Updated 07/28/2015 Printed 09/08/2017 Page 1 of 2 Project No. 45268-B DESIGN AND CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER EMPIRE STATE PLAZA ALBANY, NY 12242 ADDENDUM NO. 2 TO PROJECT NO. 45268 HAZARDOUS MATERIALS WORK PROVIDE EPDM ROOFING AND ABATE HAZARDOUS MATERIALS 8 TH AND 9 TH FLOORS BUILDING NO. 8 STATE OFFICE BUILDING CAMPUS 1220 WASHINGTON AVENUE ALBANY, NY September 8, 2017 NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual. Acknowledge receipt of this Addendum in the space provided on the Bid Form. SPECIFICATIONS 1. Page 011000-2, Subparagraph 1.04 B.1: Delete this Subparagraph in its entirety and replace with the following: “1. Window removals and associated and limited interior removals at the window locations to be removed, including but not limited to induction unit abatement and removal, above- ceiling fireproofing and fireproofing debris removal, and contaminated ceiling system removals, and well as the handling and disposal of PCB-containing sealants associated with windows will be required prior to the lift installation, which is the first item required under the contract for three floors for hoist access.” 2. Page 011000-3, Subparagraph 1.06 A.1.: Delete this Subparagraph in its entirety and replace with the following: “1. All structural connections on the 3rd, 6 th , and 9 th floors for exterior hoist and ACM abatement shall be performed on weekends between the hours of 6:00 pm Friday and 6:00 am Monday, or between the hours of 6:00 pm and 6:00 am Monday thru Friday.” 3. Page 011000-6, Paragraph 1.11 J.: Delete this Paragraph in its entirety and replace with the following: “J. Furniture, cubicles, modular partitions, and portable equipment, which interferes with execution of the Work, will be removed by Facility personnel.”

Upload: others

Post on 10-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group

Updated 07/28/2015

Printed 09/08/2017 Page 1 of 2 Project No. 45268-B

DESIGN AND CONSTRUCTION GROUP

THE GOVERNOR NELSON A. ROCKEFELLER

EMPIRE STATE PLAZA

ALBANY, NY 12242

ADDENDUM NO. 2 TO PROJECT NO. 45268

HAZARDOUS MATERIALS WORK

PROVIDE EPDM ROOFING AND ABATE HAZARDOUS MATERIALS

8TH AND 9TH FLOORS

BUILDING NO. 8

STATE OFFICE BUILDING CAMPUS

1220 WASHINGTON AVENUE

ALBANY, NY

September 8, 2017

NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.

Acknowledge receipt of this Addendum in the space provided on the Bid Form.

SPECIFICATIONS

1. Page 011000-2, Subparagraph 1.04 B.1: Delete this Subparagraph in its entirety and replace with

the following:

“1. Window removals and associated and limited interior removals at the window locations

to be removed, including but not limited to induction unit abatement and removal, above-

ceiling fireproofing and fireproofing debris removal, and contaminated ceiling system

removals, and well as the handling and disposal of PCB-containing sealants associated

with windows will be required prior to the lift installation, which is the first item

required under the contract for three floors for hoist access.”

2. Page 011000-3, Subparagraph 1.06 A.1.: Delete this Subparagraph in its entirety and replace

with the following:

“1. All structural connections on the 3rd, 6th, and 9th floors for exterior hoist and ACM

abatement shall be performed on weekends between the hours of 6:00 pm Friday and

6:00 am Monday, or between the hours of 6:00 pm and 6:00 am Monday thru Friday.”

3. Page 011000-6, Paragraph 1.11 J.: Delete this Paragraph in its entirety and replace with the

following:

“J. Furniture, cubicles, modular partitions, and portable equipment, which interferes with

execution of the Work, will be removed by Facility personnel.”

Page 2: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group

ADDENDUM NO. 2 TO PROJECT NO. 45268 September 8, 2017

Created 05/19/2009

Edited and/or Printed 09/08/2017 Page 2 of 2 Project No. 45268-B

DRAWINGS

4. Drawing No. H-001, GENERAL ABATEMENT NOTES, Note 16: Delete this Note in its

entirety and replace with the following:

“16. REMOVE ALL SPRAY-ON FIREPROOFING AND OVERSPRAY FROM THE

CEILING DECK, STRUCTURAL MEMBERS, PIPING AND DUCTWORK, AND

ALL OTHER SURFACES IN ALL ABOVE-CEILING LOCATIONS. REMOVALS

SHALL INCLUDE ALL PRIMER AND/OR SUBCOAT ASSOCIATED WITH

FIREPROOFING LOCATED BENEATH THE SPRAY-ON FIREPROOFING ON THE

DECK SURFACE OR OTHER SUBSTRATE. SUPPLY AND RETURN

DUCTWORK, OTHER THAN WHICH IS SHOWN TO REMAIN, SHALL BE

REMOVED AND DISPOSED AS ASBESTOS.”

5. Revised Drawings:

a. Drawing Nos. H-101 and H-102 noted “REVISED DRAWING 9/06/2017” accompany

this Addendum and supersede the same numbered originally issued drawings.

END OF ADDENDUM

Margaret F. Larkin

Executive Director

Design and Construction

JRC:jc

Page 3: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group

Project NumberMARK DATE DESCRIPTION

SHEET OF

DRAWING NUMBER:

SHEET TITLE:

APPROVED BY:

FIELD CHECK BY:

DRAWN BY:

DESIGNED BY:

PROJECTNUMBER:

BLDG 8 STATE OFFICE BUILDING CAMPUS1220 WASHINGTON AVE.

ALBANY, NY 12226

NEW YORK STATE OFFICE OFGENERAL SERVICES

45268-BMARK DATE DESCRIPTION

BID DOCUMENTS07/07/2017

DESIGN & CONSTRUCTION

ADDENDUM NO. 209/06/2017

REVISED DRAWING9/06/2017

Page 4: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group

Project NumberMARK DATE DESCRIPTION

SHEET OF

DRAWING NUMBER:

SHEET TITLE:

APPROVED BY:

FIELD CHECK BY:

DRAWN BY:

DESIGNED BY:

PROJECTNUMBER:

BLDG 8 STATE OFFICE BUILDING CAMPUS1220 WASHINGTON AVE.

ALBANY, NY 12226

NEW YORK STATE OFFICE OFGENERAL SERVICES

45268-BMARK DATE DESCRIPTION

BID DOCUMENTS07/07/2017

DESIGN & CONSTRUCTION

ADDENDUM NO. 209/06/2017

REVISED DRAWING9/06/2017