nls/augment project philip gust february 16, 2004
TRANSCRIPT
![Page 1: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/1.jpg)
NLS/Augment Project
Philip Gust
February 16, 2004
![Page 2: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/2.jpg)
Project Goals
• Capture most recent version of NLS/Augment and emulation environment
• Resolve ownership/copyright issues and attempt to move NLS/Augment system into public domain; secondary goal to move TOPS/20 from “hobbyists only” to public domain
• Create replicatable and distributable version of NLS/Augment, including full source code
• Collect and index a complete set of system documentation, including design, architecture, implementation, and training
• Where helpful, supplement documentation with captured oral history
• Report to CHS on conservation techniques and issues
![Page 3: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/3.jpg)
Active Members
Current:– Jonathan Chayer
– Philip Gust
– Peter Yim
Prospective:– Ken Harrenstein (PDP-10/TOPS-20 emulation)
– Raylene Pak (NLS system/content expertise)
– Sinya Yamada (NLS content expertise)
![Page 4: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/4.jpg)
Advisory Members
Current:– Doug Engelbart
Prospective:– Christina Engelbart– Jake Feinler– Henry Lowood– Jeff Rulifson
![Page 5: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/5.jpg)
NLS/Augment Environment
Host Operating System (Linux)
Hardware
Emulated Hardware (PDP-10)
Emulated Operating System (TOPS-20)
NLS/Augment
![Page 6: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/6.jpg)
Milestones
– Resolve ownership and get release from Boeing– Create initial snapshot of Doug’s NLS/Augment
environment, expunged of user data and accounts and create installable package
– Create NLS/Augment snapshot that can be installed on clean DEC-10/TOPS-20 system.
– Create new version of NLS/Augment from source that can be installed and rebuilt on clean DEC-10/TOPS-20 system
– Inventory design, operations and training documents available within the NLS/Augment repository and identify missing information
– Collect external design, operations, and training documents; collect oral histories where appropriate
![Page 7: NLS/Augment Project Philip Gust February 16, 2004](https://reader036.vdocument.in/reader036/viewer/2022081809/56649d145503460f949e87aa/html5/thumbnails/7.jpg)
February Tasks
– Initial meeting of current active members, recruit prospective active and advisory members: by 2/28
– Select and set up system for project collaboration: by 2/28
– Initiate discussion with Boeing on releasing NLS/Augment (John Toole/Phil Gust): by 2/28
– Create initial snapshot of Doug’s system (Ken Harrenstein, Raylene Pak, Doug Engelbart): by 3/11