newcastle university -80 freezer replacement programme and the next steps bob nicholson...

4
Newcastle University -80 freezer replacement programme and the next steps Bob Nicholson [email protected] Daniel O’Connor

Upload: maximilian-shepherd

Post on 30-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Newcastle University -80 freezer replacement programme and the next steps Bob Nicholson Bob.nicholson@ncl.ac.uk Daniel O’Connor

Newcastle University -80 freezer replacement programme and

the next steps

Bob [email protected]

Daniel O’Connor

Page 2: Newcastle University -80 freezer replacement programme and the next steps Bob Nicholson Bob.nicholson@ncl.ac.uk Daniel O’Connor

Replacement Programme 200

• Salix• Questionnaire• 35 freezers were replaced on campus• £180K with a 6 yr payback.

“One example in a survey was drawing 36kw/day. At the time of the project modern freezers only use 15/10 kW/day. At the current time -80 freezer are as efficient as 8kW/yr.“

Page 3: Newcastle University -80 freezer replacement programme and the next steps Bob Nicholson Bob.nicholson@ncl.ac.uk Daniel O’Connor

Going forward

• -20?• Better procurement– Informal arrangements – Life Cycle costs versus capital outlay

• Business continuity– Floods– Air con out of control– Consolidation– Design for BC

Page 4: Newcastle University -80 freezer replacement programme and the next steps Bob Nicholson Bob.nicholson@ncl.ac.uk Daniel O’Connor

Managing Freezer space

• Bob’s lament• Legal practice of tracking samples• Behaviour change• Territorial• Only child syndrome!• Transient population• Anymore?