NewExt

Structure of the final report

1. Executive Summary2. Introduction3. Monetary Valuation of mortality risks4. Valuation of impacts based on the standard-price approach5. Multi-media impact pathways6. Assessment of major accidents7. Revision of external cost estimates8. Conclusions

NewExt

Work Package 6: Revision of External Cost Estimates

IER (5.2 PM), ARMINES (2 PM), VITO (1.5 PM), PSI (1 PM)

Draft Structure

NewExt

Time plan until the end of the project

End of May: Cost statementsAnnual report

Mid of June: All inputs for WP 6 availableEnd of June: Official end of NewExt

WP 2/3/4/5 reportsEnd of August: Final report ready

Technology Implementation PlanFinal Cost Statements

Final Meeting (Brussels?)

NewExt

Key technologies that have been analysed beforewithin the ExternE project:

• Coal fired power plant• Oil fired power plant• Combined-cycle plant using natural gas• Photovoltaic plant• Wind turbine• How do new methodologies affect external cost estimates?

Work Package 6: Revision of External Cost Estimates

NewExt

DIEM workshop /

GreenSense ?

Work Package 6: Revision of External Cost Estimates

• Status ExternE National Implementation

• Status before / without NewExt

• Status including NewExt

Changes due to new valuesapplied according to WP 2/3/4/5

Changes due to parameter, DRF,and database updates etc.

NewExt

Changes by new methods of assessment?

• Monetary Values of mortality• Valuation of impacts based on standard-price • New multi-media impact pathways (real EcoSense extensions)• Major accidents • Calculations within / without EcoSense ? (in the frame of this project)

Work Package 6: Revision of External Cost Estimates

NewExt

NewExt

NewExt

NewExt

NewExt

Comments and conclusions:

NewExt