2007
The pad was poured in late 2006 and in 2007 the lower section was raised by the local high school carpentry crew.
2008
In 2008 museum visitors and local wildlife enjoyed the new structure at the rear of the site.
2008
The roof was installed in the fall of 2008.
2009
In 2009 we learned that the roof would need snow stops
2010
By 2010 the windows and snow stops were installed
2011
2011 saw much activity in behind the cedars. The new porch was added….
2011
and water/electricity were roughed in.
2012
The Services Upgrade (water, sewer, power, communications) was completed in May/June.
2012
The Exterior siding was donated and installed in the summer of 2012
2012
Landscaping work was completed and the site was extended to its legal survey line in the NE corner.
2012
The site was graded and gravel was spread and the equipment was placed
2013
The porch deck was laid and the work on the interior began over the winter
2013
The insulation was completed over the winter.
2013
The interior was dry-walled after the HVAC system was installed.
2013
The exterior doors were painted and installed.
2013
Painting, trim and carpet installation is underway and the fire system components.
2013
The interior finishing upper level includes an Office, Processing Rm, and Archive Rm
2013
The lower level includes a Display space, Washroom, and Utility closet
2013
This project was made possible with funding from Heritage Canada. Seed money was provided by local government and local businesses and members. Thanks to all who have supported this project since 2007.