WASHINGTON UNION STATION’S 2ND CENTURY PLAN: NEAR-TERM CONSTRUCTION OPPORTUNITIES June 8, 2017 | Columbus Club at Washington Union Station
2 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
NATIONAL RAILROAD PASSENGER NETWORK
ABOUT AMTRAK
• Amtrak operates a nationwide rail system:
500+ destinations
21,300 route miles
300+ daily trains
600+ Thruway connections
• Private Corporate carrying out a public mission.
• ~31 million riders, 50% ridership growth since 1998
• $2.14B revenue (+$12M over 2015), covering 94% of operating costs
• Amtrak is the majority owner of the Northeast Corridor mainline from Boston to Washington, D.C.
• 65% of Amtrak trains and 50% of Amtrak riders use the Northeast Corridor
Amtrak’s Revenue Growth Initiative is programmatically improving and
developing its major stations in New York, Philadelphia, Baltimore, Chicago
and Washington, D.C.
3 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
STEWARDS OF UNION STATION
ABOUT USRC
Union Station Redevelopment Corporation (USRC)
Founded in 1983 as stewards of the Station, entrusted to protect the station’s history while working to develop its future.
Board of Directors
USRC Est. 1983 by USDOT
501c3
Federal City Council
Federal Railroad Administration
US Dept. of Transportation
(Chair) Amtrak
District of Columbia
Mayor
4 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
INTRODUCTION: WASHINGTON UNION STATION
5 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
ONE OF THE MOST VISITED DESTINATIONS IN THE WORLD
A BUSY INTERMODAL NEXUS
37 million people pass through Union Station each year, almost 50% more than Reagan, BWI or Dulles Airports.
6 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
WASHINGTON UNION STATION AERIAL
EXISTING STATION AND RAIL YARD COMPLEX
7 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
COMPLEX STATION OPERATIONS
CONTROLLING INTERESTS
HISTORIC STATION: LEASED BY USRC TO USI/JONES
LANG LASALLE
PARKING GARAGE: LEASED BY USRC TO USPG
8 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
VISIONARY PLANNING FOR THE NEXT CENTURY
ADVANCING A BOLD VISION FOR UNION STATION
Washington Union Station’s 2nd Century Plan:
A phased set of both near-term improvements and long-term planning
initiatives to dramatically modernize and expand the station.
2012 Master Plan Vision:
Informs ongoing planning and project implementation
Near-term Improvements
Claytor Concourse Expansion [Amtrak]
Station Operational Rail Improvements
[Amtrak]
Long-term Improvements
Union Station Expansion Project
[FRA/USRC/Amtrak]
Burnham Place Air Rights Development
[Akridge]
The 2nd Century Plan is informed by the 2012 Master Plan which set a vision for both near- and long-term growth goals for the station.
9 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
COLLABORATING ON THE STATION’S FUTURE
2ND CENTURY SPONSORS AND PARTNERS
2ND CENTURY PARTNERS 2ND CENTURY STAKEHOLDERS
Intercity and commuter rail infrastructure owner and operator
Nonprofit station complex landlord and public steward
Owner/developer of air rights project (Burnham Place)
10 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
WORKING TOWARDS A COMPREHENSIVE REDEVELOPMENT
LONG-TERM PLANNING ADVANCES
Washington Union Station Expansion Project Environmental Impact Statement / Master Development Plan:
• FRA lead federal agency with BBB/Grimshaw; Alternatives build upon the 2012 Master Plan Vision
• Includes the footprint of the historic station, terminal rail yard, parking garage and its uses (buses, parking, etc).
• Includes a comprehensive Terminal Infrastructure plan for the rail terminal with consideration for rebuild of H Street Bridge.
Washington Union Station Expansion Project
11 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
READY TO BUILD AT UNION STATION
NEAR-TERM CONSTRUCTION OPPORTUNITIES
CONCOURSE MODERNIZATION PROJECT 2017 Procurement | Project Completion 2021
AMTRAK POLICE DEPARTMENT RELOCATION 2017 Procurement | Project Completion 2019
TRACK 22 REACTIVATION & ADA IMPROVEMENTS 2017/2018 Procurement | Project Completion 2020
SUBASEMENT STRUCTURAL REPLACEMENT TBD Procurement | Project Completion 2022
12 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
NEAR-TERM UNION STATION CONSTRUCTION OPPORTUNITIES
13 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
ALLEVIATE CONGESTION; DOUBLE PASSENGER CAPACITY
CONCOURSE MODERNIZATION PROJECT
1. FIRST STREET LEVEL/BACK OF HOUSE WORK This will provide Amtrak support space on the
First Street Level; Build a new emergency generator and
substation for the building. Funded by Amtrak federal assistance (also
known as “general capital”).
2. NORTH HANGAR RENOVATION Provides needed safety and furnishing
improvements to the structure known as the North Hangar.
The FRA Rail Safety Infrastructure Improvement Grant and its non-federal matching dollars will fund this.
3. CLAYTOR CONCOURSE MODERNIZATION Renovation of the main level of the Claytor
Concourse and construct a new Club Acela for the station.
Funded by the federal RRIF loan for the new train sets.
The comprehensive renovation of Union Station’s rail concourse will support
the introduction of Amtrak’s next-generation high-speed Acela Express Fleet.
14 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
DOUBLING PASSENGER CAPACITY
CONCOURSE MODERNIZATION PROJECT
The expansion of the Claytor Concourse will nearly double passenger capacity when
compared to current condition.
