT, Charagahvikas (Fodder, production )

Arable land- (conservation), DLT,Non arable land

production Agro- forestry, Charagah vikas

(Pasture Development)

DLT,Pasture Development, Agro-forestry

Saving, Environmental non arable land-conservation

6 Total revolving fund provided to SHGs. (RS.) Total 1,50,000 Rs. (25000 to

each SHG). Total Rs. 1 lakh

(4 SHGs) NIL Total Rs. 70,000/-

7 Ugs Thrift (Rs.) - - - -

Note:- DLT= Drainage line treatment activities

Source:- District office of WD & SC located at zilla parishad of Ajmer, Chittorgarh,Kota and Udaipur.

Page 54: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

54

Most of the UGs had marginal involvement in the planning various phases of the

watershed programme. Thus, role of UGs in selected watersheds was not found so

effective. It seems that UGs were formed just to fulfill the suggested administrative

requirement of the programme in WJ guidelines.

Section II

I) Activity-Wise Physical and Financial Target and Achievement of the Project.

Activity-wise and component-wise data on physical and financial target and

achievement under the NWDPRA project in sample watersheds have been presented in

Table 3.8 to 3.11. Important observations relating to physical and financial progress and

achievement are given below separately for each sample watershed.

i) Kirap watershed:-

The activity-wise data relating to target and achievement for Kirap watershed

provided in Table 3.8.clearly indicates that of the total sanctioned amount of Rs.22.50 lakhs,

a total Rs. 20.565 lakhs (92.15%) was spent on various components of the project upto

Sept. 2007. Under the management component which includes activities such as

administration, training programme for PIA, WC, WDT, publicity, community mobilization etc.

only 45.94 percent of the target amount of Rs. 4.9625 lakhs was utilized. The data clearly

reveals that the available surplus fund of management component has been utilized for the

completion of various activities related to Natural Resource Management (NRM).For the

development components (NRM, FPS and LSS) of the project total amount spent was

105.37 percent (Rs. 18.285 lakhs) of the allocated amount of Rs. 17.354 lakhs.

Under management cost, spending on administration at watershed committee and

PIA level, honorarium to village base community organizer and training cost at identified

institutes as well as state / district level (training to WC, WA, SHGs, UGs, watershed

community, exposure tours, publication etc.) has been found to be very low and below 50

percent of the amount allocated for it in the strategic plan. However, under entry point

activities, Barani Chetna Kendra (Community hall) was constructed in common pasture land

at village Kirap by utilizing full budgeted amount of 0.675 lakh. The common pasture land of

14 Ha. was taken up for development. Boundry, plantation of agro-forestry trees such as

babul, neem, ratanjyot etc. were taken up on it. Due to non-provision of fencing and

adequate protection measures for the pasture land, the development of pasture land not

taken place as per expectation and the survival rate of agro-forestry trees planted around

pasture land was also found low. In watershed programme for Kirap, major thrust was laid

on activities related to Natural Resource Management (NRM). And among NRM, focus was

Page 55: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

55

more on activities undertaken for arable land. In order to conserve soil and moisture, under

the Natural Resource Management (NRM), a numbers of measures were undertaken on

arable and non-arable land.

Major measures undertaken were preparation of earthen bunds, contour bunds,

contour vegetative bunds, soil-stone bunds etc. on arable land and construction of run off

structures such as anicut, nadi, gali plugs, diversion channel, khadin, v-ditches etc.on non-

arable land.Againts the target of 3000 RMT, lenth of various type of bunding completed was

24077 RMT (829 %). Also planting of horticultural seedling of lemon, ambla, gauva etc. was

undertaken. As per PIA, the survival rate of horticulture plantation was near to 55 percent.

For increasing the area under green cover, plantation of agro-forestry trees/ species such as

deshi babool, vilayati babool, ker, neem, khejodi etc.was undertaken on large scale mostly

on non-arable land. The financial achievement to the target set for NRM activities was

187.44 percent for arable land whereas it was only 55.32 percent for non-arable land (see

table 3.8 and for photo annexure II, III)

Drainage line treatment (DLT) works were undertaken on upper, middle and lower

reaches. For DLT, against the target of Rs. 3.46 lakhs, amount spent was Rs. 4.37 lakhs.

Thus, achievement of financial target set for DLT was 126.30 percent. For Farm Production

System (FPS) activities, amount utilized in relation to target was zero for activities such as

establishment of nursery, adoption of proven technology, livestock management etc.

However activity of testing and demonstration was undertaken and amount spent on it was

over 3 folds. However, for diversification of production system, against provision of Rs. 1.50

lakhs, very small amount of Rs. 0.02 (1.33 %) was spent.

Overall, achievement of the financial target set for FPS has been 87.88 percent. For

activities included under the head of livelihood support system for landless families (LSS),

93.31 percent amount of the target amount of Rs. 1.61 lakhs was utilized. From the above, it

is obvious that financial achievement in Kirap watershed in respect of management

component was far below expectation. In respect of development component, though a few

important activities were ignored due to shortage of fund and other reasons, on the whole,

financial achievement may be considered nearly satisfactory.

Page 56: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

56

Table:-3.8

Physical and financial target and achievement under NWDPRA programme.

Watershed:- Kirap (Ajmer) Period:-2002-07

(Rs.in Lakh)

Sr. No.

Components / Activities Unit

Strategic plan from 2001-02 to

2006-07 (including

extended phase, if any)

Cumulative Progress

% of Achievement

Physical Financial

(Rs.) Physical

Financial (Rs.)

Physical Financia

l

1 2 3 4 5 6 7

A Management Component:

I Administration Cost:

(a) State/District Hq. - 0.125 - - - 0.00

(b) Watershed committees - 0.90 - 0.50 - 55.56

(i) salary - 1.125 - - - 0.00

(ii) Other expenses - - - - - -

Sub Total (Watershed Committees) - 2.15 - 0.50 0.00 23.26

(c) Project Implementation Agencies (PIA) - - - - - -

(i) Salary - - - - - -

(ii) Other expenses - - - - - -

Sub Total (PIA) - - - - - -

Sub Total (Admn. Cost ) - 2.15 - 0.50 0.00 23.26

II Community Organizations:

(a) Entry point activities of WC No. 1 0.675 1 0.675 100.00 100.00

(b) Honorarium to village Based Community No. - 0.45 - 0.25 - 55.56

(c) Expenses at Distt.HQ .for Misc. - 0.5625 - 0.225 - 40.00

(d) Corpus for WDP (Rs.) - - - - - -

Sub Total (Community Org) 1 1.6875 1 1.15 100.00 68.15

III Training Programme:

(a) State/District level training cost No. - 0.675 12 0.38 - 56.30

(b) PIA: Training cost at identified Institutes No. - 0.45 1 0.25 - 55.56

Sub Total (Training) - 1.125 13 0.63 0.00 56.00

TOTAL (A) 1 4.9625 14 2.28 1400.00 45.94

B Development Component:

I Natural Resource Management (NRM):

(a) Arable Land:

(i) Soil & Moisture Conservation Activities Ha. 45 0.545 - - 0.00 0.00

(ii) Contour Bunding /field bunding executed (Cumulative) in RMT

Rmt 3000 0.6 24077 4.975 802.57 829.17

(iii) Agronomic Conservation Practices Ha. - - - - - -

(iv) Others Ha. 8 2.0 5 0.92 62.50 46.00

Sub Total ( Arable Land) 3053 3.145 24082 5.895 788.80 187.44

Cont..

Page 57: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

57

(b) Non Arable Land:

(i) Run off Management Structures /CF/ST Ha. 100 1.94 60 1.23 60.00 63.40

(ii) Water Harvesting structures (WHS) (Cumulative)

No. - - - - - -

(iii) Dry Land Horticulture Ha. - - - - - -

(iv) Conservation & Development of

Bio- Mass/Plantation No. 5000 2.22 5000 1.13 100.00 50.90

(v) Others Ha. 1000 0.486 800 0.21 80.00 43.21

Sub Total (Non Arable ) 6100 4.646 5860 2.57 96.07 55.32

(c) Drainage Lines (DLT):

(i) Upper reaches ( No.of Structure) No. 110 1.17 8 1.60 7.27 136.75

(ii) Middle reaches (no.of Structure) No. 12 1.29 8 1.77 66.67 137.21

(iii) Lower reaches (No. of Structure ) No. 4 1.0 4 1.0 100.00 100.00

Sub Total (Drainage Line ) 126 3.46 20 4.37 15.87 126.30

sub Total (NRM) 9279 11.251 29962 12.835 322.90 114.08

II Farm Production system for land owning Families (FPS):

(a) Est. of nurseries and production of seedlings

No. 6000 0.12 - - 0.00 0.00

(b) Testing and Demonstration of new technologies

No. 530 1.20 15074 3.93 0.00 327.50

(C) Diversification of Production system No. 2500 1.50 10 0.02 0.40 1.33

(d) Adoption of proven technology. Ha. 100 0.70 - - 0.00 0.00

(e) Livestock Management Ha. 300 0.975 - - 0.00 0.00

(f) Others Ha. - - - - - -

Sub Total FPS 9430 4.50 15084 3.95 159.96 87.88

III Livelihood support system for land -less femilies:

(a) Household production system No. 20 0.20 1 0.25 5.00 125.00

(b) Bio-mass based rural industry activities No. 10 0.20 1 0.25 10.00 125.00

(c) Dairy etc. No. 10 0.50 4.0 1.0 40.00 200.00

(d) Livestock Management No. 8 0.7075 - - 0.00 0.00

(e) Others No. - - - - - -

Sub Total for LSS 48 1.61 6 1.5 12.50 93.31

Sub Total (B): 18757 17.354 45052 18.285 240.19 105.37

GRAND TOTAL (A+B) 18758 22.316 45066 20.565 240.25 92.15

Area Treated Ha. 500 - 500 - 100.00 -

Source:- District office of WD & SC, Ajmer zilla parishad, Ajmer.

ii) Sakariya watershed:-

The activity-wise data on physical and financial target and achievement for Sakariya

watershed has been provided in Table 3.9. The maximum permissible project cost for

Sakariya watershed was Rs. 22.50 lakhs. Upto the end of project period (Sept. 2007), 96.75

percent of the permissible project cost was utilized for undertaking various project activities.

Page 58: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

58

Table:-3.9

Physical and financial target and achievement under NWDPRA programme.

Watershed:- Sakariya (Chittorgarh) Period:-2002-07

(Rs.in Lakh)

Sr. No.

Components / Activities Unit

Strategic plan from 2001-02 to 2006-07 (including extended phase, if any)

Cumulative Progress

% of Achievement

Physical Financial

(Rs.) Physical

Financial (Rs.)

Physical Financial

1 2 3 4 5 6 7 8 9

A Management Component:

I Administration Cost:

(a) State/District Hq. - 0.225 - 0.225 - 100.00

(b) Watershed committees - - - - - -

(i) salary - 0.550 - 0.550 - 100.00

(ii) Other expenses - - - - - -

Sub Total (Watershed Committees) - 0.775 - 0.775 - 100.00

(c) Project Implementation Agencies (PIA) - - - - - -

(i) Salary - 1.125 - 1.125 - 100.00

(ii) Other expenses - - - - - -

Sub Total (PIA) - 1.125 - 1.125 - 100.00

Sub Total (Admn. Cost ) - 1.900 - 1.900 - 100.00

II Community Organizations: - - - - - -

(a) Entry point activities of WC No. 1 0.675 1 0.675 100.00 100.00

(b) Honorarium to village Based Community No. - 0.100 - 0.094 - 94.00

(c) Expenses at Distt.HQ .for Misc. - - - - - -

(d) Corpus for WDP (Rs.) - 0.225 - 0.225 - 100.00

Sub Total (Community Org) 1 1.000 1 0.994 100.00 99.40

III Training Programme:

(a) State/District level training cost No. - 0.500 - 0.355 - 71.00

(b) PIA: Training cost at identified Institutes No. - 0.510 - 0.510 - 100.00

Sub Total (Training) - 1.010 - 0.865 - 85.64

TOTAL (A) 1 3.910 1 3.759 100.00 96.14

B Development Component:

I Natural Resource Management (NRM):

(a) Arable Land:

(i) Soil & Moisture Conservation Activities Ha. 8 0.130 8 0.130 100.00 100.00

(ii) Contour Bunding /field bunding executed (Cumulative) in RMT

Rmt - - - - - -

(iii) Agronomic Conservation Practices Ha. - - - - - -

(iv) Others Ha. - - - - - -

Sub Total ( Arable Land) 8 0.130 8 0.130 100.00 100.00

Cont….

Page 59: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

59

(b) Non Arable Land:

(i) Run off Management Structures /CF/ST

Ha. 29 1.240 29 1.240 100.00 100.00

(ii) Water Harvesting structures (WHS) (Cumulative)

No. 7 3.060 7 3.060 100.00 100.00

(iii) Dry Land Horticuture Ha. - - - - - -

(iv) Conservation & Development of Bio- Mass/Plantation

No. - - - - - -

(v) Others Ha. - - - - - -

Sub Total (Non Arable ) 36 4.300 36 4.300 100.00 100.00

(c) Drainage Lines (DLT):

(i) Upper reaches ( No. of Structure) No. 5 0.160 5 0.160 100.00 100.00

(ii) Middle reaches (No. of Structure) No.

(iii) Lower reaches (No. of Structure ) No. 4 8.431 4 8.410 100.00 99.75

Sub Total (Drainage Line ) 9 8.591 9 8.570 100.00 99.76

sub Total (NRM) 53 13.021 53 13.000 100.00 99.84

II Farm Production system for land owning Families (FPS):

(a) Est. of nurseries and production of seedlings

No. - - - - - -

(b) Testing and Demonstration of new technologies

No. 270 4.050 268 4.010 99.26 99.01

(C) Diversification of Production system No. - - - - - -

(d) Adoption of proven technology. Ha. - - - - - -

(e) Livestock Management Ha. - - - - - -

(f) Others Ha. - - - - - -

Sub Total FPS 270 4.050 268 4.010 99.26 99.01

III Livelihood support system for land -less families:

(a) Household production system No. - - - - - -

(b) Bio-mass based rural industry activities

No. - - - - - -

(c) Dairy etc. No. - - - - - -

(d) Livestock Management No. - - - - - -

(e) Others No. 6 1.519 4 1.000 66.67 65.83

Sub Total for LSS 6 1.52 4 1.000 66.67 65.83

Sub Total (B): 329 18.590 325 18.010 98.78 96.88

GRAND TOTAL (A+B) 330 22.500 326 21.769 98.79 96.75

Area Treated Ha. 500.00 500.00 100.00

Source:- District office of WD & SC, Chittorgardh zilla parishad, Chittorgardh.

Thus, as far as achievement of financial target is concerned, the achievement was

impressive and very close to target.For management component, amount utilized to target

was 96.14percent.Except activity namely training, publicity, material printing etc.at state/

district level, the utilization of allocated amount was 100 percent for other activities included

Page 60: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

60

under the management component (See table 3.9). Under the entry point activities, WC

undertook civil work of construction of chabootara at village Sakariya.

The activities classified under Natural Resource Management (NRM) are the

key activities of the project and success of the project is highly associated with effectiveness

of these activities. Under NRM, for activities related with arable land, non-arable land and

drainage line (DLT), 100 percent of the target amount was spent. For NRM activities related

to arable land, very negligible amount (1%) was provided in the budget. Among NRM

activities on non-arable land, activities related to runoff management and water harvesting

were undertaken as per strategic plan. These activities include construction of anicut, dug

out earthen ponds, gully plugs etc.

Also plantation of 230 agro-forestry seedlings such as bamboo, ratanjyot etc.was

taken up on field boundaries as well as on non-arable land. The survival rate of these agro

forestry plantation reported by PIA was around 60 percent. The seedlings of horticultural

crops like ambla, mango etc. were distributed to farmers but they mostly failed to survive

mainly due to soil-climatic condition. The expenditure incurred under drainage lines was

mainly on work undertaken at lower reaches. Not a single rupee was spent on contour/ field

bunding, agronomic conservation measures, development of bio-mass etc. (See table 3.9).

It is interesting to note that in Sakariya watershed, of the total budget for NRM (Rs.

13.021 lakh), 66 percent was spent for DLT and 33 percent for activities on non-arable land.

Under Farm Production System (FPS), only one activity namely testing and demonstration

of new technologies was undertaken as per target. And for that, of the target amount of Rs.

4.05 lakhs, utilized amount was Rs. 4.01 lakhs (99.01 %).

Among activities classified under livelihood support system (LSS) for landless

families, except providing revolving fund to SHGs, no other activities were carried out.

The data given in table 3.9, clearly indicate that some of the important project

activities such as field bunding, dryland horticulture, dairy, livestock development,

development of bio-mass, adoption of new technology, crop diversification etc. were not

undertaken under the project for Sakariya watershed.

In Sakariya watershed, financial achievement for different project activities is though

uneven but on the whole, it is fairly good.

iii) Modak-VI watershed:-

The activity-wise data on physical and financial target and progress of NWDPRA in

Modak-VI watershed during project period has been shown in Table 3.10.

Page 61: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

61

Table:-3.10

Physical and financial Target and Achievements under NWDPRA programme.

Watershed:- Modak-VI (Kota) Period:-2002-07

(Rs.in Lakh)

Sr. No

Components / Activities Unit

Strategic plan from 2001-02 to

2006-07 (including

extended phase, if any)

Cumulative Progress

% of Achievement

Physical Financial(

Rs.) Physical

Financial(Rs.)

Physical Financial

1 2 3 4 5 6 7 8 9

A Management Component:

I Administration Cost:

(a) State/District Hq - - - - - -

(b) Watershed committees - 0.47 - 0.64 - 136.17

(i) salary No. - - - - - -

(ii) Other expenses - - - - - -

Sub Total (Watershed Committees): - 0.47 - 0.64 - 136.17

(c) Project Implementation Agencies (PIA) - 0.20 - 0.19 - 95.00

(i) Salary - - - - - -

(ii) Other expenses - - - - - -

Sub Total (PIA): - 0.20 - 0.19 - 95.00

Sub Total (Admn. Cost ): - 0.67 - 0.83 - 123.88

II Community Organizations:

(a) Entry point activities of WC No. 2 0.45 1 0.65 50.00 144.44

(b) Honorarium to village. Based Community No. - - - - - -

(c) Expenses at Distt.HQ .for Misc. - 0.17 - 0.16 - 94.12

(d) Corpus for WDP No. - 0.17 - 0.15 - 88.24

(e) Publicity No. 50 0.15 40 0.20 80.00 133.33

Sub Total (Community Org): 52 0.94 41 1.16 78.85 123.40

III Training Programme:

(a) State/District level training cost No. 10 0.10 3 0.03 30.00 30.00

(b) PIA: Training cost at identified Institutes No. 14 0.34 12 0.56 85.71 164.71

Sub Total (Training) 24 0.44 15 0.59 62.50 134.09

TOTAL (A) 76 2.05 56 2.58 73.68 125.85

B Development Component:

I Natural Resource Management(NRM)

(a) Arable Land:

(i) Soil & Moisture Conservation Activities Ha. 250 2.90 100 0.70 40.00 24.14

(ii) Contour Bunding /field bunding executed (Cumulative) in RMT

Rmt - - - - - -

(iii) Agronomic Conservation Practices Ha. 12 0.20 - - - -

(iv) Others Ha. - - - - - -

Sub Total ( Arable Land): 262 3.10 100 0.70 38.17 22.58

Cont…

Page 62: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

62

(b) Non Arable Land:

(i)

Run off Management Structures /CF/ST

No. - - - - - -

(ii)

Water Harvesting structures (Cumulative)

No. 2 1.60 1 0.62 50.00 38.75

(iii) Dry Land Horticuture No. - - - - - -

(iv)

Conservation & Development of Bio- Mass/Plantation

No. 2000 0.30 3000 0.34 150.00 113.33

(v) Fancing Ha. 1.5 1.50 1.30 1.32 86.67 88.00

(vi) Others (Plantation) Ha. 2000 0.20 4000 0.26 200.00 130.00

Sub Total (Non Arable ): 4003.5 3.60 7002.3 2.54 174.90 70.56

(c) Drainage Lines:

(i) Upper reaches ( No. of Structure) No. 10 0.20 25 0.26 250.00 130.00

(ii) Middle reaches (No. of Structure) No. 1 1.52 1 2.49 100.00 163.82

(iii) Lower reaches (No. of Structure ) No. 1 2.00 1 4.10 100.00 205.00

Sub Total (Drainage Line ): 12 3.72 27 6.85 225.00 184.14

Sub Total (NRM): 4277.5 10.42 7129.3 10.09 166.67 96.83

II Farm Production system (FPS) for land owning Families :

(a)

Est. of nurseries and production of seedlings

No. - - - - - -

(b)

Testing and Demonstration of new technologies

No. 85 0.70 90 0.72 105.88 102.86

(C) Diversification of Production system No. 150 1.00 - - 0.00 0.00

(d) Adoption of proven technology. Ha. 50 0.50 - - 0.00 0.00

(e) Livestock Management Ha. 5 0.33 - - 0.00 0.00

(f) Others (Vermi Compost) Ha. 100 0.50 12 0.23 12.00 46.00

Sub Total FPS 390 3.03 102 0.95 26.15 31.35

III

Livelihood support system (LSS)for land -less femilies:

a- Household production system No. 40 0.40 - - 0.00 0.00

b-Bio-mass based rural industry activities

No. - - - - - -

c- Dairy etc. No. 5 0.50 - - 0.00 0.00

d- Livestock Management No. 5 0.25 1 0.07 20.00 28.00

e- Others (SHG for Agri.) No. - - - - - -

Sub Total for LSS: 50 1.15 1 0.07 2.00 6.09

Sub Total (B): 4717.50 14.60 7232.30 11.11 153.31 76.10

GRAND TOTAL (A+B): 4793.50 16.65 7288.30 13.69 152.05 82.22

Area Treated: Ha. 370.00 370.00 100.00

Source:- District office of WD & SC, Kota zilla parishad, Kota.

Against the entire project cost of Rs. 16.65 lakhs, upto the end of the project, total

amount of Rs. 13.69 lakhs (82.22 %) was spent. Though, financial achievement is uneven

for different project activities, it is fairly good for the project as a whole. Under entry point

Page 63: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

63

activity, community hall was constructed at village Dhuniya by spending Rs. 65 thousands.

Under management component, expenditure incurred on administration (at WC and PIA)

component was 23.88 percent higher than targeted amount of Rs. 67 thousands. The

amount spent on community organization and mobilization activities was also higher than

target amount. The training programmes and exposure tours were arranged for WC, WA

functionaries, WDT members, SHGs, UGs, Watershed community, PIA etc. The amount

spent on it was higher by 34.09 percent in relation to provision of Rs. 0.44 lakhs in strategic

plan. It may be noted that all the training programmes and exposure visits were arranged

during project‟s initial years 2002-03 to 2003-04.Among 4 selected watersheds, amount

spent on management cost was higher than target in only Modak-VI watershed.

As per the strategic plan, for the development of natural resources in the watershed,

soil and moisture conservation activity namely contour bunding was undertaken on arable

land on a very small scale by spending only 24.14 percent amount of the budgeted amount

of Rs. 2.90 lakhs. On non-arable land, construction activities such as dug out earthen pond,

development of 30 Ha. pasture land, conservation and development of bio-mass/ plantation,

fencing on pasture land planting of agro-forestry trees etc. were undertaken.

The total amount spent on activities carried out on non-arable land was Rs. 2.54 lakhs,

which was nearly 30 percent less than targeted amount. The drainage line treatments were

carried out in upper, middle and lower reaches. The civil work of construction of 2 anicuts in

lower reaches, preparation of loose stone boulder check-dam and other water harvesting

and diversion structures in middle and upper reaches were undertaken. The expenditure

incurred was 184.14 percent of the targeted amount of Rs. 3.72 lakhs (for photo: see

annexure-I, IV, V). The surplus amount of NRM activities for arable and non-arable land was

utilized to meet the additional expenditure made for DLT works.

Under FPS, only two activities namely testing and demonstration of new

technologies and vermi-compost were executed. Hence, only 31.35 percent of the budgeted

amount was utilized for FPS activities.

Majority activities included under LSS were not carried out during the project period.

Therefore, only 6.09 percent of allocated amount (Rs. 1.15 lakh) was utilized for LSS

activities.

Overall, financial achievement in this watershed was better in respect of

management components, NRM component for non-arable land and drainage line

treatment. It was very poor for FPS, LSS activities.

Page 64: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

64

iv) Dhar watershed:-

From the table 3.11, it is evident that spending on administration component was

only 0.90 lakhs (38.14 %) as against the financial provision of Rs. 2.36 lakhs. The

expenditure incurred at state / district H.Q. and PIA level was reported as nil. Expenses for

the community organization and mobilization intervention carried out were more or less

according to provision made in the strategic plan. Under entry point activities, the

construction of stage in school, chabootara and kheli (drinking water storage for livestock)

were undertaken. For these works, public contribution came in the form of labour

participation; PIA arranged the training programmes and exposure visit for WC, WA and

watershed community but amount utilized for that was only 42. 67 percent of the allocated

amount.

Under NRM, major intervention carried out on arable land was for soil and moisture

conservation purpose. The activities such as nala pluging, stone bunding, nadi construction

etc. were undertaken. These activities were found effective in reducing the erosive velocity

of the runoff, in checking soil loss and increasing the soil-moisture. Overall expenses

incurred for development of arable land was Rs. 1.98 lakh (84.26 %) of the allocated amount

of Rs. 2.35 lakhs (See table 3.11).

On non-arable land, against the provision of installation of 140 WHS and other

structures, total structures installed were 640. Out of these 640, 578 were loose stone

check-dam (LSCD). On non-arable land, near village ubeswar, development of 40 Ha.

pasture land was undertaken and amount spent for that was 26.76 percent higher than the

plan provision of Rs. 71000 (See table 3.11). Also, the plantation of 20000 Ratan jyot and

growing of Dhaman grass on ground and pasture land were also taken up. On the whole

expense incurred on various measures taken up for development of non-arable land was

86.64 percent of the targeted amount of Rs. 4.64 lakhs (for photo: see annexure-I). For

drainage lines treatments (DLT) expenses were incurred mainly for the activities carried out

for the development of upper reaches. Total expense incurred for DLT was Rs. 5.25 lakhs

(100 %).

Among FPS activities, diversification of production system and testing and

demonstration of new technologies were undertaken on a large scale. The spending on

diversification of production system was higher by Rs. 81000 (41.54 %).

Page 65: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

65

Table:-3.11

Physical and financial progress under NWDPRA programme of X plan.

Watershed:- Dhar (Udaipur)

(Rs.in Lakh)

Sr. No.

Components / Activities Unit

Strategic plan from 2001-02 to 2006-07

(including extended phase, if

any)

Cumulative Progress

% of Achievement

Physical Financial

(Rs.) Physical

Financial (Rs.)

Physical Financial (

1 2 3 4 5 6 7

A Management Component:

I Administration Cost:

(a) State/District Hq. - 0.23 - - - 0.00

(b) Watershed committees - - - - - -

(i) salary - 0.90 - 0.90 - 100.00

(ii) Other expenses - - - - - -

Sub Total (Watershed Committees) - 1.13 - 0.90 - 79.65

(c) Project Implementation Agencies (PIA)

- 1.23 - - - 0.00

(i) Salary - - - - - -

(ii) Other expenses - - - - - -

Sub Total (PIA) - 1.23 - - - -

Sub Total (Admn. Cost ) - 2.36 - 0.90 - 38.14

II Community Organizations:

(a) Entry point activities of WC No. 2 0.68 2 0.68 100.00 100.00

(b) Honorarium to village Based Community

No. 1 0.29 1 0.29 100.00 100.00

(c) Expenses at Distt.HQ .for Misc. - 0.03 1 0.02 - 66.67

(d) Corpus for WDP (Rs.) - 0.225 - 0.225 - 100.00

Sub Total (Community Org) 3 1.225 4 1.215 133.33 99.18

III Training Programme:

(a) State/District level training cost No. 4 0.675 4 0.06 100.00 8.89

(b) PIA: Training cost at identified Institutes

No. 10 0.45 10 0.42 100.00 93.33

Sub Total (Training) 14 1.125 14 0.48 100.00 42.67

TOTAL (A) 17 4.71 18 2.595 105.88 55.10

B Development Component:

I Natural Resource Management (NRM):

(a) Arable Land:

(i) Soil & Moisture Conservation Activities

Ha. 100 1.63 100 1.58 100.00 96.93

Cont…

Page 66: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

66

(ii) Contour Bunding /field bunding executed (Cumulative) in RMT

Rmt - - - - - -

(iii) Agronomic Conservation Practices Ha. 40 0.40 40 0.40 100.00 100.00

(iv) Others Ha. - 0.32 - - - 0.00

Sub Total ( Arable Land) 140 2.35 140 1.98 100.00 84.26

(b) Non Arable Land:

(i) Run off Management Structures /CF/ST

Ha. 140 3.93 604 3.12 431.43 79.39

(ii) Water Harvesting structures (WHS) (Cumulative)

No. - - - - - -

(iii) Dry Land Horticuture Ha. - - - - - -

(iv) Conservation & Development of Bio- Mass/Plantation

No. 40 0.71 40 0.90 100.00 126.76

(v) Others Ha. - - - - - -

Sub Total (Non Arable ) 180 4.64 644 4.02 357.78 86.64

(c) Drainage Lines (DLT):

(i) Upper reaches ( No. of Structure) No. 676 4.00 676 4.00 100.00 100.00

(ii) Middle reaches (No. of Structure) No. 4 0.25 4 0.25 100.00 100.00

(iii) Lower reaches (No. of Structure ) No. 1 1.00 1 1.00 100.00 100.00

Sub Total (Drainage Line ) 681 5.25 681 5.25 100.00 100.00

sub Total (NRM) 1001 12.24 1465 11.25 146.35 91.91

II Farm Production system for land owning Families (FPS):

(a) Est. of nurseries and production of seedlings

No. - - - - - -

(b) Testing and Demonstration of new technologies

No. 500 0.84 800 0.84 160.00 100.00

(C) Diversification of Production system No. 32000 1.95 38000 2.76 118.75 141.54

(d) Adoption of proven technology. Ha. 10 1.26 0 0.32 - 25.40

(e) Livestock Management Ha. - - - - - -

(f) Others Ha. - - - - - -

Sub Total FPS 32510 4.05 38800 3.92 119.35 96.79

III Livelihood support system for land -less femilies:

a- Household production system No. - - - - - -

b-Bio-mass based rural industry activities

No. 10 0.45 10 0.45 100.00 100.00

c- Dairy etc. No. 5 0.63 5 0.40 100.00 63.49

d- Livestock Management No. - 0.42 - - - 0.00

e- Others No. - - - - - -

Sub Total for LSS 15 1.50 15 0.85 100.00 56.67

Sub Total (B): 33526 17.79 40280 16.02 120.15 90.05

GRAND TOTAL (A+B) 33543 22.50 40298 18.615 120.14 82.73

Area Treated Ha. 500 500 100.00

Source:- District office of WD & SC, Udaipur zilla parishad, Udaipur.

Page 67: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

67

Under LSS activities, mainly dairy and Bio-mass based rural industry activities were

undertaken. Overall spending for LSS activities was only 56.67 percent of the provision

made in strategic plan.

Financial achievement for watershed as a whole was fairly good (82. 71 %).

Section:- III

I) Problems faced in the Implementation of NWDPRA and suggestions to

improve them:

While implementing the 10th plan NWDPRA in Rajasthan state, implementing agency

WD & SC department came across several problems/ constraints. The nature of constraints

faced by them and suggestions to remove the same for better implementation of the

programme are given below:

Sr. No.

