NIUMINCO GROUP LIMITED ANNUAL GENERAL MEETING 30 NOVEMBER 2015

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

NIUMINCO GROUP LIMITED

ANNUAL GENERAL MEETING 30 NOVEMBER 2015

Page 2: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

Important Information

This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction nor a securities recommendation.

The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions, investors should rely on their own examination of Niuminco Group Limited and consult with their own legal, tax, business and/or financial advisers in connection with any acquisition of securities.

The information contained in this presentation has been prepared in good faith by Niuminco Group Limited. However, no representation or warranty, express or implied, is made as to the completeness or adequacy of any statements, estimates, opinions or other information contained in this presentation.

To the maximum extent permitted by law, Niuminco Group Limited, its directors, officers, employees and agents disclaim liability for any loss or damage which may be suffered by any person through the use of, or reliance on, anything contained in or omitted from this presentation.

Certain information in this presentation refers to the intentions of Niuminco Group Limited, but these are not intended to be forecasts, forward looking statements, or statements about future matters for the purposes of the Corporations Act (Cth, Australia) or any other applicable law. The occurrence of events in the future are subject to risks, uncertainties and other factors that may cause Niuminco Group Limited’s actual results, performance or achievements to differ from those referred to in this presentation to occur as contemplated.

The presentation contains only a synopsis of more detailed information to be published in relation to the matters described in this document and accordingly no reliance may be placed for any purpose whatsoever on the sufficiency or completeness of such information and to do so could potentially expose you to a significant risk of losing all of the property invested by you or incurring by you of additional liability. Recipients of this presentation should conduct their own investigation, evaluation and analysis of the business, data and property described in this document. In particular, any estimates or projections or opinions contained herein necessarily involve significant elements of subjective judgment, analysis and assumptions and you should satisfy yourself in relation to such matters.

The information in this report that relates to exploration results is based on Information reviewed by Ian Plimer (BSc [Hons], PhD) who is a Fellow of the Australasian Institute of Mining and Metallurgy. Professor Plimer is a director of Niuminco Group Limited and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. He consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Page 3: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

CORPORATE OVERVIEW

Board of Directors: Prof. Ian Plimer – Independent Chairman

Tracey Lake – Managing Director

Matthew Roberts – Independent Director

Neill Arthur – Independent Director

Capital Structure:

ASX Code: NIU POMSoX Code: NIU Website: www.niuminco.com.au

Shares on issue 1,413,306,999

No outstanding options

Page 4: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

FINANCIAL YEAR 2015 - REVIEW

• Loss of AUD$197,041 before depreciation & impairment.

• Successful scale-up of mining & gold production at Edie Creek – acquisition of 2nd excavator, bulldozer & 2 additional rod mills/barrels.

• 4th quarter, machinery downtime, water inundation & lower grade ore.

• 36,473g (1,173 oz) gold & 30,716g (988 oz) silver produced from 1526t at avg grade of 23.9g/t.

• Addition of 1800mm x 900mm ball mill to processing circuit in QTR4.

• Successful Wardens’ hearings held in April at Bolobip and May River ELAs.

• Acquisition of drill rigs and commenced drilling at Edie Creek with own rigs and crew.

• Capital raising completed in May in difficult environment.

Page 5: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

OPERATING IN WORLD CLASS GEOLOGICAL PROVINCES

Papua New Guinea Tasmania

• Edie Creek Mine - producing gold & silver. • May River - major copper gold porphyry and

epithermal anomalies. Adjoins Frieda River deposit.

• Bolobip – 60km east of Ok Tedi, a major, drill ready, copper gold porphyry target.

• Aberfoyle tin and tungsten–includes Royal George, Great Pyramid and Lutwyche deposits.

• Old Oonah mine tin/silver deposit.

Page 6: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

EDIE CREEK – AN OPERATING MINE Significant upside – currently mining only 3.2 tonnes and processing 5.6 tonnes of ore per day – with extensive infrastructure in place

Page 7: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

EDIE CREEK Epithermal Gold & Silver

Identified bulk tonnage targets

• High grade Au-Ag veins.

• Lower grade bulk tonnage – a number of bodies with substantial economic potential identified.

• Drilling program expanded.

• Measured scale-up of pilot mining & processing continuing.

Page 8: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

DRILLING – Edie Creek

• Still relatively unexplored: - only 38 drill holes for 6118m since drilling commenced in 1988.

• Extensions of known vein & lode systems.

• Bulk tonnage targets.

• New exploration drilling.