EXISTING CONCOURSE
Conceptual Rendering
15 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
CONCEPTUAL RENDERING
VIEW EAST FROM SBARRO’S
16 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
CONCEPTUAL RENDERING
VIEW FROM TRACKS OF NEW GATES AND LOUNGE
17 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
CONCEPTUAL RENDERING
NEW CLUB ACELA
18 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
ALLEVIATE CONGESTION; DOUBLE PASSENGER CAPACITY
CONCOURSE MODERNIZATION PROJECT
Concourse Modernization Project
Project Partners USRC, FRA, WMATA, USI/JLL Current Consultants Design: KGP/ARUP/Grimshaw Status / Schedule • Final design Fall 2017 • Construction completion 2021
Project Funding Federal RRIF loan and USRC contributions Procurement Timeline • Construction Management
Procurement: Summer 2017
• General Contractor Procurement: Early Fall 2017
Scope Summary
Construction Manager:
• Contracted through a single USRC procurement and funded by Amtrak with Amtrak federal assistance (also known as “general capital” or “GCAP”).
• CM will manage the entire program as the “umbrella” Construction Manager of the program.
General Contractor:
• Contracted through a single USRC procurement
• Will build First Street/BOH, North Hangar Renovations, and the Concourse Modernization Project with separate funding sources
The CM and GC scopes of work will include WMATA's First Street Entrance and North Mezzanine Project as well as an optional task to repair the slab/roof above the north mezzanine.
2017 PROCUREMENT
19 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
NEW REVENUE SERVICE AND ADA ACCESS
TRACK 22 CONSTRUCTION
Project Partners Federal Railroad Administration (FRA) Virginia Railway Express (VRE) Current Consultants Design: AECOM (with LTK) Status / Schedule • 65% design complete • Full design and construction
documents complete by end of summer
• Construction completion 2020
Project Funding Pursuing FRA grant for construction. Procurement Timeline RFP release Summer 2017 pending construction funding.
Scope Summary
• Construct additional revenue track and platform to serve the run through tracks.
• Includes new Americans with Disabilities Act (ADA) compliant vertical circulation from the North Hangar area of the concourse
• Seeking a General Contractor for non-Amtrak performed work and a Construction Manager.
• Specific construction tasks could include: Historic canopy removal and restoration
Track alignment*
Overhead contact system (OCS) work*
Platform rehabilitation
Installation of elevator and escalator
Miscellaneous Work: Utilities, Fire Safety Improvements, HVAC, Security, PIDS
* To be performed by Amtrak forces
TRACK 22 CONSTRUCTION 2017/2018 PROCUREMENT
20 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
NEW REVENUE SERVICE AND ADA ACCESS
TRACK 22 CONSTRUCTION
21 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
MODERN FACILITIES; GAINS IN PASSENGER SPACE
AMTRAK POLICE DEPARTMENT
Project Partners N/A Current Consultants Design: Jacobs Status / Schedule • 95% design complete; Construction
documents mid-Summer 2017 • Construction completion 2019
Project Funding Amtrak General Capital Funds Procurement Timeline
• Construction Management Procurement: RFP released, award shortly
• General Contractor Procurement: Mid-Summer 2017
Scope Summary
• Construction of a new two-story building under the Parking Garage to house the Amtrak Police Department.
• This is the first step in clearing the Concourse area for the Concourse Modernization project.
• Spaces include:
Offices and workstations for Officers and Investigators.
Enlarged Holding cells and support rooms.
Canine Unit with kennels and office spaces.
Large Conference/Training rooms with moveable partitions
Enlarged Locker and Shower facilities.
AMTRAK POLICE DEPARTMENT 2017 PROCUREMENT
22 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
MODERN FACILITIES; GAINS IN PASSENGER SPACE
AMTRAK POLICE DEPARTMENT
The new 10,000 SF facility will feature additional professional space, in addition to Canine Unit space. The relocation of APD provides key passenger space
for the Concourse Modernization Project.
23 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
CRITICAL FOR SOUTHERN CONNECTIVITY
SUBBASEMENT STRUCTURAL REPLACEMENT
Project Partners USRC, FRA, VRE, MARC, AOC, USI/JLL Current Consultants Concept Design: Gensler/AECOM Final Design: Gannet Flemming Status / Schedule • Design to be completed Summer
2019 • Construction completion 2022
Project Funding Design fully funded; Construction funding not yet identified Procurement Timeline TBD based on construction funding
Scope Summary
• Replacement of antiquated subbasement beams, girders and columns with new structural support system.
• Replace existing reinforced concrete slab and waterproof new slab.
• Replace in kind existing ballast and tracks.
• Replace subgrade drainage elements
• Remove, reinstall or replace existing catenary lines and poles and communications/signaling cables and boxes.
Subbasement Structural Replacement TBD PROCUREMENT
24 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
CRITICAL FOR SOUTHERN CONNECTIVITY
SUBBASEMENT STRUCTURAL REPLACEMENT
Replacement of existing antiquated infrastructure which supports the Amtrak run-through rail tunnel below the historic Washington Union Station…
…This rail tunnel connects the Northeast rail corridor to points south and is vital to not only the nation’s economy but also local and regional economy as well.
View of Tracks 26 and 27 heading south into the run through rail tunnel at Washington Union Station.
25 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
RAIL OPERATIONAL IMPROVEMENTS
OTHER NEAR-TERM DESIGN PROJECTS
26 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
NEXT STEPS: PROCUREMENT OVERVIEW
27 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
YOUR BUSINESS IS IMPORTANT TO US
STAY INFORMED
Connect with Amtrak
PROCUREMENT.AMTRAK.COM
NEC.AMTRAK.COM
Connect with USRC
USRCDC.COM/PROCUREMENT-MAILING-LIST/
USRCDC.COM/CATEGORY/RFP
28 | Washington Union Station’s 2nd Century: Near-term Construction Opportunities
THANK YOU FOR YOUR TIME QUESTIONS?