Problems/ constraints

Details of problems and suggestions

1 In view of

current wage

rate and

material cost,

per hectare

cost norm of

Rs. 4500/- is

very low.

In X plan NWDPRA, per hectare cost celing has been fixed

at Rs. 4500/-for land with less than 8 percent slope and Rs. 6000/-

for slope higher than 8%. During the implementation period,

minimum wage rate jumped from Rs. 60/- to Rs. 100/-. The

material cost, hiring cost of skilled human resource also recorded

significant increase. As there was no provision for revising cost

norm per hectare during the mid term of the project, the activities

undertaken in the later phase of the project failed to meet target

due to heavy increase in inputs cost. Many works undertaken at

this stage were found inadequate in size and scale and lacking

quality. As a result, effectiveness and impact of such works is

unlikely to sustain for a longer period. Therefore to avoid such

situation it is desirable to review the overall cost norm and to fix it

in the range of Rs. 12000-15000 per hectare. Moreover, there

should be arrangement to review it regularly at the interval of every

two years or so during the implementation period of the project.

This will take care of smooth and timely implementation during

later phase of the project.

2 Delay in

transfer of

funds at the

After release of project funds by MOA, GOI, it is commonly

observed that it takes about 2-4 months to reach at the grass root

level i.e. village watershed committee. This hampers the timely

Page 68: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

68

grass root

level

implementation of the project, Therefore it is desirable to evolve a

system with fixed time limit to ensure timely transfer of project

funds from MOA, GOI to grass root level PIA/ WDT. A one month

time-period seems to be the most appropriate time limit for this

purpose.

3 No provision

for survey &

projectisation.

There is no financial provision at all for survey & projectisation

work in WJ Guidelines. It is necessary to conduct survey for finding

not only accurate and appropriate places for water retention bodies

which save time and money but also generate higher benefits for

the watershed community. Preparation of such detailed project

report requires some expenses at the initial stage and hence

adequate arrangement of fund for survey & projection work (about

1-2%) should be provided for this purpose.

4 Internal

head-wise

reallocation of

development

funds

Under specific situation, there is a provision in WJ guidelines

for reallocation/ transfer of the budget amount to the extent of 10

percent from one subcomponent to another subcomponent. Any

savings from the management component may also be transferred

to development component. In Rajasthan, natural resource

management (NRM) is very important and is also a part of a few

other schemes which are presently implemented besides

NWDPRA. The farmers and herders who are major beneficiaries of

this project, demand these NRM works on a greater scale in

comparison to other heads. There are certain sub heads where

there is no scope of further work and have surplus funds. Hence, it

would be appropriate to increase reallocation limits from present

10% to 25 % to 30%. The situation from watershed to watershed is

varying greatly as arable/ non-arable/ pasture land ratio is not

uniform.

5 Beneficiary

contribution

under

plantation sub

head (50%) is

very high.

In NWDPRA, planting of Agro forestry/ horticulture crops

envisage for 50% contribution by participants which is viewed too

much by them as under similar Haryali project the same is 10% for

general and 5 % for SC/ST farmers. Therefore, beneficiary

contribution under plantation sub head should be reduced in line

with Haryali guideline as mentioned above.

Page 69: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

69

6 Allocation of

funds for

NRM works is

less

In WJ guideline, there is a provision of utilizing 50 percent

fund for development of natural resources namely land and water.

The degraded common lands requires more funds to bring it upto

the production level i.e. Silvi-pasture level. The requirement of

funds varies from one watershed to other watershed and even

farmers to farmers depending upon the condition and type of land.

Looking to the land condition of Rajasthan, more funds are needed

for NRM works such as water conservation, water harvesting, and

soil conservation activities for raising productivity of the cultivable

land. In view of above situation, the amount allocated for NRM

works has not been found adequate in many watersheds.

Therefore, there is a need to raise the upper limit of allocation

made for NRM works.

7 Inadequate

staff at

implementing

level

The Directorate of watershed development and soil

conservation (WDSC) presently working under panchayatiraj

department is implementing NWDPRA in the state. The total

technical staff (excluding peon, ministrel cadre, class IV cadre)

available with the department is about 700. In addition to 1128

NWDPRA watersheds, they are looking for other 5000-5500

watersheds of DDP, DPAP, CDP, IWDP etc. Therefore, on an

average, 1 person is looking after about 9 watersheds. Hence this

most unfavorable staff ratio at implementing level is adversely

impacting the timely, effective and qualitative implementation of the

project. Therefore, it is better to have a separate agency with

adequate staff strength for better implementation of NWDPRA.

8 Extension of

capacity

building

phase in 2nd

year also

In WJ, there is a provision to extend capacity building phase

upto end of first project year. However, project agency is facing a

problem to complete the time bound action plan of capacity

building of different personnel categories in one year. Therefore,

make provision in WJ guidelines to extend of extension of capacity

building phase upto end of 2nd year.This will bring clearity.

9 State/ District

level poor

Monitoring.

State level watershed committee (SLWC) and District level

watershed committee (DWC) were formed as per WJ guidelines.

SLWC is supposed to meet regularly atleast once in six months for

Page 70: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

70

periodic review and monitoring of overall progress of NWDPRA in

the state. Instead of having atleast 10 meetings of SLWC, during

entire project period, only 3 meetings were held. This in turn

affected the qualitative level and time schedule of the project

activities and overall project progress. Similar poor situation was

observed in case of district level monitoring by DWC. Hence, there

is a need to strengthen the project monitoring system at state/

district/ block/ watershed level.

Sum-up:

From the above review of physical and financial target and achievement of 4

selected watersheds, it is evident that for many activities of the project, mainly FPS and LLS,

the financial achievement was much below the target. The constraints discussed at length in

Chapter II were mainly responsible for non-achievement of physical and financial target.

Significant price rise in material cost, increase in wage labour and non-upward

revision of financial limit directly impacted negativity on the quality of the structures, size and

length of the bunds created during the phase years of the watershed project. The quality,

relevance and effectiveness aspects of the assets/ structures created under the project is

discussed in the next chapter.

%%%%%%%%%%%The End%%%%%%%%%%%

Page 71: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

71

Chapter:-4

Farm Level Agro-Economic Impact of NWDPRA.

4.1. Background:

As mentioned earlier, four sample watersheds namely Kirap, Sakariya, Modak-VI

and Dhar belonging to distinct districts and agro-climatic zones were selected for study. In

these selected watersheds, NWDPRA programme was implemented during period 2002-

2007 (Tenth plan). As NWDPRA project has been completed in these sample watersheds in

september-2007, it became imperative to look in depth at the effectiveness and relevance of

project components and to make qualitative and quantitative assessment of the various

agro-economic impacts using farm level survey data collected from sample households for

the base year 2001-02 and reference year 2006-07.Further, it is also worthwhile to study

overall impact of the NWDPRA programme on the development of rainfed areas and to

identify all possible constraints which are impacting negatively on the effectiveness and

outcomes of the project. For studying the various aspects discussed above, 80 sample

households comprising 40 beneficiaries and 40 non-beneficiaries were selected as sample

from each selected watershed. All related data for the study were collected from the

selected sample households by recall method which has some known limitations.

It is quite difficult to measure the quantum of certain indirect benefits such as

improvement in eco-system, ecological balance, prevention of degradation of soil etc.

Therefore, in this chapter, attempt has been made only to measure direct farm level agro-

economic aspects.

The NWDPRA was implemented in selected watersheds during the period 2002-

2007. During the implementation period, different activities/ components of NWDPRA were

undertaken and adopted by PIA/ farmers at different point of time. Some components were

taken in year 2003-04 and some in year 2004-05 or 2005-06. Therefore, in few cases, time

gap between date of adoption and date of field survey was somewhat short in relation to

required gestation period. Therefore, for such activities, impact worked out here shows only

partial picture.

This chapter mainly deals with the socio-economic profile of sample households,

programme impact on land use pattern, crop-pattern, crop-productivity, ground water

recharge and water resources potential, adoption of improved farming practices, farm

income, relevance, adequacy and sustainability of the technology adopted under

programme, people participation, identification of constraints operating at field level in the

Page 72: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

72

implementation of programme and overall impact of the programme activities on socio-

economic aspects.

4.2. Cast-wise classification of sample households:

The NWDPRA programme emphasizes more on activities which enhance livelihood

support particularly for under priviledged castes of rural community. Therefore, caste-wise

classification of sample households is attempted here and related data are shown in Table

4.1.

The data reveals absence of minority community (Muslim) in the selected sample

households. In sample households selected for Dhar and Sakariya watersheds, atleast 97.5

percent households are of schedule tribes (ST). In Kirap, 92.5 percent sample households‟

belongs to general communities and rest to SC. In Modak-VI watershed, majority sample

households are of general communities and ST. Thus, from the total 320 sample

households, more than 82 percent households are either ST or SC. This shows dominance

of under priviledged castes SC/ST in the selected sample households.

4.3. Family Size:

Family human labour is a major source of labour required for carry out timely all type

of farming operations and other allied activities. The extent of availability of family human

labour directly impact the paid out cost of cultivation. The availability of family human labour

is directly related with the size and composition of family and number of economically active

workers in the family. In this context, the average family size of sample households and

availability of economically active workers are discussed here.

Table 4.1 shows that except Kirap, average family size for beneficiary households in

remaining three watersheds ranged from 6.13 persons in Dhar to 7.58 persons in Sakariya.

For Kirap it was 5.68. For non-beneficiary households, average family members were below

6 in all the sample watersheds. Thus, average family size of beneficiary households was

found a little higher as compared to corresponding non-beneficiary households of selected

watersheds.

Page 73: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

73

Table :- 4.1

Information Regarding Cast-wise Family Size of Sample Households in Selected Watersheds

Sr. No.

Name of the

Castes

Watershed- 1 (Kirap/Ajmer) Watershed- 2 (Sakariya/Chittorgarh)

Beneficiary HHs. Non-Beneficiary HHs. Beneficiary HHs. Non-Beneficiary HHs.

HHs M F T HHs M F T HHs M F T HHs M F T

1

General 37 112 95 207 37 102 104 206 - - - - - - - -

% 92.50 54.11 45.89 100.00 92.50 49.51 50.49 100.00 - - - - - - - -

Avg.FS - 3.03 2.57 5.59 - 2.76 2.81 5.57 - - - - - - - -

2

SC 3 11 9 20 3 6 7 13 1 2 2 4 39 127 99 226

% 7.50 55.00 45.00 100.00 7.50 46.15 53.85 100.00 2.50 50.00 50.00 100.00 97.50 56.19 43.81 100.00

Avg.FS - 3.67 3.00 6.67 - 2.00 2.33 4.33 - 2.00 2.00 4.00 - 3.26 2.54 5.79

3

ST - - - - - - - - 39 152 147 299 1 2 3 5

% - - - - - - - - 97.50 50.84 49.16 100.00 2.50 40.00 60.00 100.00

Avg.FS - - - - - - - - - 3.90 3.77 7.67 - 2.00 3.00 5.00

4

All 40 123 104 227 40 108 111 219 40 154 149 303 40 129 102 231

% 100.00 54.19 45.81 100.00 100.00 49.32 50.69 100.00 100.00 50.83 49.17 100.00 100.00 55.84 44.16 100.00

Avg.FS - 3.08 2.60 5.68 - 2.70 2.78 5.48 - 3.85 3.73 7.58 - 3.23 2.55 5.78

Sr. No.

Name of the

Castes

Watershed- 3 (Modak-VI/Kota) Watershed- 4 (Dhar/Udaipur)

Beneficiary HHs. Non-Beneficiary HHs. Beneficiary HHs. Non-Beneficiary HHs.

HHs M F T HHs M F T HHs M F T HHs M F T

1

General 19 73 58 131 17 56 44 100 1 4 4 8 - - - -

% 47.50 55.73 44.27 100.00 42.50 56.00 44.00 100.00 2.50 50.00 50.00 100.00 - - - -

Avg.FS - 3.84 3.05 6.89 - 3.29 2.59 5.88 - 4.00 4.00 8.00 - - - -

2

SC - - - - 10 33 22 55 - - - - - - - -

% - - - - 25.00 60.00 40.00 100.00 - - - - - - - -

Avg.FS - - - - - 3.30 2.20 5.50 - - - - - - - -

3

ST 21 69 57 126 13 32 32 64 39 118 119 237 40 110 99 209

% 52.50 54.76 45.23 100.00 32.50 50.00 50.00 100.00 97.50 49.79 50.21 100.00 100.00 52.63 47.37 100.00

Avg.FS 3.29 2.71 6.00 - 2.46 2.46 4.92 - 3.026 3.051 6.08 - 2.75 2.48 5.23

4

All 40 142 115 257 40 121 98 219 40 122 123 245 40 110 99 209

% 100.00 55.25 44.74 100.00 100.00 55.25 44.749 100.00 100.00 49.80 50.20 100.00 100.00 52.63 47.37 100.00

Avg.FS - 3.55 2.88 6.43 - 3.03 2.45 5.48 - 3.05 3.08 6.13 - 2.75 2.48 5.23

Source :- Field Survey Note:-No household of minority & other castes,

M= Male,F=Female,T=Total, Avg. FS= Average Family size. Note: - % denote percentage to all for HHs. and percentage to T for M and F.

Page 74: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

74

Table:4.2

Information regarding working population in sample households

Name of Watershed

Beneficiary Non-Beneficiary

No. of working members

Total population No. of working

members Total population

M F T M F T M F T M F T

Kirap %

79 65 144 123 104 227 74 67 141 108 111 219

64.23 62.50 63.44 100.00 100.00 100.00 68.52 60.36 64.38 100.00 100.00 100.00

Sakariya %

92 91 183 154 149 303 81 68 149 129 102 231

59.74 61.07 60.40 100.00 100.00 100.00 62.79 66.67 64.50 100.00 100.00 100.00

Modak-VI %

93 73 166 142 115 257 75 67 142 121 98 219

65.49 63.48 64.59 100.00 100.00 100.00 61.98 68.37 64.84 100.00 100.00 100.00

Dhar %

79 80 159 121 123 244 62 58 120 110 99 209

65.29 65.04 65.16 100.00 100.00 100.00 56.36 58.59 57.42 100.00 100.00 100.00

Total %

343 309 652 540 491 1031 292 260 552 468 410 878

63.52 62.93 63.24 100.00 100.00 100.00 62.39 63.41 62.87 100.00 100.00 100.00

Source:- Field survey. Note:- % denote percentage of working members to total population.

M=Male, F=Female, T=Total.

From table 4.2, it is evident that among four sample watersheds, the percentage of

economically active workers per beneficiary households ranged between 60.40 percent

(Sakariya) and 65.16 percent (Dhar). For non-beneficiary households, it ranged between

57.42 percent (Dhar) to 64.84 percent (Modak-VI). In Dhar watershed, as compared to non-

beneficiary households, proportion of active workers was found somewhat higher for

beneficiary households. In Kirap and Modak-VI watersheds, the proportion of workers for

beneficiary as well as non-beneficiary households was found almost similar with marginal

difference.

4.4. Education Status:

Apart from other factors, education level of members of sample households also

plays an important role in adoption of new technology and agricultural practices. It is

assumed that formal education helps farmers for better and judicious use of available farm

resources and in determining possible effect of various components undertaken under

NWDPRA project. With this in view, the data on educational status of family members of

sample households has been presented in Table 4.3. In beneficiary as well as non-

beneficiary households of the selected watersheds, percentage of illiteracy among female

was found high as compared to same for male.

Page 75: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

75

Table:-4.3

Education Level of Family Member of Beneficiary Households

Name of Watershed

Nos. of members

Illiterate Primary Secondary Higher Secondary Total

M F T M F T M F T M F T M F T

Kirap

%

36 52 88 54 37 91 28 15 43 5 - 5 123 104 227

29.27 50.00 38.76 43.90 35.58 40.09 22.76 14.42 18.94 4.07 - 2.20 54.19 45.81 100.00

Sakariya

%

45 90 135 89 53 142 20 6 26 - - - 154 149 303

29.22 60.40 44.55 57.79 35.57 46.86 12.99 4.03 8.58 - - - 50.83 49.17 100.00

Modak-VI

%

21 54 75 77 47 124 42 13 55 2 1 3 142 115 257

14.79 46.95 29.18 54.23 40.87 48.25 29.58 11.30 21.40 1.41 0.87 1.17 55.25 44.75 100.00

Dhar

%

52 85 137 59 36 95 10 2 12 - - - 121 123 244

42.98 69.11 56.15 48.76 29.27 38.93 8.26 1.63 4.92 - - - 49.59 50.41 100.00

All

%

154 281 435 279 173 452 100 36 136 7 1 8 540 491 1031

28.52 57.23 42.19 51.67 35.23 43.84 18.52 7.33 13.19 1.30 0.20 0.78 52.38 47.62 100.00

Education Level of Family Member of Non-Beneficiary Households

Name of Watershed

Nos. of members

Illiterate Primary Secondary Higher Secondary Total

M F T M F T M F T M F T M F T

Kirap

%

30 52 82 46 43 89 28 16 44 4 - 4 108 111 219

27.78 46.85 37.44 42.59 38.74 40.64 25.93 14.41 20.09 3.70 - 1.83 49.32 50.68 100.00

Sakariya

%

41 66 107 73 31 104 15 4 19 - 1 1 129 102 231

31.78 64.71 46.32 56.59 30.39 45.02 11.63 3.92 8.23 - 0.98 0.43 55.84 44.16 100.00

Modak-VI

%

26 45 71 64 45 109 21 8 29 10 1 11 121 98 219

21.49 45.92 32.42 52.89 45.92 49.77 17.36 8.16 13.24 8.26 1.02 5.02 55.25 44.75 100.00

Dhar

%

45 69 114 57 30 87 8 1 9 - - - 110 99 209

40.91 69.70 54.55 51.82 30.30 41.63 7.27 1.01 4.31 - - - 52.63 47.37 100.00

All

%

142 232 374 240 149 389 72 29 101 14 2 16 468 410 878

30.34 56.59 42.60 51.28 36.34 44.31 15.38 7.07 11.50 2.99 0.49 1.82 53.30 46.70 100.00

Source :- Field Survey M= Male,F=Female,T=Total

Note:- % denote percent share of category to total of the watershed.

Page 76: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

76

Only 0.78 percent of total members of beneficiary households had education upto

higher secondary and above, whereas, it was 1.82 percent among total members of non-

beneficiary households. The percentage of members having education upto primary level

was found around 44 percent for both, beneficiary as well as non-beneficiary households.

The marginal difference in average education level between members of beneficiary and

non-beneficiary households clearly suggests nearly equal role of education level in adoption

and judicious use of new agricultural technology by both categories of sample watersheds.

Among 4 sample watersheds, education level of members of sample households seem

somewhat better in Modak-VI as compared to that in remaining three watersheds.

4.5. Occupational Pattern:

The occupational pattern of economically active workers of beneficiary as well as

non-beneficiary sample households has been furnished in Table 4.4.

Table:-4.4

Occupational Pattern of economically active members of Sample Households

(Number in %)

Watershed Name

Ben.(B)/ Non.Ben.

(NB)

Principal Occupation Subsidiary Occupation

Agri. Dairy Agri.

Labour Service

Busi./ Prof.

Others Agri. Dairy Agri.

Labour Service

Busi/ Prof.

Others

Kirap B 62.50 3.47 18.06 2.08 2.78 11.11 3.47 48.61 9.03 1.39 1.39 18.06

NB 63.12 2.13 16.31 2.13 4.96 11.35 2.13 45.39 9.22 2.13 2.13 17.02

Sakariya B 53.55 4.37 11.48 3.28 3.83 23.50 4.37 44.81 15.30 1.64 3.28 11.48

NB 54.36 4.03 12.75 1.34 2.68 24.83 4.03 50.34 15.44 1.34 3.36 10.74

Modak-VI B 56.02 3.61 8.43 1.81 4.82 25.30 3.61 51.81 11.45 0.60 2.41 12.05

NB 59.15 1.41 12.68 2.82 2.11 21.83 3.52 45.77 12.68 0.70 2.11 14.08

Dhar B 54.09 5.66 10.06 1.89 0.63 27.67 2.52 44.03 9.43 3.77 2.52 20.13

NB 50.00 3.33 13.33 0.83 2.50 30.00 2.50 50.00 11.67 1.67 1.67 22.50

All B 56.29 4.29 11.81 2.30 3.07 22.24 3.53 47.24 11.50 0.77 2.45 15.18

NB 56.88 2.72 13.77 1.81 3.08 21.74 3.08 47.83 12.32 1.45 2.36 15.76

Note:- Figure denote percentage of Economical Active Population engaged in concern occupation.

EAM= Economical Active Members. Source:- Field Survey. B= Beneficiary, NB= Non-beneficiary.

The data shown in Table 4.4 clearly reveal that in all the four sample watersheds,

majority of active workers of beneficiary as well as non-beneficiary households had

agriculture as principal occupation and dairy as subsidiary occupation. In Kirap, from the

total active workers of beneficiary households, 62.50, 18.06 and 11.11 percent had

agriculture, agricultural labour and other occupations (mainly non-agricultural labour)

respectively as princncipal occupation, where as, 48.61 percent had dairy and 18.06 percent

had other occupations as subsidiary occupation. In Sakariya, Modak-VI and Dhar

Page 77: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

77

watersheds, the percentage of active workers of beneficiary households who had agriculture

as principal occupation varied between 53.55 (Sakariya) and 56.02 (Modak-VI). For other

occupations (mainly non-agri. Labour), it varied between 25.30 percent (Sakariya) and 26.77

percent (Dhar). In these 3 watersheds, majority workers of beneficiary households had dairy

as main subsidiary occupation. After dairy, other occupations and agricultural labour were

next important subsidiary occupations.

In each selected watershed, the occupational pattern of the active workers of non-

beneficiary households was found nearly similar to the occupational pattern observed for the

beneficiary households.

4.6. Average size of operational land holding:

It is known that the size of operational land holding mainly influences the cost of

cultivation and net return of crops, adoption rate of new agricultural technology and capital

investment in agriculture sector.

Table:-4.5

Category-wise average size of land holding per sample households - 2006-07 (Area in Ha.)

Category of HHs

B/ NB

Total/ Avg.*OA

Kirap Sakariya Modak-VI Dhar

I U T I U T I U T I U T

M.F

B Total 1.46 4.61 6.07 1.01 4.45 5.46 3.88 2.59 6.47 1.11 2.53 3.64

Avg* OA 0.18 0.58 0.76 0.13 0.56 0.68 0.49 0.32 0.81 0.14 0.32 0.46

NB Total 0.32 3.56 3.88 1.11 3.84 4.96 0.16 5.18 5.34 0.91 1.72 2.63

Avg* OA 0.04 0.45 0.49 0.14 0.48 0.62 0.02 0.65 0.67 0.11 0.21 0.33

S.F

B Total 2.91 6.80 9.71 4.25 5.46 9.71 5.34 7.61 12.95 7.18 15.68 22.86

Avg* OA 0.36 0.85 1.21 0.53 0.68 1.21 0.67 0.95 1.62 0.45 0.98 1.43

NB Total 1.94 9.06 11.01 2.23 9.91 12.14 2.27 8.66 10.93 2.43 22.25 24.68

Avg* OA 0.24 1.13 1.38 0.28 1.24 1.52 0.28 1.08 1.37 0.15 1.39 1.54

Med. F

B Total 5.99 13.43 19.42 6.88 12.95 19.83 7.28 17.16 24.44 7.49 12.34 19.83

Avg* OA 0.75 1.68 2.43 0.86 1.62 2.48 0.91 2.14 3.06 0.94 1.54 2.48

NB Total 5.10 12.95 18.05 2.23 21.24 23.47 5.18 22.01 27.19 3.03 15.93 18.97

Avg* OA 0.64 1.62 2.26 0.28 2.66 2.93 0.65 2.75 3.40 0.38 1.99 2.37

Big.F

B Total 9.06 33.18 42.25 16.18 22.25 38.44 12.46 25.25 37.71 - - -

Avg* OA 1.13 4.15 5.28 2.02 2.78 4.80 1.56 3.16 4.71 - - -

NB Total 6.80 26.87 33.67 6.47 31.36 37.83 17.80 43.05 60.86 - - -

Avg* OA 0.85 3.36 4.21 0.81 3.92 4.73 2.23 5.38 7.61 - - -

All

B Total 19.42 58.03 77.45 28.32 45.11 73.43 28.97 52.60 81.58 15.78 30.55 46.33

Avg* OA 0.61 1.81 2.42 0.89 1.41 2.29 0.91 1.64 2.55 0.49 0.95 1.45

NB Total 14.16 52.44 66.61 12.04 66.35 78.39 25.41 78.91 104.32 6.37 39.90 46.28

Avg* OA 0.44 1.64 2.08 0.38 2.07 2.45 0.79 2.47 3.26 0.20 1.25 1.45

Avg*= Average operated Area per HHs. B=Beneficiary, NB=Non-beneficiary.

M.F=Marginal farmers (Below 1Ha.),S.F=Small farmers(1-2 Ha.),Med.F=Mediumfarmers (2-4 Ha.),

Big.F =Big farmers(4 Ha.& Above),LL=Landless farmers. I=Irrigable,U=Unirrigable,T=I+U.

Note:-Data for 32 sample HHs (Excluding LL HHs.) for each sample watershed.

Source:-Field Survey

Page 78: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

78

In this context, average size of operational land holdings of sample households for

reference year 2006-07 is examined here.Table 4.5 presents watershed-wise, category-wise

average size of operational land holding of the sample households. In Kirap, the overall

average size of land holding for 2006-07 worked out to 2.42 hectares for beneficiary and

2.08 hectares for non-beneficiary. Among four selected watersheds, overall average

operational size of land holding per beneficiary household varied from 1.45 hectares (Dhar)

to 2.55 hectares (Modak-VI) whereas, it varied from 1.45 hectares (Dhar) to 3.26 hectares

(Modak-VI) for non-beneficiary households. The average land holding for beneficiary as well

as non-beneficiary households was lowest in Dhar watershed due to non-availability of big

farmers in sample households. On account of very sloppy and hilly type non-fertile land, the

average size of land holding in Dhar watershed is relatively low. In Sakariya and Modak-VI

watersheds, average size of land holding of beneficiary households was somewhat lower as

compared to that for non-beneficiary households. It may be noted that in each sample

watershed, category-wise average land holding size of sample households in pre-project

year 2001-02 was found to be almost the same as for the year 2006-07. This suggests that

size of land holding has not been impacted at all by the implementation of NWDPRA.

4.7. Composition of Land Holdings and Net Cropped Area:

On account of practices such as leased in, leased out, mortgaged-in, mortgaged out,

cultivable fallow, permanent fallow etc., the size of operational land may differ from the net

cropped area (NCA).Moreover, it is assumed that implementation of NWDPRA project will

impact positively on crop-irrigation and moisture retention capacity. Subsequently, this will

be helpful to beneficiary farmers for attaining better level of land utilization through effecting

suitable diversification in the crop-pattern.

From the data shown in table 4.6, it is evident that not a single sample household of

selected sample watersheds reported leased out or mortgaged out land. Further, data

suggest that the practice of leased-in and mortgaged in land in sample households of

selected watersheds is on very minor scale and not common. Except non-beneficiary

households of Sakariya watershed, the proportion of current fallow land is very negligible in

other selected watersheds. Therefore, in Kirap and Modak-VI watershed, the proportion of

net cropped area to land holding was 97 percent or more for beneficiary as well as non-

beneficiary households (See table 4.6).

Page 79: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

79

In Dhar watershed, on account of sloppy, hilly and non fertile soil having very high

risk of erosion, nearly 30 percent operational land of beneficiary households and 40.33

percent land of non-beneficiary households turned as permanent fallow. On account of very

high proportion of fallow land in Dhar watershed, net cropped area was reduced significantly

for both, beneficiary as well as non-beneficiary households (See table 4.6).

4.8 Cropping Pattern:

The cropping pattern on a farm is a function of multiple factors. In sample

watersheds, agriculture and hence cropping pattern is highly affected by the behaviour of

rainfall and availability of irrigation. Therefore, in sample watersheds, beside other factors,

extent of availability of irrigation and moisture level in the soil are two major deciding factors

of the cropping pattern. It is assumed that after the intervention of NWDPRA in the sample

watersheds, there would be an increase in the extent of irrigation and soil moisture level and

subsequently beneficiary farmers may effect appropriate changes in the cropping pattern. In

this context, therefore, it is pertinent to examine the cropping pattern of sample households

for base year (2001-02) and reference year (2006-07) and particularly changes effected in

allocation of area to different crop.

Table:-4.6

Land Use Pattern of Sample Households in selected watersheds

Name of watersheds

B/NB

% of Land Holding Size

Avg.Land holding per HHs.

(Ha.)

Own Land

LI/MI Leased

out Culti. Land

Fallow Per.

Culti. Fallow

Kirap B 97.70 0.21 - 2.09 - 2.42

NB 96.84 - - 3.16 - 2.08

Sakariya B 97.80 1.10 1.10 - - 2.29

NB 90.97 - 9.03 - - 2.45

Modak-VI B 97.22 - 0.79 1.98 - 2.55

NB 100.00 - - - - 3.26

Dhar B 70.09 29.91 - - - 1.45

NB 59.67 40.33 - - - 1.45

All B 93.00 5.32 0.52 1.16 - 2.18

NB 90.58 6.31 2.40 0.71 - 2.31

Source:-Field Survey.

B= Beneficiary, NB=Non beneficiary.

LI= Leased in,MI=Mortgaged in.

Page 80: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

80

The crop-pattern data of sample households of selected watersheds have been

furnished in Table 4.7.1 to Table 4.7.4. The data suggest that sample farmers had grown a

number of crops such as Maize, Bajra, Jowar, Soyabean, Groundnut, Moong, Udad, Wheat,

Barley, Gram, Rapeseed, Coriander, Ashwagandha etc. and farmers allocated area to these

crops keeping in view their resource base including irrigation.

i) Kirap watershed:

The crop-pattern data of Kirap watershed is given in Table 4.7.1. The data shows that

the GCA was higher for year 2006-07 (post project) as compared to base year 2001-02

(Pre-project) for both, beneficiary as well as non-beneficiary households. The increase in

GCA in 2006-07 was mainly due to increase in area under rabi crops due to improvement in

irrigation potential and moisture level.

In Kirap watershed, data reveals that Maize, Bajra and Jowar were the most

important kharif food crops. For beneficiary households, together it claimed about 74.67 and

71.30 percent area of GCA in 2001-02 and 2006-07 respectively. The corresponding

percentage for non-beneficiary households were 73.56 and 71.35 respectively. Among

kharif pulses, Udad and Moong were important crops and for non-beneficiary households,

together they claimed about 6.81 percent and 6.55 percent area of GCA in 2001-02 and

2006-07 respectively. However, as compared to beneficiary, area allocation by non-

beneficiary households to Udad and Moong crops was found nearly double. The area

devoted to different kharif crops in 2006-07 did not differ significantly from the area

allocation to kharif crops for 2001-02. In base year as well as reference year, except one

case of Moong, all kharif crops were grown as unirrigated.

For beneficiary households, the percentage of area under rabi crops to GCA was

18.52 percent in base year and it increased to 20.23 percent in 2006-07. The corresponding

figures for non-beneficiary households were 14.98 percent and 18.68 percent respectively.

The almost equal increase in area under rabi crops in 2006-07 over 2001-02 for beneficiary

and non-beneficiary households suggests that factors other than NWDPRA were mainly

responsible for increasing area under rabi crops in 2006-07.

Wheat, Gram and Barley were main rabi crops grown by beneficiary as well as non-

beneficiary sample households. Wheat and Barley were grown as irrigated crops whereas

Gram was mostly grown as unirrigated crop. For beneficiary households, area under

irrigated Wheat and Barley increased in 2006-07 as compared to 2001-02, whereas in case

of non-beneficiary households, area under irrigated Wheat declined. This suggests a

marginal positive impact of NWDPRA intervention on enhancing irrigation potential.

