new product development module - gap osm · 2019-10-03 · gap osm's npd ( new ......
TRANSCRIPT
![Page 1: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/1.jpg)
New Product Development ModuleGAP OSM's NPD ( New Product Development) module ensures a smooth Design & Development Activity which is based on APQP and simultaneously prepares all the required PPAP documentation.It creates and saves all the documents required for Verification, Validation, Process and Product Monitoring. It also results in a smooth transition from Development to Production.
It keeps a tab on the Product Cost and the Time frame.
1/16
![Page 2: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/2.jpg)
The various Activities covered under NPD module are shown below:-
• Project Initiation
• Projects Listing
• Working on Individual Product
• Function Identification & Study / Quality Function Deployment (QFD)
• Quality Function Deployment (QFD)
• Design Validation Plan (DVP)
• Performance Testing Sheet
• Product Costing Sheet
• Part List with details
• Development Status Review
• Defining the Process Stations with Required Inputs
• Process Flow Chart
• Process FMEA Work Sheet & Print Out
• Special Characteristics Matrix
• Inspection Sheet for Layout
• PDI Sheet ( Pre Despatch Inspection )
• Checking Aids List
• Skills Required and Available Plan
• Skills Development Plan
• Child Part Detailing
• Child Part Raw material details
• Child Part Processing Details
• Child Part Finishing details
• Child Part Control Plans
• Part Submission Warrant
• PPAP Documents
2/16
![Page 3: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/3.jpg)
Project Initiation
Projects Listing
3/16
![Page 4: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/4.jpg)
Working on Individual Product
Function Identification & Study / Quality Function Deployment (QFD)
4/16
![Page 5: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/5.jpg)
Quality Function Deployment (QFD)
Design Validation Plan (DVP)
5/16
![Page 6: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/6.jpg)
Performance Testing Sheet
Product Costing Sheet
6/16
![Page 7: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/7.jpg)
Part List with details
Development Status Review
7/16
![Page 8: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/8.jpg)
Defining the Process Stations with Required Inputs
Process Flow Chart
8/16
![Page 9: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/9.jpg)
Process FMEA Work Sheet
Process FMEA Print Out
9/16
![Page 10: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/10.jpg)
Special Characteristics Matrix
Inspection Sheet for Layout and PDI ( Pre Despatch Inspection )
10/16
![Page 11: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/11.jpg)
Layout Inspection Sheet
PDI Sheet
11/16
![Page 12: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/12.jpg)
Checking Aids List
Skills Required and Available Plan
12/16
![Page 13: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/13.jpg)
Skills Development Plan
Child Part Detailing
13/16
![Page 14: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/14.jpg)
Child Part Raw material details
Child Part Processing Details
Child Part Finishing details
14/16
![Page 15: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/15.jpg)
Child Part Control Plans
Part Submission Warrant
15/16
![Page 16: New Product Development Module - GAP OSM · 2019-10-03 · GAP OSM's NPD ( New ... Verification, Validation, Process and Product Monitoring. It also results in a smooth transition](https://reader033.vdocument.in/reader033/viewer/2022050408/5f851a7a397a8c71ae1abd13/html5/thumbnails/16.jpg)
PPAP Documents
Gilard Application Programmers LLPC-132, Phase VIII,
Industrial Area, Mohali,PUNJAB INDIA
www.gaposm.com
0172-5020510 +91-9888111773
16/16