DDH - EDD018

Page 9: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

DRILLING – Edie Creek

Page 10: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

DRILLING – Edie Creek

Drill holes EDD017 & EDD018

Page 11: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

PILOT MINING – Edie Creek

• Developing 4 semi-circular small pits over existing, known vein/lode systems, to

• Extend current mining of medium to high grade vein/lode systems

Page 12: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

PILOT MINING – Edie Creek Plan of Alpha East – Edie Lode Extension Pit

Page 13: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

EDIE CREEK PRODUCTION

Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct

Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76 4.33

Processed Ore 6.15 6.51 5.97 3.98 2.51 4.66 6.45 6.62 6.91 6.85

Grade 19.4 31.36 16.73 10.51 17.98 17.60 7.76 8.89 10.07 6.79

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

G

r

a

d

e

A

v

T

o

n

n

e

s

P

e

r

D

a

y

Av Tonnes per Day of Mined & Processed Ore, and Grade

Page 14: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

PROCESSING – Edie Creek Now Ball mill & amalgam barrels

Page 15: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

PROCESSING – near term

Page 16: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

PROCESSING – the future

Page 17: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

EDIE CREEK PRODUCTION

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

0

50

100

150

200

250

Jul 14 Aug Sep Oct Nov Dec Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct

Au (g)

Ore (t)

Month

Gold produced and ore processed by month

Proc'ed Ore (kg&t)

Au (g)

The challenge to increase production given the lower grade ore from 6.5 tonnes per day to 20 tonnes per day

Breakeven – PNG Operations

Page 18: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

0.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

14000.00

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

March 14 Qtr June 14 Qtr Sep 14 Qtr Dec 14 Qtr Mar 15 Qtr Jun 15 Qtr Sep 15 Qtr

Au (g) Sales in PGK

Quarter

Edie Creek - Quarterly Gold Production & Sales

Au & Ag Sales (K)

Au (g)

EDIE CREEK PRODUCTION

Page 19: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

MAY RIVER - HOTMIN BASE

Niuminco’s base camp acts as a regional exploration base at Hotmin.

Ideal locality in centre of May River Exploration Licence.

Existing airstrip, and major supplies brought in by low-cost river transport.

A major airborne geophysical survey completed.

Airborne VTEM and ZTEM, covering North & South May River completed.

Page 20: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

MAY RIVER – Warden’s hearing

Page 21: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

Frieda River

2bnt Resource

MAY RIVER – ADJOINS FRIEDA RIVER

SKIRASIA DRILLING: 06SK98 109m @ 1.53g/t Au 11SK98 54m @ 1.83g/t Au 93SK001 96m @ 0.89g/t Au UFOU PROSPECTS: 009UF97 11m @ 10.6% Cu, 1.98g/t Au 010UF97 19m @ 11.47% Cu, 2.17g/t Au

Page 22: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

MAY RIVER-structural interpretation

• Frieda River/May River area contains a number of circular type structures - 1km to 20km diameter.

• Some may relate to regional caldera collapse structures and some collapses above porphyry and/or exposed intrusive bodies or diatreme breccia bodies.

• Horse-Ivaal to Nena trend coincides with NE rim of inner structure, Iku to Skirasia trend coincides with SW rim of outer structure.

Page 23: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

BOLOBIP BASE CAMP

A MAJOR COPPER GOLD PORPHYRY TARGET 60KM EAST OF OK TEDI MINE

Page 24: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

BOLOBIP – drill targets

• A multi-phase intrusive complex. 3 drill targets ready to drill.

• Latest data shows coherent 1km diameter copper and gold anomaly.

• Classic geochemical signature of a leached cap above a mineralised copper-gold porphyry system. Extensive surface gold mineralisation in trench channel samples (CRA).

Page 25: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

Focus to remain on the advanced exploration assets:

The Aberfoyle Tin & Tungsten Project; Comprising the Aberfoyle/Lutwyche/Storey’s Creek/Royal George/Great Pyramid tin and tungsten deposits. - current JORC 2012 Inferred Mineral Resources for the Royal George and Great Pyramid deposits.

Drilled Oonah during the year - re-assessment of future exploration.

TASMANIAN PROJECTS

Page 26: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

ABERFOYLE – TIN, TUNGSTEN

Potential underpins TNT’s valuation

Development opportunity

Potential for combined open-cut and underground mine feeding low CAPEX gravity separation plant

Extensive historical data

Page 27: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

GREAT PYRAMID – TIN

Inferred Mineral Resource of 5.2m tonnes @ 0.2% Sn.

Shallow, near surface deposit with low stripping ratio.

Excellent infrastructure and access to site.

Low CAPEX as planned operation is a satellite mine to Aberfoyle.

Page 28: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

ROYAL GEORGE - TIN

• Inferred Mineral Resource of 800,000 tonnes at 0.33% tin for 2640 tonnes of contained tin using a 0.2% cut-off.

• Planned development satellite mine to Aberfoyle deposit.

Page 29: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

2016 – STRATEGY GOING FORWARD

- Measured scale-up of mining & production at EDIE CREEK, through completion of ball mill circuit; and - Development of 4 existing, known vein/lode systems, to achieve - Consistent monthly ore processing & gold production circa 5000g (160 oz), Thereby allowing the Group to: - Continue low cost exploration & extension drilling at EDIE CREEK using own rigs & crew. - Complete low cost drilling of 3 targets at BOLOBIP using own rig & crew. - Confirm drill targets & commence exploration drilling at SOUTH MAY RIVER.

Page 30: NIUMINCO GROUP LIMITED Presentation 2015.pdf · FINANCIAL YEAR 2015 - REVIEW ... Jan 15 Feb Mar Apr May Jun Jul Aug Sep Oct Mined Ore 3.55 3.36 2.99 2.16 1.83 2.62 3.49 4.03 3.76

THANK YOU