Page 81: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

81

By and large, crop-pattern followed by non-beneficiary households in 2001-02 and

2006-07 was found almost similar to the crop-pattern observed for the beneficiary

households. Thus, after the intervention of NWDPRA, beneficiary farmers did not effect

significant changes in the area allocation to different crops. However, the improvement in

soil moisture level due to NWDPRA helped the beneficiary farmers in obtaining better crop-

production.

After demonstrations by PIA on farmer‟s field under NWDPRA programme and also efforts

by state agriculture department, many beneficiary farmers increased the use level of HYV

seed for Maize and Wheat crops. Some beneficiaries also started to use vermi-compost.

This shift in cropping system also helped beneficiary farmers in availing better crop yields.

II) Sakariya Watershed:

The data on crop-pattern given in Table 4.7.2 reveal that Soyabean, Maize, Udad

and Groundnut were main kharif crops whereas Wheat, Gram and Rapeseed were main

Table:-4.7.1

Crop pattern of sample households in Kirap watershed-2001-02 and 2006-07

Crop pattern

Beneficiary Non-Beneficiary

2001-02 2006-07 2001-02 2006-07

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Kharif crops

Maize 27.19 29.34 - 23.07 23.93 - 22.98 29.34 - 22.17 27.08 -

jowar 11.49 12.40 - 16.67 17.30 - 7.28 9.30 - 8.90 10.87 -

Bajra 30.51 32.93 - 28.97 30.06 - 27.35 34.92 - 27.35 33.40 -

Udad 3.88 4.19 - 3.24 3.36 - 3.24 4.13 - 3.56 4.35 -

Moong 2.43 2.62 - 3.08 3.19 5.20 5.75 7.33 - 4.61 5.63 -

soyabean - - - - - - - - - - - -

Ground nut - - - - - - - - - - - -

Sesamum - - - - - - - - - - - -

Jowar fodder - - - - - - - - - - - -

Other Crops - - - 1.13 1.18 - - - - - - -

Total Kharif 75.51 81.48 - 76.16 79.01 0.21 66.61 85.02 - 66.61 81.32 -

Rabi crops

Wheat 10.20 11.00 100.00 11.90 12.34 100.00 9.63 12.29 100.00 10.44 12.75 100.00

Barley 1.46 1.57 100.00 2.35 2.43 100.00 - - - 1.62 1.98 100.00

Gram 5.50 5.94 2.94 5.99 6.21 - 2.10 2.69 - 3.24 3.95 -

Rapeseed - - - - - - - - - - - -

Coriander - - - - - - - - - - - -

Other Crops - - - - - - - - - - - -

Total Rabi 17.16 18.52 68.87 20.23 20.99 70.40 11.73 14.98 82.07 15.30 18.68 78.84

Gross Cropped Area (GCA)

92.66 100.00 12.75 96.39 100.00 14.94 78.34 100.00 12.29 81.90 100.00 14.72

Source:- Field survey.

Page 82: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

82

rabi crops. In kharif, all crops were grown as unirrigated (except small area of Soyabean) by

beneficiary as well as non-beneficiary farmers. As compared to base year 2001-02, in kharif

season, beneficiary households increased the area allocation to more remunerative and

higher moisture/ water demanding crops such as Soyabean and Groundnut in post -project

year 2006-07. Whereas, in case of non-beneficiary households, area allocation to Soyabean

remained almost stable and it declined for the Groundnut crop.

Table:-4.7.2

Crop pattern of sample households in Sakariya watershed-2001-02 and 2006-07

Crop pattern

Beneficiary Non-Beneficiary

2001-02 2006-07 2001-02 2006-07

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Kharif crops

Maize 15.48 16.12 - 14.46 13.24 - 25.19 26.57 - 23.06 24.15 -

jowar - - - - - - - - - 0.10 0.11 -

Bajra - - - - - - - - - - - -

Udad 4.45 4.64 - 3.44 3.15 - 0.61 0.64 - 1.72 1.80 -

Moong - - - - - - - - - - - -

soyabean 45.21 47.10 0.67 48.15 44.07 1.25 40.76 43.01 - 40.66 42.58 -

Ground nut 2.63 2.74 - 4.96 4.54 - 3.14 3.31 - 2.83 2.97 -

Sesamum - - - - - - 0.81 0.85 - 0.71 0.74 -

Jowar fodder - - - - - - 1.62 1.71 - 2.43 2.54 -

Other Crops - - - - - - - - - - - -

Total Kharif 67.77 70.60 0.45 71.01 65.00 0.84 72.12 76.09 - 71.51 74.89 -

Rabi crops

Wheat 12.64 13.17 100.00 16.29 14.91 100.00 9.10 9.61 100.00 8.29 8.69 100.00

Barley - - - - - - - - - - - -

Gram 10.01 10.43 - 11.43 10.46 - 13.15 13.87 - 13.45 14.09 -

Rapeseed 2.83 2.95 100.00 5.26 4.81 100.00 0.20 0.21 100.00 2.02 2.12 100.00

Coriander - - - - - - - - - - - -

Other Crops 2.73 2.85 100.00 5.26 4.81 100.00 0.20 0.21 100.00 0.20 0.21 100.00

Total Rabi 28.22 29.40 64.52 38.23 35.00 70.11 22.66 23.91 41.96 23.97 25.11 43.88

Gross Cropped Area (GCA)

95.99 100.00 19.28 109.24 100.00 25.09 94.78 100.00 10.03 95.49 100.00 11.02

Source:- Field survey.

This clearly shows that intervention of NWDPRA lead to shift in the cropping pattern from

low water demanding crops to more remunerative and higher moisture/ water demanding

crops. Summer crops were not grown by sample farmers.As compared to base year,

beneficiary households increased the area under rabi crops and also GCA by about 9

percent in 2006-07. On the otherside, the increase in area under rabi crops and GCA for

non-beneficiary households was meagre. In 2006-07, as compared to base year, the

beneficiary households were able to put additional areas under higher water/moisture

Page 83: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

83

demanding rabi crops such as Wheat and Rapeseed, whereas, non-beneficiary households

were not able to increase area under irrigated Wheat. In rabi, Gram was grown as

unirrigated crop by both beneficiary as well as non-beneficiary households.Further on

account of crop-demonstrations and jointly efforts by PIA and agriculture department, the

proportion of use of HYV seeds for Soyabean, Rapeseed and Wheat crops in 2006-07 was

found higher for beneficiary households. This ultimately helped them in enhancing the crop

production.

The above observations clearly indicate that NWDPRA intervention impacted

positively on crop-pattern, crop-system and area allocation to different crops.

iii) Modak-VI Watershed:

While examining the cropping pattern data of Modak-VI watershed given in Table

4.7.3, it was observed that Soyabean and Maize among kharif crops and Coriander and

Wheat among rabi crops occupied the dominant position. In 2006-07, beneficiary

households had nearly 36 percent of GCA under rabi crops whereas it was only 23.38

percent of GCA for non-beneficiary households. Thus, as compared to non-beneficiary,

substantial higher proportion of area under rabi crops for beneficiary households gives clear

indication of positive impact of NWDPRA implementation on the availability of irrigation and

in turn on shifting of the crop pattern.

As compared to base year 2001-02, in case of non-beneficiary households, area

under kharif crops remained unchanged in post project year 2006-07. Whereas, for

beneficiary households, it increased marginally. In rabi season, Wheat and Rapeseed were

grown as irrigated whereas spice crop Coriander was grown as unirrigated as well as

irrigated. The beneficiary farmers increased area under rabi crops from 29.30 Ha. in 2001-

02 to 35.76 Ha. in 2006-07. Whereas in case of non-beneficiary, it moved up from 27.52 Ha.

to 30.75 Ha. Thus, in post-project year 2006-07 both, beneficiary as well as non-beneficiary

households increased the area under rabi crops and irrigation, but the quantum of

incremental area was much higher for the beneficiary households. This clearly gives

indication of positive impact of the intervention of NWDPRA on crop-pattern and irrigation.

Moreover, due to intervention of NWDPRA, use level of HYV seeds for Rapeseed, Wheat

and Coriander crops also went up.

Table:-4.7.3

Page 84: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

84

iv) Dhar Watershed:

The cropping pattern data of sample households of Dhar watershed given in Table

4.7.4 show that Maize and Udad were the main kharif food crops. Wheat, Gram and

Rapeseed were the main rabi crops. In 2006-07, 20.13 percent of total kharif area was

irrigated for beneficiary households as against only 3.03 percent for non-beneficiary

households. This suggests that compared to non-beneficiary, due to improvement in

irrigation potential, beneficiary households were able to provide life saving irrigation to more

areas of kharif crops. This increment in irrigation potential achieved by beneficiary

households was mainly due to soil and water conservation measures undertaken on arable

land through NWDPRA programme. As compared to base year, beneficiary households

increased the area under rabi crops by 5.26 Ha. in 2006-07 as against only 1.51 Ha. by non-

beneficiary households.

Crop pattern of sample households in Modak-VI watershed-2001-02 and2006-07

Crop pattern

Beneficiary Non-Beneficiary

2001-02 2006-07 2001-02 2006-07

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Kharif crops

Maize 25.09 23.90 - 23.15 19.30 - 26.14 20.38 - 27.44 20.86 -

jowar 4.05 3.86 - 3.40 2.83 - 12.79 9.97 - 11.17 8.49 -

Bajra - - - -

Udad 6.88 6.55 - 8.09 6.75 - 12.63 9.84 - 17.97 13.66 -

Moong - - - - - - - - - - - -

soyabean 39.33 37.47 - 42.08 35.09 - 46.13 35.96 - 42.89 32.62 -

Ground nut 0.32 0.31 - 0.32 0.27 - 3.08 2.40 - 1.29 0.98 -

Sesamum - - - - - - - - - - - -

Jowar fodder - - - - - - - - - - - -

Other Crops - - - 3.56 2.97 - - - - 0.32 0.25 -

Total Kharif 75.67 72.09 - 77.05 64.24 - 100.76 78.55 - 100.76 76.62 -

Rabi crops

Wheat 8.82 8.40 100.00 12.95 10.80 100.00 9.23 7.19 100.00 10.20 7.75 100.00

Barley - - - - - - - - - - - -

Gram 1.29 1.23 - 5.02 4.18 - - - - - - -

Rapeseed 2.75 2.62 100.00 5.83 4.86 100.00 4.53 3.53 100.00 6.15 4.68 100.00

Coriander 16.43 15.65 17.24 19.10 15.92 45.76 13.27 10.35 36.59 13.92 10.58 46.51

Other Crops - - - - - - 0.49 0.38 100.00 0.49 0.37 100.00

Total Rabi 29.30 27.91 49.17 42.89 35.76 64.15 27.52 21.45 69.41 30.75 23.38 75.79

Gross Cropped Area (GCA)

104.97 100.00 13.72 119.94 100.00 22.94 128.27 100.00 14.89 131.51 100.00 17.72

Source:- Field survey.

Table:-4.7.4

Page 85: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

85

A similar trend was also witnessed in respect of GCA. These clearly indicate that on

account of positive impact of NWDPRA intervention, beneficiary households were able to

bring additional area under irrigation and rabi crops and this helped them to raise farm

income substantially.

4.9 Changes in Area allocation to crops and Irrigated Area over Base Year-

2001-02:

It is assumed that implementation of NWDPRA will improve the ground water recharging

and water recuperation in wells and this in turn, will increase the irrigation potential of the

beneficiary households. Keeping in mind the increase in the irrigation potential, for

maximizing the net return from farming, beneficiary households may effect suitable

diversification in the crop-pattern. In this context, it is pertinent to examine the diversification

effected in crop-pattern for the post project year 2006-07 by sample households. The related

data have been furnished in table 4.8.1 and 4.8.2.

Crop pattern of sample households in Dhar watershed-2001-02 and 2006-07

Crop pattern

Beneficiary Non-Beneficiary

2001-02 2006-07 2001-02 2006-07

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Area (Ha.)

% to GCA Irri. %

Kharif crops

Maize 26.86 57.97 17.33 25.19 47.98 20.88 26.20 87.21 3.09 25.29 80.39 3.20

jowar - - - - - - - - - - - -

Bajra - - - - - - - - - - - -

Udad 2.43 5.24 4.17 3.84 7.32 13.27 0.61 2.02 - 1.42 4.50 -

Moong - - - 0.46 0.87 - - - - - - -

soyabean - - - - - - - - - - - -

Ground nut - - - - - - - - - - - -

Sesamum 0.96 2.07 10.53 1.67 3.18 30.56 - - - - - -

Jowar fodder - - - - - - - - - - - -

Other Crops 1.62 3.49 100.00 1.42 2.70 100.00 - - - - - -

Total Kharif 30.24 65.28 16.05 31.15 59.34 20.13 26.80 89.23 3.02 26.70 84.89 3.03

Rabi crops

Wheat 7.49 16.16 100.00 11.18 21.29 100.00 2.83 9.43 100.00 4.45 14.15 100.00

Barley - - - 0.05 0.10 - - - - - - -

Gram 6.57 14.19 6.15 7.03 13.39 5.76 0.40 1.35 - 0.20 0.64 -

Rapeseed 2.02 4.37 50.00 3.09 5.88 40.98 - - - - - -

Coriander - - - - - - - - - - - -

Other Crops - - - - - - - - - 0.10 0.32 -

Total Rabi 16.08 34.72 55.35 21.34 40.66 60.19 3.24 10.77 87.50 4.75 15.11 93.62

Gross Cropped Area (GCA)

46.33 100.00 29.69 52.50 100.00 36.41 30.04 100.00 12.12 31.46 100.00 16.72

Source:- Field survey.

Page 86: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

86

I ) Kirap watershed:

In Kirap, compared to base year 2001-02, beneficiary as well as non-beneficiary

households recorded marginal increase in area under kharif crops and allocation of area to

different crops shows marginal difference, which suggests nearly nil impact of NWDPRA on

kharif crop-pattern. The area under rabi crops increased by 17.92 percent for beneficiary

households and 30.34 percent for non-beneficiary households. Similarly beneficiary

households recorded increase in GCA by 4.02 percent whereas it was little higher at 4.55

percent for non-beneficiary households. The beneficiary households, increased the area

under irrigation by 2.59 Ha., as against 3.43 Ha. by non-beneficiary households (See table

4.8.1 and 4.8.2).Thus, a slightly better performance reported by non-beneficiary households

in respect of increase in area under irrigation and GCA gives clear indication that in this

watershed, additional area brough under irrigation and rabi-crops was not a effect of

NWDPRA intervention.

II ) Sakariya watershed:

In Sakariya watershed, as compared to 2001-02, the increase obtained by

beneficiary households for the post project year 2006-07 in respect of area under rabi crops,

GCA and irrigation were 35.48, 13.80 and 48.16 percent respectively. The corresponding

incremental percentages for non-beneficiary households were only 5.80, 0.75 and 10.63

respectively (See table 4.8.1 and 4.8.2). Thus, compared to non-beneficiary, a remarkable

rise reported by the beneficiary households in respect of area under irrigation and rabi crops

clearly demonstrated that soil and water conservation measures executed under the

NWDPRA programme helped for diversification in crop pattern and farm activities.

III ) Modak-VI watershed:

Data on changes in crop area in post project year (2006-07) over base year (2001-

02) suggest far better performance of beneficiary households in respect of area under rabi

crops, area under irrigation and GCA. For beneficiary households, incremental area under

kharif crops, rabi crops and GCA were 4.94 Ha., 13.60 Ha. and 18.53 Ha. respectively. For

non-beneficiary households, it was only 0.32 Ha. for kharif crops, 3.24 Ha. for rabi crops and

3.56 Ha. for GCA.The beneficiary households recorded nearly 91.00 percent increase in

area under irrigation, whereas, it was only 22.04 percent for the non-beneficiary households

(See table 4.8.1 & 4.8.2).

Page 87: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

87

Table:-4.8.1

Changes in Crop-pattern of 2006-07 over 2001-02-Beneficiary HHs.

Area in Ha.

Croping Pattern

Changes over 2001-02.

Kirap Sakariya Modak-VI Dhar

Area Irri. Area Area Irri. Area Area Irri. Area Area Irri. Area

Actual % Actual % Actual % Actual % Actual % Actual % Actual % Actual %

Kharif crops

Maize -4.13 -15.18 0.00 - -1.01 -6.54 0.00 - -1.94 -7.74 0.00 - -1.67 -6.21 0.61 13.12

jowar 5.18 45.07 0.00 - 0.00 0.00 0.00 - -0.65 -16.00 0.00 - 0.00 9.00 0.00 0.00

Bajra -1.54 -5.04 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00

Udad -0.65 -16.67 0.00 - -1.01 -22.73 0.00 - 1.21 17.65 0.00 - 1.42 58.33 0.41 410.00

Moong 0.65 26.67 0.16 100.00 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.46 0.00 0.00 0.00

soyabean 0.00 0.00 0.00 - 2.93 6.49 0.30 100.00 2.75 7.00 0.00 - 0.00 0.00 0.00 0.00

Ground nut 0.00 0.00 0.00 - 2.33 88.46 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00

Sesamum 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.71 73.68 0.41 410.00

Jowar fodder 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00

Other Crops 1.13 0.00 0.00 - 0.00 0.00 0.00 - 3.56 0.00 0.00 - -0.20 -12.50 -0.20 -12.35

Total Kharif 0.65 0.86 0.16 100.00 3.24 4.78 0.30 100.00 4.94 6.52 0.00 0.00 0.71 2.34 1.23 19.01

Rabi crops

Wheat 1.70 16.67 1.70 16.67 3.64 28.80 3.65 28.88 4.13 46.79 4.13 46.83 3.69 49.32 3.69 49.27

Barley 0.89 61.11 0.89 60.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00

Gram 0.49 8.82 -0.16 -100.00 1.42 14.14 0.00 0.00 3.72 287.50 0.00 0.00 0.46 6.92 0.00 0.00

Rapeseed 0.00 0.00 0.00 0.00 2.43 85.71 2.43 85.87 3.08 111.76 3.08 112.00 1.06 52.50 0.25 24.75

Coriander 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.67 16.26 5.91 208.83 0.00 0.00 0.00 0.00

Other Crops 0.00 0.00 0.00 0.00 2.53 92.59 2.53 92.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Rabi 3.08 17.92 2.43 20.56 10.01 35.48 8.61 47.31 13.60 46.41 13.12 91.11 5.26 32.70 3.94 44.27

Gross Cropped Area (GCA)

3.72 4.02 2.59 21.91 13.25 13.80 8.91 48.16 18.53 17.66 13.12 91.11 5.97 12.88 5.17 33.64

Source:-Field Survey.

Page 88: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

88

Table:-4.8.2

Changes in 2006-07 Crop-pattern over 2001-02- Non-beneficiary HHs.

Area in Ha.

Croping Pattern

Change in Area over 2001-02 (Ha.)

Kirap Sakariya Modak-VI Dhar

Area Irri. Area Area Irri. Area Area Irri. Area Area Irri. Area

Actual % Actual % Actual % Actual % Actual % Actual % Actual % Actual %

Kharif crops

Maize -0.81 -3.52 0.00 - -2.12 -8.43 0.00 - 1.29 4.95 0.00 - -0.91 -3.47 0.00 -

jowar 1.62 22.22 0.00 - 0.10 0.00 0.00 - -1.62 -12.66 0.00 - 0.00 0.00 0.00 -

Bajari 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 -

Udad 0.32 10.00 0.00 - 1.11 183.33 0.00 - 5.34 42.31 0.00 - 0.81 133.33 0.00 -

Moong -1.13 -19.72 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 -

soyabean 0.00 0.00 0.00 - -0.10 -0.25 0.00 - -3.24 -7.02 0.00 - 0.00 0.00 0.00 -

Ground nut 0.00 0.00 0.00 - -0.30 -9.68 0.00 - -1.78 -57.89 0.00 - 0.00 0.00 0.00 -

Sesamum 0.00 0.00 0.00 - -0.10 -12.50 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 -

Jowar fodder 0.00 0.00 0.00 - 0.81 50.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 -

Other Crops 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.32 0.00 0.00 - 0.00 0.00 0.00 -

Total Kharif 0.00 0.00 0.00 -0.61 -0.84 0.00 - 0.32 0.32 0.00 - -0.10 -0.38 0.00 -

Rabi crops

Wheat 0.81 8.40 1.81 18.80 -0.81 -8.89 -0.81 -8.90 0.97 10.53 0.97 10.51 1.62 57.14 1.62 57.24

Barley 1.62 0.00 1.62 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gram 1.13 53.85 0.00 0.00 0.30 2.31 0.00 0.00 0.00 0.00 0.00 0.00 -0.20 -50.00 0.00 0.00

Rapeseed 0.00 0.00 0.00 0.00 1.82 900.00 1.82 910.00 1.62 35.71 1.62 35.76 0.00 0.00 0.00 0.00

Coriander 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65 4.88 1.62 33.40 0.00 0.00 0.00 0.00

Other Crops 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 0.00

Total Rabi 3.56 30.34 3.43 35.62 1.31 5.80 1.01 10.63 3.24 11.76 4.21 22.04 1.52 46.88 1.62 57.24

Gross Cropped Area (GCA)

3.56 4.55 3.43 35.62 0.71 0.75 1.01 10.63 3.56 2.78 4.21 22.04 1.42 4.71 1.62 44.51

Source:-Field Survey.

Page 89: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

89

This clearly demonstrates significant positive impact of watershed treatments of

NWDPRA programme on enhancing irrigation area, cropping intensity and thereby farm-

income.

IV ) Dhar watershed:

As compared to base year, beneficiary households in post project year, increased

the area under irrigated kharif crops by 1.23 Ha. and under irrigated rabi crops by 3.94 Ha.

The corresponding increase recorded by non-beneficiary households was nil and 1.62 Ha.

respectively. Thus, beneficiary households recorded moderately higher increase in gross

cropped area and irrigated area (See table 4.8.1 & 4.8.2). This suggest that due to

intervention of NWDPRA, the improvement in water level in the wells and soil moisture

helped the beneficiary farmers to effect suitable shift in crop-pattern in favour of more

profitable irrigated crops such as Wheat and Rapeseed and in turn to enhance their farm

income.

4.10 Cropping Intensity:

The intervention of NWDPRA influences so many aspects, the cropping intensity

being one of them. It is assumed in the programme that with the increase in irrigation

potential, beneficiary farmers will be in a better position to use land resources more

intensively and generate higher net return from per unit land.

Cropping intensity is an indicator to know whether same parcel of land has been

used for raising more than one crop during the same agricultural year or not. The data on

cropping intensity for sample households are presented in table 4.9.

Table:-4.9

Cropping Intensity of Sample Households in Selected watersheds

Area in Ha.

Items B/ NB

Kirap Sakeriya Modak-VI Dhar

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

Net cropped Area B 75.67 75.67 71.81 71.81 79.71 79.71 32.37 32.47

NB 64.51 64.51 71.31 71.31 104.32 104.32 27.51 27.61

Gross Cropped Area B 92.66 96.39 95.99 109.24 104.97 119.94 46.33 52.50

NB 78.34 81.90 94.78 95.49 128.27 131.51 30.04 31.46

Cropping Intensity (%) B 122.45 127.38 133.67 152.12 131.69 150.47 143.13 161.69

NB 121.44 126.96 132.91 133.91 122.96 126.06 109.20 113.94

B=Beneficiary,NB=Non-beneficiary

Source:- Field Survey

The data clearly suggest that except Kirap, compared to base year 2001-02,

cropping intensity recorded notable increase in post project year 2006-07 for both,

Page 90: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

90

beneficiary as well as non-beneficiary households. However, this increase in percentage

term and absolute term was much higher for beneficiary households compared to that for

non-beneficiary households. In Sakariya, increase in cropping intensity for beneficiary

households was 18.45 percent whereas it was only 1 percent for non-beneficiary

households. A similar pattern was also observed in Modak-VI and Dhar watersheds. In Kirap

watershed, the percentage increase in cropping intensity was nearly the same for

beneficiary as well as non-beneficiary households (See table 4.9). As compared to non-

beneficiary households, the noticeable increase in cropping intensity achieved by

beneficiary households clearly exhibit the anticipated positive impact of NWDPRA activities.

4.11 Crop-wise changes in cost of cultivation in 2006-07 over 2001-02:

On account of watershed treatment, there was an increase in water availability for

irrigation purpose. This tempted beneficiary farmers to effect suitable changes in cropping

pattern and inputs application. Due to changes in inputs application pattern and increase in

input prices, per unit cost of cultivation of different crops also moved upward. With this in

view, average cost of cultivation per hectare of cropped area and changes in cost of

cultivation of crops in 2006-07 over base year 2001-02 have been worked out for each

selected watershed and presented in table 4.10.1 to 4.10.4.The cost of family labour, own

bullock labour, home produced seeds and manure have been worked out by considering

prevalent market rates in the sample watersheds.

I) Kirap watershed:

From the table 4.10.1 it is evident that for beneficiary households, the overall cost of

cultivation per hectare of cropped area (all crops) increased from Rs.5489 in 2001-02 to Rs.

8716 in 2006-07.This shows an increase of 58.80 percent. As against this, cost of cultivation

per hectare for non-beneficiary households shows an increase of 43.25 percent. Thus, the

higher increase of 15.55 percent in the cost of cultivation for beneficiary households was

partly due to higher use of costly inputs such as fertilizer, pesticides, HYV seeds etc. This

clearly suggest that watershed treatments impacted some extent to the use pattern of crop-

inputs.The crop-wise examination of data suggest that as compared to base year,

beneficiary as well as non-beneficiary households recorded significant increase in the cost

of cultivation for each crop in 2006-07. As compared to non beneficiary, for crops such as

Wheat, Bajra, Gram etc., beneficiary households registered higher increase in the cost of

cultivation. For crops such as Jowar, Udad etc., the increase recorded in the cost of

cultivation was higher for non-beneficiary households.

Page 91: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

91

Table:-4.10.1

Crop-wise changes in cost of cultivation in Kirap watershed

(Cost of cultivation Rs. /Ha.)

Crops

Beneficiary Non-Beneficiary

2001-02 2006-07 Change in %

2001-02 2006-07 Change in %

Maize 5193.69 8808.40 69.60 5408.81 7642.89 41.30

Jowar 5485.60 7064.79 28.79 5412.37 7763.45 43.44

Wheat 8092.63 12749.79 57.55 8022.68 10733.60 33.79

Barley 7460.13 11725.18 57.17 - 8946.80 N.A

Udad 4343.56 6737.59 55.12 4488.22 7571.83 68.70

Moong 5856.62 8424.02 43.84 5357.38 8234.56 53.71

Gram 5489.04 8435.97 53.69 5728.31 7341.78 28.17

Bajra 4879.05 7827.65 60.43 5029.15 7289.45 44.94

Cotton - 13820.79 N.A - - N.A

All Crops 5488.74 8716.00 58.80 5567.92 7976.03 43.25

Change in percentage denote change in 2006-07 over 2001-02.

N.A=Not applicable. Source:- Field Survey.

II) Sakariya watershed:

The data shown in table 4.10.2 clearly reveal surprising trend in respect of per

hectare cost of cultivation.

Table:-4.10.2

Crop-wise changes in cost of cultivation in Sakariya watershed

(Cost of cultivation Rs. /Ha.)

Crops

Beneficiary Non-Beneficiary

2001-02 2006-07 Change in %

2001-02 2006-07 Change in %

Maize 4905.77 8701.31 77.37 4339.89 7821.46 80.22

Wheat 6460.53 7938.99 22.88 6785.78 9919.90 46.19

Udad 4663.17 5896.60 26.45 5700.12 6323.24 10.93

Gram 4283.08 5584.80 30.39 3558.46 5059.00 42.17

Soyabean 5822.94 8908.91 53.00 4630.80 9499.54 105.14

Groundnut 5101.02 8246.07 61.66 5238.84 9831.64 87.67

Rapseed 7920.86 6631.71 -16.28 6857.44 7660.56 11.71

Sesamum - - - 2502.04 4726.96 88.92

Methi 4759.14 5440.83 14.32 - - N.A

Garlic - 12138.29 N.A - - N.A

Isabgul 6113.62 4790.23 -21.65 7215.76 6585.61 -8.73

Jowar - - N.A - 10625.94 N.A

Jowar Fodder - - N.A 4170.06 5644.52 35.36

All Crops 5568.00 7993.66 43.56 4622.90 8332.90 80.25

Change in percentage denote change in 2006-07 over 2001-02.

N.A=Not applicable. Source:- Field Survey.

Page 92: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

92

For non-beneficiary households, overall, per hectare cost of cultivation increased

from Rs. 4623 in 2001-02 to Rs.8333 in 2006-07, which shows an increase of 80.25 percent.

As against this, beneficiary households recorded only 43.56 percent increase in per hectare

cost of cultivation. This suggests that watershed treatments had not impacted at all the

inputs use pattern of beneficiary households. The crop-wise examination of data also

reveals that non-beneficiary households recorded higher increase in cost of cultivation for

majority of crops. This suggests that non-beneficiary households also raised the investment

on costly inputs including irrigation, even though their operational areas did not receive the

benefit of watershed treatments.

III) Modak-VI Watershed:

In Modak VI watershed, overall average cost of cultivation per hectare of cropped

area in 2006-07 was Rs. 8350 for beneficiary households whereas it was Rs. 8089 for non-

beneficiary households. Similar trend was also witnessed for base year 2001-02 (See table

4.10.3). This suggests that as compared to base year 2001-02 use level of high priced

inputs was slightly higher for beneficiary households in 2006-07.

Compared to base year 2001-02, for each crop, the per hectare cost of cultivation for

beneficiary as well as non beneficiary households moved up significantly due to price rise of

inputs and increase in use level of improved inputs.

Table:-4.10.3

Crop-wise changes in cost of cultivation in Modak-VI watershed

(Cost of cultivation Rs. /Ha.)

Crops

Beneficiary Non-Beneficiary

2001-02 2006-07 Change in %

2001-02 2006-07 Change in %

Maize 5328.04 7941.38 49.05 4790.28 7752.05 61.83

Jowar 5047.08 6419.50 27.19 4281.19 6828.87 59.51

Wheat 7006.05 11288.21 61.12 7096.10 11220.78 58.13

Udad 5012.01 8598.12 71.55 4912.99 6932.51 41.11

Gram 4957.74 5436.53 9.66 - - N.A

Soyabean 6181.63 9283.15 50.17 5580.64 8837.20 58.35

Groundnut 5875.84 8957.92 52.45 5272.65 9041.32 71.48

Sesamum - 9711.62 N.A - - N.A

Rapseed 5250.47 6484.36 23.5 4741.08 6330.37 33.52

Coriander 4456.22 7037.40 57.92 4538.48 7218.05 59.04

Ashwagandha - 7733.57 N.A - 8377.20 N.A

Other Crops - - N.A 4703.42 7479.35 59.02

All Crops 5630.86 8349.89 48.29 5185.13 8088.83 56.00

Change in percentage denote change in 2006-07 over 2001-02.

N.A=Not applicable. Source:- Field Survey.

Page 93: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

93

IV) Dhar watershed:

The average cost of cultivation per hectare for the base year 2001-02, study year

2006-07 and percentage changes in the cost of cultivation recorded by both, beneficiary as

well as non-beneficiary households do not differ significantly (See table 4.10.4).

Table:-4.10.4

Crop-wise changes in cost of cultivation in Dhar watershed

(Cost of cultivation Rs. /Ha.)

