newext structure of the final report 1.executive summary 2.introduction 3.monetary valuation of...
TRANSCRIPT
NewExt
Structure of the final report
1. Executive Summary2. Introduction3. Monetary Valuation of mortality risks4. Valuation of impacts based on the standard-price approach5. Multi-media impact pathways6. Assessment of major accidents7. Revision of external cost estimates8. Conclusions
NewExt
Work Package 6: Revision of External Cost Estimates
IER (5.2 PM), ARMINES (2 PM), VITO (1.5 PM), PSI (1 PM)
Draft Structure
NewExt
Time plan until the end of the project
End of May: Cost statementsAnnual report
Mid of June: All inputs for WP 6 availableEnd of June: Official end of NewExt
WP 2/3/4/5 reportsEnd of August: Final report ready
Technology Implementation PlanFinal Cost Statements
Final Meeting (Brussels?)
NewExt
Key technologies that have been analysed beforewithin the ExternE project:
• Coal fired power plant• Oil fired power plant• Combined-cycle plant using natural gas• Photovoltaic plant• Wind turbine• How do new methodologies affect external cost estimates?
Work Package 6: Revision of External Cost Estimates
NewExt
DIEM workshop /
GreenSense ?
Work Package 6: Revision of External Cost Estimates
• Status ExternE National Implementation
• Status before / without NewExt
• Status including NewExt
Changes due to new valuesapplied according to WP 2/3/4/5
Changes due to parameter, DRF,and database updates etc.
NewExt
Changes by new methods of assessment?
• Monetary Values of mortality• Valuation of impacts based on standard-price • New multi-media impact pathways (real EcoSense extensions)• Major accidents • Calculations within / without EcoSense ? (in the frame of this project)
Work Package 6: Revision of External Cost Estimates