Page 1: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Ph

oto

s :

©E

DF

Méd

iath

èq

ue -

Ale

xis

Mo

rin

- A

nto

ine

So

ub

igo

u/T

ou

s d

roit

s r

éserv

és.

Am

én

ag

em

en

t F

lam

an

vil

le 3

, C

om

mu

nic

ati

on

.

EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES

Page 2: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Main control room Thursday 23 November: Tests being performed on a chemical and volume control system.

Page 3: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Load tests being performed on the polar crane.

Page 4: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Wednesday 28 November: Commissioning of the first reactor coolant pump (pump

no. 2).

Page 5: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Workers extracting a radiological tool from a main steam system pipe.

Page 6: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Remote monitoring of a grinding operation inside a main steam system pipe.

Page 7: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Workers check that the inside of the reactor coolant system is clean before the start of

cold testing.

Page 8: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Workers installing a gasket inside reactor coolant pump no. 3.

Page 9: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Reactor building Pickling/passivation work inside the emergency core-cooling cavity.

Page 10: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Safeguard buildings Worker performing maintenance on the internals of a safety-injection pump.

Page 11: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Safeguard buildings A maintenance worker replaces anti-friction bearings inside the safety-injection system

motor.

Page 12: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Turbine building Commissioning of the chemical treatment unit.

Page 13: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Pump house Testing of the essential service water system (French acronym: SEC).

Page 14: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Pump house Worker checking the tightness of wall penetration seals in train 1.

Page 15: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site Work on the PARTNER Sud area is nearing completion. By mid-December, all offices and

changing rooms will be occupied.

Page 16: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site Completion of paint work inside the walkway between the operational service centre, the

turbine building and the building leading to the main control room.

Page 17: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site Worker installing cables inside the walkway.

Page 18: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site Work forges ahead on the site’s permanent fences.

Page 19: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site The Flamanville-3 site is now in its final stage of construction. The security turnstiles have

been installed.

Page 20: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site Conformance inspection of floor grating in all the buildings.

Page 21: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

Site

Worker installing electrical connections inside the emergency control centre.

Page 22: New NOVEMBER 2017: THE LATEST NEWS IN PICTURES · 2018. 2. 27. · EPR FLAMANVILLE 3 NOVEMBER 2017: THE LATEST NEWS IN PICTURES . Main control room Thursday 23 November: Tests being

View of the Flamanville-3 EPR construction site – 23 November 2017