Crops

Beneficiary Non-Beneficiary

2001-02 2006-07 Change

in % 2001-02 2006-07

Change in %

Maize 4647.10 8018.55 72.55 4584.60 8510.27 85.63

Peddy 5816.47 9268.58 59.35 - - N.A

Wheat 5551.40 9616.30 73.22 4400.41 8658.01 96.75

Berley - 7512.29 N.A - - N.A

Udad 4573.69 9358.50 104.62 5312.97 8709.04 63.92

Moong - 7375.01 N.A - - N.A

Gram 3901.75 8143.32 108.71 4262.73 6424.99 50.72

Sesamum 5082.76 10219.40 101.06 - - N.A

Rapseed 3756.15 8016.25 113.42 - - N.A

Other Crops - - N.A - 6177.87 N.A

All Crops 4691.92 8538.09 81.97 4577.66 8519.15 86.10

Change in percentage denote change in 2006-07 over 2001-02.

N.A=Not applicable. Source:- Field Survey.

This suggest that changes in input use pattern adopted by beneficiary and non-

beneficiary households were more or less alike. Therefore, it can not be concluded that

changes in the input pattern in the watershed area was mainly due to NWDPRA factors.

4.12 Input-wise cost per hectare of cropped area:

It is anticipated in the programme that due to watershed treatments, there will be

change in the water table and accordingly the beneficiary farmers are likely to effect

changes in the crop-pattern and subsequently in the composition of inputs and labour

application. This may enhance the per unit cost of cultivation. Keeping this in view, cost of

different inputs in absolute term and its percentage share in total cost of cultivation has been

worked out and presented in tables 4.11.1 to 4.11.4.

I) Kirap watershed:

In the total cost of cultivation, most important items were human labour, bullock

labour and machinery labour. In 2006-07, for beneficiary households, of the total cost, these

three items together claimed lion share of 82.78 percent. For non-beneficiary households, it

was 79.74 percent. For both, beneficiary and non-beneficiary households‟ percentage share

of family labour was very high as compared to hired human labour. For beneficiary as well

Page 94: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

94

as non-beneficiary households, of the total cost, seed claimed between 4 to 5 percent,

pesticides claimed between 1 to 1.3 percent, irrigation claimed between 1.59 to 1.74 percent

and chemical fertilizers claimed between 3.10 to 3.62 percent (See table 4.11.1).

This suggests that contribution of these items in total cost of cultivation is not so

impacting. Further, percentage share of different inputs for both, beneficiary and non-

beneficiary differs marginally which suggests that changes in the use pattern of inputs took

place in nearly equal proportion.

II) Sakariya watershed:

As compared to base year, of the total cost, the percentage share for inputs namely

seeds, chemical fertilizers and hired human labour increased to some extent in post project

year 2006-07 for both, beneficiary as well as non-beneficiary households. However, in case

of seeds, chemical fertilizers and own human labour, percentage share in total cost was

Table:-4.11.1

Input-wise cost per Hect.(Rs.) of cropped area.-Kirap

(Cost in Rs.)

Sr.No. Items 2001-02 2006-07

Change over 2001-02

B NB B NB B NB

1 Seed 243 229 404 338 161 109

% 4.43 4.11 4.63 4.24 4.98 4.53

2 Fym 519 627 599 749 80 122

% 9.47 11.26 6.87 9.39 2.47 5.07

3 Chem. Fert. 101 134 270 289 169 155

% 1.84 2.41 3.10 3.62 5.22 6.44

4 Pesti cides 34 65 89 101 55 36

% 0.62 1.17 1.02 1.27 1.70 1.50

5 Irri.(Inclu.own) 89 113 139 139 50 26

% 1.62 2.03 1.59 1.74 1.55 1.08

6 Hired/own Machinery 875 958 1170 1226 295 268

% 15.96 17.21 13.42 15.37 9.12 11.13

7 Bullock Labour 971 1162 1187 1346 216 184

% 17.72 20.87 13.62 16.88 6.67 7.64

8 Human Labour - - - - - -

I) Own Value

1751 1750 3491 2877 1740 1127

% 31.95 31.43 40.05 36.08 53.77 46.82

II) Hired Value 898 530 1368 910 470 380

% 16.38 9.52 15.69 11.41 14.52 15.79

9 Total Cost 5481 5568 8717 7975 3236 2407

% 100.00 100.00 100.00 100.00 100.00 100.00

Note:- % denote percentage share of respective items in total cost.

B= Beneficiary, NB=Non-beneficiary

Source:- Field Survey.

Page 95: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

95

higher for non-beneficiary households as compared to that for beneficiary households (See

table 4.11.2). This means that changes effected in use pattern of inputs by beneficiary

households were mainly impacted by some other factors. And impact of watershed

treatments on use level of inputs was insignificant.

Table:-4.11.2

Input-wise cost per Hect.(Rs.) of cropped area.-Sakariya.

(Cost in Rs.)

Sr.No. Items 2001-02 2006-07

Change over 2001-02

B NB B NB B NB

1 Seed 473 413 860 1143 387 730

% 8.49 8.93 10.76 13.72 15.95 19.69

2 Fym 465 399 524 618 59 219

% 8.36 8.64 6.56 7.42 2.43 5.91

3 Chem. Fert. 148 208 512 379 364 171

% 2.66 4.50 6.41 4.55 15.00 4.61

4 Pesti cides 121 83 164 129 43 46

% 2.17 1.80 2.05 1.54 1.78 1.23

5 Irri.(Inclu.own) 127 78 158 121 31 42

% 2.28 1.69 1.97 1.45 1.28 1.14

6 Hired/own Machinery 419 347 475 474 56 127

% 7.52 7.51 5.94 5.69 2.32 3.43

7 Bullock Labour 1199 916 1603 1145 404 229

% 21.53 19.82 20.05 13.74 16.67 6.17

8 Human Labour

I) Own Value 1735 1331 2011 2675 275 1344

% 31.17 28.79 25.15 32.10 11.35 36.23

II) Hired Value 881 847 1687 1649 806 802

% 15.82 18.32 21.10 19.78 33.22 21.61

9 Total Cost 5568 4623 7994 8333 2426 3710

% 100.00 100.00 100.00 100.00 100.00 100.00

Note:- % denote percentage share of respective items in total cost.

B= Beneficiary, NB=Non-beneficiary

Source:- Field Survey.

III) Modak-VI watershed:

As compared to base year 2001-02, the expenditure on different inputs in absolute

value had increased to a great extent in post-project year 2006-07. But this has happened

mainly due to significant rise in the prices of inputs. In base year 2001-02 and reference

year 2006-07, the percentage share of different input items in total cost do not reveal

notable difference among beneficiary and non-beneficiary households. This suggests almost

Page 96: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

96

similar changes carried out in the use pattern of inputs by both type of households (See

table 4.11.3). From these observations, it can be concluded that changes in the use pattern

of inputs effected by beneficiary farmers were mainly due to factors other than NWDPRA.

IV) Dhar watershed:

In Dhar watershed, as compared to base year, the percentage share in total cost for

the post project year 2006-07 declined for inputs namely seeds and FYM, for beneficiary as

well as non-beneficiary households. In total cost of cultivation, most important items were

human labour and bullock labour. Of the total cost, these two items together claimed 81.91

percent and 84.23 percent for beneficiary and non-beneficiary households respectively. In

other selected watersheds, the percentage share in total cost for bullock labour varied

Table:-4.11.3

Input-wise cost per Hect.(Rs.) of cropped area.-Modak-VI

(Cost in Rs.)

Sr.No. Items 2001-02 2006-07

Change over 2001-02

B NB B NB B NB

1 Seed 423 433 676 567 253 134

% 7.51 8.35 8.09 7.01 9.30 4.62

2 Fym 476 333 556 545 80 212

% 8.46 6.42 6.66 6.74 2.93 7.31

3 Chem. Fert. 244 275 389 369 145 94

% 4.34 5.30 4.66 4.56 5.32 3.23

4 Pesti cides 4 25 106 94 102 68

% 0.08 0.49 1.27 1.16 3.74 2.36

5 Irri.(Inclu.own) 108 108 186 144 78 35

% 1.92 2.09 2.22 1.78 2.85 1.22

6 Hired/own Machinery

592 618 633 769 41 151

%

10.51 11.93 7.58 9.51 1.51 5.20

7 Bullock Labour 1473 1257 2132 1790 659 534

% 26.16 24.24 25.53 22.13 24.24 18.37

8 Human Labour

I) Own Value 1568 1362 2389 2408 821 1047

% 27.84 26.26 28.61 29.77 30.20 36.05

II) Hired Value 742 774 1284 1403 541 628

% 13.18 14.93 15.37 17.34 19.91 21.64

9 Total Cost 5631 5185 8350 8089 2719 2904

% 100.00 100.00 100.00 100.00 100.00 100.00

Note:- % denote percentage share of respective items in total cost.

B= Beneficiary, NB=Non-beneficiary

Source:- Field Survey.

Page 97: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

97

between 13 to 24 percent whereas in case of Dhar watershed, it was found much higher and

ranging between 30.90 to 36.46 percent (See table 4.11.4).

Table:-4.11.4

Input-wise cost per Hect.(Rs.) of cropped area.-Dhar

(Cost in Rs.)

Sr.No. Items 2001-02 2006-07

Change over 2001-02

B NB B NB B NB

1 Seed 308 201 398 255 90 54

% 6.56 4.40 4.66 3.02 2.34 1.39

2 Fym 591 798 577 955 -14 156

% 12.60 17.44 6.76 11.28 -0.36 4.02

3 Chem. Fert. 86 60 261 122 175 61

% 1.82 1.32 3.05 1.44 4.56 1.58

4 Pesti cides N.A N.A N.A N.A N.A N.A

%

5 Irri.(Inclu.own) 108 18 228 120 -18

% 2.30 0.40 2.67 0.00 3.12 -0.47

6 Hired/own Machinery

29 81 3 53 3

% 0.61 0.00 0.95 0.04 1.37 0.08

7 Bullock Labour 1450 1433 2858 3085 1408 1652

% 30.90 31.31 33.47 36.46 36.61 42.53

8 Human Labour

I) Own Value 1403 1468 2739 2860 1336 1393

% 29.90 32.06 32.08 33.80 34.74 35.85

II) Hired Value 718 598 1397 1182 678 584

% 15.31 13.07 16.36 13.97 17.63 15.02

9 Total Value 4692 4578 8538 8462 3846 3885

% 100.00 100.00 100.00 100.00 100.00 100.00

Note:- % denote percentage share of respective items in total cost.

B= Beneficiary, NB=Non-beneficiary

Source:- Field Survey.

The low investment on seed and FYM and high percentage share of bullock labour

was mainly due to sloppy cultivable land. The nearly equal percentage share of different

input items in total cost for beneficiary and non-beneficiary suggest impact of non-watershed

factors on input use pattern.

4.13 Yield of crops:

Among the many factors which determine the yield level of crops, the most decisive

are the timely and adequate availability of water, moisture level of soil, adoption of HYV

seeds and adequate and timely use of nutrients etc. In NWDPRA, it is assumed that soil and

water conservation treatments undertaken under the project is likely to improve the irrigation

potential and moisture level in soil. And subsequently, it will help beneficiary farmers to

Page 98: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

98

achieve better yield of the crops. For verification of this assumption, yield differential

between pre-project and post-project period and between beneficiary and non-beneficiary

farmers have been examined here. Table 4.12 provides comparative yield performance of

different crops for base year 2001-02 and post project year 2006-07 for the sample

households.

I) Kirap watershed:

From Table 4.12, it is obvious that as compared to base year 2001-02, beneficiary as

well as non-beneficiary households achieved far better yield for all crops (except Gram in

case of non-beneficiary). Further, as compared to non-beneficiary farmers, the increase in

yield level for different crops (except Jowar) recorded by the beneficiary farmers was found

much higher. As compared to non-beneficiary farmers, the increase in yield recorded by

beneficiary farmers was 4.77 percent for Maize, 6.63 percent for Wheat, 30.91 percent for

Udad, 22.38 percent for Moong and 6.84 percent for Bajra. The far better achievement in

respect of yield of kharif crops by beneficiary farmers gives clear indication that the

improvement in the moisture/ irrigation level of the farm land helped the beneficiary farmers

in obtaining higher crop-yield. Thus, NWDPRA impacted positively on the crop yields which

ultimately pushed up the farm income of the beneficiary farmers.

II) Sakariya watershed:

As compared to base year 2001-02, both, beneficiary as well as non-beneficiary

farmers achieved significantly higher yield for all the crops (see table 4.12). The incremental

yields achieved by the beneficiary farmers varied from 35.96 percent for Gram to 188.46

percent for the cash crop Isabgul. For non-beneficiary farmers, it varied from 3.98 percent

for Gram to 100 percent for Isabgul (See table 4.12). For all the grown crops, yield

achievement by beneficiary farmers was found far superior than that for non-beneficiary

households. This clearly indicate that implementation of NWDPRA programme improved the

irrigation potential and soil-moisture, which subsequently helped beneficiary farmers to

harvest better crop yields.

III) Modak-VI watershed:

For the different crops grown (except Jowar) in post project year 2006-07, the yield

obtained by beneficiary as well as non-beneficiary farmers were found remarkably higher

than that for the base year 2001-02.For beneficiary households, yield increment varied from

15.01 percent for Soyabean to 90.02 percent for Jowar.

Page 99: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

99

Table:-4.12

Yield of Main Crops in Selected Watersheds.

Yield in Qtl./Ha.

Crop B/

NB

Kirap Sakariya Modak-VI Dhar

Yield (Qtl./ Ha.) Yield (Qtl./ Ha.) Yield (Qtl./Ha.) Yield (Qtl./Ha.)

2001-02

2006-07

Change over 2001-02

2001-02

2006-07

Change over 2001-02

2001-02

2006-07

Change over 2001-02

2001-02

2006-07

Change over 2001-02

Actual % Actual % Actual % Actual %

Maize

B 21.55 26.66 5.11 23.73 12.92 19.77 6.85 53.00 23.50 30.24 6.75 28.71 15.77 20.80 5.04 31.93

NB 21.95 26.11 4.16 18.96 10.94 15.65 4.71 43.10 22.57 26.39 3.82 16.92 15.08 17.02 1.95 12.91

Jowar

B 12.79 16.02 3.22 25.20 - - - - 12.85 24.42 11.57 90.02 - - - -

NB 12.63 17.52 4.89 38.74 0.00 4.94 4.94 NA 13.76 13.07 -0.69 -5.02 - - - -

Bajra

B 27.01 33.24 6.23 23.07 - - - - - - - - - - - -

NB 26.58 30.89 4.31 16.23 - - - - - - - - - - - -

Udad

B 5.66 8.96 3.30 58.18 11.23 15.56 4.32 38.47 6.25 9.33 3.08 49.24 5.66 8.77 3.10 54.79

NB 6.18 7.86 1.68 27.27 9.89 12.21 2.33 23.53 5.41 9.07 3.66 67.70 9.89 10.59 0.71 7.14

Moong

B 5.77 7.80 2.04 35.34 - - - - - - - - 0.00 12.08 12.08 NA

NB 6.53 7.37 0.84 12.94 - - - - - - - - - - - -

Soyabean

B - - - - 8.46 11.98 3.52 41.66 11.14 12.81 1.67 15.01 - - - -

NB - - - - 8.91 10.78 1.87 21.02 9.71 12.17 2.46 25.31 - - - -

Groundnut

B - - - - 9.13 12.61 3.48 38.18 7.55 12.36 4.81 63.64 - - - -

NB - - - - 11.48 12.71 1.23 10.71 7.64 10.43 2.78 36.44 - - - -

Wheat

B 45.99 56.65 10.66 23.18 18.59 26.22 7.63 41.07 29.81 41.39 11.58 38.84 13.89 17.85 3.95 28.46

NB 38.63 45.02 6.39 16.55 15.60 22.67 7.07 45.31 28.94 37.85 8.91 30.80 11.83 14.04 2.21 18.72

Gram

B 9.45 17.53 8.08 85.55 9.14 12.42 3.29 35.96 10.43 12.36 1.93 18.52 9.81 12.82 3.01 30.65

NB 12.36 9.58 -2.78 -22.50 8.94 9.29 0.36 3.98 - - - - 4.94 9.89 4.94 100.00

Barley

B 35.35 54.96 19.61 55.47 - - - - - - - - 0.00 4.94 4.94 NA

NB 0.00 46.91 46.91 NA - - - - - - - - - - - -

Rapeseed

B - - - - 7.59 13.88 6.29 82.83 26.53 30.72 4.19 15.79 9.39 8.49 -0.90 -9.58

NB - - - - 4.94 8.90 3.95 80.00 25.82 26.83 1.01 3.91 - - - -

Coriander

B - - - - - - - - 13.51 22.78 9.26 68.55 - - - -

NB - - - - - - - - 13.11 17.03 3.92 29.90 - - - -

Isabgul

B - - - - 4.94 14.26 9.32 188.46 - - - - - - - -

NB - - - - 4.94 9.89 4.94 100.00 - - - - - - - -

Source:- Field Survey. B=Beneficiary, NB=Non-beneficiary.

Page 100: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

100

For all the crops, except Udad and Soyabean, beneficiary farmers achieved higher

incremental yields as compared to their counterpart non-beneficiary farmers. Further, for

majority kharif unirrigated crops, beneficiary households achieved notable higher

incremental yields as compared to non-beneficiary households (See table 4.12). This clearly

shows positive impact of watershed treatments on crop yields.

IV) Dhar watershed:

As compared to pre-project year 2001-02, the yield level of all the crops (except

Rapseed) improved to a great extent in post project year 2006-07 for both, beneficiary as

well as non-beneficiary farmers. The crop-wise examination of data reveals that except

Gram, increment in yields obtained by beneficiary farmers were far superior for each crop as

compared to that of non-beneficiary farmers(see table 4.12). This again, clearly suggests

positive impact of NWDPRA programme on enhancing level of irrigation and soil-moisture,

which subsequently impacted positively on crop yields.

The above analysis of four sample watersheds clearly suggests that, the NWDPRA

had noticeable positive impact on crop-yields. However, degree of impact varied across the

watersheds due to variation in soil-climatic conditions and water resources.

4.14 Crop-wise per hectare production of By-Product:

For increasing as well as stabilising the household‟s income of the rainfed areas, the

NWDPRA is focusing mainly on development of allied agricultural sector namely livestock /

dairy. The by-products, mainly of cereals and pulses, are used as nutritious fodder for milch

and draught animals. Therefore, in the programme for development of livestock sector,

emphasis is given on enhancing the fodder / biomass crop residue.

The data on per hectare production of by-product of major crops for base year and

post project year have been provided in table 4.13. The data clearly reveals that in selected

watersheds, as compared to base year, except one or two cases, beneficiary and non-

beneficiary households recorded remarkable increase in production of by product for all the

major crops in post-project year 2006-07 (see table 4.13).Further, it is evident that in all the

four sample watersheds, per hectare average production of by-product achieved for different

crops by beneficiary households were considerably higher than those for non-beneficiary

households. The improvement in soil-moisture level and irrigation potential due to various

soil-conservation treatments under NWDPRA programme helped beneficiary farmers to

enhance significantly the production of by-product of food and other crops.

Page 101: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

101

Table:-4.13 Crop wise per Hect. Production (Yield) of By-product of Major crops.

(Yield in Qtl./Ha.)

Crops B/ NB

Production per Hect. in Qtl.

Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

Change* 2001-

02 2006-

07

Change* 2001-

02 2006-

07

Change* 2001-

02 2006-

07

Change*

Actual % Actual % Actual % Actual %

Maize B 26.85 32.78 5.93 22.09 30.98 38.44 7.46 24.06 33.88 45.36 11.48 33.90 31.43 40.08 8.65 27.53

NB 28.00 32.02 4.02 14.36 22.59 28.01 5.42 23.99 31.45 37.91 6.46 20.55 29.09 35.12 6.03 20.73

Jowar B 38.90 52.54 13.65 35.09 - - - - 21.75 45.01 23.27 106.98 - - - -

NB 38.85 51.45 12.59 32.41 14.83 14.83 N.A 23.77 22.30 -1.48 -6.22 - - - -

Bajra B 36.35 45.15 8.80 24.20 - - - - - - - - - - - -

NB 35.86 39.63 3.77 10.50 - - - - - - - - - - - -

Barley B 41.19 63.49 22.30 54.14 - - - - - - - - 29.66 29.66 N.A

NB 58.07 58.07 N.A - - - - - - - - - - - -

Wheat B 52.56 63.80 11.24 21.38 24.91 34.48 9.57 38.40 36.73 45.33 8.60 23.42 22.11 28.13 6.02 27.22

NB 46.73 52.39 5.67 12.13 23.89 33.40 9.50 39.78 37.50 40.60 3.10 8.26 20.66 23.70 3.05 14.76

Soyabean B - - - - 12.78 16.45 3.67 28.68 13.93 14.54 0.61 4.38

NB - - - - 12.29 14.62 2.33 18.96 12.14 13.80 1.66 13.69

Groundnut B - - - - 16.73 20.38 3.65 21.80 10.98 9.27 -1.72 -15.63

NB - - - - 20.09 21.89 1.80 8.96 9.43 9.27 -0.16 -1.72

Gram B 9.81 15.36 5.55 56.56

NB 12.36 10.19 -2.16 -17.50

All Crops B 32.34 41.77 9.43 29.17 15.50 19.07 3.58 23.08 14.75 19.42 4.68 31.71 23.01 27.29 4.29 18.63

NB 31.31 36.60 5.29 16.91 14.41 16.99 2.58 17.94 16.07 17.51 1.45 9.01 27.61 32.36 4.75 17.20

Source:- Field survey, B=Beneficiary, NB= Non-beneficiary

* Change denote change in production in 2006-07 over 2001-02.

Page 102: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

102

This enhancement in the availability of fodder (by-product) and development of

community pasture land allowed the beneficiary farmers to keep and feed more milch

animals and thereby to improve the supplementary income.

4.15 Average farm harvest price of main crops:

The data given in table 4.14 clearly indicates that in all the four sample watersheds,

as compared to baseline year 2001-02, the farm harvest price of all crops moved

significantly upward in 2006-07, which in turn, pushed up the agricultural income of the

farmers. The quantum of increase in the farm harvest price fluctuates from crop to crop. It

was also found varying from one watershed to another. Thus, we can say that besides the

enhancement achieved in the crop yields, the considerably higher farm harvest prices of the

crops also played a vital role in generating higher farm income for the beneficiary farmers.

4.16 Value of Gross Produce per Hectare:

On account of the implementation of the NWDPRA programme, the production

environment in the project areas reflect positive changes, which in turn has raised the gross

and net farm income of the beneficiary households. The total value of main product plus by-

product has been taken as gross farm income.

Table:-4.14

Average Farm Harvest Price (Rs./Qtl.) of Main Product of the Major Crops-2001-02 and 2006-07.

Price Rs./Qtl

Crop

Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

Change Actual

2001-02

2006-07

Change Actual

2001-02

2006-07

Change Actual

2001-02

2006-07

Change Actual

Maize 665 853 188

(28.27) 523 881 358

(68.45) 621 770 149

(23.99) 736 989 253

(34.38)

Jowar 613 732 119

(19.41) - - - 696 970 274

(39.37) - - -

Bajra 554 673 119

(21.48) - - - - - - - - -

Barley 909 1200 291

(32.01) - - - - - - 0 1100 1100 (N.A)

Wheat 820 1146 326

(39.76) 675 941 266

(39.41) 671 1054 383

(57.08) 825 1014 189

(22.91)

Soyabean - - - 943 1465 522

(55.36) 1456 2235 779

(53.50) - - -

Groundnut - - - 1273 1879 606

(47.60) 1414 2000 586

(41.44) - - -

Gram 2121 2549 428

(20.18) - - - 1500 2187 687

(45.80) 1444 1619 175

(12.12)

Source:- Field survey

Note:-Figure in bracket denote percentage change in 2006-07 over 2001-02.

Page 103: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

103

Table:-4.15 The value of Gross Produce (MP+BP) Per Hectare.

Crops B/ NB

The Value (Rs./ Hect.) of Gross Produce (MP+BP)

Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

Change 2001-

02 2006-

07

Change 2001-

02 2006-

07

Change 2001-

02 2006-

07

Change

Actual % Actual % Actual % Actual %

Maize B 17573 28251 10678 60.76 10420 25095 14675 140.84 18545 30501 11956 64.47 15418 27272 11855 76.89

NB 17984 27651 9667 53.75 8387 19393 11006 131.24 17695 26347 8652 48.89 14617 22701 8085 55.31

Jowar B 13618 22235 8617 63.28 - - - - 13295 34635 21339 160.50 - - - -

NB 13493 23117 9624 71.32 - 7785 N.A N.A 14335 18098 3764 26.26 - - - -

Bajra B 18516 27781 9265 50.04 - - - - - - - - - - - -

NB 18238 25547 7309 40.08 - - - - - - - - - - - -

Barley B 37275 75591 38316 102.79 - - - - - - - - - 10183 N.A N.A

NB - 65172 N.A N.A - - - - - - - - - - - -

Wheat B 43975 74073 30098 68.44 15589 30145 14556 93.37 24276 50846 26570 109.45 14641 23046 8405 57.41

NB 37234 59085 21850 58.68 13444 26639 13195 98.15 23769 46353 22584 95.01 12733 18412 5679 44.6

Soyabean B - - - - 9456 20217 10761 113.80 18390 31489 13100 71.24 - - - -

NB - - - - 9829 18167 8338 84.83 16034 29919 13885 86.60 - - - -

Groundnut B - - - - 14598 28434 13837 94.79 12116 26103 13987 115.44 - - - -

NB - - - - 18191 28963 10771 59.21 12043 22473 10431 86.61 - - - -

Gram B 20659 45969 25310 122.52 15214 29536 14323 94.14 15639 27025 11386 72.81 14168 20754 6586 46.49

NB 26986 25266 -1720 -6.37 14878 22086 7208 48.45 - - - - 7138 16006 8868 124.2

All Crops B 20633 35788 15155 73.45 11842 25013 13170 111.21 20962 57778 36815 175.62 14751 24180 9429 63.92

NB 20167 30638 10471 51.92 10854 20318 9464 87.20 18307 39865 21558 117.76 14402 22197 7796 54.13

Source:- Field survey, N.A= Not Applicable. B=Beneficiary, NB=Non-beneficiary

Page 104: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

104

The value of gross produce per hectare of GCA have been furnished in Table 4.15.

As compared to baseline year 2001-02, for each crop, value of gross produce shoot up

sharply for both, beneficiary and non-beneficiary households. Overall, for all crops together,

for beneficiary households, it went up by 73.45 percent in Kirap, 111.21 percent in Sakariya,

175.62 percent in Modak-VI and 63.92 percent in Dhar watershed. For non-beneficiary

households, it ranged between 51.92 percent in Kirap to 117.76 percent in Modak-VI

watershed. This upsurge in the value of gross produce was mainly due to higher farm

harvest prices and higher yield achievement. Further, data clearly indicates that in each

selected watershed, the enhancement in the value of gross produce for the beneficiary

households was more impressive compared to that for the corresponding non-beneficiary

households. This indicates that due to positive impact of the various treatments executed

under the NWDPRA programme, beneficiary households were able to achieve relatively

higher crop-production. As a result, the gross and net farm income of the beneficiary

households moved up to a good extent in post project year 2006-07.

4.17 Gross/ Net Farm Income per Hectare and Output-Input Ratio:

The soil and water conservation activities and other treatments carried out under the

watershed programme bring many changes in the cropping pattern and crop-production

environment in the villages covered under the programme. These changes in turn impacted

the level of farm income of the beneficiary households. The economic viability of watershed

programme is judged here by studying the change in net farm income. It is calculated by

subtracting average cost of cultivation per hectare from the value of gross production per

hectare. Table 4.16 provides the data on average net farm income in base year 2001-02

and reference year 2006-07 for beneficiary and non-beneficiary farmers.

I) Kirap watershed:

As compared to base year, per hectare value of gross production and net farm

income registered significant increase for beneficiary and non-beneficiary households. The

net farm income per hectare of GCA for beneficiary households went up from Rs. 15144 in

2001-02 to Rs. 27072 in 2006-07, which shows an increase of 78.76 percent. As against

this, the net farm income of non-beneficiary farmers was Rs. 22662 in 2006-07, registering

an increase of 55.23 percent (see table 4.16). Thus, beneficiary households had about

23.53 percent (Rs. 4410) higher net farm income per hectare than that of non-beneficiary

households. This suggests that watershed programme led to an increase in gross and net

farm income of beneficiary households. The output-input ratio for beneficiary as well as non-

beneficiary farmers for post project year 2006-07 was found higher than that in 2001-02.

Page 105: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

105

Table: 4.16

Net Farm Income per Hectare and Output-Input Value Ratios for Selected Watersheds.

Source:-Field Survey, B=Beneficiary, NB=Non-beneficiary,

GCA= Gross Cropped Area, NCA=Net Cropped Area.

Sr. No.

Particulars B/ NB

Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

% Increase over 2001-02

2001-02

2006-07

% Increase over 2001-02

2001-02

2006-07

% Increase over 2001-02

2001-02

2006-07

% Increase over 2001-02

1

Per Hect.of GCA. i) Gross Value of Production (Rs.) (MP+BP)

B 20633 35788 73.45 11482 25013 111.21 20962 57778 175.62 14751 24180 63.92

NB 20167 30638 51.92 10854 20318 87.20 18307 39865 117.76 14402 22197 54.13

ii) Cost of Cultivation (Rs.)

B 5489 8716 58.80 5568 7994 43.56 5631 8350 48.29 4692 8538 81.97

NB 5568 7976 43.25 4623 8333 80.25 5185 8089 56.00 4578 8519 86.10

iii) Net Farm Income (Rs.) [ (i) –(ii)]

B 15144 27072 78.76 5914 17019 187.77 15331 49428 222.41 10059 15642 55.51

NB 14599 22662 55.23 6231 11985 92.30 13122 31776 142.16 9824 13678 39.23

2

Net Farm Income Per Hect. of NCA (Rs.)

B 18544 34484 85.96 7905 25889 227.50 20189 74374 268.39 14397 25292 75.68

NB 17729 28772 62.29 8282 16049 93.78 16135 40057 148.26 10728 15585 45.27

3

Output-Input Ratio B 3.76:1 4.11:1 9.30 2.06:1 3.13:1 51.95 3.72:1 6.92:1 86.02 3.14:1 2.83:1 -9.87

NB 3.62:1 3.84:1 6.08 2.35:1 2.44:1 3.83 3.55:1 4.93:1 39.66 3.15:1 2.61:1 -17.14

Page 106: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

106

Net Farm Income Per Ha. of GCA

0

10000

20000

30000

40000

50000

60000

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

Kirap Sakariya Modak-VI Dhar

Year & Watershed Name

Ne

t F

arm

Inc

om

e (

Rs

.)iii) Net Farm

Income (Rs.)

for beneficiary.

iii) Net Farm

Income (Rs.)

for non-

beneficiary.

This shows that net return per unit of investment moved up in post project period.

Further, for year 2006-07 output-input ratio worked out for beneficiary households was found

substantially higher than that for non-beneficiary households which suggests quite positive

impact of watershed programme on net return from farm enterprise.

II) Sakariya watershed:

For beneficiary households, the net farm income per hectare of GCA increased from

Rs. 5914 in 2001-02 to Rs. 17019 in 2006-07, an increase of 187.77 percent. The non-

beneficiary households also registered an increase of 92.30 percent. Thus, compared to

non-beneficiary, increase in net farm income for beneficiary households was very large and

impressive. The output-input ratio for beneficiary households was found substantially higher

than that for non-beneficiary households. This suggests that overall watershed programme

generated noteable positive impact on net return from farming business.

