neel engineers and contractors

19
Your STAKE HOLDER in building CLEAN ROOM projects as per NATIONAL and INTERNATIONAL STANDRANDS

Upload: mypresentations-services

Post on 20-Jun-2015

1.207 views

Category:

Business


0 download

DESCRIPTION

NEEL Engineers and Contractors (NEEL) is a contracting firm started by young professional technocrats having more than 10 years of professional experience in the field of project design, selection, project management, project planning, project execution, qualification and validation. We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.

TRANSCRIPT

Page 1: Neel Engineers and Contractors

Your STAKE HOLDER in building CLEAN ROOM projects as per NATIONAL and INTERNATIONAL STANDRANDS

Page 2: Neel Engineers and Contractors

History and Start up

We are a contracting firm started by young professional technocrats. We are taking project on the basis of Cost+ and Design & build concept.

More than 11 years of professional experience in the field of project design, selection, project management, project planning, project

execution, qualification and validation

We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.

Page 3: Neel Engineers and Contractors

History and Start up

Established in March 2011Within 8 months we are worked with 2 MNC clients. M/s Aptar Pharma

and M/s Sandoz & working with 2 Indian clients M/s Celogen Pharma Pvt. Ltd. and M/s Zeiss Pharmaceuticals Pvt. Ltd.

Orders of more than `. 24 million

First Two projects commissioning & Validation completed and client has officially inaugurated facility and started production. Other Two projects are

under design stage.

We are also providing design services to 1 MNC FMCG client i.e. M/s PepsiCo, Punjab for Electrical and Mechanical discipline.

Page 4: Neel Engineers and Contractors

History and Start up

We understand the requirements of present market of Asian Continent and Worldwide

We believe in timely execution of project with Quality

Started three verticals in the firm: Electrical, HVAC and Mechanical Piping & Erection to take project on

turnkey basis.

We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector

Planning to start two more disciplines:Instrumentation and Validation

Page 5: Neel Engineers and Contractors

Executive Profile: Amol D Sainwar

An incisive professional with over 11 years of rich experience in Project activities like design, selection, Erection Commissioning and Maintenance

Bachelor’s Degree in Mechanical Engineering from Nagpur University with 2nd Rank in University with excellent academic background

Work Experience:

President of Social Organization HOPE (Help Our People for Education) since June 2008 for Development of Rural India

Page 6: Neel Engineers and Contractors

Executive Profile: Jitendra Arun Jadhav

Engineering Professional with an experience of 10 years in Pharmaceutical and FMCG green field projects

Work experience: Cipla Ltd, Ajanta Pharma, Titan Lab, B. Mehtalia Consultants Pvt. Ltd.

Projects managed:

Page 7: Neel Engineers and Contractors

Executive Profile: Naveen Kaul

Energetic engineer having B. Tech in Mechanical, 9 years of experience in the field of Marketing and Project Management

Experience in marketing industrial projects and machineries

Executed clean room projects for:

Exhibit products and review competitor’s products in trade shows

Page 8: Neel Engineers and Contractors

Strength in terms of Expertise :

Mechanical Engineer – 3 Nos.

Electrical Engineer – 3 Nos.

Mechanical Piping & HVAC Draftsman – 1 No.

Electrical draftsman – 1 No.

Clean room panel expert – 1 No.

Accounts / Planning – 1 No.

Page 9: Neel Engineers and Contractors

Our Services

HVAC Contracting

Electrical Contracting

Mechanical Piping and

Erection Contracting

TURNKEY Solutions to

Project

Page 10: Neel Engineers and Contractors

TURNKEY SolutionsIntegrated provider of engineering services

Procurement Value Engineering

Time Schedule

Commissioning and Validation

As-built drawings

Project Construction management

Utilities Instrumentation

Clean room Validation

Process

Mechanical

Electrical

Civil

Control Engineering

HVAC

Process Architecture

Building Management System

Design Construction

Page 11: Neel Engineers and Contractors

Projects Handled

Solid Dose Manufacturing Liquid Dose Manufacturing

Small and Large Volume Sterile Products

Novel Product Delivery Systems

Vaccines Production Facilities

Potent Products and Cytotoxic

Packaging API FMCG Chemical Industry

Page 12: Neel Engineers and Contractors

Advantages with us

One point solution for all your project needs

Being experienced and professional technocrats, we understand your project requirements in detail

We provides project planning, monitoring and execution with latest project planning tools

We provide cost effective and quality solutions for all your requirements

We provide solutions by understanding guidelines like Schedule M, cGMP, cGLP, USFDA, ISO, ASHRAE, ISME, OSHA and all

regulatory authorities

Page 13: Neel Engineers and Contractors

Executed Projects

Project Value : `. 16 Million, Duration : 4 Months.

Project Value : `. 2 Million, Duration : 2 Months.

Project Value : `. 1.2 Million, Duration : 2 Months.

Page 14: Neel Engineers and Contractors

Projects under Progress / Pipeline

Z

Page 15: Neel Engineers and Contractors

Scope of HVAC work Double Skin Air Handling Unit’s and Ventilations Systems

Room Data Sheet & Heat load calculations for the system

High side HVAC – Chiller, Cooling tower, Pumps and its control system

Filters: 20µ, 10µ, 5µ, 3µ, 0.3µ as per EU or ISO standards

Design of areas as per Grade D, C , B orISO 8, 7 & 5 as per international guidelines

Dehumidifier with heat recovery wheel & Humidifier

Air distribution i.e. ducting, insulation, damper, fire damper, diffusers & grills

Chilled water, hot water, condenser and refrigerant piping

HVAC Power & Control panel, cabling and instrumentation

Duct able and Hi Wall Split air conditioning unit

Execution of Total low side and high side HVAC projects

Qualification and validation work

Page 16: Neel Engineers and Contractors

Scope of Electrical work HT Work with two pole or four pole structure with CTPT, HT Breaker,

Transformer

Power distribution panel i.e. LTPCC, MCC, MPDB, MLDB, PDB, LDB

HT & LT Cable Schedule and Cable Selection

Lighting calculation and light fixture selection

Earthing and lightening arrester grid Street light and external lighting

Power, LAN, Telephone distribution network

Installation and Commissioning of equipment i.e. Transformer, DG set, UPS etc

Liasoning with Electricity board for load sanction and charging of Transformer, DG Set and other equipment

Execution of Total HT and LT Electrical projects

Page 17: Neel Engineers and Contractors

Scope of Mechanical Piping and Erection workP & ID, Piping Distribution plan, Isometric view and MTO

External and internal pipe rack fabrication and erection

Fabrication and erection of IBR and Non IBR Piping

Fabrication and installation of fire hydrant network

Equipment rigging and installation

Painting to Structure and piping as per Code

Positioning & Installation of Instrumentation

Cold and Hot Insulation with or without cladding

Liasoning with IBR authorities, CCOE approval for tank forms and Fire Inspector approvals

Execution of Total Mechanical piping and erection projects

Page 18: Neel Engineers and Contractors

THANK YOU & HOPE TO BE PART OF YOUR FUTURE PROJECTS

Thanks, Hope to associate with you in your Project Need

NEEL TEAM

Page 19: Neel Engineers and Contractors