Updated 07/28/2015
Printed 09/08/2017 Page 1 of 2 Project No. 45268-B
DESIGN AND CONSTRUCTION GROUP
THE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZA
ALBANY, NY 12242
ADDENDUM NO. 2 TO PROJECT NO. 45268
HAZARDOUS MATERIALS WORK
PROVIDE EPDM ROOFING AND ABATE HAZARDOUS MATERIALS
8TH AND 9TH FLOORS
BUILDING NO. 8
STATE OFFICE BUILDING CAMPUS
1220 WASHINGTON AVENUE
ALBANY, NY
September 8, 2017
NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.
Acknowledge receipt of this Addendum in the space provided on the Bid Form.
SPECIFICATIONS
1. Page 011000-2, Subparagraph 1.04 B.1: Delete this Subparagraph in its entirety and replace with
the following:
“1. Window removals and associated and limited interior removals at the window locations
to be removed, including but not limited to induction unit abatement and removal, above-
ceiling fireproofing and fireproofing debris removal, and contaminated ceiling system
removals, and well as the handling and disposal of PCB-containing sealants associated
with windows will be required prior to the lift installation, which is the first item
required under the contract for three floors for hoist access.”
2. Page 011000-3, Subparagraph 1.06 A.1.: Delete this Subparagraph in its entirety and replace
with the following:
“1. All structural connections on the 3rd, 6th, and 9th floors for exterior hoist and ACM
abatement shall be performed on weekends between the hours of 6:00 pm Friday and
6:00 am Monday, or between the hours of 6:00 pm and 6:00 am Monday thru Friday.”
3. Page 011000-6, Paragraph 1.11 J.: Delete this Paragraph in its entirety and replace with the
following:
“J. Furniture, cubicles, modular partitions, and portable equipment, which interferes with
execution of the Work, will be removed by Facility personnel.”
![Page 2: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group](https://reader036.vdocument.in/reader036/viewer/2022071213/603f9e8bee1e6b270314147c/html5/thumbnails/2.jpg)
ADDENDUM NO. 2 TO PROJECT NO. 45268 September 8, 2017
Created 05/19/2009
Edited and/or Printed 09/08/2017 Page 2 of 2 Project No. 45268-B
DRAWINGS
4. Drawing No. H-001, GENERAL ABATEMENT NOTES, Note 16: Delete this Note in its
entirety and replace with the following:
“16. REMOVE ALL SPRAY-ON FIREPROOFING AND OVERSPRAY FROM THE
CEILING DECK, STRUCTURAL MEMBERS, PIPING AND DUCTWORK, AND
ALL OTHER SURFACES IN ALL ABOVE-CEILING LOCATIONS. REMOVALS
SHALL INCLUDE ALL PRIMER AND/OR SUBCOAT ASSOCIATED WITH
FIREPROOFING LOCATED BENEATH THE SPRAY-ON FIREPROOFING ON THE
DECK SURFACE OR OTHER SUBSTRATE. SUPPLY AND RETURN
DUCTWORK, OTHER THAN WHICH IS SHOWN TO REMAIN, SHALL BE
REMOVED AND DISPOSED AS ASBESTOS.”
5. Revised Drawings:
a. Drawing Nos. H-101 and H-102 noted “REVISED DRAWING 9/06/2017” accompany
this Addendum and supersede the same numbered originally issued drawings.
END OF ADDENDUM
Margaret F. Larkin
Executive Director
Design and Construction
JRC:jc
![Page 3: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group](https://reader036.vdocument.in/reader036/viewer/2022071213/603f9e8bee1e6b270314147c/html5/thumbnails/3.jpg)
Project NumberMARK DATE DESCRIPTION
SHEET OF
DRAWING NUMBER:
SHEET TITLE:
APPROVED BY:
FIELD CHECK BY:
DRAWN BY:
DESIGNED BY:
PROJECTNUMBER:
BLDG 8 STATE OFFICE BUILDING CAMPUS1220 WASHINGTON AVE.
ALBANY, NY 12226
NEW YORK STATE OFFICE OFGENERAL SERVICES
45268-BMARK DATE DESCRIPTION
BID DOCUMENTS07/07/2017
DESIGN & CONSTRUCTION
ADDENDUM NO. 209/06/2017
REVISED DRAWING9/06/2017
![Page 4: New DESIGN AND CONSTRUCTION GROUP THE GOVERNOR … 02 B.pdf · 2017. 9. 8. · updated 07/28/2015 printed 09/08/2017 page 1 of 2 project no. 45268-b design and construction group](https://reader036.vdocument.in/reader036/viewer/2022071213/603f9e8bee1e6b270314147c/html5/thumbnails/4.jpg)
Project NumberMARK DATE DESCRIPTION
SHEET OF
DRAWING NUMBER:
SHEET TITLE:
APPROVED BY:
FIELD CHECK BY:
DRAWN BY:
DESIGNED BY:
PROJECTNUMBER:
BLDG 8 STATE OFFICE BUILDING CAMPUS1220 WASHINGTON AVE.
ALBANY, NY 12226
NEW YORK STATE OFFICE OFGENERAL SERVICES
45268-BMARK DATE DESCRIPTION
BID DOCUMENTS07/07/2017
DESIGN & CONSTRUCTION
ADDENDUM NO. 209/06/2017
REVISED DRAWING9/06/2017