III) Modak-VI watershed:

The beneficiary and non-beneficiary households of this watershed realized far better

gross and net farm income compared to their counterpart in other selected watersheds. For

beneficiary households, the net farm income per hectare of GCA increased from Rs. 15331

in base year to Rs. 49428 in 2006-07 showing net increase of 222.41 percent. For non-

beneficiary households, it increased from Rs. 13122 in 2001-02 to Rs. 31776 in 2006-07;

showing net increase of 142.16 percent. Thus, beneficiary households recorded significantly

higher increase in net farm income as compared to non-beneficiary households. Also

output-input ratio for beneficiary households is much higher than that of non-beneficiary

Page 107: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

107

households (See table 4.16). These observations clearly signal very positive role of

watershed treatments in raising the net return from farming for beneficiary households.

IV) Dhar watershed:

As compared to base year 2001-02, the beneficiary as well as non-beneficiary

households registered significant rise in gross and net farm income per hectare in post-

project year. The net farm income per hectare of GCA for beneficiary farmers moved up by

55.51 percent whereas it went up by 39.23 percent for non-beneficiary households. This

suggests that watershed treatments were effective in raising the farm income and

development of rainfed agriculture.Further, as compared to base year, output-input ratio

declined to some extent in post-project year. This was mainly due to lower rate of rise in

crop yields compared to rise in the cost of cultivation.

On account of high sloppy areas of the watershed, the quantum of net increase in

net farm income was found somewhat lower compared to other selected watersheds having

plain or mild sloppy areas.

V) Sum Up:

From the above observations of four selected watersheds it appear that watershed

programme is one of the most effective tools for reduceing the disparity between rainfed and

irrigated farming. The programme is also effective in raising the farm income in beneficial

areas. Further, it was observed that the impact level of the watershed programme also

depends upon soil-type. As compared to plain or mild slope areas, the impact level of

watershed programme was found lower for the hilly and sloppy land.

4.18 Disposal Pattern of Crop Produce:

The utilization and disposal pattern of crop-produce is governed by numorous factors.

Among them major factors are demand, market prices of crop-produce, need for home

consumption and cattle feeding, economic condition of producers and marketing

infrastructure. The data on percentage disposal of crop-produce of major crops have been

furnished in table 4.17.

In selected all four watersheds, Maize and Wheat are the principal food crops and

hence sample farmers have grown these crops for home consumption as well as for

marketing purpose. The percentage of disposal quantity of food crops such as Maize, Wheat

etc. were found low as compared to crops such as Soyabean, Groundnut and Gram. The

percentages of disposal quantity are low for food crops because of the practice to retain part

of the production for home consumption.

Page 108: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

108

Among four selected watersheds, the percentage of disposal quantity of food crops

Maize and Wheat were found lowest for sakariya watershed. For all crops together, the

percentages of disposal were slightly higher for 2006-07, compared to that 2001-02. The

disposal pattern of crop-produce for beneficiary households did not differ much from that of

non-beneficiary households.

4.19 Improvement in the Well’s Water Table:

The NWDPRA programme rely upon the low cost indigenous and traditional rain

water conservation technology which convert surface water flow into sub-surface (deep

percolation) water flow and recharge water in the surrounding wells and reduce the velocity

and volume of rain water going outside the watershed. This in turn also reduces the soil-

erosion. In this context, it is worthwhile to examine the impact of this technology on water

level of the wells. The data relating to changes in the water table of the wells is given in

table 4.18. From the table 4.18, it is obvious that various measures implemented for

moisture conservation and run off control of rain water succeeded in improving the

groundwater aquifers as well as water volume.

Table:-4.17

Disposal of Main product of Major Crops in Selected Watersheds

(% of Disposal)

Crops B/NB Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

2001-02

2006-07

Maize B 54.10 55.28 12.00 17.83 35.11 42.00 58.80 64.69

NB 57.88 56.65 27.95 25.35 44.41 46.69 57.97 64.00

Jowar B 63.27 64.79 - - 48.08 39.76 - -

NB 70.65 67.31 - - 46.02 56.16 - -

Bajra B 59.47 65.11 - - - - - -

NB 62.45 62.37 - - - - - -

Barley B 54.37 35.66 - - - - - 80.00

NB - 48.68 - - - - - -

Wheat B 47.33 54.30 18.72 28.57 12.55 36.19 36.54 41.10

NB 43.55 50.43 27.11 22.61 35.21 33.16 35.82 25.60

Soyabean B - - 84.05 86.31 85.16 89.98 - -

NB - - 87.13 92.70 92.86 89.85 - -

Groundnut B - - 72.92 77.60 54.55 75.00 - -

NB - - 75.00 86.11 72.34 74.07 - -

Gram B 71.15 80.00 87.98 85.56 51.85 90.32 68.22 84.91

NB 76.92 87.10 93.19 93.20 - - 50.00 75.00

All Crops B 55.96 59.66 54.69 60.42 56.77 66.43 55.43 61.28

NB 58.43 59.13 57.21 55.69 64.63 65.76 56.47 59.86

Note:- Disposal is shown as % to total production.

Source:- Field Survey. B=Beneficiary, NB=Non-beneficiary.

Page 109: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

109

In all sample watersheds, notable increase in water level of the wells was observed

in all the three seasons of the post project year 2006-07, compared to corresponding

seasons of the base year 2001-02.

The average rise in water level in wells during kharif season recorded by beneficiary

households ranged from 7.03 feet in Dhar watershed to 8.55 feet in Kirap watershed. During

summer season, beneficiary farmers recorded increase in water table from 1.88 feet in Dhar

watershed to 2.66 feet in Sakariya watershed. The net increase in water table in the wells

was not found uniform. It was observed that the recharge in wells increased if wells were

near to anicut / check-dams. The recharge of water in wells decreased with their distance

from anicut / check-dams / percolation ponds. Also, increase in water level varied according

to soil-type. The net increase in water table in beneficiary wells during rabi season 2006-07

ranged from 2 to 11 feet in Kirap, 2 to 12 feet in Sakariya, nil to 13 feet in Modak-VI and nil

to 8 feet in Dhar watershed. It was observed that duration of pumping hours before well

went dry also increased for the beneficiary households. As compared to non-beneficiary

households, the net increase observed in water table for beneficiary households was more

than 4.43 feet in kharif season, 1.88 feet in rabi season and 0.62 feet in summer season

(See table 4.18). Compared to non-beneficiary households, far better improvement in the

water table observed for beneficiary wells clearly indicating that adopted water conservation

technology under NWDPRA is effective and had shown favourable impact on water level of

the beneficiary wells and ground water aquifers. This improvement in ground water table

situation eased the drinking water problems to some extent in the watershed villages. Due to

this improvement, time spent especially by women and children in fetching drinking water

has gone down to some extent.

Table:-4.18 Average Increase in well’s Water level in 2006-07 over 2001-02 in selected watersheds.

(Increase in feet)

Watersheds

Beneficiary (B) Non-Beneficiary (NB) Increase in water level of B

Wells over NB (Feet) Increase over 2001-02 (Feet) Increase over 2001-02 (Feet)

Kharif Rabi Summer Kharif Rabi Summer Kharif Rabi Summer

Kirap 8.55 6.65 2.16 3.10 2.50 1.43 5.45 4.15 0.73

Sakariya 7.69 6.29 2.66 3.05 2.71 1.73 4.64 3.58 0.93

Modak-VI 7.63 6.16 2.56 3.20 2.96 1.80 4.43 3.20 0.76

Dhar 7.03 4.38 1.88 2.17 2.50 1.27 4.87 1.88 0.62

Source:- Field Survey.

Page 110: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

110

4.20 Activities undertaken under NWDPRA on own land (Beneficiary HHs.):

In all the 4 selected watersheds, under the NWDPRA programme, stakeholders

undertook activities mainly of two types:

i) Preparation of soil / soil stone bunds

ii) Planting of horticulture / agro-forestry trees on field boundry and waste land.

Only two stakeholders of Kirap watershed prepared farm ponds on waste land under

NWDPRA (See table 4.19). Under the programme, as far as user contributions are

concerned, 10 percent (5 % for SC, ST) contribution in cash or kind for activities or

investment on own land was envisaged. The idea of contribution was to induce a thinking

process in the minds of participants of judging pros and cons of the activities since their

involvement in investment. Almost all the programme beneficiaries opted for kind

contribution in terms of labour. The number of labour days contributed for different activities

is shown in table 4.19. Generally, in all the sample watersheds, except one or two cases in

each watershed, the bunds created were found in good position.

Table:-4.19

Activities undertaken under NWDPRA on own land (Only Beneficiary)

Items Unit

Kirap Sakariya

No. of Farmers

Size of

work done

Labour contribution (Man-days)

Present position

No. of

Farmers

Size of

work done

Labour cont. (Man-days)

Present position

V.G P.D/ F.D

V.G P.D/ F.D

Soil bunds Mtr. 17 900 179 16 1 11 580 165 10 1

Soil stone bunds Mtr. 7 340 80 7 - - - - - -

Farm ponds Nos. 2 95 40 2 - - - - - -

Planting of horticulture tree Nos. 5 280 19 3 2 3 45 9 2 1

Planting of Agro.Forestry trees Nos. 18 2345 158 12 6 25 698 182 17 8

Items Unit

Modak-VI Dhar

No. of Farmers

Size of

work done

Labour contribution (Man-days)

Present position No.

of Farmers

Size of

work done

Labour cont. (Man-days)

Present position

V.G P.D/ F.D

V.G P.D/ F.D

Soil bunds Mtr. - - - - - - - - - -

Soil stone bunds Mtr. 5 230 47 5 31 1650 330 29 2

Farm ponds Nos. - - - - - - - - - -

Planting of horticulture tree Nos. 2 45 12 2 5 115 22 2 3

Planting of Agro.Forestry trees Nos. 26 865 213 26 15 390 107 10 5

Note:- V.G:-Very good, F.D:-Fully damaged, P.D:-partly damaged.

Note:-Cont. = Contribution.

Source:- Field Survey.

Page 111: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

111

However, in each watershed, a number of beneficiaries reported partly / fully damaged

and failure of planted horticulture / agro forestry trees (see table 4.19). This was mainly due

to non-suitability of soil, inadequate treatments and damage by cattle due to open grazing

system.

4.21 Horticulture trees and shrubs plantation under NWDPRA:

The data on plantation of dry land horticulture and agro-forestry/ afforstation trees

undertaken by the beneficiary households under the project have been given in table 4.20.

Table:-4.20

Survival Rate of Horticulture plants and trees under NWDPRA

Items Planted (Nos.)

Survival (Nos.)

Survival Rate (%)

Total Cost (Rs.)

Benefit (Rs.)

Income during 2002-07

Watershed Kirap

Horticulture

Amla 180 84 46.67 1980 * **

Mango 30 1 3.33 360 * **

Lemon 70 22 31.43 770 * **

Agro forestry

Ratanjyot 2345 1179 50.28 14070 * **

Watershed Sakariya

Horticulture

Amla 40 19 47.50 440 * **

Mango 5 2 40.00 60 * **

Agro forestry

Ratanjyot 698 433 62.03 4188 * **

Watershed Modak-VI

Horticulture

Amla 30 17 56.67 330 * **

Mango 10 7 70.00 120 * **

Lemon 5 4 80.00 55 * **

Agro forestry

Ratanjyot 865 612 70.75 5190 * **

Watershed Dhar

Horticulture

Amla 75 26 34.67 825 * **

Mango 15 2 13.33 180 * **

Papita 25 9 36.00 250 * **

Agro forestry

Ratanjyot 332 243 73.19 1992 * **

Neem 14 6 42.86 112 * **

Bambu 17 8 47.06 119 * **

Hukashi 14 9 64.29 140 * **

Others 13 6 46.15 78 * **

Note:-* Received plant free of cost under NWDPRA.

** Due to gestations period, the production not realised.Hence, no income.

Source:-Field survey.

Page 112: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

112

The seedlings/ plants for dryland horticulture and agro-forestry trees were distributed

free of cost under the project. The main horticulture plants distributed were mango, lemon,

anola (amla). The ratanjyot, neem, bambu were important agro-forestry trees/ shrubs. The

horticulture plants were planted on field boundaries and terrace. Due to non-suitability of soil

to some horticulture plants, damage caused by cattle due to open grazing system and

inadequate treatments given to plants by sample farmers, the survival rate of the horticulture

crop was found very low and below 50 percent in Dhar, Kirap, and Sakariya watersheds. It

was found somewhat better in Modak-VI watershed.

The survival rate of ratanjyot plantation was found between 50 to 73 percent. For neem,

bambu etc. survival rate was 47 percent or less. As horticulture and agro forestry trees have

long gestation period of 3 to 5 years, no income was reported from it at the time of survey.

Therefore, it is not possible to determine economic return from it.

4.22 Adoption of Improved Farming Systems:

Under the project, in order to encourage farmers for adoption of improved farming

systems and technology, a number of demonstrations of new technology and proven

technology were carried out by the PIA of each selected watershed. Further, project

intervention led to improvement in level of soil moisture and water table of wells. To take the

benefits of these improvements, beneficiaries made suitable changes in their cropping

systems and adopted improved set of farming practices on larger scale. The data showing

the percentage of sample households who had adopted improved farming practices during

2001-02 and 2006-07 have been furnished in tables 4.21.1 to 4.21.4. Important observations

emerging from the tables are as under:

I) In all the four selected watersheds, as compared to base year, the proportion of

beneficiaries as well as non-beneficiary farmers who adopted various improved farming

practices is found much higher in post- project year 2006-07 (See table 4.21.1 to 4.21.4).

The number of demonstrations carried out under the project and improvement in crop-

environment due to project intervention were mainly responsible for enhanced rate of

adoption of improved farming practices. Further, farmers found these suggested farming

practices very useful and effective.

II) In Kirap watershed, after the project intervention, use of chemical fertilizers, bio-

fertilizers, pesticides and bunding activity for soil-water conservation registered remarkable

increase for beneficiary households as compared to same for non-beneficiary households

(See table 4.21.1).

Page 113: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

113

III) In Sakariya watershed, during post project period, the increase in adoption rate in

respect of use of chemical and bio-fertilisers, improved threshing method, planting of

horticulture and bunds preparation was found much higher for beneficiary households

compared to same for non-beneficiary households. This suggests that NWDPRA

implementation impacted positively on adoption of improved farming practices (See table

4.21.2).

Table:-4.21.1 Adoption of Improved Farming Practices by Sample Households in Kirap Watershed

(% adoption)

Sr. No.

Type of Farming Practice

Beneficiary Non Beneficiary

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

1 Improved /H.Y.V /HB Seed 62.50 68.75 6.25 50.00 53.13 3.13

2 Seed Treatment 31.25 56.25 25.00 31.25 46.88 15.63

3 F.Y.M use 100.00 100.00 0.00 100.00 100.00 0.00

4 Chem. Fert. Use 68.75 100.00 31.25 56.25 84.38 28.13

5 Bio-Fert. Use 6.25 65.63 59.38 0.00 0.00 0.00

6 Pesticides 37.50 90.63 53.13 31.25 59.38 28.13

7 Improved method for threshing 81.25 93.75 12.50 71.88 81.25 9.38

8 Planting of Horticulture 12.50 31.25 18.75 8.50 13.00 4.50

9 Bunds for Soil-water conservation 9.38 90.63 81.25 10.00 31.00 21.00

Source:-Field Survey

Note:- Figure denote percentage of households who adopted farming practices.

Table:-4.21.2

Adoption of Improved Farming Practices by Sample Households in Sakariya watershed

(% adoption)

Sr. No.

Type of Farming Practice

Beneficiary Non Beneficiary

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over 2001-02

1 Improved /H.Y.V /HB Seed 62.50 87.50 25.00 65.63 78.13 12.50

2 Seed Treatment 71.88 84.38 12.50 68.75 78.13 9.38

3 F.Y.M use 100.00 100.00 0.00 100.00 100.00 0.00

4 Chem. Fert. Use 65.63 100.00 34.38 50.00 78.13 28.13

5 Bio-Fert. Use 0.00 40.63 40.63 0.00 0.00 0.00

6 Pesticides 56.25 75.00 18.75 40.63 53.13 12.50

7 Improved method for threshing 78.13 96.88 18.75 56.25 62.50 6.25

8 Planting of Horticulture 28.13 56.25 28.13 25.00 37.50 12.50

9 Bunds for Soil-water conservation 37.50 78.13 40.63 31.25 56.25 25.00

Source:-Field Survey

Note:- Figure denote percentage of households who adopted farming practices.

Page 114: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

114

IV) In Modak-VI, after the NWDPRA project, as compared to non-beneficiary households,

the adoption in respect of use of pesticides, planting of horticulture crops, use of chemical

and bio-fertilisers etc. was found moderately higher for beneficiary households. This also

gives indication of positive impact of NWDPRA on adoption of improved farming inputs and

methods (see table 4.21.3).

V) In Dhar watershed, after the implementation of NWDPRA, the bunding activities

increased very sharply.

Table:-4.21.3 Adoption of Improved Farming Practices by Sample Households in Modak-VI Watershed

(% adoption)

Sr. No.

Type of Farming Practice

Beneficiary Non Beneficiary

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

Pre-Project 2001-02 %

Post-Project

2006-07 %

Change in % over

2001-02

1 Improved /H.Y.V /HB Seed 71.88 96.88 25.00 65.63 81.25 15.63

2 Seed Treatment 81.25 100.00 18.75 81.25 93.75 12.50

3 F.Y.M use 100.00 100.00 0.00 100.00 100.00 0.00

4 Chem. Fert. Use 84.38 100.00 15.63 81.25 87.50 6.25

5 Bio-Fert. Use 0.00 28.13 28.13 0.00 21.88 21.88

6 Pesticides 40.63 100.00 59.38 43.75 78.13 34.38

7 Improved method for threshing 90.63 100.00 9.38 65.63 68.75 3.13

8 Planting of Horticulture 18.75 50.00 31.25 12.50 25.00 12.50

9 Bunds for Soil-water conservation 37.50 62.50 25.00 31.25 50.00 18.75

Source:-Field Survey

Note:- Figure denote percentage of households who adopted farming practices.

Table:-4.21.4 Adoption of Improved Farming Practices by Sample Households in Dhar Watershed

(% adoption)

Sr. No.

Type of Farming Practice

Beneficiary Non Beneficiary

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

Pre-Project 2001-02

%

Post-Project 2006-07

%

Change in % over

2001-02

1 Improved /H.Y.V /HB Seed 43.75 56.25 12.50 37.50 46.88 9.38

2 Seed Treatment 75.00 90.63 15.63 65.63 78.13 12.50

3 F.Y.M use 100.00 100.00 0.00 100.00 100.00 0.00

4 Chem. Fert. Use 37.50 53.13 15.63 12.50 25.00 12.50

5 Bio-Fert. Use 0.00 0.00 0.00 0.00 0.00 0.00

6 Pesticides 0.00 0.00 0.00 0.00 0.00 0.00

7 Improved method for threshing 0.00 0.00 0.00 0.00 0.00 0.00

8 Planting of Horticulture 25.00 46.88 21.88 28.13 31.25 3.12

9 Bunds for Soil-water conservation 9.38 81.25 71.88 6.25 56.25 50.00

Source:-Field Survey

Note:- Figure denote percentage of households who adopted farming practices.

Page 115: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

115

This increase was 50 percent for non-beneficiary households whereas it was 71.88

percent for beneficiary households. The proportion of beneficiary households who adopted

planting of horticulture crops was found better than that of non-beneficiary households (see

table 4.21.4).

4.23 Impact of NWDPRA on Livestock Sector:

Under the NWDPRA programme, a number of activities directly aimed at livestock

management have been suggested. But as shown in tables 3.8 to 3.11 (Chapter. 3),

activities relating to livestock management have been taken up in selected watersheds on a

smaller scale than it was planned. The activities like purchase of improved breed dairy

animal and livestock management were planned through SHGs, which had been given

revolving fund. Also to increase the fodder production, development of pasture land was

undertaken but it was on a lesser scale than it was planned.

4.23.1 Change in Livestock Position:

The data on livestock position of sample households have been given in table 4.22.

As expected, crop-livestock linkages improved after the intervention of the NWDPRA

programme in the sample villages.

Table:-4.22 Changes in Live stock position

Type of Live

Stock

Nos. of animals with Beneficiary households

Kirap Sakariya Modak-VI Dhar

2001- 02

2006-07

Change 2001-02

2006-07

Change 2001-02

2006-07

Change 2001-02

2006-07

Change

No. % No. % No. % No. %

Bullocks 17 17 0 0.00 50 51 1 2.00 39 35 -4 -10.26 42 46 4 9.52

Cows 30 36 6 20.00 32 34 2 6.25 42 46 4 9.52 31 36 5 16.13

Cow calf 13 15 2 15.38 11 14 3 27.27 13 21 8 61.54 7 21 14 200.00

Buffaloes 62 66 4 6.45 41 42 1 2.44 38 42 4 10.53 9 12 3 33.33

Buffalo calf 23 28 5 21.74 18 24 6 33.33 14 18 4 28.57 5 7 2 40.00

Goats 219 193 -26 -11.87 65 67 2 3.08 2 2 0 0.00 108 107 -1 -0.93

Sheep 38 45 7 18.42 1 1 0 0.00 - - - - - - - -

Nos. of animals with Non-beneficiary households

Type of Live

Stock

Kirap Sakariya Modak-VI Dhar

2001-02

2006-07

Change 2001-02

2006-07

Change 2001-02

2006-07

Change 2001-02

2006-07

Change

No. % No. % No. % No. %

Bullocks 13 13 0 0.00 44 42 -2 -4.55 26 26 0 0 44 43 -1 -2.27

Cows 20 20 0 0.00 32 34 2 6.25 40 40 0 0 31 36 5 16.13

Cow calf 7 7 0 0.00 8 11 3 37.50 11 19 8 72.73 12 18 6 50.00

Buffaloes 43 46 3 6.98 19 20 1 5.26 32 34 2 6.25 7 7 0 0.00

Buffalo calf 19 23 4 21.05 9 10 1 11.11 14 17 3 21.43 3 5 2 66.67

Goats 112 109 -3 -2.68 63 65 2 3.17 - - - - 91 94 3 3.30

Sheep 30 30 0 0.00 - - - - - - - - - - - -

Source:-Field survey.

Note:- Change denote change in 2006-07 over 2001-02.

Page 116: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

116

This is indicated by increase in livestock population in post-project year. The data

given in table 4.22 clearly reveal that as compared to base year 2001-02, number of dairy

animals such as cows, buffaloes etc. with beneficiary households showed moderate

improvement whereas it showed comparatively little improvement for non-beneficiary

households. In few cases, the cross-bred cows and buffaloes were purchased by SHGs and

provided to members. Some farmers purchased them from their own financial sources. The

number of bullocks and goats showed almost stable position.

The above changes in livestock position clearly reveals that activities namely

development of common land resources (CPRs) and pasture land, various project measures

undertaken for the development and enhancing fodder production improved the availability

of fodder to some extent in the villages covered under the programme. This encouraged

beneficiary farmers to own more milch animals of better breed and in turn to improve the

recurring income from the sale of milk and milk products. This indicates that watershed

programme has helped farmers for the diversification of crop livestock mixes and reduce the

risks level. Further, the improvement in dairy/ livestock sector created incremental

employment mainly for women.

4.23.2 Impact of NWDPRA on Cattle Grazing and Fodder Availability:

In view of pivotal role of livestock in upgrading the ecology and economy of the rural

areas, livestock development activities such as breed improvement, pasture development

on common land, promotion of cultivation of fodder crops etc. have been included in

NWDPRA programme.

The data given in table 4.23 shows that in each selected watershed, for beneficiary

as well as non-beneficiary households the number of open grazing days for cattle were

reduced to some extent in post project year 2006-07 and subsequently this increased the

number of stall feeding days of the cattle. However, quantum of increase in number of stall

feeding days was found moderately higher for the beneficiaries which suggest quite positive

impact of NWDPRA intervention on fodder availability and feeding system of the animals.

Also in each sample watershed, around 38 to 52 percent beneficiaries reported that

due to programme intervention fodder availability, access to common grazing land and

animal health registered marked improvement in watershed areas.

Page 117: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

117

4.23.3 Milk Productivity and Consumption:

The percentage distribution of sample households reporting improvement in 2006-07

in respect of milk production, productivity and consumption have been given in table 4.24.

Table:-4.23 Changes in stall feeding days in 2006-07 over 2001-02

( per HHs./year days)

Watershed Name

Per Household/ Year

After NWDPRA % of Ben.HHs. Reporting

improvement in

Open / Forest

Grazing

Stall Feeding Fodder

avail.

Access to

CGL.

Livestock health

Kirap

Beneficiary -29 29 45.00 42.50 50.00

Non Beneficiary -12 12 N.A N.A N.A

Sakariya

Beneficiary -30 30 45.00 47.50 40.00

Non Beneficiary -10 10 N.A N.A N.A

Modak VI

Beneficiary -67 67 52.50 50.00 50.00

Non Beneficiary -20 20 N.A N.A N.A

Dhar

Beneficiary -17 17 37.50 35.00 40.00

Non Beneficiary -10 10 N.A N.A N.A

Note:- Avail.=Availability, CGL.=Common Grazing Land.

Note:-N.A.=Not Applicable.

Source:-Field Survey

Table:-4.24

Impact of NWDPRA on milk productivity & milk consumption

Watershed Name

% of HHs. Reporting increase in 2006-07 over 2001-02.

Increase in average, milk yield per day/ animal in Ltr. milk

production

Per capita milk

consumption

productivity of milch animals

Cow Buffalow

Kirap

Beneficiary 97.50 97.50 85.00 0.525 0.780

Non Beneficiary 60.00 70.00 62.50 0.333 0.387

Sakariya

Beneficiary 85.00 92.50 85.00 0.603 0.825

Non Beneficiary 50.00 100.00 50.00 0.385 0.413

Modak VI

Beneficiary 95.00 100.00 95.00 0.723 0.982

Non Beneficiary 67.50 100.00 67.50 0.413 0.489

Dhar

Beneficiary 75.00 100.00 75.00 0.680 0.745

Non Beneficiary 55.00 100.00 52.50 0.289 0.315

Source:-Field Survey

Page 118: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

118

From the table 4.24, it is evident that in each sample watershed, the percentage of

beneficiary households reporting increase in respect of milk production, per capita milk

consumption and productivity of milch animals has been much higher than those for non-

beneficiary households. This clearly suggests that NWDPRA contributed positively in

enhancing the milk production and productivity of milch animals. As compared to base year

2001-02, in each sample watershed, average increase in milk yield / animal / day for

beneficiary households in 2006-07 was found significantly higher than that for the non-

beneficiary households. This shows that watershed treatments impacted positively on milk

yield of the dairy animals.

4.24 Additional Farm Employment Generation:

Employment is one of the important indicators of watershed development and its

impact on rural poverty. Availability of sustainable employment is crucial for livelihood of

rural poor. Besides enabling beneficiaries to enhance agricultural production and farm

income, one of the important benefits of NWDPRA intervention was the generation of larger

employment opportunities initially through execution of project work and subsequently on a

continuing basis every year through intensification and diversification of cultivation. Here, an

attempt is made to estimate the total additional on farm employment days (own + Hired in

+Hired out) generated per annum on account of project intervention. The additional

employment generated through project activities such as gauchar and pasture development,

forestry, livestock and dairy etc. has not been considered here.

As compared to base year, in all 4 selected watersheds, requirement of human

labour (own+Hired) in 2006-07 for farming sector shows significant rise for beneficiary as

well as non-beneficiary households. However, comparison reveals that additional on farm

employment days of the beneficiary households were much higher than that for non-

beneficiary households (See table 4.25). As compared to 2001-02, beneficiary households

in 2006-07 generated per Ha./annum average additional on farm employment of 42

mandays in Kirap and Sakariya, 36 mandays in Modak-VI and 56 mandays in Dhar

watershed. Compared to non-beneficiary households, through intensive cultivation of one

hectare land, beneficiary farmers created per annum, on an average additional farm

employment of about 23 mandays in Kirap watershed, about 17 mandays in Sakariya

watershed, about 14 mandays in Modak-VI watershed and about 37 mandays in Dhar

watershed (see table 4.25).

Page 119: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

119

Table:-4.25

Change in on farm employment days for Sample HHs. In 2006-07.

(Days Per Ha./annum)

Labour

Per Hect. Employment days (Agriculture)-2006-07.

Kirap Sakariya Modak-VI Dhar

Change over 2001-02.

Change over NB

Change over 2001-02.

Change over NB

Change over 2001-02.

Change over NB

Change over 2001-02.

Change over NB

Ben. Non. Ben.

Actual Ben. Non. Ben.

Actual Ben. Non. Ben.

Actual Ben. Non. Ben.

Actual

1 2 3 1 2 3 1 2 3 1 2 3

Family labour on own fields:-

Kharif 11.40 4.19 7.21 5.95 5.83 0.12 4.33 2.68 1.64 8.41 3.23 5.19

Rabi 8.30 3.30 5.00 7.54 4.26 3.28 9.17 3.04 6.13 7.79 2.34 5.45

Total 19.70 7.49 12.21 13.50 10.09 3.41 13.50 5.72 7.77 16.20 5.57 10.63

Hired out family labour:-

Kharif 5.94 4.05 1.89 6.14 4.99 1.15 6.19 5.57 0.62 13.40 5.44 7.97

Rabi 6.55 3.03 3.51 8.44 3.52 4.92 6.74 6.14 0.60 14.27 4.05 10.22

Total 12.49 7.09 5.40 14.59 8.51 6.08 12.93 11.71 1.22 27.67 9.49 18.18

Hired in labour for own fields:-

Kharif 5.54 2.64 2.90 6.40 3.95 2.45 4.65 2.49 2.15 7.27 2.41 4.86

Rabi 4.30 1.80 2.50 8.01 2.91 5.10 5.11 1.83 3.28 5.05 1.98 3.07

Total 9.84 4.44 5.39 14.41 6.80 7.61 9.76 4.32 5.43 12.32 4.39 7.93

Grand Total:- 42.03 19.02 23.01 42.49 25.40 17.09 36.19 21.76 14.43 56.19 19.45 36.75

Source:-Field survey, Ben.= Beneficiary, Non.Ben.= Non-beneficiary

Due to varying cropping intensity, the generated incremental farm employment

mandays also varied across selected watersheds. Further, the data clearly suggest that

farmers of watershed villages experienced substantial upsurge in the onfarm employment

due to the NWDPRA intervention.

4.25 Out- Migration of Sample Households:

As out-migration is an economic phenomenon, it requires special attention. The

natural forces like famine, social and cultural factors and lack of employment opportunities in

the village have a huge bearing on the migration process.

One of the objectives of watershed programme is to curtail the out- migration through

generation of sustainable higher employment opportunities in the watershed areas. With this

in view, the changes in the extent of out-migration of sample households during 2001-02

and 2006-07 have been studied here.

Page 120: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

120

Table:-4.26

Details of Out-Migration of Sample Households

Watershed Name

Season

Nos. of out-migration days

Beneficiary Non-Beneficiary

2001-02

2006-07

Change over 2001-02

2001-02

2006-07

Change over 2001-02

days % days %

Kirap

Kharif 104 62 -42 -40.38 98 66 -32 -32.65

Rabi 240 198 -42 -17.50 232 216 -16 -6.90

Summer 394 330 -64 -16.24 424 376 -48 -11.32

Total 738 590 -148 -20.05 754 658 -96 -12.73

Sakariya

Kharif 110 96 -14 -12.73 105 90 -15 -14.29

Rabi 246 206 -40 -16.26 278 266 -12 -4.32

Summer 424 390 -34 -8.02 430 412 -18 -4.19

Total 780 692 -88 -11.28 813 768 -45 -5.54

Modak-VI

Kharif 0 0 0 0.00 0 0 0 0.00

Rabi 80 40 -40 -50.00 92 54 -38 -41.30

Summer 160 112 -48 -30.00 158 124 -34 -21.52

Total 240 152 -88 -36.67 250 178 -72 -28.80

Dhar

Kharif 62 38 -24 -38.71 75 55 -20 -26.67

Rabi 132 62 -70 -53.03 129 88 -41 -31.78

Summer 230 172 -58 -25.22 272 219 -53 -19.49

Total 424 272 -152 -35.85 476 362 -114 -23.95

Source:-Field survey.

The data presented in table 4.26 show that on account of implementation of

location specific activities such as development of CPRs, development of livestock sector

and increase in cropping intensity, the degree of out-migration was reduced to some extent

among beneficiary households of the selected watersheds.

The season-wise examination of data suggest that out-migration was highest in

summer season and lowest in kharif season. In a few cases, nature of migration was found

long term whereas in the majority cases it was of short term in nature. In Modak-VI,

industrial units of kota stone are located in the vicinity of sample villages. Hence, during the

slack agriculture season, the unemployed villagers are availing employment in these

industries without migrating from the residential place. Similar situation prevailed in Dhar

watershed. The villagers of Dhar watershed are not facing any difficulties in availing

employment in marble, construction, hotel and tourist industries located in nearby Udaipur

city. Thus, due to locational advantage, level of out-migration was found considerably lower

in Modak-VI and Dhar watersheds. Further, in all the 4 selected watersheds, level of out-

migration and average period of out-migration is lower for beneficiary households compared

to non-beneficiary households. This indicates somewhat positive impact of NWDPRA

intervention in curtailing out-migration.

4.26 Assets Per Household:

The asset position is one of the important indicator of the economic and production

potential status of the households. Further, NWDPRA intervention aims to generate positive

Page 121: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

121

impact on the income level and subsequently assets composition of the sample households.

With this in view, changes in asset position of sample households have been examined

here.

Assets have been classified into 3 categories. Farm assets consisting of all types of

agricultural implements, wells, water lifting devices, pipe-lines, tractors, bullocks etc. Non-

farm assets include financial assets, houses, furniture, modern durables consumer goods,

vehicles etc. Livestock assets consist of buffaloes, cows, goats, sheep, camel, cattle sheds

etc.

From Table 4.27, it is seen that in all the four selected watersheds, during the period

2001-02 to 2006-07, the investment in assets made by beneficiary households was fairly

higher than for corresponding non-beneficiary households. This clearly gives indication that

implementation of NWDPRA has enhanced assets formation for beneficiaries.

As compared to non-beneficiary, assets investment per beneficiary households

during 2001-02 to 2006-07 was found higher by Rs. 27260 in Kirap, Rs. 12638 in Sakariya,

Rs. 18281 in Modak-VI and Rs. 20035 in Dhar watershed. In total assets investment during

2001-02 to 2006-07, share of non-farm assets was higher than farm assets. This suggests

that, in respect of spending from increamental income, sample farmers (Ben. and Non.Ben.)

gave first priority to purchase of non-farm assets such as electrical goods, mobile, T.V,

cycle, bike / scooter etc.

The investment on farm assets received the next priority. Further, share of

incremental investment made on farm and non-farm assets together ranged between 84 and

96 percent for both types of households (Except NB of Dhar).The very small share of

incremental income spent for livestock suggests that sample farmers gave least importance

to development of livestock / dairy sector.

Table:-4.27 Changes in Assets in 2006-07over 2001-02

(Assets in Rs./HHs.)

Type of Assets

Change in 2006-07 over 2001-02.

Kirap Sakariya Modak-VI Dhar

Ben. Non. Ben.

Ben. Non. Ben.

Ben. Non. Ben.

Ben. Non. Ben.

Farm Assets 20088 4290 11600 7300 12000 9550 14375 3913

% 40.75 19.46 35.36 36.21 28.08 39.05 44.00 30.96

Non-farm Assets 23720 14238 18901 11413 27928 13959 15915 5853

% 48.11 64.60 57.62 56.60 65.34 57.07 48.71 46.31

Livestock Assets 5493 3513 2300 1450 2813 950 2383 2873

% 11.14 15.94 7.01 7.19 6.58 3.88 7.29 22.73

Grand Total 49300 22040 32801 20163 42740 24459 32673 12638

% 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Source :-Field Survey Note:- Ben. =Beneficiary, Non-Ben. =Non-beneficiary. Note:- % denote percentage to Grand total of assets.

Page 122: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

122

4.27 Source-wise per household Annual Net Income in 2006-07 and Change

over 2001-02:

The annual income of beneficiary households from agriculture, animal husbandry

and wage labour is expected to move up due to the watershed intervention. In sample

watersheds, the introduction of NWDPRA induces farmers to put more area under

cultivation. Dairy is an alternative source of livelihood and is mostly influenced by increase in

availability of fodder from the common property resources (CPRs) treated under the project.

Additional employment generation and crop-diversification due to programme intervention is

also expected to contribute in raising the annual income of the beneficiary households. From

the table 4.28, it is seen that as compared to pre-project year, the net annual income from

various sources had increased in post-project year 2006-07, for both, beneficiary and non-

beneficiary households.

Annual Net Income Per HHs. (Rs.)-2006-07

0

20000

40000

60000

80000

100000

120000

140000

Ben

.

Non

Ben.

Ben

.

Non

Ben.

Ben

.

Non

Ben.

Ben

.

Non

Ben.

Kirap Sakariya Modak VI Dhar

Watershed Name & Ben. and Non-Bene.

Inco

me (

Rs.)

Page 123: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

123

Table:-4.28

Source wise Net Annual Income per HHS.in 2006-07 and Change over 2001-02.

(Rs./HHs.)

Watershed Name

Source wise Net Annual Income (Rs./HHs.) in 2006-07 Change in Net income in 2006-07 over 2001-02.

Agri. Dairy Live

stock

Wage Labour

Others Grand Total

Agri. Dairy Live

stock

Wage Labour

Others Grand Total Agri.

Non. Agri.

Agri. Non. Agri.

Kirap

Ben. 33816 8920 2583 4850 3475 13000 66644 17252 1745 555 975 900 4000 25427

% 50.74 13.38 3.88 7.28 5.21 19.51 100.00 67.85 6.86 2.18 3.83 3.54 15.73 100.00

Non Ben. 21903 6245 1370 4435 3887.5 10575 48416 9669 1310 73 1075 788 1575 14489

% 45.24 12.90 2.83 9.16 8.03 21.84 100.00 66.73 9.04 0.50 7.42 5.44 10.87 100.00

Sakariya

Ben. 16980 3298 948 5375 13150 6525 46275 10346 775 -30 1478 2050 1450 16068

% 36.69 7.13 2.05 11.62 28.42 14.10 100.00 64.39 4.82 -0.19 9.20 12.76 9.02 100.00

Non Ben. 9259 2683 923 5275 14850 5425 38414 5453 604 130 1408 2575 975 11144

% 24.10 6.98 2.40 13.73 38.66 14.12 100.00 48.93 5.42 1.17 12.63 23.11 8.75 100.00

Modak VI

Ben. 87543 3545 333 3913 16700 12625 124658 29840 755 83 1143 3150 2300 37270

% 70.23 2.84 0.27 3.14 13.40 10.13 100.00 80.06 2.03 0.22 3.07 8.45 6.17 100.00

Non Ben. 65556 2670 210 4250 12525 9025 94236 19991 683 -3 1200 2550 1325 25746

% 69.57 2.83 0.22 4.51 13.29 9.58 100.00 77.65 2.65 -0.01 4.66 9.90 5.15 100.00

Dhar

Ben. 9182 1746 1573 3243 28225 0.00 43967 3012 598 655 1055 8500 0.00 13819

% 20.88 3.97 3.58 7.37 64.20 0.00 100.00 21.79 4.32 4.74 7.63 61.51 0.00 100.00

Non Ben. 7969 818 524 3400 21700 4500 38910 2576 261 89 970 5675 625 10196

% 20.48 2.10 1.35 8.74 55.77 11.57 100.00 25.27 2.56 0.87 9.51 55.66 6.13 100.00

Source:- Field Survey

Note:-% denote Percentage to Grand Total. Ben=Beneficiary, Non.Ben=Non-beneficiary

Page 124: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

124

However, in all the 4 selected watersheds, the increase in the annual net income

from various sources was much higher for beneficiary households as compared to that for

non-beneficiary households (see table 4.28 and Graph). This shows that watershed

activities had impacted positively on livelihood security of different stackholders of the

selected watersheds.

It has been observed that in Kirap and Modak-VI watersheds, agriculture was the

dominant source of income. Wage labour has been found as a major source of income in

Dhar and Sakariya watersheds (See table 4.28).

Further, in all the sample watersheds, income from dairy enterprise for beneficiary

households was fairly higher than for non-beneficiary households. This clearly suggest

favourable impact of NWDPRA on the dairy activities and dairy income of the beneficiary

households.

4.28 Per Household Annual Expenditure in 2006-07:

The item wise data on per household annual expenditure for 2006-07 and change in

it over 2001-02 have been presented in table 4.29. It is seen from the table that in each

sample watershed, as compared to 2001-02, the overall per household annual expenditure

in 2006-07 went up by 27 to 35 percent. For rise in annual expenditure, rise in the prices of

items and change in consumption and expenditure pattern due to impressive rise in income

owing to NWDPRA intervention were mainly responsible. The overall annual family

expenditure per household for beneficiary and non-beneficiary households was found

almost similar in Kirap and Modak-VI watershed. It was around Rs. 41 thousand in Kirap

and around Rs. 45 thousand in Modak-VI watershed. In Sakariya and Dhar watershed,

annual family expenditure was found higher for beneficiary households than non-beneficiary

households. In Sakariya annual expenditure for beneficiary was Rs. 37720 whereas it was

Rs. 30298 for non-beneficiary.

The data on percentage change in expenditure in 2006-07 over 2001-02 suggest

that increase in expenditure level of beneficiary households did not differ significantly from

the non-beneficiary households. Hence, almost similar expenditure pattern of beneficiary

and non-beneficiary households suggest that expenditure pattern of beneficiary households

broadly remained non-impacted despite smart rise in income level due to NWDPRA

intervention.

Page 125: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

125

4.29 Perception of Sample Farmers on Activities of NWDPRA:

The level of success of watershed programme can be judged by examining the

farmer‟s perception on relevance, adequacy, sustainability and effectiveness of the various

activities executed under the NWDPRA programme. Further, it is worthwhile to know the

level of satisfaction of the beneficiaries on various activities undertaken. With this in view,

opinions and suggestions in this regard were collected from sample beneficiaries and these

data have been discussed below:

4.29.1) Perception of Beneficiary Farmers on Activities on Arable Land:

The perception of sample beneficiaries about the relevance, adequacy, sustainability

and satisfication on various activities / treatments carried out on arable land through

watershed programme have been presented in table 4.30. It can be seen that preparation of

soil bunds, soil-stone bunds and vegetative bunds was considered as most relevant and

suitable for their land by all the sample beneficiaries (100%) of Kirap, Modak-VI and Dhar

watersheds. In Sakariya watershed, it was considered relevant by more than 87 percent of

sample beneficiaries.

Table:-4.29

Per Household Item-wise Annual Expenditure in 2006-07 and Change over 2001-02

(Exp. In Rs./HHs.)

Name of Items

B/ NB

Expenditure in 2006-07 (Rs./HHs.)

Kirap Sakariya Modak-VI Dhar

Actual (Rs.)

% to GT

% Change over 2001-02

Actual (Rs.)

% to GT

% Change over 2001-02

Actual (Rs.)

% to GT

% Change over 2001-02

Actual (Rs.)

% to GT

% Change over 2001-02

Food B 23488 56.28 19.68 23750 62.96 22.19 26650 58.40 20.59 18000 63.57 29.15

NB 24075 58.64 18.96 18013 59.45 22.02 23750 52.57 21.17 14175 61.94 23.93

Clothing B 7015 16.81 30.69 4335 11.49 30.62 6783 14.86 29.81 2465 8.71 37.42

NB 6713 16.35 34.99 3990 13.17 37.59 5715 12.65 29.15 2220 9.70 31.95

Education B 2250 5.39 71.10 1903 5.04 44.95 2486 5.45 182.63 853 3.01 83.33

NB 2118 5.16 48.86 1340 4.42 59.05 4840 10.71 45.04 660 2.88 48.31

Health B 2420 5.80 36.15 1433 3.80 28.19 2343 5.13 42.19 1123 3.96 65.38

NB 1909 4.65 39.84 1448 4.78 37.20 2995 6.63 56.54 625 2.73 -1.96

Fuel B 2305 5.52 42.06 1093 2.90 56.07 2016 4.42 43.25 753 2.66 43.95

NB 2508 6.11 130.05 1219 4.02 58.28 2215 4.90 56.54 940 4.11 77.78

Tran. & Others

B 4255 10.20 41.83 5208 13.81 42.67 5353 11.73 39.21 5124 18.09 43.32

NB 3733 9.09 47.82 4289 14.16 36.37 5665 12.54 51.02 4265 18.64 39.04

Grand Total

B 41733 100.00 27.59 37720 100.00 27.71 45630 100.00 27.81 28316 100.00 35.01

NB 41054 100.00 29.87 30298 100.00 29.06 45180 100.00 37.04 22885 100.00 28.58

Note:- % to GT =Percentage share to Grand Total.

B=Beneficiary, NB=Non-beneficiary. Tran=Transportation.

Source:- Field Survey.

Page 126: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

126

With regard to land leveling work, of the total sample beneficiaries 60.50 percent of

Kirap, 100.00 percent of Sakariya and only 31.25 percent of Modak-VI considered it as

relevant.

In all sample watersheds, more than 60 percent sample beneficiaries found planting

of horticulture/ agro-forestry/ fuel trees on bunds, field boundary and waste land as relevant.

The soil-water conservation measures on farm were found most relevant by all the

beneficiaries in all selected watersheds. However, in respect of nalla pluging near farm

nearly 69 percent of Modak-VI and nearly 59 percent beneficiaries of Dhar watershed found

it as non-relevant (See table 4.30.)

Table:-4.30

Perception of Sample Beneficiaries on activities on Arable Land

(% of Ben. HHs. With positive opinion)

Sr. No.

Type of Activity /Treatment of WS

Kirap Sakariya

Relev ant

Adequate

Sustainable

Satisfactions

Relevant

Adequate

Sustainable

Satisfactions

1 Land Development

i) Soil/ Stone/ Vegetative Bunds 100.00 87.50 87.50 100.00 87.50 68.75 62.50 87.50

ii) Land Leveling 62.50 9.38 9.38 62.50 100.00 68.75 68.75 100.00

2 Planting of Trees

(I) Horticulture on Bunds & field boundary 81.25 68.75 68.75 81.25 62.50 15.63 15.63 62.50

(II) Agro- Forestry/ Fuel trees 93.75 62.50 62.50 93.75 78.13 9.38 9.38 78.13

(III) Legumes trees of shurbs 78.13 50.00 50.00 78.13 - - - -

3 Nalla Pluging Near Farm - - - - - - - -

4 Water Conservation Measures on Farm 100.00 96.88 96.88 100.00 100.00 100.00 100.00 100.00

Sr. No.

Type of Activity /Treatment of WS

Modak-VI Dhar

Relevant

Adequate

Sustainable

Satisfactions

Relevant

Adequate

Sustainable

Satisfactions

1 Land Development

i) Soil/ Stone/ Vegetative Bunds 100.00 78.13 78.13 100.00 100.00 75.00 75.00 100.00

ii) Land Leveling 31.25 18.75 18.75 31.25 - - - -

2 Planting of Trees

(I) Horticulture on Bunds & field boundary 62.50 9.38 9.38 62.50 68.75 21.88 21.88 68.75

(II) Agro- Forestry/ Fuel trees 87.50 56.25 56.25 87.50 78.13 28.13 28.13 78.13

(III) Legumes trees of shurbs 78.13 40.63 40.63 78.13 62.50 15.63 15.63 62.50

3 Nalla Pluging Near Farm 31.25 21.88 21.88 31.25 40.63 21.88 21.88 40.63

4 Water Conservation Measures on Farm 100.00 96.88 96.88 100.00 100.00 84.38 84.38 100.00

* Data relate to 32 Semple House holds

Source:-Field Survey.

Page 127: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

127

The relevance of the activities suggest need for the same but not indicate

adequacy of activities undertaken. From table 4.30, it is clear that 12.50 percent

beneficiaries in Kirap, 31.25 percent in Sakariya, 21.87 percent in Modak-VI and 25.00

percent in Dhar watershed found that prepared bunds were inadequate in respect of their

height, length and width. However, in each selected watershed, more than 60 percent

beneficiaries found bunds as sustainable. In respect of planting horticulture/ agro-forestry/

fuel trees, more than 50 percent beneficiaries of Sakariya, Modak-VI and Dhar watersheds

found it inadequate. They found it inadequate in respect of number of trees planted in per

unit area. In NWDPRA planting of agro-forestry/ horticulture envisage for 50 percent

contribution by beneficiaries. Therefore trees planted in per unit area were inadequate. More

than 80 percent beneficiaries of Sakariya, Modak-VI and Dhar watersheds opined that

planted horticulture trees were not suitable for soil and feared low survival rate. Water

conservation measures undertaken under NWDPRA were found adequate sustainable and

satisfactory in all the selected watersheds. However, in respect of nall pluging work near

farm, majority beneficiaries of Modak-VI and Dhar watersheds found it inadequate, non-

sustainable and non-satisfactory.

4.29.2) Effectiveness of Bunding Activities:

The effectiveness of conservation measure namely bunding activity have been

analysed on the basis of opinions collected from beneficiaries in respect of retention of soil-

moisture, reduction in soil-erosion/ degradation of land and recharge of water.

Table:-4.31

Effectiveness of Bunding activities

(% of Ben. HHs. With positive opinion)

Impact of Bunding activities

Effectiveness

Kirap Sakariya

Signi. Moderate Low Nil Signi. Moderate Low Nil

Increase moisture retention 67.50 22.50 10.00 0.00 47.50 30.00 22.50 0.00

Reduced soil erosion 67.50 25.00 7.50 0.00 45.00 30.00 25.00 0.00

Increase recharging of water 67.50 25.00 7.50 0.00 52.50 27.50 20.00 0.00

Impact of Bunding activities

Effectiveness

Modak-VI Dhar

Signi. Moderate Low Nil Signi. Moderate Low Nil

Increase moisture retention 60.00 25.00 15.00 0.00 52.50 27.50 17.50 0.00

Reduced soil erosion 67.50 25.00 7.50 0.00 52.50 27.50 20.00 0.00

Increase recharging of water 95.00 5.00 0.00 0.00 52.50 25.00 22.50 0.00

Source:-Field Survey, Signi.= Significant.

Page 128: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

128

For the analysis, only those beneficiaries who expressed positive opinion on

effectiveness were considered. The relevant data are given in table 4.31.From the table, it is

apparent that in all the sample watersheds, beneficiaries found bunding activities as most

effective in increasing soil-moisture, reducing soil-erosion, conservation of rain-water and

increasing recharging of underground water.

It was found that 67.50 percent beneficiaries of Kirap, nearly 50.00 percent

beneficiaries of Sakariya, more than 60.00 percent beneficiaries of Modak-VI and 52.50

percent beneficiaries of Dhar watersheds firmly belived that bunding activities created

significant impact in respect of increasing the soil-moisture, recharging of water and

reducing run-off/ soil-erosion. The rest of the beneficiaries also expressed positive effect of

bunding activities on soil-moisture, soil-erosion and recharging of water but level of impact

reported was an either moderate or low.

The above analysis clearly suggests that adoption of bunding activities as a part of

conservation measures on farm is a most vital and crucial component of NWDPRA

programme for the development of rainfed areas.

4.29.3) About Activities related to Non-Arable Land, Drainage Line (DLT), Farm

Production System (FPS) and Livelihood Support System (LSS):

The type, quality and adequacy of the activities undertaken for development of non-

arable land, drainage line treatments (DLT), FPS and LSS has been discussed at length in

section-II of Chapter-3 (Table 3.8 to 3.11). Here, the percentage distribution of beneficiaries

having positive opinions on relevance, adequacy and sustainability of different project

activities carried out for development of non-arable land, drainage line treatments, FPS and

LSS have been given in table 4.32.

The important observations emerging from the table 4.32 are as follows;

(a) In all the 4 sample watersheds, more than 80 percent beneficiaries felt that activities

such as creation of structures for run-off management, water storage and harvesting and

drainage line, testing and demonstration of new technology, livestock management,

preparation and use of vermicompost, development of dairy /poultry for livelihood support

etc. are most relevant. They also felt that location selection by WDT/PIA for creation of

structures is proper and suitable. All cent percent beneficiaries believe that for harvesting

better benefits of the project, repair and maintenance of existing structures is most relevant

and essential.

Page 129: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

129

Table:4.32 Beneficiaries Perception on Non-Arable Land, Drainage Line, FPS and LLS Activities

(% of Ben. HHs. With positive opinion)

Sr.No.

Items

Kirap Sakariya Modak-VI Dhar

Relevant

Adequate

Sustainable

Relevant

Adequate

Sustainable

Relevant

Adequate

Sustainable

Relevant

Adequate

Sustainable

1 Run-off Management Structure 81.25 56.25 53.12 93.75 78.12 68.75 65.63 53.12 53.12 84.37 56.25 56.25

2 Water Harvesting Structures 93.75 78.12 68.75 81.25 78.12 71.87 81.25 68.75 65.62 93.75 96.87 78.12

3 Conservation and Development of Bio-Mass 65.63 53.12 45.75 68.75 53.12 40.63 93.75 78.12 68.75 93.75 68.75 53.12

4 Drainage line Structures (Upper, Middle, Lower reaches) 93.75 78.12 71.87 96.87 71.87 53.12 90.62 78.12 68.75 96.87 78.12 68.75

5 Farm Prod. System (FPS)

i) Testing and demonstration of new technology 96.87 96.87 96.87 96.87 96.87 100.000 96.87 100.00 100.00 96.87 96.87 93.75

ii) Diversification of Prod. System 68.75 - - 53.12 - - 56.25 - - 81.25 68.75 43.75

iii) Livestock Management 87.50 - - 93.75 - - 87.50 43.75 43.75 81.25 37.50 37.80

iv) Vermicompost 93.75 93.75 93.75 50.00 18.75 18.75 96.87 96.87 96.87 87.50 78.12 68.75

6 Livelihood Support System for Landless (LSS for LL)

i) Dairy / Poultry 81.25 78.12 78.12 93.75 - - 93.75 9.38 9.38 93.75 53.12 53.12

ii) Household Prod. System 68.75 53.12 43.75 81.25 - - 65.63 - - 81.25 - -

7 Repair & Maintenance of Existing Structures 100.00 71.87 53.12 100.00 78.12 43.75 100.00 81.25 68.75 100.00 71.87 53.12

Source:-Field Survey.

Page 130: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

130

However, due to average / poor quality of some structures created under project,

nearly 30 to 40 percent beneficiaries believed that these created water harvesting and

drainage line structures will become less effective and workable in the next 5 years or so.

Therefore, proper financial and administrative arrangement for timely repairs and maintance

of these structures is most important (See table 4.32).

(b) Under livelihood support system (LSS) for landless families, no work was undertaken in

respect of development of dairy /poultry and household production system in 3 sample

watershed namely, Sakariya, Modak-VI and Dhar. Majority of beneficiaries believed that

these activities are most relevant (see table 4.32) and need to be executed.

(c) More than 70 percent beneficiaries informed that repair and maintance work of existing

structures was carried out adequately by the competent authorities (see table 4.32) and

hence existing structures are in good shape.

4.30 Awareness and Participation of Beneficiaries:

Among so many factors that contribute to the success of watershed development

programme (WDP), people‟s active participation at all stages of the programme has been at

the centre stage. Watershed development is essentially a dynamic group action programme

in which all members of the watershed contribute towards the attainment of objectives and

share the benefits of the programme. People‟s participation is accepted widely as being

necessary for sustainable development of watershed. Successful WDPs had demonstrated

that performance could be enhanced through community participation and the lack of it is

one of the primary reasons for poor outcomes of WDPs. The programme activities like

pasture development, planting of trees, development of non-arable lands, watershed co-

operatives etc. relied upon community approach. Even important issues of programme can

not be resolved by PIA/ WDT/ WC or the beneficiaries alone. For that joint efforts are

necessary. Thus participatory process is a powerful catalyst for the success of WDPs.

Further, to ensure people‟s participation on a larger scale in different activities of the

programme, full awarness and clarity among stackholders about the programme is most

crucial. With this in view, the nature and extent of awareness and participation level of

sample beneficiaries in different activities of the programme were studied and relevant data

are presented in table 4.33.

4.30.1 Awareness about programme:

According to sample beneficiaries, considerable measures have been taken by PIA

to create awareness about the project activities. Pamphlets were distributed and meetings

Page 131: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

131

were organized to acquaint the villagers about salient features and benefits of the WDP.

Study tours were also organized by PIA.

Table:-4.33 Awareness & participation of beneficiaries in respect of planning and implementation of

NWDPRA

(Figure in % of Ben. HHs.)

Sr. No.

Particulars Kirap Sakariya Modak-

VI Dhar

1 Awareness of NWDPRA

i) Objective of NWDPRA 97.50 100.00 100.00 95.00

ii)Various activity under NWDPRA

a) Fully known 52.50 60.00 65.00 50.00

b) Partialy known 45.00 40.00 35.00 45.00

iii) About PIA /WDT/WC/WA 100.00 100.00 100.00 100.00

2 Are you member of :

i) SHGs 35.00 42.50 52.50 42.50

ii) UGs 15.00 15.00 15.00 12.50

iii) WC 5.00 7.50 10.00 5.00

3 Calling meeting regularly ?

i) SHGs 82.50 85.00 90.00 80.00

ii) UGs 72.50 75.00 80.00 70.00

iii) WC/ WA 47.50 45.00 50.00 45.00

4 Attending of WC/WA meetings

i) Attended all 17.50 22.50 37.50 25.00

ii) Attended but not all 47.50 55.00 55.00 47.50

iii) Not attended 35.00 22.50 7.50 27.50

5 Have you made any suggestion in following meetings?

i) At PRA level 2.50 2.50 5.00 5.00

ii) At planning level 5.00 7.50 10.00 5.00

iii) At Execution level 5.00 7.50 10.00 5.00

6 Whether your suggestions are accepted /implemented

i) At PRA level 2.50 2.50 2.50 5.00

ii) At planning level 2.50 5.00 10.00 5.00

iii) At Execution level 5.00 5.00 7.50 5.00

7 Have you participated in " Shramdan" 100.00 100.00 100.00 100.00

8 Are you knowing Community organiser/ Watershed volunteers/ WDT members

100.00 100.00 100.00 100.00

9 Do you think that WA / WC working efficiently 65.00 62.50 70.00 57.50

10 Received any training under NWDPRA 10.00 0.00 40.00 10.00

11 Have you visited any KVK,Krishi mela,Krishi research centre, Krishi University etc under the programme 25.00 0.00 100.00 37.50

12 Do you think that SHGs generated additional income? 45.00 57.50 72.50 75.00

13 Any conflict take place between members

i) At planning stage 0.00 0.00 0.00 0.00

ii) At Implementation stage 10.00 12.50 5.00 15.00

14 Do you think NWDPRA need to be replicated in other rainfed area 100.00 100.00 100.00 100.00

15 Do you think that watershed working well in post withdrawal phase? 80.00 77.50 80.00 77.50

Source:- Field Survey.

A persual of table 4.33 reveals that in sample watersheds, nearly 95-100 percent of

the sample beneficiaries were found aware about the objectives of the programme.

However, with regard to different activities of the NWDPRA project, 50-65 percent

beneficiaries were found fully aware, whereas remaining beneficiaries were found lacking in

sufficient awarness about it. It is heartening to note that in each selected watershed, all the

Page 132: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

132

sample beneficiaries were fully aware about the formation of PIA, WDT, WA and WC.

Further, many beneficiaries informed that they are not knowing all the members of PIA/

WDT. However, many beneficiaries in each selected watershed informed that they were not

fully aware and indecisive about work division/ work field of the PIA, WDT and WA. (see

table 4.33)

The above observations calls for higher efforts and more interactions with the

watershed villagers by PIA/ WDT for raising the awareness level of the watershed

community about the WDP.

4.30.2 Participation in SHGs/ UGs/ WC/ WA.(Institutional Set-up):

Under the programme, as per norms laid down in WARSA guidelines, SHGs, UGs,

WC and WA were constituted in each selected watershed. The percentage of sample

beneficiaries who were members of SHGs, UGs, WC are shown in table 4.33. Atleast 50

percent sample beneficiaries in each selected watershed informed that after the initial stage

of the project, meetings of WC/WA were not held regularly (See table 4.33) as per norms

laid down in the guidelines. Further, sample beneficiaries informed that most of the UGs had

only marginal involvement in the planning and other phases of the programme. The role of

UGs not found so effective (see chapter-III, (xiii) (iv)). From the table 4.33, it is apparent that

47.50 to 55.00 percent sample beneficiaries attended the meetings of WA/ WC occasionally,

and 7.50 percent (Modak-VI) to 35.00 percent (Kirap) did not attend a single meeting of

WA/WC. This suggests need for large scale efforts by WDT/ PIA for ensuring greater

people‟s participation in the decision making and other activities of the programme.The

percentage of sample beneficiaries who made suggestions in the meetings at different

stages (PRA, planning & Execution) of the programme ranged between 2.50 to 10.00 (See

table 4.33).This suggest that from the beneficiaries who attended WA/ WC meetings,

majority of them attended it silently and were non participants in the discussion held in the

meetings. All sample beneficiaries participated/ contributed by way of “Shramdan” in

activities carried out on non-arable land, common land and own farm land.

They avoided financial contribution by participating in shramdan.Except Modak-VI,

only 10.00 percent sample beneficiaries participated in the training organized under the

programme. On account of non-arrangment of adequate training programmes by PIA,

majority of beneficiaries were not able to participate in the training programme. In Sakariya

watershed, not a single sample beneficiary participated in subject tours arranged by PIA. In

Kirap, 75.00 percent and in Dhar 62.50 percent sample beneficiaries did not get the benefit

of subject tours under the programme. This suggests the need to enhance participation and

Page 133: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

133

involvement of people in the programme as well as to create more awareness about the

programme. There is a need of increasing the frequency of training programmes and subject

tours. Arrangement of very few training and subject tours is a major factor for lower people‟s

participation in the programme. A large proportion of sample beneficiaries in each selected

watershed felt that after the withdrawal of PIA, structures created under programme as well

as other activities of watershed programme are in good shape now and working well.

However, they feared that in the years to come, problem of maintenance and repairing of

these structures and management of common property resources is bound to arise and can

be resolved only by effective leadership of local institutions such as panchayat, WC, WDT

etc. and provision of adequate fund.

All the sample beneficiaries believed that NWDPRA is a most effective programme

for developing the rainfed farming, enhancing the farm income and employment, boost

people‟s empowerment and uplifting the village community of rainfed areas. Therefore, this

needs to be replicated on a larger scale in other rainfed areas. On the whole, participation

level of the sample beneficiaries at different stages of the programme can be considered as

moderate and indicates need for further sincere efforts by PIA/ WDT to enhance the

participation of the people in WDPs.

4.31 Direct Impact of programme on quality of life of the beneficiary

households:

The sample beneficiaries were asked to give their opinions on the type of impacts of

the watershed programme had in changing the quality of life in their villages. The perception

of beneficiary households with regard to different indicators determining the quality of life

has been given in table 4.34.

The data in table 4.34 clearly show that most of the indicators determining the quality

of life of watershed villagers are showing positive changes in all the sample watersheds.

The impact of watershed has been found moderate to high in all watersheds in respect of

agricultural production, cropping intensity, crop-pattern, irrigation, recharging of

groundwater, dairy activities, per capita income etc. The impact has been found moderate to

low in respect of land quality, change in livestock, change in green cover, absorption of

women labour, out-migration, availability of drinking water etc. As compared to Kirap,

Sakariya and Modak-VI watersheds, impact level in respect different indicators has been

found lower in Dhar watershed.

Page 134: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

134

Table:-4.34

Beneficiaries perception on Impact of watershed treatments on quality of life

(Figure in %)

Sr. No.

Aspects

% of Beneficiaries showing impact

Kirap Sakariya Modak-VI Dhar

High Moderate

Low Nil High Mode rate

Low Nil High Moder

ate Low Nil High

Mode rate

Low Nil

1 Agri.Production 35.00 57.50 7.50 0.00 35.00 45.00 20.00 0.00 32.50 45.00 25.00 0.00 0.00 60.00 40.00 0.00

2 Cropping Intensity 32.50 57.50 10.00 0.00 0.00 35.00 47.50 17.50 25.00 35.00 20.00 20.00 0.00 37.50 62.50 0.00

3 Crop - Pattern 65.00 22.50 5.00 7.50 30.00 35.00 17.50 17.50 27.50 30.00 25.00 17.50 0.00 32.50 30.00 37.50

4 Irrigation 67.50 32.50 0.00 0.00 30.00 42.50 27.50 0.00 37.50 40.00 22.50 0.00 0.00 37.50 37.50 25.00

5 Land quality 0.00 60.00 0.00 40.00 15.00 30.00 15.00 40.00 27.50 25.00 17.50 30.00 0.00 25.00 32.50 42.50

6 Recharging of water 62.50 25.00 7.50 5.00 47.50 25.00 12.50 15.00 42.50 45.00 12.50 0.00 0.00 62.50 37.50 0.00

7 Other Agro -Allied activities 45.00 25.00 5.00 25.00 32.50 27.50 15.00 27.50 22.50 40.00 15.00 22.50 0.00 0.00 55.00 45.00

8 Dairy activities 30.00 52.50 17.50 0.00 0.00 70.00 30.00 0.00 10.00 42.50 20.00 27.50 0.00 0.00 22.50 77.50

9 Changes in livestock 0.00 47.50 30.00 22.50 7.50 25.00 30.00 37.50 7.50 30.00 30.00 32.50 0.00 20.00 35.00 45.00

10 Labour absorption 12.50 57.50 30.00 0.00 20.00 45.00 35.00 0.00 35.00 42.50 22.50 0.00 0.00 32.50 30.00 37.50

11 Absorption of women labour 0.00 22.50 77.50 0.00 0.00 17.50 52.50 30.00 12.50 27.50 22.50 37.50 0.00 25.00 20.00 55.00

12 Change in green cover 20.00 47.50 32.50 0.00 17.50 37.50 17.50 27.50 30.00 42.50 30.00 0.00 0.00 0.00 25.00 75.00

13 Qualitative aspect of livelihood 0.00 35.00 65.00 0.00 0.00 35.00 40.00 25.00 0.00 37.50 37.50 25.00 0.00 17.50 30.00 52.50

14 Change in literary ratio 30.00 45.00 25.00 0.00 22.50 50.00 27.50 0.00 25.00 42.50 32.50 0.00 0.00 25.00 22.50 52.50

15 Per capita income 35.00 40.00 25.00 0.00 32.50 40.00 27.50 0.00 27.50 45.00 30.00 0.00 0.00 30.00 70.00 0.00

16 Nos. of SHGs 0.00 60.00 40.00 0.00 0.00 45.00 57.50 0.00 0.00 37.50 62.50 0.00 0.00 35.00 65.00 0.00

17 Out migration 0.00 0.00 70.00 30.00 0.00 0.00 67.50 32.50 0.00 0.00 72.50 27.50 0.00 0.00 70.00 30.00

18 Availability of drinking water 0.00 0.00 50.00 50.00 0.00 10.00 42.50 47.50 5.00 12.50 50.00 32.50 0.00 0.00 40.00 60.00

Source:- Field Survey.

Page 135: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

135

In all sample watersheds, beneficiaries reported improvement in transportation,

communication and educational facilities. They also reported that due to increase in

underground water recharge, improvement in soil-moisture and slowdown in degradation of

land due to soil-water conservation measures, the quality of land improved to some extent.

4.32 Non-beneficiaries views on NWDPRA:

The responses of non-beneficiaries on few questions related to impact of NWDPRA

on various aspects are presented in table 4.35.

Table:-4.35

Views of Non-beneficiaries on NWDPRA

(Figure in %)

Sr.No. Items Type of Change

% of Non-beneficiaries

Kirap Sakariya Modak-

VI Dhar

1 Irrigation Increase 55.00 52.50 60.00 50.00

2 Cropping intensity Increase 52.50 50.00 57.50 50.00

3 Crop-Production Increase 52.50 40.00 42.50 57.50

4 Crop-Diversification Increase 40.00 42.50 45.00 37.50

5 Employment Increase 57.50 62.50 65.00 60.00

6 Farm income Increase 47.50 62.50 57.50 67.50

7 Dairy activity Increase 57.50 60.00 62.50 55.00

8 Wish to cover your village under NWDPRA?

Yes 85.00 90.00 95.00 87.50

Source:-Field Survey

In each selected watershed, more than 50 percent non-beneficiaries expressed very

positive opinion about the impact of NWDPRA intervention in respect of irrigation. Cropping

intensity, crop-productivity and production, farm income, employment and dairy activities.

Around 37 to 45 percent non-beneficiaries expressed that NWDPRA intervention is helpful

in effecting crop-diversification. More than 85 percent non-beneficiaries wanted

implementation of NWDPRA in their villages at the earliest. This clearly reveals that many

non-beneficiaries are aware about the positive impact and benefits of the NWDPRA

programme.

%&%&%&%&%&%&%&% The End %&%&%&%&%&%&%&

Page 136: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

136

Chapter:- 5

Economic Appraisal

The economic appraisal carried out here is based on incremental income generated

owing to NWDPRA intervention from agriculture, livestock/dairy, horticulture and developed

pasture land. This economic appraisal gives indication about the economic viability of the

watershed project. The economic appraisal has been carried by calculating various

measures such as Net Present Value (NPV), Benefit-cost ratio (BCR) and Internal Rate of

Return (IRR) using discounted cash-flow method.

5.1 Methodology and Assumptions:

The net incremental income per hectare due to NWDPRA from agriculture, dairy,

pasture and horticulture crops has been worked out for sample beneficiaries using base

year (2001-02) and post-project year (2006-07) data. Also net incremental income of sample

non-beneficiaries has been worked out using base year and current year (2006-07) data.

The net incremental income per hectare of beneficiaries is a result of combined impact of

NWDPRA and other non-NWDPRA factors. The net incremental income of non-beneficiaries

is a result of impact of non-NWDPRA factors only. Therefore, net incremental income per

hectare due to NWDPRA intervention has been estimated by subtracting incremental

income of non-beneficiaries from the net incremental income per hectare of sample

beneficiaries. Using this net incremental income per hectare of sample beneficiaries, net

incremental income due to NWDPRA has been estimated for the whole watershed.

The analysis has been done with respect to two scenarios: one with a 10-year time

horizon and the other with a 20-years time horizon. For cost-benefit and NPV, a 10%

discount rate has been used. Initial investment spread over five years has been taken into

account as a cost. Also estimated maintenance cost of the structures created and pasture

land are considered from the 6th year onward. The income of additional generated of

employment, land value appreciation due to land improvement, environmental improvement

value etc. are ignored.

5.2 Formulas Used:

i) Benefit-Cost Ratio (BCR): Where T Bt __ Bt = Benefit at time„t‟

∑ (1 + i) t Ct = Cost at time„t‟ BCR = t=1________ i = discount rate

T T = lifespan in year. ∑ Ct / (1+i) t

t=1

Page 137: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

137

ii) Net Present Value (NPV):

T NPV = ∑ (Bt – Ct)

t=1 (1 + i) t

iii) Internal Rate of Return (IRR): T IRR = ∑ (Bt – Ct) t =1 (1 + i) t = 0

5.3 BCR, NPV and IRR for sample watersheds:

1) Benefit- Cost Ratio (BCR):

BCR is used almost exclusively as a measure of social/ economic benefits.

Therefore, to know the economic viability of sample watersheds, benefit-cost ratio (BCR)

has been worked out for 10 years and 20 years time horizon by taking 10 percent discount

rate. For 10 years horizon, BCR is 3.50 for Kirap, 3.82 for Sakariya, 9.02 for Modak-VI and

1.17 for Dhar watershed. For 20 years horizon, it worked to 5.31 for Kirap, 5.68 for Sakariya,

13.14 for Modak-VI and 1.68 for Dhar watershed (See table 5.1). Among 4 sample

watersheds, BCR is lowest for Dhar watershed as it had lowest proportion of arable land

(10.4 %). The BCR for Modak-VI watershed is highest as it had very high proportion of

arable land (81.08 %). The BCR is more than one for all the sample watersheds, which

suggest that investment in NWDPRA project is economically viable and very attractive.

Table 5.1

BCR, IRR and NPV of selected watersheds

(Discount rate 10 %)

Item Time

Horizon Kirap Sakariya Modak-VI Dhar

Benefit-cost ratio

(BCR)

10 Yr. 3.50 3.82 9.02 1.17

20 Yr. 5.31 5.68 13.14 1.68

Net present

value (NPV)

(Rs. In Lakh)

10 Yr. 51.78 60.05 83.11 16.17

20 Yr. 82.64 94.60 135.70 23.28

Internal rate of

return % (IRR)

10 Yr. 53 62 144 16

20 Yr. 59 64 144 23

Note: - (i) Discount rate applied is 10 %

(ii) NPV in Rs. Lakh and IRR in percent (%).

Page 138: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

138

2) Net Present Value (NPV):

The net present value (NPV) is the difference between the present value of benefits

accrued from the programme and the present value of costs. The NPV worked out for 10

years and 20 years time horizon are shown in table 5.1. For 20 years horizon, it is Rs. 82.64

lakhs for Kirap, Rs. 94.60 lakhs for Sakariya, Rs. 135.70 lakhs for Modak-VI and Rs. 23.28

lakhs for Dhar watershed. For 10 years time horizon, NPV of each selected watershed is

positive and ranged from Rs. 83.11 lakhs for Modak-VI to Rs. 16.17 lakhs for Dhar

watershed. A positive NPV for each sample watershed implies positive worth of the project

in generating returns in excess of all costs.

3) Internal Rate of Return (IRR):

IRR represents the average earning power of money used for the project over project

life. Using 10 percent discount rate and 10 years and 20 years project life, IRR for sample

watersheds has been worked out and presented in table 5.1. For 20 years project life, IRR

is 59 % for Kirap, 62% for Sakariya, 144% for Modak-VI and 23% for Dhar. For 10 years

horizon, it is 53 % for Kirap, 62 % for Sakariya, 144% for Modak-VI and 16% for Dhar

watershed. For all the selected watersheds, the yielded IRR are more than the opportunity

cost of capital of 10 %, heance the investment on NWDPRA programme is economically

viable.

5.4 Overview of Performance Indicators of the Selected Watershed:

Table 5.2 presents an overview of performance indicators of the selected watershed

in Rajasthan. In each watershed, project expenditure has been less than the total project

cost sanctioned. Except Dhar watershed, the number of employment man days generated in

remaining three watersheds has been encouraging. The additional area brought under

cultivation and supplemental irrigation also indicates good performance. In each sample

watersheds except Sakariya, the picture of planting of agro-forestry/ fuel trees and its

survival is rosy. The internal rate of return in each selected watershed is attractive and more

than opportunity cost of capital. The NPV and BCR worked out are positive and high. The

value of IRR, NPV, BCR of each selected watershed clearly indicates that investment on

NWDPRA programme is economically, very attractive and viable.

Page 139: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

139

Table 5.2

Performance Indicators of the selected watersheds

Sr. No

Particulars

Selected Watersheds

Kirap (Ajmer)

Sakariya (Chhitorgardh)

Modak-VI (Kota)

Dhar (Udaipur)

1 Total Project Cost (Rs.) 22,50,000 22,50,000 16,65,000 22,50,000

2 Project Expenditure (Rs.) 20,56,500 21,76,900 13,69,000 18,61,500

3 Watershed Area for Development (Ha.)

i) Arable (Ha.) 338 375 300 52

ii) Non-arable (Ha.) 162 125 70 448

iii) Others (Ha.) - - - -

iv) Total (Ha.) 500 500 370 500

4 Area Developed (Ha.) 500 500 350 450

5 Internal rate of return (%) (IRR)

i) Project life 10 Yrs. 53 62 144 16

ii) Project life 20 Yrs. 59 64 144 23

6 Benefit-cost ratio (BCR), 10 % Discount rate

i) Project life 10 Yrs. 3.5 3.82 9.02 1.17

ii) Project life 20 Yrs. 5.31 5.68 13.14 1.68

7 Net Present Value (NPV) (Rs.)

i) Project life 10 Yrs. 51,78,000 60,05,000 83,11,000 16,17,000

ii) Project life 20 Yrs. 82,64,000 94,60,000 135,70,000 23,28,000

8 Horticulture

(i) Nos. of seedlings planted 740 N.A - -

(ii) Nos. of seedlings survived 630 N.A - -

(iii) Survival percentage (%) 85.13 - - -

9 Agro-Forestry:-

(i) Nos. of seedlings planted 12864 230 50000 20000*

(ii) Nos. of seedlings survived 9656 142 42000 16500

(iii) Survival percentage (%) 75.06 61.74 84.00 82.50

10 Employment generated (Man-days) 17500 14246 11750 4100

11 Nos. of Training 30 7 12 16

12 Nos of persons trained 350 145 365 236

13 Total fund given (Rs.)

(i) SHGs 1,50,000 1,00,000 - 70,000

(ii) UGs - - - -

14 Additional Area Brought under cultivation (Ha.) 50 25 45 2

15 Additional Area Brought under supplemental Irri. (Ha.) 62 20 40 8

Source:- (i) Project report of selected districts, (ii) Field Survey.

Note:- * Ratanjyot plantation. N.A= Not Available.

5.5 Pre and Post Project Scenario of Selected Watershed:

Table number 5.3 illustrates the pre and post project scenario of the selected

watersheds in Rajasthan.

Page 140: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

140

Table:-5.3

Pre and Post project scenario of the selected watersheds (For Sample Beneficiary HHs.)

Pre-Project year:-2001-02

Post-Project year:-2006-07

Sr. No.

Particulars

Kirap (Ajmer) Sakariya (Chittorgarh) Modak-VI (Kota) Dhar (Udaipur)

2001-02

2006-07

% Change

2001-02

2006-07

% Change

2001-02

2006-07

% Change 2001-02 2006-

07 %

Change

1 Productivity of Major Crops (Qtl. /Ha.)

i) Maize 21.55 26.66 23.73 12.92 19.77 53.00 23.50 30.24 28.71 15.87 20.80 31.93

ii) Bajra 27.01 33.24 23.07 - - - - - - - - -

iii) Jowar 12.79 16.02 25.20 - - - 12.85 24.42 90.02 - - -

iv) Wheat 45.99 56.65 23.18 18.59 26.22 41.07 29.81 41.39 38.84 13.89 17.85 28.46

v) Soyabean - - - 8.46 11.98 41.66 11.14 12.81 15.01 - - -

vi) Pulses 7.45 12.84 72.34 9.80 13.15 34.18 6.91 10.49 51.80 5.14 9.60 86.77

vii) Coriander - - - - - - 13.51 22.75 68.55 - - -

2 Cropped Area of Major Crops (Ha.)

i) Maize 27.19 23.06 -15.18 15.48 14.46 -6.54 25.09 23.15 -7.74 26.86 25.19 -6.21

ii) Bajra 30.51 28.97 -5.04 - - - - - - - - -

iii) Jowar 11.49 16.67 45.07 - - - 4.05 3.40 -16.00 - - -

iv) Wheat 10.20 11.90 16.67 12.64 16.29 28.80 8.82 12.95 46.79 7.49 11.18 49.32

v) Soyabean - - - 45.21 48.15 6.50 39.33 42.08 7.00 - - -

vi) Pulses 11.81 12.31 4.23 14.46 14.87 2.84 8.17 13.11 60.46 9.00 11.33 25.89

vii) Coriander - - - - - - 16.43 19.10 16.26 - - -

3 Cropping Intensity (%) 122.45 127.38 4.03 133.67 152.12 13.80 131.69 150.47 14.26 143.13 161.69 12.97

4 Net Income Per Ha.of NCA (Rs.) 18544 34484 85.96 7905 25889 227.50 20189 74374 268.39 14397 25292 75.68

5 Family income Per annum (Rs.) 41217 66644 61.69 30207 46275 53.19 87388 124658 42.65 30148 43967 45.84

6 Migration of Rural poor (Mandays) 738 590 -20.05 780 692 -11.28 240 152 -36.67 424 272 -35.55

7 Ground water level (feets) 44 38 13.64 40 34 15.00 36 31 13.89 29 25 13.79

8 Fodder Yield (Qtl./Ha.) 32.34 41.77 29.17 15.50 19.07 23.08 14.75 19.42 31.71 23.01 27.29 18.63

9 Average milk yield (Litre/day/ animal)

(i) Cow 2.085 2.610 25.18 1.980 2.583 30.45 2.030 2.753 35.62 1.980 2.660 34.34

(ii) Buffaloes 2.450 3.230 31.84 2.150 2.975 38.37 2.580 3.562 38.06 2.520 3.265 29.56

10 Nos. of days of Stall feedings (Per HHs.) 163 192 17.79 160 190 18.75 160 227 41.88 188 205 9.04

11 Percentage runoff from watershed 35 - 40 % 30 - 35 % 40 - 45 % 30 - 35 %

Source:- Field Survey.

Page 141: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

141

The comparative analysis of productivity of major crops in the selected watersheds

indicates that the productivity of major crops registered spectacular increase after the

implementation of NWDPRA. In case of cereal crops (Maize, Bajra, Wheat, Jowar)

productivity increased by 23-25 % in Kirap, 41-53 % in Sakariya, 28-90 % in Modak-VI and

28-32 % in Dhar. Across sample watersheds, productivity registered increase from 34.18%

to 86.77 % for pulses, 15.01 % to 41.66 % for soyabean and 68.55 % for coriander. Area

under Maize and Bajra registered decline in all selected watersheds, whereas area under

wheat, soyabean, pulses and coriander registered noticeable increase. Across sample

watersheds, cropping intensity increased in the range of 4.03% to 14.26%. The net farm

income per hectare increased by 75.68% (Dhar) to 268.39% (Modak-VI). The family income

per annum also increased by 42.65 % (Modak-VI) to 61.69 % (Kirap). On account of

NWDPRA intervention, ground water table of the wells increased moderately, out-migration

of rural poor was reduced to some extent, fodder yield improved, average milk yield per day

per animal improved by 25-35 % and number of days of stall feeding increased by 9-42 %.

The NWDPRA programme also helped in reducing the run-off of water, soil-erosion and land

degradation.

5.6 Concluding Observations:

Based on evaluation carried out using field level data, it can be inferred that

NWDPRA holds the key to the development of country‟s vast rainfed areas. The programme

improved the groundwater aquifers as well as in situ moisture level of soil. Further NWDPRA

programme brought very positive changes in respect of irrigation, cropping intensity, crop-

pattern, farm employment, fodder and bio-mass, out-migration, status of land less

households etc. It boost the village economy. The NWDPRA is beneficial but it lacks

certainty regarding its sustainability in future.

Though, it is very difficult to identify a single key factor, improvement in water

availability for irrigation and in situ moisture lead to rise in crop-yields and farm income seem

to be the driving force behind the noticeable performance of NWDPRA.

The study further reveals that quantum of benefits derived were below the expected

level. By effecting necessary corrections to eliminate constraints discussed in forgoing

analysis, benefit level of programme can be raised further. The participation of beneficiaries

was low at the stages of planning, implementation and in village meetings. The awareness

level about project activities was also low to moderate. This call for higher efforts to increase

the people‟s participation at all the stages of programme, decision making process and

particularly activities related to common property resources. Further, additional efforts are

Page 142: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

142

needed to raise the awareness level and building capacity of the stakeholders/ beneficiaries.

Regular arrangement of meetings of WC/ WA will bring more transparency. The regular

interaction between PIA/ WDT/ WC and beneficiaries will be helpful in identify problems and

evolving solution in a participatory ways. Though, NWDPRA have an essential component

of institutional building, but most of the created institutions were found average/ weak in

nature. On FPS, LSS and capacity building activities, WDT/ PIA had paid little attention.

Hence, there is a need for WDT, PIA and WC to give more emphasis on these aspects. The

inclusion/ support of local NGOs in the programme will be helpful in reducing

implementation problems. Timely repairs and maintenance of created structures also

needed for sustainability of the impact of the programme.

The NWDPRA is economically very attractive and viable and has succeeded in

boosting people‟s empowerment. The goals of upliftment of farming communities of rainfed

areas, equity, employment and food-security would not look distant, if NWDPRA is persued

in earnest. In the years to come, the NWDPRA deserves higher financial allocation and

large scale replication in untreated rainfed areas of Rajasthan and country.

%%%%%%%%%%The End %%%%%%%%%%%%

Page 143: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

143

Chapter:-6

SUMMARY AND CONCLUSIONS

6.1: Introduction:

In India, of the total 142 million arable land, rainfed areas constitute about 63

percent. Until 1980, the policy thrust was on development of irrigated areas and it

overlooked the development needs of rainfed farming. This neglect of rainfed areas created

unintended agricultural, socio-economic and ecological imbalances between irrigated and

rainfed areas. In early 80‟s , government realized these disparities and adopted participatory

watershed development approach for improvement of rural livelihoods and rainforce farming

system/ productivity of rainfed areas in a sustainable manner. Technically, watershed is an

area with a common drainage point, implying that rainwater falling within watershed flows

through one or more natural courses and converges at a common point. The watershed unit

spatially comprises of arable land, non-arable land and network of natural drainage lines.

For improving the soil productivity, degraded lands and livelihood of people of rainfed

areas on a sustainable manner, a number of projects based on watershed approach are

being implemented by state/ central government, NGOs, externally aided projects and

privately by local communities. Among these projects, the largest project in terms of scope is

“The National Watershed Development Project for Rainfed Area (NWDPRA)”, being

implemented by ministry of agriculture, GoI. The NWDPRA was launched in 1990-91 in 25

states and 2 UTs and continued to be implemented upto IX plan. On the basis of lessons

learnt and experience gained, NWDPRA was restructured in the year 2001. For bringing

uniformity in approach of watershed programmes being implemented by various agencies,

the “WARASA JANSAHBHAGITA (WJ)” guidelines were formulated and adopted jointly by

ministry of agriculture (MoA) and rural development (MoRD), GoI. During tenth plan period

(2002-07), the revised NWDPRA was implemented as per WJ in 6315 blocks spread over

28 states and 2 UTs covering area of 23.30 lakh hectares by spending about Rs.1148

crores. NWDPRA is now planned, implemented, monitored and maintained by watershed

communities themselves. In WJ, “Bottom-up management approach” is adopted for

organizing NWDPRA.

6.2 Need of the study:

As 10th plan revised NWDPRA is over by the end of 2006-07, it became imperative

worthwhile to conduct a impact assessment study to look in depth at the effectiveness,

relevance, sustainability of project activities, nature and extent of agro-economic benefits,

Page 144: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

144

changes in socio-economic and institutional parameters, people‟s participation, post-project

management etc. Further, to improve the performance of the NWDPRA, identification and

elimination of constraints affecting the project outcomes is essential. This can be done by

conducting a comprehensive impact assessment study of 10th plan NWDPRA. Keeping this

in view, MoA, GoI, asked Agro-Economic Research Centre, Vallabh Vidyanagar to

undertake this study on “Impact Evaluation of Revised National Watershed Development

Project for Rainfed Areas (NWDPRA) during 10th Plan in Rajasthan.”

6.3 Objectives:

The specific objectives of the study are as follows:-

i) To evaluate the overall changes in agro-economic, socio-economic parameters

due to intervention of the NWDPRA programme.

ii) To assess the qualitative performance of the NWDPRA programme.

iii) To locate the problems/ constraints faced at different stages of the programme

and to suggest remedial strategies to eliminate it.

iv) To cross-examine the information on programme implementation provided by the

nodal agency.

v) To have suitable policy implications, if need be.

6.4 Sampling Design:

In consultation with the state nodal agency, four districts falling in distinct agro-

climatic zones of Rajasthan were selected. From each selected district, one watershed

under 10th plan NWDPRA was selected.

Details of sample watersheds and sample HHs.

Watershed

(District)

Selected

Block

Selected

Villages

B/

NB

Selection of sample HHs.(Nos.)

MF SF MD BF LL T

Kirap

(Ajmer) Masuda Kirap

B 8 8 8 8 8 40

NB 8 8 8 8 8 40

Sakariya

(Chittorgarh)

Chhoti

sadari

Sakariya B 8 8 8 8 8 40

Sandikheda NB 8 8 8 8 8 40

Modak-VI

(Kota) Kherabad

Dhuniya B 8 8 8 8 8 40

Nimana NB 8 8 8 8 8 40

Dhar

(Udaipur) Badgaon

Dhar B 8 16 8 - 8 40

Badanga NB 8 16 8 - 8 40

Note:-B-Beneficiary, NB=Non-beneficiary,

MF=Marginal farmers, SF=Small farmers, MD=Medium farmers, BF=Big farmers, LL=Landless, T=Total.

All the villages falling under the catchment areas of selected watersheds were

selected for the study. For selection of non-beneficiary households, nearby non-watershed

villages were selected for each selected watershed. From each selected watershed, 40

Page 145: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

145

beneficiary(B) households comprising 8 marginal (<1 ha.), 8 small (1-<2 Ha.), 8 medium (2-

<4 Ha.), 8 big (above 4 Ha.) and 8 landless were selected randomly. By following same

procedure, for each selected watershed, 40 non-beneficiary (NB) households from non-

watershed villages were selected randomly. Thus, in all total 320 households (80 from each

watershed) were selected as per table given above.

6.5 Reference year and data collection:

Through well structured schedules, the field data were collected from sample

households for pre-project year 2001-02 and project ending year 2006-07.

6.6 Analysis approach:

The difference between post-project and pre-project parameters shows combined

impact of NWDPRA plus non-NWDPRA factors. The changes in parameters for non-

beneficiary households shows impact of only non-NWDPRA factors. Therefore, to ascertain

realistic impact of NWDPRA, the changes observed for beneficiary households are

compared with changes observed for non-beneficiary households.

6.7 Agricultural characteristics of Rajasthan state:

Agriculture plays an important role in Rajasthan economy. The agriculture prospects

largely depends upon behaviour of monsoon. The average annual rainfall is 575 mm. and it

ranged from low of 84 mm to 1354 mm. The scanty and erratic rainfall and adverse natural

conditions are the limiting factors against shaping of dynamic agriculture. The drought

conditions exist almost in alternate year. The majority of the north-west region of state is

either desert or semi-desert. Only 29.51 percent of GCA was irrigated. Wells/ Tubewells are

the prime sources of irrigation. The irrigation intensity is only around 122 and cropping

intensity was only 124.50. Bajra, Maize, Jowar and Wheat are the major cereal crops and

Moth, Gram, Moong and Udad are the major pulses crops. Mustard, Soyabean, Sesamum

and Groundnut are the major oilseeds crops. Rajasthan is a leading producer of Coriander,

Cumin and Guar. The per hectare fertilizer consumption is low. The crop-productivity is

fluctuating and poor. Soil-erosion and salinity problems are also adversely affecting

agriculture. In view of these adversities, preventing soil-erosion, increasing ground-water

resources, harvesting rain-water and efficient and sustainable use of water resources

through adoption of NWDPRA assumes vital importance in the state.

6.8 NWDPRA (xth Plan) and other watershed projects in Rajasthan:

Number of soil and water conservation programmes have been executed in

Rajasthan since fifties, earlier by the department and after 1991 by the directorate of

watershed development and soil-conservation (WDSC). In 2007, under different

Page 146: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

146

programmes such as CDP, DDP, DPAP, IWDP, NWDPRA, TAD, externally/ privately aided

etc., a total 8642 watershed projects were under implementation (see table 1.2).

The centrally sponsored NWDPRA programme is in operation since 1986-87 and

uptill now it has covered 31 districts (out of 32). In Rajasthan, under xth plan NWDPRA, total

1138 watersheds covering 545496 Ha. area of 201 blocks spread over 31 districts were

taken up for development by spending about Rs. 202 crores. It was implemented with 90%

central share and 10 % state matching share. Upto May-2004, X plan NWDPRA was

implemented by WDSC. After the merger of WDSC with panchyati raj (PR) department, from

June 2004 onward ministry of rural development and panchayati raj became a state level

implementing agency. The NWPRA is monitored at watershed level by WA, at block level by

PIA, at district level by zilla parishad/ DNA and state level by WDSC.

6.9 Physical and Financial Achievement at State Level:

(i) During the total project period (till Sept. 2007), of the targeted area of 466930 Ha., 93.96

percent area was covered under Xth plan NWDPRA.

(ii) The expenditure incurred on various activities of the project taken together was only

81.69 percent (Rs.20177.79 lakhs) of the total proposed outlay of 24699.17 lakhs.

(iii) There was a delay in initiating entry point activities, preparing DPR, institutions and

capacity building works in a preparatory phase year 2001-02. Hence, amount spent in this

year was only 27.48 percent of the proposed outlay (see table 2.4).

(iv) Out of the proposed outlay for management administration, PIA and training, spending

on these components was very low. This was mainly due to delay in appointment of staff

and also less number of appointments. This in turn directly affected the monitoring, of

project implementation and people participation level in the programme.

(v) In the project, Natural Resources Management (NRM) activities received higher

importance and amount utilized was 111.64 % of the proposed outlay. Among NRM

activities on arable land, soil and moisture conservation activities hold prime importance and

amount spent on it was 62.60 percent higher than proposed. On non-arable land,

constructing anicut and other water harvesting and run-off management structures were the

main activities.

(vi) Except testing and demonstration of new technology, other activities under FPS and

livelihood support system (LSS) were undertaken on a very small scale. (see table 2.5).

(vii) Under the programme, total 8868 SHGs were formed.

(viii) As per state nodal agency, implementation of X plan NWDPRA generated additional

employment of 3927757 mandays in the state.

Page 147: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

147

6.10 Profile of the selected watersheds:

The table given below gives brief profile of selected 4 watersheds. In all the 4

watersheds, rainfall is highly variable, scanty and erratic and recharge level of wells, sown

area and crop-productivity is highly dependent on the rainfall pattern. Soil erosion occurs

through wind and water. Soil in all 4 watersheds have generally poor productivity. Soil in all

4 watersheds is poorly drained and recharging capacity is poor.

Profile of the Selected Watersheds

Sr. No

Particular

Watershed Name

Kirap (Ajmer)

Sakariya (Chittorgarh)

Modak-VI (Kota)

Dhar (Udaipur)

1 Area available for treatment (Ha.) 500 500 370 500

i) Arable land (Ha.) 338.40 375 300 52

ii) Non-arable land (Ha.) 161.60 125 70 448

iii) % of irri. Arable land 11.11 17.33 16.67 38.46

2 Project sanction cost (Lakh Rs.) 22.50 22.50 16.65 22.50

3 General soil type Clay loam & stony

Clay and Clay loam

Black Alluvial clay loam

Sandy loam

4 Soil Slop (%)

0-8 % (Ha.) 500 500 370 450

8-15 % (Ha.) - - - 50

5 Average Temperature (C°) Mini.-Max.

6-45 2-47 5-48 7-44

6 Average Rainfall (mm.) 305 600 980 600

7 Rainfall in 2006-07 (mm.) 696 1010 910 980

8 Main Crops

Maize,Bajra, Jowar,Wheat, Udad,Gram

Soyabean, Maize,G.nut, Udad,Wheat,

Gram, Rapeseed

Soyabean, Maize,Jowar,

Coriander, Udad,Gram,

Wheat

Maize, Wheat, Gram, Udad,

Rapeseed

9 Main Source of irrigation Wells Wells/ T.wells Wells/T.wells Wells

10 Illiterate population (%) 62.95 62.85 63.04 N.A

11 Predominance Castes ST General SC & ST ST

12 % of marginal & small holdings 79.35 71.88 70.00 89.16

13 Nos. of SHGs formed 6 5 4 3

14 Nos. of UGs formed 6 5 4 4

15 Formation of WTC / WC Yes Yes Yes Yes

16 Amt. in WDF at project completion time (Lakh Rs.)

1.85 0.952 1.05 1.23

Source:- Project completion report, Directorate of WDSC, Jaipur, Govt. of Rajathan. Vital Agriculture Statistics, Directorate of Agriculture, Rajasthan.

The primary occupation of majority households is agriculture and secondary

occupation is livestock keeping/ dairy and wage labour. Majority milch animals were of local

breed and milk yield/ animal/ day was relatively low. In summer, majority of wells/ hand

pumps goes dry and villagers are facing problem of paucity of drinking water. Few big

livestock holders and landless families are migrating to other places mostly during summer.

6.11 Physical and Financial Achievement in Selected Watersheds:

i) Kirap Watershed:- Against the sanctioned amount of Rs.22.50 lakhs, a total Rs. 20.565

lakhs (92.75%) was spent. Under the management cost, spending on administration at WC

Page 148: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

148

and PIA level, community organization training and tours for WC,WA,SHGs, watershed

community, Publications etc. was found below 50 percent of the allocated amount. This

directly impacted the awareness level of the watershed community and their participation in

the NWDPRA programme. The major thrust was laid on NRM activities. The financial

achievement to the target was 187.32 percent for non-arable land (see table 3.8). For

drainage line treatments (DLTs), against the target of Rs. 3.46 lakhs, amount spent was Rs.

4.37 lakhs. Amount spent on testing and demonstration was over 3 fold. Under FPS, no

amount was utilized for activities such as adoption of proven technology, establishment of

nursery, livestock management etc. For LSS activities, 93.31 percent of the proposed

amount of Rs. 1.61 lakhs was utilized.

ii) Sakariya Watershed:- For management component, amount utilized to target was 96.14

percent. Under NRM, for activities related with arable land, non-arable land and DLT,

amount spent was 100 percent of the target. From the total budget of NRM activities, 66

percent was spent for DLT, 33 percent for activities on non-arable and only 1 percent for

activities on arable land. Under FPS, only one activity namely testing and demonstration of

new technologies was undertaken and over 99 percent of targeted amount was utilized.

Under LSS, except providing revolving fund to SHGs, no other activities were carried out

(see table 3.9). On the whole financial achievement was fairly good.

iii) Modak VI Watershed:-Against total project cost of Rs. 16.65 lakhs, an amount of Rs.

13.69 lakhs (82.22 %) was spent. Amount spent on community organization, training to WC,

WA,WDT,SHGs,UGs etc. exposure tours and other capacity building activities was higher

than provision made in strategic plan. However, amount spent on activities undertaken on

arable land was only 24.14 percent of the budgeted amount of Rs 2.90 lakhs. For non-

arable land, it was nearly 30 percent less than targeted amount. The expenditure incurred

on DLT was 184.44 percent of the targeted outlay. Under FPS, only two activities namely

vermi-compost and demonstration and testing of new technologies were undertaken and

hence only 31.35 percent of the allocated amount was utilized. Under LSS activities, only

6.09 percent of allocated amount was utilized (see table 3.10). Thus, overall financial

achievement was better in respect of management components and DLT. It was very poor

for FPS and LSS activities.

iv) Dhar Watershed: - Against total cost of Rs 22.50 lakhs, amount spent on project was

82.73 percent. Expenses incurred for community organization and mobilization, training and

study tours for stakeholders etc. was much lower than targeted. Under management

components only 55.10 percent of targeted amount was utilized. For various activities

Page 149: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

149

carried out under NRM, total expense incurred was Rs. 11.25 lakhs (91.91 %). Under FPS

activities, diversification of production system and testing of new technologies were

undertaken on a large scale. The spending on FPS was 96.79 percent of the targeted

amount. The spending on LSS was only 56.67 percent of the provision made in the project

plan.

6.12 Socio-Economic Characteristics of Sample Households:

i) From the total 320 sample households, more than 82 percent are either ST or SC.

ii) Average family size for beneficiary households ranged from 5.68 in Kirap to 7.58 persons

in Dhar. For non-beneficiary, it was below 6 persons in selected watersheds.

iii) In selected watersheds, about 42.19 percent family members of beneficiary as well as

non-beneficiary households were illiterate. Only 0.78 percent of total members of

beneficiary households had education upto higher secondary and above.

iv) In all selected watersheds, majority of beneficiary as well as non-beneficiary households

had agriculture as principal and dairy/ livestock keeping as subsidiary occupation.

6.13 Major Findings on Impact of NWDPRA:

6.13.1) Operational Land Holding:-The overall size of operational land holding of

beneficiary households for 2006-07 worked out to 2.42 Ha. in Kirap, 2.29 Ha. in Sakariya,

2.55 Ha. in Modak-VI and only 1.45 Ha. in Dhar watershed. For non-beneficiary households,

it worked out to 2.08 Ha. in Kirap, 2.45 Ha. in Sakariya, 3.26 Ha. in Modak-VI and 1.45 Ha.

in Dhar. For each selected watershed, category-wise average size of land holding of sample

households in pre-project year 2001-02 and in year 2006-07 remained almost same.

6.13.2) Net cropped Area (NCA):-In Kirap and Modak VI watershed, the proportion of net

cropped area to size of land holding was 97 percent or more for beneficiary (B) and non-

beneficiary (NB) households. In Dhar, on account of sloppy and hilly soil, nearly 30 %

operational land of B households and 40 % of NB households turned as permanent fallow.

As a result, net cropped area was reduced significantly for B and NB households.

6.13.3) Crop Pattern:

i) Kirap watershed:- In 2006-07, compared to base year 2001-02, B as well as NB

households recorded marginal increase in respect of area under Kharif crops and area

allocation to different crops. The area under rabi crops increased by 3.08 Ha. for B

households and 3.56 Ha. for NB households. Similarly, B registered increase in GCA by

3.72 Ha. and NB by 3.56 Ha. The B households increased the irrigation area by 2.59 Ha. as

against 3.43 Ha. by NB households. This gives clear indication of no role of NWDPRA in

expanding irrigation area in this watershed.

Page 150: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

150

ii) Sakariya watershed: - Compared to base year, B households increased the area

allocation to more remunerative and higher moisture/ water demanding crops such as

soyabean and groundnut in 2006-07. Whereas, in case of NB, it remained nearly stable for

soyabean and declined to some extent for groundnut. In 2006-07, B households increased

area under rabi crops and GCA by about 9 percent. The increase in rabi area and GCA for

NB households was meager. B households were able to put additional area under irrigated

wheat and rapeseed in 2006-07. This clearly indicates that NWDPRA intervention impacted

positively on shifting of crop- pattern and crop-diversification.

iii) Modak-VI watershed: - In crop-pattern, soyabean and maize among Kharif crops and

coriander and wheat among rabi crops occupied the dominant position. As compared to

2001-02, for B households, increase in area under rabi crops and GCA was by 13.60 Ha.

and 18.60 Ha. respectively. Whereas, for NB households, it was only 3.24 Ha. for rabi crops

and 3.56 Ha. for GCA. The B households recorded 91 percent increase in area under

irrigation, whereas, it was only 22.04 percent for NB households (see table 4.8.1, 4.8.2).

Compared to NB households, higher quantum of incremental area under irrigation and GCA

for B clearly demonstrate positive impact of NWDPR activities on irrigation and crop-pattern.

iv) Dhar watershed: - As compared to pre-project year, B households increased area under

rabi crops by 5.26 Ha. in 2006-07 as against 1.51 Ha. by NB households. A similar trend

was witnessed in respect of GCA. In 2006-07, 20.13 percent of Kharif crop area was

irrigated by B households as against only 3.03 percent by NB households. This indicates

positive impact of NWDPRA intervention on irrigation and cropped area.

6.13.4) Cropping Intensity:- In all 4 watersheds, compared to base year 2001-02, cropping

intensity recorded notable increase in 2006-07 for B as well as NB households. However,

this increase in percentage and absolute term was much higher for B households. The

NWDPRA intervention improved the ground water aquifers and soil-moisture which

subsequently helped B households to increase double cropped areas and supplemental

irrigation. This helped B households in enhancing cropping intensity.

6.13.5) Cost of Cultivation:- As compared to 2001-02, the overall average cost of

cultivation per hectare in 2006-07 for beneficiary shows an increase of 58.80 percent in

Kirap, 43.56 percent in Sakariya, 48.29 percent in Modak-VI and 81.97 percent in Dhar

watershed. For non-beneficiary, it ranged between 43.25 percent for Kirap and 86.10

percent for Dhar. The increase in cost of cultivation was mainly due to higher use of costly

inputs such as HYV seeds, fertilizers, higher rate of application of inputs and increase in

input prices. Thus, watershed treatments brought changes in use pattern of inputs and also

Page 151: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

151

enhanced cost of cultivation. In total cost of cultivation, most important items were human

labour, bullock labour and machine labour.

6.13.6) Yield of Crops:- In all the 4 watersheds, compared to base year, B and NB farmers

achieved higher yield for all crops (barring few cases) in 2006-07. In Sakariya, the

incremental yields achieved by B farmers varied from 35.96 percent for gram to 188.46

percent for isabgul. And for NB, it varied from 3.98 percent for gram to 100 percent for

isabgul (table 4.12). In Kirap, for B farmers, it varied from 23.07 percent for Bajra to 58.18

percent for udad. And for NB, it varied from -22.50 percent for gram to 38.74 percent for

jowar. In Modak-VI, yield increment for B households varied from 15.01 percent for

soyabean to 90.02 percent for jowar. In Dhar also, increment in yields (except gram)

obtained by beneficiary households were far superior for each crop as compared to same

for NB. Thus, in all 4 watersheds, NWDPRA had noticeable positive impact on crop-yields.

However, scale of impact varied across watersheds due to variation in soil-climatic

conditions, soil-moisture lavel, terrain, rainfall, input use pattern etc.

6.13.7) Value of Gross Produce:- In all 4 selected watersheds, as compared to base year,

value of gross produce per hectare of cropped area shoot up sharply for both, B and NB

households. Overall, for B farmers, it went up by 73.45 percent in Kirap, 111.21 percent in

Sakariya, 175.62 percent in Modak-VI and 63.92 percent in Dhar watershed. For NB

households, it ranged from 51.92 percent in Kirap to 117.76 percent in Modak-VI. The

significant upsurge in the value of gross produce was mainly due to higher farm harvest

prices and higher yield achievement.

6.13.8) Net Farm Income per Hectare and Output-Input Ratio:-

The table below give details of net farm income and Output-Input Ratio.

Sr. No

Particulars B/ NB

Kirap Sakariya Modak-VI Dhar

01-02

06-07

% change

over 01-02

01-02

06-07

% change

over 01-02

01-02

06-07

% change

over 01-02

01-02

06-07

% change

over 01-02

1 Net Farm Income per Hect. Of GCA (Rs.)

B 15144 27072 78.76 5914 17019 187.77 15331 49428 222.41 10059 15642 55.51

NB 14599 22662 55.23 6231 11985 92.30 13122 31776 142.16 9824 13678 39.23

2 Output-Input Ratio.

B 3.76:1 4.11:1 9.30 2.06:1 3.13:1 51.95 3.72:1 6.92:1 86.02 3.14:1 2.83:1 -9.87

NB 3.62:1 3.84:1 6.08 2.35:1 2.44:1 3.83 3.55:1 4.93:1 39.66 3.15:1 2.61:1 -17.14

Source:- Field Survey.

In all 4 sample watersheds, net farm income per hectare of GCA and output-input

ratio (except Dhar) for beneficiary and non-beneficiary households in 2006-07 were found

much higher than those in 2001-02. Further, net farm income and output input ratio for

beneficiary households was found substantially higher than those for non-beneficiary

Page 152: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

152

households. This suggests quite positive impact of NWDPRA on net return from farm

enterprise.

6.13.9) Annual Net Income per Household:- In selected watersheds, as compared to

2001-02, the average annual net income per household from various sources recorded

impressive increase in 2006-07, for both, B and NB households (table 4.28). For

beneficiary, it was Rs. 25427 in Kirap, Rs. 16068 in Sakariya, Rs. 37270 in Modak-VI and

Rs. 13819 in Dhar. The corresponding numbers for non-beneficiary were Rs. 14489, Rs.

11144, Rs. 25745 and Rs. 10196 respectively. The share increase in the net annual income

per beneficiary households shows positive impact of NWDPRA on livelihood security of

different stakeholders of the watersheds.

6.13.10) Assets per Household:- As compared to non-beneficiary, assets investment per

beneficiary household during 2001-02 to 2006-07 was found higher by Rs. 27260 in Kirap,

Rs. 12638 in Sakariya, Rs. 18281 in Modak-VI and Rs. 20035 in Dhar watershed.

6.13.11) Improvement in water table of wells:- As compared to base year 2001-02, the

average rise in water level in wells during Kharif-2006-07 recorded by beneficiary

households ranged from 7.03 feet in Dhar watershed to 8.55 feets in Kirap watershed (table

4.18). During summer, it ranged from 1.88 feets in Dhar to 2.66 feet in Sakariya watershed.

As compared to non-beneficiary, net increase in water table for beneficiary households was

more than 4.43 feet in Kharif, 1.88 feet in rabi and 0.62 feet in summer season. This clearly

indicates that water conservation technology adopted under NWDPRA proved effective in

improving the groundwater aquifers. Further, this improvement in water table situation eased

the drinking water problems of watershed community to some extent.

6.13.12) Planting of horticulture and agro-forestry trees:- Mango, lemon and amala

were main horticulture plants and Ratanjyot, Neem, Bamboo were important agro-forestry

trees. The survival rate of horticulture plants was found below 50 percent in Dhar, Sakariya

and Kirap. For Neem, Bamboo survival rate was found 47 percent or less.

6.13.13) Adoption of improved farming systems:- In all 4 selected watersheds, as

compared to base year, the proportion of beneficiaries as well as non-beneficiaries who

adopted various improved farming practices is found higher in 2006-07. As compared to NB

households, the adoption rate was found moderately higher for B households which

indicates positive impact of NWDPRA on adoption of improved farm technology.

6.13.14) Livestock, Cattle Grazing and Milk Production:- As expected, in all selected

watersheds, number of milch animals and total number of livestock increased moderately in

2006-07. The NWDPRA activities such as development of pasture land, common land

Page 153: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

153

resources and measures for enhancing fodder production improved fodder availability to

some extent. And, it encouraged beneficiary households to own more milch animals for

meeting domestic milk requirement and cash resources. The average number of stall

feeding days of cattle for beneficiary households increased to some extent in 2006-07. In

each selected watershed, the percentage of beneficiary households reporting increase in

total milk production and productivity of milch animals in 2006-07 has been found

moderately higher than non-beneficiary households. This indicates positive contribution of

NWDPRA in enhancing livestock numbers fodder availability and milk yield (see table 4.23,

4.24)

6.13.15) Farm Employment Generation: - In selected watersheds, requirement of human

labour for farming sector shows noticeable upsurge in 2006-07. Compared to 2001-02,

beneficiary households in 2006-07 generated per Ha./annum additional farm employment of

42 mandays in Kirap and Sakariya, 36 mandays in Modak-VI and 56 mandays in Dhar

watershed. Additional farm employment generation was relatively very low for non-

beneficiary households (see table 4.25).

6.13.16) Out-Migration:- In majority cases, the out-migration was of short duration. In

selected watersheds, average period of out-migration in 2006-07 was somewhat lower for

beneficiary as compared to non-beneficiary households (see table 4.26).

6.13.17) Quality of Life:- The perceptions of beneficiaries indicate that most of the

indicators determining the quality of life are showing positive changes in all the selected

watersheds. Beneficiaries reported moderate improvement in transportation,

communication, educational facilities. They also reported moderate to high positive changes

in respect of farming aspects, irrigation and household income. The impact has been found

positive but somewhat below the expectation in respect of out-migration, availability of

drinking water etc (see table 4.34).

6.14 Perception of Sample Farmers on Activities of NWDPRA:

In selected watersheds, bunding activities, soil-conservation measures on farm,

creation of structures for run off management, water storage and harvesting and drainage

line, testing and demonstration of new technology, livestock management, planting of

horticulture/ agro forestry trees etc. were considered as most relevant and sustainable

activities by more than 85 percent of sample beneficiaries. Further, all watershed farmers

found bunding activities as on arable land most effective in increasing soil-moisture and

recharge of water, reducing soil-erosion and conservation of rain-water. However, due to

average / poor quality of structures, 30 to 40 percent beneficiaries feared that created

Page 154: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

154

structures will be less effective in the years to come. Therefore, proper financial and

administrative arrangement for timely repair and maintenance of these structures is most

important. With regards to different activities of the NWDPRA, 35-50 percent beneficiaries

were found lacking awareness on some aspects/ activities of NWDPRA. Majority farmers

believes that role of UGs is not so effective. All beneficiaries participated/ contributed by way

of “Shramdan” in project activities and avoided financial contribution. Majority of

beneficiaries did not get the chance of participating in training programme, subject tours etc.

Nearly 26 percent beneficiaries believed that selection of participants for training

programme, subject tours, visit to KVK, Krishi Mela etc. is not free from personal favour and

bias. Allmost all sample beneficiaries/ non-beneficiaries believed that NWDPRA is a most

effective multi sectoral programme for developing rainfed areas and by effecting suitable

corrections, it should be replicated on a larger scale in other untreated rainfed areas too.

6.15 Economic Appraisal (BCR, IRR, NPV):

Using 10 percent discount rate, BCR, IRR and NPV have been worked out for 10

and 20 years time horizon. For 10 years horizon, Benefit Cost Ratio (BCR) was 3.50 for

Kirap, 3.82 foe Sakariya, 9.02 for Modak-VI and 1.17 for Dhar watershed. And the Net

Present Value (NPV) was Rs. 51.78 lakhs for Kirap, 60.05 lakhs for Sakariya, 83.11 lakhs

for Modak-VI and 16.17 lakhs for Dhar watershed. The Internal Rate of Return (IRR) was 9

% for Kirap, 62% for Sakariya, 144% for Modak-VI and 23 % for Dhar (see table 5.1). BCR,

IRR and NPV worked out for 20 years horizon are higher than 10 years time horizon. For

each selected watershed, IRR are greater than opportunity cost of capital and BCR are

greater than one which clearly indicates that investment on NWDPRA is economically very

attractive and viable. A positive and high NPV for each sample watershed implies positive

worth of project in generating returns in excess of all costs.

6.16 Constraints in the NWDPRA implementation and suggestions:

The forgoing analysis of secondary data and personal discussion with state/ district/

watershed level project officers, knowledgeable persons of watershed community and

Watershed Committee (WC) etc. clearly revealed presence of some problems/ constraints

which affected the timely and smooth implementation of the NWDPRA.The nature of

constraints observed at different stages of the implementation and suggestions for

elimination of the same are given below:

Page 155: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

155

Sr.

No.

Problems/

Constraints Details of Problems and Suggestions

1 Per Hectare

cost norm of

Rs. 4500/-

(<8% slope)

and Rs.6000/-

(>8% Slope)

is very low.

During X plan period, minimum wage rate per day jumped from Rs.

60/- to 100/-and more. The material cost and hiring cost of skilled

human resources also recorded abnormal increase. Due to these

heavy increase in input cost, the activities undertaken in the mid/ later

phase of the project, failed to meet target. Many works completed at

this stage were found inadequate in size and scale and lacking

desired quality. This ultimately affected the effectiveness and impact

level of such works. In view of this situation, it is desirable to review

cost norm and to fix it at a realistic level (around Rs. 12000-14000/

Ha.). Further, make arrangement to review cost norm regularly at the

interval of every two years or so.

2 Delay in

transfer of

funds at the

grass root

level.

Generally, it is observed that after release of funds by MoA, GoI, it

takes 2-4 months to reach at WC/ WDT. This affects the timely

implementation of the project. Therefore, it is desirable to evolve a

system with fixed time limit to ensure timely transfer of funds to

WC/PIA/WDT.

3 No provision

for survey

and

projectisation

It is necessary to conduct survey at the initial stage of project for

deciding an appropriate location for installation/ construction of water

harvesting structures and type of treatments required to be given

under the project for generating maximum benefits for the watershed

community. Conducting survey and preparation of such project report

requires some expenses. Hence, there is a need for adequate

provision of funds for survey & project work in project budget.

4 Internal

head-wise

reallocation of

development

funds

There is a provision in WJ guidelines for reallocation of the budget to

the extent of 10 percent from one subcomponent to another

subcomponent. In Rajasthan, NRM is very important. The farmers

and herders who are major beneficiaries of NWDPRA demand these

NRM works on a greater scale. There are some sub heads where

there is no scope of work and have surplus funds. Hence, it would be

appropriate to increase reallocation limits from present 10% to 25 %.

Page 156: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

156

5 50%

contribution

under

plantation sub

head is too

high.

In NWDPRA, planting of Agro forestry/ horticulture crops envisage for

50% contribution by participants which is viewed as too high by them

as under similar Haryali project, the same is 10% for general category

and 5% for SC/ST farmers. Therefore, it should be reduced in line

with Haryali guidelines.

6 Less

Allocation of

funds for

NRM works.

In WJ guideline, there is a provision of 50 percent fund for NRM

works. The requirement of funds for NRM works depends upon the

degraded condition, slope and type of land. Looking to the high

proportion of degraded land in many watersheds of Rajasthan, more

fund is needed for NRM works for improving the soil condition and

productivity. Therefore, there is a need to raise the upper limit of the

allocation of fund for NRM works.

7 Inadequate

staff at

implementing

level

The total technical staff (excluding peon, ministrel cadre, class IV

cadre) available with state level nodal agency WDSC is about 700. In

addition to 1128 NWDPRA watersheds, they are looking after other

5000-5500 watersheds of DDP, DPAP, CDP, IWDP etc. Therefore,

on an average, 1 person is looking after about 9 watersheds. Hence,

this most unfavorable staff ratio at implementing level is adversely

impacting the timely and effective implementation of the project.

Therefore, it is better to have a separate agency/ department with

adequate staff strength for better implementation of NWDPRA in the

state.

8 Extension of

capacity

building

phase in 2nd

year also.

In WJ, there is a provision to extend capacity building phase upto

end of first year. However, agency is facing a problem to complete

the capacity building work of different personnel categories in first

year. Therefore, provision of extension of capacity building phase in

2nd year is suggested.

9 State/ District

level project

monitoring is

poor.

State Level Watershed Committee (SLWC) and District Level

Watershed Committee (DWC) were formed as per WJ guidelines.

SLWC is supposed to meet regularly atleast once in six months for

periodic review and monitoring of overall progress of NWDPRA in the

state. Instead of having atleast 10 meetings of SLWC during entire

Page 157: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

157

project period, only 3 meetings were held. This in turn affected the

qualitative level and time schedule of the project activities and overall

project progress. Similar poor situation was observed in case of

district level monitoring by DWC. Hence there is a need to strengthen

the project monitoring system at stat, district, block and watershed

level.

6.17 Conclusion and Policy Implications:

Based on evaluation carried out using field level data, it can be inferred that

NWDPRA holds the key to the development of country‟s vast rainfed areas. The programme

improved the groundwater aquifers as well as in situ moisture level of soil. Further NWDPRA

programme brought very positive changes in respect of irrigation, cropping intensity, crop-

pattern, farm employment, fodder and bio-mass, out-migration, status of land less

households etc. It boost the village economy. The NWDPRA is beneficial but it lacks

certainty regarding its sustainability in future.

Though, it is very difficult to identify a single key factor, improvement in water

availability for irrigation and in situ moisture lead to rise in crop-yields and farm income seem

to be the driving force behind the noticeable performance of NWDPRA.

The study further reveals that quantum of benefits derived were below the expected

level. By effecting necessary corrections to eliminate constraints discussed in forgoing

analysis, benefit level of programme can be raised further. The participation of beneficiaries

was low at the stages of planning, implementation and in village meetings. The awareness

level about project activities was also low to moderate. This call for higher efforts to increase

the people‟s participation at all the stages of programme, decision making process and

particularly activities related to common property resources. Further, additional efforts are

needed to raise the awareness level and building capacity of the stakeholders/ beneficiaries.

Regular arrangement of meetings of WC/ WA will bring more transparency. The regular

interaction between PIA/ WDT/ WC and beneficiaries will be helpful in identify problems and

evolving solution in a participatory ways. Though, NWDPRA have an essential component

of institutional building, but most of the created institutions were found average/ weak in

nature. On FPS, LSS and capacity building activities, WDT/ PIA had paid little attention.

Hence, there is a need for WDT, PIA and WC to give more emphasis on these aspects. The

inclusion/ support of local NGOs in the programme will be helpful in reducing

Page 158: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

158

implementation problems. The effective arrangement of timely repairs and maintenance of

created structures also needed for sustainability of the impact of the programme.

The NWDPRA is economically very attractive and viable and has succeeded in

boosting people‟s empowerment. The goals of upliftment of farming communities of rainfed

areas, equity, employment and food-security would not look distant, if NWDPRA is persued

in earnest. In the years to come, the NWDPRA deserves higher financial allocation and

large scale replication in untreated rainfed areas of Rajasthan and country.

****************The End *******************

Page 159: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

159

Bibliography

1) U.Hemanthakumar, June-2009; “Equity & Livelihood Issues in Watershed

Development: Evidences from Andhra Pradesh” Anvesak, Volume-39, No-1, Jan-

June:-2009, Page. 12.

2) Badal, Pramodkumar and others, june,2006, “ Dimensions & Determinants of

peoples participation in watershed development programes in Rajasthan” Agricultural

Economics Research Review, Jan-June 2006, Vol-19, No-1, January-June 2006.

3) Govind Babu, R.K. Singh and B.Singh, October 2004; “Socio-Economic Impact of

Watershed Development in Kanpur” Agricultural Economics Research Review,

October 2004, Vol-17.

4) D.K.Majmudar & Saikia, July 2006, “Peoples Participation and Constraints in

Watershed Development Programmes” Agricultural Situation in India, July 2006, Vol-

LX III, No-4.

5) Shah V.D & Patel (1996), “Impact of national watershed development project for

rainfed areas (NWDPRA) in Gujarat” A.E.R.C, V.V.Nagar, Gujarat, India.

6) Teri (2007), “Mid-term evaluation of tenth plan watershed implemented under

NWDPRA in Rajasthan” The Energy & Resources Institute, New Delhi.

7) Joshi Deep (2006), “Broadening the scope of watershed development”, Economic

and political weekly, Vol No 27, July.

8) NWDPRA, 2002, “National watershed development project for rainfed areas”, New

Delhi, Department of Agriculture and Cooperation, Government of India.

9) Rao, C.H. Hanumantha (2000), “ Watershed development in India- Recent

experience and emerging issues”, Economic and political weekly, Vol. 35, No. 45,

November, 4.

10) Narayanamoorthy & Kshirsagar (2000), “Rapid Impact Evaluation of NWDPRA in

Maharastra”, AERC, Pune.

11) Singh, Vaidya & Karol, (2007), “Concurrent Evaluation of Micro Management of

Agriculture Scheme in Himachal Pradesh”, AERC, Himachal Pradesh, Shimla.

12) Reddy, Sastry & Singh, (2001), “Watershed Approach for Rural Development”,

Agriculture Situation in India, (Oct, 2001).

13) Sharma R.K, (1996), “Impact of National Watershed Development Project in

Haryana”, AERC, Delhi.

14) Dr. Singh D.V, (1999), “Social Assessment of Phase of Integrated watershed

Development Project (H.P)”, AERC, Himachal Pradesh, Simla.

Page 160: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

160

15) Sharma K.G, (2001), “Impact Evaluation of NWDPRA in Madhya Pradesh”, AERC,

Jabalpur, (M.P).

16) Shah V.D (1999), “Impact of National Watershed Development Project for Rainfed

Areas (NWDPRA) in Gujarat” AERC, V.V.Nagar, Gujarat, India.

17) Purohit S.D, (1994), “Evaluation of National Watershed Development Programme (A

Study of two districts in Rajasthan)”, AERC, Vallabh Vidyanagar, Gujarat.

18) Deshpande & Narayanamoorthy, (1999), “Impact of National Watershed

Development for Rainfed Areas (NWDPRA): An Analysis across States”, AERC,

Pune.

19) “Vital Agriculture Statistics”, (2005), DOA, Rajasthan, Jaipur.

20) “District Statistical outlines”, (2005), DES, GOR, Jaipur.

(Ajmer, Kota, Chittogarh, Udaipur).

21) Shah Amita (2005), “Economic Rational, Subsidy and Cost Sharing in Watershed

Project”, Economic and Political Weekly, (June, 25- July, 1, 2005).

22) Reddy, Das, Sharma, Vishnu Murthy and Ramanarao, (1991), “Watershed

Programme Approach for Dryland Development in India”, Agricultural Situation in

India, (December, 1991).

23) Singh J, Singh P.K, Mahnot and Modi, (1995), “Watershed Approach in Improving

the Socio-Economic Status of Trible Area”, Journal of Rural Development,

Rajendranagar, Hyderabad, (April-June, 1995).

24) Mahnot, Singh P.K and Sharma, (1992), “Socio-Economic Evaluation of Watershed

Management Project- A Case Study”, Journal of Rural Development, Rajendranagar,

Hyderabad, (March, 1992).

25) Majumdar and Saikia, (2006), “People Participation and Constraints in Watershed

Development Programme”, Agricultural Situation in India, MOA, GOI, (July, 2006)

26) Bhatnagar Pradip, (1996), “Growth Potential of Rural Employment Progarmmes-The

Watershed Approach”, Journal of Rural Development, Rajendranagar, Hyderabad,

(April-June, 1996).

27) Arya and Sharma, (1994), “Determinates of People‟s Participation in Watershed

Development and Management- An Exploratory Case Study in Shiwalik Foothill

Village in Haryana”, Journal of Rural Development, Rajendranagar, Hyderabad,

(July-September, 1994).

Page 161: NATIONAL WATERSHED DEVELOPMENT PROJECT FOR RAINFED …€¦ · Shri Hitesh Makwana carefully carried out the data entry work, computerized data processing/ tabulation work with utmost

161

28) Despande R.S, Sharma V.P and Others, “Glimpses of Indian Agriculture-Macro and

Micro aspects, Vol.2”, Academic Foundation in association with MOA, GOI, New

Delhi.

29) Shri Ramulu U.S, (1998), “Management of Water resources in Agriculture”, New age

international (p) Ltd, New Delhi.

30) Raju K.V, Narayanamoorthy and Others, (2004), “State of Indian Farmers-A

Millennium Study, Vol.3”, Dept of Agri. & Co-Op, Govt. of India, New Delhi.

31) “Annual Report”, (2007-08), Dir. of Watershed Development & Soil Conservation,

Govt. of Rajasthan.

32) Shah Amita, (2000), “Watershed Programme- A long way to go”, Economic &

Political Weekly, PP.No.3155-3164.

33) Despande R.S & Rajasekaran, (1995), “Impact of NWDPRA in Maharastra”,

Gokhale Institute of Politics & Economics, Pune.